Charging control method, program, and charging control system
The charging control method for mobile robots sets battery thresholds and uses emergency charging instructions to reduce communication traffic, improving charging efficiency and operational continuity.
Patent Information
- Application Number
- JP2020156769
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-09-17
- Publication Date
- 2024-11-11
- Estimated Expiration
- 2040-09-17
AI Technical Summary
Existing mobile robot charging systems incur increased communication traffic due to constant monitoring and prioritization of battery levels, which affects the efficiency of charging operations.
A charging control method that sets threshold values for battery levels and uses emergency charging instructions based on charging time, reducing the need for continuous communication to monitor battery levels and prioritize charging.
This approach reduces communication traffic and enhances charging efficiency by allowing robots to prioritize charging based on battery thresholds without continuous monitoring, ensuring uninterrupted operations.
Smart Images

Figure 0007580064000001 
Figure 0007580064000002 
Figure 0007580064000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a charge control method, a program, and a charge control system. More specifically, the present disclosure relates to a charge control method, a program, and a charge control system that control charging of a work device that performs work. [Background technology]
[0002] Patent Document 1 discloses a mobile robot charging system that includes a charger and a charge control device. The charger charges the batteries (power storage units) of multiple mobile robots (working devices). The charge control device sets a priority for each of the multiple mobile robots according to the remaining charge during discharging and charging. If, while the charger is charging the maximum number of mobile robots that can be charged, a new mobile robot that needs charging has a higher priority than the mobile robot currently being charged, the charge control device stops charging the mobile robot with the lowest priority among the mobile robots currently being charged. The charge control device then automatically drives the mobile robot that needs charging to the charger to perform the charging task. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2010-237924 A Summary of the Invention [Problem to be solved by the invention]
[0004] In the mobile robot charging system described above, in order to compare the priority of a mobile robot that needs to be newly charged with the priority of a mobile robot that is currently being charged, it is necessary to constantly monitor the remaining battery power of the mobile robot that is currently being charged and set a priority according to the remaining power, which may increase communication traffic between the charge control device and multiple mobile robots.
[0005] An object of the present disclosure is to provide a charge control method, a program, and a charge control system that are capable of reducing communication traffic caused by communication with a work device. [Means for solving the problem]
[0006] A charging control method according to an aspect of the present disclosure includes a setting process and a charging control process. The setting process sets at least a first threshold value as a threshold value for a remaining amount of a power storage unit included in each of a plurality of handling devices. The charging control process controls charging of the power storage unit included in each of the plurality of handling devices as a handling device to be controlled. In the charging control process, when an emergency charging determination condition is satisfied in an emergency charging state, Stopping charging the working device that is being charged, The control unit outputs an emergency charging instruction to the work device to be controlled to start charging. The emergency charging state is a state in which the remaining charge of the power storage unit included in the work device to be controlled is equal to or less than the first threshold. The emergency charging determination condition is a charging time from the start of charging of a work device being charged among the plurality of work devices. The condition is that the emergency charging time has elapsed. The emergency charging instruction instructs the work device to be controlled to charge the power storage unit for the emergency charging time.
[0007] A program according to one aspect of the present disclosure is a program for causing a computer system to execute the charging control method.
[0008] A charging control system according to an aspect of the present disclosure includes a setting unit and a charging control unit. The setting unit sets at least a first threshold value as a threshold value for a remaining charge of a power storage unit included in each of a plurality of work devices. The charging control unit controls charging of the power storage unit included in each of the plurality of work devices as a control target work device. When an emergency charging determination condition is satisfied in an emergency charging state, the charging control unit: Stopping charging the working device that is being charged, The control unit outputs an emergency charging instruction to the work device to be controlled to start charging. The emergency charging state is a state in which the remaining charge of the power storage unit included in the work device to be controlled is equal to or less than the first threshold. The emergency charging determination condition is a charging time from the start of charging of a work device being charged among the plurality of work devices. The condition is that the emergency charging time has elapsed. The emergency charging instruction instructs the work device to be controlled to charge the power storage unit for the emergency charging time. Effect of the Invention
[0009] According to the present disclosure, it is possible to reduce communication traffic caused by communication with a work device. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a schematic plan view of a work area where a work device, the charging of which is controlled by a charge control system according to an embodiment of the present disclosure, performs work. [Diagram 2] FIG. 2 is a block diagram showing a schematic configuration of the charging control system. [Diagram 3] FIG. 3 is an explanatory diagram of a threshold value set for the remaining capacity of a power storage unit included in the maintenance device. [Figure 4] FIG. 4 is a flowchart illustrating the operation of the charging control system. [Diagram 5] FIG. 5 is a graph showing a change over time in the remaining capacity of a power storage unit included in the working device. [Figure 6] FIG. 6 is a graph showing the change over time in the number of tasks performed by the above-mentioned operating device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] (Embodiment) (1) Overview As shown in FIG. 1, a charging control system 1 according to this embodiment is a system for controlling charging of a plurality of work devices 2 that perform work in a predetermined work area A1.
[0012] The operating device 2 includes a power storage unit 24 (see FIG. 2 ) and performs an operation by utilizing the electric energy stored in the power storage unit 24. In the following embodiment, the operating device 2 is a transport device that receives an instruction from the server device 3 and performs a transport operation of transporting an object within the operation area A1. That is, the "operation" performed by the operating device 2 is a transport operation of transporting an object. This type of transport device may include an automated guided vehicle (AGV), a mobile robot, a drone, and the like. The mobile robot referred to in the present disclosure is, for example, a wheeled, crawler, or legged (including walking) robot. Note that the operation performed by the operating device 2 is not limited to the transport operation of transporting an object, and may have a function of performing various operations such as picking, welding, mounting, display, customer service, security, assembly, and inspection.
[0013] In the work area A1, a charger 4 is installed for charging the work apparatus 2. In the work area A1, a charging area A2 is set up in which the entry of work apparatus 2 other than the work apparatus 2 being charged by the charger 4 is prohibited. In addition, in the work area A1, a charging standby area A3 is set up adjacent to the charging area A2 in which, when the charger 4 is charging a work apparatus 2, another work apparatus 2 waits for the charger 4 to become available.
[0014] Here, the number of chargers 4 is less than the number of operating devices 2 used in the working area A1, and in the example of FIG. 1, one charger 4 is installed for two operating devices 2. In other words, the number of operating devices 2 used in the working area A1 is greater than the number of operating devices 2 that can be charged simultaneously by the charger 4 (hereinafter referred to as the "chargeable number"). Therefore, if the storage units 24 of more operating devices 2 than the chargeable number need to be charged, some operating devices 2 will wait to be charged because the charger 4 is in use, and there is a problem that the number of operating devices 2 that can perform work (e.g., transportation work) will decrease. In the following description, when distinguishing between two operating devices 2, they may be written as operating devices 2A and 2B. In the following description, the number of operating devices 2 is two, but the number of operating devices 2 is not limited to two and may be three or more.
[0015] The charge control system 1 of this embodiment includes a setting unit 31 and a charge control unit 32, as shown in FIG.
[0016] The setting unit 31 sets at least a first threshold value (urgent charging determination threshold value) L1 as a threshold value for the remaining amount of the power storage unit 24 included in each of the plurality of working devices 2A, 2B (see FIG. 3).
[0017] The charging control section 32 treats each of the plurality of working apparatuses 2A, 2B as a working apparatus 2X (working apparatus 2A or 2B) to be controlled, and controls charging of the power storage section 24 included in the working apparatus 2X (working apparatus 2A or 2B) to be controlled.
[0018] When the emergency charging determination condition is satisfied in the emergency charging state R1, the charging control unit 32 outputs an emergency charging instruction to the working apparatus 2X to be controlled to start charging. The emergency charging state R1 is a state in which the remaining amount of the power storage unit 24 included in the working apparatus 2X to be controlled is equal to or less than a first threshold value L1. The emergency charging determination condition includes a condition based on a charging time from the start of charging of the working apparatus 2 being charged among the multiple working apparatuses 2.
[0019] Here, the control of the charging of the power storage unit 24 by the charging control unit 32 includes indirectly controlling the charging of the power storage unit 24 by the charging control unit 32 outputting an emergency charging instruction to the work apparatus 2X to be controlled and causing the work apparatus 2X to be controlled to perform charging in accordance with the emergency charging instruction (hereinafter also referred to as emergency charging). Note that the control of the charging of the power storage unit 24 by the charging control unit 32 may include directly controlling the operation of the charger 4 that charges the power storage unit 24.
[0020] In the charging control system 1 of this embodiment, when the remaining amount of the power storage unit 24 becomes the emergency charging state R1, which is equal to or less than the first threshold value L1, and a predetermined emergency charging determination condition is satisfied, an emergency charging instruction is output to the working apparatus 2X to be controlled. Here, the emergency charging determination condition includes a condition based on the charging time from the start of charging of the working apparatus 2 being charged, so it is possible to determine whether or not the emergency charging determination condition is satisfied based on the charging time, and there is no need to constantly monitor the remaining amount of the power storage unit 24 for the working apparatus 2 being charged. Therefore, according to this embodiment, there is no need to communicate with the working apparatus 2 being charged in order to obtain the remaining amount of the power storage unit 24 from the working apparatus 2 being charged, and a charging control system 1 that reduces communication traffic with the working apparatus 2 being charged can be realized.
[0021] (2)Details (2.1) Structure The configuration of the charging control system 1 according to this embodiment will be described in detail below with reference to Figs. 1 to 4. The numerical values, shapes, materials, positions of components, positional relationships and connection relationships between multiple components, etc. shown below are merely examples and are not intended to limit the present disclosure. In addition, all of the drawings referred to below are schematic diagrams, and the ratios of sizes and thicknesses of the components in the drawings do not necessarily reflect the actual dimensional ratios.
[0022] In the following, a case will be described in which the working device 2, which is the control target of the charging control system 1, is an automated guided vehicle. The automated guided vehicle as the working device 2 performs the task of transporting an object while moving within the working area A1.
[0023] In the present disclosure, a "work area" is a space in which a plurality of working devices 2 are deployed, and the working devices 2 move within this working area A1 upon receiving instructions from, for example, a server device 3. Examples of the working area A1 include warehouses, factories, construction sites, stores (including shopping malls), logistics centers, offices, parks, homes, schools, hospitals, stations, airports, and parking lots. In addition, for example, when the working devices 2 are deployed inside a moving body, such as the inside of a ship, a railroad car, or an airplane, the inside of the moving body becomes the working area A1. In this embodiment, an example will be described in which the working area A1 is a warehouse.
[0024] 1 and 2, the charging control system 1 includes a server device 3 and a relay device 5 installed in a work area A1. The relay device 5 relays communication between the server device 3 and a work device 2 performing work in the work area A1.
[0025] FIG. 1 is a schematic plan view of the work area A1. In this embodiment, the work area A1 is a warehouse, and a space surrounded by an outer wall 81 is the work area A1. The work area A1 assumed in this embodiment has entrances 82 and 83 for carrying objects into and out of the work area A1. The work area A1 is divided by a partition wall 84 arranged in the work area A1. One charger 4 described above is installed in this work area A1. The number of chargers 4 is not limited to one, and the number of chargers 4 can be changed appropriately depending on the number of work devices 2 used in the work area A1, etc. In addition, the number of work devices 2 is two in FIG. 1, but the number of work devices 2 is not limited to two, and may be three or more. Although only one relay device 5 is illustrated in FIG. 1, multiple relay devices 5 may be arranged in the work area A1. In addition, FIG. 1 is merely one example of the work area A1, and the arrangement of the work area A1 can be changed appropriately.
[0026] The server device 3 is installed, for example, outside the work area A1, and is connected to a plurality of relay devices 5 via a communication network NT1 such as the Internet.
[0027] The server device 3 and each of the multiple maintenance devices 2 are configured to be able to communicate with each other. In the present disclosure, "able to communicate" means that information can be exchanged directly or indirectly via the communication network NT1 or the relay device 5, etc., by an appropriate communication method such as wired communication or wireless communication. In other words, the server device 3 and each of the multiple maintenance devices 2 can exchange information with each other. In this embodiment, each of the multiple maintenance devices 2 communicates with one of the multiple relay devices 5 by wireless communication using radio waves as a medium. Therefore, the server device 3 and the multiple maintenance devices 2 communicate indirectly at least via the communication network NT1 and the relay device 5.
[0028] In short, each relay device 5 is a device (access point) that relays communication between each maintenance device 2 and the server device 3. The relay device 5 communicates with the server device 3 via a communication network NT1. In this embodiment, as an example, wireless communication conforming to standards such as Wi-Fi (registered trademark), Bluetooth (registered trademark), ZigBee (registered trademark), or low-power radio (specific low-power radio) that does not require a communication license is adopted for communication between the relay device 5 and the maintenance device 2. In addition, the communication network NT1 is not limited to the Internet, and may be, for example, a local communication network within the work area A1 or within the operating company of the work area A1.
[0029] Next, the working device 2 will be described in more detail with reference to Figures 1 and 2. The working device 2 autonomously travels on a flat moving surface 80 formed, for example, of the floor surface of the working area A1. The working device 2 includes a first control unit 20, a first communication unit 21, a traveling device 22, a charge / discharge circuit 23, a power storage unit 24, and a detection unit 25. Each of the multiple working devices 2 used in the working area A1 is set with individual identification information.
[0030] The first communication unit 21 communicates with the server device 3 (the second communication unit 33 of the server device 3) via the relay device 5 and the communication network NT1. Here, the first communication unit 21 communicates with the relay device 5 by wireless communication.
[0031] The traveling device 22 drives at least some of the multiple wheels provided on the working device 2 to make the working device 2 travel. At least some of the multiple wheels are drive wheels. The drive wheels are, for example, omni-directional wheels such as omni wheels. The traveling device 22 drives the drive wheels based on a control command input from the first control unit 20 to make the working device 2 travel.
[0032] The power storage unit 24 is, for example, a secondary battery such as a lithium ion battery or a nickel-metal hydride battery.
[0033] The charge / discharge circuit 23 controls charging to and discharging from the power storage unit 24. When the working device 2 is connected to the charger 4, the charge / discharge circuit 23 stores electric energy supplied from the charger 4 in the power storage unit 24. The charge / discharge circuit 23 also supplies power to the first control unit 20, the first communication unit 21, and the traveling device 22 by discharging electric energy from the power storage unit 24. That is, the working device 2 performs work by using the electric energy stored in the power storage unit 24.
[0034] The detection unit 25 detects current position information and the like related to the current position where the working device 2 is located within the work area A1. The detection unit 25 includes, for example, a receiver that receives beacon signals transmitted by radio waves from a plurality of transmitters. The plurality of transmitters are arranged at a plurality of locations within the work area A1. The detection unit 25 measures the current position of the working device 2 based on the positions of the plurality of transmitters and the received radio wave intensity of the beacon signal at the receiver. The detection unit 25 may be realized using a satellite positioning system such as a Global Positioning System (GPS). The working device 2 periodically transmits information on the current position detected by the detection unit 25 and identification information of the working device 2 from the first communication unit 21 to the server device 3 at a predetermined transmission time interval (for example, one second interval). The working device 2 may irregularly transmit information on the current position detected by the detection unit 25 and identification information of the working device 2 from the first communication unit 21 to the server device 3 in response to a transmission request from the server device 3.
[0035] The detection unit 25 may also detect the operating state of the working apparatus 2, the surrounding conditions of the working apparatus 2, and the like. The operating state of the working apparatus 2 may include the remaining amount of the power storage unit 24 of the working apparatus 2, a state indicating whether the working apparatus 2 is moving or stopped, the speed (and speed change) of the working apparatus 2, the acceleration acting on the working apparatus 2, and the attitude of the working apparatus 2. The detection unit 25 includes sensors such as a speed sensor, an acceleration sensor, and a gyro sensor, and detects the operating state of the working apparatus 2 using these sensors. The detection unit 25 also includes sensors such as an image sensor (camera), a sonar sensor, a radar, and a LiDAR (Light Detection and Ranging), and detects the surrounding conditions of the working apparatus 2 using these sensors. The surrounding conditions of the working apparatus 2 include, for example, the presence or absence of an object (obstacle, etc.) present ahead in the traveling direction of the working apparatus 2, and the position (distance and direction) of the object, and the like. The obstacles include other working apparatuses 2 and people. In response to a transmission request from the server device 3, for example, the maintenance device 2 transmits information on the remaining amount of power in the power storage unit 24 detected by the detection unit 25 and identification information of the maintenance device 2 from the first communication unit 21 to the server device 3.
[0036] The first control unit 20 mainly comprises a computer system including a memory and a processor. That is, the function of the first control unit 20 is realized by the processor executing a program recorded in the memory of the computer system. The program may be pre-recorded in the memory, may be provided through a telecommunication line such as the Internet, or may be recorded and provided in a non-transitory recording medium such as a memory card. When the first control unit 20 receives a transport command for the transported object from the server device 3, for example, the first control unit 20 controls the traveling device 22 to autonomously travel the working device 2 based on the current position information detected by the detection unit 25, the operating state of the surrounding working device 2, and the surrounding situation. The first control unit 20 transports the transported object instructed by the server device 3 to the destination by controlling the traveling of the working device 2.
[0037] Next, the server device 3 will be described in more detail with reference to Figures 1 and 2. The server device 3 includes a second control unit 30 and a second communication unit 33.
[0038] The second communication unit 33 communicates with the relay device 5 via the communication network NT1. The second communication unit 33 communicates with each of the multiple (two in this embodiment) maintenance devices 2 via the communication network NT1 and the relay device 5. As a communication method between the second communication unit 33 and the relay device 5, an appropriate communication method such as wireless communication or wired communication is adopted.
[0039] The second control unit 30 mainly comprises, for example, a computer system including a memory and a processor. That is, the functions of the second control unit 30 (for example, the functions of the setting unit 31 and the charging control unit 32, etc.) are realized by the processor executing a program recorded in the memory of the computer system. The program may be pre-recorded in the memory, may be provided through a telecommunication line such as the Internet, or may be provided by recording it on a non-transitory recording medium such as a memory card.
[0040] As shown in FIG. 3, the setting unit 31 sets at least a first threshold L1 and a second threshold L2 (normal charging determination threshold) that is greater than the first threshold L1 as thresholds for the remaining amount of the power storage unit 24 of each of the multiple working devices 2. The first threshold L1 and the second threshold L2 are thresholds for determining the level at which charging is required for the working device 2X to be controlled in multiple stages. Specifically, the second threshold L2 is a threshold for determining whether charging of the power storage unit 24 is required. The first threshold L1 is a threshold for determining whether charging is prioritized over work or work is prioritized over charging when charging the power storage unit 24. In this embodiment, a state in which the remaining amount of the power storage unit 24 is equal to or less than the first threshold L1 is referred to as an emergency charging state R1 in which charging is prioritized over work. Also, a state in which the remaining amount of the power storage unit 24 is greater than the first threshold L1 and equal to or less than the second threshold L2 is referred to as a normal charging state R2 in which charging is required but work is prioritized over charging. In addition, a state in which the remaining charge of the storage unit 24 is higher than the second threshold L2 and less than 100% is called an additional charging state R3 in which there is no need for charging, but if it is an off-season when there is little work, additional charging (hereinafter referred to as additional charging) may be performed to bring the remaining charge closer to 100% in preparation for the busy season.
[0041] In the emergency charging state R1, the power storage unit 24 has no remaining capacity, so the charge control system 1 prioritizes charging over work and causes the work device 2 to charge the power storage unit 24. That is, in the emergency charging state R1, the charge control system 1 causes the work device 2 to charge the power storage unit 24 even if there is new work to be given to the work device 2.
[0042] In the normal charge state R2, the power storage unit 24 has a relatively large remaining capacity, so the charge control system 1 controls the charging of the working device 2 so as to prioritize work over charging. That is, in the normal charge state R2, the charge control system 1 causes the working device 2 to charge the power storage unit 24 when there is no new work to be given to the working device 2.
[0043] In this case, if the remaining charge of the power storage unit 24 of the two working devices 2 becomes equal to or less than the first threshold value L1 at the same time, only one charger 4 is installed in the working area A1, so that only one working device 2 can be charged at a time. Therefore, while the charger 4 charges the power storage unit 24 of the first working device 2, the remaining charge of the power storage unit 24 of the other working device 2 continues to decrease. Therefore, the value of the first threshold value L1 is set so that the remaining charge of the power storage unit 24 of the other working device 2 does not run out until the charger 4 finishes charging the power storage unit 24 of the first working device 2. In this embodiment, when the fully charged state of the power storage unit 24 is 100% remaining, the first threshold value L1 is set to a charge level of, for example, 30%, and the second threshold value L2 is set to a charge level of, for example, 80%. The set values of the first threshold L1 and the second threshold L2 are merely examples, and can be changed as appropriate depending on the number of working apparatuses 2, the number of chargeable apparatuses, the number of work tasks performed by the working apparatuses 2, and the like.
[0044] The charging control section 32 treats each of the multiple (for example, two in this embodiment) working apparatuses 2A, 2B as working apparatuses 2X to be controlled, and controls charging of the power storage section 24 included in the working apparatuses 2X to be controlled. When the working apparatus 2X to be controlled receives an instruction to start charging from the charging control section 32, if the working apparatus 2X is performing work, the working apparatus 2X starts charging based on the instruction to start charging after finishing the work.
[0045] In the emergency charging state R1, when the number of working apparatuses 2 being charged (hereinafter referred to as the number of charging apparatuses) is less than the number of apparatuses that can be charged by the charger 4, that is, when there is a vacant charge in the charger 4, the charging control unit 32 outputs an emergency charging instruction to the working apparatus 2X to be controlled to start charging. In other words, when the working apparatus 2X to be controlled enters the emergency charging state R1, if there is a vacant charge in the charger 4, the charging control unit 32 outputs an emergency charging instruction to the working apparatus 2X to be controlled to charge the power storage unit 24.
[0046] On the other hand, in the emergency charging state R1, when the number of units that can be charged by the charger 4 is the same as the number of units being charged, that is, when there is no available charge in the charger 4, the charging control unit 32 outputs an emergency charging instruction to the working apparatus 2X to be controlled to start charging when the emergency charging determination condition is met. That is, when the working apparatus 2X to be controlled is in the emergency charging state R1 and there is no available charge in the charger 4, the charging control unit 32 stops charging of the working apparatus 2 that is being charged and outputs an emergency charging instruction to the working apparatus 2X to be controlled to charge the power storage unit 24 when the emergency charging determination condition is met.
[0047] Incidentally, when the remaining charge of the power storage unit 24 of the working apparatus 2 being charged reaches a predetermined value, in order to stop charging and start charging the working apparatus 2X to be controlled, the charging control system 1 needs to successively monitor the remaining charge of the power storage unit 24 of the working apparatus 2 being charged. If the charging control system 1 monitors the remaining charge of the power storage unit 24 of all the working apparatuses 2 including the working apparatus 2 being charged, the communication traffic between the charging control system 1 and the working apparatuses 2 may increase.
[0048] In contrast, in this embodiment, the emergency charging determination condition includes a condition based on the charging time from the start of charging of the working apparatus 2 being charged, and the charging control unit 32 determines whether to output an emergency charging instruction based on the charging time of the working apparatus 2 being charged. Therefore, the charging control system 1 does not need to monitor the remaining amount of the power storage unit 24 included in the working apparatus 2 being charged, and the communication traffic between the charging control system 1 and the working apparatus 2 can be reduced.
[0049] In this embodiment, the emergency charging determination condition includes a condition that the charging time of the working apparatus 2 during charging reaches a certain emergency charging time CT1 (see FIG. 5). In this embodiment, the charging control unit 32 outputs an emergency charging instruction to the working apparatus 2X to be controlled to charge for the certain emergency charging time CT1, and the working apparatus 2 that has received the emergency charging instruction receives power supply from the charger 4 and charges the power storage unit 24 for the emergency charging time CT1. In other words, the working apparatus 2 that has received the emergency charging instruction receives power supply from the charger 4 and charges the power storage unit 24 for the emergency charging time CT1, and then ends the emergency charging.
[0050] Here, the emergency charging time CT1 is set to, for example, a time required to charge the power storage unit 24 of the working apparatus 2 in the emergency charging state until the remaining amount exceeds the first threshold value L1. Therefore, when the power storage unit 24 of the working apparatus 2 is charged for the emergency charging time CT1, it is assumed that the remaining amount of the power storage unit 24 exceeds the first threshold value L1 and enters the normal charging state. If the emergency charging determination condition is satisfied that the charging time of the working apparatus 2 being charged reaches the emergency charging time CT1, the charging control unit 32 determines that the charging of the working apparatus 2 being charged has ended, and outputs an emergency charging start instruction to the working apparatus 2X to be controlled. Here, the working apparatus 2X to be controlled waits until the working apparatus 2 being charged stops charging because the charging time reaches the emergency charging time. That is, the working apparatus 2X to be controlled that has received the emergency charging start instruction moves to the charging standby area A3 when the working apparatus 2 being charged (for example, a transporting operation) ends, and waits in the charging standby area A3 if another working apparatus 2 is present in the charging area A2. When the other work apparatus 2 in the charging area A2 finishes charging and moves out of the charging area A2, the work apparatus 2X to be controlled moves to the charging area A2 and receives power supply from the charger 4 to charge the power storage unit 24.
[0051] When the working apparatus 2 being charged finishes emergency charging, if there are no other working apparatuses 2 waiting to be charged, the working apparatus 2 that has finished emergency charging may continue charging the power storage unit 24. When the working apparatus 2 being charged finishes emergency charging, if the remaining amount of the power storage unit 24 is equal to or less than the first threshold value L1, the working apparatus 2 enters the emergency charging state again, and the charging of the power storage unit 24 is controlled by the charging control unit 32.
[0052] In addition, when the working apparatus 2X to be controlled is in the normal charging state R2 and the normal charging judgment condition is satisfied, the charging control unit 32 outputs a normal charging instruction to the working apparatus 2X to be controlled to start charging. The normal charging state R2 is a state in which the remaining amount of the power storage unit 24 included in the working apparatus 2X to be controlled is greater than the first threshold L1 and is equal to or less than the second threshold L2. Here, the normal charging judgment condition includes a condition based on the number of tasks of work given to the multiple working apparatuses 2. The normal charging state R2 is a state in which the remaining amount of the power storage unit 24 included in the working apparatus 2X to be controlled is relatively large, and is a state in which work is prioritized over charging. The charging control unit 32 obtains information on the number of tasks of work from a server device that manages the work to be given to the multiple working apparatuses 2, and determines whether the normal charging judgment condition based on the number of tasks is satisfied. Note that the server device 3 may have a work management function that manages the work to be given to the multiple working apparatuses 2, and in that case, the charging control unit 32 may obtain information on the number of tasks of work from the work management function. When the normal charging determination condition based on the number of tasks is satisfied, the charging control unit 32 outputs a normal charging instruction to the target working apparatus 2X, and when the normal charging determination condition is not satisfied, the charging control unit 32 does not output a normal charging instruction to the target working apparatus 2X. Therefore, if the target working apparatus 2X is in the normal charging state R2, charging is performed only when the normal charging determination condition based on the number of work tasks is satisfied, so that the target working apparatus 2X can prioritize work over charging, and delays in work can be suppressed.
[0053] Here, the normal charging determination condition includes a condition regarding the presence or absence of unperformed work. Specifically, the normal charging determination condition includes a condition that there is no unperformed work, that is, the number of tasks of unperformed work is zero. Here, the unperformed work includes at least a work that is not currently being performed by the maintenance device 2, and may also include a work that has not been instructed to be performed by the maintenance device 2.
[0054] In the normal charging state R2, if there is an unexecuted task, that is, if the normal charging determination condition is not satisfied, the charging control unit 32 does not allow the controlled maintenance apparatus 2X to charge. In other words, if there is a task to be newly assigned to the controlled maintenance apparatus 2X, the charging control unit 32 does not allow the controlled maintenance apparatus 2X to charge. This reduces the number of maintenance apparatuses 2 that can execute tasks, reducing the possibility that the unexecuted tasks will not be executed or will be delayed. On the other hand, in the normal charging state R2, if there is no unexecuted task, that is, if the normal charging determination condition is satisfied, the charging control unit 32 allows the controlled maintenance apparatus 2X to charge (hereinafter also referred to as normal charging). In other words, if a new task can be executed by a maintenance apparatus 2 other than the controlled maintenance apparatus 2X, the charging control unit 32 allows the controlled maintenance apparatus 2X to charge. This allows the controlled maintenance apparatus 2X to be charged while reducing the possibility that the unexecuted tasks will not be executed or will be delayed. In other words, the operating device 2X to be controlled can be made to perform the operation with priority over charging, and the occurrence of delays in the operation can be suppressed. Note that the condition regarding the presence or absence of unperformed operations is not limited to the condition that there is no unperformed operation, and may be the condition that the number of unperformed operations is a predetermined number or less.
[0055] The normal charging instruction output by the charging control unit 32 instructs the working apparatus 2X to be controlled to charge for a predetermined normal charging time CT2 (see FIG. 5). Here, the normal charging time CT2 is set based on the remaining amount of the power storage unit 24 at the timing when the working apparatus 2X to be controlled starts charging. The charging control unit 32 acquires the remaining amount of the power storage unit 24 at the timing when the working apparatus 2X to be controlled starts charging from the working apparatus 2X to be controlled, and sets the normal charging time CT2 based on this remaining amount. The charging control unit 32 sets the normal charging time CT2 to a time required to charge the power storage unit 24 to a predetermined charge level (e.g., 90%) that is greater than the second threshold value L2, based on the remaining amount B12 of the power storage unit 24 at the timing when the working apparatus 2X starts charging (normal charging) (times t3, t13, t23). That is, the charging time (emergency charging time CT1) in emergency charging performed in emergency charging state R1 is a fixed length of time, but the charging time (normal charging time CT2) in normal charging performed in normal charging state R2 is set in accordance with the remaining capacity B12 of the power storage unit 24 at the timing when charging starts (times t3, t13, t23). For example, the smaller the remaining capacity B12 of the power storage unit 24 at the timing when charging starts (times t3, t13, t23), the longer the normal charging time CT2, and the larger the remaining capacity B12 of the power storage unit 24 at the timing when charging starts (times t3, t13, t23), the shorter the normal charging time CT2. This allows normal charging to be performed so that the remaining capacity B13 of the power storage unit 24 reaches a predetermined charge level at the timing when normal charging ends (times t4, t14, t24).
[0056] (2.2) Operation Description The operation of the charging control system 1 of this embodiment will be described with reference to FIG.
[0057] The server device 3 periodically communicates with a maintenance device 2 that is not being charged among the multiple maintenance devices 2 (2A, 2B) and acquires information on the remaining charge of the power storage unit 24 of the maintenance device 2 and its identification information.
[0058] FIG. 4 is a flowchart illustrating the operation when the working apparatus 2B is charging and the working apparatus 2A is performing an operation other than charging.
[0059] The server device 3 regards the maintenance device 2A that is not being charged as the maintenance device 2X to be controlled, and periodically communicates with the maintenance device 2X (maintenance device 2A) to obtain information on the remaining amount of the power storage unit 24 from the maintenance device 2X (maintenance device 2A). When obtaining information on the remaining amount B1 of the power storage unit 24 from the maintenance device 2X (maintenance device 2A) to be controlled, the charging control unit 32 compares the remaining amount B1 of the power storage unit 24 of the maintenance device 2A with a first threshold value L1 (S1).
[0060] When the remaining amount B1 of the power storage unit 24 is equal to or less than the first threshold value L1 (S1: Yes), the charging control unit 32 determines that the working apparatus 2A is in the emergency charging state R1. Here, if the working apparatus 2A in the emergency charging state R1 is performing a task (transport task), the charging control unit 32 allows the working apparatus 2A to continue the task. Then, when the working apparatus 2A in the emergency charging state R1 finishes the task, the charging control unit 32 determines whether or not there is a vacant charge in the charger 4 (S6). Note that, when the working apparatus 2A in the emergency charging state R1 is performing a task, the charging control unit 32 may interrupt the task and proceed to the process of step S6, or may allow another working apparatus 2 to take over the interrupted task. The charging control unit 32 holds information indicating whether each of the multiple working apparatuses 2 is being charged, and in step S6, determines whether or not there is a vacant charge in the charger 4 based on the number of units that can be charged by the charger 4 and the number of working apparatuses 2 being charged (the number of units being charged).
[0061] If it is determined in step S6 that the charger 4 has an available charge (S6: Yes), the charging control unit 32 outputs an emergency charging instruction to the work device 2A in the emergency charging state R1, and causes the work device 2A to start charging (S10).
[0062] In the determination of step S6, if there is no free charge in the charger 4 (S6: No) and the working apparatus 2B being charged is performing normal charging, the charging control unit 32 causes the working apparatus 2B being normally charged to end charging. Then, the charging control unit 32 outputs an emergency charging instruction to the working apparatus 2A in the emergency charging state R1, and causes the working apparatus 2A to start charging (S10).
[0063] In the determination in step S6, if there is no available charger 4 (S6: No) and the working apparatus 2B being charged is performing emergency charging, the charging control unit 32 determines whether or not a charging time (emergency charging time CT1) has elapsed since the start of charging of the working apparatus 2B being charged (S7).
[0064] In the determination in step S7, if the charging time (emergency charging time CT1) has not elapsed since the start of charging of the working device 2B being charged (S7: No), the working device 2B being charged is allowed to continue the charging operation (S8).
[0065] Then, when the charging time (emergency charging time CT1) has elapsed since the start of charging of the working device 2B being charged, the charging control unit 32 instructs the working device 2B being charged to stop charging, and causes the working device 2B to end charging (S9). As a result, the working device 2B performing emergency charging performs charging for a certain emergency charging time CT1 and ends charging.
[0066] Then, when the work apparatus 2B performing emergency charging finishes charging, the charge control section 32 outputs an emergency charging instruction to the work apparatus 2A in the emergency charging state R1, and causes the work apparatus 2A to start charging (S10).
[0067] Furthermore, if it is determined in step S1 that the remaining capacity B1 of the power storage unit 24 is greater than the first threshold L1 (S1: No), the charging control unit 32 compares the remaining capacity B1 of the power storage unit 24 with the second threshold L2 (S2).
[0068] If it is determined in step S2 that the remaining capacity B1 of the power storage unit 24 is greater than the second threshold value L2 (S2: No), the charging control unit 32 determines that charging of the power storage unit 24 is not necessary, and returns to step S1 to prepare for the next process.
[0069] In the determination in step S2, if the remaining capacity B1 of the power storage unit 24 is equal to or less than the second threshold L2 (S2: Yes), the charging control unit 32 determines that the remaining capacity B1 of the power storage unit 24 is in a normal charging state R2 in which the remaining capacity B1 is greater than the first threshold L1 and equal to or less than the second threshold L2. When the maintenance apparatus 2X (maintenance apparatus 2A) to be controlled is in the normal charging state R2, the charging control unit 32 determines whether the maintenance apparatus 2A is performing a task or has an unperformed task (remaining task) based on information acquired from the server apparatus 3 that manages the execution status of tasks by multiple maintenance apparatuses 2 or from the maintenance apparatus 2A (S3).
[0070] In the determination of step S3, if the maintenance device 2A is performing a task or there is an unperformed task (S3: Yes), the charging control unit 32 does not output a charging start instruction to the maintenance device 2A, and the maintenance device 2A continues the task or performs a new task (S4). If the maintenance device 2A has not finished the task being performed (S5: No), the maintenance device 2A returns to step S4 and continues the task. On the other hand, if the maintenance device 2A finishes the task being performed (S5: Yes), the maintenance device 2A returns to step S1 and repeats the processes from step S1 onward.
[0071] In the determination of step S3, if the working device 2A is not performing work and there is no work that has not been performed (S3: No), the charging control unit 32 determines that the normal charging determination condition is met. Then, when the normal charging determination condition is met in the normal charging state R2, the charging control unit 32 determines whether or not there is an available charge in the charger 4 (S6).
[0072] If it is determined in step S6 that there is free space in the charger 4 (S6: Yes), the charging control unit 32 outputs a normal charging instruction to the work apparatus 2A, which is in the normal charging state R2, and causes the work apparatus 2A to start charging (S10), and then returns to the processing of step S1.
[0073] In the determination of step S6, if there is no free charger 4 (S6: No) and the working apparatus 2B being charged is performing emergency charging, the charging control unit 32 prioritizes charging of the working apparatus 2B being emergency charged. That is, the charging control unit 32 does not output a normal charging instruction to the working apparatus 2A to be controlled, and ends the process. On the other hand, if the working apparatus 2B being charged is performing normal charging, the charging control unit 32 determines whether or not a charging time (normal charging time CT2) has elapsed since the start of charging of the working apparatus 2B being charged (S7).
[0074] In the determination in step S7, if the charging time (normal charging time CT2) has not elapsed since the start of charging of the working device 2B being charged (S7: No), the working device 2B being charged is allowed to continue the charging operation (S8), and the process returns to step S1.
[0075] Then, when the charging time (normal charging time CT2) has elapsed since the start of charging of the working apparatus 2B being charged, the charging control unit 32 instructs the working apparatus 2B being charged to stop charging, and after the working apparatus 2B finishes charging (S9), the process returns to step S1. As a result, the working apparatus 2B performing normal charging performs charging for the normal charging time CT2 and finishes charging.
[0076] The charging control system 1 controls the charging of each of the plurality of work apparatuses 2A, 2B by repeatedly executing the operations of steps S1 to S10 described above, with each of the work apparatuses 2A, 2B being the work apparatus 2X to be controlled.
[0077] Here, the operation of the charge control system 1 to control the charging of the maintenance device 2A will be described with reference to Fig. 5. In Fig. 5, a period DC1 is a period during which the maintenance device 2A performs work and the power storage unit 24 is discharged. A period CG1 is a period during which the maintenance device 2A performs emergency charging, and a period CG2 is a period during which the maintenance device 2A performs normal charging. A period CG3 is a period during which the maintenance device 2A performs additional charging after normal charging to bring the remaining amount B1 closer to 100%.
[0078] The charge control unit 32 of the charge control system 1 periodically acquires information on the remaining capacity B1 of the power storage unit 24 from the maintenance device 2A during a period DC1 in which the maintenance device 2A is performing work and not charging. As the maintenance device 2A performs work, the remaining capacity B1 of the power storage unit 24 decreases, and when the remaining capacity B1 of the power storage unit 24 becomes equal to or less than the first threshold value L1 at time t1, the charge control unit 32 determines that the maintenance device 2A is in an emergency charging state R1. At this time, if the maintenance device 2A is performing work, the charge control unit 32 causes the maintenance device 2A to continue performing the work. Then, if the maintenance device 2A finishes the work at time t2 and there is space in the charger 4, the charge control unit 32 outputs an emergency charging instruction to the maintenance device 2A to charge for the emergency charging time CT1.
[0079] The working device 2A that has received the emergency charging instruction moves to the charging area A2, receives power supply from the charger 4, and charges the power storage unit 24. Here, the working device 2A in the emergency charging state R1 charges for the emergency charging time CT1, and at time t3 when the emergency charging time CT1 has elapsed from time t2, the remaining amount B1 of the power storage unit 24 is greater than the first threshold value L1 and is equal to or less than the second threshold value L2, so that the working device 2A enters the normal charging state R2. In this way, by the working device 2A in the emergency charging state R1 charging for the emergency charging time CT1, it is possible to avoid the remaining amount B1 of the power storage unit 24 being depleted, and the working device 2A can perform work after charging.
[0080] At time t3, if the normal charging determination condition is not met or there is another work apparatus 2 waiting to be charged, the charging control unit 32 stops charging the work apparatus 2A and allows the work apparatus 2A to perform work.
[0081] On the other hand, if the normal charging determination condition is met at time t3, the charging control unit 32 outputs a normal charging instruction to the maintenance device 2A to execute normal charging for charging the power storage unit 24 until the normal charging time CT2 has elapsed from time t3. Here, the charging control unit 32 acquires the remaining capacity B12 of the power storage unit 24 at the timing (time t3) when normal charging starts from the maintenance device 2A. Then, the charging control unit 32 calculates the time required to charge the power storage unit 24 from the remaining capacity B12 at time t3 to a predetermined level (e.g., 90%) or more as the normal charging time CT2.
[0082] At time t4 when the normal charging time CT2 has elapsed since time t3, the remaining amount B1 of the power storage unit 24 is charged to a value greater than the second threshold value L2. When the normal charging time CT2 has elapsed since time t3, the charging control unit 32 determines that normal charging has ended, and outputs a stop instruction to the maintenance device 2A to stop charging. When the maintenance device 2A receives the stop instruction from the charging control system 1, it ends charging and moves out of the charging area A2, and becomes available to perform work. Note that at time t4, if the number of unexecuted work tasks is less than the number of maintenance devices 2 that can perform work and there is no maintenance device 2 that has entered the emergency charging state, the charging control unit 32 may output an additional charging instruction to the maintenance device 2A to instruct additional charging, and have the maintenance device 2A perform additional charging (period CG3).
[0083] When charging is terminated at time t4, the remaining amount B1 of the power storage unit 24 decreases as the working device 2A performs work. When the remaining amount B1 of the power storage unit 24 becomes a normal charging state in which the remaining amount B1 is greater than the first threshold value L1 and is equal to or less than the second threshold value L2, the charging control unit 32 judges whether or not the normal charging judgment condition is satisfied, and does not perform charging if the normal charging judgment condition is not satisfied. After that, when the remaining amount B1 of the power storage unit 24 further decreases and becomes equal to or less than the first threshold value L1 at time t11, the charging control unit 32 judges that the working device 2A is in an emergency charging state and judges whether or not the emergency charging judgment condition is satisfied. Then, when the emergency charging judgment condition is satisfied, the charging control unit 32 controls charging of the power storage unit 24 of the working device 2A. Note that the operation after time t12 is the same as the operation from time t1 to time t12, and detailed description will be omitted.
[0084] Here, the length of the emergency charging time CT1, which is the charging time in emergency charging, is the same in the operation in the first period from time t1 to time t4, the operation in the second period from time t11 to time t14, and the operation in the third period from time t21 to time t24. Meanwhile, in the operation in the first period, the operation in the second period, and the operation in the third period, the remaining amount B11 of the power storage unit 24 at the timing when emergency charging is started (times t2, t12, and t22) varies, so the remaining amount B12 of the power storage unit 24 at the timing when emergency charging is ended (times t3, t13, and t23) also varies. Here, the normal charging time CT2, which is the charging time in normal charging, is set based on the remaining amount B12 of the power storage unit 24 at the timing when normal charging is started (times t3, t13, and t23), so if there is variation in the remaining amount B12 of the power storage unit 24 at times t3, t13, and t23, the normal charging time CT2 will also vary. Specifically, the charging control unit 32 determines the time required to charge the remaining capacity B1 of the power storage unit 24 to a predetermined charge level in normal charging as the normal charging time CT2, and therefore the lower the remaining capacity B12 at the timing of starting normal charging, the longer the normal charging time CT2. In this manner, if the normal charging determination condition is met while the working device 2A is in a normal charging state, the working device 2A can be caused to charge for the normal charging time CT2, and the remaining capacity B1 of the power storage unit 24 of the working device 2A can be increased to prepare for future work.
[0085] As described above, when the working apparatus 2A to be controlled is in an emergency charging state, if the emergency charging determination condition including the condition based on the charging time from the start of charging of the working apparatus 2 being charged is satisfied, the charging control unit 32 outputs an emergency charging instruction to the working apparatus 2A to be controlled. Therefore, the charging control unit 32 does not need to continuously monitor the remaining capacity B1 of the power storage unit 24 included in the working apparatus 2A being charged, which has the advantage of reducing communication traffic between the charging control system 1 and the working apparatus 2.
[0086] In the graph shown in FIG. 5, the rate at which the remaining amount B1 of the power storage unit 24 decreases and the rate at which the remaining amount B1 increases may change depending on the deterioration of the power storage unit 24. When the maximum charge capacity of the power storage unit 24 decreases depending on the deterioration of the power storage unit 24, the rate at which the remaining amount B1 of the power storage unit 24 (the ratio of the remaining amount to the maximum charge capacity) decreases relative to the discharge amount increases. Similarly, when the maximum charge capacity of the power storage unit 24 decreases depending on the deterioration of the power storage unit 24, the rate at which the remaining amount B1 of the power storage unit 24 (the ratio of the remaining amount to the maximum charge capacity) increases relative to the charge amount increases. Therefore, it is also preferable that the setting unit 31 sets the values of the first threshold L1 and the second threshold L2 taking into account the deterioration of the power storage unit 24. For example, the setting unit 31 may hold a table that stores the set values of the first threshold L1 and the second threshold L2 relative to the cumulative operating time of the working device 2, and set the first threshold L1 and the second threshold L2 by reading the set values from the table based on the operating time of the working device 2 up to the present.
[0087] Incidentally, when charging control is performed such that the remaining amount B1 of the power storage unit 24 is charged until it reaches a target level in each of emergency charging and normal charging, if the maximum charging capacity of the power storage unit 24 decreases due to aging, the electric energy actually stored in the power storage unit 24 may be less than expected. In contrast, in the charge control system 1 of the present embodiment, when the working device 2 in the emergency charging state is charged, charging is performed for a certain emergency charging time CT1, and when the working device 2 in the normal charging state is charged, charging is performed for a normal charging time CT2, so that electric energy according to the length of the charging time is stored in the power storage unit 24. Therefore, even if the maximum charging capacity of the power storage unit 24 decreases due to aging, electric energy according to the length of the charging time (emergency charging time CT1 and normal charging time CT2) can be stored in the power storage unit 24 in each of emergency charging and normal charging. Therefore, even if the maximum charging capacity of the power storage unit 24 decreases due to aging, the operable time during which the working device 2 can operate after emergency charging and normal charging can be equalized. For example, even if there are multiple working devices 2 whose power storage units 24 have different maximum charging capacities due to factors such as aging, charging is performed by determining the charging time (emergency charging time CT1 and normal charging time CT2) for each emergency charging and normal charging, so that each working device 2 can be operated for an operating time according to the length of the charging time.
[0088] (3) Modifications The above embodiment is merely one of various embodiments of the present disclosure. The above embodiment can be modified in various ways depending on the design and the like as long as the object of the present disclosure can be achieved. In addition, the same function as the charge control system 1 may be embodied in a charge control method, a computer program, or a non-transitory recording medium on which a program is recorded. The charge control method according to one aspect includes a setting process and a charge control process. In the setting process, at least a first threshold value L1 is set as a threshold value for the remaining amount of the power storage unit 24 included in each of the multiple work devices 2. In the charge control process, each of the multiple work devices 2 is treated as a work device 2X to be controlled, and charging of the power storage unit 24 included in the work device 2X to be controlled is controlled. In the charge control process, when the emergency charge determination condition is satisfied in the emergency charge state R1, an emergency charge instruction is output to the work device 2X to be controlled to start charging. The emergency charge state R1 is a state in which the remaining amount of the power storage unit 24 included in the work device 2X to be controlled is equal to or less than the first threshold value L1. The emergency charging determination condition includes a condition based on a charging time from the start of charging of the working device 2 being charged among the multiple working devices 2. A (computer) program according to one aspect is a program for causing a computer system to execute a setting process and a charging control process.
[0089] Modifications of the above embodiment are listed below. The modifications described below can be applied in appropriate combinations.
[0090] (3.1) Variation 1 The charge control system 1 of the modified example 1 differs from the above embodiment in that the charge control unit 32 stops outputting a normal charging instruction to the work apparatus 2X to be controlled, except during a low task period in which the number of work tasks given to the multiple work apparatuses 2 is less than a predetermined reference level. Note that since the configuration of the charge control system 1 is similar to that of the above embodiment, the same reference numerals are used for the common components, and the description thereof will be omitted.
[0091] Fig. 6 is a graph showing the change over time in the number of work tasks given to a plurality of work devices 2. Fig. 6 is a graph showing the change over time in the number of work tasks performed by a plurality of work devices 2 in a predetermined collection period. Based on the change over time in the number of tasks actually performed in the predetermined collection period, setting unit 31 estimates a low task period TA1 in which the number of tasks will be less than a reference level W1 in a predetermined period (e.g., one day, one week, or one month), and sets the low task period TA1 within the predetermined period.
[0092] When the remaining amount of the power storage unit 24 of the working apparatus 2X to be controlled is in a normal charging state where the remaining amount is equal to or greater than the first threshold value L1 and less than the second threshold value L2, the charging control unit 32 judges whether the current time is within the low task period TA1. If the current time is outside the low task period TA1, the charging control unit 32 does not output a charging start instruction to the working apparatus 2X to be controlled. On the other hand, if the current time is within the low task period TA1, the charging control unit 32 judges whether a normal charging determination condition is satisfied, and if the normal charging determination condition is satisfied, outputs a charging start instruction to the working apparatus 2X to be controlled.
[0093] In this way, if the maintenance apparatus 2X to be controlled is in the normal charging state in the low task period TA1 and the normal charging determination condition is satisfied, the charging control unit 32 outputs a charging start instruction to the maintenance apparatus 2X to be controlled, so that the maintenance apparatus 2 can be charged in the low task period TA1. In other words, since normal charging of the maintenance apparatus 2 is difficult to perform outside the low task period TA1, by increasing the number of maintenance apparatuses 2 that can perform work outside the low task period TA1, it becomes possible to perform more work by a plurality of maintenance apparatuses 2.
[0094] In the above embodiment, the normal charging determination condition may include a condition that the current time is within the low task period TA1. That is, when the condition that the current time is within the low task period TA1 is satisfied in the normal charging state R2, the charging control system 1 may output a normal charging instruction to the working apparatus 2 to be controlled. As a result, in the low task period TA1, a normal charging instruction can be output to the working apparatus 2X to be controlled that has entered the normal charging state R2, to cause the working apparatus 2X to perform normal charging.
[0095] (3.2) Other Modifications The charging control system 1 (the working device 2 and the server device 3) in the present disclosure includes a computer system. The computer system is mainly composed of a processor and a memory as hardware. The processor executes a program recorded in the memory of the computer system, thereby realizing the functions of the charging control system 1 in the present disclosure. The program may be pre-recorded in the memory of the computer system, may be provided through an electric communication line, or may be provided by being recorded in a non-transitory recording medium such as a memory card, an optical disk, or a hard disk drive that can be read by the computer system. The processor of the computer system is composed of one or more electronic circuits including a semiconductor integrated circuit (IC) or a large-scale integrated circuit (LSI). The integrated circuits such as IC or LSI referred to here are called by different names depending on the degree of integration, and include integrated circuits called system LSI, VLSI (Very Large Scale Integration), or ULSI (Ultra Large Scale Integration). Furthermore, a field-programmable gate array (FPGA) that is programmed after the manufacture of the LSI, or a logic device that can reconfigure the connection relationship inside the LSI or reconfigure the circuit partition inside the LSI, can also be adopted as a processor. The electronic circuits may be integrated in one chip or distributed among multiple chips. The chips may be integrated in one device or distributed among multiple devices. The computer system referred to here includes a microcontroller having one or more processors and one or more memories. Thus, the microcontroller is also composed of one or more electronic circuits including a semiconductor integrated circuit or a large-scale integrated circuit.
[0096] Furthermore, it is not essential for the charging control system 1 that multiple functions are concentrated in one housing, and the components of the charging control system 1 may be distributed across multiple housings. Furthermore, at least some of the functions of the charging control system 1, for example, the functions of the charging control unit 32, may be realized by the cloud (cloud computing) or the like.
[0097] In the above embodiment, in the comparison between the remaining capacity of the power storage unit 24 and the thresholds (first threshold L1 and second threshold L2) and the like, "less than" may be "equal to or less than." In other words, in the comparison between the two values, whether or not the two values are equal can be arbitrarily changed depending on the settings of the thresholds, etc., so there is no technical difference between "less than" and "equal to or less than." Similarly, "equal to or more than" may be "greater than."
[0098] In the above embodiment, the working device 2 is a transport device that travels in the working area A1, but the working device 2 may be a ship (autonomous ship) or an aircraft (drone). When the working device 2 is an autonomous ship, the water area in which the autonomous ship navigates becomes the working area A1. When the working device 2 is a drone, the space in which the drone flies becomes the working area A1.
[0099] In the above embodiment, the first threshold L1 and the second threshold L2 set by the setting unit 31 are not limited to being constant values, and may be values that vary within a predetermined range according to a predetermined parameter. Examples of the predetermined parameter include a time during which the working device 2 performs a task, and the number of tasks of the tasks performed by the working device 2, and the first threshold L1 and the second threshold L2 may vary within a predetermined range according to at least one of the time and the number of tasks. In addition, the setting unit 31 may provide hysteresis between the thresholds (first threshold L1 and second threshold L2) in a discharging state in which the power storage unit 24 is discharging and the thresholds (first threshold L1 and second threshold L2) in a charging state in which the power storage unit 24 is charging.
[0100] (summary) As described above, the charge control method of the first aspect includes a setting process and a charge control process. In the setting process, at least a first threshold value (L1) is set as a threshold value for the remaining amount (B1) of the power storage unit (24) included in each of the multiple work devices (2). In the charge control process, each of the multiple work devices (2) is treated as a control target work device (2X), and charging of the power storage unit (24) included in the control target work device (2X) is controlled. In the charge control process, when an emergency charging determination condition is satisfied in the emergency charging state (R1), an emergency charging instruction is output to the control target work device (2X) to start charging. The emergency charging state (R1) is a state in which the remaining amount (B1) of the power storage unit (24) included in the control target work device (2X) is equal to or less than the first threshold value (L1). The emergency charging determination condition includes a condition based on a charging time from the start of charging of the work device (2) being charged among the multiple work devices (2).
[0101] According to this aspect, in the charging control process, when the working device (2X) to be controlled enters the emergency charging state (R1), if a predetermined emergency charging determination condition is satisfied, an emergency charging instruction is output to the working device (2X) to be controlled. Here, the emergency charging determination condition includes a condition based on the charging time from the start of charging of the working device (2) being charged, so it is possible to determine whether or not the emergency charging determination condition is satisfied based on the charging time, and there is no need to periodically monitor the remaining capacity (B1) of the power storage unit (24) of the working device (2) being charged. Therefore, there is no need to periodically communicate with the working device (2) being charged in order to obtain the remaining capacity (B1) of the power storage unit (24) from the working device (2) being charged, and communication traffic due to communication with the working device (2) can be reduced.
[0102] In the charge control method of the second aspect, in the first aspect, the emergency charge determination condition includes a condition that the charging time reaches a certain emergency charging time (CT1).
[0103] According to this aspect, when the charging time of the working implement (2) during charging reaches the emergency charging time (CT1), an emergency charging instruction can be output to the working implement (2X) to be controlled.
[0104] In the charge control method of the third aspect, in the second aspect, the working device (2X) to be controlled waits until the charging time reaches the emergency charging time (CT1) and the charging device (2) stops charging.
[0105] According to this embodiment, charging can be continued until the charging time of the working implement (2) during charging reaches the emergency charging time (CT1).
[0106] In the charge control method of the fourth aspect, in any one of the first to third aspects, the emergency charge instruction instructs the working device (2X) to be controlled to charge for a certain emergency charge time (CT1).
[0107] According to this aspect, the working device (2X) to be controlled, which has entered the emergency charging state (R1), can be caused to perform charging for a certain emergency charging time (CT1), thereby reducing the possibility of the remaining capacity (B1) of the storage unit (24) becoming insufficient.
[0108] In the charge control method of the fifth aspect, in any one of the first to fourth aspects, in the setting process, a second threshold (L2) larger than the first threshold (L1) is further set as a threshold for the remaining amount of the power storage unit (24). In the charge control process, in the normal charging state (R2), when a normal charging determination condition is satisfied, a normal charging instruction is output to the working device (2X) to be controlled to instruct the working device (2X) to start charging. The normal charging state (R2) is a state in which the remaining amount (B1) of the power storage unit (24) included in the working device (2X) to be controlled is larger than the first threshold (L1) and is equal to or smaller than the second threshold (L2). The normal charging determination condition includes a condition based on the number of work tasks given to the multiple working devices (2).
[0109] According to this embodiment, for the work device (2X) to be controlled that is in the normal charging state (R2), it is possible to determine whether or not to charge the work device (2X) according to the normal charging determination condition based on the number of work tasks.
[0110] In the charge control method of the sixth aspect, in the fifth aspect, the normal charge determination condition includes a condition regarding the presence or absence of an unperformed operation.
[0111] According to this aspect, the working device (2X) to be controlled can be charged depending on whether or not there is an unexecuted task.
[0112] In the charge control method of the seventh aspect, in the fifth aspect, the normal charge determination condition includes a condition that the normal charge determination condition is a low task period (TA1) in which the number of tasks is less than a predetermined reference level.
[0113] According to this embodiment, in the low task period (TA1), a normal charging instruction can be output to the working device (2X) to be controlled that is in the normal charging state (R2), so that the working device (2X) can perform normal charging.
[0114] In the charge control method of the eighth aspect, in any one of the fifth to seventh aspects, the normal charging instruction instructs the working device (2X) to be controlled to charge for a predetermined normal charging time (CT2). The normal charging time (CT2) is set based on the remaining amount (B1) of the power storage unit (24) at the time when the working device (2X) to be controlled starts charging.
[0115] According to this aspect, for the working device (2X) to be controlled that is in the normal charging state (R2), the normal charging time (CT2) can be set to a time corresponding to the remaining capacity (B1) of the storage unit (24) at the timing when charging starts.
[0116] In the charge control method of the ninth aspect, in any one of the first to eighth aspects, the work performed by the working device (2) is a transport work of transporting an object to be transported.
[0117] According to this embodiment, it is possible to control charging of the working device (2) that performs the transport work.
[0118] A program according to a tenth aspect is a program for causing a computer system to execute the charge control method according to any one of the first to ninth aspects.
[0119] According to this embodiment, it is possible to reduce communication traffic caused by communication with the working device (2).
[0120] The charge control system (1) of the eleventh aspect includes a setting unit (31) and a charge control unit (32). The setting unit (31) sets at least a first threshold value (L1) as a threshold value for the remaining capacity (B1) of the power storage unit (24) included in each of the plurality of working devices (2). The charge control unit (32) treats each of the plurality of working devices (2) as a working device (2X) to be controlled and controls charging of the power storage unit (24) included in the working device (2X) to be controlled. When an emergency charging determination condition is satisfied in the emergency charging state (R1), the charge control unit (32) outputs an emergency charging instruction to the working device (2X) to be controlled to start charging. The emergency charging state (R1) is a state in which the remaining capacity (B1) of the power storage unit (24) included in the working device (2X) to be controlled is equal to or less than the first threshold value (L1). The emergency charging determination condition includes a condition based on the charging time from the start of charging of the working device (2) that is being charged among the multiple working devices (2).
[0121] According to this aspect, when the working device (2X) to be controlled enters the emergency charging state (R1), if a predetermined emergency charging determination condition is satisfied, the charging control section (32) outputs an emergency charging instruction to the working device (2X) to be controlled. Here, the emergency charging determination condition includes a condition based on the charging time from the start of charging of the working device (2) being charged, so it is possible to determine whether or not the emergency charging determination condition is satisfied based on the charging time, and it is not necessary to periodically monitor the remaining amount (B1) of the power storage unit (24) of the working device (2) being charged. Therefore, it is not necessary to periodically communicate with the working device (2) being charged in order to obtain the remaining amount (B1) of the power storage unit (24) from the working device (2) being charged, and it is possible to reduce communication traffic due to communication with the working device (2).
[0122] Without being limited to the above-mentioned aspects, various configurations (including modified examples) of the charge control system (1) according to the above-mentioned embodiment can be embodied as a charge control method of the charge control system (1), a (computer) program, or a non-transitory recording medium having a program recorded thereon, or the like.
[0123] The configurations according to the second to ninth aspects are not essential for the charging control method and program, and may be omitted as appropriate. [Explanation of symbols]
[0124] 1. Charging control system 2. Working Equipment 2X Controlled work equipment 24 Power storage unit 31 Setting section 32 Charging control unit B1 Remaining CT1 emergency charging time CT2 normal charging time L1 First threshold L2 Second Threshold R1 Emergency charging state R2 Normal charging state TA1 Low task period W1 Reference Level
Claims
1. a setting process for setting at least a first threshold as a threshold for a remaining amount of a power storage unit included in each of the plurality of working devices; a charging control process for controlling charging of the power storage unit included in each of the plurality of operational devices as a control target operational device, In the charging control process, when an emergency charging determination condition is satisfied in which a charging time from a charging start of a working device being charged among the plurality of working devices reaches a certain emergency charging time in an emergency charging state in which the remaining amount of the power storage unit included in the working device to be controlled is equal to or less than the first threshold, charging of the working device being charged is stopped, and an emergency charging instruction is output to the working device to be controlled to instruct the working device to start charging; The emergency charging instruction instructs the work device to be controlled to charge the power storage unit for the emergency charging time. Charging control method.
2. The work device to be controlled waits until the charging time reaches the emergency charging time and the charging device stops charging. The charge control method according to claim 1 .
3. In the setting process, a second threshold value larger than the first threshold value is further set as a threshold value for the remaining capacity of the power storage unit; In the charging control process, In a normal charging state in which the remaining amount of the power storage unit included in the working device to be controlled is greater than the first threshold value and is equal to or less than the second threshold value, when a normal charging determination condition is satisfied, a normal charging instruction is output to the working device to be controlled to instruct the working device to start charging. The normal charging determination condition is a condition based on the number of work tasks assigned to the plurality of work devices; The charge control method according to claim 1 or 2.
4. The normal charging determination condition is: including conditions regarding whether work remains to be performed; The charge control method according to claim 3 .
5. The normal charging determination condition is: a low task period in which the number of tasks is less than a predetermined reference level; The charge control method according to claim 3 .
6. The normal charging instruction instructs the work device to be controlled to charge for a predetermined normal charging time, the normal charging time is set based on a remaining amount of the power storage unit at a timing when the working device to be controlled starts charging; The charge control method according to any one of claims 3 to 5.
7. The work performed by the work device is a transport work of transporting a transport object. The charge control method according to any one of claims 1 to 6.
8. A method for causing a computer system to execute the charge control method according to any one of claims 1 to 7, program.
9. A setting unit that sets at least a first threshold value as a threshold value for a remaining capacity of a power storage unit provided in each of a plurality of work devices; a charge control unit that controls charging of the power storage unit included in each of the plurality of operational devices as a control target operational device, The charging control unit is when an emergency charging determination condition is satisfied in which a charging time from a charging start of a working device being charged among the plurality of working devices reaches a certain emergency charging time in an emergency charging state in which the remaining amount of the power storage unit included in the working device to be controlled is equal to or less than the first threshold, charging of the working device being charged is stopped, and an emergency charging instruction is output to the working device to be controlled to instruct the working device to start charging; The emergency charging instruction instructs the work device to be controlled to charge the power storage unit for the emergency charging time. Charging control system.
Citation Information
Patent Citations
Magnetic levitation conveyance system
JP1996289414A
Mobile robot charging system
JP2010237924A
Carrier system
JP2019101963A
