Methods for handling phase-to-phase short circuits in three-phase non-earthed power supply systems.
Control switches and power electronic switches in the power supply system manage phase-to-phase short circuits by detecting current pulses and generating controlled current pulses to isolate faults, addressing inefficiencies in conventional methods and reducing power outages.
Patent Information
- Application Number
- JP2023558926
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-12-12
- Filing Date
- 2021-12-02
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-12-02
AI Technical Summary
Conventional methods for handling phase-to-phase short circuits in three-phase non-effectively grounded power supply systems are inefficient, leading to prolonged exposure to short-circuit currents, potential damage, and large power grid impacts due to the inability to automatically and accurately locate and eliminate faults.
Implementing control switches in the power supply system to detect current pulses and disconnect circuits based on preset pulse counts, creating artificial grounding to form closed circuits with faulty phases, generating controlled current pulses to isolate faults, and using power electronic switches for timely disconnection.
Quickly and accurately converts phase-to-phase faults into single-phase ground faults, enabling automatic fault elimination and minimizing power outages by controlling current pulses and disconnections.
Smart Images

Figure 0007575620000001 
Figure 0007575620000002
Abstract
Description
[Technical field]
[0001] The present invention relates to the field of power supply system fault handling, and in particular to a method for handling a phase-to-phase short circuit fault in a three-phase non-effectively grounded power supply system. [Background technology]
[0002] At present, when a phase-to-phase short circuit occurs for a circuit in a three-phase non-effectively grounded power supply system, the usual methods are as follows: 1, the method of adopting reclosing: first disconnect the first circuit breaker on this circuit, and then close this first circuit breaker. If it is an instantaneous phase-to-phase short circuit, it will be eliminated after the first circuit breaker is closed, and normal power supply will continue. If this phase-to-phase short circuit fault still exists after the first circuit breaker is closed, disconnect the first circuit breaker and wait for inspection. 2, the method of adopting the time-step cooperation method: that is, the circuit breakers of the same circuit are different according to the distance from the power source, and adjust different overcurrent trip times, and the closer to the power source, the longer the trip time, and the generally settling step is 100ms, and this time is determined by the opening and closing time of the machine operation and the consumption time of the algorithm, this method can isolate the fault area, but for faults whose fault points are close to the power source, the power supply system has a longer time to withstand the short circuit current, and the impact on the power grid is greater. 3. Trip the first circuit breaker due to overcurrent, then trip the last circuit breaker. If the fault occurs after the last circuit breaker, the fault can be eliminated; otherwise, close the first circuit breaker; if there is still a fault current, trip the first circuit breaker due to overcurrent, then open the second circuit breaker; if a phase-to-phase short circuit occurs between the second circuit breaker and the last circuit breaker, the fault can be eliminated; by analogy, open the circuit breakers in order forward until the fault is eliminated. However, during this operation, the circuit breakers that have not been opened and the power supply system continue to be shocked by a large short-circuit current, and if the time is too long or the number of times is too large, it may cause damage to the circuit. If the duration of the phase-to-phase short circuit should not exceed 300 milliseconds and the trip time of the circuit breaker is 100 milliseconds, generally, it should not exceed three circuit breakers on the circuit, otherwise the above method may cause the circuit to be shocked for more than 300 milliseconds. For this reason, the conventional phase-to-phase short circuit processing methods all have the disadvantages of taking a long time to process the fault and not being able to automatically eliminate the fault. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] China Patent Application Publication No. 105006810 Summary of the Invention [Problem to be solved by the invention]
[0004] The present invention aims to provide a method for treating a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system, which can quickly locate a phase-to-phase short circuit fault section, automatically, quickly and accurately remove the fault, effectively improve the quality of treating the phase-to-phase short circuit fault, and improve the safety of power supply. [Means for solving the problem]
[0005] In order to achieve the above object, the present invention employs the following embodiments. A method for handling a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system, comprising: a plurality of control switches distributed in the three-phase non-effectively grounded power supply system; the control switches can detect current pulses; and cut off a circuit according to the number of current pulses; When a simple two-phase or three-phase short circuit occurs in one circuit, (a) maintain one faulty phase of the circuit in conduction, trip the other faulty phase, artificially ground another faulty phase that is in conduction with the one faulty phase, and then cyclically connect / disconnect one live phase or neutral point of the three-phase non-effectively grounded power supply system, except for the one faulty phase, to the ground so as to form a closed circuit with the one faulty phase and generate a current pulse, and set the number of current pulses that trigger the disconnection in the control switch downstream of the power source to be less than the number of current pulses that trigger the disconnection in the control switch upstream of the power source, and after a control switch reaches a trigger condition and disconnects the circuit, stop the grounding of the other fault and stop the grounding of the one live phase or the neutral point; When a ground fault occurs in one circuit due to a two-phase or three-phase short circuit, the fault is dealt with in accordance with the above method (a), or (b) one faulty phase of the circuit is kept conductive, the other faulty phases are tripped, and then one live phase or neutral point of the power supply system, except for the one faulty phase, is cyclically connected to and disconnected from the ground so as to form a closed circuit with the one faulty phase and generate a current pulse, the number of current pulses that triggers disconnection in a control switch downstream of the power source is set to be smaller than the number of current pulses that trigger disconnection in a control switch upstream of the power source, and after a control switch reaches a trigger condition and disconnects the circuit, the grounding of the one live phase or neutral point is stopped.
[0006] Preferably, in the method (a) and method (b), maintaining the continuity of the one faulted phase includes tripping the one faulted phase and then conducting the one faulted phase, and not tripping the one faulted phase.
[0007] Preferably, in the method (a), first, a first circuit breaker of the one circuit is tripped, then the one faulty phase is short-circuited in the first circuit breaker via a first switch to make the one faulty phase conductive, the first switch is the control switch, the other faulty phase is artificially grounded at the outlet of the first circuit breaker via a third switch, the one live phase is cyclically connected / disconnected to the ground at the inlet of the first circuit breaker or the system neutral point via a second switch to form a closed circuit with the one fault and generate a current pulse, after a certain control switch reaches a trigger condition and breaks the circuit, the first switch and the third switch are turned off, and the grounding of the second switch is stopped, and then the first circuit breaker is closed.
[0008] Preferably, in the method (b), first, a first circuit breaker of the first line is tripped, then the one faulty phase is short-circuited by the first circuit breaker via a first switch to make the one faulty phase conductive, the first switch is the control switch, and the one live phase is cyclically connected / disconnected to the ground at the inlet of the first circuit breaker or the system neutral point via a second switch to form a closed circuit with the one fault and generate a current pulse, after a certain control switch reaches a trigger condition and breaks the circuit, the first switch is turned off and the second switch is stopped from being grounded, and then the first circuit breaker is closed.
[0009] Preferably, the second switch is a power electronic switch.
[0010] Preferably, the power electronic switches are insulated gate bipolar transistors.
[0011] Preferably, when the control switch reaches a trigger condition and breaks the circuit, it simultaneously sends a signal to the second switch to remove the second switch from grounding.
[0012] Preferably, the control switch can cut off the circuit in a timely manner according to the number of current pulses to avoid the passage of the next current pulse.
[0013] Preferably, in method (b), when the resistance of the closed circuit is relatively small, the closed circuit is connected to ground when the voltage phase angle is zero to obtain a current pulse with a relatively small peak value, or when the resistance of the closed circuit is relatively large, the closed circuit is connected to ground when the voltage phase angle is 90 degrees to obtain a current pulse with a relatively large peak value.
[0014] Preferably, the magnitude of the current pulse is monitored and when the instantaneous value of the current pulse reaches a preset value, i.e., the second switch is turned off to complete the pulse operation, and the peak of each current pulse is controlled so as not to exceed the preset value.
[0015] Preferably, in the method (a) and the method (b), a current limiting resistor is connected in series to the closed circuit.
[0016] Preferably, a variable resistor is connected in series between the second switch and ground. Effect of the Invention
[0017] The beneficial effects of the present invention are as follows: After the occurrence of phase-to-phase short circuit fault, the original fault current is first cut off, and then a current pulse is artificially created and flows through the new circuit of the original whole fault circuit or partial fault circuit, which is used for fault analysis. Specifically, one fault phase is made to be single-phase grounded, another fault phase (two-phase short circuit) is cut off, or the third phase (three-phase short circuit) is cut off at the same time, and then one live phase or neutral point of the power supply system is cyclically grounded and cut off to form a closed circuit with the fault phase of the ground to generate a current of a controllable magnitude, and the current pulse is detected through the control switch of the fault phase, and the control switch is turned off after reaching the trigger condition, and the number of current pulses that trigger the cut-off in the control switch downstream of the power supply is less than the number of current pulses that trigger the cut-off in the control switch upstream of the power supply, so the control switch after the phase-to-phase short circuit fault point on the fault phase does not enter a closed circuit and there is no current flowing, so the first control switch before the phase-to-phase short circuit fault point is turned off first to determine the elimination of the phase-to-phase short circuit fault. In the above case, if the single-phase grounding is caused by a phase-to-phase short circuit, the corresponding grounding point can be used as it is, or an artificially created grounding point can be used. If the simple phase-to-phase short circuit is caused, an artificial grounding point must be created, that is, a grounding point must be created in the other faulty phase through a third switch, which is preferably located at the outlet of the first circuit breaker, and can also be located at another location in the other faulty phase, especially if it is located after the phase-to-phase short circuit point, the control switch of the other faulty phase must be set accordingly so as not to detect the corresponding phase current pulse, and not to be cut off earlier than the control switch to be cut off. The method converts the phase-to-phase fault into a single-phase ground fault and processes it, and can automatically trip using the control switch, quickly, accurately and automatically eliminate the fault, and then stop the other fault grounding and then stop cyclically connecting the live phase to the ground, and finally close the first circuit breaker to restore power supply. [Brief description of the drawings]
[0018] [Figure 1] FIG. 2 is a wiring schematic diagram of one example of the method of the present invention. [Diagram 2] FIG. 2 is a wiring schematic diagram of another example of the method of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] The present invention will be further described with reference to the accompanying drawings and specific embodiments. A three-phase power supply system is a general non-effectively grounded system, and generally, a busbar of a three-phase power supply system has multiple lead wires, and each lead wire is provided with multiple control switches, and the control switches can detect current pulses on one, two or three phases on the circuit according to their installation, and can be set to disconnect the three-phase circuit when the current pulses passing through any phase reach a preset value. A specific example of the control switch includes a control unit, a current detection unit and an execution unit, and the current detection units can respectively detect the phase currents of the three-phase circuit, and the control unit can compare the current pulses by the current detection units with the preset values, and can be set to send a signal to disconnect the three-phase circuit by the execution unit when the number of current pulses of any phase reaches the preset value. For the preset value of the number of current pulses that triggers disconnection, the preset value of the number of current pulses of the control switch downstream in the power supply direction is less than the preset value upstream in the power supply direction, the upstream in the power supply direction is relatively close to the power supply, and the downstream in the power supply direction is relatively far from the power supply, that is, the power is discharged from the power supply and transmitted from upstream to downstream. Alternatively, along the upstream and downstream of the power supply, the smaller the preset value that triggers the disconnection of the control switch farther from the power supply, the earlier the trigger condition is reached and the switch is likely to be disconnected. In practice, the circuit breaker installed on each lead wire can detect the number of current pulses passing through the circuit breaker, and can be set to disconnect the circuit when a certain number of current pulses pass through a certain phase or multiple phases, so the circuit breaker can be regarded as a control switch.
[0020] As shown in FIG. 1, in one specific embodiment, a first circuit breaker 90 is installed near the busbar in each of the three outgoing wires of the ABC three phases, and a first switch 1 is provided in the first circuit breaker 90, and the first switch 1 includes three switches KA1, KB1, and KC1 attached to the ABC three phases, and the first switch is the control switch, that is, the switches KA1, KB1, and KC1 are all disconnected according to the preset current pulse number, and the first switch 1 can short-circuit a certain phase with the first circuit breaker 90 (for example, after the circuit is disconnected by the first circuit breaker 90, the switch KA1 of the first switch 1 can be closed, that is, the A phase can be short-circuited, so that the A phase can bypass the first circuit breaker 90 and re-conduct), so that the first circuit breaker is conductive and charged even if it is disconnected or short-circuited (of course, it is possible to keep the first circuit breaker from the beginning not to disconnect any one phase, and in this case, it will be charged from the beginning without the need to short-circuit using the first switch). A plurality of circuit breakers (these circuit breakers after the first circuit breaker are regarded as control switches) are provided after the first circuit breaker 90, and each circuit breaker can cut off the three-phase circuit according to the number of current pulses of a certain phase. A third switch 3 is installed at the outlet of the first circuit breaker 90 of each lead-out wire, and the three switches KA3, KB3, and KC3 of the third switch 3 can respectively conduct the three phases A, B, C to the ground, so that any one of the phases can be grounded. At the same time, a second switch 2 (i.e., the second switch 2 is located at the inlet of the first circuit breaker 90, or is installed between the system neutral point and the ground, in this case, only one phase needs to be opened and closed) is installed on the busbar, and the three switches KA2, KB2, and KC2 of the second switch 2 can respectively ground and cut off the three phases of the busbar. When a simple phase-to-phase short circuit (for example, a BC 2-phase short circuit, or a 3-phase short circuit) occurs at point F, the first circuit breaker 90 is first tripped to disconnect the 3-phase circuit, and then the first switch 1 is closed to make the faulty phase (for example, if it is phase B, switch KB1 is closed) conductive and charged, and then, at the outlet of the first circuit breaker 90, one of the third switches 3 is used to connect the faulty phase to another faulty phase (i.e., phase C, in which case switch KC3 is closed) and to ground at point D.In this way, the B phase of this circuit is grounded to point D via the short circuit point F through the C phase, forming a single-phase ground. Then, by cyclically connecting and disconnecting the A phase (in this case, the A phase is a live phase) to and from the ground at the inlet of the first circuit breaker via one switch KA2 of the second switches, a current pulse is generated (or the C phase may be cyclically grounded and disconnected using the switch KC2 to generate a current pulse that forms a closed circuit), and the current pulse flows through the faulty phase B phase via the ground point E of the second switch, the ground point D of the third switch, and the phase-to-phase short circuit point F. When the number of current pulses reaches the trigger condition of the closest control switch 91 before the phase-to-phase short circuit point F, this control switch 91 breaks the circuit and removes the phase-to-phase short circuit point F from the system (the control switch 92 is not broken because the number of current pulses has not reached the trigger condition of the more upstream control switch 92, and the control switch 93 after the phase-to-phase short circuit point on the B phase does not operate because no current flows through it). Then, switch KB1 on the first switch 1 is turned off, KC3 in the third switch 3 is disconnected from the ground, KA2 in the second switch is disconnected from the cyclic ground, and finally the first switch 90 is closed to restore the circuit power supply.
[0021] In one embodiment, the first circuit breaker can be controlled separately for three phases and have the function of a control switch, in which case the first circuit breaker can be directly used to hold the continuity of one fault and trip the other faulty phases. At the same time, the number of current pulses that the first circuit breaker triggers to disconnect can be set to be the largest (i.e., longer than the second circuit breaker), and if the circuit breakers after the first circuit breaker (used as control switches) are not tripped, indicating that a phase-to-phase short circuit occurs between the first circuit breaker and the second circuit breaker, the first circuit breaker will necessarily trip based on the set trigger condition and can isolate the fault.
[0022] As shown in Fig. 2, in another embodiment, when a phase-to-phase short circuit occurs at point F and is grounded at the short-circuit point, the third switch of the above method can be used to create an artificial ground point, and then a current pulse can be generated through the second switch, that is, the above method is still applicable. In the case of such a fault accompanied by grounding, the first circuit breaker 90 is tripped to disconnect the three-phase circuit, and then the switch KB1 of the first switch is closed to directly use the ground point at the short-circuit point to create a single-phase ground, and then the second switch is used to cyclically connect and disconnect phase A (or phase C) with the earth at the inlet of the first circuit breaker, generating overlapping current pulses, which flow through the faulty phase B phase via the ground point E of the second switch and the ground point F at the phase-to-phase short-circuit point, and when the number of current pulses reaches the trigger condition of the closest control switch 91 before the phase-to-phase short-circuit point, the control switch 91 will break the circuit and eliminate the phase-to-phase short-circuit point F from the system. There is also another method. Thereafter, the first switch KB1 is disconnected, the second switch KB2 stops cyclically grounding the live phase, and the first circuit breaker 90 is closed to restore circuit power.
[0023] In the above embodiment, the relationship between the trip time of the control switch, the time of the current pulse, and the time interval between connecting two current pulses is adjusted, so that the tripping after the trip condition of the control switch is reached is timely so that the next current pulse does not flow, and therefore the tripping of the upstream control switch is avoided. In this way, if any control switch reaches the disconnection condition before the next current pulse occurs, the tripping is completed, and the unreasonable large-area power outage caused by the occurrence of multiple current pulses while the control switch is not tripped, and the undesirable tripping of one or more control switches before the control switch to be tripped occurs can be avoided. The above processing method can also eliminate the fault when three-phase short circuit occurs simultaneously at the phase-to-phase short circuit point or when earthing is accompanied.
[0024] OneIn a specific embodiment, short-term cyclical connection and disconnection is achieved using power electronic switches such as insulated gate bipolar transistors. Currently, insulated gate bipolar transistors can withstand high power on-off, have microsecond-level response, and can produce short-circuit current pulses of a few milliseconds duration.
[0025] The single-phase grounding created through the third switch has a small grounding resistance, so that the short-circuit current pulse will be large, which will damage the power supply equipment and may trigger the overcurrent protection of the first stage, second stage, etc. of the three-phase system, causing a large-area blackout. In order to avoid this possibility, the on-off performance of the power electronic switch is utilized to install a current detection device to detect the instantaneous value of the current pulse, and when the instantaneous value of the current pulse is too large and exceeds the preset value, the circuit will be disconnected in a timely manner to avoid triggering the overcurrent protection. Alternatively, an appropriate current limiting resistor may be connected in series in advance, for example, an adjustable resistor is connected in series between the second switch and the ground. In addition, when the interphase short circuit point is accompanied by grounding, if the grounding resistance is small, the power electronic switch can be set to turn on when the voltage phase angle is zero, which will not generate an excitation current, avoid the increase in the short-circuit current, and make the current pulse peak relatively small. If the grounding resistance is large, the switch can be turned on when the voltage phase angle is 90 degrees, which will generate an excitation current and increase the peak value of the short-circuit current, which is favorable for detection. The resistance of the ground short circuit and the magnitude of the short circuit current are analyzed and determined according to the specific detection environment, and are understood by those skilled in the art. When the resistance of the short circuit is so small that the short circuit current is difficult to detect, the circuit is closed at a voltage phase angle of about 90 degrees to increase the current and improve the detection degree; when the resistance of the ground short circuit is small and the current is too large to burn the equipment, the instantaneous value of the current pulse is detected and timely cut off when it reaches the preset value, or the circuit is closed when the voltage phase angle is zero to prevent the current from increasing, and current monitoring can be performed at the same time.
[0026] The above examples are merely some illustrations of the concept and realization of the present invention, and are not intended to limit the same. Any technical solution that does not make any substantial transformation under the concept of the present invention is still within the scope of protection. [Industrial Applicability]
[0027] Through experiments in a three-phase power supply system, the above method is completely feasible.
Claims
1. A plurality of control switches are distributed in the three-phase non-effectively grounded power supply system, the control switches can detect current pulses, and can cut off the circuit according to the number of current pulses; When a simple two-phase or three-phase short circuit occurs in one circuit, (a) maintain one faulty phase of the circuit in conduction, trip the other faulty phase, and artificially ground another faulty phase that is in conduction with the one faulty phase, and then cyclically connect and disconnect one live phase or neutral point of the three-phase non-effectively grounded power supply system, except for the one faulty phase, to the ground so as to form a closed circuit with the one faulty phase and generate a current pulse, and set the number of current pulses that trigger the disconnection in the control switch downstream of the power source to be less than the number of current pulses that trigger the disconnection in the control switch upstream of the power source, and after a control switch reaches a trigger condition and disconnects the circuit, stop the grounding of the other fault and stop the grounding of the one live phase or the neutral point; A method for treating a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system, characterized in that, when a ground fault occurs in one circuit due to a two-phase or three-phase short circuit, the method is treated in accordance with the above method (a), or (b) the method is treated in accordance with the above method, in which one faulty phase of the circuit is maintained conductive, another faulty phase is tripped, and then one live phase or neutral point of the three-phase non-effectively grounded power supply system, excluding the one faulty phase, is cyclically connected to and disconnected from the ground so as to form a closed circuit with the one faulty phase and generate a current pulse, the number of current pulses that triggers disconnection in a control switch downstream of a power source is set to be smaller than the number of current pulses that trigger disconnection in a control switch upstream of a power source, and after a trigger condition is reached and a control switch disconnects the circuit, the grounding of the one live phase or the neutral point is stopped.
2. 2. The method for handling a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system according to claim 1, wherein in the method (a) and the method (b), maintaining the continuity of the one faulted phase includes tripping the one faulted phase and then enabling the one faulted phase, and not tripping the one faulted phase.
3. 2. The method for treating a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system according to claim 1, wherein the method (a) comprises: first tripping a first circuit breaker of the one circuit; then shorting the one faulty phase in the first circuit breaker via a first switch to make the one faulty phase conductive; the first switch is the control switch; artificially grounding the other faulty phase at the outlet of the first circuit breaker via a third switch; cyclically connecting and disconnecting the one live phase to the ground at the inlet or neutral point of the first circuit breaker via a second switch to form a closed circuit with the one fault and generate a current pulse; and after a trigger condition is reached and a control switch is disconnected from the circuit, the first switch and the third switch are turned off, and the grounding of the second switch is stopped, and then the first circuit breaker is closed.
4. 2. The method for treating a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system according to claim 1, wherein the method (b) comprises: first tripping a first circuit breaker of the one circuit; then shorting the one faulty phase with the first circuit breaker through a first switch to make the one faulty phase conductive; the first switch is the control switch; the one live phase cyclically connects and disconnects with the ground at the inlet or neutral point of the first circuit breaker through a second switch to form a closed circuit with the one fault and generate a current pulse; after a trigger condition is reached and a control switch disconnects the circuit, the first switch is turned off and the second switch is stopped from grounding; and then the first circuit breaker is closed.
5. The method for handling a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system according to claim 3 or 4, characterized in that when the control switch reaches a trigger condition and disconnects the circuit, a signal is simultaneously sent to the second switch to stop grounding the second switch.
6. The method for handling a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system according to claim 1, characterized in that the control switch can timely cut off the circuit according to the number of current pulses to avoid the passage of the next current pulse.
7. 2. The method for treating a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system according to claim 1, wherein in the method (b), when the resistance of the closed circuit is relatively small, the closed circuit is connected to the ground when the voltage phase angle is zero to obtain a current pulse with a relatively small peak value, or when the resistance of the closed circuit is relatively large, the closed circuit is connected to the ground when the voltage phase angle is 90 degrees to obtain a current pulse with a relatively large peak value.
8. The method for handling a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system according to claim 3 or 4, characterized in that the magnitude of the current pulse is monitored, and when the instantaneous value of the current pulse reaches a preset value, i.e., when the second switch is turned off, the pulse operation is completed, and the peak of each current pulse does not exceed the preset value.
9. The method for treating a phase-to-phase short circuit in a three-phase non-effectively grounded power supply system according to claim 1, characterized in that in the method (a) and the method (b), a current limiting resistor is connected in series to the closed circuit.
10. 5. A method for treating an inter-phase short circuit in a three-phase non-effectively grounded power supply system according to claim 3, further comprising the step of connecting a variable resistor in series between said second switch and the ground.
Citation Information
Patent Citations
Fault processing method of neutral-point non-effective grounding system and corresponding processing system
CN105006810A
Method of reclosing circuit at high speed
JP1982135617A
Reclosing system
JP1996033186A
Load connection type distribution line
JP2005184945A
Cited By
Method for processing single-phase grounding of non-effectively grounded system
US20240039271A1
