Heat source equipment
The system optimizes energy use in heat source equipment by using dedicated cooling paths and temperature-based mode switching to efficiently cool heat load devices with different temperature needs, reducing energy consumption through selective free cooling and refrigeration.
Patent Information
- Application Number
- JP2020200055
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-02
- Publication Date
- 2024-10-17
- Estimated Expiration
- 2040-12-02
AI Technical Summary
Existing heat source equipment fails to efficiently utilize free cooling for heat load devices with different required temperatures, leading to increased energy consumption.
A system with dedicated cooling water and cold water circulation paths for each heat load device, allowing for selective use of free cooling and refrigeration, and operation mode switching based on temperature ranges to optimize energy use.
Reduces energy consumption by pre-cooling return cold water with free cooling paths and supplying cooled water directly from the cooling tower, ensuring efficient cooling of heat load devices with varying temperature requirements.
Smart Images

Figure 0007569210000001 
Figure 0007569210000002 
Figure 0007569210000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a heat source facility that utilizes cooling water cooled in a cooling tower. [Background technology]
[0002] In heat source equipment such as that described above, a chiller is provided that generates cold water using cooling water cooled in a cooling tower, and the cold water from the chiller is supplied to heat load equipment where processing is carried out using the cold heat contained in the cold water (see, for example, Patent Document 1).
[0003] In the facility described in Patent Document 1, a pre-cooling heat exchanger is provided on the return path from the heat load equipment to the chiller, and cooling water cooled in a cooling tower can be supplied to the pre-cooling heat exchanger. The operation control unit is configured to be able to switch the operation mode between a free cooling use mode in which the load-side heat medium is cooled in the pre-cooling heat exchanger and the cooled load-side heat medium is further cooled by the chiller, a chiller only use mode in which the load-side heat medium is cooled by the chiller while the cooling of the load-side heat medium in the pre-cooling heat exchanger is stopped, and a free cooling mode in which the load-side heat medium is cooled to the required temperature of the load side only by cooling in the pre-cooling heat exchanger while the chiller is stopped. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 4311924 Summary of the Invention [Problem to be solved by the invention]
[0005] In the equipment described in Patent Document 1, in addition to a chiller-only mode, the operating modes of the heat source equipment that supplies cold heat to heat load equipment include a free cooling utilization mode and a free cooling mode, thereby making the most of free cooling and achieving energy savings in the heat source equipment.
[0006] Incidentally, there are many different types of heat load equipment that are provided as targets for cold heat supply in heat source equipment, and for example, there are cases where two types of heat load equipment with different required temperatures are provided. However, Patent Document 1 does not describe how to utilize free cooling to reduce energy consumption when two types of heat load equipment with different required temperatures are provided.
[0007] In view of this situation, the main objective of the present invention is to reduce the amount of energy consumed to cool the cold water in the chiller while ensuring the required amount of cold energy for each heat load device by appropriately utilizing free cooling in a heat source facility that supplies cold energy to two types of heat load devices with different required temperatures. [Means for solving the problem]
[0008] A first characteristic configuration of the present invention is a cooling water circulation path that circulates cooling water cooled in a cooling tower between the cooling tower and a chiller; a first cold water circulation path that circulates cold water cooled by the refrigerator using the cooling water between the refrigerator and a first heat load device; a second cold water circulation path that circulates the cold water between a second heat load device having a lower available temperature for free cooling than the first heat load device and the chiller; a first free cooling path that circulates the cooling water between a heat exchange unit provided in a return path from the first heat load device to the chiller in the first chilled water circulation path and the cooling tower, thereby enabling cooling of the return chilled water from the first heat load device to the chiller in the heat exchange unit; A second free cooling path is provided to circulate the cooling water between the cooling tower and the second heat load device, thereby enabling the cooling water to be directly supplied to the second heat load device; The second heat load device includes a first cooling coil to which the cold water is supplied, and a second cooling coil to which the cold water or the cooling water is supplied, the first cold water circulation path and the second cold water circulation path are connected in parallel to the chiller, and the cold water from the chiller can be supplied to the first cold water circulation path and the second cold water circulation path; The operation mode is a mode in which the chilled water cooled by operating the refrigerator is supplied to the first chilled water circulation path and the second chilled water circulation path. Branching outan operation control unit that switches between a first free cooling combined mode in which the cooling water is circulated through the first free cooling path in a circulation state and a second free cooling combined mode in which the cooling water is circulated through the first free cooling path and the second free cooling path in the circulation state; In the second free cooling combined mode, the cold water is supplied to the first cooling coil and the cooling water is supplied to the second cooling coil. It is at the point.
[0009] According to this configuration, in the first free cooling combined mode, in addition to supplying the cold water cooled by the refrigerator to the first heat load device and the second heat load device to cool both heat load devices, the return cold water after the cold energy is consumed by the first heat load device can be pre-cooled with the cold energy of the cooling water circulating through the first free cooling path before being cooled by the refrigerator. This makes it possible to reduce the amount of energy consumed to cool the return cold water by the refrigerator, compared to when the return cold water after the cold energy is consumed is cooled only by the refrigerator.
[0010] In addition, in the second free cooling combined mode, the second heat load equipment can be supplied with both the chilled water cooled by the refrigerator and the cooling water cooled by the cooling tower. This makes it possible to reduce the amount of cold energy consumed from the chilled water while ensuring the amount of cold energy required by the second heat load equipment, compared to the case where only the chilled water cooled by the refrigerator is supplied to the second heat load equipment, and therefore reduces the amount of energy consumed to cool the chilled water by the refrigerator.
[0011] Furthermore, since a dedicated free cooling path is provided for each of the first and second heat load equipment, which have different available free cooling temperatures, free cooling can be used appropriately for each heat load equipment without being limited to the lower available free cooling temperature, as would be the case if a shared free cooling path were provided.
[0012] A second characteristic configuration of the present invention is that the operation control unit switches the operation mode to a first free cooling combination mode when, based on the temperature of the cooling water after cooling by the cooling tower, the temperature of the cooling water is below a first set temperature at which the free cooling can be used for the first thermal load equipment and is within a temperature range exceeding a second set temperature at which the free cooling can be used for the second thermal load equipment, and switches the operation mode to a second free cooling combination mode when the temperature of the cooling water is below the second set temperature.
[0013] According to this configuration, the operating mode of the heat source equipment can be appropriately switched based on the temperature of the cooling water, thereby making it possible to more appropriately reduce the energy consumption of the chiller while ensuring the amount of cold heat required by each heat load device.
[0014] A third characteristic configuration of the present invention is that the second heat load device is Cooling air with the first cooling coil and the second cooling coil; The second cooling coil is disposed upstream of the first cooling coil in the air flow direction. Points is located.
[0015] According to this configuration, in the second free cooling combined mode, the cold water cooled by the refrigerator is supplied to the first cooling coil, and the cold water cooled by the cooling tower is supplied to the second cooling coil, so that the air to be cooled can be pre-cooled by the cold water supplied to the second cooling coil, and then cooled by the cold water supplied to the first cooling coil. This makes it possible to reduce the amount of cold energy consumed from the cold water in the first cooling coil while ensuring the cooling performance of the air conditioner, and to reduce the amount of energy consumed to cool the cold water in the refrigerator.
[0016] In a fourth characteristic configuration of the present invention, the operation control unit is configured to control the temperature of the cooling water to The free cooling can be used for the second heat load equipment.When the temperature is equal to or lower than a third set temperature, which is the required temperature of the second heat load equipment and is lower than the second set temperature, the operating mode is switched to a free cooling mode in which the cooling water is circulated through both the first free cooling path and the second free cooling path with at least the operation of the chiller being stopped.
[0017] According to this configuration, in the free cooling mode, the return cold water after the cold energy is consumed by the first heat load equipment can be lowered to the temperature required by the first heat load equipment by heat exchange with the cooling water circulating through the first free cooling path in the heat exchanger. Also, the cooling water cooled to a third set temperature (required temperature of the second heat load equipment) or lower in the cooling tower can be supplied to the second heat load equipment. As a result, in the free cooling mode, the amount of cold energy required by each heat load equipment can be secured only by the cold energy contained in the cooling water from the cooling tower, without consuming energy in the chiller. [Brief description of the drawings]
[0018] [Figure 1] FIG. 1 is a diagram showing a schematic configuration of a cooling water circuit and a chilled water circuit in a heat source facility in a normal mode. [Diagram 2] A diagram showing the schematic configuration of the cooling water circuit and the chilled water circuit in the first free cooling combined mode on the high temperature side in the heat source equipment. [Diagram 3] A diagram showing the schematic configuration of the cooling water circuit and the chilled water circuit in the first free cooling combined mode on the low-temperature side in the heat source equipment. [Figure 4] A diagram showing the schematic configuration of the cooling water circuit and the chilled water circuit in the second free cooling combined mode in the heat source equipment. [Diagram 5] A diagram showing the schematic configuration of the cooling water circuit and the chilled water circuit in free cooling mode in the heat source equipment. [Figure 6] A flowchart showing the operation mode switching operation by the operation control unit. [Figure 7] A diagram showing a part of the cooling water circuit and the cold water circuit in the heat source equipment. [Figure 8] A diagram showing a part of the cooling water circuit and the cold water circuit in the heat source equipment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a heat source facility according to the present invention will be described with reference to the drawings. As shown in Fig. 1, this heat source equipment 1 is equipped with a cooling tower 2 and a chiller 3 that produces cold water using the cooling water produced in the cooling tower 2, and is equipment for using the cooling water produced in the cooling tower 2 and the chiller 3. The cooling water produced in the cooling tower 2 and the chiller 3 are supplied to heat load equipment such as first heat load equipment 4, 5 and second heat load equipment 6, and the heat load equipment performs cold heat utilization processes such as cooling an object to be cooled and cooling a space to be air-conditioned.
[0020] 1 to 5 show the schematic configuration of the cooling water circuit and the chilled water circuit in the heat source equipment 1, and show the same circuit configuration. In Fig. 1 to Fig. 5, since the parts through which the cooling water and the chilled water flow are different, the parts through which the cooling water and the chilled water flow are indicated by thick lines, and the parts through which the cooling water and the chilled water do not flow are indicated by thin lines.
[0021] One or more cooling towers 2 and chillers 3 may be provided. Fig. 1 shows a schematic diagram of a case where a plurality of units (e.g., three units) are provided. For example, when a plurality of units are provided, a plurality of cooling towers 2 can be connected in parallel, and a plurality of chillers 3 can be connected in parallel.
[0022] A wide variety of devices can be used as the heat load devices, but two types of heat load devices, namely, first heat load devices 4 and 5 and second heat load device 6, which have different required temperatures for performing cold heat utilization processing, are provided. The required temperatures of the first heat load devices 4 and 5 are set to a higher temperature than that of the second heat load device 6.
[0023] For example, the first heat load devices 4 and 5 are configured as cooling devices for cooling electronic devices and information processing devices, etc., which are objects to be cooled. The first heat load devices 4 and 5 are also provided with two types of devices, the high-temperature side first heat load device 4 (for example, the required temperature is set to 28°C) and the low-temperature side first heat load device 5 (for example, the required temperature is set to 18°C), which have different required temperatures for cooling the objects to be cooled. The second heat load device 6 is configured as an air conditioner (for example, the required temperature is set to 14°C) that performs air conditioning such as cooling of the air-conditioned space, which is the room in which the electronic devices and information processing devices are installed. The second heat load device 6 is provided with a first cooling coil 6a and a second cooling coil 6b that cool the air. The second cooling coil 6b is arranged upstream of the first cooling coil 6a in the air flow direction (upstream of the air flow direction, see the arrow in FIG. 1).
[0024] The cooling water (cooled cooling water) generated in the cooling tower 2 is branched into a plurality of flow paths or merged into a plurality of flow paths using the first header H1 and the second header H2, and is configured to be circulated and supplied to various devices such as the chiller 3, the heat exchange units 7 and 8, and the second heat load device 6. As flow paths for circulating and supplying the cooling water generated in the cooling tower 2 to the various devices, a cooling water circulation path 11 for circulating the cooling water between the cooling tower 2 and the chiller 3, first free cooling paths 12 and 13 for circulating the cooling water between the cooling tower 2 and the heat exchange units 7 and 8, and a second free cooling path 14 for circulating the cooling water between the cooling tower 2 and the second heat load device 6 are provided.
[0025] The chilled water (cooled chilled water) generated in the chiller 3 is branched into a plurality of flow paths or merged into a plurality of flow paths using the third header H3 and the fourth header H4, so that it can be circulated and supplied to various devices such as the first heat load devices 4, 5 and the second heat load device 6. As flow paths for circulating and supplying the chilled water generated in the chiller 3 to the various devices, first chilled water circulation paths 15, 16 for circulating the chilled water between the chiller 3 and the first heat load devices 4, 5 and second chilled water circulation paths 17, 18 for circulating the chilled water between the chiller 3 and the second heat load device 6 are provided.
[0026] Each flow path will now be described. (Cooling water circulation path) The cooling water circulation path 11, which circulates the cooling water between the cooling tower 2 and the chiller 3, includes a first flow path R1 that supplies the cooling water from the cooling tower 2 to the first header H1, a second flow path R2 that branches off at the first header H1 and supplies the cooling water from the first header H1 to the chiller 3, a third flow path R3 that supplies the cooling water from the chiller 3 to the second header H2, and a fourth flow path R4 that merges at the second header H2 and supplies the cooling water from the second header H2 to the cooling tower 2. The first flow path R1 and the second flow path R2 form a forward path that supplies the cooling water from the cooling tower 2 to the chiller 3, and the third flow path R3 and the fourth flow path R4 form a return path that returns the cooling water from the chiller 3 to the cooling tower 2.
[0027] The first flow path R1 is provided with a first pump P1 for supplying cooling water from the cooling tower 2 to various devices from the upstream side in the flow direction of the cooling water, and a first flow rate detection unit F1 for detecting the flow rate of the cooling water, and the first header H1 is provided with a first temperature detection unit T1 for detecting the temperature of the cooled cooling water supplied from the cooling tower 2. The second flow path R2 is provided with a second pump P2 for supplying cooling water to the chiller 3, and the third flow path R3 is provided with a second flow rate detection unit F2 for detecting the flow rate of cooling water returned to the cooling tower 2.
[0028] (1st cold water circulation path) The first cold water circulation paths 15, 16 circulate cold water between the chiller 3 and the first heat load equipment 4, 5. Since the first heat load equipment 4, 5 includes a first heat load equipment 4 on the high temperature side and a first heat load equipment 5 on the low temperature side, a first cold water circulation path 15 on the high temperature side and a first cold water circulation path 16 on the low temperature side are provided.
[0029] The first cold water circulation path 15 on the high temperature side is provided with a fifth flow path R5 that supplies cold water from the chiller 3 to the third header H3, a sixth flow path R6 that branches off at the third header H3 and supplies cold water from the third header H3 to the first heat load device 4 on the high temperature side, a seventh flow path R7 that supplies cold water from the first heat load device 4 on the high temperature side to the fourth header H4, and an eighth flow path R8 that joins at the fourth header H4 and supplies cold water from the fourth header H4 to the chiller 3. The fifth flow path R5 and the sixth flow path R6 form a forward path that supplies cold water from the chiller 3 to the first heat load device 4 on the high temperature side, and the seventh flow path R7 and the eighth flow path R8 form a return path that returns cold water from the first heat load device 4 on the high temperature side to the chiller 3.
[0030] The fifth flow path R5 is provided with a third pump P3 for supplying cold water from the chiller 3 to various devices. The sixth flow path R6 is provided with a second temperature detection unit T2 for detecting the temperature of cold water supplied to the first heat load device 4 on the high temperature side from the upstream side of the cold water flow direction, and a fourth pump P4 for supplying cold water to the first heat load device 4 on the high temperature side. The seventh flow path R7 is provided with a high temperature side heat exchange unit 7, a first control valve D1 for turning on and off the supply of cold water to the high temperature side heat exchange unit 7, and a third flow rate detection unit F3 for detecting the flow rate of cold water returned from the first heat load device 4 on the high temperature side to the chiller 3 from the upstream side of the cold water flow direction. The high temperature side heat exchange unit 7 is provided in the seventh flow path R7, which is a return path returning from the first heat load device 4 on the high temperature side to the chiller 3. A ninth flow path R9 for bypassing the high temperature side heat exchange unit 7 is connected to the seventh flow path R7. The ninth flow path R9 branches off from the seventh flow path R7 at a location upstream of the high-temperature heat exchange unit 7 in the flow direction of the cold water in the seventh flow path R7, and joins the seventh flow path R7 at a location downstream of the first control valve D1. The ninth flow path R9 is provided with a second control valve D2 that can interrupt the supply of cold water to the ninth flow path R9.
[0031] The seventh flow path R7 and the sixth flow path R6 are connected to each other through a tenth flow path R10, which allows a part of the cold water that has passed through the first heat load device 4 on the high temperature side to bypass the heat exchange unit 7 on the high temperature side and the chiller 3 and mix with the cold water before being supplied to the first heat load device 4 on the high temperature side. The tenth flow path R10 branches off from the seventh flow path R7 at a location upstream of the heat exchange unit 7 on the high temperature side in the flow direction of the cold water in the seventh flow path R7, and merges with the sixth flow path R6 at a location upstream of the second temperature detection unit T2 in the flow direction of the cold water in the sixth flow path R6. The tenth flow path R10 is provided with a third control valve D3 that can freely adjust the amount of cold water supplied to the tenth flow path R10.
[0032] The first cold water circulation path 16 on the low temperature side includes a fifth flow path R5, an eleventh flow path R11 branched at the third header H3 to supply cold water from the third header H3 to the first heat load device 5 on the low temperature side, a twelfth flow path R12 to supply cold water from the first heat load device 5 on the low temperature side to the fourth header H4, and an eighth flow path R8. The fifth flow path R5 and the eleventh flow path R11 form a forward path for supplying cold water from the chiller 3 to the first heat load device 5 on the low temperature side, and the twelfth flow path R12 and the eighth flow path R8 form a return path for returning cold water from the first heat load device 5 on the low temperature side to the chiller 3.
[0033] The eleventh flow path R11 is provided with a third temperature detector T3 for detecting the temperature of the cold water supplied to the first heat load device 5 on the low temperature side from the upstream side of the cold water flow direction, and a fifth pump P5 for supplying cold water to the first heat load device 5 on the low temperature side. The twelfth flow path R12 is provided with a low temperature heat exchanger 8, a fourth control valve D4 for turning on and off the supply of cold water to the low temperature heat exchanger 8, and a fourth flow rate detector F4 for detecting the flow rate of cold water returned from the first heat load device 5 on the low temperature side to the chiller 3 from the upstream side of the cold water flow direction. The low temperature heat exchanger 8 is provided in the twelfth flow path R12, which serves as a return path returning from the first heat load device 5 on the low temperature side to the chiller 3. A thirteenth flow path R13 for bypassing the low temperature heat exchanger 8 is connected to the twelfth flow path R12. The 13th flow path R13 branches off from the 12th flow path R12 at a location upstream of the low-temperature side heat exchange unit 8 in the flow direction of the cold water in the 12th flow path R12, and merges with the 12th flow path R12 at a location downstream of the fourth control valve D4. The 13th flow path R13 is provided with a fifth control valve D5 that can interrupt the supply of cold water to the 13th flow path R13.
[0034] The 12th flow path R12 and the 11th flow path R11 are connected to each other through a 14th flow path R14, which allows a part of the cold water that has passed through the first heat load device 5 on the low temperature side to bypass the heat exchange unit 8 on the low temperature side and the chiller 3 and mix with the cold water before being supplied to the first heat load device 5 on the low temperature side. The 14th flow path R14 branches off from the 12th flow path R12 at a position upstream of the heat exchange unit 8 on the low temperature side in the flow direction of the cold water in the 12th flow path R12, and merges with the 11th flow path R11 at a position upstream of the third temperature detection unit T3 in the flow direction of the cold water in the 11th flow path R11. The 14th flow path R14 is provided with a sixth control valve D6 that can freely adjust the amount of cold water supplied to the 14th flow path R14.
[0035] (Second cold water circulation path) The second cold water circulation paths 17, 18 circulate cold water between the chiller 3 and the second heat load equipment 6. Since the second heat load equipment 6 is equipped with a first cooling coil 6a and a second cooling coil 6b, the second cold water circulation paths 17, 18 include a second cold water circulation path 17 on the first cooling coil 6a side and a second cold water circulation path 18 on the second cooling coil 6b side.
[0036] The second cold water circulation path 17 on the first cooling coil 6a side includes a fifth flow path R5, a fifteenth flow path R15 branched at the third header H3 to supply cold water from the third header H3 to the first cooling coil 6a, a sixteenth flow path R16 to supply cold water from the first cooling coil 6a to the fourth header H4, and an eighth flow path R8. The fifth flow path R5 and the fifteenth flow path R15 form a forward path for supplying cold water from the chiller 3 to the first cooling coil 6a of the second heat load device 6, and the sixteenth flow path R16 and the eighth flow path R8 form a return path for returning cold water from the first cooling coil 6a of the second heat load device 6 to the chiller 3.
[0037] The fifteenth flow path R15 is provided with a sixth pump P6 and a first on-off valve K1 for supplying cold water to the first cooling coil 6a from the upstream side in the cold water flow direction. The sixteenth flow path R16 is provided with a seventh control valve D7 that can turn on and off the supply of cold water to the first cooling coil 6a, a second on-off valve K2, and a fifth flow rate detector F5 that detects the flow rate of cold water returning from the first cooling coil 6a from the upstream side in the cold water flow direction. Here, the first on-off valve K1 and the second on-off valve K2 are normally open, and are switched to a closed state when it is desired to stop the flow of cold water to the first cooling coil 6a.
[0038] The second cold water circulation path 18 on the second cooling coil 6b side includes the fifth flow path R5, the seventeenth flow path R17 branched at the third header H3 to supply cold water from the third header H3 to the second cooling coil 6b, the eighth flow path R18 to supply cold water from the first cooling coil 6a to the fourth header H4, and the eighth flow path R8. The fifth flow path R5 and the seventeenth flow path R17 form a forward path for supplying cold water from the chiller 3 to the second cooling coil 6b of the second heat load device 6, and the eighth flow path R18 and the eighth flow path R8 form a return path for returning cold water from the second cooling coil 6b of the second heat load device 6 to the chiller 3.
[0039] The 17th flow path R17 is provided with an eighth control valve D8 capable of interrupting the supply of cold water from the refrigerator 3 to the second cooling coil 6b, a seventh pump P7 for supplying cold water to the second cooling coil 6b, and a third on-off valve K3, from the upstream side in the flow direction of cold water. The 18th flow path R18 is provided with a ninth control valve D9 capable of interrupting the supply of cold water to the second cooling coil 6b, a fourth on-off valve K4, a sixth flow rate detection unit F6 for detecting the flow rate of cold water returned from the second cooling coil 6b, and a tenth control valve D10 capable of interrupting the return of cold water from the second cooling coil 6b to the refrigerator 3, from the upstream side in the flow direction of cold water. Here, the third on-off valve K3 and the fourth on-off valve K4 are normally in an open state, and are switched to a closed state when it is desired to stop the flow of cold water to the second cooling coil 6b.
[0040] (First free cooling route) The first free cooling paths 12, 13 circulate the cooling water between the cooling tower 2 and the heat exchange units 7, 8, and are configured to indirectly supply the cold energy of the cooling water from the cooling tower 2 to the first heat load devices 4, 5 via the heat exchange units 7, 8, etc., rather than directly supplying the cooling water from the cooling tower 2 to the first heat load devices 4, 5. Since the first heat load devices 4, 5 are provided with the first heat load device 4 on the high temperature side and the first heat load device 5 on the low temperature side, the heat exchange units 7, 8 are also provided with the high temperature side heat exchange unit 7 for supplying cold energy to the first heat load device 4 on the high temperature side, and the low temperature side heat exchange unit 8 for supplying cold energy to the first heat load device 5 on the low temperature side. For this reason, the first free cooling paths 12, 13 are also provided with the high temperature side first free cooling path 12 for circulating the cooling water between the cooling tower 2 and the high temperature side heat exchange unit 7, and the low temperature side first free cooling path 13 for circulating the cooling water between the cooling tower 2 and the low temperature side heat exchange unit 8.
[0041] The first free cooling path 12 on the high temperature side includes the first flow path R1, a 19th flow path R19 branched at the first header H1 to supply cooling water from the first header H1 to the high temperature side heat exchange section 7, a 20th flow path R20 to supply cooling water from the high temperature side heat exchange section 7 to the second header H2, and a fourth flow path R4. The first flow path R1 and the 19th flow path R19 form a forward path for supplying cooling water from the cooling tower 2 to the high temperature side heat exchange section 7, and the fourth flow path R4 and the 20th flow path R20 form a return path for returning cooling water from the high temperature side heat exchange section 7 to the cooling tower 2.
[0042] The 19th flow path R19 is provided with an eighth pump P8 for supplying cooling water from the cooling tower 2 to the high-temperature side heat exchange section 7 from the upstream side in the flow direction of the cooling water, and a seventh flow rate detection section F7 for detecting the flow rate of cooling water supplied to the high-temperature side heat exchange section 7. The 20th flow path R20 is provided with an 11th control valve D11 that can freely interrupt the supply of cooling water to the high-temperature side heat exchange section 7.
[0043] The first free cooling path 13 on the low temperature side includes the first flow path R1, a 21st flow path R21 that branches off at the first header H1 and supplies cooling water from the first header H1 to the heat exchange section 8 on the low temperature side, a 22nd flow path R22 that supplies cooling water from the heat exchange section 8 on the low temperature side to the second header H2, and a fourth flow path R4. The 21st flow path R21 and the 19th flow path R19 in the first free cooling path 12 on the high temperature side are configured as a common flow path at their upstream portions, and are branched off at their downstream portions. The 22nd flow path R22 and the 20th flow path R20 in the first free cooling path 12 on the high temperature side are joined at their intermediate portions, and are configured as a common flow path at their downstream portions. The first flow path R1 and the 21st flow path R21 form a forward path that supplies cooling water from the cooling tower 2 to the low-temperature side heat exchange section 8, and the 22nd flow path R22 and the fourth flow path R4 form a return path that returns cooling water from the low-temperature side heat exchange section 8 to the cooling tower 2.
[0044] The 21st flow path R21 is provided with an eighth pump P8 that supplies cooling water from the cooling tower 2 to the low-temperature side heat exchange section 8 from the upstream side in the flow direction of the cooling water, and an eighth flow rate detection section F8 that detects the flow rate of cooling water supplied to the low-temperature side heat exchange section 8. The 22nd flow path R22 is provided with a 12th control valve D12 that can freely interrupt the supply of cooling water to the low-temperature side heat exchange section 8.
[0045] (Second free cooling route) The second free cooling path 14, which circulates the cooling water between the cooling tower 2 and the second heat load device 6, is configured to directly supply the cooling water from the cooling tower 2 to the second cooling coil 6b of the second heat load device 6, and to directly supply the cold energy of the cooling water from the cooling tower 2 to the second cooling coil 6b. The second free cooling path 14 is provided with the first flow path R1, a 23rd flow path R23 that is branched at the first header H1 and supplies the cooling water from the first header H1 to the second cooling coil 6b of the second heat load device 6, a 24th flow path R24 that supplies the cooling water from the second cooling coil 6b to the second header H2, and a 4th flow path R4. The 23rd flow path R23 is connected to a middle portion of the 17th flow path R17 in the second cold water circulation path 18 on the second cooling coil 6b side, and a downstream portion of the 23rd flow path R23 is a common flow path that is connected to the 17th flow path R17. The junction of the 23rd flow path R23 and the 17th flow path R17 is between the 8th control valve D8 and the 7th pump P7 in the 17th flow path R17. The 24th flow path R24 branches off from the middle of the 18th flow path R18 in the second cold water circulation path 18 on the second cooling coil 6b side, and the upstream side of the junction is a common flow path. The 24th flow path R24 and the 18th flow path R18 branch off from the 6th flow rate detector F6 and the 10th control valve D10 in the 18th flow path R18. The first flow path R1 and the 23rd flow path R23 form a forward path that supplies cooling water from the cooling tower 2 to the second cooling coil 6b of the second heat load device 6, and the 24th flow path R24 and the 4th flow path R4 form a return path that returns cooling water from the second cooling coil 6b of the second heat load device 6 to the cooling tower 2.
[0046] In the upstream portion of the 23rd flow path R23 until it is joined and connected to the 17th flow path R17, there are provided, from the upstream side in the flow direction of the cooling water, a 13th control valve D13 capable of switching on and off the supply of cooling water from the cooling tower 2 to the second cooling coil 6b, and a 9th flow rate detection unit F9 that detects the flow rate of cooling water supplied from the cooling tower 2 to the second cooling coil 6b. In the downstream portion of the 24th flow path R24 branched off from the 18th flow path R18, there is provided a 14th control valve D14 capable of switching on and off the cooling water returned from the second cooling coil 6b to the cooling tower 2.
[0047] (Other flow paths) In addition, the heat source equipment 1 is provided with a 25th flow path R25 that connects the first header H1 and the second header H2 to allow the flow of cooling water between the first header H1 and the second header H2, a 26th flow path R26 that connects the second flow path R2 and the third flow path R3 to allow a part of the cooling water returned from the chiller 3 to the cooling tower 2 to be mixed with the cooling water before being supplied from the cooling tower 2 to the chiller 3, and a 27th flow path R27 that connects the third header H3 and the fourth header H4 to allow the flow of cold water between the third header H3 and the fourth header H4. The 26th flow path R26 is provided with a 15th control valve D15 that can freely adjust the flow rate of the cooling water to be mixed with the cooling water before being supplied from the cooling tower 2 to the chiller 3.
[0048] A configuration for controlling the operation of the heat source equipment 1 will be described below. An operation control unit 9 is provided for controlling the operation of this heat source equipment 1. The operation control unit 9 controls the operation of the heat source equipment 1 by controlling the operating state of the cooling tower 2, the operating state of the chiller 3, the operating states of the first to eighth pumps P1 to P8, the operating states of the first to fifteenth control valves D1 to D15, and the like. The operation control unit 9 can freely acquire detection information from the first to third temperature detection units T1 to T3 and detection information from the first to ninth flow rate detection units F1 to F9, and controls the operation of the heat source equipment 1 based on the information acquired from these detection units.
[0049] The operation control unit 9 has a normal mode (see FIG. 1), a first free cooling combined mode (see FIG. 2 and FIG. 3), a second free cooling combined mode (see FIG. 4), and a free cooling mode (see FIG. 5) as operation modes of the heat source equipment 1. Each operation mode will be described below.
[0050] (Normal mode) In normal mode, as shown in FIG. 1, the cooling tower 2 and the chiller 3 are operated, and the chiller 3 uses the cooling water produced in the cooling tower 2 to produce cold water of the desired temperature. The produced cold water is then supplied to the first heat load equipment 4, 5 and the second heat load equipment 6, and the first heat load equipment 4, 5 and the second heat load equipment 6 perform cold energy utilization processes such as cooling the object to be cooled and cooling the space to be air-conditioned.
[0051] In normal mode, the operation control unit 9 operates the cooling tower 2 and the chiller 3, supplies the cooling water produced in the cooling tower 2 to the chiller 3 via the cooling water circuit 11, supplies a portion of the chilled water produced in the chiller 3 to the first thermal load equipment 4, 5 via the first chilled water circuit 15, 16, and supplies the remaining portion to the second thermal load equipment 6 via the second chilled water circuit 17.
[0052] The operation control unit 9 controls the operation state of the first pump P1 in the cooling water circulation path 11 so that the flow rate of the cooling water supplied from the cooling tower 2 is the minimum necessary, and controls the operation state of the second pump P2 so that the temperature of the cooling water returned from the chiller 3 to the cooling tower 2 is a constant desired temperature. At this time, the minimum necessary flow rate of the cooling water can be, for example, the primary side flow rate required by the chiller 3 for the chiller 3 to generate chilled water at a set temperature, and the primary side flow rate can be obtained from the detection information of the second flow rate detection unit F2, etc. The operation control unit 9 also controls the opening degree of the fifteenth control valve D15 so that the temperature of the cooling water supplied to the chiller 3 does not become equal to or lower than the chiller stop temperature. For example, a minimum temperature is set based on the chiller stop temperature, and the operation control unit 9 can control the opening degree of the fifteenth control valve D15 so that the temperature of the cooling water supplied to the chiller 3 is equal to or higher than the minimum temperature.
[0053] The operation control unit 9 controls the chiller 3 and the third pump P3 by controlling the operating state of the chiller 3 so that the temperature of the chilled water supplied from the chiller 3 becomes a set temperature (for example, a third set temperature (for example, 14°C) required by the second heat load device 6), and controls the operating state of the third pump P3 so that the flow rate of the chilled water supplied from the chiller 3 is a necessary minimum. At this time, the necessary minimum flow rate of the chilled water can be, for example, the secondary flow rate required by the heat load devices to cover all the heat loads of the first heat load devices 4, 5 and the second heat load device 6, and the secondary flow rate can be obtained from the detection information of the third to fifth flow rate detection units F3 to F5, etc.
[0054] The operation control unit 9 controls the fourth to eighth pumps P4 to P8 and the first to fourteenth control valves D1 to D14 by stopping only the seventh pump P7 and the eighth pump P8 and operating the other pumps, and by controlling the opening and closing of the control valves other than the third control valve D3 and the sixth control valve D6.
[0055] The operation control unit 9 controls the flow rate of the cold water in the first cold water circulation paths 15, 16 by controlling the operating states of the fourth pump P4 and the fifth pump P5. The operation control unit 9 controls the output of the fourth pump P4 according to the magnitude of the heat load of the first heat load device 4 on the high temperature side, and controls the output of the fifth pump P5 according to the magnitude of the heat load of the first heat load device 5 on the low temperature side. For example, the operation control unit 9 controls the fourth pump P4 to have a higher output as the heat load of the first heat load device 4 on the high temperature side increases, and controls the fifth pump P5 to have a higher output as the heat load of the first heat load device 5 on the low temperature side increases. Incidentally, a plurality of the fourth pumps P4 and the fifth pumps P5 may be provided, and in the case where a plurality of the fourth pumps P4 and the fifth pumps P5 are provided, the operation control unit 9 can control the number of pumps in operation so that the number of pumps increases as the heat load of the first heat load devices 4, 5 increases.
[0056] The operation control unit 9 controls the amount of cold water supplied to the first cooling coil 6a by controlling the operating state of the sixth pump P6. The operation control unit 9 controls the output of the sixth pump P6 according to the magnitude of the thermal load of the first cooling coil 6a. For example, the operation control unit 9 controls the sixth pump P6 so that the output becomes higher as the thermal load of the first cooling coil 6a increases. Incidentally, a plurality of sixth pumps P6 may be provided, and in the case where a plurality of sixth pumps P6 are provided, the operation control unit 9 can control the number of pumps in operation so that the number of pumps in operation increases as the thermal load of the first cooling coil 6a increases. At this time, the operation control unit 9 stops the operation of the seventh pump P7.
[0057] Regarding the control of opening and closing of the control valves, the operation control unit 9 closes the first control valve D1 and opens the second control valve D2, so that in the first cold water circulation path 15 on the high temperature side, a part of the cold water generated in the chiller 3 is supplied to the first heat load device 4 on the high temperature side through the fifth flow path R5 and the sixth flow path R6, and the cold water that has passed through the first heat load device 4 on the high temperature side is returned to the chiller 3 through the seventh flow path R7, the ninth flow path R9, and the eighth flow path R8 in a state of bypassing the heat exchange unit 7 on the high temperature side. At this time, since the eighth pump P8 is in an operation stop state and the eleventh control valve D11 is in a closed state, the supply of the cold water from the cooling tower 2 to the heat exchange unit 7 on the high temperature side through the first free cooling path 12 on the high temperature side is stopped.
[0058] The operation control unit 9 closes the fourth control valve D4 and opens the fifth control valve D5, thereby supplying a part of the cold water generated in the chiller 3 through the fifth flow path R5 and the eleventh flow path R11 to the first heat load device 5 on the low temperature side in the first chilled water circulation path 16 on the low temperature side, and returning the cold water that has passed through the first heat load device 5 on the low temperature side through the twelfth flow path R12, the thirteenth flow path R13 and the eighth flow path R8 to the chiller 3 in a state of bypassing the heat exchange unit 8 on the low temperature side. At this time, since the eighth pump P8 is in an operation stop state and the twelfth control valve D12 is in a closed state, the supply of the cold water from the cooling tower 2 to the heat exchange unit 8 on the low temperature side through the first free cooling path 13 on the low temperature side is stopped.
[0059] The operation control unit 9 opens the seventh control valve D7, thereby supplying a part of the chilled water generated in the chiller 3 to the first cooling coil 6a through the fifth flow path R5 and the fifteenth flow path R15 in the second chilled water circulation path 17 on the first cooling coil 6a side, and returning the chilled water that has passed through the first cooling coil 6a to the chiller 3 through the sixteenth flow path R16 and the eighth flow path R8. The operation control unit 9 also closes the eighth control valve D8, the ninth control valve D9, and the tenth control valve D10 to stop the supply of chilled water from the chiller 3 to the second cooling coil 6b through the second chilled water circulation path 18 on the second cooling coil 6b side. Furthermore, the operation control unit 9 closes the thirteenth control valve D13 and the fourteenth control valve D14 to stop the supply of chilled water from the cooling tower 2 to the second cooling coil 6b through the second free cooling path 14.
[0060] In this way, in the normal mode, the chilled water is supplied from the chiller 3 only to the first cooling coil 6a, so that, for example, during a breakdown or maintenance, the operation control unit 9 closes the seventh control valve D7 and opens the eighth to tenth control valves D8 to D10 to stop the supply of chilled water from the chiller 3 to the first cooling coil 6a through the second chilled water circulation path 17 on the first cooling coil 6a side, and supplies chilled water from the chiller 3 to the second cooling coil 6b through the second chilled water circulation path 18 on the second cooling coil 6b side. This allows for dual cooling coils, and allows the second heat load device 6 to continue cold energy utilization processing while flexibly responding to breakdowns and maintenance.
[0061] Incidentally, in addition to opening the seventh control valve D7, the operation control unit 9 can also open the eighth to tenth control valves D8 to D10 to supply cold water to both the first cooling coil 6a and the second cooling coil 6b, thereby performing cold energy utilization processing such as cooling the space to be air-conditioned in a state in which the air is cooled by both the first cooling coil 6a and the second cooling coil 6b in the second thermal load equipment 6.
[0062] The operation control unit 9 controls the opening of the third control valve D3 and the sixth control valve D6 to control the temperature of the cold water supplied to the first heat load equipment 4, 5. The operation control unit 9 controls the opening of the third control valve D3 so that the temperature detected by the second temperature detection unit T2 becomes the required temperature of the first heat load equipment 4 on the high temperature side (e.g., 28°C), thereby supplying cold water of a constant required temperature to the first heat load equipment 4 on the high temperature side. The operation control unit 9 controls the opening of the sixth control valve D6 so that the temperature detected by the third temperature detection unit T3 becomes the required temperature of the first heat load equipment 5 on the low temperature side (e.g., 18°C), thereby supplying cold water of a constant required temperature to the first heat load equipment 5 on the low temperature side.
[0063] (First free cooling combined mode) As shown in Figures 2 and 3, in the first free cooling combination mode, in addition to the normal mode operation in which cold water produced in the chiller 3 is supplied to the first heat load equipment 4, 5 and the second heat load equipment 6, and cold energy utilization process is performed in the first heat load equipment 4, 5 and the second heat load equipment 6, a portion of the cold water produced in the cooling tower 2 is supplied to heat exchange sections 7, 8 to pre-cool the cold water before returning it to the chiller 3, and the cold energy contained in the cold water produced in the cooling tower 2 is indirectly used to perform cold energy utilization process in the first heat load equipment 4, 5.
[0064] Since there are two types of first thermal load equipment 4, 5, a high-temperature side first thermal load equipment 4 and a low-temperature side first thermal load equipment 5, the first free cooling combination mode also has a high-temperature side first free cooling combination mode (see Figure 2) in which a portion of the cooling water generated in the cooling tower 2 is supplied to the high-temperature side heat exchange section 7, and a low-temperature side first free cooling combination mode (see Figure 3) in which a portion of the cooling water generated in the cooling tower 2 is supplied to the low-temperature side heat exchange section 8.
[0065] (High temperature side 1st free cooling combined mode) 2, in the high-temperature side first free cooling combined mode, the operation control unit 9 operates the cooling tower 2 and the chiller 3, supplies a portion of the cooling water generated in the cooling tower 2 to the chiller 3 through the cooling water circulation path 11, and supplies the remaining portion to the high-temperature side heat exchanger 7 through the high-temperature side first free cooling path 12. Then, a portion of the cold water generated in the chiller 3 is supplied to the first heat load equipment 4, 5 through the first cold water circulation paths 15, 16, and the remaining portion is supplied to the second heat load equipment 6 through the second cold water circulation path 17.
[0066] Since a part of the cooling water generated in the cooling tower 2 is supplied to the high-temperature side heat exchange section 7, in the high-temperature side heat exchange section 7, the cold water (e.g., cold water of 36°C) whose temperature has increased in the high-temperature side first heat load device 4 can be cooled by the cooling water (e.g., cooling water of 32°C or less) generated in the cooling tower 2. This allows the cold water before being returned from the high-temperature side first heat load device 4 to the chiller 3 to be pre-cooled in the high-temperature side first cold water circulation path 15, thereby reducing the energy consumption of the chiller 3.
[0067] Specific control of pumps, control valves, etc. will be described below, but the control different from the normal mode (see FIG. 1) will be mainly described, and a description of similar controls will be omitted.
[0068] The control of the second pump P2 and the fifteenth control valve D15 in the cooling water circulation path 11, the control of the chiller 3 and the third pump P3, the control of the fourth to seventh pumps P4 to P7, and the control of the first to fifteenth control valves D1 to D15 other than the first control valve D1, the second control valve D2, and the eleventh control valve D11 are the same as in the normal mode.
[0069] The operation control unit 9 controls the operation state of the first pump P1 in the cooling water circulation path 11 so that the primary side flow rate required by the chiller 3 and the secondary side flow rate required by the high-temperature side heat exchange unit 7 are the same flow rate. At this time, the flow rate of the cooling water can be, for example, the total flow rate of the primary side flow rate required by the chiller 3 to generate cold water at a set temperature and the secondary side flow rate required by the high-temperature side heat exchange unit 7, and the total flow rate of the primary side flow rate and the secondary side flow rate can be calculated from the detection information of the second flow rate detection unit F2 and the seventh flow rate detection unit F7, etc.
[0070] In addition, the operation control unit 9 controls the fourth to eighth pumps P4 to P8 and the first to fourteenth control valves D1 to D14 by operating the pumps other than the seventh pump P7 and controlling the opening and closing of the control valves other than the third control valve D3 and the sixth control valve D6.
[0071] Unlike the normal mode, the operation control unit 9 closes the second control valve D2 and opens the first control valve D1, thereby supplying a part of the cold water generated in the chiller 3 to the first heat load device 4 on the high temperature side through the fifth flow path R5 and the sixth flow path R6 in the first chilled water circulation path 15 on the high temperature side, and returning the cold water that has passed through the first heat load device 4 on the high temperature side through the seventh flow path R7 and the eighth flow path R8 to the chiller 3 in a state where the cold water passes through the heat exchange unit 7 on the high temperature side without passing through the ninth flow path R9. In addition, the operation control unit 9 operates the eighth pump P8 and opens the eleventh control valve D11, thereby supplying a part of the cooling water generated in the cooling tower 2 to the heat exchange unit 7 on the high temperature side through the first flow path R1 and the 19th flow path R19 in the first free cooling path 12 on the high temperature side, and returning the cooling water that has passed through the heat exchange unit 7 on the high temperature side to the cooling tower 2 through the 20th flow path R20 and the fourth flow path R4. This enables heat exchange between the cooling water and cold water in the heat exchange section 7 on the high temperature side.
[0072] The operation control unit 9 controls the operation state of the eighth pump P8 so as to ensure the flow rate of the cooling water required by the high-temperature side heat exchange unit 7 based on the detection information of the seventh flow rate detection unit F7, thereby controlling the flow rate of the cooling water in the first free cooling path 12 on the high-temperature side. The operation control unit 9 controls the eighth pump P8 so that the output becomes higher as the flow rate of the cooling water required by the high-temperature side heat exchange unit 7 increases. Incidentally, a plurality of eighth pumps P8 may be provided, and in the case where a plurality of eighth pumps P8 are provided, the operation control unit 9 can control the number of pumps in operation so that the number of pumps increases as the flow rate of the cooling water required by the high-temperature side heat exchange unit 7 increases.
[0073] In this way, in the high-temperature side first free cooling combined mode, the eighth pump P8 is in an operating state and the eleventh control valve D11 is in an open state, so that cooling water is supplied from the cooling tower 2 to the high-temperature side heat exchanger 7 in the high-temperature side first free cooling path 12, and heat exchange between the cooling water and the cold water is performed in the high-temperature side heat exchanger 7. This allows the cold water that has passed through the high-temperature side first heat load device 4 to be pre-cooled and then returned to the chiller 3, thereby reducing the energy consumption of the chiller 3. Moreover, the cold energy of the cooling water generated in the cooling tower 2 is transferred to the cold water in the high-temperature side first cold water circulation path 15 in the high-temperature side heat exchanger 7, and the cold water is supplied to the high-temperature side first heat load device 4, so that the cold energy of the cooling water generated in the cooling tower 2 can be indirectly used to perform cold energy utilization processing in the high-temperature side first heat load device 4.
[0074] (Combined with first free cooling on low temperature side) 3, in the low-temperature side first free cooling combined mode, the operation control unit 9 operates the cooling tower 2 and the chiller 3, and supplies a portion of the cooling water generated in the cooling tower 2 to the chiller 3 through the cooling water circulation path 11, and supplies the remaining portion to the high-temperature side heat exchanger 7 through the high-temperature side first free cooling path 12, and also to the low-temperature side heat exchanger 8 through the low-temperature side first free cooling path 13. Then, a portion of the cold water generated in the chiller 3 is supplied to the first heat load equipment 4, 5 through the first cold water circulation paths 15, 16, and a portion of the remaining portion is supplied to the second heat load equipment 6 through the second cold water circulation path 17.
[0075] Since a part of the cooling water generated in the cooling tower 2 is supplied to the high-temperature side heat exchange section 7, in the high-temperature side heat exchange section 7, the cold water (for example, cold water of 36°C) whose temperature has risen in the first heat load device 4 on the high-temperature side can be cooled by the cooling water (for example, cooling water of 24°C or less) generated in the cooling tower 2. Moreover, since a part of the cooling water generated in the cooling tower 2 is also supplied to the low-temperature side heat exchange section 8, in the low-temperature side heat exchange section 8, the cold water (for example, cold water of 26°C) whose temperature has risen in the first heat load device 5 on the low-temperature side can also be cooled by the cooling water (for example, cooling water of 24°C or less) generated in the cooling tower 2. As a result, not only the cold water before being returned from the first heat load device 4 on the high-temperature side to the chiller 3 in the first cold water circulation path 15 on the high-temperature side, but also the cold water before being returned from the first heat load device 5 on the low-temperature side to the chiller 3 in the first cold water circulation path 16 on the low-temperature side can be pre-cooled, and the energy consumption of the chiller 3 can be reduced.
[0076] Specific control of pumps, control valves, etc. will be described below, but the control different from the normal mode (see FIG. 1) will be mainly described, and a description of similar controls will be omitted.
[0077] The control of the second pump P2 and the fifteenth control valve D15 in the cooling water circulation path 11, the control of the chiller 3 and the third pump P3, the control of the fourth to seventh pumps P4 to P7, and the control of the first to fifteenth control valves D1 to D15, other than the first control valve D1, the second control valve D2, the eleventh control valve D11, the fourth control valve D4, the fifth control valve D5, and the twelfth control valve D12, are the same as in the normal mode.
[0078] The operation control unit 9 controls the operation state of the first pump P1 in the cooling water circulation path 11 so that the primary side flow rate required by the chiller 3 and the secondary side flow rate required by the heat exchange units 7 and 8 are the same. At this time, the flow rate of the cooling water can be, for example, the total flow rate of the primary side flow rate required by the chiller 3 for the chiller 3 to generate cold water at a set temperature and the secondary side flow rate required by the high-temperature side heat exchange unit 7 and the low-temperature side heat exchange unit 8, and the total flow rate of the primary side flow rate and the secondary side flow rate can be calculated from the detection information of the second flow rate detection unit F2, the seventh flow rate detection unit F7, and the eighth flow rate detection unit F8, etc.
[0079] In addition, the operation control unit 9 controls the fourth to eighth pumps P4 to P8 and the first to fourteenth control valves D1 to D14 by operating the pumps other than the seventh pump P7 and controlling the opening and closing of the control valves other than the third control valve D3 and the sixth control valve D6.
[0080] Unlike the normal mode, the operation control unit 9 closes the second control valve D2 and opens the first control valve D1, thereby supplying a part of the cold water generated in the chiller 3 to the first heat load device 4 on the high temperature side through the fifth flow path R5 and the sixth flow path R6 in the first chilled water circulation path 15 on the high temperature side, and returning the cold water that has passed through the first heat load device 4 on the high temperature side through the seventh flow path R7 and the eighth flow path R8 to the chiller 3 in a state where the cold water passes through the heat exchange unit 7 on the high temperature side without passing through the ninth flow path R9. In addition, the operation control unit 9 operates the eighth pump P8 and opens the eleventh control valve D11, thereby supplying a part of the cooling water generated in the cooling tower 2 to the heat exchange unit 7 on the high temperature side through the first flow path R1 and the 19th flow path R19 in the first free cooling path 12 on the high temperature side, and returning the cooling water that has passed through the heat exchange unit 7 on the high temperature side to the cooling tower 2 through the 20th flow path R20 and the fourth flow path R4. This enables heat exchange between the cooling water and cold water in the high-temperature side heat exchange section 7. Incidentally, these controls are the same as those in the first free-cooling combination mode on the high-temperature side (see FIG. 2).
[0081] The operation control unit 9 closes the fifth control valve D5 and opens the fourth control valve D4, thereby supplying a part of the cold water generated in the chiller 3 to the first heat load device 5 on the low temperature side through the fifth flow path R5 and the eleventh flow path R11 in the first chilled water circulation path 16 on the low temperature side, and returning the cold water that has passed through the first heat load device 5 on the low temperature side through the twelfth flow path R12 and the eighth flow path R8 to the chiller 3 in a state where the cold water passes through the heat exchange unit 8 on the low temperature side without passing through the thirteenth flow path R13. In addition, the operation control unit 9 operates the eighth pump P8 and opens the twelfth control valve D12, thereby supplying a part of the cooling water generated in the cooling tower 2 to the heat exchange unit 8 on the low temperature side through the first flow path R1 and the twenty-first flow path R21 in the first free cooling path 13 on the low temperature side, and returning the cooling water that has passed through the heat exchange unit 8 on the low temperature side to the cooling tower 2 through the twenty-second flow path R22 and the fourth flow path R4. This enables heat exchange between the cooling water and cold water in the heat exchange section 8 on the low temperature side.
[0082] The operation control unit 9 controls the operating state of the eighth pump P8 to ensure the flow rates of cooling water required by the high-temperature side heat exchange unit 7 and the low-temperature side heat exchange unit 8 based on information detected by the seventh flow rate detection unit F7 and the eighth flow rate detection unit F8, thereby controlling the flow rates of cooling water in the high-temperature side first free cooling path 12 and the low-temperature side first free cooling path 13. The operation control unit 9 controls the eighth pump P8 to have a higher output as the flow rates of cooling water required by the high-temperature side heat exchange unit 7 and the low-temperature side heat exchange unit 8 increase.
[0083] In this way, in the low-temperature side first free cooling combined mode, the eighth pump P8 is in an operating state and the eleventh control valve D11 and the twelfth control valve D12 are in an open state, so that cooling water is supplied from the cooling tower 2 to the high-temperature side heat exchanger 7 in the high-temperature side first free cooling path 12, and heat exchange between the cooling water and cold water is performed in the high-temperature side heat exchanger 7, and cooling water is supplied from the cooling tower 2 to the low-temperature side heat exchanger 8 in the low-temperature side first free cooling path 13, and heat exchange between the cooling water and cold water is also performed in the low-temperature side heat exchanger 8. As a result, not only the cold water that has passed through the high-temperature side first heat load device 4, but also the cold water that has passed through the low-temperature side first heat load device 5 can be pre-cooled and then returned to the chiller 3, and the energy consumption of the chiller 3 can be reduced.
[0084] Furthermore, the cold energy contained in the cooling water produced in the cooling tower 2 is transferred to the cold water in the high-temperature side first cold water circulation path 15 in the high-temperature side heat exchange section 7, and this cold water is supplied to the high-temperature side first heat load equipment 4, and is also transferred to the cold water in the low-temperature side first cold water circulation path 16 in the low-temperature side heat exchange section 8, and this cold water is supplied to the low-temperature side first heat load equipment 5.Therefore, the cold energy contained in the cooling water produced in the cooling tower 2 can be indirectly used to perform cold energy utilization processing in both the high-temperature side first heat load equipment 4 and the low-temperature side first heat load equipment 5.
[0085] (2nd free cooling combined mode) In the second free cooling combination mode, as shown in Figure 4, in addition to the normal mode operation of supplying the cold water produced in the chiller 3 to the first heat load equipment 4, 5 and the second heat load equipment 6 to perform cold energy utilization processing in the first heat load equipment 4, 5 and the second heat load equipment 6, a portion of the cold water produced in the cooling tower 2 is supplied to the heat exchange sections 7, 8 to pre-cool the cold water before returning it to the chiller 3, and the cold energy contained in the cooling water produced in the cooling tower 2 is indirectly used to perform cold energy utilization processing in the first heat load equipment 4, 5. In addition, a portion of the cold water produced in the cooling tower 2 is also supplied to the second heat load equipment 6, and the cold energy contained in the cooling water produced in the cooling tower 2 is directly used to perform cold energy utilization processing in the second heat load equipment 6.
[0086] In the second free cooling combined mode, the operation control unit 9 operates the cooling tower 2 and the chiller 3, and supplies part of the cooling water generated in the cooling tower 2 to the chiller 3 through the cooling water circulation path 11, and supplies the remaining part to the high temperature side heat exchanger 7 through the first free cooling path 12 on the high temperature side, to the low temperature side heat exchanger 8 through the first free cooling path 13 on the low temperature side, and to the second cooling coil 6b of the second heat load device 6 through the second free cooling path 14, thereby supplying the water to three devices. Then, part of the cold water generated in the chiller 3 is supplied to the first heat load devices 4 and 5 through the first cold water circulation paths 15 and 16, and the remaining part is supplied to the second heat load device 6 through the second cold water circulation path 17.
[0087] Since a part of the cooling water generated in the cooling tower 2 is supplied to the high-temperature side heat exchange section 7, in the high-temperature side heat exchange section 7, the cold water (for example, cold water of 36°C) whose temperature has risen in the first heat load device 4 on the high-temperature side can be cooled by the cooling water (for example, cooling water of 20°C or less) generated in the cooling tower 2. Moreover, since a part of the cooling water generated in the cooling tower 2 is also supplied to the low-temperature side heat exchange section 8, in the low-temperature side heat exchange section 8, the cold water (for example, cold water of 26°C) whose temperature has risen in the first heat load device 5 on the low-temperature side can also be cooled by the cooling water (for example, cooling water of 20°C or less) generated in the cooling tower 2. As a result, not only the cold water before being returned from the first heat load device 4 on the high-temperature side to the chiller 3 in the first cold water circulation path 15 on the high-temperature side, but also the cold water before being returned from the first heat load device 5 on the low-temperature side to the chiller 3 in the first cold water circulation path 16 on the low-temperature side can be pre-cooled, and the energy consumption of the chiller 3 can be reduced.
[0088] Furthermore, since a part of the cooling water generated in the cooling tower 2 is also supplied to the second cooling coil 6b of the second heat load device 6, the air (e.g., air at 30°C) before being supplied to the first cooling coil 6a can be cooled in the second cooling coil 6b by the cooling water (e.g., cooling water at 20°C or less) generated in the cooling tower 2. As a result, the first cooling coil 6a only needs to cool the air pre-cooled by the second cooling coil 6b, so that the air can be sufficiently cooled and the air conditioning of the space to be air-conditioned can be performed effectively. In addition, the amount of cold energy consumed in the first cooling coil 6a can be reduced, so that the energy consumption of the refrigerator 3 can be reduced.
[0089] Specific control of pumps, control valves, etc. will be described below, but the control different from the normal mode (see FIG. 1) will be mainly described, and a description of similar controls will be omitted.
[0090] The control of the second pump P2 and the fifteenth control valve D15 in the cooling water circulation path 11, the control of the chiller 3 and the third pump P3, the control of the fourth to sixth pumps P4 to P6, and the control of the third control valve D3, the sixth control valve D6, and the seventh control valve D7 among the first to fifteenth control valves D1 to D15 are the same as in the normal mode.
[0091] The operation control unit 9 controls the operation state of the first pump P1 in the cooling water circulation path 11 so that the primary side flow rate required by the chiller 3 is equal to the secondary side flow rate required by the heat exchange units 7, 8 and the second cooling coil 6b of the second heat load device 6. At this time, the flow rate of the cooling water can be, for example, the total flow rate of the primary side flow rate required by the chiller 3 to generate chilled water at a set temperature and the secondary side flow rate required by the heat exchange units 7, 8 and the second cooling coil 6b, and the total flow rate of the primary side flow rate and the secondary side flow rate can be calculated from the detection information of the second flow rate detection unit F2, the seventh flow rate detection unit F7, the eighth flow rate detection unit F8 and the ninth flow rate detection unit F9, etc.
[0092] The operation control unit 9 controls the fourth to eighth pumps P4 to P8 and the first to fourteenth control valves D1 to D14 by putting all of the fourth to eighth pumps P4 to P8 into operation and controlling the opening and closing of the control valves other than the third control valve D3 and the sixth control valve D6.
[0093] Unlike the normal mode, the operation control unit 9 closes the second control valve D2 and opens the first control valve D1, thereby supplying a part of the cold water generated in the chiller 3 to the first heat load device 4 on the high temperature side through the fifth flow path R5 and the sixth flow path R6 in the first chilled water circulation path 15 on the high temperature side, and returning the cold water that has passed through the first heat load device 4 on the high temperature side through the seventh flow path R7 and the eighth flow path R8 to the chiller 3 in a state where the cold water passes through the heat exchange unit 7 on the high temperature side without passing through the ninth flow path R9. In addition, the operation control unit 9 operates the eighth pump P8 and opens the eleventh control valve D11, thereby supplying a part of the cooling water generated in the cooling tower 2 to the heat exchange unit 7 on the high temperature side through the first flow path R1 and the 19th flow path R19 in the first free cooling path 12 on the high temperature side, and returning the cooling water that has passed through the heat exchange unit 7 on the high temperature side to the cooling tower 2 through the 20th flow path R20 and the fourth flow path R4. This enables heat exchange between the cooling water and cold water in the high-temperature side heat exchange section 7. Incidentally, these controls are similar to those in the first high-temperature side free-cooling combination mode (see FIG. 2) and the first low-temperature side free-cooling combination mode (see FIG. 3).
[0094] The operation control unit 9 closes the fifth control valve D5 and opens the fourth control valve D4, thereby supplying a part of the cold water generated in the chiller 3 to the first heat load device 5 on the low temperature side through the fifth flow path R5 and the eleventh flow path R11 in the first chilled water circulation path 16 on the low temperature side, and returning the cold water that has passed through the first heat load device 5 on the low temperature side through the twelfth flow path R12 and the eighth flow path R8 to the chiller 3 in a state where the cold water passes through the heat exchange unit 8 on the low temperature side without passing through the thirteenth flow path R13. In addition, the operation control unit 9 operates the eighth pump P8 and opens the twelfth control valve D12, thereby supplying a part of the cooling water generated in the cooling tower 2 to the heat exchange unit 8 on the low temperature side through the first flow path R1 and the twenty-first flow path R21 in the first free cooling path 13 on the low temperature side, and returning the cooling water that has passed through the heat exchange unit 8 on the low temperature side to the cooling tower 2 through the twenty-second flow path R22 and the fourth flow path R4. This enables heat exchange between the cooling water and cold water in the low-temperature side heat exchange section 8. Incidentally, these controls are the same as those in the low-temperature side first free-cooling combination mode (see FIG. 3).
[0095] The operation control unit 9 closes the eighth control valve D8 and the tenth control valve D10 and opens the ninth control valve D9, the thirteenth control valve D13, and the fourteenth control valve D14, thereby supplying a part of the cooling water generated in the cooling tower 2 to the second cooling coil 6b through the first flow path R1 and the 23rd flow path R23 in the second free cooling path 14, and returning the cooling water that has passed through the second cooling coil 6b to the cooling tower 2 through the 24th flow path R24 and the fourth flow path R4. At this time, since the eighth control valve D8 and the tenth control valve D10 are in the closed state, the supply of cold water from the refrigerator 3 to the second cooling coil 6b through the second cold water circulation path 18 on the second cooling coil 6b side is stopped.
[0096] The operation control unit 9 controls the amount of cooling water supplied to the second cooling coil 6b by controlling the operating state of the seventh pump P7. The operation control unit 9 controls the output of the seventh pump P7 according to the magnitude of the thermal load of the second cooling coil 6b. For example, the operation control unit 9 controls the seventh pump P7 so that the output becomes higher as the thermal load of the second cooling coil 6b increases. Incidentally, a plurality of seventh pumps P7 may be provided, and in the case where a plurality of seventh pumps P7 are provided, the operation control unit 9 can control the number of pumps in operation so that the number of pumps in operation increases as the thermal load of the second cooling coil 6b increases.
[0097] The operation control unit 9 controls the operation state of the eighth pump P8 so as to secure the flow rate of the cooling water required by the high-temperature side heat exchange unit 7 and the low-temperature side heat exchange unit 8 based on the detection information of the seventh flow rate detection unit F7 and the eighth flow rate detection unit F8, thereby controlling the flow rate of the cooling water in the first free cooling path 12 on the high-temperature side and the first free cooling path 13 on the low-temperature side. The operation control unit 9 controls the eighth pump P8 so as to have a higher output as the flow rate of the cooling water required by the high-temperature side heat exchange unit 7 and the low-temperature side heat exchange unit 8 increases. In addition, the operation control unit 9 controls the flow rate of the cooling water in the second free cooling path 14 by controlling the operation state of the seventh pump P7 so as to secure the flow rate of the cooling water required by the second cooling coil 6b based on the detection information of the ninth flow rate detection unit F9, etc. The operation control unit 9 controls the seventh pump P7 so as to have a higher output as the flow rate of the cooling water required by the second cooling coil 6b increases.
[0098] In this way, in the second free cooling combined mode, the eighth pump P8 is in an operating state and the eleventh control valve D11 and the twelfth control valve D12 are in an open state, so that cooling water is supplied from the cooling tower 2 to the high-temperature side heat exchanger 7 in the first free cooling path 12 on the high-temperature side, and heat exchange between the cooling water and the cold water is performed in the high-temperature side heat exchanger 7, and cooling water is supplied from the cooling tower 2 to the low-temperature side heat exchanger 8 in the first free cooling path 13 on the low-temperature side, and heat exchange between the cooling water and the cold water is also performed in the low-temperature side heat exchanger 8. As a result, not only the cold water that has passed through the first heat load device 4 on the high-temperature side, but also the cold water that has passed through the first heat load device 5 on the low-temperature side can be pre-cooled and then returned to the refrigerator 3. Furthermore, since the seventh pump P7 is in an operating state and the thirteenth control valve D13 and the fourteenth control valve D14 are in an open state, cooling water is supplied from the cooling tower 2 to the second cooling coil 6b in the second free cooling path 14, and the air can be pre-cooled in the second cooling coil 6b before being supplied to the first cooling coil 6a.
[0099] (Free cooling mode) In the free cooling mode, as shown in FIG. 5, the chiller 3 is stopped and the cooling tower 2 is operated, and a portion of the cooling water produced in the cooling tower 2 is supplied to the heat exchange sections 7 and 8 to cool the cold water circulated in the first cold water circuit 15. The cooled cold water is then supplied to the first heat load equipment 4 and 5, thereby not only indirectly using the cold energy contained in the cooling water produced in the cooling tower 2 to perform cold energy utilization processing in the first heat load equipment 4 and 5, but also supplying a portion of the cooling water produced in the cooling tower 2 to the second heat load equipment 6, and directly using the cold energy contained in the cooling water produced in the cooling tower 2 to perform cold energy utilization processing in the second heat load equipment 6.
[0100] In the free cooling mode, the operation control unit 9 stops the operation of the chiller 3 and operates the cooling tower 2, so that the cooling water generated in the cooling tower 2 is supplied to the high-temperature side heat exchange unit 7 through the high-temperature side first free cooling path 12, is also supplied to the low-temperature side heat exchange unit 8 through the low-temperature side first free cooling path 13, and is further supplied to the second cooling coil 6b of the second heat load device 6 through the second free cooling path 14. Then, cold water is circulated through the first cold water circulation paths 15 and 16 to supply cold water to the first heat load devices 4 and 5.
[0101] Since a portion of the cooling water generated in the cooling tower 2 is supplied to the high-temperature side heat exchange section 7, in the high-temperature side heat exchange section 7, the cold water (e.g., cold water of 36°C) whose temperature has increased in the first heat load device 4 on the high-temperature side can be cooled by the cooling water (e.g., cooling water of 14°C or less) generated in the cooling tower 2. Moreover, since a portion of the cooling water generated in the cooling tower 2 is also supplied to the low-temperature side heat exchange section 8, in the low-temperature side heat exchange section 8, the cold water (e.g., cold water of 26°C) whose temperature has increased in the first heat load device 5 on the low-temperature side can also be cooled by the cooling water (e.g., cooling water of 14°C or less) generated in the cooling tower 2. As a result, not only can cold water cooled in the high-temperature side heat exchange section 7 be supplied to the high-temperature side first heat load device 4 by the high-temperature side first cold water circulation path 15 to perform cold heat utilization processing in the high-temperature side first heat load device 4, but also cold water cooled in the low-temperature side heat exchange section 8 by the low-temperature side first cold water circulation path 16 can be supplied to the low-temperature side first heat load device 5 to perform cold heat utilization processing in the low-temperature side first heat load device 5. Therefore, even when the chiller 3 is stopped, cold heat utilization processing in the first heat load devices 4, 5 can be properly performed, and energy can be saved.
[0102] Furthermore, a portion of the cooling water generated in the cooling tower 2 is also supplied to the second cooling coil 6b of the second heat load device 6, so that in the second cooling coil 6b, air (e.g., air at 30°C) can be cooled with the cooling water (e.g., cooling water at 14°C or less) generated in the cooling tower 2. As a result, by cooling in the second cooling coil 6b, temperature-controlled air for cooling the space to be air-conditioned can be generated, thereby conditioning the space to be air-conditioned. Therefore, even when the operation of the refrigerator 3 is stopped, the space to be air-conditioned can be effectively air-conditioned by cooling in the second cooling coil 6b.
[0103] Specific control of pumps, control valves, etc. will be described below, but the control different from the normal mode (see FIG. 1) will be mainly described, and a description of similar controls will be omitted.
[0104] The control of the fourth pump P4 and the fifth pump P5, and the control of the third control valve D3 and the sixth control valve D6 among the first to fifteenth control valves D1 to D15 are similar to those in the normal mode.
[0105] Unlike the normal mode, the operation control unit 9 stops controlling the opening degree of the fifteenth control valve D15, stops the operation of the second pump P2 and the third pump P3, and stops the operation of the chiller 3.
[0106] The operation control unit 9 controls the operation state of the first pump P1 in the cooling water circulation path 11 so as to ensure a secondary flow rate required by the heat exchange units 7 and 8 and the second cooling coil 6b of the second heat load device 6. At this time, the secondary flow rate can be obtained from the detection information of the seventh flow rate detection unit F7, the eighth flow rate detection unit F8, and the ninth flow rate detection unit F9, etc.
[0107] The operation control unit 9 controls the fourth to eighth pumps P4 to P8 and the first to fourteenth control valves D1 to D14 by operating the pumps other than the sixth pump P6 and controlling the opening and closing of the control valves other than the third control valve D3 and the sixth control valve D6.
[0108] Unlike the normal mode, the operation control unit 9 closes the second control valve D2 and opens the first control valve D1, thereby circulating cold water in the first cold water circulation path 15 on the high temperature side in a state where the cold water passes through the first heat load device 4 on the high temperature side and the heat exchange unit 7 on the high temperature side through the sixth flow path R6, the seventh flow path R7, and the 27th flow path R27 without passing through the ninth flow path R9. In addition, the operation control unit 9 operates the eighth pump P8 and opens the eleventh control valve D11, thereby supplying a part of the cold water generated in the cooling tower 2 to the heat exchange unit 7 on the high temperature side through the first flow path R1 and the 19th flow path R19 in the first free cooling path 12 on the high temperature side, and returning the cold water that has passed through the heat exchange unit 7 on the high temperature side to the cooling tower 2 through the 20th flow path R20 and the fourth flow path R4. This enables heat exchange between the cold water and the cold water in the heat exchange unit 7 on the high temperature side.
[0109] The operation control unit 9 closes the fifth control valve D5 and opens the fourth control valve D4, thereby circulating the cold water in the first cold water circulation path 16 on the low temperature side in a state in which the cold water passes through the first heat load device 5 on the low temperature side and the heat exchange unit 8 on the low temperature side through the eleventh flow path R11, the twelfth flow path R12, and the 27th flow path R27 without passing through the thirteenth flow path R13. In addition, the operation control unit 9 operates the eighth pump P8 and opens the twelfth control valve D12, thereby supplying a part of the cold water generated in the cooling tower 2 to the heat exchange unit 8 on the low temperature side through the first flow path R1 and the 21st flow path R21 in the first free cooling path 13 on the low temperature side, and returning the cold water that has passed through the heat exchange unit 8 on the low temperature side to the cooling tower 2 through the 22nd flow path R22 and the fourth flow path R4. This enables heat exchange between the cold water and the cold water in the heat exchange unit 8 on the low temperature side.
[0110] The operation control unit 9 closes the eighth control valve D8 and the tenth control valve D10 and opens the ninth control valve D9, the thirteenth control valve D13, and the fourteenth control valve D14, thereby supplying a part of the cooling water generated in the cooling tower 2 to the second cooling coil 6b through the first flow path R1 and the 23rd flow path R23 in the second free cooling path 14, and returning the cooling water that has passed through the second cooling coil 6b to the cooling tower 2 through the 24th flow path R24 and the fourth flow path R4. At this time, the third pump P3 is in an operation stop state, and the eighth control valve D8 and the tenth control valve D10 are in a closed state, so that the supply of cold water to the second cooling coil 6b through the second cold water circulation path 18 on the second cooling coil 6b side is stopped.
[0111] The operation control unit 9 stops the flow of cold water in the second cold water circulation path 17 on the first cooling coil 6a side by stopping the operation of the sixth pump P6 and closing the seventh control valve D7, thereby stopping the supply of cold water to the first cooling coil 6a.
[0112] The operation control unit 9 controls the amount of cooling water supplied to the second cooling coil 6b by controlling the operating state of the seventh pump P7. The operation control unit 9 controls the output of the seventh pump P7 according to the magnitude of the heat load of the second cooling coil 6b.
[0113] The operation control unit 9 controls the operation state of the eighth pump P8 so as to secure the flow rate of the cooling water required by the high-temperature side heat exchange unit 7 and the low-temperature side heat exchange unit 8 based on the detection information of the seventh flow rate detection unit F7 and the eighth flow rate detection unit F8, thereby controlling the flow rate of the cooling water in the first free cooling path 12 on the high-temperature side and the first free cooling path 13 on the low-temperature side. The operation control unit 9 controls the eighth pump P8 so as to have a higher output as the flow rate of the cooling water required by the high-temperature side heat exchange unit 7 and the low-temperature side heat exchange unit 8 increases. In addition, the operation control unit 9 controls the flow rate of the cooling water in the second free cooling path 14 by controlling the operation state of the seventh pump P7 so as to secure the flow rate of the cooling water required by the second cooling coil 6b based on the detection information of the ninth flow rate detection unit F9, etc. The operation control unit 9 controls the seventh pump P7 so as to have a higher output as the flow rate of the cooling water required by the second cooling coil 6b increases.
[0114] In this way, in the free cooling mode, the eighth pump P8 is in an operating state and the eleventh control valve D11 and the twelfth control valve D12 are in an open state, so that the cooling water is supplied from the cooling tower 2 to the high-temperature side heat exchange unit 7 through the first free cooling path 12 on the high-temperature side, and heat exchange between the cooling water and the cold water is performed in the high-temperature side heat exchange unit 7, and the cooling water is supplied from the cooling tower 2 to the low-temperature side heat exchange unit 8 through the first free cooling path 13 on the low-temperature side, and heat exchange between the cooling water and the cold water is also performed in the low-temperature side heat exchange unit 8. As a result, not only can the cold water cooled in the high-temperature side heat exchange unit 7 be supplied to the high-temperature side first heat load device 4 through the high-temperature side first cold water circulation path 15 to perform cold heat utilization processing in the high-temperature side first heat load device 4, but also the cold water cooled in the low-temperature side heat exchange unit 8 be supplied to the low-temperature side first heat load device 5 through the low-temperature side first cold water circulation path 16 to perform cold heat utilization processing in the low-temperature side first heat load device 5.
[0115] Furthermore, since the seventh pump P7 is in an operating state and the thirteenth control valve D13 and the fourteenth control valve D14 are in an open state, cooling water is supplied from the cooling tower 2 to the second cooling coil 6b in the second free cooling path 14, and by cooling the air with the cooling water in the second cooling coil 6b, temperature-controlled air for cooling the space to be air-conditioned is generated, thereby conditioning the space to be air-conditioned.
[0116] Regarding the switching of operation modes by the operation control unit 9, the operation control unit 9 automatically switches between the normal mode (see FIG. 1), the first free cooling combination mode (see FIG. 2 and FIG. 3), the second free cooling combination mode (see FIG. 4), and the free cooling mode (see FIG. 5) based on the temperature of the cooling water after cooling by the cooling tower 2 (the temperature of the generated cooling water).
[0117] The operation control unit 9 acquires the temperature of the cooling water (the temperature of the generated cooling water) after cooling by the cooling tower 2 based on the detection information of the first temperature detection unit T1. Then, as shown in the flowchart of Fig. 6, the operation control unit 9 switches between the normal mode (see Fig. 1), the first free-cooling combination mode (see Figs. 2 and 3), the second free-cooling combination mode (see Fig. 4), and the free cooling mode (see Fig. 5) depending on the temperature range of the temperature detected by the first temperature detection unit T1.
[0118] 6, when the temperature detected by the first temperature detection unit T1 is higher than the upper temperature range, the operation control unit 9 switches the operation mode to the normal mode (if Yes in step #1, step #2). The upper temperature range is set to a temperature range that is lower than the set temperature (e.g., 32°C, corresponding to the first set temperature) at which free cooling can be used for the first heat load device 4 on the high temperature side, and higher than the set temperature (e.g., 24°C, corresponding to the first set temperature) at which free cooling can be used for the first heat load device 5 on the low temperature side.
[0119] When the temperature detected by the first temperature detector T1 is within the upper temperature region, the operation controller 9 switches the operation mode to the first free cooling combination mode on the high temperature side (if Yes in step #3, step #4).
[0120] If the temperature detected by the first temperature detection unit T1 is within the intermediate temperature region, the operation control unit 9 switches the operation mode to the first free cooling combined mode on the low temperature side (if Yes in step #5, step #6). The intermediate temperature region is set to a temperature region that is equal to or lower than a set temperature (e.g., 24°C, corresponding to the first set temperature) at which free cooling can be used for the first heat load device 5 on the low temperature side, and higher than a second set temperature (e.g., 20°C) at which free cooling can be used for the second heat load device 6.
[0121] If the temperature detected by the first temperature detection unit T1 is within the lower temperature range, the operation control unit 9 switches the operation mode to the second free cooling combined mode (if Yes in step #7, step #8). The lower temperature range is set to a temperature range that is equal to or lower than a second set temperature (e.g., 20°C) at which free cooling can be used for the second heat load device 6 and is higher than a third set temperature (e.g., 14°C) that is the required temperature of the second heat load device 6.
[0122] When the temperature detected by the first temperature detection unit T1 is equal to or lower than the third set temperature, the operation control unit 9 switches the operation mode to the free cooling mode (if Yes in step #9, step #10).
[0123] Fig. 1 shows a schematic configuration of the cooling water circuit and the chilled water circuit in the heat source equipment 1, but the piping can be doubled in the cooling water circuit and the chilled water circuit as shown in Fig. 7 and Fig. 8. This not only makes it possible to perform maintenance work efficiently, but also improves the reliability of the equipment, for example, because even if one device breaks down, the other device can be used to supply cooling water or chilled water.
[0124] Incidentally, in Fig. 7 and Fig. 8, the cooling water circuit and the chilled water circuit are shown separated by cutting them at intermediate locations. In Fig. 7 and Fig. 8, the cut locations are labeled "A1 to A13," and the same numbers are connected, such as "A1" in Fig. 7 and "A1" in Fig. 8. In Fig. 7 and Fig. 8, as in Fig. 1, in normal mode, the locations through which the cooling water and chilled water flow are indicated by thick lines, and the locations through which the cooling water and chilled water do not flow are indicated by thin lines.
[0125] 7, the first header H1 and the second header H2 are doubled, and therefore, at least a portion of the first to fourth flow paths R1 to R4 connected to the first header H1 and the second header H2 are doubled. The third header H3 and the fourth header H4 are also doubled, and therefore, at least a portion of the fifth flow path R5, the sixth flow path R6, the seventh flow path R7, the eighth flow path R8, the eleventh flow path R11, the twelfth flow path R12, the fifteenth flow path R15, the sixteenth flow path R16, the seventeenth flow path R17, and the eighteenth flow path R18 are doubled.
[0126] As shown in FIG. 8, the high-temperature side heat exchange section 7 and the low-temperature side heat exchange section 8 are duplicated, and accordingly, the tenth flow path R10 and the fourteenth flow path R14 are duplicated. In addition, since a plurality of second heat load devices 6 (for example, three) can be provided, the fifteenth flow path R15, the sixteenth flow path R16, the seventeenth flow path R17, and the eighteenth flow path R18 are connected to each of the plurality of second heat load devices 6. When a plurality of second heat load devices 6 are provided, they are provided in parallel as shown in FIG. 8. By providing a plurality of second heat load devices 6, it is possible to perform air conditioning for a plurality of different air-conditioned spaces, but it is also possible to perform air conditioning for one air-conditioned space using a plurality of second heat load devices 6.
[0127] Although not shown in the drawings, it is also possible to provide a plurality of high-temperature side first heat load devices 4 and a plurality of low-temperature side first heat load devices 5. In this case, a plurality of high-temperature side first heat load devices 4 and a plurality of low-temperature side first heat load devices 5 can be provided in parallel.
[0128] [Another embodiment] Other embodiments of the present invention will be described below. Note that the configurations of the embodiments described below are not limited to being applied alone, but may also be applied in combination with the configurations of other embodiments.
[0129] (1) In the above embodiment, the first thermal load equipment 4, 5 is configured as a cooling equipment for cooling electronic equipment, information processing equipment, etc., and the second thermal load equipment 6 is configured as an air conditioner for conditioning the space to be air-conditioned. However, a wide variety of thermal load equipment can be applied as long as it includes two types of thermal load equipment, a first thermal load equipment and a second thermal load equipment, which have different required temperatures.
[0130] (2) In the above embodiment, the first thermal load devices 4, 5 are two types of thermal load devices with different required temperatures, the first thermal load device 4 on the high temperature side and the first thermal load device 5 on the low temperature side. However, for example, it is also possible to have three or more types of thermal load devices with different required temperatures, or conversely, it is also possible to have one type of thermal load device.
[0131] (3) In the above embodiment, the operation control unit 9 switches the operation mode based on the temperature of the cooling water after cooling by the cooling tower 2, but for example, the operation control unit can also switch the operation mode based on the outside air temperature, and can switch the operation mode based on various conditions such as the season, date, etc. In addition, the operation mode can also be manually switched based on the human operation of a user, manager, etc. [Explanation of symbols]
[0132] 2 cooling tower 3. Refrigeration machine 4. First heat load equipment on the high temperature side 5. First heat load equipment on the low temperature side 6 Second heat load equipment 6a First cooling coil 6b Second cooling coil 7 High temperature side heat exchange section 8 Low temperature side heat exchange section 9 Operation control unit 11 Cooling water circulation path 12 First free cooling path on the high temperature side 13 First free cooling passage on the low temperature side 14 Second free cooling route 15 First cold water circuit on the high temperature side 16 First cold water circuit on the low temperature side 17 Second cold water circuit on the first cooling coil side 18 Second cooling coil side second cold water circuit
Claims
1. a cooling water circulation path for circulating the cooling water cooled in the cooling tower between the cooling tower and the refrigerator; a first cold water circulation path that circulates cold water cooled by the refrigerator using the cooling water between the refrigerator and a first heat load device; a second cold water circulation path that circulates the cold water between a second heat load device having a lower available temperature for free cooling than the first heat load device and the refrigerator; a first free cooling path that circulates the cooling water between a heat exchange unit provided in a return path from the first heat load device to the chiller in the first chilled water circulation path and the cooling tower, thereby enabling cooling of the return chilled water from the first heat load device to the chiller in the heat exchange unit; A second free cooling path is provided for circulating the cooling water between the cooling tower and the second heat load device to enable direct supply of the cooling water to the second heat load device; The second heat load device includes a first cooling coil to which the cold water is supplied, and a second cooling coil to which the cold water or the cooling water is supplied, the first cold water circulation path and the second cold water circulation path are connected in parallel to the chiller, and the chilled water from the chiller can be supplied to the first cold water circulation path and the second cold water circulation path; an operation control unit that switches an operation mode between a first free cooling combined mode in which the cooling water cooled by operating the refrigerator is branched into the first cold water circulation path and the second cold water circulation path and circulated, and a second free cooling combined mode in which the cooling water is circulated through the first free cooling path and the second free cooling path in the circulation state; In the second free cooling combined mode, the cold water is supplied to the first cooling coil and the cooling water is supplied to the second cooling coil.
2. The heat source equipment of claim 1, wherein the operation control unit switches the operation mode to a first free cooling combination mode when, based on the temperature of the cooling water after cooling by the cooling tower, the temperature of the cooling water is below a first set temperature at which the free cooling can be used for the first heat load equipment and is within a temperature range exceeding a second set temperature at which the free cooling can be used for the second heat load equipment, and switches the operation mode to a second free cooling combination mode when the temperature of the cooling water is below the second set temperature.
3. The heat source equipment according to claim 1 or 2, wherein the second heat load equipment is an air conditioner that cools air using the first cooling coil and the second cooling coil, and the second cooling coil is arranged upstream of the first cooling coil in the air flow direction.
4. The heat source equipment according to any one of claims 1 to 3, wherein the operation control unit switches the operation mode to a free cooling mode in which the cooling water is circulated through both the first free cooling path and the second free cooling path with at least the operation of the chiller stopped when the temperature of the cooling water is equal to or lower than a third set temperature, which is a required temperature of the second heat load equipment that is lower than a second set temperature at which the free cooling can be used for the second heat load equipment.
Citation Information
Patent Citations
Method for cooling computer room
JP2002061911A
Free cooling utilized cold / heat source facility
JP2004132651A
Air conditioning system
JP2005061647A
Cooling system and method using free cooling
JP2008215730A
Intermediate temperature heat source system concurrently utilizing free cooling operation
JP2012072921A