Charging device, charging system, charging method, and charging program

The charging system for EV buses manages multiple chargers to balance current usage within contracted limits, addressing high initial costs and stabilizing electricity charges, ensuring timely charging for operations.

JP7576135B2Active Publication Date: 2024-10-30AESC JAPAN LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023127456
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-08-04
Publication Date
2024-10-30
Estimated Expiration
2039-06-12

AI Technical Summary

Technical Problem

The high initial investment and operational costs associated with transitioning from fossil fuel buses to electric vehicles (EVs) are significant barriers for bus operating companies, particularly due to the need for multiple EV buses and charging equipment, and there is a risk of increased electricity charges if instantaneous current exceeds contracted limits.

Method used

A charging system with multiple chargers and a management center that determines charging methods to ensure the total current does not exceed the contracted limit, using a quick charging circuit or normal charging circuit to balance the load, thereby minimizing fixed electricity charges.

Benefits of technology

The system effectively manages the charging of multiple EV buses while adhering to contracted current limits, reducing initial investment costs and stabilizing electricity charges, ensuring buses are charged in time for operations without exceeding contracted current thresholds.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007576135000001
    Figure 0007576135000001
  • Figure 0007576135000002
    Figure 0007576135000002
  • Figure 0007576135000003
    Figure 0007576135000003
Patent Text Reader

Abstract

To prevent a lease charge from fluctuating with the quantity of a charging current.SOLUTION: A charging apparatus includes: a plurality of chargers 10-1 to 10-3 that charge on-vehicle batteries 32 by at least either one of two charging methods; and a charging control device 20 that receives supply of current for charging the on-vehicle batteries 32 with the plurality of chargers 10-1 to 10-3 and determines a charging method in such a way that the total current for charging the plurality of on-vehicle batteries 32 does not exceed an upper limit value as the basis of the calculation of an electric power charge.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a charging device, a charging system, a charging method, and a charging program. [Background technology]

[0002] Electric vehicles, or EVs, are equipped with rechargeable batteries and run on the power of the onboard batteries. In addition to passenger cars, commercial vehicles, trucks, buses, and other vehicles used by businesses or EVs will also be used in the vehicles used, and the market for such commercial EVs is expected to expand in the future. Consumer EVs are being recharged at home, so there is a demand for multiple on-board batteries to be charged simultaneously. However, since business operators have multiple EVs, multiple vehicle-mounted devices can be used at the same time. There is a high demand for charging batteries.

[0003] An automatic charging device connected to a commercial power line to charge the onboard batteries of commercial EVs. 2. Description of the Related Art An automatic charging device that enables a charger to charge multiple vehicle-mounted batteries is known (Patent Document 1). In the charging device of Patent Document 1, multiple control devices called actuators are connected to one charger. The vehicle batteries connected to each control device are charged. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Japanese Patent Application Publication No. 10-136571 Summary of the Invention [Problem to be solved by the invention]

[0005] In the recent trend of vehicle electrification, for example, for bus operating companies that own a large number of buses, Considering environmental issues and the spread of autonomous driving, it is becoming increasingly important to replace fossil fuel-powered buses with EV buses. However, initial investment is required for a large number of EV buses and charging facilities. In addition, there are operational costs after the introduction of EV buses. In order to lower the cost hurdle for this, EV buses and charging equipment will be leased rather than owned. There is a strong demand to do so. [Means for solving the problem]

[0006] (1) A charging device according to a first aspect of the present invention is a charging device that charges a battery in one of at least two charging methods. A plurality of chargers for charging the batteries are provided, and power is supplied to the plurality of chargers for charging the batteries. The total current for charging multiple batteries must not exceed the upper limit that is the basis for calculating electricity charges. For this purpose, a determination unit that determines the charging method is provided. (2) The charging system according to the second aspect of the present invention is capable of charging in one of at least two ways. a plurality of chargers for charging batteries, the plurality of chargers being connected to the chargers via a communication line, The total current charged to each battery must not exceed the upper limit used to calculate electricity charges. and a management center including a determination unit that determines the charging method, the management center comprising: A command instructing the charging method determined by the determination unit is transmitted to the charger via the communication line. The charger then charges the battery in a charging method based on the received command. (3) The charging method according to the third aspect of the present invention includes at least a rapid charging circuit and a normal charging circuit. A charging method for charging a plurality of batteries, comprising: The sum of the currents charging the plurality of batteries exceeds the upper limit value that is the basis for calculating the electricity fee. and when it is determined that the sum of the currents exceeds the upper limit value, Set the normal charging circuit to charge any battery so that the limit is not exceeded. Equipped with. (4) A charging program according to a fourth aspect of the present invention includes at least a rapid charging circuit and a normal charging circuit. A charging program for charging a plurality of batteries in any one of the circuits, the charging program comprising: The sum of the currents charging the multiple batteries in the quick charging circuit is the basis for calculating the electricity fee. It is determined whether the sum of the currents exceeds an upper limit value, and when it is determined that the sum of the currents exceeds the upper limit value. and charging any one of the batteries through the normal charging circuit so as not to exceed the upper limit. The computer is caused to execute the process. [Brief description of the drawings]

[0007] [Figure 1] FIG. 1 is a diagram illustrating a charging system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram showing a charging device for an EV bus according to one embodiment. [Diagram 3] FIG. 3 is a diagram for explaining a configuration example of an EV bus according to an embodiment. [Figure 4] FIG. 4 is a diagram illustrating a charger according to an embodiment. [Diagram 5] FIG. 5 is a diagram illustrating a charging control device and a management center according to an embodiment. [Figure 6A] FIG. 6A is a diagram illustrating normal charging in a battery charging system according to an embodiment. [Figure 6B] FIG. 6B is a diagram for explaining quick charging in the battery charging system of one embodiment. [Figure 7] FIG. 7 is a flowchart illustrating the process of a battery controller of an on-board battery mounted on an EV bus according to an embodiment. [Figure 8] FIG. 8 is a flowchart illustrating the process of the vehicle control device of the electric bus according to one embodiment. [Figure 9] FIG. 9 is a flowchart illustrating the process of the charger in the battery charging system according to the embodiment. [Figure 10] FIG. 10 is a flowchart illustrating the process of the charge control device in the battery charging system according to one embodiment. [Figure 11] FIG. 11 is a flowchart illustrating the process of the charge control device following FIG. [Figure 12] FIG. 12 is a flowchart illustrating the process of the charge control device following FIG. [Figure 13] FIG. 13 is a flowchart illustrating the process of the management center in the battery charging system according to one embodiment. [Figure 14A] FIG. 14A is a diagram showing an example of the time change characteristics of the charging current when charging an EV bus by rapid charging in a battery charging system according to one embodiment. [Figure 14B] FIG. 14B is a diagram showing an example of the time change characteristics of the charging current when charging an EV bus by quick charging in a battery charging system according to one embodiment. [Figure 14C] FIG. 14C is a diagram showing an example of the time change characteristics of the charging current when an EV bus is charged by normal charging in a battery charging system according to one embodiment. [Figure 15] FIG. 15 is a diagram for explaining the sum of the contract current and the charging current corresponding to the diagrams of FIGS. 14A to 14C. [Figure 16A] FIG. 16A is a diagram for explaining an operation plan information table stored in the database of the management center shown in FIG. [Figure 16B] FIG. 16B is a diagram for explaining an operation plan information table stored in the database of the management center shown in FIG. [Figure 17A] FIG. 17A is a diagram explaining the symbols used in the identifiers. [Figure 17B] FIG. 17B is a diagram for explaining symbols used for the full charge amount, various times, etc. [Figure 18] FIG. 18 is a diagram showing an example of a data structure of various IDs, remaining battery charge, full charge amount, various times, etc. for the electric buses 30-1 to 30-3. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. (Outline of the embodiment) First, an outline of the embodiment will be described. The charging device at a bus operating company will be described as an example. The company manages the operation of electric buses (hereinafter referred to as EV buses). It has a vehicle depot for maintenance, inspection, and parking, and buses that have finished operating according to the operation plan are kept as vehicles. The bus returns to the base and undergoes maintenance and inspection to prepare for the next trip. It is charged at the base. In this specification, a so-called EV bus that is driven solely by an on-board battery will be described as an example. Unlike other electric buses that use on-board batteries, such as HV buses that are powered by on-board batteries and a prime mover, The present invention can also be applied to

[0009] The charging device according to an embodiment of the present invention includes a charger and a control device for controlling charging by the charger. The charging device for charging multiple electric buses is installed in a vehicle depot. This is a large-scale device, and the installation costs are high. Bus operating companies are leasing charging equipment to There is a demand for leasing from a supplier to reduce initial investment. It is also desirable for the introduction of such a system that the basic fee is a fixed amount.

[0010] Electricity charges are divided into a flat rate according to the contracted rated current (A) and a variable rate according to the amount of electricity used. The flat rate is based on the rated current (contract current) set in advance at the time of the contract. However, if the instantaneous current usage exceeds the contract current, an additional interest rate is applied to the fixed rate. It is expensive and expensive to connect multiple chargers to a charging device installed in a vehicle depot to charge multiple in-vehicle batteries. If the batteries are charged at the same time, the instantaneous current usage is expected to exceed the contracted current, and a flat rate will be charged. In reality, however, it is highly likely that the tariffs will be variable. In the charging device according to one embodiment of the present invention, the on-board batteries mounted on a plurality of EV buses are simultaneously When multiple vehicle batteries are charged at the same time, the instantaneous current used must not exceed the contract current. Control charging. The charging voltage is constant, and the amount of power is a value according to the charging current. Therefore, the integrated value of the current required for charging is equivalent to the amount of power required for charging.

[0011] (Battery charging system) FIG. 1 is a diagram illustrating a battery charging system according to the present embodiment. The battery charging system according to the embodiment is a system for charging a battery of a bus operator that uses a plurality of electric vehicles as route buses. This is a system that allows companies (hereafter referred to as bus companies) to charge and manage the batteries of electric buses. The battery charging system is installed at a vehicle depot 40 for route buses (hereinafter referred to as EV buses). Chargers 10-1, 10-2, and 10-3 (hereinafter collectively referred to as 10) and A charging control device 20 that controls the electric appliances 10-1 to 10-3 and a management center managed by the bus company. The chargers 10-1, 10- 2, 10-3 are EV buses 30-1, 30-2, 30-3 (hereinafter, collectively referred to as In this example, three EV buses 30 are connected to the power supply unit. This indicates that charging will occur at the same time.

[0012] (Charger 10) As shown in FIG. 2, the charger 10 receives high voltage power from a commercial high-power line HV and a low-voltage line LV. The charger 10 receives power and low-voltage power from an on-board battery (not shown) of the EV bus 30. Each charger 10 is assigned an identifier (hereinafter referred to as In this embodiment, three chargers 10-1, 10-2, and 10-3 are used. The devices are assigned IDs 1 to 3. Since any number of devices can be used, An electrical appliance ID is represented as IDz, where z is an integer equal to or greater than 1.

[0013] (Electric bus 30) FIG. 3 shows an on-board system installed in an EV bus 30. The on-board system includes an inverter A driving device 31 that is equipped with a steering wheel, a motor, etc. and drives the EV bus 30 to run, and a driving device 3 A vehicle battery 32 that supplies power to the vehicle drive unit 31, a switch 34, and the vehicle drive unit 31 and the vehicle battery 3 2 and controls the entire vehicle; and an electrical component 36 including a PS sensor. Each electric bus 30 is assigned an identifier IDi (hereinafter referred to as a bus ID). In this embodiment, three EV buses 30-1, 30-2, and 30-3 are used. In addition, since any number of buses can be used, E The V bus ID is represented as IDi, where i is an integer equal to or greater than 1.

[0014] (Vehicle battery 32) The vehicle-mounted battery 32 manages a plurality of unit batteries 321 and the capacity of the plurality of unit batteries. The battery controller 322 is configured to include a battery controller (battery control The control device 322 includes sensors (not shown) for detecting the voltage, current, temperature, etc. of the multiple unit batteries. The output of the battery 32 is input, and the total voltage, input / output current, temperature, etc. are used to calculate the battery 32 output. The SOC is output to the vehicle control device 35. The battery controller 322 detects the full charge amount Qmax of the vehicle battery 32. The vehicle control device 35 transmits the SOC and the full charge amount Qmax to the charger 10. do. In this embodiment, the vehicle battery 32 is installed in three EV buses 30-1, 30-2, and 30-3. Therefore, the full charge amount Qmax of the on-board battery 32 and the current battery capacity Qr are linked to the bus IDi. The data is transmitted and received, allowing each electric bus to be identified.

[0015] (Detailed configuration of Charger 10) FIG. 4 shows a detailed configuration of the charger 10. The charger 10 is a high-power charger connected to a commercial high-power line. A connection connector 11H, a low-power connection connector 11L connected to a low-power line, and a quick charging circuit A circuit 12, a normal charging circuit 13, and opening / closing switches 14H and 14H for switching between these circuits. L, a charging connector 15 that is connected to a connector provided on the EV bus 30, and an opening / closing A control device 16 is provided to instruct the opening and closing of the switches 14H and 14L. The device 10 is provided with an operation panel 18. The operation panel 18 includes a charging start button 1 When an operator presses down the charging start button 18a, charging begins. The open / close switches 14H and 14L are connected to the charging circuit selection command sent from the charging control device 20. The control device 16 receives the signal and opens or closes the quick charging circuit 12 or the normal charging circuit 1 3 supplies charging power to the vehicle battery 32. The switching between charging by the quick charging circuit 12 and charging by the normal charging circuit 13 will be explained later. Explain in detail.

[0016] (Charging control device 20) FIG. 5 shows the configuration of the charging control device 20. The charging control device 20 is installed, for example, in a vehicle depot 40. The system includes a control device 21, a storage device 22, and a communication device 23. The communication device 23 is The control device 21 is connected to a management center 60 via an internet line 50. As will be explained in detail, the maximum current consumption is managed when charging with three chargers 10. At the same time, the power supply of the EV bus 30 is controlled so as to be fully charged, for example, by a scheduled time. The vehicle battery 32 may be charged to 80% or to the amount of charge required for the next trip. stomach. The charging control device 20 is assigned an identifier IDj (hereinafter, referred to as a charging control device ID). In this embodiment, for the sake of simplicity, one charging control device 20 is provided in a vehicle depot. However, a plurality of charging control devices 20 may be installed in the vehicle depot 40. In this case, j is an integer greater than or equal to 1.

[0017] The charge control device 20 needs to be managed so that it can be used only by specific users. In order to identify users who can use the charging control device 20, in this embodiment, a user identification The user ID is an identifier for the bus operating company and is used for the telephone number. In the embodiment, there is only one bus operating company, but there are multiple If there are multiple bus operating companies, a user ID will be assigned to each bus operating company. Or, if the same bus operating company installs charging equipment at different depots, In cases where a contract is concluded between the company and each power meter at the depot and electricity charges are settled, A user ID may be set for each base. Therefore, multiple user IDs are suffixed. The ID of the object is expressed as y, where y is an integer greater than or equal to 1.

[0018] 17A and 17B, the symbols used in the identifiers of the embodiments and the symbols used in the embodiments I is an identifier for the EV bus 30 that explains the symbols used for the full charge amount and various times. Di, IDy as a user identifier, IDz as an identifier of the charger 10, and the charging control device 2 IDj is used as an identifier for the battery 32. The full charge amount of the vehicle battery 32 is Qmax, The remaining charge is Qr, the battery capacity required for the next operation is Qreq, the charging start time is Tjs, and the next operation start time is The start time is Tos. The physical quantities in Figure 17B are all linked to the IDi of the electric bus. Data is exchanged.

[0019] (Management Center 60) The configuration of the management center 60 will be described with reference to FIG. The management center 60 is a server managed by the bus operating company, and includes a control device including a processing unit. The system includes a device 63 , a storage device 62 , and a communication device 61 . The storage device 62 stores operation plan information for a plurality of electric buses managed by the management center 60. It is recorded as a planning information table. For example, the bus ID of each bus, the route information of the bus, etc. Information (route, next bus start time, return time to depot, time from start of bus operation to depot The battery capacity required for the train to return to its destination is estimated in advance for each route. is the battery capacity and is the output WH required from the departure point to the return trip.

[0020] (Operation plan information table) The operation plan information table will be described with reference to Figs. 16A and 16B. Although the diagram shows it as being divided, the database is continuous. The operation plan information table 621 shown in FIG. 16A and FIG. 16B includes the operation plan information managed by the management center 60. For example, the route name "Dai01" is used as the bus route. The name of the depot from which the bus departs, the names of multiple stops between the departure point and the final destination, and the name of the bus The names of both bases and the bus IDs are entered. The starting station and end station for the route "Dai01" are also entered. Station names, scheduled arrival times at each point, required battery capacity, start and end times of service are also included in the operation plan information. The required battery capacity is stored in the information table 621. The required output is WH.

[0021] In Figures 16A and 16B, "Large 01", "Horizontal 02", "Small 03", "Beach 04", and "Shallow 05" are " Five route names are shown, and routes "Large 01" and "Small 03" are operated by buses with bus ID 1, Routes "Yoko 02" and "Hama 04" are operated by bus ID2. Route "Asa 05" is operated by bus ID Bus D3 will operate. In the following explanation, bus ID1 will start operating route "Dai01" Before ID2 bus started operating the route "Hama 02", ID3 bus started operating the route "Asa 03". Before the trains start operating, the three trains are charged simultaneously at charging stations 10-1 to 10-3 in the depot 40. It shall be so.

[0022] (Travel drive device 31) Although not shown, the traveling drive device 31 includes an electric motor for traveling and a power supply for the electric motor. The inverter is driven by an inverter drive signal received from the vehicle control device 35. The current sensor detects the motor current and outputs the current to the motor controller. The voltage sensor detects the voltage applied to the motor. The motor controller uses these current sensors to The output signal and the voltage detection signal are transmitted to the vehicle control device 35. The device 35 drives and controls the motor.

[0023] (Vehicle control device 35) Although not shown, the vehicle control device 35 includes a sensor for detecting the amount of depression of the accelerator pedal, Various sensors (not shown), such as a sensor that detects the amount of depression of the rake pedal, are used to detect various driving-related information. The vehicle control device receives various types of information and calculates the required driving torque as a torque command. 35 supplies the calculated torque command to the motor controller. The motor controller The inverter drive signal is generated according to the input torque command to drive the inverter. As a result, the motor is driven so as to output the required driving torque. 35 calculates the actual torque by inputting the motor current and motor applied voltage from the motor controller. The inverter is controlled based on the difference between the torque command and the actual torque.

[0024] The vehicle control device 35 also receives S The OC and other information are transmitted to the charger 10 together with the bus ID.

[0025] (Charging method) Normal charging and quick charging will be described with reference to FIGS. 6A and 6B. FIG. 6A is a graph showing the relationship between charging time and SOC during normal charging. It uses three-phase 200V AC power received from a low-power line as power and draws a constant current of 10 amperes ( When the SOC reaches approximately 80%, the current is gradually reduced until the battery is fully charged. It takes about 8 hours to fully charge the battery in normal charging mode. FIG. 6B is a graph showing the relationship between charging time and SOC during rapid charging. It uses three-phase 200V AC power received from a high-power line as power and operates at a voltage of about 50 to 500V. Charge with a maximum current of about 100 amperes. Gradually reduce the current value to several tens of amperes. When charging, the SOC will reach about 80% in about 30 minutes. After that, the current value gradually decreases until it is fully charged. With fast charging, it takes about 2 to 4 hours to fully charge the battery. As shown in FIG. 4, the charger 10 includes a normal charging circuit 13 that performs charging using a normal charging method, The battery is equipped with a quick charging circuit 12 that performs charging by a quick charging method. The maximum current of the charging circuit 13 is represented as If, and the maximum current of the rapid charging circuit 12 is represented as Ik(>If). There are various methods for determining the time-varying characteristics of the charging time and the charging current. It is not limited to one charging method.

[0026] (wattmeter) The electricity charges that bus companies use for charging are calculated based on the amount of electricity used. As mentioned above, electricity charges are divided into a flat rate based on the maximum contracted current (A) and a rate based on the amount of electricity used. The flat rate is based on the maximum current (contract current) set in advance at the time of the contract. However, if the instantaneous current usage exceeds the contract current, an additional fee will be charged. In the charging system according to the present embodiment, the vehicle depot 40 is installed When multiple vehicle batteries are charged simultaneously using three chargers 10, the total instantaneous current used is However, in order to ensure that the current value calculated by the wattmeter does not exceed the contract current, multiple on-board power supplies are used. Controls battery charging.

[0027] In this embodiment, three chargers 10 are installed, and the current usage calculated by the power meter is The sum of the currents is the sum of the currents when charging with the three chargers 10. For ease of explanation, the bus operating company will obtain the power from the power company for one power meter at the depot 40. It is assumed that there is a contract.

[0028] The charging control device 20 is capable of simultaneously performing rapid charging within a range not exceeding the upper limit current value. The number of EV buses that can be fast-charged is set at Nk. The maximum current required to supply power is Imax, and the upper limit of the available current determined by the contract current is Iu. p, the maximum current for normal charging is Imin, the rapid charging is performed so as to satisfy the following formula (1). The number of chargeable devices Nk is set. Iup>(Imax × Nk + Imin × (number of chargers at base station - Nk)) …(1) When the charging control device 20 performs charging that satisfies the formula (1), the instantaneous current of the three chargers 10 is It is possible to charge multiple EV buses as desired without the total amount exceeding the contract current. become. In the embodiment, an example in which three chargers 10 are installed in the vehicle depot 40 is shown. Even when four or more chargers are used, the charge control device 20 can be quickly adjusted to satisfy the formula (1). The number of devices that can be quickly charged, Nk, is set.

[0029] (Processing of battery controller 322) FIG. 7 is a flowchart illustrating the calculation process performed by the battery controller 322. In step S11, the remaining capacity Qr of the vehicle-mounted battery 32 is calculated. In step 11, the remaining battery capacity Qr is calculated. The vehicle control device 35 calculates the full charge amount Qmax of the vehicle battery 32 stored in a storage device (not shown). Send to.

[0030] (Processing of vehicle control device 35) FIG. 8 is a flowchart illustrating the calculation process performed by the vehicle control device 35 of the EV 30. In step S21, the remaining capacity Qr and the full charge amount Qmax of the vehicle-mounted battery 32 are calculated. In step S22, the in-vehicle battery 32 The remaining capacity Qr and the full charge amount Qmax are stored in the storage device of the vehicle control device 35. and the bus ID are added, and this information is transmitted to the charger 10.

[0031] (Charger 10 processing) FIG. 9 is a flowchart illustrating the calculation process performed by the control device 16 of the charger 10. In step S31, the user ID, the bus ID, the remaining capacity Qr of the in-vehicle battery 32, and the charge status are input. The charge amount Qmax is received from the vehicle control device 35. In step S32, the charging start button is pressed. If it is determined that the charging start button 18a has been pressed down, in step S33, The time when 8a is pressed is stored as the charging start time Tjs. , charger ID, charging start time Tjs, user ID, bus ID, battery capacity Q of the vehicle battery 32 The charge control device 20 transmits r and the full charge amount Qmax.

[0032] An example of the data structure is shown in Fig. 18. The bus ID is stored in the header, and the EV bus ID is The remaining battery charge Qr and the fully charged capacity Qmax of the onboard battery of EV bus 30, and the charger connected to EV bus 30 ID, the charger ID connected to the charging control device ID, and the operator of the EV bus 30 User ID to be identified, battery capacity Qreq required to operate the route, charging start time Tj s and the operation start time Tos are used as one piece of data. The data structure shown in Fig. Not limited to 18 structures.

[0033] In step S35, the charger 10 receives a charging circuit selection command from the charging control device 20. If it is determined that the charging circuit selection command has been received, then in step S36, the charging circuit selection command is The closing switches 14H and 14L are controlled to be open or closed. The charging port is closed and charging of the vehicle-mounted battery 32 begins. When it is determined that the battery is fully charged, the open / close switch 14H is closed to end the charging. 14L is opened. The full charge determination in step S37 is Based on the battery capacity Qr received from the re-controller 322 via the vehicle control device 35, The control device 16 of the charger 10 performs this. Alternatively, the vehicle control device 35 of the EV 30 being charged performs this. A full charge determination may be performed based on the battery capacity Qr, and the result may be transmitted to the charger 10.

[0034] (Processing of the charging control device 20) FIG. 10 is a flowchart illustrating the calculation process performed by the charging control device 20. In step S41, the charger ID from the charger 10 and the pressing of the charging start button 18a are input. When the charge start command signal is received, the process from step S42 onward is executed. In step S42, the charger 10 transmits the user IDy, the bus IDi, and the vehicle-mounted Battery 32 remaining capacity (current battery capacity) Qr and full charge amount Qmax, charger IDz, charging start time In step 42-2, the time Tjsp is received. It is determined whether the user ID stored in the storage device matches the user ID received from the charger 10. If they match, the process proceeds to the next step, and if they do not match, the process ends. Users who are allowed to use the control device 20 are defined.

[0035] In the embodiment, the charging is assumed to start at the same charging start time. In the charging device of the present invention, each charger starts charging at different times. 10 may start charging. In that case, multiple times may be used, so The charging start time is represented by the symbol Tjsp, where p is an integer of 1 or more.

[0036] In step S43, the charge control device ID and the bus ID are transmitted to the management center 60. In step S44, the charge control device 20 receives the self-information transmitted from the management center 60. Among the information that has the charging control device ID, the operation management data of the corresponding bus ID In step S45, the operation start time included in the received operation management data is In step S46, the charge control device 20 reads the time Tos from the management center 60. When it is determined that the operation management data for all bus IDs sent to has been received, Continue to step S47.

[0037] The explanation will continue with reference to FIG. In step S47, the charge amount Qj required for full charge is calculated and stored. Qj is calculated by subtracting the remaining capacity Qr from the full charge amount Qmax. Calculate the capacity Qk that can be charged by normal charging until the operation start time Tos. For example, The current by time when normal charging starts at the start time Tjs and ends at the operation start time Tos. By multiplying the value by the voltage value (constant), the amount of power, i.e., the chargeable capacity Qk of the battery, is calculated. do.

[0038] In step S49, if it is determined that the chargeable capacity Qk is greater than the required charge amount Qj, For example, in step S50, the operation start time of the electric bus 30 having the bus ID to be processed It is determined that the battery will be fully charged by normal charging by Tos, and the normal charging flag is set. In S49, if it is determined that the chargeable capacity Qk is smaller than the required charge amount Qj, the operation is started. Since the battery will not be fully charged by the start time Tos in normal charging, in step S51, rapid charging is performed. The EV bus 30- The sum of the charging currents from all chargers 10-i connected to 1 to 30-3 exceeds the upper limit. This is used as a reference when selecting a charging method so as not to exceed the limit. Calculate the number Nn (described later). In step S52, the chargers 10 connected to the EV bus 30 are When the process of determining whether or not normal charging is possible for IDz is completed, the process proceeds to step S53.

[0039] In step S53, the bus ID of the bus that was recognized as needing quick charging in step S51 is If the number Nn of i is equal to or less than the number Nk of vehicles that can be quickly charged set in the charging control device 20, In step S54, the chargers 10-1 to 10-3 are A command signal for selecting the normal charging circuit 13 for each of the chargers 10 according to the result, or A command signal is sent to select the quick charging circuit 12. In response to this command signal, each charger 10 Charging begins in either the normal charging circuit 13 or the quick charging circuit 12.

[0040] In this case, the total charging current is the current that exceeds the contract current with the power company and increases the power charge. The value corresponds to the condition for which the premium is applied. For example, the instantaneous power consumption of the chargers 10-1 to 10-3 is It is the sum of the current. It is not instantaneous, but the integrated current value over a certain period of time is measured, and the average value is set as the upper limit. It may be compared to a value.

[0041] In step S53, the bus ID of the bus that was recognized as needing quick charging in step S49 is It is determined that the number Nn of i exceeds the number Nk of vehicles that can be quickly charged set in the charging control device 20. If so, the process proceeds to step S55. The time required for the on-board battery 32 mounted on the EV bus 30 to be fully charged when rapid charging is performed is The required time Tk is calculated for each bus ID, that is, the battery life of the vehicle battery 32. The time varies depending on the remaining capacity.

[0042] Based on the result of the determination in step S49, it is recognized that quick charging is necessary (the quick charging flag is Of the multiple Nn (an integer greater than Nk, 1 or greater) electric buses 30, Nn or more The ΔN units obtained by subtracting Nk from the above (in the embodiment, Nn is 3, Nk is 2, and ΔN is 1) are It is necessary to start charging with normal charging. Therefore, in step S51, it is determined that quick charging is necessary. Among the bus IDs of EV bus 30 that are recognized as such (fast charging flag is set), Then, the bus IDi at which normal charging will start is determined as follows.

[0043] For example, as shown in step S56, the bus ID with the latest operation start time Tos is used. The charger 10 that charges the on-board battery 32 of the EV bus 30 charges using a normal charging circuit 13, and The charger 10 for charging the Nk EV buses 30 is configured to charge the Nk EV buses 30 using the quick charging circuit 12. Then, in step 57, the charger 10 transmits a charging circuit selection command signal to the charger 10. It is determined that the number of buses, i.e., the number of chargers 10 performing quick charging, has decreased. In this case, in step 58, the charger 10 of the EV bus 30 undergoing normal charging is provided with a quick charging circuit. In this embodiment, the SOC of the on-board battery 32 being fast-charged is 80 At this rate, the fast charging current Ik drops to almost the normal charging current If. Therefore, it is determined that the number of chargers 10 performing quick charging has decreased. Since there are various time waveform characteristics of the charging current, the number of EV buses 30 that are being fast-charged is decreasing. The fast charge current Ik is set to a new value that is smaller than the current Ik. It may be judged by the length.

[0044] By the above-mentioned processing from step S41 to step S58, each charging The charging circuit of the battery 10-i is determined, and each charger 10 is connected to the normal charging circuit 13 or the quick charging circuit 14. The battery 32 is charged via one of the paths 12.

[0045] (Processing by Management Center 60) FIG. 13 is a flow chart for explaining the calculation process carried out in the management center 60. In step S61, the charging control device ID and the bus ID are received from the charging control device 20. In step S62, the operation plan information table for each bus ID stored in the storage device 62 is In step S63, the operation plan corresponding to the received bus ID is read from the bus. The control device 63 of the management center 60 receives the charging control device ID and the bus The operation plan data corresponding to the ID is transmitted to the charging control device 20 via the Internet line 50. Believe.

[0046] The operation plan information table is shown in Figs. 16A and 16B, which will be described later. , route name, bus ID, start time, route from base to base via stop The time, required battery capacity, next operation start time, operation end time, etc. are stored in advance.

[0047] (Explanation of charging current time characteristics) 14A to 14C, the charging current time of quick charging and normal charging in the embodiment is Explain the characteristics. For the EV bus 30-1 and the EV bus 30-2, the charging start times are Tjs-1 and Tjs- At time T80-2, charging using the quick charging circuit 12 is started. The charging current is Ik. 1. When the SOC reaches 80 percent at T80-2, the current is reduced to if, and at time Tend When full charge is determined, charging ends. For the EV bus 30-3, charging using the normal charging circuit 13 is started at charging start time Tjs-3. The SOC of the on-board batteries 32 of EV30-1 and EV30-2 is at time T80-1. When T80-2 and T80-3 reach 80 percent and the charging current drops to If, the charger -3 is switched to the quick charging circuit 12, and the on-board battery 32 of the EV bus 30-3 is charged with a charging current Ik When the SOC reaches 80 percent at time T80-3, charger 10-3 starts charging. The charging current is reduced to If, and at time Tend2, full charge is determined and charging ends. The charging current time characteristic shown by the two-dot chain line in FIG. 14C is 4 shows the waveform when the battery 32 is rapidly charged.

[0048] (Explanation of what to do when the instantaneous charging current exceeds the upper limit) With reference to FIG. 15, the process when the instantaneous charging current exceeds the upper limit will be described. In the embodiment, for the sake of simplicity, assumptions 1 and 2 are set. Assumption 1: When the onboard batteries 32 of all EV buses 30-1 to 30-3 are normally charged, The V-bus 30 cannot be fully charged by the start time of operation times Tos1 to Tos3. Assumption 2: If the on-board batteries 32 of all EV buses 30-1 to 30-3 are fast-charged, then As shown in 5(i), the total charging current exceeds the contracted current.

[0049] Therefore, the bus with the latest start time among Tos1 to Tos3, EV bus 30-3, The on-board battery 32 starts charging with normal charging, and the sum of the charging currents (=Ik×2+If) is equal to the contract current. Charging is started so as not to exceed the upper limit value of . This is shown in FIG. 15(ii). At times T80-1 and T80-2, the SOC of the onboard batteries 32 of the EV buses 30-1 and 30-2 is When the charger voltage reaches 80%, the chargers 10-1 and 10-2 for the EV buses 30-1 and 30-2 are The current Ik is reduced to If and charging is continued until the battery is fully charged. At time T80-1 (T80-2), the EV bus The charger 10-3 of the EV battery 30-3 switches the normal charging circuit 12 to the quick charging circuit 12. The on-board battery 32 of the EV bus 30-3 is rapidly charged with a charging current Ik. When the SOC of battery 32 reaches 80 percent at time T80-3, the charger for EV bus 30-3 10-3 reduces the current Ik to If and charges until it is fully charged. At time Tend2, charging of battery 32 is completed when battery 32 is fully charged. This is shown in Figure 15(iii). In (iii), the charging current of EV buses 30-1 and 30-2 is the normal charging current value. It is shown as "If".

[0050] The effects of the above-described embodiment will now be described. (1) The charging device of the embodiment charges the vehicle-mounted battery 32 in one of at least two charging methods. A plurality of chargers 10-1 to 10-3 are used to charge the batteries. Power is supplied to charge the battery 32, and the sum of the currents charging the multiple vehicle-mounted batteries is A charging control device that determines the charging method so as not to exceed the upper limit on which the power charge is calculated. determination unit 20. According to the charging device of the embodiment, the on-board batteries 32 of a plurality of EV buses 30 can be charged simultaneously. In this case, the charging current does not exceed the contract current, so the fixed charge portion of the electricity fee does not fluctuate. (2) In the charging device of the above (1), the determination unit 20 determines whether the EV battery in which the on-board battery 32 is mounted is a Refer to the operation plans of the electric vehicles (commercial electric vehicles) 30-1 to 30-3, and check that the total current exceeds the upper limit. The system determines whether to use fast charging or normal charging so as not to exceed the limit. This allows the vehicle operation schedule to be followed and fluctuations in the fixed portion of the electricity rate to be suppressed. do. (3) In the case of the charging device in (2), the operation plan includes an EV bus 30- The operation start times Tos of 1 to 30-3 are included, and the determination unit 20 also takes into account the operation start times Tos. Then, a charging method for the plurality of chargers 10-1 to 10-3 is determined. Charging control is performed taking into account the start time of operation, so the charging current is suppressed while maintaining the start time of operation. It is possible to reliably charge the battery by the time the battery is charged. (4) In the charging device of (3), the determination unit 20 determines the charging state of the in-vehicle battery 32 and the time when the vehicle starts to travel. Based on the time Tos, the charging method is determined. Charging control is based on the current battery remaining charge and the start time of the trip. It is possible to reliably charge the battery by the time the train starts running while suppressing the charging current. (5) For the charging equipment described in (1) to (4), the upper limit shall be based on the current contracted by the charging equipment. The charger 10 is set to charge by normal charging (first charging method) or at a rate lower than normal charging. The vehicle-mounted battery 32 is charged by either a fast charging method (a second charging method) or a fast charging method (a second charging method) that charges the battery in a short time. When 32 reaches the planned charging state, for example, when it is fully charged, charging stops. For example, the normal charging circuit and the quick charging circuit that are widely used in CHADEMO chargers By using the path switching, the charging current can be suppressed below the upper limit. The charging device of the present invention can be provided at low cost without the need for development.

[0051] (6) The charging system of the embodiment charges the vehicle battery 3 by at least one of two charging methods. A plurality of chargers 10-1 to 10-3 for charging the battery 2 and a battery connected to the chargers 10-1 to 10-3. The total current of the charging currents to the on-board batteries of the multiple chargers 10-1 to 10-3 is calculated based on the power charge. A management center having a determination unit that determines a charging method so as not to exceed an upper limit value that is the basis for issuing a charge. The management center 60 issues a command to indicate the charging method determined by the determination unit 20. The chargers 10-1 to 10-3 then Charge the battery using the standard charging method. According to the charging system of the embodiment, when multiple vehicle-mounted batteries 32 are charged simultaneously, Since the contract current is not exceeded, the fixed portion of the electricity charge does not fluctuate. All the data and information required for charging is collected at the management center 60, The electrical processing can be centralized at the management center 60. In the charging system of (7) and (6), the determination unit 20 determines the upper limit value, the operation start time, and the vehicle The charging method is determined by referring to the charging state of the onboard battery. In the charging system of (8)(7), the chargers 10-1 to 10-3 are The battery controller 322 mounted on the electric vehicles 30-1 to 30-3 supplies the vehicle-mounted battery The charging status of the battery 32 is received, and the received charging status of the vehicle-mounted battery 32 is transmitted to the management center 60. Then, the charging method is set by receiving a command from the management center 60, and the charging method of the in-vehicle battery 32 is Charging will stop when the battery reaches the expected charging state. By providing the function of a charge control device that controls the charger 10 to the management center 60, Management and electricity bill control are simplified.

[0052] (9) The charging method of the embodiment uses at least one of the quick charging circuit 12 and the normal charging circuit 13. A charging method for charging a plurality of vehicle-mounted batteries 32, comprising the steps of: prior to charging, The total current for charging the multiple on-board batteries 32 in 12 is the upper limit on which the electricity rate is calculated. It is determined whether the total current exceeds the threshold value (steps S47 to S53 in FIG. 11, etc.) and When it is determined that the sum exceeds the upper limit, one of the on-board batteries is normally The charging circuit 13 is set to charge (step S54 in FIG. 11, etc.). . According to the charging method of the embodiment, when multiple vehicle-mounted batteries 32 are charged simultaneously, Since the current is not exceeded, the fixed portion of the electricity bill does not fluctuate. (10) In the charging method of (9), charging of an in-vehicle battery being charged by a quick charging circuit 12 When the charging current becomes smaller than the quick charging current, the on-board battery being charged by the normal charging circuit 13 is turned on. The method further comprises configuring the battery to be charged by the fast-charging circuit 32.

[0053] (11) The charging program of the embodiment includes at least the rapid charging circuit 12 and the normal charging circuit 1 3, a charging program for charging a plurality of vehicle-mounted batteries 32, The sum of the currents charging the multiple vehicle-mounted batteries 32 in the quick charging circuit 12 is used to calculate the electricity fee. It is determined whether or not the base upper limit value is exceeded (step 11 of FIG. 11 executed by the charging control device 20). When it is determined that the total current exceeds the upper limit, the upper limit is exceeded. In order to prevent this, the vehicle battery is set to be charged by the normal charging circuit 13 (charging control 11 executed by the control device 20) is The control device 21 of the device 20 executes the process. According to the charging program of the embodiment, when multiple vehicle-mounted batteries 32 are charged simultaneously, Since the contracted current is not exceeded, the fixed portion of the electricity bill does not fluctuate. The charging program may be implemented in the control device 63 of the management center 60. (12) In the charging program of (11), a battery being charged by the quick charging circuit 12 When the charging current of the normal charging circuit 13 becomes smaller than the fast charging current, and configuring the computer to charge the battery with the fast charging circuit 12. .

[0054] The battery charging system of the present invention can be modified as follows. (Variation 1) In the embodiment, the battery state, such as the battery capacity and the remaining battery power, was explained as SOC. The capacity of the battery is not limited to SOC as long as it is a physical quantity that indicates the battery capacity of the battery. (Variation 2) In the embodiment, an example in which three buses 30 are charged by the chargers 10 has been described. The present invention can also be applied to a case where four or more buses are charged by each charger 10. (Variation 3) In the embodiment, the charge control device 2 judges whether the sum of the charging currents exceeds the upper limit. 0, it may be performed by the charger 10 or the management center 60.

[0055] (Variation 4) In the embodiment, the battery controller 322 is connected to the charger 20 via the vehicle control device 20. 10, the SOC is transmitted from the battery controller 322 to the vehicle control device 2 0 to the charging control device 20 or the management center 60, and then to the charger 10 may be sent to

[0056] (Variation 5) In the embodiment, the full charge determination associated with charging is performed by the charger 10. The battery controller 3 may also perform the above process. At 22, a full charge determination is performed, and the full charge is notified to the charge control device 20 and the management center 60. The charge control device 20 or the management center 60 transmits a charge end command to the charger 10. It may be arranged to do so. (Variation 6) In the embodiment, the charging control device 20 is installed in the vehicle depot 40. The device 20 may be installed at a location other than the vehicle depot 40. For example, the device 20 may be installed at the management center 60. The control device 63 of the management center 60 is provided with the functions of the charge control device 20 (such as a determination unit). It is okay. (Variation 7) Charger 10 supports a wide range of charging methods, including the CHADEMO method proposed by Japan, the European method, and the American method. Other schemes may also be employed.

[0057] (Variation 8) In the embodiment, the charging start times of the three EV buses 30-1 to 30-3 are the same. The present invention can also be applied to a case where charging is started at different times. Prevent all of 10-1 to 10-3 from switching to the quick charging circuit 12 at the same time. . (Variation 9) In the embodiment, when the sum of the charging currents exceeds the upper limit of the contract current, the E The V bus with the latest start time will start charging with normal charging. The two electric buses being charged using quick charging will be fully charged before the start of operation. However, the EV bus 30 that can be charged quickly and the EV bus 30 that can be charged normally are operated. In this case, the vehicle may not be fully charged by the time the trip starts. The battery capacity Qreq required for the next operation recorded in 2 is set as the target battery capacity for charging. This allows the battery to be charged to the minimum required capacity before the start of operation. It is highly likely that In addition, if the battery capacity required for the next operation cannot be charged, the E There is a risk that V-buses will run out of power during operation. In this case, a replacement EV bus will be prepared. You may do so.

[0058] (Variation 10) In the embodiment, the charge, which is originally fixed, is assumed to vary depending on the upper limit of the current. However, the present invention can also be applied to cases where the fixed fee varies due to other factors at the time of charging by the business operator. (Variation 11) In the embodiment, an example is shown in which the system is applied to a charging device for multiple EV buses used by a bus operating company. However, the present invention is not limited to this. For example, a charging device for multiple electric garbage trucks used by a local government, The present invention can also be applied to charging devices for multiple home delivery vehicles used by a transportation company.

[0059] (Variation 12) In this embodiment, the on-board battery 32 mounted on the EV bus 30 is charged by the charger 10. However, when multiple on-board batteries stored in the vehicle depot 40 are charged at the same time, The present invention can also be applied to the above. (Variation 13) In the embodiment, a case where one EV bus 30 is connected to one charger 10 for charging is described. However, when a plurality of EV buses 30 are connected to one charger 10 for charging, The present invention can also be applied in such cases.

[0060] (Variation 14) In this embodiment, three chargers 10 and one charging control device 20 are installed in one vehicle depot 40. However, as shown by reference numeral 40A in FIG. The present invention can also be applied to a case where a vehicle depot 40A is provided separately from the vehicle depot 40A. Since each depot has a power meter, it is possible to check whether the total charging current exceeds the upper limit for each depot. The charging method is then determined. (Variation 15) In the embodiment, a quick charging circuit 12 and a normal charging circuit 13 are mounted on the charger 10, and a large The battery is charged with two different charging currents: a small current Ik and a small current If. The present invention can also be applied to a charging method in which the charging voltage is switched between three or more levels. The present invention can also be applied to a charging method in which the current is steplessly variable.

[0061] (Variation 16) In the embodiment, the number of EV buses that can be rapidly charged simultaneously is determined so as to satisfy the formula (1). Then, the number of EV buses that need to be fast-charged by the start of operation, Nn, and the number of EV buses that need to be fast-charged by the start of operation, Nk Based on the comparison with the upper limit, the total charging current was controlled so as not to exceed the upper limit. This is just one example. A different algorithm may be used to control the total charging current so that it does not exceed the upper limit. stomach.

[0062] The present invention is not limited to the above-described embodiment. Other embodiments contemplated within the scope of the present invention are also within the scope of the present invention. [Explanation of symbols]

[0063] 10: Charger; 12: Rapid charging circuit; 13: Normal charging circuit; 18: Control device 20...Charging control device 30...EV bus 31...Travel drive device 32...On-board battery 34...switch; 35...vehicle control device; 37...communication device; 40...vehicle depot; 60: Management center 63: Control device 322: Battery controller

Claims

1. a plurality of chargers that charge batteries using either a first charging method or a second charging method that charges the batteries in a shorter time than the first charging method; a determination unit that determines a charging method for each of the plurality of chargers so as to supply power for charging each battery from the plurality of chargers and to satisfy the following formula (1). Iup>(Imax×Nk+Imin×(total number of the plurality of chargers−Nk)) (1) Where: Iup is the upper limit value on which the electricity fee is calculated, Imin is the maximum current required for charging in the first charging method, Imax is the maximum current required for charging in the second charging method, Nk is the number of chargers that can simultaneously charge using the second charging method.

2. 2. The charging device according to claim 1, The charging device, wherein the determination unit determines a charging method for each of the plurality of chargers by also referring to an operation plan of a commercial electric vehicle in which the battery is mounted.

3. The charging device according to claim 2, The operation plan includes an operation start time of the commercial electric vehicle, The charging device, wherein the determination unit determines a charging method for each of the plurality of chargers while also taking into consideration the operation start time.

4. The charging device according to claim 3, The charging device, wherein the determination unit determines a charging method for each of the plurality of chargers based on a charging state of the battery and the operation start time.

5. The charging device according to any one of claims 1 to 4, The upper limit value is set based on a current amount contracted by the charging device, The charger is a charging device that stops charging when the battery reaches a predetermined charging state.

6. a plurality of chargers that charge batteries using either a first charging method or a second charging method that charges the batteries in a shorter time than the first charging method; a management center connected to the chargers via a communication line and including a determination unit that determines a charging method for each of the plurality of chargers so as to satisfy the following formula (1); The management center transmits a command instructing the charging method determined by the determination unit to the charger via the communication line, and the charger charges using the charging method based on the received command. Iup>(Imax×Nk+Imin×(total number of the plurality of chargers−Nk)) (1) Where: Iup is the upper limit value on which the electricity fee is calculated, Imin is the maximum current required for charging in the first charging method, Imax is the maximum current required for charging in the second charging method, Nk is the number of chargers that can simultaneously charge using the second charging method.

7. 7. The charging system according to claim 6, The determination unit determines a charging method for each of the plurality of chargers by referring to the upper limit value, an operation start time, and a charging state of the battery.

8. The charging system according to claim 7, The charger receives the charging state of the battery from a battery control device installed in a commercial electric vehicle, transmits the received charging state of the battery to the management center, receives the command from the management center to set the charging method, and stops charging when the received charging state of the battery reaches a planned charging state.

9. A charging method for charging a battery using a plurality of chargers, either by a first charging method or by a second charging method that charges a battery in a shorter time than the first charging method, comprising: determining a charging method for each of the plurality of chargers so as to satisfy the following formula (1) when power is supplied to charge each battery from the plurality of chargers: Iup>(Imax×Nk+Imin×(total number of the plurality of chargers−Nk)) (1) Where: Iup is the upper limit value on which the electricity fee is calculated, Imin is the maximum current required for charging in the first charging method, Imax is the maximum current required for charging in the second charging method, Nk is the number of chargers that can simultaneously charge using the second charging method.

10. A charging program for charging a battery using a plurality of chargers by either a first charging method or a second charging method that charges a battery in a shorter time than the first charging method, comprising: A charging program that causes a computer to execute the following: when power is supplied to charge each battery by the plurality of chargers, determining a charging method for each of the plurality of chargers so as to satisfy the following formula (1): Iup>(Imax×Nk+Imin×(total number of the plurality of chargers−Nk)) (1) Where: Iup is the upper limit value on which the electricity fee is calculated, Imin is the maximum current required for charging in the first charging method, Imax is the maximum current required for charging in the second charging method, Nk is the number of chargers that can simultaneously charge using the second charging method.

11. A charging method in which each of a plurality of chargers charges a battery using either a rapid charging circuit or a normal charging circuit, comprising: Prior to charging, determining whether the following formula (1) is satisfied when charging the plurality of batteries using the rapid charging circuit; A charging method for charging a plurality of batteries comprising, when it is determined that formula (1) is not satisfied, setting one of the batteries to be charged by the normal charging circuit so that formula (1) is satisfied. Iup>(Imax×Nk+Imin×(total number of the plurality of chargers−Nk)) (1) Where: Iup is the upper limit value on which the electricity fee is calculated, Imin is the maximum current required for charging in the normal charging circuit, Imax is the maximum current required to charge the battery through the fast charge circuit, Nk is the number of chargers that can be charged simultaneously by the rapid charging circuit.

12. The charging method according to claim 11, The charging method for charging a plurality of batteries further comprises setting a battery being charged by the normal charging circuit to be charged by the rapid charging circuit when the charging current of the battery being charged by the rapid charging circuit becomes smaller than the rapid charging current.

13. A charging program for each of a plurality of chargers to charge a battery using either a rapid charging circuit or a normal charging circuit, comprising: Prior to charging, it is determined whether or not the following formula (1) is satisfied when charging the plurality of batteries using the rapid charging circuit: A charging program for charging a plurality of batteries, which causes a computer to execute a setting so that any one of the batteries is charged by the normal charging circuit so as to satisfy formula (1) when it is determined that formula (1) is not satisfied. Iup>(Imax×Nk+Imin×(total number of the plurality of chargers−Nk)) (1) Where: Iup is the upper limit value on which the electricity fee is calculated, Imin is the maximum current required for charging in the normal charging circuit, Imax is the maximum current required to charge the battery through the fast charge circuit, Nk is the number of chargers that can be charged simultaneously by the rapid charging circuit.

14. In the charging program according to claim 13, The charging program for charging a plurality of batteries further causes a computer to execute a setting so that the battery being charged by the normal charging circuit is charged by the rapid charging circuit when the charging current of the battery being charged by the rapid charging circuit becomes smaller than the rapid charging current.

Citation Information

Patent Citations

  • Automatic charger of mobile car

    JP1998136571A

  • Charging system and charging method of charging system

    JP2011211891A

  • Overhead view image generation device, overhead view image generation method and overhead view image generation program

    JP2013225336A

  • Electric vehicle charging system

    JP2014176232A

  • Vehicle charging system

    JP2016054590A