Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

399results about How to "Improve the anti-leakage effect" patented technology

Three-piece square can and method of manufacturing the same

The present invention provides a three-piece rectangular can which can overcome drawbacks (joint defect) of a can body joint portion of a three-piece can, and is of a new type which overcomes shortage of a can body strength which a two-piece can possesses, and exhibits excellent liquid leakage resistance, excellent can body strength and excellent heat radiation property or the like even when the can is used as a casing of a battery or electric equipment. For this end, the three-piece rectangular can of the present invention is formed such that a circular blank formed of an aluminum plate which forms an organic film on at least one surface thereof is formed into a bottomed circular can by deep drawing such that the organic film forms an inner side of the can, a cylindrical sleeve having no seam on a side surface thereof is formed by cutting a can bottom of the bottomed circular can, a rectangular can body portion having no seam on a side surface thereof is formed by deforming the cylindrical sleeve into a rectangular shape, a necking formed portion is formed by applying necking forming to opening portions at both ends of the rectangular can body, and a top lid and a bottom lid are mounted on the opening portions at both ends of the rectangular can body by double seaming by way of an organic compound.
Owner:TOYO SEIKAN KAISHA LTD +1

Anti-leakage pulsator washing machine

The invention discloses an anti-leakage pulsator washing machine. The anti-leakage pulsator washing machine comprises a clutch, a first waterproof device and a second waterproof device. The clutch comprises a washing shaft and a dehydrating shaft, wherein the dehydrating shaft coaxially rotates around the washing shaft. The first waterproof device comprises a first water seal, an inner barrel flange and an outer barrel, wherein a first waterproof space is formed among the first water seal, the inner barrel flange, the dehydrating shaft and the outer barrel. The second waterproof device comprises an impeller and a second water seal, wherein a second waterproof space is formed among the impeller, the second water seal, the washing shaft and the dehydrating shaft. According to the anti-leakage pulsator washing machine, water which is poured in the process of washing is used for compressing air sealed in the first waterproof space and the second waterproof space, the compressed air effectively blocks the water and prevents a portion prone to leakage from contacting with the water in the washing machine, and therefore a condition that the clutch portion leaks water so as to enable the clutch to get rusty and corroded and influence the performance of the whole machine is effectively avoided. The anti-leakage pulsator washing machine is low in cost and good in anti-leakage effect.
Owner:NANJING CHUANGWEI HOUSEHOLD ELECTRONICS APPLIANCES LTD

Polyamide 66 membrane covered nickel-titanium alloy intravascular scaffold and preparation method thereof

The invention relates to a polyamide 66 membrane covered nickel-titanium alloy intravascular scaffold and a preparation method thereof. The intravascular scaffold comprises a nickel-titanium alloy scaffold and a polyamide 66 membrane, and is provided with a tubular blood vessel shaped structure or a cylindrical blood vessel shaped structure, wherein the surfaces of an inner wall and an outer wallof the scaffold are covered by thin membranes with the thickness between 0.2 and 5 millimeters. The preparation method comprises the following steps of: preparing 1 to 20 percent of polyamide 66 solution by using formic acid as a solvent; coating a layer of the polyamide 66 solution on a glass rod and volatizing the solvent; sleeving a nickel-titanium shape memory alloy expanding scaffold on the glass rod; coating another layer of the polyamide 66 solution on the glass rod and volatizing the solvent; and peeling off the polyamide 66 membrane and the nickel-titanium alloy intravascular scaffold from the glass rod, and performing vacuum drying to obtain the polyamide 66 membrane covered intravascular scaffold. The intravascular scaffold prepared by the method has a stable structure, good mechanical property, transportability and anti-seepage property, overcomes the performance defects of a single material, and has a simple preparation process.
Owner:DONGHUA UNIV

Heat barrier material high temperature heat conductivity plane heat source test system and method

The invention provides a heat barrier material high temperature heat conductivity plane heat source test system and method, and heat barrier material heat conductivity at the temperature of room temperature to 1200 DEG C can be tested. Three stacked to-be-tested samples are placed in a high temperature furnace, a plane heat source providing a constant power output is placed between a middle sample and a lower sample, the plane heat source is connected with a constant flow source meter by a high temperature resistant wire, a temperature testing thermocouple responding test temperature is arranged between an upper sample and the middle sample, and the temperature testing thermocouple is connected with a temperature display instrument. After the high temperature furnace is heated, the plane heat source is charged with a step type heating current, and temperature change of the temperature testing thermocouple is tested and recorded under constant pressure so as to calculate the heat conductivity of the to-be-tested sample. The plane heat source and the temperature testing thermocouple can solve the problem of temperature signal interference during test of heat conductivity of a low resistivity material by use of transient plane source method, and can achieve test of high temperature heat conductivity of the low resistivity material.
Owner:AEROSPACE RES INST OF MATERIAL & PROCESSING TECH +1

Lining layer of bamboo-wound composite pipe and preparation method thereof

The invention discloses a lining layer of a bamboo-wound composite pipe and a preparation method thereof. The lining layer comprises a natural fiber fabric layer and a reinforced fabric layer in sequence from inside to outside in the radial direction of the pipe; a natural fiber fabric of the natural fiber fabric layer and a reinforced fabric of the reinforced fabric layer are both dipped with adhesive; the adhesive dipping rate of the natural fiber fabric is higher than 92%; the adhesive dipping rate of the reinforced fabric is higher than 71%; and the adhesive includes a resin and a curing agent. The method comprises the following steps: firstly, a demolding layer is prepared; one layer of adhesive is poured on the surface of the demolding layer, then, the natural fiber fabric is wound, and the adhesive infiltrates the natural fiber fabric to obtain the natural fiber fabric layer; one layer of adhesive is poured on the surface of the natural fiber fabric layer, the reinforced fabric is wound, the adhesive infiltrates the reinforced fabric to obtain the reinforced fabric layer; and then, the needed lining layer is obtained through curing treatment. The lining layer is excellent in leakage resistance and corrosion resistance, and satisfies the sanitation requirement; and the preparation method is simple in operation and high in efficiency.
Owner:ZHEJIANG XINZHOU BAMBOO BASED COMPOSITES TECH +1

Grouting system and grouting method used for composite lining structure backfill and grouting

ActiveCN105697034ASolve the problem that grouting cannot be repeatedRealize repeated groutingUnderground chambersTunnel liningScrew threadGrout
The invention discloses a grouting system and a grouting method used for composite lining structure backfill and grouting.The grouting system comprises a one-way non-return suction cup, a one-way non-return grouting pipe, a water-stopping ring, a sealing plug and a connection pipe, wherein the one-way non-return suction cup is composed of a grouting disc and a non-return hole; the one-way non-return grouting pipe comprises a grouting pipe first end and a grouting pipe second end, a one-way valve is arranged at the grouting pipe first end, and the grouting pipe first end is communicated with a grout inlet of the grouting disc through a screw thread; the water-stopping ring is located on the outer wall of the middle of the one-way non-return grouting pipe; the sealing plug is connected with the grouting pipe second end through a screw thread; the connection pipe comprises a first end and a second end; the first end of the connection pipe is connected with the grouting pipe second end are connected through a screw thread, and the second end of the connection pipe is used for being connected with grouting equipment.The water-stopping ring is additionally arranged on the middle of the grouting pipe, and the water-stopping effect of a contact face between the outer wall of the pipe and a secondary lining structure can be effectively improved.The one-way non-return suction cup is arranged at the tail end of the one-way non-return grouting pipe, repeated grouting can be achieved, and the defect that a traditional grouting system cannot achieve repeated grouting is overcome.
Owner:BCEG CIVIL ENG

Building formwork forming structure, fasteners and construction method of building formwork

The invention relates to a building formwork forming structure, a fastener used for the structure and a construction method, belonging to the formwork technology for concrete pouring in the construction industry. Its building formwork forming structure includes templates, tensioning screws, reinforcing ribs and clamps. The templates are arranged on both sides of the concrete filling cavity in parallel. There are one pair of tensioning bolt holes set opposite to each other on the formwork. The two ends of the pull bolts are matched, and the two ends of the pull bolts are threaded to connect a pair of frustum-shaped fasteners; the frustum-shaped fasteners are arranged on the inside of the two templates, and the large end faces of the frustum-shaped fasteners facing the outside are arranged There is an extended screw that can pass through the hole of the pull bolt on the template; the protruding part of the extended screw passes through the column on the outside of the template and is tightened and fixed by a conventional clamp. The structure and method of the invention reduce the waste caused by cutting the ends of the pull bolts in the traditional structure, and simultaneously simplify the construction and improve the efficiency.
Owner:黄学贵

Molding method of integral type bibcock waterway inner core

The invention discloses a molding method of an integral type bibcock waterway inner core, which comprises the following steps: (1) a main body with two water entry channels, at least one water effluent channel and at least one intermediate fluid channel is integrally formed through once injection by means of a once-injection mold and a mandril in a position corresponding to the position of the mold, wherein the intermediate fluid channel is perpendicular to the two water entry channels, and the external ends of the channels are respectively provided with a water inlet, a water outlet and a core loosing hole; and a plug for sealing the core loosing hole is formed in an injection molding mode by means of a plug mold; (2) the plug and a seal ring are arranged in the core loosing hole of the main body to form an insert for secondary injection molding; and (3) the insert is placed into the mold for secondary injection molding; a cladding layer for maintaining the relative position of the plug and the main body is coated on the insert through secondary injection molding; and the integral type bibcock waterway inner core is obtained after demoulding. The bibcock inner core body processed and molded according to the method of the invention has firm structure, is convenient to install and use, prolongs the service life of a bibcock, and has less possibility of leakage.
Owner:XIAMEN RUNNER IND CORP

Manufacturing process of mold for manufacturing carbon fiber box

InactiveCN105500731AHigh thermal deformation coefficientImprove the finishSteel platesHigh intensity
The invention relates to a manufacturing process of a mold for manufacturing a carbon fiber box. In the process, a male mold is used. The manufacturing process comprises the following steps: step 1, spraying a gel coat on the outer surface of the male mold and curing to form a gel coat layer; step 2, coating the gel coat layer with surface felt to form a surface felt layer; step 3, gluing at least three layers of shortly-chopped felt on the surface felt layer to form a shortly-chopped felt layer, and curing the surface felt layer, resin and the shortly-chopped felt layer to form a glass fiber reinforced plastic layer; step 4, sequentially laying the shortly-chopped felt layer, a multi-axial cloth layer and a bordering cloth layer on the glass fiber reinforced plastic layer; step 5, filling in vacuum, namely sequentially laying de-molding cloth, a double-layered flow guide net, a flow guide belt, a flow guide pipe and a double-layered vacuum bag on the layer in the step 4, and after keeping pressure, filling to primarily form a female mold shell plate; step 6, gluing a steel frame and a steel plate; and step 7, after sticking the steel frame and the female mold shell plate for at least 48 hours, taking out the male mold from the female mold shell plate so as to manufacture the mold. The manufacturing process provided by the invention has the characteristics that the high-strength performance of the mold is guaranteed, the durability of the mold is improved, the service life of the mold is prolonged and the like.
Owner:NEWTRY COMPOSITE

Method of anti-leak treatment on petroleum drilling place by adopting composite geo-membrane

The invention discloses a method of anti-leak treatment on a petroleum drilling place by adopting a composite geo-membrane, relating to the technical field of adopting composite geotechnical materials to treat leakage of the petroleum drilling place. The method comprises the following steps of firstly, leveling the place; secondly, paving the composite geo-membrane; thirdly, paving a leakage pipeline: arranging the leakage pipeline at a position of easily having leakage; fourthly, paving a lime-ash stabilizing layer: with crushed stones, lime and fly ash as raw materials, paving the lime-ash stabilizing layer on the composite geo-membrane, wherein the lime-ash stabilizing layer comprise the following raw materials in percentage by weight, calculated by occupying the total volume of the raw materials: 8-10 percent of the lime, 10-12 percent of the fly ash and the balance of the crushed stones; and fifthly, paving a crushed stone surface layer: paving a 8-10cm crushed stone surface layer on the lime-ash stabilizing layer. By adopting the invention, waste mud and waste liquid of petroleum can be prevented from polluting the drilling place to enable idle land after drilling to be in second plowing, thereby having the effects of protecting land resources and lowering the land using cost.
Owner:CHINA NAT PETROLEUM CORP CHUANQING DRILLING ENG CO LTD

Water proofing and leak repairing construction method for sewage pipe network below underground water level

The invention discloses a water proofing and leak repairing construction method for a sewage pipe network below the underground water level. The method is performed through the following steps that 1, sewage removal is performed on a pipeline; 2, leak points are found and marked; 3, a precipitation well is drilled, and precipitation processing is performed on a construction well point; 4, leaking stoppage is performed on the interior of the pipeline; 5, a grouting hole is drilled, and cement paste is backfilled and grouted. According to the method, a lining pipe does not need to be used, the construction cost is saved by 50% compared with the method that water proofing and leak repairing are performed on the sewage pipe network in a lining pipe mode, and the high application and popularization value is achieved; the actual available pipe diameter of the sewage pipeline cannot be reduced, and the phenomenon that the drainage capacity of the sewage pipeline is reduced due to water proofing and leak repairing cannot occur; by grouting on the exterior of the pipeline to form a grouting layer at the periphery of the sewage pipeline, the strata at the periphery of the sewage pipeline is reinforced, and effective protection on the sewage pipeline is formed to prevent formation stress from destroying the sewage pipeline.
Owner:XUCHANG WATER CONSERVANCY CONSTR ENG CO LTD

Embedded leak-proof joint

InactiveCN104452949AEasy to rotate and alignRealize the inconvenience of installationSewerage structuresDomestic plumbingArchitectural engineeringBuilding construction
The invention discloses an embedded leak-proof joint used for the connecting position of pipelines for building decoration. The embedded leak-proof joint comprises a leak-proof joint body and a reducing connecting piece. A water guide groove is formed in the upper end of the leak-proof joint body, water drain holes are formed in the leak-proof joint body, a fixing ring is arranged at the lower end of the leak-proof joint body, the fixing ring is provided with fixing pins and fixing holes, the reducing connecting piece is connected with the leak-proof joint body, the eccentricity of the reducing connecting piece is -10 mm to +10 mm, anti-skid convex edges are arranged on the outer side of the reducing connecting piece, a plurality of lead angle type round edges are arranged on the periphery of the fixing ring, the lead angle type round edges and the fixing pins are spaced, the middle end of the leak-proof joint body is provided with a concave water drain ring and inward convex edges, the inward convex edges are connected with a pipeline, the horizontal distance between the outer side of each fixing hole and the outer side of a water guide groove is 2 mm to 5 mm, and the fixing holes are lengthened fixing holes. The embedded leak-proof joint has the advantages that embedded construction can be completed at a time, construction time is shortened, labor cost is reduced, installation is convenient, and installation efficiency is high.
Owner:湖南中财化学建材有限公司

Leakage-proof construction method combining tower crane foundation and basement floor

InactiveCN106120872AEliminate potential safety hazards such as rustAvoid prolonged water accumulationProtective foundationProof constructionBrick
The invention discloses a leakage-proof construction method combining a tower crane foundation and a basement floor. The method comprises the following steps: excavating an earthwork groove and building a brick membrane along an inner wall of the earthwork groove, laying a waterproof material, distributing a foundation reinforcement cage, mounting supporting feet of a tower crane, mounting a grounding device, pouring concrete, mounting standard sections of the tower crane and the like. The leakage-proof construction method has the advantages that problems in a utilization process of the tower crane that the standard sections of a tower body are immersed in water for a long period to cause potential safety hazards including rusting and the like and the water is deposited in an installation position of the tower crane for a long period are effectively avoided, a dismounting procedure of the tower crane is simplified and the stability of connection between the earthwork groove and the basement floor is increased after the concrete is poured into the earthwork groove; and the leakage-proof construction method has very good leakage-proof effect and is suitable for being applied to a tower crane construction process of various types of mid-rise buildings and high-rise buildings.
Owner:TIANJIN 20 CONSTR

Tin pot base production method of float glass production line

InactiveCN101381200AReduced splice weldsReduce welding distortionProduction lineEngineering
The invention relates to a method for manufacturing a tin bath bottom shell of a float glass production line. The method comprises the following: a step 1 of prophase preparation, which is to work out a manufacturing process and proposal according to a drawing as well as manufacturing standards and requirements, draw a typesetting drawing of folding the edge of a bottom plate, obtain the reasonable order size of a wide plate and customize materials; a step 2 of folding the edge of the wide plate, which is to determine accurate blanking size, form a welding groove via cutting blanking, plate leveling and edge planing, fold the edges of two ends of the wide plate and use an assembled die to fold the edges and control the radius of a fillet; a step 3 of assembling a bottom frame, which is to assemble a platform first, assemble and weld the bottom frame then, calibrate and polish after welding is over; and a step 4 of assembling the wide plate and the bottom frame, which is to assemble the bottom frame calibrated on the platform in the step 3 together with the wide plate, weld, calibrate, spray sand, paint, number and package. The method ensures that users can directly obtain every part of the production line and only need to splice the parts, thereby guaranteeing the manufacturing quality of the production line.
Owner:SHANGHAI BAOYE GRP CORP +1

Leakage-proof structure and method for leakage maintenance of toilet floor

InactiveCN106049801AImprove adhesion fastnessImprove anti-leakage abilityFlooring insulationsCeramic tilesEngineering
The invention relates to a leakage-proof structure and method for leakage maintenance of a toilet floor, and belongs to the field of building decoration. In order to solve the problems that existing maintenance is complex and poor in leakage-proof effect, the invention provides the leakage-proof structure and method for leakage maintenance of the toilet floor. The leakage-proof structure for leakage maintenance of the toilet floor comprises a ground base layer, the surface of the ground base layer is paved with a cement mortar combined layer, the surface of the cement mortar combined layer is paved with a ceramic tile layer, the surface of the ceramic tile layer is coated with a waterproof paint layer, the surface of the waterproof paint layer is paved with a self-leveling layer, the surface of the self-leveling layer is coated with multiple plastic floorings in a bound mode, all the plastic floorings are tightly arranged and paved, and the edges of every two adjacent plastic floorings abut against each other. The method comprises the steps that the toilet floor is cleaned, and the surface of the cleaned toilet floor is coated with the waterproof paint layer; self-leveling treatment is conducted; the toilet floor subjected to self-leveling treatment is covered with the plastic floorings in the bound mode; sealing treatment is conducted, and maintenance is completed. The leakage-proof structure and method for leakage maintenance of the toilet floor have the advantages that the leakage-proof effect is good, the service life is long, and the maintenance construction period is short.
Owner:浙江一方建筑装饰实业有限公司

Waterproof construction method for preventing leakage of deformation joint

The invention discloses a waterproof construction method for preventing leakage of a deformation joint. The waterproof construction method comprises the steps that an arc-shaped supporting strip is arranged in the deformation joint along a central buried waterstop belt, and a cavity is formed between the inner wall of the arc-shaped supporting strip and the central buried waterstop belt; a first layer of leaking-stoppage materials are arranged on the outer wall of the arc-shaped supporting strip along the deformation joint; grouting water-stopping materials are injected into the cavity; jointfilling materials and a second layer of leaking-stoppage materials are sequentially arranged on the outer wall of the first layer of leaking-stoppage materials along the deformation joint; and an external waterstop belt is arranged on the second layer of leaking-stoppage materials along the deformation joint. The arc-shaped supporting strip is arranged in the deformation joint along the central buried waterstop belt and fixed in the deformation joint by the first layer of leaking-stoppage materials, then the grouting water-stopping materials are injected into the cavity, the grouting water-stopping materials injected into the deformation joint are made compact and uniform by the arc-shaped supporting strip, and thus, the anti-leakage effect of the grouting water-stopping materials is improved; and a waterproof structural layer is additionally arranged, so that the anti-leakage effect of the deformation joint is further improved, and the waterproof effect after repair is improved through rigid-flexile combination.
Owner:SHANGHAI ORIENTAL YUHONG WATERPROOF TECH +1

Positive pole piece of winding lithium-manganese battery

The invention discloses a positive pole piece of a winding lithium-manganese battery. The positive pole piece comprises a positive pole current collector and active matter layers coating surfaces of two sides of the positive pole current collector, wherein mutually-communicated net-shaped grooves are arranged on the upper surfaces of the active matter layers. The positive pole piece has the advantages that the mutually-communicated net-shaped grooves are arranged on the upper surfaces of the active matter layers, and a groove structure is arranged on the positive pole piece and is smoother than a conventional positive pole piece, thus the storage space of an electrolyte is increased; and the inventory of the electrolyte is increased. The grooves on the surface of the positive pole piece are mutually communicated, thus the electrolyte on the whole positive pole piece can be effectively mutually complemented, and the state of no electrolyte in a local place is prevented. A vacuumizing electrolyte injecting manner is adopted as a main manner in the current industry of winding lithium-manganese batteries, but the electrolyte has difficulty in permeating to a middle section of the positive pole piece at present to cause the result that a part of a positive plate at the middle section does not participate in reaction, the phenomenon is effectively improved through a manner of additionally arranging the grooves on the surface of the positive pole, the whole positive pole piece participates in the reaction, and thus the discharge efficiency of the battery is increased.
Owner:NINGBO XINGRUI ENERGY TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products