ENERGY MANAGEMENT SYSTEM, ENERGY MANAGEMENT METHOD, AND PROGRAM
The energy management system optimizes microgrid operations by predicting demand and renewable energy output, formulating equipment plans, and displaying operational information to ensure continuous power supply and efficient use of resources during emergencies.
Patent Information
- Application Number
- JP2023039933
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-03-14
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2043-03-14
AI Technical Summary
Microgrids that integrate renewable energy sources like biogas and solar power generation, in addition to storage batteries, face challenges in ensuring continuous power supply during emergencies and optimizing energy management to prevent battery depletion.
An energy management system that includes mode identification, prediction, planning, and display functionalities to manage power demand, renewable energy output, and equipment operation, allowing for autonomous operation and efficient use of resources during grid-connected and standalone modes.
Enables smooth power supply during emergencies by optimizing generator and battery usage, extending operation time, and minimizing the impact of planned outages through proactive measures like pre-charging batteries and redirecting surplus energy.
Smart Images

Figure 0007577777000001 
Figure 0007577777000002 
Figure 0007577777000003
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to an energy management system, an energy management method, and a program. [Background technology]
[0002] In microgrids that can be switched between normal times (grid-connected) and emergency situations (grid power outage, independent operation), technology has been developed to improve battery operation, such as predicting emergency loads during normal times and preventing the battery from running out of power in an emergency (see Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2021-184682 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in addition to storage batteries, the elements that make up a microgrid also include generators using biogas and other fuels, as well as renewable energy sources such as solar power generation. There is a demand for further efficiency improvements in the operation of microgrids and for long-term power supply by utilizing these in emergencies. [Means for solving the problem]
[0005] The energy management system according to the embodiment includes a mode identification unit, a prediction unit, a planning unit, and a display I / F unit. A duration calculation unit;The mode identification unit identifies whether the microgrid is in a grid-connected mode in which the microgrid receives power supply from a power grid, or in an independent operation mode in which power supply from the power grid to the microgrid is stopped and the microgrid operates independently. The prediction unit predicts the power demand and renewable energy output in the microgrid when the grid-connected mode continues and when the microgrid switches to the independent operation mode in the grid-connected mode. The planning unit formulates equipment operation plans for the microgrid in the grid-connected mode and the independent operation mode based on these predictions. The display I / F unit displays operation information related to the operation of the microgrid in the independent operation mode on the display unit, even when the microgrid is in the grid-connected mode, based on the equipment operation plan. The duration calculation unit calculates a possible continuous time for which the microgrid can operate independently in the independent operation mode at a predetermined time ahead based on the power demand. The operation information includes the possible continuous time. The duration calculation unit predicts a power outage duration based on meteorological information, and sets the time until the predicted power outage duration to the predetermined time. [Brief description of the drawings]
[0006] [Figure 1] FIG. 1 is a diagram for explaining an example of a microgrid to which the energy management system according to the present embodiment is applied. [Diagram 2] FIG. 2 is a diagram for explaining an example of the role of the energy management system according to the present embodiment. [Diagram 3] FIG. 3 is a diagram for explaining an example of main functions of the energy management system according to the present embodiment. [Figure 4] FIG. 4 is a diagram illustrating an example of a functional configuration of the energy management system according to the present embodiment. [Diagram 5] FIG. 5 is a diagram for explaining an example of the calculation process of the operational information in the energy management system according to the present embodiment. [Figure 6] FIG. 6 is a diagram showing an example of operation information displayed in the energy management system according to the present embodiment. [Figure 7] FIG. 7 is a flowchart showing an example of the flow of a display process of operation information in the energy management system according to the present embodiment. [Figure 8]FIG. 8 is a flowchart showing another example of the flow of the display process of the operation information in the energy management system according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0007] Hereinafter, an energy management system, an energy management method, and a program according to the present embodiment will be described with reference to the accompanying drawings.
[0008] Fig. 1 is a diagram for explaining an example of a microgrid to which the energy management system according to the present embodiment is applied. As shown in Fig. 1, the energy management system according to the present embodiment receives power from a power grid during normal operation, and supplies power to equipment in the microgrid. That is, during normal operation, the microgrid is in a grid-connected mode in which it receives power from the power grid.
[0009] In addition, the energy management system according to this embodiment supplies power to equipment in the microgrid from a generator or a storage battery in the microgrid in an emergency, as shown in Fig. 1. That is, in an emergency, power supply from the power system to the microgrid is stopped and the microgrid operates in an independent operation mode.
[0010] Furthermore, as shown in FIG. 1, in an emergency, the microgrid of this embodiment can limit the loads to which power is supplied from the generators or storage batteries in the microgrid to specific loads (e.g., evacuation shelters), and exclude other loads from the supply of power, so that no power is supplied to them.
[0011] 2 is a diagram for explaining an example of the roles of the energy management system according to this embodiment. The energy management system according to this embodiment has the following roles (1) to (3). (1) The energy management system according to the present embodiment predicts power demand, creates an equipment operation plan, and performs peak cutting and peak shifting of interconnection lines based on the equipment operation plan. This prevents the depletion of storage batteries in the microgrid, enables the microgrid to be operated so as to comply with the contracted power, and realizes economical operation of the microgrid according to the value difference between day and night.
[0012] (2) The energy management system according to the present embodiment promotes local production and consumption of energy, making it possible to effectively utilize surplus renewable energy without waste and suppressing reverse power flow. (3) The energy management system according to the present embodiment enables independent operation by being disconnected from the power grid in an independent operation mode.
[0013] 3 is a diagram for explaining an example of main functions of the energy management system according to the present embodiment. The energy management system according to the present embodiment predicts power demand and renewable energy output in a microgrid, formulates an equipment operation plan based on the prediction results, and economically optimizes the operation of the microgrid based on the equipment operation plan.
[0014] Specifically, the power generator and the storage battery are controlled based on a power generation plan for the generator and a charge / discharge plan for the storage battery.
[0015] Fig. 4 is a diagram showing an example of the functional configuration of the energy management system according to the present embodiment. As shown in Fig. 4, the energy management system according to the present embodiment includes a mode identification unit 401, a prediction unit 402, a database 403, a planner 404, a control unit 405, a duration calculation unit 406, and a screen display I / F unit 407.
[0016] The database 403 stores information necessary for predicting the power demand and renewable energy output in the microgrid, such as weather information, the actual power demand of the microgrid, and the actual renewable energy output.
[0017] The mode identification unit 401 is an example of a mode identification unit that identifies whether the microgrid is in the grid-connected mode or the isolated operation mode. For example, the mode identification unit 401 may identify whether the microgrid is in the grid-connected mode or the isolated operation mode based on whether power is being supplied from the power grid to the microgrid, the state of a breaker that is provided at the entrance of the microgrid and can cut off the power supply from the power grid, an input from an operator, etc.
[0018] In this embodiment, the prediction unit 402 predicts the power demand of the microgrid in the grid-connected mode based on the weather information and the power demand history stored in the database 403, and predicts the power demand of the microgrid assuming the independent operation mode at a predetermined timing. That is, the prediction unit 402 is an example of a prediction unit that predicts the power demand in the microgrid and the output of renewable energy when the grid-connected mode continues and when the operation mode is switched to the independent operation mode in the grid-connected mode. In this embodiment, the prediction unit 402 may predict, in the grid-connected mode, a value obtained by subtracting renewable energy from the load (e.g., a specific load) in the microgrid in the independent operation mode as the net demand for power of the microgrid in the independent operation mode.
[0019] The planning unit 404 is an example of a planning unit that formulates an equipment operation plan for the microgrid in the independent operation mode (e.g., an operation (charging and discharging) plan for the storage battery) based on the prediction result of the net demand for power by the prediction unit 402. That is, the planning unit 404 formulates equipment operation plans for the microgrid in the grid-connected mode and the independent operation mode based on the prediction result of the power demand and the output of renewable energy. For example, the planning unit 404 may calculate the amount of power required for the load in the independent operation mode (e.g., the net demand amount for each time period) based on the prediction result of the net demand for power by the prediction unit 402. Then, the planning unit 404 may formulate an operation plan for the storage battery based on the calculated amount of power.
[0020] The planner 404 may also periodically update the equipment operation plan of the microgrid in the isolated operation mode. The planner 404 may also periodically update the equipment operation plan of the microgrid assuming the isolated operation mode in the grid-connected mode. Alternatively, the planner 404 may update the equipment operation plan at any timing of the operator of the microgrid.
[0021] The control unit 405 controls the generators and the storage batteries based on the facility operation plan formulated by the planning unit 404, and operates the microgrid.
[0022] The duration calculation unit 406 is an example of a duration calculation unit that calculates the possible continuous time for which the microgrid can operate independently in the independent operation mode (e.g., the time until the remaining charge of the storage battery reaches the lower limit of operation) based on the result of the power demand prediction by the prediction unit 402. The duration calculation unit 406 may calculate the possible continuous time for the independent operation mode when the independent operation mode is entered a predetermined time N in the future (N hours from the present). Here, the predetermined time N is a time set in advance, and may be, for example, the time until the power outage time when a planned power outage is performed. In this embodiment, the duration calculation unit 406 may predict the power outage time based on meteorological information, and set the predetermined time N based on the power outage time.
[0023] That is, the possible continuity time is not limited to the possible continuity time when the microgrid goes into an emergency (independent operation mode) right now, but may be the possible continuity time when the microgrid goes into an emergency in a predetermined time N. In this case, the duration calculation unit 406 predicts the possible continuity time in normal operation up to the predetermined time N ahead, and calculates the possible continuity time in an emergency from the predetermined time N ahead. For example, the duration calculation unit 406 predicts the power outage duration based on meteorological information, sets the time until the predicted power outage duration as the predetermined time N, and calculates the possible continuity time after the predetermined time N.
[0024] The screen display I / F unit 407 is an example of a display I / F unit that displays operation information related to the operation of the microgrid in the grid-connected mode or in the isolated operation mode on the display unit based on the equipment operation plan formulated by the planner 404. The screen display I / F unit 407 also displays operation information on the display unit based on an updated equipment operation plan. The screen display I / F unit 407 may simultaneously display the operation information in the grid-connected mode and the operation information in the isolated operation mode.
[0025] Here, the operation information may include the available continuity time calculated by the duration calculation unit 406. This allows the operator of the microgrid to take measures such as grasping the start timing of the emergency generator or extending the available continuity time by charging the storage battery in advance, thereby making it possible to smoothly supply power in an emergency. In this embodiment, when the available continuity time is displayed as the operation information, the screen display I / F unit 407 may acquire the available continuity time via the duration calculation unit 406 and display the operation information including the acquired available continuity time on the display unit. In addition, since the power outage time is determined in advance in the case of a planned power outage, if the available continuity time displayed on the screen is shorter than the power outage time, the above-mentioned measures can be taken to continue the power supply during the planned power outage, thereby minimizing the impact of the planned power outage. Furthermore, if the available continuity time of the independent operation mode is already sufficient, the surplus capacity (for example, the charge / discharge surplus capacity of the storage battery) can be used for economic operation (for example, discharging the storage battery during the time period when the demand for power is at its peak and supplying power to another microgrid), leading to efficiency improvements.
[0026] The operation information may also include a time required for power to be supplied to the load in the isolated operation mode. For example, the operation information may include a time required for the storage battery to be charged in the isolated operation mode and then for power to be supplied from the storage battery to the microgrid.
[0027] The operation information may also include an equipment operation plan for the microgrid in the independent operation mode. The equipment operation plan may be, for example, a charge / discharge plan for a storage battery, a renewable energy output suppression plan, a demand suppression plan (demand response), etc. For example, the equipment operation plan may be a plan for charging a storage battery by photovoltaic power generation in the independent operation mode, and then supplying power from the storage battery to the microgrid. In this embodiment, when the equipment operation plan is displayed as the operation information, the screen display I / F unit 407 may directly acquire the equipment operation plan formulated by the planning unit 404 from the planning unit 404 without going through the duration calculation unit 406, and display the equipment operation plan on the display unit.
[0028] Here, the equipment operation plan may include a time until power can be supplied to the load in the isolated operation mode. Also, the equipment operation plan may be an equipment operation plan for the microgrid when the isolated operation mode is entered a predetermined time N ahead.
[0029] Furthermore, when an emergency generator startup plan is input, the equipment operation plan may be changed based on the emergency generator startup plan. In this case, the equipment operation plan may be changed accordingly every time the emergency generator startup plan is changed. Furthermore, when an emergency load range (e.g., only evacuation shelters) is input, the equipment operation plan may be changed based on the emergency load range. In this case, too, the equipment operation plan may be changed every time the emergency load range is changed.
[0030] 5 is a diagram for explaining an example of a calculation process of operation information in the energy management system according to the present embodiment. In the present embodiment, first, the prediction unit 402 predicts a value obtained by subtracting renewable energy (renewable energy) from a specific load in the microgrid in the grid-connected mode as a net demand of the microgrid in an emergency (in the independent operation mode) (step S501).
[0031] Next, the planner 404 calculates an equipment operation plan for the storage battery in the microgrid in the independent operation mode based on the net demand of the microgrid predicted by the predictor 402, and obtains a transition of the SOC (State Of Charge) of the storage battery based on the equipment operation plan of the storage battery (step S502). Furthermore, the duration calculator 406 calculates a possible continuation time based on the transition of the SOC of the storage battery (step S502). Then, the screen display I / F unit 407 displays the calculated possible continuation time (time available for independent operation) and the net demand of the microgrid in an emergency on the display unit as operation information (step S503).
[0032] Fig. 6 is a diagram showing an example of operation information displayed in the energy management system according to this embodiment. In this embodiment, the screen display I / F unit 407 may display, as shown in Fig. 6, a power flow plan of the microgrid, a demand predicted by the prediction unit 402, a charge / discharge plan of the storage battery, a predicted value of the output of renewable energy, and the like, as operation information on the display unit.
[0033] FIG. 7 is a flowchart showing an example of the flow of the display process of the operation information in the energy management system according to the present embodiment. In the present embodiment, first, the mode identification unit 401 identifies whether the microgrid is in the grid-connected mode (step S701). If the microgrid is not in the grid-connected mode (step S701: No), the prediction unit 402 predicts the power demand and the output of renewable energy in the independent operation mode (step S702). Next, the planner 404 formulates an equipment operation plan for the independent operation mode based on the prediction results of the power demand and the output of renewable energy in the independent operation mode (step S703). Then, the screen display I / F unit 407 displays the operation information of the microgrid in the independent operation mode on the display unit based on the equipment operation plan for the independent operation mode (step S704).
[0034] If the microgrid is in the grid-connected mode (step S701: Yes), the prediction unit 402 predicts the power demand and the output of renewable energy in the grid-connected mode and the independent operation mode (steps S705 and S706). Next, the planning unit 404 formulates an equipment operation plan for the grid-connected mode based on the prediction results of the power demand and the output of renewable energy in the grid-connected mode, and formulates an equipment operation plan for the independent operation mode based on the prediction results of the power demand and the output of renewable energy in the independent operation mode (steps S707 and S708). Then, the screen display I / F unit 407 displays the operation information of the microgrid in the grid-connected mode and the independent operation mode on the display unit based on the equipment operation plans for the grid-connected mode and the independent operation mode (step S709).
[0035] 8 is a flowchart showing another example of the flow of the display process of the operational information in the energy management system according to the present embodiment. In the following description, the same processes as those shown in FIG. 7 will not be described.
[0036] In this embodiment, when the microgrid is not in the grid-connected mode and an equipment operation plan for the isolated operation mode is formulated (step S703), the duration calculation unit 406 calculates the possible continuation time of the isolated operation mode (step S801). Next, the screen display I / F unit 407 displays the operation information including the possible continuation time on the display unit (step S802).
[0037] When the microgrid is in the grid-connected mode and an equipment operation plan for the isolated operation mode is formulated (step S708), the duration calculation unit 406 calculates the possible continuation time for the isolated operation mode (step S803). Then, the screen display I / F unit 407 displays the operation information for the grid-connected mode and the operation information for the isolated operation mode including the calculated possible continuation time on the display unit (step S804).
[0038] In this way, according to the energy management system of the present embodiment, the operator of the microgrid can grasp the start timing of the emergency generator and can take measures such as precharging the storage battery to extend the continuous time, so that it is possible to smoothly supply power in an emergency. In addition, since the power outage time is determined in advance in the case of a planned power outage, if the continuous time displayed on the screen is shorter than the power outage time, the above-mentioned measures can be taken to continue the power supply during the planned power outage, thereby minimizing the impact of the planned power outage. Furthermore, if the continuous time of independent operation is already sufficient, it is possible to improve efficiency by using the surplus power for economic operation.
[0039] The energy management system of this embodiment is equipped with a control device such as a CPU (Central Processing Unit), a storage device such as a ROM (Read Only Memory) and a RAM (Random Access Memory), an external storage device such as a HDD (Hard Disk Drive) and a CD drive device, a display device such as a display device, and input devices such as a keyboard and a mouse, and has a hardware configuration that utilizes a normal computer.
[0040] The programs executed by the energy management system of this embodiment are provided as files in an installable or executable format recorded on a computer-readable recording medium such as a CD-ROM, a flexible disk (FD), a CD-R, or a DVD (Digital Versatile Disk).
[0041] The program executed by the energy management system of the present embodiment may be stored on a computer connected to a network such as the Internet and provided by being downloaded via the network. The program executed by the energy management system of the present embodiment may be provided or distributed via a network such as the Internet.
[0042] The program of this embodiment may be provided by being pre-installed in a ROM or the like. The program executed in the energy management system of this embodiment has a modular configuration including the above-mentioned units (mode identification unit 401, prediction unit 402, planner 404, controller 405, duration calculation unit 406, and screen display I / F unit 407), and as actual hardware, an example of a processor such as a CPU reads out the program from the storage medium and executes it, thereby loading the above-mentioned units onto a main storage device, and the mode identification unit 401, prediction unit 402, planner 404, controller 405, duration calculation unit 406, and screen display I / F unit 407 are generated on the main storage device.
[0043] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0044] 401 Mode Identification Unit 402 Prediction Department 403 Database 404 Planning Department 405 Control Unit 406 Duration Calculation Unit 407 Screen display I / F section
Claims
1. a mode identification unit that identifies whether the microgrid is in a grid-connected mode in which the microgrid receives power supply from a power grid, or in an independent operation mode in which power supply from the power grid to the microgrid is stopped and the microgrid performs an independent operation; A prediction unit that predicts, during the grid-connected mode, a power demand in the microgrid and an output of renewable energy when the grid-connected mode continues and when the mode is switched to the independent operation mode; A planning unit that formulates an equipment operation plan for the microgrid in the grid-connected mode and the isolated operation mode based on these predictions; a display I / F unit that displays operation information regarding the operation of the microgrid in the isolated operation mode on a display unit, even when the microgrid is in the grid-connected mode, based on the facility operation plan; a duration calculation unit that calculates a duration for which the microgrid can be independently operated in the independent operation mode at a predetermined time ahead based on the power demand, The operational information includes the available continuation time, An energy management system, wherein the duration calculation unit predicts a power outage duration based on meteorological information, and sets the predicted time until the power outage duration to the specified time.
2. The energy management system according to claim 1 , wherein the operational information includes a time until power can be supplied to the load in the independent operation mode.
3. The energy management system according to claim 1 , wherein the operation information includes the equipment operation plan of the microgrid in the isolated operation mode.
4. The energy management system according to claim 3 , wherein the facility operation plan includes a time until power can be supplied to the load in the independent operation mode.
5. The energy management system according to claim 3 , wherein the equipment operation plan is an equipment operation plan for the microgrid when the microgrid enters the independent operation mode at a predetermined time ahead.
6. The planning unit periodically updates the facility operation plan, The energy management system according to claim 1 , wherein the display I / F unit displays the operation information on the display unit based on the updated facility operation plan.
7. The planning unit updates the equipment operation plan at any timing selected by an operator, The energy management system according to claim 1 , wherein the display I / F unit displays the operation information on the display unit based on the updated facility operation plan.
8. 1. An energy management method carried out in an energy management system, comprising: a mode identification unit identifying whether the microgrid is in a grid-connected mode in which the microgrid receives power supply from a power grid, or in an independent operation mode in which power supply from the power grid to the microgrid is stopped and the microgrid performs an independent operation; A prediction unit predicts, during the grid-connected mode, a power demand in the microgrid and an output of renewable energy when the grid-connected mode continues and when the mode is switched to the isolated operation mode; A planning unit developing an equipment operation plan for the microgrid in the grid-connected mode and the isolated operation mode based on these predictions; a step of displaying, on a display unit, operation information related to the operation of the microgrid in the isolated operation mode even in the grid-connected mode, based on the equipment operation plan, by a display I / F unit; a duration calculation unit calculating a duration during which the microgrid can be autonomously operated in the autonomous operation mode at a predetermined time ahead based on the power demand; The operational information includes the available continuation time, An energy management method, wherein the duration calculation unit predicts a power outage duration based on meteorological information, and sets the predicted time until the power outage duration to the specified time.
9. Computer, a mode identification unit that identifies whether the microgrid is in a grid-connected mode in which the microgrid receives power supply from a power grid, or in an independent operation mode in which power supply from the power grid to the microgrid is stopped and the microgrid performs an independent operation; A prediction unit that predicts, during the grid-connected mode, a power demand in the microgrid and an output of renewable energy when the grid-connected mode continues and when the mode is switched to the independent operation mode; A planning unit that formulates an equipment operation plan for the microgrid in the grid-connected mode and the isolated operation mode based on these predictions; a display I / F unit that displays operation information regarding the operation of the microgrid in the isolated operation mode on a display unit, even when the microgrid is in the grid-connected mode, based on the facility operation plan; a duration calculation unit that calculates a duration during which the microgrid can be independently operated in the independent operation mode at a predetermined time ahead based on the power demand; The operational information includes the available continuation time, The duration calculation unit predicts a power outage duration based on meteorological information, and sets the predicted time until the power outage duration to the specified time.
Citation Information
Patent Citations
Control apparatus, electric power control system, and electric power control method
JP2012228043A
Energy management system and energy management method
JP2014183699A
Energy management system
JP2015156785A
Storage battery management device, storage battery management method, and storage battery management program
JP2021184682A
Seamless Transition Method and Apparatus for Micro-grid Connect / Disconnect from Grid
US20120283888A1