AI Technical Summary

Technical Problem

Building rigid frame structures with steel or reinforced concrete columns and beams is time-consuming and labor-intensive due to complex joint connections, especially when embedding beams in columns or welding them to top plates.

Method used

A column-beam frame design featuring H-shaped steel beams arranged in one direction with simplified connections, where a second beam intersects and connects to the first beam's upper surface, and columns are made of precast concrete to reduce processing effort and joint complexity.

Benefits of technology

This design simplifies joint structures, reduces construction time and labor, allows for larger span beams, and decreases the number of steel frames required, thereby improving workability and construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007580207000001
    Figure 0007580207000001
  • Figure 0007580207000002
    Figure 0007580207000002
  • Figure 0007580207000003
    Figure 0007580207000003
Patent Text Reader

Abstract

To improve the workability of a column-beam frame by simplifying a joint structure of a column and a beam.SOLUTION: A column-beam frame 10 has: a column 20 erected on a support structure 14; a first steel beam 22 bridged and joined to a head part 28 of the column 20 and arranged in one direction; and a second steel beam 24 bridged and joined to an upper surface of the first steel beam 22 so as to intersect the first steel beam 22.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a column-beam structure. [Background technology]

[0002] In buildings with large span structures such as single-story factories, rigid frame structures are often used (see, for example, Patent Documents 1 and 2). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-37774 A [Patent Document 2] JP 2019-196637 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, if a rigid frame structure is used with steel columns and steel beams, it takes a lot of work to process the steel frame to rigidly connect the beams to the columns.

[0005] In addition, when constructing a rigid frame structure with reinforced concrete columns and steel beams, the method of embedding the beams in the columns and rigidly joining them to the columns requires joining beams in two directions, and the construction work of embedding these beams in the concrete of the columns is time-consuming. Also, the method of placing the beam end on a top plate installed on the upper surface of the column capital and welding the beam end to the top plate is not suitable for large span beams because the beam end is pin-jointed.

[0006] In consideration of the above, the present invention aims to simplify the joint structure between columns and beams and improve the workability of a column-beam frame. [Means for solving the problem]

[0007] The column-beam structure described in claim 1 comprises a column erected on a supporting structure, a first steel beam that is spanned and joined to the top of the column and arranged in one direction, and a second steel beam that is spanned and joined to the upper surface of the first steel beam so as to intersect with the first steel beam.

[0008] According to the column-beam structure of claim 1, the first steel beam arranged in one direction is bridged and joined to the head of the column erected on the support structure.

[0009] This simplifies the connection structure between the column and the first steel beam to a structure where the first steel beam is simply placed on the top of the column and joined, thereby reducing the effort required for processing the column and first steel beam to form the connection structure and improving the constructability of the column-beam structure.

[0010] In addition, since the first steel beam acts as if it were rigidly connected to the column against vertical loads, a beam with a larger span can be constructed compared to a joint structure in which the beam is pin-connected to the column.

[0011] Furthermore, in a conventional joint structure in which a steel beam is joined to a beam bracket that protrudes from a column, the joint position is determined by the length of the beam bracket, but in this column-beam structure, the joint position of the first steel beam can be set to a position with low stress. This makes it possible to simplify the joint structure of the first steel beam and significantly reduce the cross section of the middle part of the span of the first steel beam.

[0012] According to the column-beam frame of claim 1, the second steel beam is joined to the upper surface of the first steel beam so as to intersect with the first steel beam.

[0013] This simplifies the joint structure between the first steel beam and the second steel beam by simply placing the second steel beam on top of the first steel beam and joining it, thereby reducing the effort required for steel processing on the first steel beam and the second steel beam to form the joint structure and improving the constructability of the column-beam structure.

[0014] In addition, the second steel beam is placed continuously across the first steel beam, so it acts as if it is rigidly connected to the first steel beam. This allows the cross section of the second steel beam to be smaller, and the amount of steel required to be reduced.

[0015] Furthermore, according to the column-beam structure of claim 1, a first steel beam is placed on and joined to the top of the column, and a second steel beam is placed on and joined to the top surface of the first steel beam, thereby forming a layered structure in which the column, first steel beam, and second steel beam are stacked in this order.

[0016] This will improve the construction efficiency of column-beam structures, shortening construction time and reducing the number of workers required.

[0017] The column-beam structure according to claim 2 is the column-beam structure according to claim 1, wherein the columns are made of precast concrete.

[0018] According to the column-beam structure of claim 2, the columns are made of precast concrete.

[0019] This reduces the effort required for constructing the columns at the construction site, thereby further improving the ease of construction of the column-beam structure.

[0020] A column-beam structure according to a third aspect of the present invention is the column-beam structure according to the first or second aspect, wherein the first steel beam includes a beam-end member and a beam intermediate member having a beam depth smaller than that of the beam-end member.

[0021] According to the column-beam frame structure of claim 3, the first steel beam includes a beam-end member and a beam intermediate member having a beam depth smaller than that of the beam-end member.

[0022] This allows the first steel beam to be constructed using a smaller amount of steel. Effect of the Invention

[0023] As described above, according to the column-beam structure of the present invention, the joint structure between the columns and the beams can be simplified, thereby improving the workability of the column-beam structure. [Brief description of the drawings]

[0024] [Figure 1] 1 is a perspective view showing a building to which a column-beam frame according to an embodiment is applied. [Diagram 2] FIG. 1 is a side view showing a building to which a column-beam frame according to an embodiment is applied. [Diagram 3] FIG. 3 is a front view showing the joint structure between the column and the girder shown in FIG. 2. [Figure 4] 4 is a cross-sectional view taken along line 4-4 of FIG. 3. [Diagram 5] FIG. 3 is a side view showing the joint structure between the column and the girder shown in FIG. 2. [Figure 6] 3 is a side view showing a joint structure between a beam end member and a beam intermediate member of the main girder shown in FIG. 2. FIG. [Figure 7] FIG. 1 is a front view showing a conventional joint structure between a beam flange and a sub-beam. [Figure 8] FIG. 2 is a front view showing a joint structure between the small beams shown in FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0025] Hereinafter, a column-beam structure according to one embodiment will be described with reference to the drawings.

[0026] (Column beam frame) 1 shows a building 12 to which a column-beam structure 10 according to this embodiment is applied. Note that an arrow X shown in each drawing indicates the inter-beam direction of the building 12 (hereinafter referred to as the "inter-beam direction X"), and an arrow Y indicates the row direction of the building 12 that is perpendicular to the arrow X in a plan view (hereinafter referred to as the "row direction Y").

[0027] As shown in Fig. 1, the building 12 is a one-story factory with a large span structure, and is built on a mat slab 14 as a supporting structure constituting a spread foundation. As shown in Fig. 2, the mat slab 14 is provided on a surface layer 18 formed on a supporting ground 16.

[0028] 1 and 2, the column-beam structure 10 is configured to include a column 20, a main girder 22 as a first steel beam, and a sub-beam 24 as a second steel beam. The main girder 22 and the sub-beam 24 are configured from H-shaped steel.

[0029] The pillars 20 are made of precast concrete and stand on the mat slab 14, which is formed by pouring on rubble concrete 26 laid on the supporting ground 16. The pillars 20 are made of strong members that can bear the seismic force (horizontal force) generated in the building 12 as a cantilever pillar.

[0030] As shown in FIG. 1, all of the girders 22 are arranged in one direction, that is, the inter-beam direction X, and are arranged in parallel at predetermined intervals in the longitudinal direction Y.

[0031] 3, 4 and 5, the girder 22 is placed on the upper surface of a column capital part 28 serving as the head of the column 20. The girder 22 is joined to the column capital part 28 of the column 20 by bolting a base plate 34 provided integrally with the lower flange 32 on both outer sides of the lower flange 32 of the girder 22 with an anchor bolt 30 provided on the column capital part 28 and protruding upward from the upper surface of the column capital part 28. In this way, the girder 22 is disposed continuously so as to straddle over the column capital part 28 of the column 20, and is joined to the column capital part 28 of the column 20.

[0032] 2 and 6, the girder 22 includes a beam end member 36 and an intermediate beam member 38 having a beam thickness smaller than that of the beam end member 36. The beam end member 36 and the intermediate beam member 38 are made of H-shaped steel.

[0033] 6, the beam end member 36 and the beam intermediate member 38 are bolted together at a joint 40 by splice plates 42, 44. The joint position of the joint 40 is set at a position where the stress generated in the girder 22 is small.

[0034] 1, all of the minor beams 24 are arranged in the girder direction Y, and are arranged in parallel at predetermined intervals in the inter-beam direction X. That is, the minor beams 24 are arranged so as to intersect with the major beams 22 at right angles.

[0035] 3 and 5, the secondary beam 24 is placed on the upper surface of the main girder 22. In addition, the secondary beam 24 is joined to the main girder 22 by bolting a lower flange 80 of the secondary beam 24 to an upper flange 78 of the main girder 22 with bolts 46.

[0036] As a result, the small beams 24 are arranged continuously across the main beams 22 and are joined to the upper surface of the main beams 22.

[0037] As shown in Fig. 8, the sub-beams 24 are bolted together at joints 48 using splice plates 50, 52. The joint position of the joints 48 is set at a position where the stress generated in the sub-beams 24 is small. As a result, the joints 48 are of a type in which only the web 82 and the lower flange 80 of the sub-beams 24 are bolted together using the splice plates 50, 52.

[0038] As shown in Fig. 8, a folded plate roof 84 is provided on the small beams 24. The folded plate roof 84 is configured to include a tight frame 54 installed on the small beams 24 and a steel folded plate 56 as a roof material attached on the tight frame 54. For convenience of explanation, the folded plate roof 84 is omitted in Figs. 1 and 2.

[0039] As explained above, the column-beam structure 10 has a layered structure in which the columns 20, the girder 22, and the minor beam 24 are stacked in this order by placing and joining the main girder 22 to the column capital part 28 of the column 20 and then placing and joining the minor beam 24 on the upper surface of the main girder 22 (see Figure 2).

[0040] (Construction method of column-beam frame) Next, an example of a construction method for the column-beam structure according to this embodiment will be described (see Figs. 2, 5 and 8).

[0041] First, the pillars 20 are erected on the mat slab 14.

[0042] Next, the girder 22 is placed on the upper surface of the column capital part 28 of the column 20, and the girder 22 is spanned across the column capital part 28 of the column 20.

[0043] Next, the girder 22 is joined to the column capital 28 of the column 20 with an anchor bolt 30 .

[0044] Next, the minor beam 24 is placed on the upper surface of the main girder 22 and the minor beam 24 is bridged over the upper surface of the main girder 22.

[0045] Next, the minor beam 24 is joined to the major beam 22 with the bolts 46 .

[0046] Next, the tight frame 54 is installed on the small beams 24, and the folded plate 56 is attached onto the tight frame 54 to form the folded plate roof 84.

[0047] (effect) Next, the effects of this embodiment will be described.

[0048] As shown in Figures 1 and 2, in the column-beam structure 10 of this embodiment, a main girder 22 arranged in one direction is spanned and joined to the column capital 28 of a column 20 erected on a mat slab 14.

[0049] This simplifies the joint structure between the column 20 and the girder 22 by simply placing the girder 22 on the column capital part 28 of the column 20 and joining them, thereby reducing the amount of processing required for the column 20 and the girder 22 to form the joint structure and improving the workability of the column-beam structure 10.

[0050] In addition, since the girder 22 acts as if it were rigidly connected to the column 20 against vertical loads, a beam with a larger span can be constructed compared to a joint structure in which the beam is pin-connected to the column.

[0051] Furthermore, in conventional joint structures in which a steel beam is joined to a beam bracket that protrudes from a column, the position of the joint is determined by the length of the beam bracket. For example, if the beam bracket installed on the column must be shortened due to transportation restrictions, the joint position for joining the steel beam to the beam bracket must be located at a position where large stress is generated. Therefore, even in beams that have different cross-sectional sizes for the beam bracket and the steel beam, the cross-sectional size of the beam cannot be significantly reduced, and the amount of steel required increases.

[0052] In contrast, in the beam-column structure 10 of this embodiment, as shown in Figures 2 and 6, the joint 40 of the girder 22 can be positioned at a position where stress is small. This makes it possible to simplify the joint structure of the girder 22 and reduce the number of bolts, and to significantly reduce the cross-section of the girder 22 at the midpoint of its span.

[0053] As shown in Figs. 1 and 2, according to the column-beam structure 10 of this embodiment, the minor beam 24 is joined to the upper surface of the major beam 22 so as to intersect with the major beam 22.

[0054] As a result, the joint structure between the main girder 22 and the secondary girder 24 can be simplified to a structure in which the secondary girder 24 is simply placed on the upper surface of the main girder 22 and joined, thereby reducing the effort required for steel processing of the main girder 22 and the secondary girder 24 to form the joint structure and improving the constructability of the column-beam structure 10.

[0055] In addition, the secondary beams 24 are arranged continuously across the main beams 22, so they act as if they are rigidly connected to the main beams 22. This allows the cross section of the secondary beams 24 to be smaller, and the amount of steel required to be reduced. In addition, compared to a joint structure in which secondary beams are joined to main beams by butt welding, the amount of processing required for the main beams 22 and secondary beams 24 can be reduced.

[0056] As shown in FIG. 7, in the conventional joint structure of the rigidly-jointed sub-beam, the end of the beam flange 60 rigidly joined to the web 88 of the main beam 58 is joined to the sub-beam 62 by the splice plates 66, 68 at the joint portion 64. In addition, the splice plate 66 protruding upward from the upper surface of the upper flange of the beam flange 60 and the sub-beam 62, the bulkhead 74 for bulkheading the bolts and nuts is provided on the upper flange of the beam flange 60 and the sub-beam 62, and a cover material 76 is provided on the joint portion 64, the tight frame 70 is installed on the bulkhead 74 and the cover material 76, and the folded plate 72 is attached on the tight frame 70 to form the folded plate roof 86. In other words, separate members such as the bulkhead 74 and the cover material 76 are required so that the tight frame 70 does not interfere with the splice plate 66 protruding upward from the upper flange surface of the beam flange 60 and the sub-beam 62, the bolts and nuts.

[0057] In contrast, in the column-beam frame 10 of this embodiment, as shown in Fig. 8, the joint position of the joint part 48 where the sub-beams 24 are joined is set at a position where the stress generated in the sub-beams 24 is small, and the joint part 48 is of a type in which only the web 82 and the lower flange 80 of the sub-beam 24 are bolted together with the splice plates 50, 52. As a result, the upper surface of the joint part 48 (sub-beam 24) is flat, so that the tight frame 54 can be attached directly to the upper surface of the upper flange of the sub-beam 24 without performing any height-raising measures.

[0058] Furthermore, according to the column-beam structure 10 of this embodiment, the girder 22 is placed on and joined to the column capital 28 of the column 20, and the minor beam 24 is placed on and joined to the upper surface of the girder 22, forming a layer structure in which the column 20, the girder 22, and the minor beam 24 are stacked in this order. This improves the construction efficiency of the column-beam structure 10, and can shorten the construction period and reduce the number of workers required.

[0059] As shown in Fig. 2, in the column-beam structure 10 of this embodiment, the columns 20 are made of precast concrete. This reduces the labor required for constructing the columns 20 at the construction site, and further improves the ease of construction of the column-beam structure 10.

[0060] 2 and 6, according to the column-beam frame 10 of this embodiment, the girder 22 includes a beam end member 36 and a beam intermediate member 38 having a smaller beam depth than the beam end member 36. This allows the girder 22 to be constructed with a small amount of steel.

[0061] (Modification) Next, a modification of the above embodiment will be described.

[0062] In the above embodiment, as shown in Fig. 2, an example was shown in which the main girder 22 and the sub-beam 24 were made of H-shaped steel, but the main girder 22 and the sub-beam 24 may be made of steel. For example, the main girder 22 and the sub-beam 24 may be made of channel steel.

[0063] In the above embodiment, the column 20 is made of precast concrete as shown in Fig. 2, but the column may be made of other structures. For example, the column 20 may be made of cast-in-place reinforced concrete or steel frame.

[0064] Furthermore, in the above embodiment, as shown in Fig. 3, an example is shown in which the girder 22 is joined to the column 20 by the anchor bolt 30, but the joining may be performed by other joining methods. For example, the girder 22 may be joined to the column 20 by bolt joining.

[0065] In addition, in the above embodiment, as shown in FIG. 1, an example is shown in which the column-beam structure 10 of the present invention is applied to a single-story building 12, but the column-beam structure 10 of the present invention may also be applied to the rooftop of a multi-story building.

[0066] Although one embodiment of the present invention has been described above, the present invention is not limited to such an embodiment, and one embodiment and various modified examples may be used in appropriate combination, and it is of course possible to implement the present invention in various forms without departing from the gist of the present invention. [Explanation of symbols]

[0067] 10 Column beam frame 14 Mat slab (support structure) 20 Pillars 22 Large beam (first steel beam) 24 Small beam (second steel beam) 28 Column head (head) 36 Beam end member 38 Beam intermediate member

Claims

1. a precast concrete column erected on a support structure; a first steel beam including a lower flange and a base plate integrally joined to an outer end of the lower flange so as to be flush with the lower flange, the first steel beam being joined to the head of the column via the base plate in an inclined state and arranged in one direction; A second steel beam that is spanned and joined to an upper flange of the first steel beam so as to intersect with the first steel beam; A column-beam structure having:

2. The first steel beam comprises a beam end member and a beam intermediate member that is bolted to the beam end member and has a beam width smaller than that of the beam end member. The column-beam structure according to claim 1.

Citation Information

Patent Citations

  • JP1988184816U

  • Connecting method for column and beam, and structure thereof

    JP1992034146A

  • Framework structure

    JP1995252889A

  • Building structure utilizing pile as pillar

    JP1998121489A

  • Skeleton framed structure of building

    JP2001295378A