Fault detection in shunt capacitor banks
The method and apparatus in shunt capacitor banks utilize voltage and current measurements to detect phase arcing faults quickly, addressing the inadequacies of existing methods and preventing cascading failures by tripping the system before significant damage occurs.
Patent Information
- Application Number
- JP2023516589
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-09-14
- Filing Date
- 2021-08-26
- Publication Date
- 2024-10-30
- Estimated Expiration
- 2041-08-26
AI Technical Summary
Existing fault detection methods in shunt capacitor banks are inadequate for detecting phase arcing faults, leading to potential damage and cascading failures due to delayed responses and reliance on complex coordination with other protection systems.
A method and apparatus for detecting phase arcing faults in shunt capacitor banks using voltage and current measurements at terminals, calculating electrical parameters like impedance angle and active power, and applying predetermined criteria to identify faults within a short time interval without additional hardware.
The method effectively detects phase arcing faults in shunt capacitor banks within a short time, preventing cascading failures and minimizing damage by initiating a trip signal to avoid further capacitor unit damage.
Smart Images

Figure 0007575838000018 
Figure 0007575838000019 
Figure 0007575838000020
Abstract
Description
[Technical field]
[0001] The present subject matter relates generally to fault detection in power systems. In particular, the present subject matter relates to fault detection in shunt capacitor banks. [Background technology]
[0002] background Shunt Capacitor Banks (SCBs) are used for reactive power compensation in power systems. Typically, SCBs contain capacitor elements that include a bank of capacitors that are connected in series and parallel. Reactive power compensation in power systems provides reactive power support that improves the capacity of the power system, improves the power factor of the system, and provides better voltage stability. However, power systems often suffer from internal or external faults and failures that can lead to arcing faults in the SCBs. If an arcing fault that occurs in a shunt capacitor bank goes undetected, it can cause damage to the entire capacitor bank.
[0003] The features, aspects, and advantages of the present subject matter will become better understood with regard to the following description and the accompanying drawings, in which: The use of the same reference numbers in different drawings indicates similar or identical features and components. [Brief description of the drawings]
[0004] [Figure 1] FIG. 13 is a diagram showing an example of an arrangement of capacitor units in an SCB. [Diagram 2] 1 illustrates a power system including an apparatus for fault detection in an SCB, according to an embodiment of the present subject matter. [Diagram 3] FIG. 13 illustrates the impedance angle locus when a phase arcing fault occurs between phase A and phase B in accordance with the present subject matter. [Figure 4]FIG. 2 illustrates a method for detecting a fault in a shunt capacitor bank, according to an embodiment of the present subject matter. Summary of the Invention [Problem to be solved by the invention]
[0005] overview An embodiment of the present invention relates to a method for detecting faults in a shunt capacitor bank connected to a power system, an apparatus for fault detection, and a computer readable storage medium containing instructions for fault detection. An objective of an embodiment of the present invention may be to identify phase arcing faults in a capacitor bank within a short time interval, thereby avoiding damage in the capacitor bank by early detection of cascading failure of units. [Means for solving the problem]
[0006] According to a first aspect, a method for detecting a fault in a shunt capacitor bank connected to a power system is provided. The method includes obtaining voltage and current measurements at terminals of the shunt capacitor bank. An electrical parameter is calculated based on the voltage and current measurements. The calculated electrical parameter is an impedance angle or an active power. Further, a difference between a first value and a second value of the electrical parameter is calculated and a fault is detected based thereon.
[0007] According to a second aspect, an apparatus is provided for detecting a fault in a shunt capacitor bank connected to a power system. The apparatus includes a processor and a fault detection module executable by the processor. The fault detection module is configured to obtain voltage and current measurements at terminals of the shunt capacitor bank. The fault detection module is configured to calculate an electrical parameter based on the voltage and current measurements. The calculated electrical parameter is an impedance angle or an active power. Further, a difference between a first value and a second value of the electrical parameter is calculated and a fault is detected based thereon.
[0008] According to a third aspect, a non-transitory computer readable medium is provided that includes program instructions that, when executed, cause an apparatus to detect a fault in a shunt capacitor bank connected to a power system.
[0009] According to one implementation, voltage and current measurements are taken for each phase at the terminals of the shunt capacitor bank.
[0010] According to another implementation, the first value and the second value of the electrical parameter are consecutive to one another.
[0011] According to another implementation, the step of detecting the fault includes determining whether a predetermined criterion is satisfied, the predetermined criterion including: an absolute value of a sum of a difference between a first value and a second value of an electrical parameter of a first one of the phases and a difference between a first value and a second value of an electrical parameter of a second one of the phases being greater than a difference between a first value and a second value of an electrical parameter of a third one of the phases, and an absolute value of a difference between the first value and a second value of an electrical parameter of a first one of the phases and an absolute value of a difference between the first value and a second value of an electrical parameter of a second one of the phases being greater than a corresponding threshold value.
[0012] According to another implementation, the fault is detected as a phase-to-phase fault between a first one of the phases and a second one of the phases.
[0013] According to another implementation, the corresponding threshold value of the electrical parameter is set based on the accuracy of the measurement equipment.
[0014] According to another implementation, the shunt capacitor banks are connected to the three-phase transmission lines in a double-Wye configuration.
[0015] According to another implementation, the failure is detected prior to a cascading failure of the shunt capacitor bank.
[0016] According to another implementation, to determine the electrical parameters, the arc resistance is calculated based on the Warrington formula. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] Detailed Description The present subject matter relates to fault detection in shunt capacitor banks connected to a power system. The fault may be an arc-over in the capacitor bank between phases.
[0018] During a phase arcing fault in an SCB, such as a capacitor element failure or flashover in a rack caused by a short circuit across single or multiple series units of the same phase, the protection scheme may initiate an alarm to notify the operator about the potential shunt capacitor bank failure. Tripping the bank helps to minimize damage and prevent possible rapid cascading of failures due to other failed elements / units. Therefore, it is desirable to detect a phase arcing fault within a short time to avoid cascading failures in the SCB.
[0019] Traditionally, in one technique, the magnitude of the current and its peak are used to detect arcing faults in shunt capacitor banks. Methods based on the current magnitude can fail during system faults that may occur near the capacitor bank. In another technique, arcing faults to ground are detected based on the third harmonics present in the voltage signal. However, this technique does not detect phase arcing faults. In another technique, arcing faults are detected on the magnitude of the negative sequence current. However, this technique is susceptible to external faults and needs to be coordinated with other protection systems of the power system that introduce a delay of 15 to 20 power cycles. Also, the operating level to set up the detection technique based on the negative sequence current is complex.
[0020] The most effective protection for arcing in a capacitor bank is provided by a fast unbalance relay. Although the unbalance trip relay is the most effective protection for arc detection in a series section, neutral voltage type unbalance relays cannot be relied upon for rack fault protection for a capacitor bank where all three phases are not adequately isolated. In this example, consider a single ungrounded wye capacitor bank with two series groups per phase, where all three phases are installed on a single steel structure. The individual phases are stacked on top of each other such that an initial fault can occur as a mid-rack phase-to-phase fault. If grounded, this fault will not cause an unbalance in the neutral voltage or neutral current, so a neutral unbalance relay is not addressed. An initial fault may propagate until it is significant enough to operate a time or instantaneous overcurrent relay. However, there may be substantial damage involving all three phases prior to bank tripping.
[0021] In shunt capacitor banks constructed such that the individual phases are well isolated on separate structures, an arc-over in the capacitor bank will begin as an arc-over across a single series group. Such a fault will result in very little phase overcurrent. If the unbalance relay protection scheme fails, more and more series groups of the same phase may become involved until the bank overcurrent relay trips the bank or a fuse opens. This fault will entail significant damage to the bank, including multiple blown fuses and destroyed capacitor units. Instantaneous overcurrent relays are usually not effective against rack faults because they require advanced settings.
[0022] For example, a 10 MVAr, 52 kV externally fused grounded dual wye connected capacitor bank having the parameters shown in Table 1 is analyzed for the performance of various protection schemes based on voltage and current magnitudes.
[0023] [Table 1]
[0024] Figure 1 shows an example of the placement of capacitor units 101 in the SCB, and the results of the analysis are shown in Table 2, where the fault location per unit value is denoted as "m". The value of "m" can vary between "0" and "1", where "0" indicates the fault location of phase arcing fault at the top of the SCB 102 and "1" indicates the fault location of phase arcing fault at the bottom of the SCB 104. In this example, phase arcing faults at different fault locations (m) are considered. The primary protection scheme adopted for tripping the relay was overvoltage (OV) set at 110% of rated voltage and overcurrent (OC) set at 135% of rated current.
[0025] As can be seen from Table 2 shown below, when a phase arcing fault occurs towards the bottom of the SCB (m=0.875), the voltage rise and fault current magnitude are less than the pre-set values of OV and OC to be detected. As a result, the voltage values across the healthy units of the bank continue to rise until they reach 110% of the rated voltage before the protective relays trip, which may then lead to a cascading fault at the SCB.
[0026] [Table 2]
[0027] Also, since the fault is a phase arcing fault, there is no neutral current due to unbalance and hence protection schemes based on neutral current will not react. Furthermore, negative sequence based protection will introduce a time delay of 15-20 power cycles for proper coordination among other protection devices of the power system for faults external to the bank. Arcing faults between different phases will result in little phase current and phase overvoltage and this fault will result in increased voltage of healthy units. Hence, capacitor banks need to be protected early from phase arcing faults to minimize damage.
[0028] The present subject matter provides a fast and reliable protection scheme for shunt capacitor banks connected to a power system against phase arcing faults. Detection of the fault is based on three-phase voltage and current values measured at the terminals of the SCB. An example method includes obtaining three-phase voltage and current measurements at the SCB terminals as voltage or current signals, respectively, using a measurement instrument. The signals are continuously measured and an electrical parameter, such as impedance angle or active power or both, at each phase is calculated. Further, a difference between a first value and a second value of the electrical parameter is calculated and tested for a predetermined criterion to detect the fault.
[0029] The proposed method and apparatus identifies phase arcing faults in the capacitor bank, also called inter-rack faults, within a short time interval, thereby avoiding damage in the capacitor bank by early detection of cascading failures of units. The proposed method is not affected by external system disturbances that increase the response time. Furthermore, no additional sensors or hardware equipment is required for detection of arcing faults.
[0030] These and other features, aspects, and advantages of the present subject matter are described more fully in connection with the following description and the accompanying drawings. Wherever possible, the same reference numbers are used in the drawings and the following description to refer to the same or like parts. Several examples are described, but modifications, adaptations, and other implementations are possible.
[0031] FIG. 2 illustrates a power system including an apparatus for fault detection in an SCB, according to an embodiment of the present subject matter. The power system 200 illustrated in this drawing includes a three-phase transmission line that may be part of a power transmission and distribution grid. For purposes of discussion, the SCB is shown as connected to the transmission line, but it will be understood that the teachings of the present subject matter may also be applied to SCBs connected to other power lines. Shunt capacitor banks 202 may be connected to the power system 200 to provide reactive power support. In one example, the SCBs may be in a double-wye configuration connected to three phases of the transmission line. However, the SCBs 202 may have a variety of configurations depending on how the capacitor units may be connected.
[0032] It will be appreciated that the power system 200 for fault detection may include a number of additional components or devices for monitoring, sensing, and controlling various parameters that may be associated with the shunt capacitor banks and the power system but are not shown for the sake of brevity. For example, components such as circuit breakers, sensors, current transformers, transformers, loads connected to the power system, shunt reactors, intelligent electronic devices (IEDs), protective relays, etc. may be connected.
[0033] The subject technology may be implemented in one or more devices associated with a power system. The devices may include current transformers, voltage transformers, circuit breakers, and devices for detecting fault locations. As shown in FIG. 2, the device 204 may be configured to receive voltage and current measurements at the terminals of the shunt capacitor bank. The device 204 may be configured to detect faults in the SCB due to internal faults, such as failure of a capacitor element or flashover in the rack, and external faults, such as increased harmonic levels or sustained overvoltage. In response to the device 204 detecting a fault in the SCB, the device 204 may be configured to send a trip signal to the circuit breakers of the shunt capacitor bank 202. In one example, the device 204 may be an intelligent electronic device (IED). In another example, the device 204 may be any computing device, such as a server, desktop device, laptop, etc., capable of receiving measurements from an IED.
[0034] In one example, the subject matter may be implemented by one or more modules. The modules may be implemented as instructions stored on a non-transitory computer-readable medium and executable by one or more processors. For example, in an example where the device 204 executes the method, the modules are executed by the processor of the device 204. If the method is partially executed by the device 204 and partially executed by a server, the modules are distributed (depending on the steps) between the device 204 and the server.
[0035] In one example, the device 204 may be configured to receive input measurement signals from various measurement instruments connected to the shunt capacitor bank, such as current transformers, potential transformers, Rogowski coils, or other measurement sensors. The device 204 may process the acquired measurements with the aid of a processor 220. The processor 220 may be implemented as a dedicated processor, a shared processor, or multiple individual processors, some of which may be shared. The device 204 may include a memory 226 that may be communicatively connected to the processor 220. Among other functions, the processor 220 may fetch and execute computer readable instructions stored in the memory 226. In one example, the memory 226 may store a fault detection module 222. In another example, the fault detection module 222 may be external to the memory 226. The memory 226 may include any non-transitory computer readable medium, including, for example, a volatile memory, such as a RAM, or a non-volatile memory, such as an EPROM, a flash memory, or the like.
[0036] Additionally, the device 204 may include an output interface 224 for communicating results obtained from the fault detection module 222, for example to a server. In one example, if the method is implemented in a server, the device 204 may communicate the current and voltage measurements to the server via the output interface 224. The output interface 224 may include a variety of computer-readable instruction-based interfaces and hardware interfaces that enable interaction with other communication, storage, and computing devices, such as network entities, web servers, databases, external repositories, and peripheral devices. In one example, the fault detection parameters, current and voltage measurements, etc. may be viewed on a display connected to the output interface 224 or integrated with the device 204.
[0037] In operation, to detect a phase arcing fault in a shunt capacitor bank 202 connected to the power system 200, the processor 220 of the apparatus 204 executes the fault detection module 222 to obtain voltage and current measurements at the terminals of the shunt capacitor bank 202. In one example, voltage and current measurements are obtained for each phase at the terminals of the shunt capacitor bank 202. It will be appreciated that the voltage and current measurements may be obtained using one or more measurement devices associated with the terminals. The processor 220 may calculate an electrical parameter based on the voltage and current measurements. In one example, the electrical parameter may be active power. In another example, the electrical parameter may be an impedance angle. The fault may be detected based on the calculated active power, the impedance angle, or both. In one example, the detected fault may be a phase arcing fault.
[0038] In one example, the apparent power flow during a phase arcing fault, which is a combination of active and reactive power, and the arc resistance may be calculated first. In one example, the arc resistance during the arcing may be considered as zero. In another example, the arc resistance during the arcing may be calculated as described below. For discussion purposes, consider a fault between phase A and phase B as an example, and the apparent power at the time of the fault may be calculated as described below. Equations (1) and (2) show the apparent power at phase A and phase B.
[0039]
number
[0040] During the ceremony, S A is the apparent power of phase A, S B is the apparent power of phase B, V A is the voltage measured on phase A, I A is the current measured on phase A, V Bis the voltage measured on phase B, I B is the current measured on phase B, In addition, V A and I A The phase angle between the B and I B The phase angle between phase A and phase B may be denoted as "φb". A phase arcing fault between phase A and phase B at the mth portion on the capacitor unit may be considered, where "m" denotes the location of the fault. To give equations (3) and (4), I A and I B The value of may be calculated by processor 220 using the principle of superposition, a method well known in the art.
[0041]
number
[0042] During the ceremony, m is the fault location, X is the reactance of each phase of the capacitor bank. In addition, V A = V<0° and V B Substituting =V<120° (V is the RMS value of the phase-to-ground voltage, Ia and Ib are equations 1 and 2, respectively), we obtain equations (5) and (6) shown below.
[0043]
number
[0044] Similarly, if a phase arcing fault between phase B and phase C is considered, the apparent powers at phase B and phase C are calculated using equation (7) and equation (8) respectively as shown below.
[0045]
number
[0046] From the above equation, during normal operation of the power system 200, i.e., when the value m=1, the active power is 0, and the equation (-V 2 It can be seen that only reactive power, which can be calculated using m = m + m (x,y) (x,y) flows into the power system 200. As long as the SCB has no internal resistance, the SCB supplies only reactive power to the power system 200. During some faults, i.e., when the value of m is less than 1, a flow of active power between the phases may be observed. Based on this flow of active power, a predetermined criterion may be set to detect a phase arcing fault. In one example, the predetermined criterion may be stored in the memory 226, and the processor 220 may execute the fault detection module 222 to detect a phase arcing fault between a first one of the phases and a second one of the phases based on the predetermined criterion.
[0047] An ideal capacitor bank does not consume any real power and supplies only reactive power to the power system 200. In one example, under practical conditions, the SCB may consume a negligible amount of real power due to contact resistance or due to leakage current through the capacitor. However, when the SCB has a phase arcing fault, the amount of real power flowing through the SCB will no longer be negligible. The fault detection module 222 may, in one example, calculate the real power flow during pre-fault conditions and upon occurrence of a fault to detect the fault. In another example, the fault detection module 222 may calculate the impedance angle during pre-fault conditions and upon occurrence of a fault to detect the fault. In yet another example, the fault detection module 222 may calculate both the real power flow and the impedance angle for fault detection.
[0048] In one example method, based on each voltage and current measurement in each phase, a change in active power flow may be calculated by calculating the difference between two successive active power calculations. In one example, the difference between the first and second active power calculations may be represented as "ΔP." Values of ΔP may be calculated for all three phases and verified with predetermined criteria shown in Table 3 to detect phase arcing faults.
[0049] [Table 3]
[0050] As can be seen from the above table, if the absolute value of the sum of the difference between the first and second values of the active power calculations of each of the first and second phases of the phases is equal to or greater than the difference between the first and second values of the active power calculations of the third phase of the phases, and the absolute value of the difference between the first and second values of the active power calculations of each of the first and second phases of the phases is greater than a threshold value, the fault detection module 222 determines that a phase arcing fault is detected between the first and second phases of the phases. The first phase of the phases may be any of phases A, B, and C, the second phase of the phases may be a different phase of phases A, B, and C, and the third phase of the phases may be the third phase of phases A, B, and C. The threshold value may be set based on the accuracy of the measurement equipment used.
[0051] Similarly, the fault detection module 222 may be configured to detect faults based on the impedance angle. When the SCB supplies only reactive power to the system, the impedance angle is always close to 90 degrees in normal operation. FIG. 3 illustrates the impedance angle trajectory when a phase arcing fault occurs between phase A and phase B in accordance with the present subject matter. However, when a phase arcing fault occurs between the capacitor units of the capacitor bank, the impedance angle is no longer 90 degrees. Continuing with the description of FIG. 2, the processor 220 may calculate the impedance angle based on equation (9) or (10) shown below.
[0052]
number
[0053] During the ceremony, <Vph and <Iph are the phase angles of the voltage measurement value and the current measurement value respectively, P Ph and Q Ph are the phase angles of the measured active power and reactive power.
[0054] Based on each voltage and current measurement value in each phase, the change in the impedance angle between the fault state and the pre-fault state may be calculated by calculating the difference between the first value and the second value of the impedance angle. In one example, the difference between the first value and the second value of the impedance angle may be represented by "Δφ". The value of Δφ may be calculated for all three phases and verified against a predetermined criterion shown in Table 4 to detect an internal arc discharge fault.
[0055]
Table 4
[0056] As can be understood from the above table, the absolute value of the sum of the difference between the first value and the second value of the impedance angle of the first phase among the phases and the difference between the first value and the second value of the impedance angle of the second phase among the phases is greater than or equal to the difference between the first value and the second value of the impedance angle of the third phase among the phases, and when the absolute value of the difference between the first value and the second value of the impedance angle of each of the first phase and the second phase among the phases is greater than the threshold value, the fault detection module 222 determines that a phase arc discharge fault between the first phase and the second phase among the phases has been detected. The first phase among the phases may be any one of the A phase, the B phase, and the C phase, the second phase among the phases may be a different phase among the A phase, the B phase, and the C phase, and the third phase among the phases may be the third phase among the A phase, the B phase, and the C phase. The threshold value may be set based on the accuracy of the measuring instrument used.
[0057] The above calculation may be performed assuming the arc resistance to be zero, but an arc fault usually involves some resistance, and in order to perform the above calculation, the arc resistance may be formulated using the Warrington formula as follows: The arc resistance value can be derived from the Warrington formula shown in Equation (11).
[0058]
number
[0059] During the ceremony, L is the length of the arc, which is the distance between the faulted racks of phase A and phase B or phase B and phase C; I is the root mean square value of the current flowing through the arc. Considering that a phase-to-phase arcing fault occurs between phases AB or BC, the current flowing through the arc can be calculated using equation (12) shown below.
[0060]
number
[0061] where X is the capacitive reactance per phase.
[0062]
number
[0063] The calculated arc resistance can then be used to determine the reactance and calculate the fault location as described above.
[0064] Thus, the present subject matter provides efficient phase arcing fault detection in shunt capacitor banks connected to a power system. The proposed fault determination technique can be implemented to detect phase arcing faults between phases of an SCB within a short time prior to the onset of cascading faults of the capacitor units.
[0065] 4 illustrates a method for detecting faults in a shunt capacitor bank, according to an embodiment of the present subject matter. The order in which method 400 is described is not intended to be construed as a limitation, and some of the described method blocks may be performed in different orders to achieve method 400 or alternative methods. Furthermore, method 400 may be implemented in any suitable hardware, computer readable instructions, firmware, or combinations thereof. For purposes of discussion, method 400 will be described with reference to the implementation shown in FIG. 2.
[0066] In the method 400, at block 402, voltage and current measurements are taken at the terminals of the shunt capacitor bank. Voltage and current measurements are taken for each phase at the terminals of the shunt capacitor bank. The voltage and current measurements are taken using one or more measurement devices associated with the terminals of the shunt capacitor bank. In one example, the voltage and current measurements are provided to the device 204.
[0067] At block 404, an electrical parameter is calculated based on the voltage and current measurements. The electrical parameter corresponds to an impedance angle or an active power. The electrical parameter is calculated for each new voltage and current measurement.
[0068] In block 406, a difference between the first value and the second value of the electrical parameter may be calculated. In one example, the first value and the second value of the electrical parameter are consecutive to each other. For each voltage and current measurement in each phase, a difference between the first value and the second value of the electrical parameter may be calculated and stored in memory 226.
[0069] At block 408, a fault is detected based on a difference between the first and second values of the electrical parameter. In one example, the fault detection may be based on a predetermined criterion. In one example, the predetermined criterion may be based on a difference between the first and second values of the electrical parameter for each voltage and current measurement in each phase, and the predetermined criterion may be stored in memory 226.
[0070] In one example, the predetermined criterion may be that a fault is detected when the absolute value of the sum of the difference between the first and second values of the electrical parameter of a first one of the phases and the difference between the first and second values of the electrical parameter of a second one of the phases is greater than the difference between the first and second values of the electrical parameter of a third one of the phases, and each of the absolute values of the difference between the first and second values of the electrical parameter of the first one of the phases and the second one of the phases is greater than a corresponding threshold value.
[0071] For the predetermined criteria, the corresponding threshold value may be set based on the accuracy of the measuring equipment. Furthermore, upon detecting a fault in the SCB, the device 204 may adopt a protection scheme to trip the SCB within a short time to avoid cascading failure of the capacitor unit.
[0072] The above method can be used to detect phase arcing faults even in lower units of the capacitor bank, thereby avoiding the initiation of cascading failures of the SCB. In the following, simulation results for a system with L=471 mm, VL-L=52 kV, and Q=10 MVAr, having the parameters considered in Table 1 above, are provided and compared with those provided in Table 2. It will be understood that these simulations are provided only as examples for validation of the present technique and not as a limitation.
[0073] Example 1 In a first example, the technique of fault detection was tested for active power as an electrical parameter. Active power flow in different phases in case of phase arcing fault between phase A and phase B at different fault locations was tested.
[0074] Considering the arc resistance as zero, the active power flows in different phases in case of phase A-phase B type phase arcing fault have been simulated and summarized in Table 5 shown below.
[0075] [Table 5]
[0076] However, since arc faults usually involve some resistance, the actual arc life may be calculated according to equation (15), and the arc resistance and different fault locations may be calculated. Table 6 shows the arc resistance at different fault locations with an arc length of 471 mm, and the system has a line voltage of 52 kV and a reactive power of 10 MVAr.
[0077] [Table 6]
[0078] Further, the technique of fault detection has been tested for the active power flow in different phases in case of phase arcing fault between phase A and phase B at different fault locations with arc resistance as shown in Table 6. The active power flow in different phases with arc resistance in case of phase A-phase B type arcing fault has been summarized in Table 7 as shown below.
[0079] [Table 7]
[0080] As can be seen from Tables 5 and 7, for phase A-phase B arc faults at different fault locations, the predefined criterion |ΔP A +ΔP B|=>ΔP C &&(|ΔP A |>P Set )&&(|ΔP B |>P Set ) helps to accurately detect faults at lower fault locations, in contrast to Table 2. Set was set at 2%.
[0081] Example 2 In a second example, the technique of fault detection was tested for impedance angle as an electrical parameter. Impedance in different phases in case of a rack type fault between phase A and phase B at different fault locations was tested.
[0082] Considering the arc resistance as zero, the impedance angles at different phases in case of phase A-phase B type phase arcing fault have been summarized in Table 8 shown below.
[0083] [Table 8]
[0084] Fault detection was also simulated based on the calculated arc resistance shown in Table 6 above. Further, the impedance angles for fault detection at the arc resistances shown in Table 6 for different phases in case of Phase A-Phase B type arcing fault were summarized in Table 9 shown below.
[0085] [Table 9]
[0086] As can be seen from Tables 8 and 9, for phase A-phase B arc faults at different fault locations, the predefined criterion |Δφ A +Δφ B |=>Δφ C &&(|Δφ A |>φ Set )&&(|Δφ B |>φSet ) helps to accurately detect faults at lower fault locations, in contrast to Table 2. Set was set at 1 degree.
[0087] Comparing the results of Examples 1 and 2 for phase arcing faults at different fault locations with the results of the voltage and current magnitude based protection schemes shown in Table 2, it can be seen that if a fault occurs in the lower unit (m=0.875) of the capacitor bank, this can initiate a cascading fault when using overcurrent or overvoltage. However, the present subject matter can use an active power based method, an impedance angle based method, or both for fault detection to avoid a cascading fault.
[0088] In this manner, the subject method and apparatus can reliably perform detection of phase arcing faults in shunt capacitor banks within a short time interval to avoid cascading failure of capacitor units and subsequent damage to the power system.
Claims
1. 1. A method for detecting a fault in a shunt capacitor bank connected to an electric power system, the method comprising: obtaining voltage and current measurements at terminals of the shunt capacitor bank; and calculating an electrical parameter based on the voltage measurements and the current measurements, the electrical parameter being an impedance angle or an effective power, the method further comprising: calculating a difference between a first value and a second value of the electrical parameter; and detecting the fault based on the difference.
2. The method of claim 1 , wherein voltage and current measurements are taken for each phase at the terminals of the shunt capacitor bank.
3. The method of claim 1 or 2, wherein the first value and the second value of the electrical parameter are consecutive to one another.
4. The step of detecting the fault includes determining whether a predetermined criterion is satisfied, the predetermined criterion being: an absolute value of the sum of a difference between the first and second values of the electrical parameter of a first one of the phases and a difference between the first and second values of the electrical parameter of a second one of the phases is greater than a difference between the first and second values of the electrical parameter of a third one of the phases; 2. The method of claim 1, wherein an absolute value of a difference between a first value and a second value of the electrical parameter of the first one of the phases and an absolute value of a difference between a first value and a second value of the electrical parameter of the second one of the phases are each greater than a corresponding threshold value.
5. The method of claim 4 , wherein the fault is detected as a phase-to-phase fault between a first one of the phases and a second one of the phases.
6. The method of claim 4 , wherein the corresponding threshold values for the electrical parameters are set based on a precision of a measurement instrument.
7. The method of claim 1 , wherein the shunt capacitor banks are connected to a three-phase transmission line in a double-Wye configuration.
8. The method of claim 1 , wherein the failure is detected prior to a cascading failure of the shunt capacitor bank.
9. The method of claim 1 , wherein to determine the electrical parameter, an arc resistance is calculated based on Warrington's formula.
10. 1. An apparatus for detecting a fault in a shunt capacitor bank connected to an electric power system, the apparatus comprising: A processor; a fault detection module executable by the processor, the fault detection module comprising: obtaining voltage and current measurements at terminals of the shunt capacitor bank; calculating an electrical parameter based on the voltage measurements and the current measurements, the electrical parameter being an impedance angle or an active power, the fault detection module further comprising: calculating a difference between a first value and a second value of the electrical parameter; The apparatus detects the fault based on the difference.
11. The apparatus of claim 10 , wherein voltage and current measurements are taken for each phase at the terminals of the shunt capacitor bank.
12. 12. The apparatus of claim 10 or 11, wherein the first value and the second value of the electrical parameter are consecutive to one another.
13. The fault detection module is executable to detect the fault based on predetermined criteria being met, the predetermined criteria comprising: an absolute value of the sum of a difference between the first and second values of the electrical parameter of a first one of the phases and a difference between the first and second values of the electrical parameter of a second one of the phases is greater than a difference between the first and second values of the electrical parameter of a third one of the phases; 11. The apparatus of claim 10, wherein an absolute value of a difference between a first value and a second value of the electrical parameter of the first one of the phases and an absolute value of a difference between a first value and a second value of the electrical parameter of the second one of the phases are each greater than a corresponding threshold value.
14. The apparatus of claim 13 , wherein the fault is detected as a phase-to-phase fault between a first one of the phases and a second one of the phases.
15. The apparatus of claim 13 , wherein the corresponding threshold value for the electrical parameter is set based on a precision of a measurement instrument.
16. 11. The apparatus of claim 10, wherein the shunt capacitor banks are connected to the three-phase transmission lines in a double-Wye configuration.
17. The apparatus of claim 10 , wherein the fault detection module is configured to detect the fault prior to a cascading failure of the shunt capacitor bank.
18. The apparatus of claim 10 , wherein to determine the electrical parameter, the fault detection module is configured to calculate an arc resistance based on a Warrington rule.
19. A non-transitory computer readable medium comprising instructions which, when executed by a processor, cause the processor to perform the method of any one of claims 1 to 9.
Citation Information
Patent Citations
The capacitor protection device
JP1985128437U