Test Equipment
Patent Information
- Application Number
- JP2021132119
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-08-16
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-08-16
AI Technical Summary
【0007】 本開示によれば、被試験器の近傍や試験場所を選ばずに試験を実施することが可能になる。
Smart Images

Figure 0007579767000001 
Figure 0007579767000002 
Figure 0007579767000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a test apparatus, and is applicable to a test apparatus that performs performance tests on a device under test, such as a wireless device. [Background technology]
[0002] The test equipment has a fixed rack structure and is installed in a building, etc. Since it is an integrated tester capable of testing multiple UUTs, all measuring instruments and dedicated testers required to test the UUTs are stored in the rack. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2011-75486 A Summary of the Invention [Problem to be solved by the invention]
[0004] As described above, the test equipment is installed and used inside a building, so in order to conduct a test, the device under test must be brought to the location where the test equipment is installed and the test must be conducted there. If the device under test is used in a remote location, the test cannot be conducted in an emergency, etc.
[0005] An object of the present disclosure is to provide a technology that enables testing to be performed near the device under test or at any testing location when necessary. [Means for solving the problem]
[0006] A brief summary of representative aspects of this disclosure is as follows. That is, the test apparatus includes a measuring instrument housed in a first case or a testing unit housed in a second case, an operation terminal housed in a third case, and a connection unit housed in a fourth case and connecting a device under test, the operation terminal, and the measuring instrument or the testing unit via cables. The operation terminal is configured to control the connection unit and the measuring instrument or the testing unit, and the first case, the second case, the third case, and the fourth case can be assembled by stacking them. Effect of the Invention
[0007] According to the present disclosure, testing can be performed near the device under test or at any testing location. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a front view showing the appearance of a test device in a comparative example. [Diagram 2] FIG. 2 is a front view showing the appearance of the portable test device in the embodiment. [Diagram 3] Figure 3(a) is a top view of the case in which the test unit is stored, Figure 3(b) is a front view of the case in which the test unit is stored, Figure 3(c) is a right side view of the case in which the test unit is stored, and Figure 3(d) is a left side view of the case in which the test unit is stored. [Figure 4] FIG. 4 is a front view showing another external appearance of the portable test device in the embodiment. [Diagram 5] FIG. 5 is a flowchart showing a procedure for preparing a test by the test device according to the embodiment. [Figure 6] FIG. 6 is a diagram showing an example of an operation screen for preparing components on an operation terminal. [Figure 7] FIG. 7 is a diagram showing an example of an operation screen for connection between components on an operation terminal. [Figure 8]Fig. 8(a) is a diagram showing an example of an operation screen for checking the connection on an operation terminal when the components are arranged as shown in Fig. 2. Fig. 8(b) is a diagram showing an example of an operation screen for checking the connection on an operation terminal when the components are arranged as shown in Fig. 4. [Figure 9] FIG. 9 is a diagram showing how the test cable is stored in the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, embodiments will be described with reference to the drawings. In the following description, the same components are designated by the same reference numerals, and repeated description may be omitted.
[0010] In order to clarify the embodiments of the present disclosure, a rack-type testing device in a comparative example will be described with reference to Fig. 1. Fig. 1 is a diagram showing the external appearance of the testing device in the comparative example.
[0011] The test equipment 100 in the comparative example mainly comprises various general-purpose measuring instruments 120, a measurement path switcher 140 that switches signals etc., and an operation terminal 110 that controls test signal switching, sets the measurement mode of the general-purpose measuring instrument 120, stores and displays measurement data, etc. A device under test 130, which is the object of testing, is connected to the test equipment 100 to perform a test.
[0012] The test apparatus 100 stores all components (general-purpose measuring instruments 120, dedicated test instruments, etc.) required to test a plurality of devices under test 130 in a fixed rack 150. Then, when the operation terminal 110 selects a device under test 130, the operation terminal 110 selects and controls the components required to test the device under test 130 and performs the test.
[0013] The test apparatus 100 has a fixed rack structure and is installed in a building or the like for use. Since the test apparatus 100 is an integrated tester capable of testing multiple devices under test 130, all components (general-purpose measuring instruments and dedicated testers) required to test the devices under test 130 are stored in the rack and already connected. A user selects a device under test 130 and a test item (optional) from the operation terminal 110 to perform the test.
[0014] As described above, the test equipment 100 is installed and used inside a building, so in order to conduct a test, the device under test 130 must be brought to the installation site of the test equipment 100, and if the device under test 130 is used in a remote location, the test cannot be conducted in an emergency, etc. In the case of the test equipment 100 in the comparative example, it is possible to disassemble and move each rack, but when assembling, it is necessary to arrange and connect all the racks in a predetermined order.
[0015] The test device in the embodiment is portable. However, when the test device is portable, if the components required for testing the DUT to be tested are not available, the test cannot be performed, so the necessary components must be prepared and connected in preparation for the test. Also, unlike the rack-type test device 100 in the comparative example, the components are configured each time a test is performed, so if the necessary components are not available, the test cannot be performed.
[0016] Therefore, in the test device of this embodiment, components of the test device (measuring instruments, dedicated testers, route switches, etc.) are connected as necessary to perform testing. Therefore, when the operation terminal is started, the device under test for which testing is to be performed is selected, component information required for testing is displayed, and the test can be performed by connecting the component. After the components are connected, the operation terminal checks the component connections to confirm that the components are usable and can display test items that can be performed.
[0017] The configuration of the test device in this embodiment will be described with reference to Fig. 2. Fig. 2 is a front view showing the appearance of the portable test device in this embodiment.
[0018] The test apparatus 10 in the embodiment is composed of a plurality of components, such as an operation terminal 110, a measuring device 120, a connection section 160, and a test section 170. Each component is stored in a single case 20, and the test apparatus 10 is composed of a plurality of cases 20. The device under test 130 is placed on a transport device 30, for example.
[0019] The test device 10 can be disassembled into components, transported to the test site, and assembled for testing. In Fig. 2, one component is stored in one case 20, but it is also possible to store multiple components in one case 20 as long as they are of a transportable size and weight.
[0020] The operation terminal 110 stores software for testing, and when a test is to be carried out, the device under test 130 and the test apparatus 10 are connected via a test cable 180 (described later) to execute a predetermined test.
[0021] Operation terminal 110 controls measuring instrument 120, connection section 160, and testing section 170. Connection section 160 includes a measurement path switch that performs signal switching and the like. Specifically, operation terminal 110 transmits a measurement path switching signal to connection section 160 in order to switch the measurement path so that a test signal is input to measuring instrument 120 or testing section 170 to be used depending on the test contents. Operation terminal 110 sets the measurement mode of measuring instrument 120 or testing section 170, stores and displays measurement data, and the like.
[0022] The operation terminal 110 is composed of a main body including a CPU (Central Processing Unit) and memory, an input / output device including a keyboard and a display device, a communication device for communicating with other devices, and a recording device for recording and reproducing data to recording media such as a CD device and a HDD device. In other words, the operation terminal 110 has hardware components as a computer capable of information processing and communicating with other devices.
[0023] Measuring instrument 120 is a general-purpose measuring device that is used in tests performed by operating terminal 110, and receives test signals output from device under test 130 via connection section 160 to perform predetermined measurements. For example, general-purpose measuring instruments 120 used to measure communication and navigation equipment include digital oscilloscopes, synthesized signal generators, modulation analyzers, low-frequency analyzers, and spectrum analyzers.
[0024] The testing section 170 is a tester dedicated to each device under test 130, and receives the test signal output from the device under test 130 via the connection section 160 and performs a predetermined measurement.
[0025] Here, the operation of the test device 10 during actual measurement will be described.
[0026] First, depending on the test item selected on the operation terminal 110, a measurement path switching signal is output from the operation terminal 110 to the connection unit 160, and the connection unit 160 sets connection paths for low-frequency signals, high-frequency signals, and paths for discrete signals at CMOS or TTL level.
[0027] Furthermore, a measuring device setting signal is output from the operation terminal 110 to the various measuring devices 120 or test sections 170, and measurement conditions such as frequency are set for the various measuring devices 120 or test sections 170 according to communication interface standards such as GP-IB and RS-232C.
[0028] Once the above settings for the connection section 160 and the various measuring instruments 120 are complete, test signals such as low and high frequencies output from the signal generator in the measuring instrument 120 are input to the device under test 130 connected to the connection section 160, and the performance measurement test begins.
[0029] Next, in the device under test 130, the transmission output or reception output corresponding to the input signal is transferred via the connection section 160 to the measuring device 120 such as a spectrum analyzer as device under test data.
[0030] In order to measure transmission output or reception output or the like, a predetermined measurement is performed in measuring device 120 assigned as a measurement system, and the output of the measurement result is transferred to operation terminal 110 as measurement result data.
[0031] The operation terminal 110 inputs the measurement data, calculates the difference from the required standard and judges whether it is good or bad, and compiles the results into a list of data as test results. This is displayed on the display unit of the operation terminal 110 and is also stored in memory as measurement data.
[0032] These test results are stored and saved in memory with the date and time managed for each data item each time a test is performed.
[0033] Next, the case 20 will be described with reference to Fig. 3. Fig. 3(a) is a top view of the case in which the test unit is stored, Fig. 3(b) is a front view of the case in which the test unit is stored, Fig. 3(c) is a right side view of the case in which the test unit is stored, and Fig. 3(d) is a left side view of the case in which the test unit is stored.
[0034] Case 20 is composed of a three-dimensional frame body in which two frame-shaped members 21a, 21b and four plate-shaped members 21c, 21d, 21e, 21f are joined to eight joints 22a to 22h. The lower right and lower left plate-shaped members 21e, 21f of case 20 have portions for fitting with the upper right and upper left plate-shaped members 21c, 21d of the lower case, respectively. In addition, the upper right and upper left plate-shaped members 21c, 21d of case 20 have portions for fitting with the lower right and lower left plate-shaped members 21e, 21f of the upper case, respectively.
[0035] The width direction lengths of the frame-shaped members 21a and 21b and the lengths of the plate-shaped members 21c, 21d, 21e, and 21f are the same in all cases, but the height of the frame-shaped members 21a and 21b can be changed to match the height of the components.
[0036] Next, another example of the arrangement of components of the test device 10 will be described with reference to Fig. 4. Fig. 4 is a front view showing another external appearance of the portable test device in the embodiment.
[0037] 2, the test sections 170 are vertically stacked in four layers, but in Fig. 4, the test sections 170 are stacked in two layers and the stacked test sections 170 are horizontally arranged. The arrangement of the components is not limited to this.
[0038] Next, the procedure for preparing for testing in the test device 10 will be described with reference to Figs. 5 to 8. Fig. 5 is a flow chart showing the procedure for preparing for testing in the test device in the embodiment. Fig. 6 is a diagram showing an example of an operation screen for preparing components in an operation terminal. Fig. 7 is a diagram showing an example of an operation screen for connecting components in an operation terminal. Fig. 8(a) is a diagram showing an example of an operation screen for checking connections in an operation terminal when the components are arranged as shown in Fig. 2. Fig. 8(b) is a diagram showing an example of an operation screen for checking connections in an operation terminal when the components are arranged as shown in Fig. 4.
[0039] In the test apparatus 10, the operation terminal 110 and the connection unit 160 for connecting the device under test 130 are essential components. However, other than that, the necessary components differ depending on the device under test 130, so it is necessary to prepare in advance the components according to the test contents of the selected device under test 130. For this reason, the test is carried out according to the following test procedure.
[0040] 5 are procedures specific to the test apparatus 10. Step S8 and subsequent steps are the same as those of the test apparatus 100 in the comparative example.
[0041] As shown in Fig. 6, the user selects the device under test from the "Equipment name" and "Part name" in the device under test selection 201a on the operation screen 201 of the operation terminal 110 (step S1). This determines the device under test. Fig. 6 shows a state in which an HF radio transceiver has been selected. The operation terminal 110 is capable of displaying the appearance of the device under test in the appearance display area 201b of the operation screen 201.
[0042] The operation terminal 110 extracts the necessary component names from the test contents of the selected device under test 130 (step S2). As shown in Fig. 6, the operation terminal 110 displays the extracted component names in the used components 201c of the operation screen 201 (step S3). The operation terminal 110 can display the appearance of the components in the appearance display area 201b of the operation screen 201.
[0043] The user collects the displayed components (step S4), and after confirming that all components are present (step S5), transports the collected components to the test site (step S6).
[0044] As shown in Fig. 7, the operation terminal 110 displays a connection diagram and cables connected corresponding to the connection diagram on the component connection screen 202. Fig. 7 shows a connection example in which the components used are the operation terminal 110, the connection unit 160, the first test unit (test unit 1) 170, and the second test unit (test unit 2) 170.
[0045] 7, one end of cable A is connected to terminal W200 of connection unit 160, and the other end is connected to terminal W400 of first testing unit (test unit 1) 170. One end of cable B is connected to terminal W201 of connection unit 160, and the other end is connected to terminal W401 of first testing unit (test unit 1) 170.
[0046] Moreover, one end of cable C is connected to terminal W301 of connection unit 160, and the other end is connected to terminal W501 of second testing unit (test unit 2) 170. One end of cable D is connected to terminal W302 of connection unit 160, and the other end is connected to terminal W502 of second testing unit (test unit 2) 170.
[0047] One end of cable E is connected to terminal W10 of operation terminal 110, and the other end is connected to terminal W105 of connection unit 160. One end of cable F is connected to terminal W11 of operation terminal 110, and the other end is connected to terminal W106 of connection unit 160.
[0048] The operation terminal 110 is connected to a first testing section (testing section 1) 170 and a second testing section (testing section 2) 170 via a hub (HUB) 40 through a LAN (Local Area Network).
[0049] The user connects the components transported in step S6 (step S7) according to the displayed connection diagram as shown in Fig. 7. Since the connection diagram shows the connections between the components, the user may freely arrange them as long as they are connectable.
[0050] After completing the arrangement and cable connection, the user checks the connection of the components from the operation terminal 110 and confirms that the devices required for the test are operable (step S8). At this time, as shown in FIG. 8(a), the connection state can be confirmed on the operation screen 203 which displays an image of the arrangement of the components of the operation terminal 110. However, since the operation terminal 110 displays the components in a predetermined arrangement (for example, the arrangement displayed in FIG. 8(a)), when the user arranges them freely as shown in FIG. 4, the arrangement of the components on the operation screen 203 shown in FIG. 8(a) differs from the actual arrangement. For this reason, the user can freely change the arrangement of the components displayed on the operation screen 203, for example, to the display of the operation screen 203 shown in FIG. 8(b). By making the arrangement of the components on the operation screen 203 the same as the actual ones, the component status can be confirmed on the screen displayed on the operation screen 203, and the location of the abnormal component can also be confirmed.
[0051] If the connections are normal, the test preparation is complete. If the connections are not normal, the user rechecks the connections of the components using the operation terminal 110 (step S10).
[0052] In preparing for a test, it is necessary to search for components and connect the components. The display of component information and connection procedures is realized by software in the operation terminal 110. Therefore, if the components are not all in one place, or if it is inconvenient to look at the screen of the operation terminal 110 when connecting the components, a separate mobile terminal such as a tablet PC (Personal Computer) may be used in combination when preparing for a test.
[0053] In addition, when performing a specific test such as a radio station inspection, the necessary components are limited and the test can be performed with a small number of components. When selecting the device under test, a list of test items for the target device is displayed, and the user can select the test item they want to perform, allowing the display of a list of components narrowed down to those required for the test.
[0054] A user performs a test by connecting the device under test 130 to the test apparatus 10 using a test cable 180 shown in Fig. 9. Fig. 9 is a diagram showing how the test cable is stored in the embodiment.
[0055] The test cable 180 is, for example, a power cable, an RF cable, a communication cable, etc. There are a plurality of types of test cables 180 used for testing, and the test cable 180 is dedicated to each device under test 130.
[0056] In the test equipment according to the comparative example, the test cables are stored near the test equipment, and when they need to be transported, they are stored in boxes or the like together for each device under test. Therefore, when connecting, each cable must be connected while checking the cable number and the connection destination. For this reason, in the embodiment, the cables are stored in a cable storage container 190 as follows to reduce the time required for transporting and connecting the cables.
[0057] The test cables 180 are stored in the storage container 190 by grouping them by device under test, with the same connection destination aligned in the same direction. To facilitate connection, the test cables 180 are passed through the loops 190b, etc. provided on the storage board 190a one by one, and the cable number and the terminal number of the connection destination are written on the cable or the loop 190b, making the notation of the connection destination easy to see. In addition, when passing the cable through the loops 190b, etc., it is arranged according to the terminal arrangement of the connection destination, so that the time required to search for the test cable in test preparation and the time required to connect the device under test and the test cable in test execution can be shortened compared to a method in which the test cables are stored individually and the connection direction of the test cable is checked when connecting.
[0058] According to this embodiment, tests can be performed without limiting the test location. In addition, by adding the operation terminal 110, the connection unit 160, and components that are frequently used according to the frequency of testing, it is possible to configure multiple test devices. In addition, it is possible to distribute the storage locations of the components.
[0059] The disclosure made by the present inventors has been specifically described above based on the embodiments, but it goes without saying that the present disclosure is not limited to the above-described embodiments and can be modified in various ways. [Explanation of symbols]
[0060] 10. Test equipment 20...Case 110... Operation terminal 120...Measuring instrument 130...Device under test 160... Connection 170 Testing Department
Claims
1. A measuring device housed in a first case; a test section housed in a second case; an operation terminal housed in a third case; a connection section that is housed in a fourth case and connects a device under test, the operation terminal, and at least one of the measurement device and the testing section via a cable; Equipped with The operation terminal and the connection unit are essential components for testing, the first case, the second case, the third case, and the fourth case can be assembled by stacking them; the operation terminal is configured to control the connection unit and at least one of the measurement device and the test unit; and the operation terminal has a first operation screen and a second operation screen, displaying components of the measuring instrument and the testing section necessary for a test based on a device under test and a test content of the device under test selected on the first operation screen; displaying, on the second operation screen, a connection diagram of components necessary for the test and the essential components, and cables to be connected corresponding to the connection diagram; The apparatus is configured such that, after a user arranges the components necessary for the test and the essential components by the assembly and the user completes the connection of the components necessary for the test and the essential components according to the displayed connection diagram, the operation terminal performs a connection check of the components necessary for the test and the essential components to confirm that the components necessary for the test are available and to display test items that can be tested. Test equipment.
2. 2. The test device of claim 1, A test apparatus in which the measuring instrument is a general-purpose measuring instrument, the testing section is a test instrument used exclusively for the device under test, and the operation terminal and the connection section are essential components.
3. 3. The test apparatus according to claim 2, The operation terminal has a second operation screen, and the test apparatus is configured to display on the second operation screen a connection diagram of components required for the test and the essential components, and cables to be connected corresponding to the connection diagram.
4. 4. The test apparatus according to claim 3, The operation terminal has a third operation screen, and the test apparatus is configured to display a layout diagram of the components required for the test and the essential components on the third operation screen.
Citation Information
Patent Citations
JP1973022571U
Denkitsushinoyobisokuteisochikeeshingu
JP1976052702A
JP1986079572U
Device test system
JP2011027558A
Device test system
JP2011075486A
