Construction method of curb and curb

The curb construction method engages one end of a second curb with an adjusted first curb to adjust the other end's height, addressing the time-consuming height alignment issues in traditional methods, thereby reducing construction time and personnel needs.

JP7579195B2Active Publication Date: 2024-11-07KK TOYOTA CHUO KENKYUSHO +1
View PDF 14 Cites 0 Cited by

Patent Information

Application Number
JP2021063268
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-04-02
Publication Date
2024-11-07
Estimated Expiration
2041-04-02

AI Technical Summary

Technical Problem

Existing curb construction methods require time-consuming adjustments to ensure uniform height and alignment, as the base may deform, leading to increased construction time and potential unevenness.

Method used

A curb construction method where one end of a second curb is engaged with an adjusted first curb, allowing adjustment of the other end's height to align the entire curb, eliminating the need for smoothing the base and reducing construction time.

Benefits of technology

This method significantly shortens construction time by allowing height adjustment of the second curb by only adjusting one end, enhancing efficiency and reducing personnel requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007579195000001
    Figure 0007579195000001
  • Figure 0007579195000002
    Figure 0007579195000002
  • Figure 0007579195000003
    Figure 0007579195000003
Patent Text Reader

Abstract

To provide a technique for shortening the construction time in a curb stone construction method.SOLUTION: A curb stone construction method includes: a first step of supporting one end of a second curb stone on one end of a first curb stone by engaging an engagement part provided at one end of the second curb stone with a part to be engaged provided at one end of the first curb stone, the height of which has been adjusted from a foundation; and a second step of adjusting the height of the other end of the second curb stone relative to the foundation after the first step.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a curb construction method and a curb. [Background technology]

[0002] Curbs that are installed at the boundary between a sidewalk and a roadway have been known for some time (for example, Patent Documents 1 to 7). In general, when constructing a curb, the curb is placed on a base such as mortar or sand that is spread on a foundation, and the height of the entire curb is adjusted so that the upper surface is parallel to the road surface while conforming to a height standard. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2014-169551 A [Patent Document 2] JP 2001-182171 A [Patent Document 3] Japanese Patent Application Publication No. 11-81522 [Patent Document 4] JP 2016-142010 A [Patent Document 5] JP 2005-98025 A [Patent Document 6] Japanese Patent Application Publication No. 10-121407 [Patent Document 7] Japanese Patent Application Publication No. 9-279513 Summary of the Invention [Problem to be solved by the invention]

[0004] However, in the above-mentioned construction method, in order to make the heights of the multiple curbs uniform, it is necessary to form the base flat. Even if the foundation and base are formed with precision, the base may be deformed and the height may change depending on how the curbs are placed. For this reason, it is necessary to adjust the height after placing the curbs on the base. However, when one end of the curb is raised, the other end may sink, which may increase the construction time of the curb.

[0005] The present invention has been made to solve the above-mentioned problems, and has an object to provide a technique for shortening construction time in a curb construction method. [Means for solving the problem]

[0006] The present invention has been made to solve at least part of the above-mentioned problems, and can be realized in the following forms.

[0007] (1) According to one aspect of the present invention, there is provided a curb construction method, which includes a first step of supporting one end of a first curb, the height of which from a foundation is adjusted, on one end of the first curb by engaging an engaging portion provided on one end of a second curb with an engaged portion provided on one end of the second curb, and a second step of adjusting the height of the other end of the second curb with respect to the foundation after the first step.

[0008] According to this configuration, in the first step, an engaging portion provided at one end of the second curb is engaged with an engaged portion provided at one end of the first curb, the height of which from the foundation is adjusted, thereby supporting one end of the second curb on the first curb. As a result, one end of the second curb has the same height as the first curb. Furthermore, in the second step, the height of the other end of the second curb is adjusted, thereby adjusting the overall height of the second curb. That is, when constructing the second curb, in order to adjust the overall height of the second curb, it is only necessary to adjust the height of the other end of the second curb. This makes it unnecessary to smooth the base before installing the curb, and it is only necessary to adjust the height of the other end of the curb to adjust the height of the entire curb, thereby shortening the time required to adjust the height. Therefore, the construction time of the curb can be shortened.

[0009] (2) In the curb construction method of the above embodiment, a third step of forming a base between the foundation and the second curb may be included prior to the first step, and the height of the other end of the second curb relative to the foundation may be adjusted by adjusting the thickness of the base in the second step. According to this configuration, the height of the other end of the second curb relative to the foundation is adjusted by adjusting the thickness of the base between the foundation and the second curb in the second step. This makes it easy to adjust the height of the other end of the second curb, thereby further shortening the curb construction time.

[0010] (3) In the curb construction method of the above embodiment, in the third step, the base between the foundation and the second curb may be formed separately from the base between the foundation and the first curb. According to this configuration, in the third step, the base between the foundation and the second curb is formed separately from the base between the foundation and the first curb. As a result, a space is formed under the second curb, so that, for example, when the second curb is moved while supporting the surface that will become the underside of the second curb, the second curb can be placed in a desired position while supporting the underside of the second curb. This makes it easy to move the second curb, further shortening the construction time of the curb.

[0011] (4) In the curb construction method of the above embodiment, in the first step, the second curb is erected with the other end of the second curb facing downward, and then the upper side of the second curb is tilted toward the first curb, thereby engaging the engaging portion of the second curb with the engaged portion of the first curb. According to this configuration, in the first step, the upper side of the second curb erected with the other end facing downward is tilted toward the first curb, thereby engaging the engaging portion of the second curb with the engaged portion of the first curb. This reduces the labor required to move the second curb. Therefore, the number of personnel required to construct the curb can be reduced, thereby reducing the cost of constructing the curb.

[0012] (5) According to another aspect of the present invention, a curbstone is provided. The curbstone includes a long body portion, an engaged portion provided at one end of the body portion, which engages with another adjacent curbstone at the one end, and an engaging portion provided at the other end of the body portion, which engages with another adjacent curbstone at the other end. According to this configuration, the curbstone has an engaged portion provided at one end of the long body portion, and an engaging portion provided at the other end. The engaged portion supports the other curbstone by engaging with the other adjacent curbstone at the one end. On the other hand, the engaging portion is supported by the other curbstone by engaging with the other adjacent curbstone at the other end. That is, since one end of the curbstone is supported by the other curbstone, the height of the curbstone can be adjusted by adjusting only the other end. Therefore, when constructing the curbstone, the time required to adjust the height of the curbstone can be shortened, and the construction time of the curbstone can be shortened.

[0013] (6) In the curb of the above embodiment, at least one of the engaged portion and the engaging portion may have an arc shape when the curb is viewed from above with the bottom surface of the curb facing down. According to this configuration, at least one of the engaged portion and the engaging portion has an arc shape when the curb is viewed from above with the bottom surface of the curb facing down. This allows the curb to be connected in a state inclined with respect to the central axis of the other curb by utilizing the arc shape when engaging at least one of the engaged portion and the engaging portion with another curb. This allows the curb to be arranged not only in a straight line but also in a curved line.

[0014] (7) In the curbstone of the above embodiment, when at least one of the engaged portion and the engaging portion of the curbstone is engaged with the other curbstone, a gap may be formed between the end of the main body portion and the other curbstone. According to this configuration, when at least one of the engaged portion and the engaging portion of the curbstone is engaged with the other curbstone, a gap is formed between the main body portion of the curbstone and the other curbstone. As a result, by filling the gap between the end of the main body portion and the other curbstone with mortar or the like, it is possible to form equally spaced joints. Therefore, it is possible to form a curbstone connecting structure with excellent appearance.

[0015] The present invention can be realized in various forms, for example, in the form of an apparatus for constructing curbs, a method for controlling this apparatus, a method for manufacturing curbs, a method for connecting curbs, a connected structure connecting multiple curbs, a method for manufacturing this connected structure, a method for paving roads, a method for adjusting the height of curbs, and a method for constructing blocks. [Brief description of the drawings]

[0016] [Figure 1] FIG. 2 is a schematic diagram showing a schematic configuration of a curb according to the first embodiment. [Diagram 2] FIG. 2 is a diagram illustrating a state in which the curb of the first embodiment is used. [Diagram 3] FIG. 1 is a first diagram illustrating a curb construction method. [Figure 4] FIG. 2 is a second diagram illustrating the curb construction method. [Diagram 5] This is the third diagram explaining the curb construction method. [Figure 6] FIG. 4 is a fourth diagram explaining the curb construction method. [Figure 7] FIG. 13 is a diagram illustrating the arrangement of curbs in an evaluation test of a curb construction method. [Figure 8] FIG. 13 is a diagram illustrating the results of an evaluation test of a curb construction method. [Figure 9] FIG. 11 is a schematic diagram showing a schematic configuration of a curb according to a second embodiment. [Figure 10] 13A to 13C are diagrams illustrating features of a curb according to a second embodiment. [Figure 11] FIG. 11 is a diagram illustrating a state in which a curb according to the second embodiment is used. [Figure 12] FIG. 1 is a first diagram illustrating a curb construction method. [Figure 13] FIG. 2 is a second diagram illustrating the curb construction method. [Figure 14] This is the third diagram explaining the curb construction method. [Figure 15] 13A to 13C are diagrams illustrating the results of an evaluation test of the curb construction method of the second embodiment. [Figure 16] FIG. 13 is a schematic diagram showing a schematic configuration of a connecting curb stone according to a third embodiment. [Figure 17] FIG. 13 is a diagram illustrating a method of using the connecting curbstone. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] First Embodiment FIG. 1 is a schematic diagram showing a schematic configuration of a curbstone 10 of the first embodiment. The curbstone 10 of this embodiment is installed on a road shoulder as a boundary between a roadway and a sidewalk, for example, and a plurality of curbs 10 are connected to form a connected structure. The curbstone 10 includes a long body 11, a first protruding portion 12, and a second protruding portion 13. In FIG. 1, the direction in which the curbs 10 are arranged when connected is the y-axis direction, and the vertical direction is the z-axis direction. The direction perpendicular to the y-axis direction in which the curbs 10 are arranged and the z-axis direction, which is the vertical direction, is the x-axis. FIG. 1(a) is a cross-sectional view of the curbstone 10 perpendicular to the x-axis. FIG. 1(b) is a diagram showing the appearance of the curbstone 10 as viewed from the direction of the arrow A in FIG. 1(a). FIG. 1(c) is a diagram showing the appearance of the curbstone 10 as viewed from the direction of the arrow B in FIG. 1(a). Therefore, FIG. 1(a) is a cross-sectional view taken along line CC in FIG. 1(b) and FIG. 1(c).

[0018] The main body 11 is a portion having a substantially rectangular parallelepiped shape, and occupies most of the length of the curbstone 10 in the y-axis direction, as shown in Fig. 1(a). In this embodiment, the main body 11 is formed so that the cross-sectional shape perpendicular to the y-axis is trapezoidal, as shown in Fig. 1(b) and Fig. 1(c). That is, the width of the top surface 11a of the main body 11 on the positive side in the z-axis direction is shorter than the width of the bottom surface 11b on the negative side in the z-axis direction (see Figs. 1(b) and (c)).

[0019] The first protrusion 12 is provided at the end of the body 11 on the positive side in the y-axis direction. The first protrusion 12 is a flat plate-shaped portion formed to protrude from the side surface 11c of the body 11 in the positive direction of the y-axis, and has a pair of main surfaces 12a, 12b. The main surface 12a is a plane on the positive side in the z-axis direction. The main surface 12b forms the same plane as the bottom surface 11b of the body 11.

[0020] The second protrusion 13 is provided at the end of the main body 11 on the negative side in the y-axis direction. The second protrusion 13 is a flat plate-shaped portion formed to protrude from the side surface 11d of the main body 11 in the negative direction of the y-axis, and has a pair of main surfaces 13a, 13b. The main surface 13a forms the same plane as the upper surface 11a of the main body 11. The main surface 13b is a plane formed on the negative side in the z-axis direction.

[0021] In this embodiment, the length of the curbstone 10 in the y-axis direction is 680 mm, of which the length of the main body 11 is 520 mm, and the length of the first protrusion 12 and the length of the second protrusion 13 are each 80 mm. The lengths of the first protrusion 12 and the second protrusion 13 are within a range of 20 mm to 100 mm, and preferably within a range of 40 mm to 80 mm. Note that the lengths of the curbstone 10 and the first protrusion 12 described above are merely examples, and are not limited to these.

[0022] In this embodiment, the height H11 in the z-axis direction of the curbstone 10 is 200 mm, the height H12 in the z-axis direction of the first protrusion 12 is 160 mm, and the height H13 in the z-axis direction of the second protrusion 13 is 40 mm. The sum of the height H12 in the z-axis direction of the first protrusion 12 and the height H13 in the z-axis direction of the second protrusion 13 is the height H11 in the z-axis direction of the curbstone 10. That is, the main surface 12a of the first protrusion 12 and the main surface 13b of the second protrusion 13 are at the same height from the bottom surface 11b of the main body 11. The heights of the curbstone 10 and the first protrusion 12 described above are merely examples and are not limited thereto. It is sufficient that the main surface 12a of the first protrusion 12 and the main surface 13b of the second protrusion 13 are at the same height from the bottom surface 11b of the main body 11.

[0023] Fig. 2 is a diagram illustrating the use state of the curbstone 10 of the first embodiment. Fig. 2(a) shows the cross-sectional shape of the installed curbstone 10 in a direction perpendicular to the connection direction of the multiple curbs 10. Fig. 2(b) shows a side view of a connection structure 5 to which multiple curbs 10 are connected. In Fig. 2(b), in order to distinguish between two curbs 10 adjacent to one another, "A" or "B" is added before the reference numerals indicating the respective portions.

[0024] The curbstone 10 of this embodiment is placed on a sand base 7 laid on a concrete foundation 6 (see FIG. 2(a)). The foundation 6 is formed by excavating wilderness soil 6a, laying crushed stone and compacting it to form a roadbed 6b, and then constructing a formwork on the roadbed 6b and pouring concrete into it. The base 7 is formed on the foundation 6 so that the thickness L7 is, for example, 0.03 m.

[0025] In the connecting structure 5, the curb A10 and the curb B10 to be connected are arranged on either side of one curb 10 (see FIG. 2(b)). The curb A10 and the curb B10 have the same configuration as the curb 10. The first protrusion 12 of the curb 10 engages with the second protrusion A13 of the curb A10. As a result, the first protrusion 12 of the curb 10 supports the second protrusion A13 of the curb A10. The second protrusion 13 of the curb 10 engages with the first protrusion B12 of the curb B10. As a result, the second protrusion 13 is supported by the first protrusion B12 of the curb B10. In other words, the curb 10 supports the curb A10 by the first protrusion 12, while the second protrusion 13 is supported by the curb B10. In this embodiment, the base 7 is formed only between the foundation 6 and the first protruding portion of each of the curbs 10, A10, and B10.

[0026] FIG. 3 is a first diagram for explaining the construction method of the curbstone 10. Next, the construction method of the curbstone 10 will be explained. In the construction method of the curbstone 10 of this embodiment, first, the curbstone 90 is installed on the foundation 6. Specifically, as shown in FIG. 3, the curbstone 90 in which the notch 92 is formed is placed on the base 97 formed on the foundation 6. In the curbstone 90, the base 7 is formed on the entire surface between the lower surface 91 and the foundation 6, and serves as a reference for the height of the connection structure 5. The notch 92 is formed on the positive side of the y-axis direction of the curbstone 90. The notch 92 is formed in the corner of the curbstone 90 on the positive side of the z-axis direction, and the depth in the z-axis direction is the same as the height in the z-axis direction of the second protruding portion 13 of the curbstone 10. Each of the bottom surface 92a and the side surface 92b forming the notch 92 is flat, and the bottom surface 92a is installed so as to be parallel to the foundation 6.

[0027] After the curbstone 90 is installed on the foundation 6, the multiple curbs 10 are arranged so as to be aligned in the y-axis direction with respect to the curbstone 90. In this embodiment, the curbstone 10 is arranged in an upright state with the end on the side where the first protrusion 12 is provided (hereinafter simply referred to as the "end on the first protrusion 12 side") facing downward and the end on the side where the second protrusion 13 is provided (hereinafter simply referred to as the "end on the second protrusion 13 side") facing upward (see FIG. 3). For convenience, the multiple curbs 10 are referred to as curbs 10a, 10b, 10c, and 10d in the order of proximity to the curbstone 90.

[0028] FIG. 4 is a second diagram for explaining the construction method of the curbstone 10. FIG. 4(a) is a schematic diagram showing a state in which a plurality of curbs 10 are arranged side by side with respect to the curbstone 90 shown in FIG. 3. After arranging a plurality of curbs 10 side by side, a base 7a is formed on the curbstone 90 side of the curbstone 10a that is closest to the curbstone 90. The base 7a is formed so as to be located between the first protruding portion 12 and the foundation 6 when the curbstone 10a is installed. In this embodiment, the base 7a between the first protruding portion 12 and the foundation 6 is formed so as to be separated from the base 97 of the curbstone 90.

[0029] After forming the base 7a on the curb 90 side of the curb 10a, the end of the curb 10a on the second protrusion 13 side is tilted toward the curb 90 (see the white arrow F1 in FIG. 4(b)). This causes the second protrusion 13 of the curb 10a to engage with the curb 90. Specifically, the main surface 13a of the second protrusion 13 comes into contact with the bottom surface 92a of the cutout 92. This causes the end of the curb 10a on the second protrusion 13 side to be supported by the curb 90. Therefore, the height of the end of the curb 10a on the second protrusion 13 side is adjusted by the curb 90, the height of which is adjusted. Furthermore, since the main surface 13a of the curb 10a comes into contact with the bottom surface 92a of the curb 90, which is installed parallel to the foundation 6, the parallelism of the curb 10a to the foundation 6 is also adjusted.

[0030] Fig. 5 is a third diagram for explaining the construction method of the curbstone 10. After engaging the curbstone 10a with the curbstone 90, the height of the end of the curbstone 10a on the first protruding portion 12 side is adjusted (see the white arrow F2 in Fig. 5). Specifically, the height of the end of the curbstone 10 on the first protruding portion 12 side is adjusted by adjusting the thickness of the base 7a between the first protruding portion 12 and the foundation 6. This adjusts the overall height of the curbstone 10a, completing the construction of the curbstone 10a.

[0031] FIG. 6 is a fourth diagram for explaining the construction method of the curb 10. After the construction of the curb 10a is completed, a base 7b separated from the base 7a is formed on the curb 10a side of the curb 10b. After the base 7b is formed, the end of the second protruding portion 13 side of the curb 10b is tilted toward the curb 10a side in the same manner as in the case of the curb 10a, and the first protruding portion 12 of the curb 10a and the second protruding portion 13 of the curb 10b are engaged. Furthermore, the height of the end of the first protruding portion 12 side of the curb 10b is adjusted by adjusting the thickness of the base 7b. As a result, the height of the entire curb 10b and its parallelism to the foundation 6 are adjusted, and the construction of the curb 10b is completed.

[0032] After the construction of the curbstone 10b is completed, each of the curbs 10c and 10d is constructed in the same manner using the bases 7c and 7d, respectively, to form the connection structure 5 for the curbstones 10. In the connection structure 5 of this embodiment, the end of one curbstone 10 on the second protruding portion 13 side does not need to be adjusted in height because it is supported by the adjacent curbstones 10 whose construction has already been completed, and the end on the first protruding portion 12 side has its height adjusted by adjusting the thickness of the base 7. As a result, the overall height of the curbstone 10 can be adjusted only by adjusting the height of the end on the first protruding portion 12 side.

[0033] In the construction method of the curbstone 10 of this embodiment, each of the bases 7a, 7b, 7c, and 7d between the first protruding portion 12 and the foundation 6 is laid so as to be separated from the adjacent bases, for example, bases 7a and 7c in the case of base 7b. This allows the gap 3 between the two bases 7 to be formed into which the claws of heavy machinery or the like for moving the curbstone 10 can be inserted when constructing the curbstone 10.

[0034] Next, an evaluation test of the curb construction method will be described. In this evaluation test, the number of personnel required for curb construction and the time required to complete the curb construction were evaluated for each of a plurality of construction methods including the curb construction method of this embodiment. Specifically, for each of the curb 10 of this embodiment and the curb of the comparative example, the spacing position of the curb before construction and the laying procedure of the base and the curb are made different to form a connecting structure of a predetermined length. Based on the procedure for forming this connecting structure, the number of personnel required was grasped and the time required to complete the curb construction was measured. Here, the curb of the comparative example is a curb having an approximately rectangular parallelepiped shape, specifically, a double-sided pedestrian-vehicle boundary block type A (JIS A 5371) joined with a top-lid type U-shaped gutter cover type 1 (JIS A 5372). In this evaluation test, in order to ensure the fairness of the evaluation test, the weight of the curb 10 and the weight of the curb of the comparative example were made the same.

[0035] FIG. 7 is a diagram for explaining the arrangement of the curb in the evaluation test of the construction method of the curb 10. The two types of arrangement shown in FIG. 7 were used for the spacing positions of the curb before construction. The spacing arrangement shown in FIG. 7(a) is an arrangement in which the curb S is arranged upright on the foundation 6 with respect to the reference curb Cs that is the height reference (hereinafter referred to as "standing arrangement"), and is the same arrangement as the spacing arrangement in the construction method of the curb 10 of the present embodiment described above. In this standing arrangement, the construction of the curb S is completed by adjusting the position and height after the curb S is knocked down on the spot (see the white arrow F3 in FIG. 7(a)). The spacing arrangement shown in FIG. 7(b) is an arrangement in which the curb S is laid down next to the foundation 6 (hereinafter referred to as "laying down arrangement"). In this laid-down arrangement, the curb S is lifted onto the foundation 6 by heavy machinery or the like, and then placed on the foundation 6 so that it is aligned with the reference curb Cs. The construction is then completed by adjusting its position and height (see the white arrow F4 in Figure 7(b)).

[0036] Figure 8 is a diagram explaining the results of the evaluation test of the curb construction method. The combinations of "curb type", "spacing position", and "laying procedure between base and curb" evaluated in this evaluation test are shown below for each "construction method" shown in Figure 8. "First embodiment" Type of curb: Curb 10 Spacing before construction: Standing Procedure for laying the base and curb: The base is formed for each curb. "Comparative Example 1" Type of curb: Curb for comparison Spacing arrangement before construction: Standing arrangement Procedure for laying the base and curb: The base is formed for each curb. "Comparative Example 2" Type of curb: Comparative example curb Spacing arrangement before construction: Laying down Procedure for laying the base and curb: The base is formed for each curb. "Comparative Example 3" Type of curb: Curb for comparison Spacing arrangement before construction: Standing arrangement Installation procedure for base and curb: Form the base for each of the curbs before installing the curbs.

[0037] In this evaluation test, the time taken from placing one standard curbstone Cs on the foundation 6 to installing four curbs S was measured three times, and the average values ​​were compared. As a result, in each of Comparative Examples 1 to 3, the construction time was around 850 seconds, and no significant difference due to the spacing arrangement or the laying procedure between the base and the curbstones was confirmed. This is thought to be because the spacing method and construction order have little effect, and most of the construction time is spent on adjusting the height of the curbs and laying them parallel. In addition, the construction method of Comparative Example 1 requires only one person for spacing arrangement compared to Comparative Examples 2 and 3, which leads to a reduction in labor costs.

[0038] It was revealed that the construction time in the construction method of the first embodiment was approximately 200 seconds, which was reduced to 24% of that in Comparative Examples 1 to 3. This is because, as described above, when constructing one curbstone 10, the height of the entire curbstone 10 can be adjusted by adjusting only the height of the end portion on the side of the first protruding portion 12, and because the flat surfaces engage with each other when engaging with an adjacent curbstone 10, the parallelism to the foundation 6 is necessarily adjusted. As a result, in the first embodiment, it is not necessary to smooth the base 7, which is necessary in Comparative Examples 1 to 3. Therefore, it was revealed that the construction time can be significantly reduced because the work is significantly simplified.

[0039] According to the curb construction method of the present embodiment described above, the second protruding portion 13 of the curb 10 is engaged with the first protruding portion 12 of another curb 10 that has already been constructed and has its height adjusted, so that the end of the curb 10 on the second protruding portion 13 side is supported by the other curb 10. As a result, the end of the curb 10 on the second protruding portion 13 side becomes the same height as the other curb 10. Furthermore, by adjusting the height of the end of the curb 10 on the first protruding portion 12 side, the overall height of the curb 10 is adjusted. That is, when constructing the curb 10, in order to adjust the height of the curb 10, it is only necessary to adjust the height of the end of the curb 10 on the first protruding portion 12 side. This allows the time required for adjusting the height to be shortened. Therefore, the construction time of the curb 10 can be shortened.

[0040] Moreover, according to the curb construction method of this embodiment, the main surface 12a of the first protruding portion 12 of the curb 10 and the main surface 13a of the second protruding portion 13 of the adjacent curb 10 are each formed in a flat shape. As a result, the main surface 12a of the first protruding portion 12 and the main surface 13a of the second protruding portion 13 come into contact with each other by engaging the curbs 10, and the parallelism of the curb 10 on the side where the second protruding portion 13 engages is also adjusted. Therefore, it is not necessary to smooth the base 7 before installing the curb 10, and the construction time of the curb 10 can be further shortened.

[0041] Furthermore, according to the curb construction method of this embodiment, after engaging with an already constructed curb 10, the thickness of the base 7 between the foundation 6 and the curb 10 is adjusted, thereby adjusting the height of the end of the curb 10 on the first protruding portion 12 side relative to the foundation 6. This makes it easy to adjust the height of the end of the curb 10 on the first protruding portion 12 side, thereby further shortening the construction time for the curb 10.

[0042] Furthermore, according to the curb construction method of this embodiment, the base 7 between the foundation 6 and the curb 10 is formed separately from the base 7 between the foundation 6 and the adjacent curb 10. As a result, a gap 3 is formed under the curb 10, so that, for example, when the bottom surface 11b of the curb 10 is supported to knock the curb 10 down, the curb 10 can be engaged with another curb 10 while the bottom surface 11b of the curb 10 is supported. This allows the curb 10 to be easily moved, further shortening the construction time for the curb 10.

[0043] In addition, according to the curb construction method of this embodiment, for example, the curb 10 can be toppled while supporting the bottom surface 11b of the curb 10, so the possibility of the curb 10 falling can be reduced compared to when the curb 10 is toppled by grasping the side surface. This makes it possible to prevent damage to the curb 10 due to falling, and ensures the safety of the person constructing the curb 10.

[0044] Furthermore, according to the curb construction method of this embodiment, the curb 10, which is erected with the end on the first protruding portion 12 side facing downward, is tilted toward the adjacent curb 10 with the end on the second protruding portion 13 side, so that the second protruding portion 13 of the curb 10 engages with the first protruding portion 12 of the adjacent curb 10. This reduces the labor required to move the curb 10 (see FIG. 8). Therefore, the number of personnel required to construct the curb 10 can be reduced, and the construction cost of the curb 10 can be reduced.

[0045] In addition, according to the curbstone 10 of this embodiment, the curbstone 10 has a first protruding portion 12 at one end of the long body portion 11, and a second protruding portion 13 at the other end. The first protruding portion 12 supports the adjacent curbstone 10 by engaging with the adjacent curbstone 10. On the other hand, the second protruding portion 13 supports another adjacent curbstone 10 by engaging with the other adjacent curbstone 10. That is, since the end of the curbstone 10 on the second protruding portion 13 side is supported by the other curbstone 10, the height of the curbstone 10 can be adjusted by adjusting only the end on the first protruding portion 12 side. Therefore, when constructing the curbstone 10, the time required to adjust the height of the curbstone 10 can be shortened, and therefore the construction time of the curbstone 10 can be shortened.

[0046] Moreover, according to the curbstone 10 of this embodiment, the main surface 12a of the first protruding portion 12 of the curbstone 10 and the main surface 13a of the second protruding portion 13 of the adjacent curbstone 10 are each formed in a flat shape. As a result, the parallelism of the curbstone 10 on the side with which the second protruding portion 13 engages is adjusted by the parallelism of the curbstone 10 on the side with which the first protruding portion 12 engages. Therefore, it is not necessary to smooth the base 7 before installing the curbstone 10, and the construction time of the curbstone 10 can be further shortened.

[0047] Moreover, the curbstone 10 of this embodiment has a relatively simple shape with notches that form the first protrusion 12 and the second protrusion 13 at two corners of the roughly rectangular parallelepiped main body. This allows the curbstone 10 to be manufactured by placing a core in a mold for manufacturing conventional curbs. This makes it possible to suppress an increase in the manufacturing cost of the curbstone 10.

[0048] <Second embodiment> 9 is a schematic diagram showing a schematic configuration of a curbstone according to the second embodiment. The curbstone according to the second embodiment is different from the curbstone according to the first embodiment (FIG. 1) in the positions of the "engaged portion" and the "engaging portion".

[0049] The curbstone 20 of this embodiment includes a long body 11, a first protruding portion 22, and a second protruding portion 23. In FIG. 9, the direction in which the curbstones 20 are arranged when they are connected is the y-axis direction, and the vertical direction is the z-axis direction. The direction perpendicular to the y-axis direction in which the curbstones 20 are arranged and the z-axis direction, which is the vertical direction, is the x-axis. FIG. 9(a) is a cross-sectional view of the curbstone 20 perpendicular to the x-axis. FIG. 9(b) is a diagram showing the appearance as seen from the direction of the arrow D in FIG. 9(a). FIG. 9(c) is a diagram showing the appearance as seen from the direction of the arrow E in FIG. 9(a). Therefore, FIG. 9(a) is a cross-sectional view of the line FF in FIG. 9(b) and FIG. 9(c).

[0050] The first protrusion 22 is a flat plate-shaped portion provided at the end of the body 11 on the positive side in the y-axis direction and formed to protrude in the positive direction of the y-axis from the side surface 11c of the body 11. Of a pair of main surfaces 22a, 22b of the first protrusion 22, the main surface 22a is a plane on the positive side in the z-axis direction. The main surface 22b forms the same plane as the bottom surface 11b of the body 11.

[0051] The second protrusion 23 is a flat plate-shaped portion provided at an end portion on the negative side in the y-axis direction of the main body 11, and formed so as to protrude in the negative direction of the y-axis from the side surface 11d of the main body 11. Of a pair of main surfaces 23a, 23b that the second protrusion 23 has, the main surface 23a forms the same plane as the upper surface 11a of the main body 11. The main surface 23b is a plane formed on the negative side in the z-axis direction.

[0052] In the curbstone 20 having a height H11 in the z-axis direction of 200 mm, the height H22 in the z-axis direction of the first protrusion 22 is 40 mm, and the height H23 in the z-axis direction of the second protrusion 23 is 160 mm. That is, the main surface 22a of the first protrusion 22 and the main surface 23b of the second protrusion 23 are at the same height from the bottom surface 11b of the main body 11.

[0053] In this embodiment, the first protrusion 22 has a length in the y-axis direction of 90 mm, which is 10 mm longer than the length in the y-axis direction of the second protrusion 23. As a result, when the first protrusion 22 of the curbstone 20 engages with the second protrusion 23 of another curbstone 20 adjacent to the curbstone 20, the tip of the first protrusion 22 comes into contact with the main body 11 of the other curbstone 20, forming a gap between the curbstone 20 and the other curbstone 20.

[0054] FIG. 10 is a diagram for explaining the characteristics of the curbstone 20 of this embodiment. FIG. 10(a) is an enlarged view of the connection portion of two connected curbs 20 viewed from above. Here, in order to distinguish between the two curbs 20 shown in FIG. 10, "A" or "B" is added before the reference numerals indicating the respective portions, such as the curbstone A20 and the second protruding portion B23. As shown in FIG. 10(a), when the curbstone A20 and the curbstone B20 are connected, the first protruding portion A22 of the curbstone A20 and the second protruding portion B23 of the curbstone B20 engage with each other. Since the length L22 of the first protruding portion A22 is longer than the length L23 of the second protruding portion B23 of the curbstone B20, the tip surface A22c of the first protruding portion A22 may contact the side surface B11d of the main body portion B11 of the curbstone B20. In this case, a gap 4 is formed between the side surface A11c of the main body portion A11 of the curbstone A20 and the tip surface B23c of the second protruding portion B23 of the curbstone B20. The gap 4 is filled with mortar or the like as a joint of the connecting structure 5 of the curbstone 20, so that the curbstone 20 of this embodiment can form joints with uniform intervals.

[0055] Furthermore, in the curbstone 20 of this embodiment, as shown in Fig. 10, the tip surface 22c of the first protrusion 22 has an arc shape. With the curbstone A20 and the curbstone B20 engaged, the curbstone A20 can be tilted with respect to the central axis C0 of the curbstone B20 even when the tip surface A22c of the first protrusion A22 is in contact with the side surface B11d of the main body B11 of the curbstone B20 (white arrow F5 in Fig. 10(b)). This allows the angle of the curbstone A20 with respect to the curbstone B20 to be adjusted, so that the curbstone 20 can form a curved connecting structure 5 arranged to curve around the curbstone 20.

[0056] FIG. 11 is a diagram illustrating the use of the curbstone 20 of this embodiment. FIG. 11 is a diagram illustrating the state in which the connection structure 5 of the curbstone 20 is used at the boundary between the road and the sidewalk. As shown in FIG. 11, the connection structure 5 of the curbstone 20 is arranged between a roadway 98, in which a roadbed 98a and asphalt 98b are layered, and a concrete sidewalk 99. The curbstone 20 is arranged on a layered body of a roadbed 6b made of crushed stone layered on wilderness soil 6a, a concrete foundation 6, and a base 7 made of sand. At this time, as shown in FIG. 11, the lower part of the connection structure 5, that is, the part close to the base 7, is located lower than the road surface Sf98 of the roadway 98 and the road surface Sf99 of the sidewalk 99, so that the part where the adjacent curbs 20 engage with each other (the negative direction of the z axis from the dotted lines 22a and 23b in FIG. 11) cannot be seen from the outside.

[0057] 12 is a first diagram illustrating a construction method for the curbstone 20. Next, the construction method for the curbstone 20 will be described. In the construction method for the curbstone 20 of this embodiment, first, a curbstone 90 serving as a height reference is installed on the foundation 6, similarly to the construction method of the first embodiment.

[0058] After the curbstone 90 is placed on the foundation 6, the multiple curbstones 20 are arranged so as to be aligned in the y-axis direction with respect to the curbstone 90. In this embodiment, the curbstone 20 is arranged in a location different from the top of the foundation 6, lying down so that the first protruding portion 22 and the second protruding portion 23 are on the lower side (see FIG. 12). For convenience, the multiple curbstones 20 are referred to as curbstones 20a, 20b, 20c, and 20d in order of proximity to the curbstone 90.

[0059] FIG. 13 is a second diagram for explaining the construction method of the curbstone 20. After arranging a plurality of curbstones 20 side by side as shown in FIG. 12, a base 7a separated from a base 97 of the curbstone 90 is formed on the foundation 6. After the base 7a is laid, the curbstone 20a is lifted by heavy machinery or the like and placed on the foundation 6 (white arrow F6 in FIG. 13(a)). At this time, the curbstone 20a may be lifted by gripping the bottom surface 11b of the curbstone 20a with the claws of the heavy machinery or the like. The second protrusion 23 of the curbstone 20a moving from above to below on the foundation 6 engages with the notch 92 of the curbstone 90. As a result, the end of the curbstone 20a on the side where the second protrusion 23 is provided is supported by the curbstone 90, and the height of the curbstone 20a is automatically adjusted by the curbstone 90 that serves as the height reference. Furthermore, since the main surface 23b of the curbstone 20a contacts the bottom surface 92a of the curbstone 90, the parallelism of the curbstone 20a to the base 6 is also adjusted.

[0060] After engaging the curbstone 20a with the curbstone 90, the height of the end of the curbstone 20a on the side where the first protrusion 22 is provided (hereinafter simply referred to as the "end on the first protrusion 22 side") is adjusted by adjusting the thickness of the base 7a (see the white arrow F7 in FIG. 13(b)). This adjusts the overall height of the curbstone 20a, completing the construction of the curbstone 20a.

[0061] FIG. 14 is a third diagram illustrating the construction method of the curbstone 20. After the construction of the curbstone 20a is completed, a base 7b separated from the base 7a is formed on the foundation 6, and the curbstone 20b is raised to engage the first protruding portion 22 of the curbstone 20a with the second protruding portion 23 of the curbstone 20b. Furthermore, the height of the end of the curbstone 20b on the side of the first protruding portion 22 is adjusted by adjusting the thickness of the base 7b. This adjusts the overall height of the curbstone 20b, completing the construction of the curbstone 20b.

[0062] After the construction of the curbstone 20b is completed, each of the curbs 20c and 20d is constructed in the same manner using the bases 7c and 7d, respectively, to form the connection structure 5 of the curbstones 20. In the connection structure 5 of this embodiment, as in the first embodiment, the height of the entire curbstone 20 can be adjusted by simply adjusting the height of the end of the first protruding portion 22 side of one curbstone 20.

[0063] In the construction method of the curbstone 20 of this embodiment, each of the bases 7a, 7b, 7c, and 7d is formed so as to be separated from the adjacent bases, so that a gap 3 is formed between the bottom surface 11b of the curbstone 20 and the foundation 6. As a result, even when the claws of a heavy machine or the like that lifts the curbstone 20 support the bottom surface 11b of the curbstone 20, the curbstone 20 can be placed on the base 7 while engaging with the adjacent curbstones 20.

[0064] FIG. 15 is a diagram illustrating the results of an evaluation test of the construction method of the curb 20 of the second embodiment. The evaluation test of this embodiment evaluated the construction method of the curb of the second embodiment for the same items as the evaluation test of the first embodiment (the number of personnel required to construct the curb, and the time required to complete the construction of the curb). The combinations of "type of curb", "spacing position", and "laying procedure of the base and curb" in the "second embodiment" shown in FIG. 15 are as follows. Note that FIG. 15 also shows the results of the evaluation test shown in the first embodiment (FIG. 8). "Second embodiment" Type of curb: Curb 20 Spacing arrangement before construction: Laying down Procedure for laying the base and curb: The base is formed for each curb.

[0065] In the second embodiment, it was found that the construction time was about 300 seconds, which was reduced to 35% of that in Comparative Examples 1 to 3. This is because, as in the first embodiment, when constructing one curbstone 20, the overall height of the curbstone 20 is adjusted by adjusting only the height of the end portion on the first protruding portion 22 side, and the parallelism to the foundation 6 is also adjusted because adjacent curbstones 20 engage with each other at their flat surfaces. As a result, it was found that the second embodiment also does not require smoothing of the base 7, which greatly simplifies the work and greatly reduces the construction time.

[0066] 15, it is clear that the construction time is increased in the second embodiment compared to the first embodiment. This is because, in the first embodiment, the curbstone 10 can be installed simply by knocking it down, whereas in the second embodiment, the curbstone 20 needs to be lifted up and installed. Furthermore, two people are needed to lift the curbstone 20, so the number of people required also increases.

[0067] According to the construction method of the curbstone 20 of this embodiment described above, the second protruding portion 23 of the curbstone 20 is engaged with the first protruding portion 22 of another curbstone 20 whose height has already been adjusted, so that the end of the curbstone 20 on the second protruding portion 23 side is supported by the other curbstone 20. Furthermore, by adjusting the height of the end of the curbstone 20 on the first protruding portion 22 side, the overall height of the curbstone 20 is adjusted. This makes it possible to shorten the time required to adjust the height. Therefore, the construction time of the curbstone 10 can be shortened.

[0068] According to the curbstone 20 of this embodiment, the first protrusion 22 has a convex shape, and the tip surface (A22c) has an arc shape when viewed from above. This allows the curbstone 20 to be connected in a state inclined with respect to the central axis C0 of the other curbstone 20 by utilizing the arc shape of the first protrusion 22 when engaging the first protrusion 22 with the other curbstone 20. This allows the curbstone 20 to be arranged in a curved shape, so that a curved connecting structure 5 can be formed.

[0069] Furthermore, according to the curbstone 20 of this embodiment, the length of the first protruding portion 22 of the curbstone 20 is longer than the length of the second protruding portion 23 of the adjacent curbstone 20, so that when the first protruding portion 22 of the curbstone 20 and the second protruding portion 23 of another curbstone 20 are engaged, a gap 4 is formed between the curbstone 20 and the adjacent curbstone 20 (see FIG. 10(a)). As a result, by filling the gap 4 between the curbstone 20 and the adjacent curbstone 20 with mortar or the like, it is possible to form equally spaced joints. Therefore, it is possible to form a connecting structure 5 with excellent appearance.

[0070] <Third embodiment> Fig. 16 is a schematic diagram showing the general configuration of the connecting curbstones 30, 40 of the third embodiment. The curbstones of the third embodiment differ from the curbstones of the first embodiment (Fig. 1) in the positions of the "engaged portion" and the "engaging portion". In Fig. 16, the direction in which multiple curbstones 20 are arranged when connecting them is the y-axis direction, and the vertical direction is the z-axis direction. The direction perpendicular to each of the y-axis direction and the z-axis direction is the x-axis.

[0071] 16(a) includes a main body 11, a first protruding portion 32, and a second protruding portion 33. The first protruding portion 32 is a flat plate-shaped portion provided at the end of the main body 11 on the positive side in the y-axis direction. Of a pair of main surfaces 32a, 32b of the first protruding portion 32, the main surface 32a is a plane on the positive side in the z-axis direction, and the main surface 32b forms the same plane as the bottom surface 11b of the main body 11.

[0072] The second protrusion 33 is a flat-plate-shaped portion provided at the end of the body 11 on the negative side in the y-axis direction. Of the pair of main surfaces 33a, 33b of the second protrusion 33, the main surface 33a forms the same plane as the upper surface 11a of the body 11, and the main surface 33b is a plane formed on the negative side in the z-axis direction. In this embodiment, in a curbstone 20 having a height H11 in the z-axis direction of 200 mm, the height H32 in the z-axis direction of the first protrusion 32 and the height H33 in the z-axis direction of the second protrusion 33 are each 40 mm.

[0073] 16(b) includes a main body 11, a first protruding portion 42, and a second protruding portion 43. The first protruding portion 42 is a flat plate-shaped portion provided at the end of the main body 11 on the positive side in the y-axis direction. Of a pair of main surfaces 42a, 42b of the first protruding portion 42, the main surface 42a is a plane on the positive side in the z-axis direction, and the main surface 42b forms the same plane as the bottom surface 11b of the main body 11.

[0074] The second protruding portion 43 is a flat-plate-shaped portion provided at the end of the main body 11 on the negative side in the y-axis direction. Of the pair of main surfaces 43a, 43b of the second protruding portion 43, the main surface 43a forms the same plane as the upper surface 11a of the main body 11, and the main surface 43b is a plane formed on the negative side in the z-axis direction. In this embodiment, in a curbstone 20 having a height H11 in the z-axis direction of 200 mm, the height H42 in the z-axis direction of the first protruding portion 42 and the height H43 in the z-axis direction of the second protruding portion 43 are each 160 mm.

[0075] FIG. 17 is a diagram for explaining how to use the connecting curbs 30, 40. The connecting structure 5 shown in FIG. 17 includes two types of connecting curbs 30, 40: the curb 10 of the first embodiment and the curb 20 of the second embodiment. In the connecting curb 30, the first protruding portion 32 is engaged with the second protruding portion 23 of the curb 20, and the second protruding portion 33 is engaged with the first protruding portion 12 of the curb 10. In the connecting curb 40, the first protruding portion 42 is engaged with the second protruding portion 13 of the curb 10, and the second protruding portion 43 is engaged with the first protruding portion 22 of the curb 20. In this way, the connecting curbs 30, 40 can connect the curb 10 that engages with it on the positive side in the z-axis direction and the curb 20 that engages with it on the negative side in the z-axis direction in the connecting structure 5.

[0076] As described above, the curbstone 10 that engages on the positive side in the axial direction requires a shorter construction time than the curbstone 20 that engages on the negative side in the z-axis direction (see FIG. 15). On the other hand, the curbstone 20 can form a curved connecting structure 5 by forming the tip surface 22c of the first protruding portion 22 in an arc shape. Therefore, the portion of the connecting structure 5 that is to have a straight shape is formed using the curbstone 10, and the portion that is to have a curved shape is formed using the curbstone 20. At this time, the connecting curbstones 30, 40 are used to connect the curbstone 10 that forms the straight shape and the curbstone 20 that forms the curved shape.

[0077] According to the construction method of the connecting structure 5 of this embodiment described above, the portion of the connecting structure 5 that is to have a straight shape can be formed using the curbstone 10, which requires a relatively short construction time, and the portion that is to have a curved shape can be formed using the curbstone 20, the connecting portion of which is hidden under the road surface. At this time, by connecting the curbstone 10 and the curbstone 20 using the connecting curbstones 30, 40, the connecting structure 5 that can have either a straight shape or a curved shape can be formed while shortening the construction time.

[0078] <Modifications of this embodiment> The present invention is not limited to the above-described embodiment, and can be embodied in various forms without departing from the spirit and scope of the invention. For example, the following modifications are also possible.

[0079] [Variation 1] In the above-described embodiment, when adjusting the overall height of the curbs 10, 20, the height of the end of the curbs 10, 20 on the first protrusions 12, 22 side is adjusted by adjusting the thickness of the base 7. However, the method of adjusting the end of the curbs 10, 20 on the first protrusions 12, 22 side is not limited to this. In cases where there is no base, for example, the height of the end of the curbs 10, 20 on the first protrusions 12, 22 side may be adjusted by inserting a member between the end of the curbs 10, 20 on the first protrusions 12, 22 side and the foundation 6.

[0080] [Variation 2] In the above embodiment, the base 7 is formed only between the first protrusions 12, 22 of the curbs 10, 20 and the foundation 6. The base 7 may be formed on the negative side of the y-axis direction from the first protrusions 12, 22. The contact ratio of the underside of the curb with the base may be 80% or less, more preferably 50% or less, and even more preferably 30% or less. That is, by having a gap below the "engagement part" of the curb, it is possible to adjust the height and parallelism of the "engagement part". In addition, when the base 7 is formed only between the first protrusions 12, 22 of the curbs 10, 20 and the foundation 6, a gap 3 is formed between the two bases 7 into which a tool for lifting the curbs 10, 20 can be inserted. This not only makes it easier to move the curbs 10, 20, but also prevents the curbs 10, 20 from being damaged by falling and ensures the safety of the constructor who constructs the curbs.

[0081] [Variation 3] The curbstone 20 of the second embodiment has an arc shape when the first protrusion 22 is viewed from above. In the curbstone 20, the second protrusion 23 and the side surface 11c of the main body 11 of the adjacent curbstone 20 (for example, the side surface A11c of the main body A11 of the curbstone A20 in FIG. 10) facing the tip surface 23c of the second protrusion 23 may each have an arc shape that fits with each other when viewed from above. Also, in the curbstone 10 of the first embodiment, the first protrusion 12, the second protrusion 13, and the side surfaces 11c, 11d of the main body 11 may have an arc shape when viewed from above with the bottom surface 11b of the main body 11 facing downward. Also, these shapes are not limited to arc shapes, and may be gently curved arc shapes.

[0082] [Variation 4] In the first embodiment, the length of the first protruding portion 12 and the length of the second protruding portion 13 are 80 mm, and are the same length. However, the relationship between the length of the first protruding portion 12 and the length of the second protruding portion 13 is not limited to this. The length of the first protruding portion 12 may be longer than the length of the second protruding portion 13 by a range of 5 mm to 10 mm. By making the length of the first protruding portion 12 longer than the length of the second protruding portion 13, as in the second embodiment, a gap for a joint is formed between adjacent curbs 10, and therefore a connecting structure 5 with excellent appearance can be formed.

[0083] [Variation 5] The sizes of each part of the curbstone shown in the above embodiment are merely examples and are not limited to these.

[0084] Although the present aspect has been described above based on the embodiment and modified examples, the above-mentioned embodiment of the aspect is intended to facilitate understanding of the present aspect and does not limit the present aspect. The present aspect may be modified or improved without departing from the spirit and scope of the claims, and equivalents are included in the present aspect. Furthermore, if a technical feature is not described as essential in this specification, it may be deleted as appropriate. [Explanation of symbols]

[0085] 4. Gap 6…Fundamentals 7,7a, 7b, 7c, 7d...base 10, 10a, 10b, 10c, 10d, 20, 20a, 20b, 20c, 20d, A10, A20, B10, B20…Curb 11, A11, B11...Main body 12,22,A22,B12...1st protrusion 12a, 22a…main surface 13,23,A23,B23…Second protrusion 13a, 23a…main surface 22c,A22c…Tip surface

Claims

1. A curb construction method comprising the steps of: a first step of supporting one end of a second curb on one end of a first curb, the height of which from a foundation is adjusted, by engaging an engaging portion provided at one end of a second curb with an engaged portion provided at one end of the second curb; a second step of adjusting the height of the other end of the second curb relative to the foundation after the first step; and a third step of forming a base between the foundation and the second curb before the first step, In the second step, a height of the other end of the second curb with respect to the foundation is adjusted by adjusting a thickness of the base, In the third step, a base between the foundation and the second curb is formed by separating it from a base between the foundation and the first curb, thereby forming a gap between the foundation and a bottom surface of the second curb. Curb construction methods.

2. The construction method according to claim 1, In the first step, the second curb is erected with the other end of the second curb facing downward, and then the upper side of the second curb is tilted toward the first curb, thereby causing an engaging portion of the second curb to engage with an engaged portion of the first curb. Curb construction methods.

3. A curbstone placed on a foundation via a base, An elongated main body portion; An engaged portion provided at one end of the main body portion, the engaged portion engaging with another adjacent curbstone on the one end side; An engaging portion provided at the other end of the main body portion, the engaging portion engaging with another adjacent curbstone on the other end side, When at least one of the engaged portion and the engaging portion of the curb is engaged with the other curb, a gap can be formed between the foundation and the bottom surface of the main body. curb.

4. The curbstone according to claim 3, At least one of the engaged portion and the engaging portion has an arc shape when the curb is viewed from above with the bottom surface of the curb facing downward. curb.

5. The curbstone according to claim 3 or claim 4, When at least one of the engaged portion and the engaging portion of the curbstone is engaged with the other curbstone, a gap is formed between the end of the main body portion and the other curbstone. curb.

Citation Information

Patent Citations

  • Curb element for providing boundaries in a pavement

    EP2088241A1

  • JP1982046603U

  • JP1990078613U

  • Boarder block in board or the like, and construction method therefor

    JP1997003810A

  • Boundary block and its construction method

    JP1997125309A