Steam system and method for warming up the same
The steam system and method optimize warm-up time by controlling pressure and flow rate through sequential valve operations, enhancing efficiency and reducing energy loss.
Patent Information
- Application Number
- JP2020211023
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-21
- Publication Date
- 2024-10-31
- Estimated Expiration
- 2040-12-21
AI Technical Summary
Existing steam system warm-up methods are inefficient in terms of shortening the warm-up time.
A steam system and method that includes a main pipe with a first flow control valve and branch pipes with second flow control valves, controlled by a control device to adjust pressure and flow rate, performing a first operation to raise pressure in the main pipe to a set value and a second operation to open branch valves gradually, maintaining pressure within a predetermined range.
The method reduces energy loss and significantly shortens the warm-up time by preventing water hammer and ensuring efficient pressure distribution across the system.
Smart Images

Figure 0007576306000001 
Figure 0007576306000002 
Figure 0007576306000003
Abstract
Description
[Technical field]
[0001] The present application relates to a steam system and a method for warming up a steam system. [Background technology]
[0002] Warming up of a steam system has been known for some time. For example, a steam system disclosed in Patent Document 1 has a steam pipe connected to a steam-using device, a plurality of drain pipes connected midway along the steam pipe, and a plurality of drain valves provided on each of the drain pipes. In the warming up of this steam system, a small amount of steam is supplied to the steam pipe, and the drain valve on the upstream side of the steam pipe is opened to discharge the drain, and when the temperature of the drain pipe rises to a predetermined value, the drain valve is closed. Such operation of the drain valve is performed sequentially for the plurality of drain valves until the warming up is completed. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 187700 / 1983 Summary of the Invention [Problem to be solved by the invention]
[0004] However, the above-mentioned warm-up operation method is not sufficient in terms of shortening the warm-up operation time, and there is room for improvement.
[0005] The technology disclosed in the present application has been made in consideration of the above circumstances, and has an object to provide a steam system and a warm-up method thereof that can shorten the warm-up operation time. [Means for solving the problem]
[0006] The technology disclosed in the present application is a steam system including a main pipe into which steam flows, a first flow rate control valve provided in the main pipe, a plurality of branch pipes branching off from the main pipe and connected to a plurality of steam-using devices, a plurality of second flow rate control valves provided in each of the plurality of branch pipes, and a control device. The control device executes a warm-up operation that performs a first operation and a second operation. The first operation is an operation of controlling the first flow rate control valve with the plurality of second flow rate control valves closed, thereby increasing the pressure of the main pipe to a set pressure while maintaining the steam flow rate of the main pipe at or below a predetermined value. The second operation is an operation of opening the plurality of second flow rate control valves to a set opening degree while maintaining the pressure of the main pipe within a predetermined range including the set pressure.
[0007] Another technology disclosed in the present application is a warm-up method for a steam system including a main pipe into which steam flows in, a first flow control valve provided in the main pipe, a plurality of branch pipes branching off from the main pipe and connected to a plurality of steam-using devices, and a plurality of second flow control valves provided in each of the plurality of branch pipes. The warm-up method includes controlling the first flow control valve with the plurality of second flow control valves closed to increase the pressure of the main pipe to a set pressure while maintaining the steam flow rate in the main pipe at or below a predetermined value, and opening the plurality of second flow control valves to set openings while maintaining the pressure of the main pipe within a predetermined range including the set pressure. Effect of the Invention
[0008] According to the technology disclosed in the present application, energy loss can be suppressed. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a schematic diagram showing a steam system. [Diagram 2] FIG. 2 is a block diagram illustrating the control device. [Diagram 3] FIG. 3 is a flowchart showing a control operation by the control device. [Figure 4]FIG. 4 is a schematic diagram showing one state of the steam system. [Diagram 5] FIG. 5 is a schematic diagram showing one state of the steam system. [Figure 6] FIG. 6 is a flowchart showing a part of the control operation performed by the control device according to the modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, embodiments of the present application will be described with reference to the drawings. Note that the following embodiments are essentially preferred examples and are not intended to limit the scope of the technology disclosed in the present application, its applications, or its uses.
[0011] 1 is a schematic diagram showing a steam system 100. The steam system 100 of this embodiment is installed in, for example, a cardboard manufacturing factory, and heats cardboard with steam. In this case, the steam system 100 supplies steam to a heating roll for cardboard, which is a steam-using device 22.
[0012] The steam system 100 includes a steam using system 2, a drain discharge system 3, and a control device 5. The drain discharge system 3 is connected to the steam using system 2. The steam using system 2 is connected to the steam generating system 1.
[0013] The steam generating system 1 generates steam. The steam generating system 1 has a boiler 11 and a supply pipe 12. The boiler 11 heats water to generate steam. The boiler 11 is connected to a steam consuming system 2 via the supply pipe 12. In other words, the supply pipe 12 supplies the steam from the boiler 11 to the steam consuming system 2.
[0014] The steam using system 2 uses the steam generated in the steam generating system 1. Specifically, the steam using system 2 heats an object (e.g., cardboard) with steam. The steam using system 2 has a header 21, a supply pipe 23, a first control valve 25, and a plurality of second control valves 26.
[0015] The header 21 is connected to the supply pipe 12 of the steam generation system 1. The header 21 is a steam header that receives steam from the supply pipe 12 and temporarily stores the supplied steam. The header 21 is connected to a supply pipe 23. The supply pipe 23 supplies the steam from the header 21 to a plurality of steam-using devices 22.
[0016] Specifically, the supply pipe 23 has a main pipe 23a and a plurality of branch pipes 23b. The main pipe 23a is connected to the header 21. The main pipe 23a is a pipe into which steam flows from the header 21. The plurality of branch pipes 23b branch off from the main pipe 23a and are connected to the plurality of steam-using devices 22, respectively. That is, each of the plurality of branch pipes 23b has an inlet end, which is one end, connected to the main pipe 23a, and an outlet end, which is the other end, connected to the steam-using device 22. The plurality of branch pipes 23b are connected in order from the upstream side (i.e., the header 21 side) of the main pipe 23a. In the supply pipe 23, steam flowing from the header 21 into the main pipe 23a is divided into each of the branch pipes 23b.
[0017] The first control valve 25 is provided in the main pipe 23a. More specifically, the first control valve 25 is provided in a portion upstream of the connection position of the branch pipe 23b located most upstream in the main pipe 23a. The multiple second control valves 26 are provided in each of the multiple branch pipes 23b. That is, the multiple branch pipes 23b are each provided with one second control valve 26. The first control valve 25 constitutes a first flow rate control valve that adjusts the flow rate of steam in the main pipe 23a. The second control valve 26 constitutes a second flow rate control valve that adjusts the flow rate of steam in the branch pipe 23b. That is, the first control valve 25 and the second control valve 26 are configured to have variable openings.
[0018] In the steam-using device 22, the steam supplied from the branch pipe 23b exchanges heat with an object (for example, cardboard), and the object is heated. Meanwhile, the steam condenses to become drain.
[0019] Further, the main pipe 23a is provided with a drain trap 27. The drain trap 27 is provided near the downstream end of the main pipe 23a. In other words, the drain trap 27 is provided in a portion of the main pipe 23a downstream of the connection position of the branch pipe 23b located most downstream in the main pipe 23a. The drain trap 27 discharges only the drain that has flowed in from the main pipe 23a to the downstream side. The main pipe 23a is capable of discharging the remaining drain in the main pipe 23a to the outside via the drain trap 27.
[0020] The drain discharge system 3 discharges drain generated in the steam usage system 2. The drain discharge system 3 has a discharge pipe 31 and a drain trap 32. The discharge pipe 31 is connected to the steam usage device 22, and discharges drain generated by condensation of steam in the steam usage device 22. The drain trap 32 is provided in the discharge pipe 31. The drain trap 32 discharges only the drain that flows in from the discharge pipe 31 to the downstream side.
[0021] The steam system 100 is also provided with a first pressure sensor 41, a second pressure sensor 42, and a plurality of third pressure sensors 43.
[0022] The first pressure sensor 41 is provided in the header 21 and detects the pressure of the header 21. The second pressure sensor 42 is provided in the main pipe 23a. Specifically, the second pressure sensor 42 is provided in a portion upstream of the connection position of the branch pipe 23b located most upstream in the main pipe 23a. More specifically, the second pressure sensor 42 is provided downstream of the first control valve 25. The second pressure sensor 42 detects the pressure of the main pipe 23a. The multiple third pressure sensors 43 are provided in each of the multiple branch pipes 23b. Specifically, the third pressure sensor 43 is provided in a portion downstream of the second control valve 26 in the branch pipe 23b. The third pressure sensor 43 detects the pressure downstream of the second control valve 26, i.e., the pressure of the steam-using device 22.
[0023] The control device 5 executes normal operation and warm-up operation. The normal operation is an operation in which steam is supplied to the steam-using device 22 to heat an object to a predetermined temperature. The warm-up operation is an operation in which the pressure in the supply pipe 23 (main pipe 23a, multiple branch pipes 23b) is increased to a set pressure in advance before the normal operation is performed.
[0024] Specifically, the warm-up operation is an operation in which a first operation is performed by controlling the first control valve 25 with the multiple second control valves 26 closed to increase the pressure of the main pipe 23a to a set pressure PS while maintaining the steam flow rate in the main pipe 23a below a predetermined value, and a second operation is performed by opening the multiple second control valves 26 to a set opening degree DS while maintaining the pressure in the main pipe 23a within a predetermined range including the set pressure PS.
[0025] Fig. 2 is a block diagram showing the control device 5. The control device 5 has, as functional blocks, an acquisition unit 51, a boiler command unit 52, a first control unit 54, and a second control unit 55. The control device 5 also has a storage unit 53. For the sake of convenience, Fig. 2 omits the illustration of the second control valve 26 and the third pressure sensor 43.
[0026] The acquisition unit 51 is configured to be able to communicate with each of the pressure sensors 41, 42, and 43 described above. The acquisition unit 51 acquires by receiving the detection values of each of the pressure sensors 41, 42, and 43. Specifically, the acquisition unit 51 acquires the pressure of the header 21 detected by the first pressure sensor 41 as the measured pressure P1, and acquires the pressure of the main pipe 23a detected by the second pressure sensor 42 as the measured pressure P2. In addition, the acquisition unit 51 acquires the pressure of the steam-using device 22 detected by the third pressure sensor 43 as the measured pressure P3.
[0027] The boiler command unit 52 is configured to be able to communicate with the boiler 11. The boiler command unit 52 outputs a drive command for the boiler 11 to a control device of the boiler 11 as necessary. The boiler command unit 52 receives an input of the operating state (drive state, stop state) of the boiler 11 from the boiler 11.
[0028] The storage unit 53 is a computer-readable storage medium that stores various programs and various data. The storage unit 53 stores opening data 531, which is correlation data between the pressure difference ΔP (P1-P2) between the measured pressure P1 and the measured pressure P2, and the opening of the first control valve 25. In other words, in the opening data 531, the opening of the first control valve 25 is set within a range in which safe operation during warm-up is possible according to the pressure difference ΔP. The pressure difference ΔP can also be said to be the pressure difference between the upstream and downstream of the first control valve 25.
[0029] In the opening data 531, the opening of the first control valve 25 is set to an opening at which the steam flow rate in the main pipe 23a is equal to or lower than a predetermined value. The predetermined value is a value that can prevent the occurrence of water hammer caused by steam flowing into the main pipe 23a at a high speed. Basically, the larger the pressure difference ΔP, the higher the steam flow rate in the main pipe 23a, so the opening of the first control valve 25 is set to a smaller value. The opening data 531 is read out and used by the first control unit 54.
[0030] The first control unit 54 is configured to be able to communicate with the first adjustment valve 25, and controls (controls the opening degree of) the first adjustment valve 25. More specifically, the first control unit 54 executes the first operation of the warm-up operation described above.
[0031] The first control unit 54 has a setting unit 541 and a valve driving unit 542 as functional blocks. The setting unit 541 sets the set pressure PS of the main pipe 23a during warm-up operation according to an input operation by the user. The valve driving unit 542 controls the aperture of the first control valve 25 based on the aperture data 531 during warm-up operation to increase the measured pressure P2 to the set pressure PS. The valve driving unit 542 controls the aperture of the first control valve 25 by outputting a drive signal corresponding to the aperture of the aperture data 531 to the first control valve 25. In this way, by controlling the first control valve 25 to the aperture of the aperture data 531 corresponding to the pressure difference ΔP, the steam flow rate of the main pipe 23a is maintained at or below a predetermined value.
[0032] The second control unit 55 is configured to be able to communicate with the second adjustment valve 26, and controls (controls the opening degree of) the second adjustment valve 26. More specifically, the second control unit 55 executes the second operation of the warm-up operation described above.
[0033] The second control unit 55 has a setting unit 551 and a valve driving unit 552 as functional blocks. The setting unit 551 sets the above-mentioned set pressure PS and the set opening degree DS of the second control valve 26 in the warm-up operation by the user's input operation. This set opening degree DS is, for example, an opening degree set as an initial opening degree of the second control valve 26 in the normal operation. The valve driving unit 552 opens the second control valve 26 to the set opening degree DS in the warm-up operation while maintaining the measured pressure P2 within a predetermined range including the set pressure PS. More specifically, the valve driving unit 552 opens the second control valve 26 to the set opening degree DS at a predetermined constant speed. The valve driving unit 552 outputs a drive signal to the second control valve 26 so that the opening degree of the second control valve 26 increases at a predetermined constant speed. The set opening degrees DS may be different values for the multiple second control valves 26.
[0034] <Normal operation> In normal operation of the steam system 100, steam generated in the boiler 11 is supplied to the header 21 and temporarily stored therein. The steam in the header 21 is branched from the main pipe 23a to a plurality of branch pipes 23b and supplied to each of the steam-using devices 22. At this time, the first control unit 54 controls the aperture of the first control valve 25 so that the measured pressure P2 of the acquisition unit 51 is maintained at the set pressure PS. In addition, the second control unit 55 controls the aperture of the second control valve 26 so that the measured pressure P3 of the acquisition unit 51 becomes a predetermined pressure.
[0035] In the steam-using device 22, heat is exchanged between the steam and the object, and the object is heated to a predetermined temperature. The steam is condensed to become drain. The drain generated by the condensation of the steam is discharged from the steam-using device 22 through the exhaust pipe 31 and the drain trap 32.
[0036] <Warm-up> In the steam system 100, the following warm-up operation method is performed by the control device 5. Fig. 3 is a flowchart showing the control operation during the warm-up operation by the control device 5. Figs. 4 and 5 are schematic configuration diagrams showing one state during the warm-up operation of the steam system 100. Specifically, the warm-up operation method of this embodiment includes the first and second operations described above.
[0037] First, the first control unit 54 fully closes the first control valve 25, and the second control unit 55 fully closes the second control valve 26 (step S1). In the following step S2, the boiler command unit 52 outputs a drive command to the boiler 11 as necessary. That is, when the boiler command unit 52 determines that the boiler 11 is in a stopped state, it outputs a drive command to operate the boiler 11. As a result, the boiler 11 is driven, and steam is stored from the boiler 11 in the header 21.
[0038] Next, a first operation is performed by the first control unit 54. First, the first control unit 54 determines whether or not the measured pressure P1 acquired by the acquisition unit 51 has reached the set pressure PS (step S3). If the measured pressure P1 has not reached the set pressure PS, the first control unit 54 waits as it is.
[0039] When the measured pressure P1 reaches the set pressure PS, the first control unit 54 controls the opening degree of the first control valve 25 (step S4). That is, the first control unit 54 controls the first control valve 25 with the multiple second control valves 26 closed to increase the pressure in the main pipe 23a to the set pressure PS while maintaining the steam flow rate in the main pipe 23a at or below a predetermined value.
[0040] Specifically, the first control unit 54 calculates the pressure difference ΔP (P1-P2) from the measured pressures P1 and P2 acquired by the acquisition unit 51. Then, the first control unit 54 controls the first adjustment valve 25 to an opening degree corresponding to the pressure difference ΔP, based on the opening degree data 531 in the storage unit 53. As a result, the measured pressure P2 gradually increases. Next, the first control unit 54 determines whether the measured pressure P2 has reached the set pressure PS (step S5).
[0041] If the measured pressure P2 has not reached the set pressure PS, the process returns to step S4, and the opening of the first control valve 25 is controlled again. That is, the first control unit 54 calculates the pressure difference ΔP, and controls the first control valve 25 to the opening of the opening data 531 corresponding to the pressure difference ΔP. Since the pressure difference ΔP decreases over time, the opening of the first control valve 25 is controlled to increase.
[0042] When the measured pressure P2 reaches the set pressure PS, the first control unit 54 ends the first operation. By performing the first operation in this manner, the pressure in the portion of the main pipe 23a and the branch pipe 23b upstream of the second control valve 26 can be increased to the set pressure PS, as shown by the thick solid line in Fig. 4. At that time, the steam flow rate in the main pipe 23a is maintained at or below a predetermined value, so that the occurrence of water hammer can be prevented. Furthermore, by performing the first operation, the drain remaining in the main pipe 23a is discharged to the outside via the drain trap 27.
[0043] Next, the second control unit 55 performs a second operation. First, the second control unit 55 opens the multiple second control valves 26 (step S6). Specifically, the second control unit 55 opens the second control valves 26 at a predetermined constant speed. That is, the second control unit 55 increases the opening degree of the second control valves 26 at a predetermined constant speed. As a result, steam flows into the portion of the branch pipe 23b downstream of the second control valve 26 or the steam using device 22. Therefore, the pressure in the portion of the branch pipe 23b downstream of the second control valve 26 or the steam using device 22 gradually increases.
[0044] Next, the second control unit 55 determines whether the measured pressure P2 has dropped from the set pressure PS by a predetermined amount or more (step S7). That is, it determines whether the measured pressure P2 is maintained within a predetermined range including the set pressure PS, in other words, whether the measured pressure P2 has dropped beyond the predetermined range including the set pressure PS.
[0045] If the measured pressure P2 has not dropped below the set pressure PS by a predetermined amount or more, that is, if the measured pressure P2 is maintained within a predetermined range including the set pressure PS, the second control unit 55 judges whether the opening of the second control valves 26 has reached the set opening DS (step S8). If the opening of the second control valves 26 has not reached the set opening DS, the process returns to step S6, and the opening operation of the second control valves 26 continues. In other words, the opening of the second control valves 26 continues to increase. Then, the judgment of step S7 is performed again.
[0046] On the other hand, when the second control unit 55 determines in step S7 that the measured pressure P2 has dropped from the set pressure PS by a predetermined amount or more, it stops the valve opening operation of the plurality of second control valves 26 (step S9). In other words, when the measured pressure P2 has dropped beyond a predetermined range including the set pressure PS, the opening degree of the second control valve 26 is maintained without increasing. This makes it possible to suppress an increase in the amount of steam flowing from the main pipe 23a side to the downstream side of the second control valve 26 (including the steam-using device 22), and therefore makes it possible to reduce the degree of drop in the measured pressure P2.
[0047] Next, the second control unit 55 determines whether the measured pressure P2 has returned to the set pressure PS (step S10). That is, it determines whether the measured pressure P2 has returned to within a predetermined range including the set pressure PS. If the measured pressure P2 has not returned to the set pressure PS, the process returns to step S9, and the stop of the valve opening operation of the second control valve 26 continues.
[0048] If the measured pressure P2 returns to the set pressure PS, the process proceeds to step S8. If the second control unit 55 determines in step S8 that the opening degree of the second control valve 26 has not reached the set opening degree DS, the process returns to step S6 and resumes the valve opening operation of the second control valves 26 (step S6). That is, the opening degree of the second control valve 26 increases again at a predetermined constant speed.
[0049] When it is determined in step S8 that the opening degree of the second control valve 26 has reached the set opening degree DS, the second operation by the second control unit 55 is terminated. By performing the second operation in this manner, as shown by the thick solid line in FIG. 5, the pressure in the portion downstream of the second control valve 26 in the branch pipe 23b or the steam using device 22 can also be raised to the set pressure PS. At that time, since the measured pressure P2 is maintained within a predetermined range including the set pressure PS, the steam maintained at high pressure can be made to flow into the portion downstream of the second control valve 26 (including the steam using device 22). Therefore, since the mass flow rate of the steam can be increased, the pressure in the portion downstream of the second control valve 26 (including the steam using device 22) can be quickly raised to the set pressure PS. With the above, the warm-up operation is terminated.
[0050] In the second action described above, the reason why the restriction of maintaining the steam flow velocity in the branch pipe 23b at or below a predetermined value is not actively set is as follows. First, because most of the drain remaining in the main pipe 23a is discharged from the drain trap 27 by the first action, the amount of drain flowing through the branch pipe 23b is small, and the possibility of water hammer occurring is low. In addition, because the branch pipe 23b is shorter than the main pipe 23a, the amount of remaining drain is small. In addition, because the second control valve 26 is opened gradually (at a constant speed) in the second action, a sudden increase in the steam flow velocity is suppressed.
[0051] As described above, the steam system 100 of the above embodiment includes the main pipe 23a into which steam flows, the first control valve 25 (first flow rate control valve) provided in the main pipe 23a, the branch pipes 23b branching from the main pipe 23a and connected to the steam using devices 22, the second control valves 26 (second flow rate control valves) provided in the branch pipes 23b, and the control device 5. The control device 5 executes a warm-up operation that performs a first operation and a second operation. The first operation is an operation of controlling the first control valve 25 with the second control valves 26 closed to increase the pressure of the main pipe 23a to the set pressure PS while maintaining the steam flow rate of the main pipe 23a at or below a predetermined value. The second operation is an operation of opening the second control valves 26 to the set opening degree DS while maintaining the pressure of the main pipe 23a within a predetermined range including the set pressure PS.
[0052] The warm-up operation method of the above embodiment is a warm-up operation method for a steam system 100 including a main pipe 23a into which steam flows in, a first control valve 25 (first flow rate control valve) provided in the main pipe 23a, a plurality of branch pipes 23b branching from the main pipe 23a and connected to a plurality of steam-using devices 22, and a plurality of second control valves 26 (second flow rate control valves) provided in each of the plurality of branch pipes 23b. The warm-up operation method includes controlling the first control valve 25 with the plurality of second control valves 26 closed to increase the pressure of the main pipe 23a to a set pressure PS while maintaining the steam flow rate of the main pipe 23a at or below a predetermined value, and opening the plurality of second control valves 26 to a set opening degree DS while maintaining the pressure of the main pipe 23a within a predetermined range including the set pressure PS.
[0053] According to these configurations, by performing the first operation and the second operation in sequence, the target region for the warm-up operation can be divided into two regions, and these regions can be pressurized in sequence. Specifically, by performing the first operation, the pressure in the main pipe 23a and the portion upstream of the second control valve 26 in the branch pipe 23b can be raised to the set pressure PS. At that time, the steam flow rate in the main pipe 23a is maintained at or below a predetermined value, so that the occurrence of water hammer can be prevented. That is, the main pipe 23a and the like can be pressurized to the set pressure PS while preventing water hammer. In addition, by performing the second operation after the first operation, the pressure in the portion downstream of the second control valve 26 (including the steam using device 22) can also be raised to the set pressure PS. At that time, since the pressure in the main pipe 23a is maintained within a predetermined range including the set pressure PS, the steam maintained at a high pressure can be flowed into the portion downstream of the second control valve 26 (including the steam using device 22). Therefore, the pressure in the portion downstream of the second control valve 26 can be quickly raised to the set pressure PS. As a result, the time required for the warm-up operation can be shortened compared to, for example, a case where the voltage is increased all at once without dividing the target range of the warm-up operation.
[0054] In other words, if you try to increase the pressure all at once without dividing the target range of the warm-up operation, that is, if you try to control the first control valve with multiple second control valves fully open, the pressure in the target range will not increase easily because the range is wide. In that case, the pressure difference ΔP between the upstream and downstream of the first control valve will not decrease easily, so it will be difficult to increase the opening of the first control valve from the perspective of preventing water hammer. As a result, it will take a long time to increase the pressure in the entire target range, which will lengthen the warm-up operation time.
[0055] In addition, in the second operation, if the pressure in the main pipe 23a drops below the specified range, the control device 5 stops the opening operation of the multiple second control valves 26, and then, when the pressure in the main pipe 23a returns to within the specified range, resumes the opening operation of the multiple second control valves 26.
[0056] According to the above configuration, even if the pressure in the main pipe 23a falls below the predetermined range, the valve opening operation of the multiple second control valves 26 is stopped, so that the pressure in the main pipe 23a can be quickly restored. Then, when the pressure in the main pipe 23a is restored, the valve opening operation of the second control valves 26 is resumed, so that the opening degree of the second control valves 26 can be quickly increased to the set opening degree DS. As a result, the warm-up operation time can be further shortened.
[0057] Furthermore, in the second action, the control device 5 opens the plurality of second control valves 26 at a predetermined constant speed. With this configuration, the control of the second control valves 26 can be simplified.
[0058] Furthermore, in the second action, when the pressure in the main pipe 23a returns to the set pressure PS, the control device 5 resumes the valve opening action of the second control valve 26.
[0059] According to the above configuration, the valve opening operation of the second control valve 26 can be continued more stably than when the valve opening operation of the second control valve 26 is resumed when the pressure in the main pipe 23a returns to within the predetermined range. In other words, even if the pressure in the main pipe 23a returns to within the predetermined range, there is a risk that the pressure in the main pipe 23a will immediately drop beyond the predetermined range. If this happens, the valve opening operation of the second control valve 26 will be repeatedly stopped and resumed, which may lengthen the time for the second operation and therefore the time for warm-up operation, but this can be avoided in the above embodiment.
[0060] (Modification of the embodiment) A modified example of the above embodiment will be described with reference to Fig. 6. Fig. 6 is a flow chart showing a part of the control operation by the control device 5 according to the modified example. In this modified example, in the control operation by the control device 5 of the above embodiment, a drive command is output to the boiler 11 as necessary before the second operation by the second control unit 55.
[0061] Specifically, in the control operation by the control device 5 of this modified example, steps S11 and S12 are added between steps S5 and S6 in the flow chart of FIG.
[0062] When it is determined in step S5 that the measured pressure P2 has reached the set pressure PS, the boiler command unit 52 determines whether the boiler 11 is being driven (step S11). That is, the boiler command unit 52 determines the operating state (driven state, stopped state) of the boiler 11. When the boiler command unit 52 determines that the boiler 11 is not being driven, that is, when it determines that the boiler is in a stopped state, it outputs a drive command to operate the boiler 11 to the boiler 11 (step S12). When the drive command is output to the boiler 11, the process returns to step S11. When it is determined in step S11 that the boiler 11 is being driven, the process proceeds to step S6, and the second control unit 55 performs the second operation.
[0063] As described above, according to this modification, a drive command is output to the boiler 11 as necessary before the second operation by the second control unit 55, so that the measured pressure P1 (pressure of the header 21) is reliably maintained at the set pressure PS. Therefore, in the second operation, it becomes easy to maintain the measured pressure P2 within a predetermined range including the set pressure PS. This makes it possible to suppress the stopping of the valve opening operation of the second control valve 26 (step S9), and as a result, the time for the second operation, and therefore the time for the warm-up operation, can be further shortened.
[0064] In the above embodiment, in the second action, the second control valve 26 is opened at a predetermined constant speed, but the opening speed of the second control valve 26 may be accelerated. In other words, the rate at which the opening degree of the second control valve 26 increases may be accelerated.
[0065] Furthermore, in the above embodiment, the valve opening operation of the second control valve 26 is stopped in step S9 in FIG. 3, but the speed at which the second control valve 26 is opened may be reduced.
[0066] In addition, in the above embodiment, in step S10 of Figure 3, it is determined whether the measured pressure P2 has returned to the set pressure PS, but it may also be determined whether the measured pressure P2 has returned to within a predetermined range including the set pressure PS. [Industrial Applicability]
[0067] INDUSTRIAL APPLICABILITY As described above, the technology disclosed in the present application is useful for a steam system and a warm-up operation method thereof. [Explanation of symbols]
[0068] 100 Steam System 5. Control device 22 Steam-using equipment 23a Master 23b Branch pipe 25 First control valve (first flow control valve) 26 Second control valve (Second flow control valve) PS Set pressure DS setting opening
Claims
1. The main pipe into which steam flows, A first flow rate control valve provided in the main pipe; A plurality of branch pipes branched from the main pipe and connected to a plurality of steam using devices, respectively; a plurality of second flow rate control valves provided in the plurality of branch pipes, respectively; a control device; The control device includes: a first operation of controlling the first flow control valve while closing the plurality of second flow control valves, thereby increasing the pressure in the main pipe to a set pressure while maintaining a steam flow rate in the main pipe at or below a predetermined value; a warm-up operation is performed after the first operation, in which a second operation is performed to increase the opening degrees of the second flow control valves to set opening degrees while maintaining the pressure of the main pipe within a predetermined range including the set pressure; After the warm-up operation, a normal operation is performed in which the second flow control valve is controlled so that the pressure of the steam using device becomes a predetermined pressure. A steam system comprising:
2. 2. The steam system of claim 1, In the second operation, when the pressure in the main pipe falls below the predetermined range, the control device stops the operation of increasing the opening degrees of the second flow rate control valves, and thereafter, when the pressure in the main pipe returns to within the predetermined range, resumes the operation of increasing the opening degrees of the second flow rate control valves. A steam system comprising:
3. 3. The steam system according to claim 1, The control device increases the opening degrees of the second flow rate control valves at a predetermined constant rate in the second action. A steam system comprising:
4. 3. The steam system of claim 2, When the pressure in the main pipe returns to the set pressure, the control device resumes the operation of increasing the opening degree of the second flow rate control valve in the second action. A steam system comprising:
5. A method for warming up a steam system, comprising: a main pipe into which steam flows in; a first flow control valve provided in the main pipe; a plurality of branch pipes branching off from the main pipe and connected to a plurality of steam using devices; and a plurality of second flow control valves provided in the plurality of branch pipes, respectively; and a method for warming up a steam system, which is performed before a normal operation, controlling the second flow control valve so that a pressure in the steam using devices becomes a predetermined pressure, controlling the first flow control valve in a state in which the plurality of second flow control valves are closed, thereby increasing the pressure in the main pipe to a set pressure while maintaining a steam flow rate in the main pipe at or below a predetermined value; and increasing the apertures of the second flow control valves to the set apertures while maintaining the pressure of the main pipe within a predetermined range including the set pressure after the pressure of the main pipe has increased to the set pressure. A method for warming up a steam system comprising:
Citation Information
Patent Citations
Warming-up method of steam pipeline
JP1983187700A
Method and device for inhibiting hammering
JP1986066996A
Monitoring system for steam use facility
JP2017090020A