Pressurizer dismantling device and method for heavy water reactor nuclear power plant

The pressurizer dismantling apparatus and method facilitate the extraction of pressurizers from heavy water reactors by using a posture guide unit and rail system, addressing the lack of a polar crane and enhancing safety and efficiency in dismantling operations.

JP7568240B2Active Publication Date: 2024-10-16DOOSAN ENERBILITY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023095614
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2022-10-07
Filing Date
2023-06-09
Publication Date
2024-10-16
Estimated Expiration
2043-06-09

AI Technical Summary

Technical Problem

Heavy water reactor nuclear power plants lack a polar crane, making it difficult to handle and transport large equipment like pressurizers within the containment building.

Method used

A pressurizer dismantling apparatus and method using a posture guide unit with cylinders to stabilize and maneuver the pressurizer, combined with a rail system and lifting mechanism to extract it from the containment building.

Benefits of technology

Enables the safe and efficient dismantling and transport of pressurizers without a polar crane, reducing radiation exposure and providing an effective strategy for handling large equipment in heavy water reactors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007568240000001
    Figure 0007568240000001
  • Figure 0007568240000002
    Figure 0007568240000002
  • Figure 0007568240000003
    Figure 0007568240000003
Patent Text Reader

Abstract

To provide a heavy water nuclear power plant pressurizer dismantling device for dismantling a pressurizer disposed inside a heavy water nuclear power plant.SOLUTION: A heavy water nuclear power plant pressurizer dismantling device for dismantling a pressurizer disposed inside a heavy water nuclear power plant is provided, the dismantling device comprising a posture guiding unit disposed in the vicinity of the pressurizer and connected to the pressurizer to guide movement of the pressurizer, a rail arranged to allow the pressurizer to move toward an exit, and a lifting unit configured to move along the rail and to be operable to lift the pressurizer.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present embodiment relates to an apparatus and method for dismantling a pressurizer of a heavy water reactor nuclear power plant, and more particularly to an apparatus and method for dismantling a pressurizer of a heavy water reactor AC type nuclear power plant for carrying out the pressurizer of the heavy water reactor AC type from a containment building. [Background technology]

[0002] For safe nuclear fission in a nuclear power plant, control rods to adjust the number of neutrons, a moderator to reduce the speed of the neutrons, and a coolant to extract heat to the outside are essential. The coolant also plays a role in transferring thermal energy to the steam generator.

[0003] Depending on the type of moderator used in a nuclear power plant, nuclear reactors are classified as heavy water reactors or light water reactors.

[0004] Two types of nuclear power plants have been built in South Korea: heavy water reactors and light water reactors. Of the 26 nuclear power plants (including Wolsong 1 and Kori 1) built in South Korea, Wolsong 1-4 are the only heavy water reactors. Wolsong 1-4, which are heavy water reactors, were developed in Canada and use heavy water as a coolant. They are also known as CANDU reactors. The remaining 22 nuclear power plants, Hanul, Kori, Saeul, Hanbit, and Shinwolsong (Reactors 1 and 2), are all light water reactors.

[0005] Heavy water reactor nuclear power plants, unlike light water reactor nuclear power plants, do not have polar cranes and are unable to handle large equipment (steam generators, pressurizers, etc.) inside the containment building.

[0006] Furthermore, there have been no cases anywhere in the world where a heavy water reactor nuclear power plant has been dismantled.

[0007] The pressurizer, a component of a heavy water reactor nuclear power plant, is located in a concrete structure with supports, making it even more difficult to handle. Such a pressurizer will be separated from the containment building and transported to the comprehensive waste treatment facility, where it will be dismantled.

[0008] However, in the case of a heavy water reactor pressurizer, since there is no polar crane, a method is needed to dismantle it within the containment building and transport it to the outside. Summary of the Invention [Problem to be solved by the invention]

[0009] SUMMARY OF THE DISCLOSURE Embodiments aim to provide an apparatus and method for removing a heavy water reactor type pressurizer from within a containment building without a power plant crane.

[0010] The problems to be solved by the present invention are not limited to those mentioned above, and other problems not mentioned here will be clearly understood by those skilled in the art from the following description. [Means for solving the problem]

[0011] An embodiment of the present invention provides a heavy water reactor nuclear power plant pressurizer dismantling device for dismantling a pressurizer disposed inside a heavy water reactor nuclear power plant, the apparatus including: a posture guide unit disposed near the pressurizer and connected to the pressurizer to guide movement of the pressurizer; a rail disposed so that the pressurizer moves toward an outlet; and a lifting unit movable along the rail to lift up the pressurizer.

[0012] Preferably, the attitude guide portion includes at least four cylinders.

[0013] Preferably, the posture guide unit includes a support unit, a pair of first cylinders and a pair of second cylinders, and one side end of the first cylinder and the second cylinder are connected to the support unit and the other side end is connected to the pressurizer.

[0014] Preferably, the other end portions of the first cylinder and the second cylinder are disposed so as to face each other across a center line of the pressurizer.

[0015] Preferably, the other end of the second cylinder is disposed above the pressurizer relative to the other end of the first cylinder.

[0016] Preferably, the posture guide portion is characterized in that, when guiding the posture of the pressurizer, the second cylinder operates to contract and the first cylinder operates to extend.

[0017] Preferably, the attitude guide portion may further include a pair of third cylinders disposed symmetrically to the second cylinder.

[0018] Furthermore, another embodiment of the present invention is realized by a method for dismantling a pressurizer of a heavy water reactor nuclear power plant, including a fixing step of fixing a pressurizer arranged inside the heavy water reactor nuclear power plant using a posture guide unit, a cutting step of cutting the fixed pressurizer using a cutting device, a sealing step of sealing the cut pressurizer, a carrying step of transporting the sealed pressurizer using the posture guide unit, and a transporting step of transporting the carried-out pressurizer using rails and a lifting unit.

[0019] Preferably, the position guide unit uses a plurality of cylinders to fix and move the pressurizer.

[0020] Preferably, the cutting device is characterized in that it uses multiple circular saws or multiple laser cutting elements to cut the pressurizer.

[0021] Preferably, the cutting apparatus is characterized in that the circular saw primarily cuts the pressurizer and the laser cutting section secondarily cuts the remaining areas of the pressurizer.

[0022] Preferably, the cutting device is characterized in that it cuts the pressurizer symmetrically.

[0023] Preferably, the posture guide portion includes a support portion, a pair of first cylinders, a pair of second cylinders, and a pair of third cylinders.

[0024] Preferably, the posture guide unit fixes the position of the pressurizer using the second cylinder and the third cylinder in the fixing step.

[0025] Preferably, the posture guide unit is characterized in that in the carrying-out step, the posture guide unit carries out the pressurizer using the first cylinder and the second cylinder.

[0026] Preferably, the posture guide unit is characterized in that, in the unloading step, the second cylinder is positioned adjacent to the pressurizer relative to the first cylinder, and when the pressurizer is unloaded, the second cylinder operates to contract and the first cylinder operates to be stretched.

[0027] Preferably, the carrying out step includes carrying out an upper portion and a lower portion of the pressurizer cut in the cutting step in sequence.

[0028] Preferably, when the lower portion is removed in the removing step, the position of the posture guide portion is inverted and connected to the lower portion.

[0029] Preferably, the sealing step includes inserting a plate between the pressurizers cut in the cutting step, and sealing each of the cut pressurizers by welding.

[0030] Preferably, the transporting step is characterized in that the pressurizer is transported to a lower portion using a crane provided in the lifting section, and the pressurizer is transported via a transport section connected to an end of the pressurizer and rotating and placing the pressurizer. Effect of the Invention

[0031] According to the embodiment, in a heavy water reactor type that does not have a polar crane and no method for handling a pressurizer, it is possible to provide a method for separating the pressurizer from the system and lifting and transporting it, and it is also possible to reduce exposure to workers and provide an efficient method for dismantling large equipment in a heavy water reactor.

[0032] The various and beneficial advantages and effects of the present invention are not limited to the above, but will be more easily understood in the course of describing specific embodiments of the present invention. [Brief description of the drawings]

[0033] [Figure 1] FIG. 2 is a diagram showing the location of a pressurizer in a heavy water reactor nuclear power plant;

[0034] [Diagram 2] FIG. 1 is a diagram showing a pressurizer dismantling device for a heavy water reactor nuclear power plant according to an embodiment of the present invention;

[0035] [Diagram 3] 4 is a flowchart of a method for dismantling a pressurizer of a heavy water reactor nuclear power plant according to another embodiment of the present invention;

[0036] [Figure 4] FIG. 4 illustrates an embodiment of a cutting device used in the cutting step of FIG.

[0037] [Diagram 5] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0038] [Figure 6] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0039] [Figure 7] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0040] [Figure 8] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0041] [Figure 9] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0042] [Figure 10] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0043] [Figure 11] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0044] [Figure 12] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0045] [Figure 13] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0046] [Figure 14] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0047] [Figure 15] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0048] [Figure 16] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0049] [Figure 17] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0050] [Figure 18] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0051] [Figure 19] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0052] [Figure 20] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0053] [Figure 21] FIG. 4 is a diagram showing the overall process of the pressurizer dismantling method for the heavy water reactor nuclear power plant shown in FIG.

[0054] [Figure 22] 4 is a diagram showing an embodiment of a transport step in the method for dismantling a pressurizer for a heavy water reactor nuclear power plant shown in FIG. 3.

[0055] [Figure 23] 4 is a diagram showing an embodiment of a transport step in the method for dismantling a pressurizer for a heavy water reactor nuclear power plant shown in FIG. 3.

[0056] [Figure 24] 4 is a diagram showing an embodiment of a transport step in the method for dismantling a pressurizer for a heavy water reactor nuclear power plant shown in FIG. 3.

[0057] [Diagram 25]4 is a diagram showing an embodiment of a transport step in the method for dismantling a pressurizer for a heavy water reactor nuclear power plant shown in FIG. 3.

[0058] [Figure 26] 4 is a diagram showing an embodiment of a transport step in the method for dismantling a pressurizer for a heavy water reactor nuclear power plant shown in FIG. 3.

[0059] [Figure 27] 4 is a diagram showing an embodiment of a transport step in the method for dismantling a pressurizer for a heavy water reactor nuclear power plant shown in FIG. 3. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0060] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

[0061] However, the technical concept of the present invention is not limited to the embodiments described, but may be realized in various different forms, and one or more of the components in the embodiments may be selectively combined or substituted within the scope of the technical concept of the present invention.

[0062] Furthermore, unless otherwise clearly specified, the terms (including technical and scientific terms) used in the embodiments of the present invention are to be interpreted in the sense that they are commonly understood by a person having ordinary knowledge in the technical field to which the present invention belongs, and the meaning of commonly used terms, such as terms defined in a dictionary, may be interpreted taking into account the contextual meaning of the relevant art.

[0063] In addition, the terms used in the embodiments of the present invention are intended to explain the embodiments and are not intended to limit the present invention.

[0064] In this specification, unless otherwise specified in the text, the singular form can also include the plural form, and when it is described as "A and (and) at least one (or more) of B, C", it can include one or more of all possible combinations of A, B, and C.

[0065] Additionally, terms such as first, second, A, B, (a), (b), etc. may be used to describe components of embodiments of the present invention.

[0066] Such terms are merely used to distinguish a component from other components, and are not intended to limit the nature, order, or sequence of the components.

[0067] Furthermore, when a component is described as being "coupled," "coupled," or "connected" to another component, it includes not only cases in which the component is directly coupled, coupled, or connected to the other component, but also cases in which the component is "coupled," "coupled," or "connected" by another component that is between the component and the other component.

[0068] In addition, when described as being formed or disposed "above or below" each component, above or below includes not only the case where two components are in direct contact with each other, but also the case where one or more other components are formed or disposed between the two components. Furthermore, when expressed as "above or below," it can include not only the meaning of the upper direction but also the meaning of the lower direction based on one component.

[0069] Hereinafter, embodiments will be described in detail with reference to the accompanying drawings. Regardless of the reference numerals, the same or corresponding elements are designated by the same reference numerals, and redundant description thereof will be omitted.

[0070] Figures 1 to 18 clearly show only the main features in order to clearly understand the concept of the present invention, and as a result, various modifications of the illustrations are anticipated, and the scope of the present invention does not need to be limited by the specific shapes shown in the drawings.

[0071] FIG. 1 is a diagram showing the position of a pressurizer 10 in a heavy water reactor nuclear power plant, and FIG. 2 is a diagram showing an apparatus for dismantling the pressurizer 10 of a heavy water reactor nuclear power plant according to an embodiment of the present invention.

[0072] 1 and 2, the apparatus for dismantling a pressurizer 10 of a heavy water reactor nuclear power plant according to an embodiment of the present invention is intended to dismantle a pressurizer 10 disposed inside a heavy water reactor nuclear power plant.

[0073] There is no polar crane in the containment building of a heavy water reactor nuclear power plant. The crane installed in the containment building is located lower than the pressurizer 10, and the pressurizer 10 is located at the end of the crane, making it difficult to access.

[0074] In addition, the pressurizer 10 is supported and installed on supports within a concrete structure, and unlike a steam generator, there is no main support base, making it difficult to dismantle.

[0075] In order to solve the above problems, the present invention provides a dismantling device and a dismantling method for a pressurizer 10 of a heavy water reactor nuclear power plant in order to dismantle the pressurizer 10 and transport it to a comprehensive waste treatment facility in a heavy water reactor nuclear power plant that does not have a polar crane.

[0076] Referring to FIG. 2 , an apparatus for dismantling a pressurizer 10 for a heavy water reactor nuclear power plant according to an embodiment of the present invention may include a posture guide unit 100 , a rail 200 , and a lifting unit 300 .

[0077] The posture guide unit 100 is disposed near the pressurizer 10 and is connected to the pressurizer 10 to guide the movement of the pressurizer 10. The posture guide unit 100 is also used to fix the posture of the pressurizer 10 when the pressurizer 10 is cut off.

[0078] The posture guide unit 100 may include at least four cylinders. In one embodiment, the posture guide unit 100 may include a support unit 110, and a first cylinder 120, a second cylinder 130, and a third cylinder 140, each of which is provided in a pair.

[0079] The support unit 110 is disposed in a concrete structure near the pressurizer 10, and a plurality of cylinders can be connected to the support unit 110. In one embodiment, the support unit 110 is provided in a frame structure, and is provided in a pair to support a plurality of cylinders disposed on both sides of the pressurizer 10. The shape of the support unit 110 is not limited, and various structures and shapes for stably supporting the pressurizer 10 can be used.

[0080] The first cylinder 120, the second cylinder 130 and the third cylinder 140, each of which is provided in a pair, are arranged to face each other and can stably support the pressurizer 10. There is no limitation on the structure of these cylinders, and various known technical configurations such as hydraulic or pneumatic types can be used.

[0081] One end of each of the first cylinder 120 , the second cylinder 130 and the third cylinder 140 is connected to the support 110 , and the other end is connected to the pressurizer 10 .

[0082] At this time, a separate fixing device (not shown) for connecting to the cylinder is connected to the pressurizer 10. The fixing device (not shown) provided in the pressurizer 10 can be connected to the pressurizer 10 to fix the position of the cylinder.

[0083] The first cylinder 120, the second cylinder 130, and the third cylinder 140 connected to the pressurizer 10 are arranged to face each other across the center line of the pressurizer 10 in order to stably support the pressurizer 10.

[0084] The pair of second cylinders 130 and the pair of third cylinders 140 can function to fix the position of the pressurizer 10 in order to cut off the pressurizer 10, and the pair of first cylinders 120 and the pair of second cylinders 130 can function to correct the posture of the pressurizer 10.

[0085] The other end of the second cylinder 130 is disposed above the pressurizer 10 relative to the other end of the first cylinder 120. This is because the pressurizer 10 is rotated by the contraction of the second cylinder 130 and the pulling action of the first cylinder 120 in order to change its position when the pressurizer 10 is transported after being cut.

[0086] To explain the operation of the posture guide unit 100 in detail, the posture guide unit 100 is connected to the pressurizer 10 to fix and guide the movement of the pressurizer 10. First, a fixing device is connected to the pressurizer 10, and after the fixing device is connected, it is connected to the posture guide unit 100.

[0087] The support portion 110 of the posture guide portion 100 is fixedly disposed on a concrete structure near the pressurizer 10 , and the first cylinder 120 , the second cylinder 130 and the third cylinder 140 provided in pairs are connected to the pressurizer 10 .

[0088] At this time, the second cylinder 130 and the third cylinder 140, which fix the posture of the pressurizer 10, are connected to each other to have a symmetrical structure, so that the pressurizer 10 can be stably supported, and the first cylinder 120 and the second cylinder 130 can operate to move the pressurizer 10.

[0089] The first cylinder 120, the second cylinder 130 and the third cylinder 140 can be coupled to the pressurizer 10 in an installable and separable structure as required.

[0090] First, the second cylinder 130 and the third cylinder 140 are connected to the pressurizer 10 and can play a role in fixing the posture when cutting the pressurizer 10. After that, when the pressurizer 10 is cut off, the first cylinder 120 connected to the center of the pressurizer 10 is provided to transport the sealed pressurizer 10, and the third cylinder 140 is removed.

[0091] At this time, the other end of the first cylinder 120 is provided below the other end of the second cylinder 130. In order to transport the pressurizer 10, the second cylinder 130 can perform a contracting operation and the first cylinder 120 can perform a stretching operation. As a result, the second cylinder 130 can perform an operation to lower the support area of ​​the pressurizer 10, and the first cylinder 120 can perform an operation to raise the support area of ​​the pressurizer 10. By combining these operations, the pressurizer 10 can rotate in its original position and move toward the rail 200.

[0092] The rail 200 can move the pressurizer 10 moving through the posture guide unit 100 toward the exit. One side of the rail 200 is disposed on the side of the concrete structure on which the pressurizer 10 is disposed, and the other side is disposed so as to face the exit so that the pressurizer 10 moving along the rail 200 can be discharged from inside the nuclear power plant.

[0093] The structure of the rail 200 is not limited, and various structures that allow the mounted pressurizer 10 to move can be used. In one embodiment, the rail 200 has a conveyor belt structure.

[0094] The lifting unit 300 can move along the rail 200 to lift the pressurizer 10. In one embodiment, the lifting unit 300 can include a support structure provided on the rail 200 and a crane connected to the support structure. The crane refers to a structure capable of raising and lowering the pressurizer 10.

[0095] Meanwhile, a method for dismantling the pressurizer 10 of a heavy water reactor nuclear power plant according to another embodiment of the present invention will be described below with reference to the accompanying drawings, however, the same description as that of the apparatus for dismantling the pressurizer 10 of a heavy water reactor nuclear power plant according to one embodiment of the present invention will be omitted.

[0096] Fig. 3 is a flowchart of a method for dismantling the pressurizer 10 of a heavy water reactor nuclear power plant according to another embodiment of the present invention, Fig. 4 is a diagram showing an embodiment of a cutting device used in the cutting step S200 of Fig. 3, and Figs. 5 to 21 are diagrams showing the overall process of the method for dismantling the pressurizer 10 of a heavy water reactor nuclear power plant shown in Fig. 3. In the explanation of Figs. 3 to 21, the same reference symbols as in Figs. 1 and 2 represent the same members, and detailed explanations will be omitted.

[0097] Referring to FIG. 3, a method for dismantling a pressurizer 10 for a heavy water reactor nuclear power plant according to another embodiment of the present invention may include a fixing step S100, a cutting step S200, a sealing step S300, a carrying out step S400, and a transporting step S500.

[0098] The fixing step S100 is a step of fixing the pressurizer 10 arranged inside the heavy water reactor nuclear power plant using the attitude guide unit 100.

[0099] The posture guide unit 100 can fix or move the pressurizer 10 using a plurality of cylinders, which are components. In one embodiment, the posture guide unit 100 can include a support unit 110 and a first cylinder 120, a second cylinder 130, and a third cylinder 140, each of which is provided in a pair.

[0100] One side of the second cylinder 130 and the third cylinder 140 is connected to the support part 110, and the other side is connected to the pressurizer 10, so that the position of the pressurizer 10 can be fixed. In the fixing step S100, the second cylinder 130 and the third cylinder 140 can have a three-point support structure to stably fix the pressurizer 10, and a pair of cylinders are arranged to face each other with the pressurizer 10 in between, so that the pressurizer 10 can be supported more stably. One side of the second cylinder 130 and the third cylinder 140 is fixed to the support part 110, and is fixed to the support part 110 with a distance wider than the diameter of the pressurizer 10, so that the stability can be increased.

[0101] In the cutting step S200, the pressurizer 10 fixed in the fixing step S100 can be cut using a cutting device. When dismantling a heavy water reactor nuclear power plant, the pressurizer 10 must be carried out using the hatch and airlock that exist in the past. However, since the size of the hatch and airlock cannot be changed, the pressurizer 10 cannot be carried out with its original size, so it must be cut to be carried out.

[0102] Figure 4 shows an embodiment of a cutting device used in the cutting step S200 of Figure 3. Figure 4(a) shows an embodiment of a cutting device that cuts using multiple circular saws 410, Figure 4(b) shows an embodiment of a cutting device that uses multiple laser cutting units 420, and Figure 4(c) shows an embodiment of a cutting device that uses both circular saws 410 and laser cutting units 420.

[0103] Referring to FIG. 4, the cutting device can use multiple circular saws 410 or multiple laser cutters 420 to cut the pressurizer 10 .

[0104] The cutting device may have a plurality of circular saws 410 or laser cutting units 420 arranged symmetrically or at the same angle to cut the pressurizer 10 in order to shorten the operation time.

[0105] Also, when cutting using the laser cutting unit 420, problems may occur if the thickness is excessively large, so as shown in Fig. 4(c), the circular saw 410 and the laser cutting unit 420 are used in parallel. In one embodiment, the cutting device cuts the pressurizer 10 by 1 / 2 of the initial thickness using the circular saw 410, and the remaining 1 / 2 is cut by the laser cutting unit 420 to increase the cutting efficiency.

[0106] The sealing step S300 is a step for sealing the cut pressurizer 10.

[0107] In the sealing step S300, the pressurizers 10 cut in the cutting step S200 can be sealed by welding each of the cut pressurizers 10 using a plate, thereby preventing the diffusion of contaminants inside the cut pressurizers 10.

[0108] In one embodiment, the sealing step S300 may include inserting a metal plate between the cut upper and lower compressors 10 and welding the contacting surfaces using a welding machine to seal the separated compressors 10. The plate used in the sealing step S300 may have various shapes and sizes capable of sealing the opening of the compressor 10, and various known methods for welding metals may be used as the welding method.

[0109] The carrying-out step S400 is a step of carrying out the pressurizer 10 sealed in the sealing step S300 by using the posture guide unit 100.

[0110] The posture guide unit 100 may use the first cylinder 120 and the second cylinder 130 to transport the pressurizer 10 in the transport step S400. As an embodiment, in the posture guide unit 100, the second cylinder 130 is disposed closer to the pressurizer 10 than the first cylinder 120 in the transport step S400, and when the pressurizer 10 is transported, the second cylinder 130 operates to contract and the first cylinder 120 operates to extend, so that the pressurizer 10 can be raised and lowered and rotated at the same time.

[0111] In the carrying-out step S400, the upper part 10a and the lower part 10b of the pressurizer 10 cut in the cutting step S200 can be sequentially carried out. When carrying out the upper part 10a of the pressurizer 10 in the carrying-out step S400, a plurality of cylinders are disposed on the upper part of the support part 110, and when carrying out the lower part 10b of the pressurizer 10, the position of the posture guide part 100 is reversed, a plurality of cylinders are connected to the lower part of the support part 110, and the lower part 10b is lifted up, and then the lower part 10b can be carried out through the same process as carrying out the upper part 10a.

[0112] In the transport step S500, the unloaded pressurizer 10 can be transported to the outside through a hatch and an airlock using the rail 200 or the lifting unit 300. At this time, as shown in Fig. 5(b), the lifting unit 300 is provided on the upper part of the rail in a plurality of units to transport the unloaded pressurizer, and each lifting unit 300 is provided with a crane.

[0113] Hereinafter, a method for dismantling the pressurizer 10 of a heavy water reactor nuclear power plant will be described with reference to FIGS.

[0114] 5 to 9 show steps for carrying out the cut upper portion 10a of the pressurizer 10. FIG.

[0115] When the pressurizer 10 is cut in the cutting step S200, the posture guide unit 100 fixes the pressurizer 10 using the support unit 110, the second cylinder 130, and the third cylinder 140. Thereafter, the cutting device is removed, and the first cylinder 120 of the posture guide unit 100 is attached to the support unit 110.

[0116] 6, the third cylinder of the posture guide unit 100 is removed, and the sealing step S300 is performed. In the sealing step S300, a seal plate is inserted into the upper part 10a and the lower part 10b of the pressurizer 10, and the opening of the separated pressurizer 10 is sealed using a sealing method such as welding.

[0117] 7, the posture guide unit 100 operates the first cylinder 120 and the second cylinder 130 to perform the unloading step S400. In the unloading step S400, the first cylinder 120 is extended and the second cylinder 130 is contracted to rotate the upper portion 10a of the pressurizer 10.

[0118] 8, the upper part 10a of the pressurizer 10 operated by the posture guide unit 100 is operated horizontally to be placed on the rail 200, and at this time, a plurality of cranes installed in the lifting unit 300 and a winch device installed on the opposite side of the lifting unit 300, not shown in the drawing, are connected to the pressurizer 10. The cylinder of the posture guide unit connected to the pressurizer 10 extends to transport the pressurizer 10 to the lifting unit 300 side, and the crane contracts to move the pressurizer to the lifting unit 300 side to place the pressurizer.

[0119] Referring to FIG. 9, as shown in FIG. 9, the product is placed on a rail 200 and connected to a lifting unit 300 to be transported along the rail 200.

[0120] 10 to 18 are diagrams showing a case where the upper structure of the pressurizer 10 is carried out and then the lower structure is carried out.

[0121] 10 to 18, as shown in Fig. 10, after the upper part 10a of the pressurizer 10 is removed, the posture guide unit 100 is reinstalled. At this time, the posture guide unit 100 is repositioned so that the position is reversed and the multiple cylinders face downward.

[0122] Referring to FIG. 11, the lower part 10b of the pressurizer 10 fixed via the posture guide part 100 is lifted upward, and after the lower part 10b is fixed, the first cylinder 120 of the posture guide part 100 is installed at the upper part, as shown in FIG.

[0123] Referring to FIG. 13, after removing the fixing device, the lower pressurizer 10 is lifted up, and after the lower part 10b of the pressurizer 10 is fixed as shown in FIG. 14, the second cylinder 130 and the third cylinder 140 of the posture guide part 100 are provided.

[0124] Thereafter, as shown in FIG. 14, after removing the fixing device, the lower part 10b of the pressurizer 10 is lifted to the top of the concrete support part 110, and as shown in FIG. 16 to FIG. 18, a transporting step S500 is performed in which the lower part 10b of the pressurizer 10 is transported through the same process as the transporting out of the upper part 10a of the pressurizer 10.

[0125] 19 to 21, the pressurizer 10 transported by the progress of the transportation step S500 moves along the rail 200, and after the lifting section 300 moves to the end portion of the rail 200, the pressurizer 10 moves along the crane installed on the lifting section 300 through the hatch.

[0126] Then, a posture guide unit 100 is installed under the hatch, and the cylinder of the posture guide unit 100 is connected to the pressurizer 10 to rotate the pressurizer 10, and then it is carried out through an airlock.

[0127] 22 to 27 are diagrams showing an embodiment of the transport step in the method for dismantling the pressurizer of the heavy water reactor nuclear power plant shown in FIG.

[0128] 22 to 27, the pressurizer 10 transported through the lifting unit 300 passes through the hatch via the crane. At this time, the direction of the pressurizer 10 transported through the transport unit 500 disposed at the bottom can be easily changed.

[0129] The conveying section 500 can include a conveying section main body 510 , a rotation support section 520 , a moving section 530 , and a carriage 540 .

[0130] The conveying unit main body 510 plays a role of supporting the entire structure, and is connected to the rotation support unit 520 at its upper part and the moving unit 530 at its lower part. The shape of the conveying unit main body 510 is not limited, and it can be modified into various structures such as a cylindrical structure or a frame structure.

[0131] The rotating support part 520 may form a groove having a curved surface to support the end of the curved pressurizer 10, and the center of the rotating support part 520 may be rotatably connected to the conveying part body 510 to support the pressurizer 10 that is lowered via the crane 310.

[0132] The moving unit 530 is provided with a plurality of wheels and can move forward and backward according to the moving state of the pressurizer 10. In one embodiment, the moving unit 530 may have a structure in which a plurality of wheels are provided on a frame structure, and may be modified into various structures for supporting the wheels.

[0133] The carriage 540 may play a role in supporting the body of the pressurizer 10 when the pressurizer 10 is placed, and may move while being connected to the moving unit 530. In one embodiment, the carriage 540 may have a curved surface in order to stably support the curved body of the pressurizer 10.

[0134] 22 to 27, an end of the pressurizer 10 passing through a hatch via the crane 310 is connected to the rotary support part 520 of the conveying part 500. At this time, the crane 310 maintains a supporting force coupled with the pressurizer 10, and the pressurizer 10 rotates as the moving part 530 moves. The rotary support part 520 connected to one side of the pressurizer 10 rotates together with the movement of the moving part 530, and the crane 310 moves the rear end of the pressurizer 10 downward.

[0135] Thereafter, when the rotary support 520 rotates 90 degrees, the rear end of the pressurizer 10 is placed on the dolly 540. At this time, since the entire body of the pressurizer 10 is supported by the rotary support 520 and the dolly 540, the connection between the crane 310 and the pressurizer 10 is released, and the conveying unit 500 moves to carry out the pressurizer 10.

[0136] The embodiments of the present invention have been specifically described above with reference to the accompanying drawings.

[0137] The above description is merely an example of the technical idea of ​​the present invention, and a person having ordinary knowledge in the technical field to which the present invention belongs may make various modifications, changes, and substitutions without departing from the essential characteristics of the present invention. Therefore, the embodiments and the accompanying drawings disclosed in the present invention are for the purpose of explanation, not for the purpose of limiting the technical idea of ​​the present invention, and the scope of the technical idea of ​​the present invention is not limited by such embodiments and the accompanying drawings. The scope of protection of the present invention should be interpreted according to the following claims, and all technical ideas within the equivalent range should be interpreted as being included in the scope of the present invention. [Explanation of symbols]

[0138] 10: Pressurizer 10a: Upper part 10b: Lower part 100: Posture guide unit 110: Support part 120: First cylinder 130: 2nd cylinder 140: 3rd cylinder 200: Rail 300: Pulling section 310: Crane 410: Circular saw 420: Laser cutting section 500: Transport section 510: Transport unit main body 520: Rotation support part 530: Mobile Division 540: Cart

Claims

1. A pressurizer dismantling device for a heavy water reactor nuclear power plant for dismantling a pressurizer installed inside the heavy water reactor nuclear power plant, a posture guide unit that is disposed near the pressurizer, is connected to the pressurizer, and guides the movement of the pressurizer, fixes the posture of the pressurizer when the pressurizer is disconnected, and rotates the pressurizer after the pressurizer is disconnected; a rail on which the pressurizer is disposed to move toward an outlet; A lifting unit that moves along the rail and can lift up the pressurizer; Pressurizer dismantling equipment for heavy water reactor nuclear power plants.

2. 2. The apparatus for dismantling a pressurizer for a heavy water nuclear power plant according to claim 1, wherein the attitude guide unit includes at least four cylinders.

3. A pressurizer dismantling device for a heavy water reactor nuclear power plant for dismantling a pressurizer installed inside the heavy water reactor nuclear power plant, a position guide unit that is disposed near the pressurizer, includes at least four cylinders, and is connected to the pressurizer to guide the movement of the pressurizer; a rail on which the pressurizer is disposed to move toward an outlet; A lifting unit that moves along the rail and can lift up the pressurizer; Pressurizer dismantling equipment for heavy water reactor nuclear power plants.

4. The posture guide unit includes a support unit, a pair of first cylinders, and a pair of second cylinders, 4. The apparatus for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 2, wherein one side end of each of the first cylinder and the second cylinder is connected to the support and the other side end is connected to the pressurizer.

5. 5. The apparatus for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 4, wherein the other end portions of the first cylinder and the second cylinder are disposed so as to face each other across a center line of the pressurizer.

6. 6. The apparatus for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 5, wherein the other end of the second cylinder is disposed above the pressurizer relative to the other end of the first cylinder.

7. When guiding the posture of the pressurizer, the posture guide portion 5. The apparatus for dismantling a pressurizer for a heavy water nuclear power plant according to claim 4, wherein the second cylinder is operated to contract and the first cylinder is operated to extend.

8. 5. The apparatus for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 4, wherein the attitude guide unit further comprises a pair of third cylinders arranged symmetrically with the second cylinders.

9. a fixing step of fixing the pressurizer disposed inside the heavy water reactor nuclear power plant using a posture guide unit; a cutting step of cutting the fixed pressurizer using a cutting device; a sealing step of sealing the cut pressurizer; a carrying-out step of carrying out the sealed pressurizer by using the posture guide unit; a conveying step of conveying the conveyed pressurizer using a rail and a lifting unit; A method for dismantling a pressurizer of a heavy water reactor nuclear power plant.

10. 10. The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 9, wherein the attitude guide unit uses a plurality of cylinders to fix and carry out the pressurizer.

11. The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 9, wherein the cutting device cuts the pressurizer using a plurality of circular saws or a plurality of laser cutting units.

12. The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 11, wherein the cutting device includes a circular saw that primarily cuts the pressurizer, and a laser cutting unit that secondarily cuts the remaining area of ​​the pressurizer.

13. The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 11, wherein the cutting device cuts the pressurizer symmetrically.

14. The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 10, wherein the attitude guide unit includes a support unit, a pair of first cylinders, a pair of second cylinders, and a pair of third cylinders.

15. The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 14, wherein the posture guide unit fixes the position of the pressurizer using the second cylinder and the third cylinder in the fixing step.

16. The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 14, wherein the attitude guide unit uses the first cylinder and the second cylinder in the carrying-out step to carry out the pressurizer.

17. In the carrying-out step, the posture guide unit The second cylinder is disposed adjacent to the pressurizer more adjacently to the first cylinder, The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 14, wherein, when the pressurizer is removed, the second cylinder is operated to contract and the first cylinder is operated to extend.

18. 10. The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 9, wherein the carrying out step carries out an upper part and a lower part of the pressurizer cut in the cutting step in sequence.

19. When the lower portion is discharged in the discharge step, The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to claim 18, wherein the position of the attitude guide part is inverted and connected to the lower part.

20. 10. The method for dismantling pressurizers for a heavy water reactor nuclear power plant according to claim 9, wherein the sealing step includes inserting a plate between the pressurizers cut in the cutting step, and sealing each of the cut pressurizers by welding.

21. The transport step includes:

21. The method for dismantling a pressurizer for a heavy water reactor nuclear power plant according to any one of claims 9 to 20, further comprising the steps of: transporting the pressurizer to a lower portion using a crane provided on the lifting section; and transporting the pressurizer via a transport section connected to an end of the pressurizer for rotating and placing the pressurizer.

Citation Information

Patent Citations

  • Apparatus for transferring cut and disassembled block

    JP1987220660A

  • Method for replacing nuclear reactor pressure vessel

    JP2005308625A

  • Demolition method and demolition device

    JP2018145622A

  • Method of handling reactor vessel

    WO2001063622A1