How to determine plastic flow properties
By measuring soil pressure with paired gauges and calculating differential earth pressure, the method simplifies the evaluation of plastic fluidity, enhancing accuracy and uniformity of earth pressure application in excavated soil.
Patent Information
- Application Number
- JP2021127231
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-08-03
- Publication Date
- 2024-10-17
- Estimated Expiration
- 2041-08-03
AI Technical Summary
Existing methods for understanding plastic fluidity of excavated soil in a chamber are time-consuming and difficult to evaluate intuitively, requiring complex numerical analysis and are influenced by the rotation of the cutter head.
Measuring soil pressure with a pair of soil pressure gauges installed on the stirring blade or fixed blade, calculating differential earth pressure, and confirming if it falls within management reference values set based on tests with adjusted soil samples, using the differential earth pressure as an index for plastic fluidity evaluation.
Enables easy and accurate determination of plastic fluidity, reducing the influence of confining earth pressure and cutter head rotation, ensuring uniform earth pressure application to the excavation face.
Smart Images

Figure 0007569289000003 
Figure 0007569289000004 
Figure 0007569289000005
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for determining the plastic flow properties of excavated soil in a chamber. [Background technology]
[0002] The shield tunneling method is one of the non-open cut methods that is widely used when constructing underground structures in relatively soft ground. The main excavation methods for the shield tunneling method are earth pressure type (including mud pressure type) and muddy water type. In the earth pressure shield tunneling method, the earth pressure of the excavated soil generated during tunnel excavation acts on the tunnel face to stabilize the tunnel face while excavating. In order to ensure the stability of excavation in the earth pressure shield tunneling method, it is important to maintain "plastic fluidity" that maintains appropriate separation resistance and fluidity by stirring the excavated soil with a stirring blade while adding additives and water as necessary in the chamber. In order to ensure that the earth pressure on the tunnel face is uniform and stable, it is necessary to accurately grasp the plastic fluidity of the excavated soil in the chamber and adjust it as necessary. Therefore, Patent Document 1 discloses a method in which the earth pressure inside the chamber is measured using an earth pressure gauge in the chamber bulkhead, which is normally installed in a shield machine, and the measured values are numerically analyzed to calculate evaluation indexes of plastic fluidity (RMS amplitude and waveform area), and the plastic flow state is evaluated based on the relationship between the RMS amplitude and shear rate and the relationship between the waveform area and the reciprocal of the separation distance between the agitator blade and the earth pressure gauge. The applicant has also disclosed a method for estimating whether or not the excavated soil is in a state of plastic flow by measuring earth pressure using a first earth pressure gauge attached to the agitator blade and a second earth pressure gauge attached to the chamber partition, subtracting the static earth pressure calculated from the measurement value of the second earth pressure gauge from the measurement value of the first earth pressure gauge to calculate the resistive earth pressure of the excavated soil in the chamber, and comparing this resistive earth pressure with preset upper and lower limit values of the resistive earth pressure of the excavated soil in a state of plastic flow. However, the method of Patent Document 1 requires complex numerical analysis to calculate the evaluation index, which is time-consuming and makes it difficult to intuitively evaluate. Furthermore, the method of Patent Document 2 requires a lot of work to calculate the static earth pressure according to the position (height) of the first earth pressure gauge, which varies with the rotation of the cutter head. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2017-025480 A [Patent Document 2] JP 2017-106263 A Summary of the Invention [Problem to be solved by the invention]
[0004] From this perspective, the present invention aims to propose a method for grasping plastic fluidity that enables easy and accurate grasping of the plastic fluidity of excavated soil in a chamber. [Means for solving the problem]
[0005] The method of grasping the plastic fluidity of the present invention for solving the above-mentioned problem comprises the steps of measuring earth pressure with a pair of earth pressure gauges installed in a chamber, calculating a differential earth pressure, which is the absolute value of the value obtained by subtracting the value measured by one of the earth pressure gauges from the value measured by the other earth pressure gauge, and confirming whether or not the differential earth pressure is within the range of the control standard value. The earth pressure gauges are installed on the front side and rear side of the forward rotation direction of the cutter head, respectively, of either a protrusion (agitating blade) formed on the rear surface of the cutter head or a protrusion (fixed blade) formed on the front surface of the bulkhead. The range of the control standard value is Based on the test results of measuring the earth pressure acting on a moving body moving in a soil tank in which a sample in a plastic flow state in which the slump value has been adjusted by adding a muddy material to excavated soil or a material of the same quality as excavated soil is stored, The upper and lower limits of the differential earth pressure within For each slump value It is set 。 According to this method for grasping plastic fluidity, since the evaluation index is calculated using an earth pressure gauge installed on the same protrusion (mixing blade or fixed blade), the index for evaluating plastic fluidity can be calculated more easily. In addition, by using the differential earth pressure as the index of plastic fluidization, the influence of the confining pressure of the earth pressure and the rotation speed of the cutter head can be mitigated, and the accuracy is increased. In addition, when the earth pressure gauge is installed on a protrusion (agitating blade) formed on the back of the cutter head, the earth pressure gauge installed on the front side of the cutter head in the direction of rotation may be regarded as the first earth pressure gauge, and the earth pressure gauge installed on the rear side of the cutter head in the direction of rotation may be regarded as the second earth pressure gauge, and the value obtained by subtracting the measurement value of the second earth pressure gauge from the measurement value of the first earth pressure gauge may be regarded as the differential earth pressure. In addition, when the earth pressure gauge is installed on a protrusion (fixed wing) formed on the front surface of the bulkhead, the earth pressure gauge installed on the front side of the cutter head in the direction of rotation may be regarded as the first earth pressure gauge, and the earth pressure gauge installed on the rear side of the cutter head in the direction of rotation may be regarded as the second earth pressure gauge, and the value obtained by subtracting the measurement value of the first earth pressure gauge from the measurement value of the second earth pressure gauge may be regarded as the differential earth pressure. Effect of the Invention
[0006] According to the method for determining the plastic fluidity of excavated soil of the present invention, it is possible to easily and accurately determine the plastic fluidity within the chamber. [Brief description of the drawings]
[0007] [Figure 1] 1 is a perspective view showing an overview of a shield excavator according to an embodiment of the present invention. [Diagram 2] FIG. 2A is a front view showing a protrusion formed on the rear surface of a cutter head or the front surface of a chamber partition, and FIG. 2B is an enlarged oblique view showing a first earth pressure gauge and a second earth pressure gauge provided on the protrusion. [Diagram 3] FIG. 1 is a cross-sectional view showing a test device for setting control reference values. [Figure 4] 1 is a graph showing particle size accumulation curves of samples used in an experiment. [Diagram 5] 13 is a graph showing the average value of the measurement results of an earth pressure gauge provided on the front side in the direction of movement of the moving body. [Figure 6] 13 is a graph showing the average value of the measurement results of an earth pressure gauge installed on the rear side of the moving body in the direction of movement. [Figure 7] 1 is a graph showing the relationship between differential earth pressure and slump. [Figure 8] FIG. 13 is a plan view showing a test device according to another embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] In the embodiment of the present invention, a case where a tunnel is constructed by an earth pressure shield method will be described. In the earth pressure shield method, the excavated soil generated by excavating the natural ground is stirred in a chamber to give it plastic fluidity, and the earth pressure of the excavated soil is applied to the face to stabilize the face while excavating. In order to stabilize the face and ensure workability, it is necessary to apply earth pressure uniformly and stably to the face. In order to ensure that the earth pressure on the face is uniform and stable, it is necessary to accurately grasp the plastic fluidity of the excavated soil in the chamber and adjust the amount and injection location of additives such as mud adders and aerating agents as necessary. In this embodiment, a method for grasping plastic fluidity includes an earth pressure measurement process, a differential earth pressure calculation process, and a plastic fluidity confirmation process, allowing construction to be carried out while accurately grasping the properties of the excavated soil in the chamber.
[0009] The shield excavator 1 of this embodiment is shown in Figure 1. As shown in Figure 1, the shield excavator 1 of this embodiment is equipped with a cylindrical shield machine body 2 and a cutterhead 3 provided on the front of the shield machine body 2. The front (face side) of the shield machine body 2 is shielded by a bulkhead (chamber partition) 4. Between the cutterhead 3 and the bulkhead 4, a chamber 5 is formed into which the excavated soil is taken in.
[0010] The cutter head 3 is provided with a plurality of cutter bits 31, 31, ... on the front surface (face side) and cuts the natural ground by rotating. A plurality of mixing blades (protrusions) 32 for mixing the excavated soil in the chamber 5 are protrudingly provided on the back surface of the cutter head 3. FIG. 2 shows an example of the arrangement of the mixing blades 32 and the fixed blades 41. In this embodiment, a plurality of mixing blades 32, 32, ... are radially arranged at intervals on the back surface of the cutter head 3. The arrangement and number of the mixing blades 32 are not limited and may be set appropriately. As shown in Fig. 2(b), a first earth pressure gauge 6 and a second earth pressure gauge 7 are fixed to the multiple agitating blades 32. The first earth pressure gauge 6 is provided on the front side of the agitating blade 32 in the rotation (forward) direction of the cutter head 3. On the other hand, the second earth pressure gauge 7 is provided on the rear side of the agitating blade 32 in the rotation direction of the cutter head 3 (opposite side to the first earth pressure gauge 6).
[0011] As shown in Fig. 1, the bulkhead 4 is provided on the front side of the shield machine main body 2, and is a partition wall that prevents excavated soil from flowing into the shield machine main body 2. In this embodiment, a plurality of fixed blades (protrusions) 41, 41, ... are protrudingly provided on the front side (the surface on the chamber 5 side) of the bulkhead 4. The multiple fixed blades 41, 41, ... are arranged radially at intervals as shown in Fig. 2(a). The fixed blades 41 are arranged in a state where a space is secured for the agitating blades 32 to pass through, so that the fixed blades 41 do not come into contact with the agitating blades 32 that rotate with the rotation of the cutter head 3. As shown in Fig. 2(b), a first earth pressure gauge 6 and a second earth pressure gauge 7 are fixed to the multiple fixed blades 41. The first earth pressure gauge 6 is provided on the front side of the fixed blade 41 in the rotation direction of the cutter head 3. On the other hand, the second earth pressure gauge 7 is provided on the rear side of the fixed blade 41 in the rotation direction of the cutter head 3 (opposite side to the first earth pressure gauge 6).
[0012] The earth pressure measurement step is a step of measuring the earth pressure of the excavated soil in the chamber 5 by the first earth pressure gauge 6 and the second earth pressure gauge 7. The following describes the case where the first earth pressure gauge 6 and the second earth pressure gauge 7 installed on the mixing blade 32 are used. Note that the measurement of earth pressure by the first earth pressure gauge 6 and the second earth pressure gauge 7 installed on the fixed blade 41 is also performed in the same manner. The first earth pressure gauge 6 measures the earth pressure acting on the front surface of the agitator 32 when the agitator 32 rotates (moves). On the other hand, the second earth pressure gauge 7 measures the earth pressure acting on the rear surface of the agitator 32 when the agitator 32 rotates (moves). The first earth pressure gauge 6 and the second earth pressure gauge 7 are connected to a measurement system (not shown), and the measurement results of the first earth pressure gauge 6 and the second earth pressure gauge 7 are input to the measurement system together with position information of the mixing blade 32. The measurement system stores the measurement values of the first earth pressure gauge 6 and the second earth pressure gauge 7.
[0013] The differential earth pressure calculation step is a step of calculating the differential earth pressure from the measurement results of the first earth pressure gauge 6 and the measurement results of the second earth pressure gauge 7 inputted into the measurement system. The differential earth pressure is the absolute value of the value obtained by subtracting the measurement value of the second earth pressure gauge 7 from the measurement value of the first earth pressure gauge 6. In this embodiment, the differential earth pressure is calculated every time the cutter head 3 rotates once, but the frequency at which the differential earth pressure is calculated is not limited. The differential earth pressure is stored in the measurement system together with the measurement time and the position of the mixing blade 32.
[0014] The plastic fluidity confirmation process is a process for confirming whether or not the differential earth pressure is within the range of the control reference value. If the differential earth pressure is within the range of the control standard value, the excavated soil is presumed to be in a plastic flow state, and if the differential earth pressure is outside the control standard value, the excavated soil is presumed to be in a plastic or flow state. In this embodiment, the result of the comparison between the differential earth pressure and the control standard value is displayed on the monitor of the measurement system. If it is confirmed that the excavated soil in the chamber 5 is not in a plastic flow state (if the differential earth pressure is outside the control standard value), a warning is displayed on the monitor of the measurement system and a warning sound is sounded. The worker adjusts the injection amount of additives, etc. in response to the warning from the measurement system.
[0015] The range of the control standard value is preset based on the upper and lower limits of the differential earth pressure in the excavated soil in a plastic flow state. An example of how to set the control standard value is shown below. The range of the control standard value is set based on the test results of measuring the earth pressure acting on a moving body 82 moving in a soil tank 81 in which a sample 9 in a plastic flow state is stored. The samples used have their slump value adjusted by adding mud-adding materials for each of several types of soil, such as clayey soil, sandy soil, and gravel soil. The test apparatus 8 is shown in Fig. 3. As shown in Fig. 3, a movable body 82 is supported in a soil tank 81 so as to move up and down. Earth pressure gauges 61, 71 are attached to the top and bottom of the movable body 82. In the test apparatus of Fig. 3, the earth pressure gauges 61, 71 attached to the movable body 82 are installed at an angle with respect to the direction of movement of the movable body 82 so that earth pressure acts in the same direction as the earth pressure acting on the earth pressure gauges 61, 71 (first earth pressure gauge 6 and second earth pressure gauge 7) attached to the mixing blade 32 rotating in the chamber 5. In the test, a sample (soil) 9 with its slump adjusted to be in a plastic flow state is stored in a soil tank 81, and the earth pressure is measured by the earth pressure gauges 61, 71 when a moving body 82 is moved up and down, and the absolute value of the difference in the measured values of the upper and lower earth pressure gauges 61, 71 is calculated. By conducting multiple tests on samples with different slumps, the range of the control standard values (upper and lower limits of the differential earth pressure) is set.
[0016] According to the method for grasping the plastic fluidity of this embodiment, the evaluation index is calculated using the first earth pressure gauge 6 and the second earth pressure gauge 7 installed on the same mixing blade 32 (or fixed blade 41), so that the index for evaluating the plastic fluidity can be calculated more simply. Furthermore, by using the differential earth pressure as the index of plastic fluidization, the influence of the confining earth pressure and the rotation speed of the cutter head 3 can be mitigated, and the accuracy is increased. In addition, by managing each position of the mixing blade 32, the distribution of properties can be understood, and the necessary processing can be carried out more appropriately. For example, by checking the distribution of properties, the amount of additive injected can be increased at positions with a high degree of plasticity and decreased at positions with high fluidity, thereby ensuring uniform plastic fluidity overall and equalizing the earth pressure on the face. The amount of additive injected can be adjusted manually by an operator based on the distribution of the properties of the excavated soil, or automatically based on the results of calculations by a measurement system.
[0017] Next, the results of an experiment carried out on the method for grasping plastic fluidity of this embodiment will be described. Fig. 3 shows the test device 8 used in the experiment. In this experiment, as shown in Fig. 3, a test device 8 equipped with a soil tank 81 having a pressurizing mechanism and a moving body 82 (a model of the mixing blade 32) that moves up and down in the soil tank 81 is used. A rubber plate 83 is provided at the bottom of the soil tank 81, and the sample 9 in the soil tank 81 is pressurized by gas pumped from a compressor 84 through the rubber plate 83. Earth pressure gauges 61, 71 are attached to the upper and lower surfaces of the movable body 82. The earth pressure gauges 61, 71 installed on the movable body 82 are installed at an angle with respect to the moving direction (vertical) of the movable body 82 so that an earth pressure acts on them in the same direction as the earth pressure acting on the first earth pressure gauge 6 and the second earth pressure gauge 7 attached to the mixing blade 32 rotating in the chamber 5. In the experiment, samples were used that had their slump values adjusted by adding mineral-based mud additives to gravel-based materials, sand-based materials, clay-based materials, and sand-clay intermediate materials. Table 1 shows the mud additive concentrations and slump values of the samples, and Table 2 shows the experimental conditions. Figure 4 shows the grain size accumulation curves of the samples used.
[0018] [Table 1]
[0019] [Table 2]
[0020] The experiment was carried out by measuring the earth pressure when the moving body 82 was moved up and down in the soil tank 81 in which the sample 9 was stored, using the earth pressure gauges 61 and 71. At this time, the upper end side of the soil tank was set as the initial position, and the earth pressure was measured when the moving body 82 was moved up and down (pushed down and pulled up) for 2 to 3 cycles. In addition, in order to eliminate the influence of the boundary surface of the soil tank 81, the earth pressure at the middle part in the height direction (mid-way of movement) was extracted, and the average value of the measurement values of the earth pressure gauges 61 and 71 installed on the front side of the moving direction of the moving body and the average value of the measurement values of the earth pressure gauges 61 and 71 installed on the rear side of the moving direction of the moving body 82 were calculated. Figure 5 shows the average value of the earth pressure measured by the earth pressure gauges 61 and 71 on the front side, and Figure 6 shows the average value of the earth pressure measured by the earth pressure gauges 61 and 71 on the rear side. As shown in Figure 5, the earth pressure on the front side increased as the slump decreased. On the other hand, the earth pressure on the rear side varied around the pressure conditions, regardless of the slump, as shown in Figure 6. FIG. 7 shows the relationship between the differential earth pressure, which is the absolute value obtained by subtracting the measurement value of the earth pressure gauge 71 on the rear side from the measurement value of the earth pressure gauge 61 on the front side, and the slump. As shown in FIG. 7, the differential earth pressure tends to increase as the slump decreases. Therefore, it was confirmed that there is a correlation between the differential earth pressure and the slump of the sample. Therefore, it was confirmed that it is possible to estimate the slump (plastic fluidity) of the excavated soil by the differential earth pressure calculated from the earth pressure of the excavated soil in the chamber 5.
[0021] The embodiment of the present invention has been described above. However, the present invention is not limited to the above embodiment, and each of the above components can be appropriately modified without departing from the spirit of the present invention. In the above embodiment, the control reference value is set by testing, but the method for setting the control reference value is not limited to this. For example, if there is existing data, the existing data may be used. The configuration of the test equipment 8 used for testing when setting the control standard value is not limited to that shown in the above embodiment. For example, as shown in FIG. 8, a test equipment 8 having a moving body 82 that rotates within a sample stored in a soil tank 81 may be used. On-site generated soil may be used as material for testing when setting control standard values. When calculating the differential earth pressure using a pair of earth pressure gauges attached to the mixing blades, it is sufficient to subtract the measurement value of the second earth pressure gauge from the measurement value of the first earth pressure gauge, and when calculating the differential earth pressure using a pair of earth pressure gauges attached to the fixed blades, it is sufficient to subtract the measurement value of the first earth pressure gauge from the measurement value of the second earth pressure gauge. [Explanation of symbols]
[0022] 1. Shield tunneling machine 2. Shield machine body 3. Cutter head 31 Cutter Bit 32 Agitating blade (protrusion) 4 Bulkhead (chamber bulkhead) 41 Fixed wing (protrusion) 5. Chamber 6 First earth pressure gauge 7 Second earth pressure gauge 8. Test Equipment 81 Earthen tank 82 Mobile
Claims
1. measuring earth pressure with a pair of earth pressure gauges provided in the chamber; A step of calculating a differential earth pressure, which is an absolute value of a value obtained by subtracting a measurement value of one of the earth pressure gauges from a measurement value of the other earth pressure gauge; A method for grasping plastic fluidity comprising a step of confirming whether the differential earth pressure is within a range of a control reference value, The earth pressure gauges are provided on either a protrusion formed on a rear surface of the cutter head or a protrusion formed on a front surface of the bulkhead, on the front side of the cutter head in the forward rotation direction and on the rear side of the protrusion in the forward rotation direction, A method for grasping plastic fluidity, characterized in that the range of the control standard values is set for each slump value by upper and lower limits of the differential earth pressure within the sample, based on test results in measuring the earth pressure acting on a moving body moving within a soil tank in which samples in a plastic flow state whose slump value has been adjusted by adding mud-adding material to excavated soil or material of equivalent quality to excavated soil are stored.
2. measuring earth pressure with a pair of earth pressure gauges provided in the chamber; A step of calculating a differential earth pressure, which is a value obtained by subtracting a measurement value of a second earth pressure gauge, which is one of the earth pressure gauges, from a measurement value of a first earth pressure gauge, which is one of the earth pressure gauges; A method for grasping plastic fluidity comprising a step of confirming whether the differential earth pressure is within a range of a control reference value, The earth pressure gauge provided on the front side of the protrusion formed on the back surface of the cutter head in the rotation direction of the cutter head is defined as the first earth pressure gauge, The earth pressure gauge provided on the rear side of the protrusion in the rotation direction of the cutter head is the second earth pressure gauge, A method for grasping plastic fluidity, characterized in that the range of the control standard values is set for each slump value by upper and lower limits of the differential earth pressure within the sample, based on test results in measuring the earth pressure acting on a moving body moving within a soil tank in which samples in a plastic flow state whose slump value has been adjusted by adding mud-adding material to excavated soil or material of equivalent quality to excavated soil are stored.
3. measuring earth pressure with a pair of earth pressure gauges provided in the chamber; A step of calculating a differential earth pressure, which is a value obtained by subtracting a measurement value of a first earth pressure gauge, which is one of the earth pressure gauges, from a measurement value of a second earth pressure gauge, which is the other of the earth pressure gauges; A method for grasping plastic fluidity comprising a step of confirming whether the differential earth pressure is within a range of a control reference value, The earth pressure gauge provided on the front side of the protrusion formed on the front surface of the bulkhead in the rotation direction of the cutter head is defined as the first earth pressure gauge, The earth pressure gauge provided on the rear side of the protrusion in the rotation direction of the cutter head is the second earth pressure gauge, A method for grasping plastic fluidity, characterized in that the range of the control standard values is set for each slump value by upper and lower limits of the differential earth pressure within the sample, based on test results in measuring the earth pressure acting on a moving body moving within a soil tank in which samples in a plastic flow state whose slump value has been adjusted by adding mud-adding material to excavated soil or material of equivalent quality to excavated soil are stored.
Citation Information
Patent Citations
Determination system of property of sediment of shielding excavator
JP1987021994A
Plastic fluidity assessment method for excavated soil inside chamber in earth pressure-type shield construction method, assessment device, and earth pressure-type shield excavator
JP2017025480A
Plastic fluidity grasping method
JP2017106263A
Plastic fluidity evaluation device and shield boring machine equipped with the same
JP2021001461A
