Air conditioning system, control device, air conditioning control method and program

The air conditioning system addresses the challenge of ventilating against floating contaminants by estimating room occupancy density, allowing for automatic ventilation adjustments to maintain a clean indoor environment.

JP7580585B2Active Publication Date: 2024-11-11MITSUBISHI ELECTRIC CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023520575
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-05-10
Publication Date
2024-11-11
Estimated Expiration
2041-05-10

AI Technical Summary

Technical Problem

Existing ventilation air conditioning systems require special sensors to measure contaminant element concentrations, making it difficult to effectively ventilate against floating droplets such as infectious pathogens.

Method used

An air conditioning system that automatically ventilates rooms based on estimated room occupancy density, using routers, human sensors, and network connectivity to determine the need for ventilation without specialized sensors, adjusting ventilation operations based on calculated density thresholds.

Benefits of technology

Enables effective ventilation to suppress indoor pollutants and droplet infections by accurately estimating room occupancy, ensuring timely and efficient air exchange even without direct concentration measurements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007580585000001
    Figure 0007580585000001
  • Figure 0007580585000002
    Figure 0007580585000002
  • Figure 0007580585000003
    Figure 0007580585000003
Patent Text Reader

Abstract

This air-conditioning system comprises: air-conditioning equipment that ventilates the air in a room; a router that connects information processing terminals in the room to a network; a presence sensor that outputs detection information indicating whether or not there is a person in the room; and a control device that controls the air-conditioning equipment. The control device has: a storage means for storing schedule information including information related to the number of persons expected to use the room and environment information including information related to the area of the room; a network management means for acquiring the number of connections of the information processing terminals to the router; an estimation means for estimating the number of users of the room on the basis of the detection information, the number of connections, and the number of expected users; a calculation means for calculating the density using the information related to the area of the room and the estimated number of users; a determination means for determining whether or not ventilation of the room is necessary on the basis of the density; and an equipment control means for causing the air-conditioning equipment to perform ventilation operation when the determination means determines that ventilation is necessary.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an air conditioning system, a control device, an air conditioning control method, and a program for ventilating an air conditioned space. [Background technology]

[0002] It is known that taking in outside air and ventilating a room is one of the effective means for maintaining a tightly sealed indoor environment. For example, focusing on CO and CO2 as indoor pollutants, a ventilation and air-conditioning system has been proposed that has an indoor sensor that measures the concentration of these pollutants, a ventilation device, and an air purifier (see, for example, Patent Document 1). The ventilation and air-conditioning system disclosed in Patent Document 1 purifies the air taken in from outside by operating the ventilation device and the air purifier when the concentration measured by the indoor sensor exceeds a set value. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2006-98007 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, in the ventilation and air conditioning system disclosed in Patent Document 1, a special sensor must be installed in the room to measure the concentration of pollutants such as CO or CO2. In addition, if the pollutants are airborne droplets of infectious pathogens, it is difficult to measure the airborne droplets with a sensor. Therefore, there is a risk that ventilation to suppress indoor pollutants will not be performed.

[0005] The present disclosure has been made to solve the above-mentioned problems, and provides an air conditioning system, a control device, an air conditioning control method, and a program that automatically ventilate a room without using a special sensor that measures the concentration of polluting elements. [Means for solving the problem]

[0006] An air conditioning system according to the present disclosure includes an air conditioning device that ventilates the air in a room, a router that connects an information processing terminal in the room to a network, a human presence sensor that detects whether or not a person is present in the room and outputs detection information indicating whether or not a person is present, and a control device that is connected to the air conditioning device, the router, and the human presence sensor and controls the air conditioning device, wherein the control device includes a storage means that stores schedule information including information on the number of people scheduled to use the room and environmental information including information on the area of ​​the room, a network management means that acquires information on the number of connections that is the number of the information processing terminals connected to the router, an estimation means that estimates the number of users of the room based on the detection information, the number of connections, and the number of people scheduled to use the room, a calculation means that calculates a density, which is the number of people per unit area, using the information on the area of ​​the room included in the environmental information and the number of users estimated by the estimation means, and a control device that calculates the density calculated by the calculation means. and comparing the density with a first threshold and a second threshold lower than the first threshold, determining that ventilation is necessary when the density is equal to or greater than the first threshold, determining that ventilation is unnecessary when the density is less than the second threshold, and determining that ventilation is necessary within a certain period of time when the density is equal to or greater than the second threshold and less than the first threshold, and setting a ventilation start time and a ventilation time, The ventilation system includes a determination means for determining whether or not ventilation of the room is required, and a device control means for causing the air conditioner to perform a ventilation operation when the determination means determines that ventilation is required.

[0007] A control device according to the present disclosure is connected to an air conditioning device that ventilates the air in a room, a router that connects an information processing terminal in the room to a network, and a human presence sensor that outputs detection information indicating whether or not a person is present in the room, and controls the air conditioning device, and includes a storage means for storing schedule information including information on the number of people scheduled to use the room and environmental information including information on the area of ​​the room, a network management means for acquiring information on the number of connections that is the number of the information processing terminals connected to the router, an estimation means for estimating the number of users of the room based on the detection information, the number of connections, and the number of people scheduled to use the room, a calculation means for calculating a density, which is the number of people per unit area, using the area of ​​the room included in the environmental information and the number of users estimated by the estimation means, and a density calculation means for calculating the density calculated by the calculation means. and comparing the density with a first threshold and a second threshold lower than the first threshold, determining that ventilation is necessary when the density is equal to or greater than the first threshold, determining that ventilation is unnecessary when the density is less than the second threshold, and determining that ventilation is necessary within a certain period of time when the density is equal to or greater than the second threshold and less than the first threshold, and setting a ventilation start time and a ventilation time, The ventilation system includes a determination means for determining whether or not ventilation of the room is required, and a device control means for causing the air conditioner to perform a ventilation operation when the determination means determines that ventilation is required.

[0008] An air conditioning control method according to the present disclosure is an air conditioning control method by a control device connected to an air conditioner that ventilates the air in a room, a router that connects an information processing terminal in the room to a network, and a human presence sensor that outputs detection information indicating whether or not a person is present in the room, and includes the steps of: storing schedule information including information on the number of people scheduled to use the room and environmental information including information on the area of ​​the room; acquiring information on the number of connections, which is the number of the information processing terminals connected to the router; estimating the number of users of the room based on the detection information, the number of connections, and the number of people scheduled to use the room; calculating a density, which is the number of people per unit area, using the area of ​​the room included in the environmental information and the estimated number of users; and comparing the density with a first threshold and a second threshold lower than the first threshold, determining that ventilation is necessary when the density is equal to or greater than the first threshold, determining that ventilation is unnecessary when the density is less than the second threshold, and determining that ventilation is necessary within a certain period of time when the density is equal to or greater than the second threshold and less than the first threshold, and setting a ventilation start time and a ventilation time, The method includes a step of determining whether or not ventilation of the room is necessary, and a step of causing the air conditioner to perform a ventilation operation when it is determined that ventilation is necessary.

[0009] A program according to the present disclosure includes, in a computer connected to an air conditioning device that ventilates the air in a room, a router that connects an information processing terminal in the room to a network, and a human presence sensor that outputs detection information indicating whether or not a person is present in the room, a storage means that stores schedule information including information on the number of people scheduled to use the room and environmental information including information on the area of ​​the room, a network management means that acquires information on the number of connections that is the number of the information processing terminals connected to the router, an estimation means that estimates the number of users of the room based on the detection information, the number of connections, and the number of people scheduled to use the room, a calculation means that calculates a density, which is the number of people per unit area, using the area of ​​the room included in the environmental information and the number of users estimated by the estimation means, and a density calculation means that calculates the density calculated by the calculation means. and comparing the density with a first threshold and a second threshold lower than the first threshold, determining that ventilation is necessary when the density is equal to or greater than the first threshold, determining that ventilation is unnecessary when the density is less than the second threshold, and determining that ventilation is necessary within a certain period of time when the density is equal to or greater than the second threshold and less than the first threshold, and setting a ventilation start time and a ventilation time, The system includes a determination means for determining whether or not ventilation of the room is necessary, and an equipment control means for causing the air conditioner to perform a ventilation operation when the determination means determines that ventilation is necessary. Effect of the Invention

[0010] According to the present disclosure, the number of users in a room is estimated based on the schedule information including the number of users scheduled to use the room, the number of router connections, and the detection information of the human presence sensor, and it is determined whether ventilation is necessary or not based on the estimated number of users and the density calculated from the area of ​​the room. If it is determined that ventilation of the room is necessary, the air conditioner installed in the room performs ventilation operation. Therefore, even if there is no special sensor that measures the concentration of polluting elements, the room is automatically ventilated when the density becomes high. As a result, the air environment in the room can be maintained in a state where polluting elements are suppressed. [Brief description of the drawings]

[0011] [Figure 1] 1 is a block diagram showing a configuration example of an air conditioning system according to a first embodiment. [Diagram 2] 4 is a block diagram showing another configuration example of the air conditioning system according to the first embodiment. FIG. [Diagram 3]4 is a block diagram showing another example of the configuration of communication connections in the air conditioning system according to the first embodiment. FIG. [Figure 4] 4 is a schematic diagram showing an example of a communication range of the router shown in FIG. 3. [Diagram 5] 4 is a block diagram showing an example of the configuration of the information processing terminal shown in FIG. 3. [Figure 6] 4 is a block diagram showing an example of a hardware configuration of a control device shown in FIG. 3. [Figure 7] 7 is a diagram showing an example of data stored in an auxiliary storage unit shown in FIG. 6; FIG. [Figure 8] 7 is a functional block diagram showing an example of the configuration of the processor shown in FIG. 6. [Figure 9] 11 is a table showing an example of conference reservation information. [Figure 10] 11 is a table showing an example of schedule information. [Figure 11] 11 is a table illustrating an example of environmental information. [Figure 12] 11 is a table showing an example of occupancy information. [Figure 13] 11 is a table illustrating an example of connection information. [Figure 14] 11 is a table illustrating an example of history information. [Figure 15] 5 is a flowchart showing an operation procedure of a control device that collects information required for ventilation control in the air conditioning system according to the first embodiment. [Figure 16] 5 is a flowchart showing an operation procedure of ventilation control by a control device in the air conditioning system according to the first embodiment. [Figure 17] 5 is a flowchart showing an operation procedure of ventilation control by a control device in the air conditioning system according to the first embodiment. [Figure 18] 5 is a flowchart showing an operation procedure of ventilation control by a control device in the air conditioning system according to the first embodiment. [Figure 19] 19 is a table showing the number of users estimated by the control device executing the flows shown in FIGS. 17 and 18. [Figure 20] FIG. 11 is a functional block diagram showing a configuration example of a processor included in a control device of an air conditioning system according to a second embodiment. [Figure 21] 10 is a flowchart showing an operation procedure of ventilation control by a control device in an air conditioning system according to embodiment 2. [Figure 22] 10 is a flowchart showing an operation procedure of ventilation control by a control device in an air conditioning system according to embodiment 2. [Diagram 23] 23 is a flowchart showing an operation procedure of a correction means in step S201 shown in FIG. 22. [Figure 24] 11 is a block diagram showing an example of the configuration of a server shown in FIG. 3 in an air conditioning system according to a third embodiment. FIG. [Diagram 25] 25 is a table showing an example of conference reservation information stored in a storage unit shown in FIG. 24. [Figure 26] 13 is a flowchart showing an operation procedure of an information processing terminal in the air conditioning system according to the third embodiment. [Figure 27] 11 is a flowchart showing an operation procedure of a control device in an air conditioning system according to a third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Embodiment 1 The configuration of the air conditioning system according to the first embodiment will be described. Fig. 1 is a block diagram showing an example of the configuration of the air conditioning system according to the first embodiment. As shown in Fig. 1, the air conditioning system 10 has air conditioning equipment 2 that ventilates a space to be air conditioned, a control device 1 that controls the air conditioning equipment 2, and routers 3 and 13. The routers 3 and 13 are connected to a wide area network NW1. The control device 1 is connected to the air conditioning equipment 2 via a local network NW2.

[0013] The wide area network NW1 is, for example, the Internet. In the first embodiment, as shown in FIG. 1, a server 5 is connected to the wide area network NW1. The local area network NW2 is, for example, a LAN (Local Area Network) conforming to a communication standard such as Ethernet (registered trademark). The local area network NW2 may be either a wired or wireless communication network, or may be a combination of both. When the local area network NW2 is a wireless network, the local area network NW2 transmits data in accordance with the IEEE802.11 standard, which is an international standard such as Wi-Fi (registered trademark). In the following, a case where the local area network NW2 is a wireless network will be described. Also, a case where the air conditioning system 10 is installed in one company will be described.

[0014] A plurality of information processing terminals 4-1 to 4-m are connected to the router 3. m is an arbitrary integer equal to or greater than 2. The information processing terminals 4-1 to 4-m are, for example, personal computers (PCs) and tablet terminals such as smartphones. In the first embodiment, a case will be described in which the information processing terminals 4-1 to 4-m are notebook PCs or tablet terminals.

[0015] When the users of the information processing terminals 4-1 to 4-m work at their own desks, each of the information processing terminals 4-1 to 4-m is connected to the server 5 via the router 13 and the wide area network NW1. The information processing terminals 4-1 to 4-m communicate with the control device 1 via the server 5. In the first embodiment, the users of the information processing terminals 4-1 to 4-m are employees of the same company.

[0016] The air conditioning equipment 2 is connected to the control device 1 via the local network NW2. The air conditioning equipment 2 is, for example, a ventilation fan. The air conditioning equipment 2 is not limited to a ventilation fan, but may be any equipment with a ventilation function that replaces outside air with air inside a room. The air conditioning equipment 2 may be an air conditioning device with a refrigerant circuit. The air conditioning equipment 2 is installed in a room that is a space to be air-conditioned. The room in which the air conditioning equipment 2 is installed is, for example, a conference room CR. The room in which the air conditioning equipment 2 is installed is not limited to a conference room. The air conditioning equipment 2 ventilates the air inside the conference room CR. The conference room CR is covered by the communication range of the router 3.

[0017] The routers 3 and 13 are devices that connect a plurality of different networks. The router 13 relays the exchange of information transmitted between the control device 1 and the information processing terminals 4-1 to 4-m. For example, the router 13 relays the exchange of information transmitted between the control device 1 and the information processing terminals 4-1 to 4-m via the server 5. Although not shown in FIG. 1, when a user of the information processing terminal 4-i carries the information processing terminal 4-i and moves to the conference room CR, the information processing terminal 4-i is connected to the router 3. i is an arbitrary integer from 1 to m. The router 3 relays the exchange of information transmitted between the control device 1 and the information processing terminal 4-i via the server 5.

[0018] The conference room CR is provided with a human presence sensor 6 that detects whether or not there is a person in the conference room CR. The human presence sensor 6 is, for example, a pyroelectric sensor. The human presence sensor 6 is connected to the control device 1. The human presence sensor 6 detects the presence status indicating whether or not there is a person in the conference room CR, and outputs detection information including information on the presence status to the control device 1. The human presence sensor 6 may be capable of simply detecting not only the presence or absence of a person, but also the number of people in the conference room CR.

[0019] Fig. 2 is a block diagram showing another example of the configuration of the air conditioning system according to the first embodiment. The air conditioning system 10 shown in Fig. 2 performs ventilation control for a plurality of conference rooms. Fig. 2 shows a case in which the air conditioned spaces to be subjected to ventilation control are a first conference room CR1 to a q-th conference room CRq, where q is an integer equal to or greater than 2. The air conditioning system 10 shown in Fig. 2 is provided with routers 3-1 to 3-n.

[0020] Note that the communication connection configurations shown in Figures 1 and 2 are merely examples, and are not limited to the configurations shown in Figures 1 and 2. Figure 3 is a block diagram showing another example of the communication connection configuration in the air conditioning system according to embodiment 1. As shown in Figure 3, information processing terminals 4-1 to 4-m, air conditioners 2-1 to 2-q, routers 3-1 to 3-n, and control device 1 may be connected so as to be able to communicate with each other via a local network NW2.

[0021] In the following, the air conditioning system 10 of the first embodiment will be described in the case of the configuration example shown in FIG. 3, but the configuration example shown in FIG. 1 or FIG. 2 may also be used.

[0022] Fig. 4 is a schematic diagram showing an example of the communication range of the routers shown in Fig. 3. Fig. 4 shows the communication range of each of the routers 3-1 to 3-3. The first conference room CR1 is covered by the communication range Cell1 of the router 3-1. The second conference room CR2 is covered by the communication range Cell2 of the router 3-2. When the information processing terminal 4-i is in the first conference room CR1, it is connected to the router 3-1, and when it is in the second conference room CR2, it is connected to the router 3-2.

[0023] On the other hand, the third conference room CR3 to the fifth conference room CR5 are covered by the communication range Cell3 of the same router 3-3. In the third conference room CR3 to the fifth conference room CR5, the information processing terminal 4-i is connected to the router 3-3 regardless of which conference room CR it is in. In this way, the communication range of each of the routers 3-1 to 3-n may cover one conference room CR, or may cover two or more conference rooms CR.

[0024] Next, the configuration of the server 5 shown in Fig. 3 will be described. The server 5 is, for example, a cloud server owned by the manufacturer of the control device 1. The server 5 is connected to the control device 1 via the wide area network NW1, the router 13, and the local network NW2. The server 5 executes authentication processing for the control device 1 and the information processing terminals 4-1 to 4-m. The server 5 prevents other devices unrelated to the air conditioning system 10 from illegally communicating with the control device 1 and the information processing terminals 4-1 to 4-m from outside.

[0025] The configuration of the information processing terminals 4-1 to 4-m shown in Fig. 3 will be described. Since the information processing terminals 4-1 to 4-m have the same configuration, the case of the information processing terminal 4-i will be described here. Fig. 5 is a block diagram showing an example of the configuration of the information processing terminal shown in Fig. 3.

[0026] The information processing terminal 4-i has a terminal storage unit 41, a terminal control unit 42, an operation unit 43, and a display unit 44. The terminal storage unit 41 is, for example, a non-volatile memory such as a flash memory. The display unit 44 is, for example, a display. The terminal control unit 42 has a memory (not shown) that stores a program, and a processor (not shown) that executes processing according to the program stored in the memory. The terminal storage unit 41 of each information processing terminal 4-i stores a schedule program that is application software for schedule management. A terminal identifier T4-i that is an identifier unique to each information processing terminal 4-i is assigned in advance to each information processing terminal 4-i. When transmitting information to another device, the terminal control unit 42 transmits the information by attaching the terminal identifier T4-i assigned to the terminal itself.

[0027] A method in which a user operates the information processing terminal 4-i to register conference reservation information will be described. When a conference is scheduled, the user operates the operation unit 43 to input an instruction to start a schedule program. The user is notified of the scheduled conference by, for example, the leader of the section to which the user belongs orally. When the instruction to start the schedule program is input, the terminal control unit 42 reads out the schedule program from the terminal storage unit 41 and executes the schedule program. Next, the terminal control unit 42 displays conference reservation input items on the display unit 44. The conference reservation input items are, for example, the conference room name, the conference name, the start time of use, and the end time of use. The user operates the operation unit 43 while referring to the display on the display unit 44 to input information into each field of the conference reservation input items. The terminal control unit 42 creates conference reservation information including the information input into the conference reservation input items and the terminal identifier, and stores the conference reservation information in the terminal storage unit 41. When the control device 1 requests the conference reservation information, the terminal control unit 42 transmits the conference reservation information to the control device 1.

[0028] Here, the case where the user operates the information processing terminal 4-i by himself / herself and makes the information processing terminal 4-i create the conference reservation information has been described, but the present invention is not limited to this method. For example, the section leader may operate his / her information processing terminal 4-i to attach the conference reservation information to an e-mail and send it to the information processing terminal 4-i of another employee in the section. In this case, when the terminal control unit 42 of the information processing terminal 4-i of the other employee in the section receives the e-mail, the terminal control unit 42 stores the conference reservation information attached to the e-mail in the terminal storage unit 41. In addition, the server 5 may manage the reservations of the conference room CR so that the reservations of the conference room CR are not duplicated, or a separate server may be provided to manage the reservations of the conference room CR.

[0029] In the first embodiment, the information processing terminal 4-i used by the user at his / her desk and the information processing terminal 4-i used in the conference room CR are the same, but they may be different. For example, the information processing terminal used by the user at his / her desk may be a desktop PC.

[0030] Next, the configuration of the control device 1 shown in FIG. 3 will be described. FIG. 6 is a block diagram showing an example of the hardware configuration of the control device shown in FIG. 3. The control device 1 is a computer that controls the air conditioners 2-1 to 2-q. The control device 1 has a processor 101 such as a CPU (Central Processing Unit), a storage unit 15, a first communication interface 104, a second communication interface 105, and a boot loader 106. The storage unit 15 has a main storage unit 102 and an auxiliary storage unit 103. The storage unit 15 is a storage means that stores information related to the air conditioning control method of the first embodiment. The processor 101, the main storage unit 102, the auxiliary storage unit 103, the first communication interface 104, the second communication interface 105, and the boot loader 106 are connected via a bus 109.

[0031] The auxiliary storage unit 103 is, for example, a storage device such as a hard disk drive (HDD). The auxiliary storage unit 103 may be a non-volatile memory such as a flash memory. The main storage unit 102 is, for example, a volatile memory such as a random access memory (RAM), but may be a non-volatile memory such as a flash memory.

[0032] The information stored in the auxiliary storage unit 103 will be described. FIG. 7 is a diagram showing an example of data stored in the auxiliary storage unit shown in FIG. 6. The auxiliary storage unit 103 is divided into an area in which programs are stored and an area in which control data is stored. The auxiliary storage unit 103 can store two or more programs in the area in which programs are stored. When two or more programs are stored in the area in which programs are stored, a different identifier is assigned to each program, and the area in which the programs are stored also has an area in which the identifiers are recorded. By assigning an identifier to each program, it is possible to identify the program that the boot loader 106 reads from the auxiliary storage unit 103 to the main storage unit 102 when the control device 1 starts up, by the identifier.

[0033] When the control device 1 is started, the boot loader 106 reads out the program to be executed by the processor 101 from the auxiliary storage unit 103 and writes it to the main storage unit 102. When it is desired to rewrite the program to be executed by the processor 101, for example, the following procedure is carried out. The program to be rewritten is stored in the server 5. This program is called an update program. While the control device 1 is operating with the current program, the boot loader 106 obtains the update program from the server 5. The boot loader 106 then stores the update program in the program area of ​​the auxiliary storage unit 103, and rewrites the identifier of the program to be executed at startup to the identifier of the update program. In this way, the program to be operated the next time the control device 1 is started can be switched to the update program.

[0034] The first communication interface 104 transmits and receives information to and from the server 5 via the router 13 and the wide area network NW1, and further transmits and receives information to and from the information processing terminals 4-1 to 4-m via the server 5. The second communication interface 105 transmits and receives information to and from the air conditioners 2-1 to 2-q via the local network NW2.

[0035] Fig. 8 is a functional block diagram showing an example of the configuration of the processor shown in Fig. 6. The processor 101 has a calculation means 16 and a timer 17. The calculation means 16 is, for example, an arithmetic logic unit. The calculation means 16 has an information acquisition means 21, a network management means 22, an occupancy management means 23, an estimation means 24, a calculation means 25, a determination means 26, and a device control means 27.

[0036] When the control device 1 starts up, the processor 101 reads out a program from the main memory unit 102. The processor 101 executes the program to realize the functions of each of the means, namely, the information acquisition means 21, the network management means 22, the presence management means 23, the estimation means 24, the calculation means 25, the determination means 26, and the device control means 27.

[0037] The control data stored in the auxiliary storage unit 103 will be described. The control data includes conference reservation information, schedule information, presence information, connection information, environmental information, and history information. However, when the control device 1 executes the ventilation control of the present embodiment 1, the processing speed slows down if the calculation means 16 reads the control data from the auxiliary storage unit 103 or writes the control data to the auxiliary storage unit 103. Therefore, when performing ventilation control, the control device 1 reads the control data from the auxiliary storage unit 103 and writes it to the main storage unit 102, and the main storage unit 102 transmits and receives information to and from the main storage unit 102. The following describes the case where the main storage unit 102 stores the control data.

[0038] First, the conference reservation information will be described. FIG. 9 is a table showing an example of the conference reservation information. The conference reservation information is information related to the reservation of each conference room. The conference reservation information stored in the terminal storage unit 41 of each information processing terminal 4-i includes information on the terminal identifier of the information processing terminal 4-i, the conference name, the conference room name, the use start time, and the use end time. The conference reservation information shown in FIG. 9 is an aggregate of the conference reservation information acquired from the information processing terminals 4-1 to 4-m by the information acquisition means 21. The conference reservation information shown in FIG. 9 is stored in the main storage unit 102. As shown in FIG. 9, the conference reservation information is information in which the conference name, the conference room, the use start time, and the use end time are registered in correspondence with the terminal identifier of the information processing terminal 4-i.

[0039] As shown in Figure 9, the following meeting names are registered: X1 meeting, X2 meeting, process meeting, progress meeting, department meeting, general meeting, and external meeting. An X1 meeting is a meeting held by employees regarding product X1. An X2 meeting is a meeting held by employees regarding product X2. A process meeting is a meeting regarding the manufacturing process of a predetermined product. A progress meeting is a meeting regarding the manufacturing progress of a predetermined product. An intra-department meeting is a meeting for employees within a department. A general meeting is a meeting for all employees involved in product manufacturing. An external meeting is a meeting held by employees with people outside the company.

[0040] In the conference reservation information shown in Fig. 9, the use start time, each use unit time, and the conference room name are described in correspondence with the terminal identifiers T4-1 to T4-m of the information processing terminal 4-i. In the conference reservation information shown in Fig. 9, the use unit time is 30 minutes, so the use end time can be calculated from the use start time. The use unit time is an example and is not limited to 30 minutes. In the conference reservation information shown in Fig. 9, the latest time that the conference room CR can be used is 17:30.

[0041] FIG. 9 shows, for example, that the conference reservation information acquired from information processing terminal 4-1 indicates that a process conference is booked in the third conference room CR3 from 9:00 to 10:00, a meeting on product X2 is booked in the second conference room CR2 from 10:00 to 10:30, and an external meeting is booked in the fifth conference room CR5 from 16:30 to 17:30.

[0042] Next, the schedule information will be described. FIG. 10 is a table showing an example of the schedule information. The schedule information is information in which the conference name, the number of users scheduled to use, the start time and end time of use, and the user name are registered corresponding to the conference room CR. The schedule information is created based on the conference reservation information shown in FIG. 9. In FIG. 10, the conference name and the user name are omitted. A user information table (not shown) in which the terminal identifier and the user name are associated with each other is stored in the auxiliary storage unit 103 in advance, and the information acquisition means 21 reads out the user name as the user name for each reserved conference. The number of users scheduled to use is calculated by counting the number of user names read out from the user information table (not shown) by the information acquisition means 21.

[0043] 10 shows that, for example, in the first conference room CR1, the number of users scheduled to use the conference room from 9:00 to 9:30 is 0, the number of users scheduled to use the conference room from 9:30 to 10:00 is 5, the number of users scheduled to use the conference room from 10:00 to 10:30 is 0, and the number of users scheduled to use the conference room from 16:30 onwards is 0. The schedule information may be associated with the conference reservation information. In this case, information such as the name of the reserved conference can be identified from the conference room CR and the usage time in the schedule information in the conference reservation information.

[0044] Next, the environmental information will be described. FIG. 11 is a table showing an example of the environmental information. The environmental information is information on the usage environment of the user of each conference room CR. Specifically, the environmental information is information in which the connectable router 3, the human sensor 6, the area of ​​the conference room CR, the maximum capacity, the initial number of users, and the threshold value thd are registered in correspondence with the conference room CR. The threshold value thd is a value that is a criterion for determining whether ventilation is necessary or not based on the density Den described later. In the first embodiment, as the threshold value thd, the first threshold value thd1 and the second threshold value thd2 are registered in advance in the environmental information, but the threshold value thd may be one. The first threshold value thd1 and the second threshold value thd2 have a relationship of thd1>thd2. FIG. 11 shows a case where the first threshold value thd1 is 0.15 and the second threshold value thd2 is 0.1, but the values ​​of the first threshold value thd1 and the second threshold value thd2 are not limited to these values.

[0045] FIG. 11 shows an example of a first conference room CR1 that is covered by the communication range of a local network NW2 of a router 3-1, has a motion sensor 6-1 installed, and has an area of ​​about 25 m 2 11 indicates that the maximum capacity is 10 people. As described with reference to Fig. 4, Fig. 11 shows that the information processing terminal 4-i is connected to different routers 3 in each of the first conference room CR1 and the second conference room CR2, but is connected to the same router 3-3 in the third conference room CR3 to the fifth conference room CR5.

[0046] Next, the presence information will be described. Fig. 12 is a table showing an example of the presence information. The presence information is information in which the use start time and use end time, and a presence state in which someone is in the conference room or an absence state in which no one is in the conference room are registered for each conference room CR. The presence information is created by the presence management means 23 using the detection information and environmental information acquired from the human presence sensor 6.

[0047] FIG. 12 shows, for example, that the first conference room CR1 is unattended from 9:00 to 9:30, is attended by a person from 9:30 to 10:00, and is unattended from 10:00 to 10:30 and after 16:00.

[0048] Next, the connection information will be described. Fig. 13 is a table showing an example of the connection information. The connection information is information indicating the number of connections Ct, which is the number of information processing terminals 4-i connected to each of the routers 3-1 to 3-n. The connection information is created by the network management means 22.

[0049] For example, FIG. 13 shows that for the router 3-1, there is no connection from 9:00 to 9:30, five information processing terminals 4-i are connected from 9:30 to 10:00, and there is no connection from 10:00 to 10:30 and after 16:00.

[0050] Next, the history information will be described. Fig. 14 is a table showing an example of the history information. The history information is information in which the conference name, user name, actual number of participants, and information on the environment are registered for conference rooms CR for conferences held in the past. The history information is created, for example, based on the schedule information, by registering the actual number of participants instead of the number of participants scheduled to use. As shown in Fig. 14, environmental information of the conference room may be registered in the history information.

[0051] Next, the configuration of each means of the processor 101 will be described with reference to Fig. 8. The timer 17 generates a reference time (clock) for causing the processor 101 to execute a program accurately on time. The information acquisition means 21 acquires conference reservation information from the information processing terminals 4-1 to 4-m at regular intervals via the server 5 shown in Fig. 3. The information acquisition means 21 creates schedule information using the acquired conference reservation information. The information acquisition means 21 stores the created schedule information in the main memory unit 102.

[0052] The presence management means 23 acquires detection information from the human sensors 6-1 to 6-q at a constant cycle. The presence management means 23 creates presence information indicating the presence status for each conference room CR using the acquired detection information. The presence management means 23 stores the created presence information in the main memory unit 102.

[0053] The network management means 22 periodically acquires information on the number of connections Ct from the routers 3-1 to 3-n. The network management means 22 uses the acquired information on the number of connections Ct to create connection information indicating the number of connections Ct of the information processing terminals 4-i connected to the routers 3-1 to 3-n. The network management means 22 stores the created connection information in the main memory unit 102.

[0054] The estimation means 24 estimates the number of users for each conference room CR based on the schedule information, connection information, and presence information stored in the main storage unit 102. The estimation means 24 may estimate the number of users for each conference room CR using environmental information stored in the main storage unit 102 in addition to the schedule information, connection information, and presence information.

[0055] The calculation means 25 calculates the density Den of each conference room CR using the estimated number of users and the area of ​​the conference room CR. The density Den is expressed as the number of people per unit area. For example, for an area of ​​20 [m 2 If there are five users in a conference room CR, the density Den is 0.25 [people / m 2 The calculation means 25 creates history information by referring to the schedule information and the conference reservation information, using the number of users estimated by the estimation means 24 as the actual number of users. The calculation means 25 stores the created history information in the main storage unit 102.

[0056] The determination means 26 determines whether ventilation is necessary for each conference room CR based on the density Den of each conference room CR calculated by the calculation means 25. Specifically, the determination means 26 compares the calculated density Den with a first threshold thd1 and a second threshold thd2 that are determined in advance. When the density Den is equal to or greater than the first threshold thd1, the determination means 26 determines that ventilation is necessary, and when the density Den is less than the second threshold thd2, the determination means 26 determines that ventilation is not necessary. On the other hand, when the density Den is equal to or greater than the second threshold and less than the first threshold thd1, the determination means 26 determines that ventilation is not necessary at all times, but is necessary within a certain period of time, and sets a ventilation start time ts and a ventilation time tv. The ventilation start time ts is an elapsed time tp that starts measuring the conference room CR from the conference start time or the time when it is determined that the conference has started. The ventilation start time ts is, for example, 20 minutes. The ventilation time tv is, for example, 5 minutes.

[0057] When the determination means 26 determines that ventilation is required for the conference room CR, the equipment control means 27 transmits command information to instruct the execution of a ventilation operation to the air conditioner 2 installed in the conference room CR via the local network NW2. When it is determined that ventilation is required for the conference room CRj, where j is an arbitrary integer from 1 to q, the equipment control means 27 transmits command information to instruct the execution of a ventilation operation to the air conditioner 2-j via the local network NW2. When the equipment control means 27 receives information on the ventilation time tv from the determination means 26, it transmits command information including the ventilation time tv to the air conditioner 2-j via the local network NW2. When the air conditioner 2-j receives the command information including the ventilation time tv, it performs a ventilation operation for only the ventilation time tv.

[0058] Next, a description will be given of the operation of the air conditioning system 10 shown in Fig. 3. Communications between the control device 1 and the information processing terminals 4-1 to 4-m are initiated after authentication is performed by an authentication process executed by the server 5, but a description of the authentication process performed by the server 5 will be omitted below.

[0059] First, an operation of the control device 1 collecting information from the information processing terminals 4-1 to 4-m and creating information to be stored in the main storage unit 102 will be described. Fig. 15 is a flowchart showing an operation procedure of the control device that collects information required for ventilation control in the air conditioning system according to the first embodiment. The flow shown in Fig. 15 is started, for example, when the control device 1 is powered on.

[0060] The timer 17 judges whether or not the time of the reference period Tref, which is a preset period, has arrived (step S001). If the time of the reference period Tref has not arrived (step S001: No), the control device 1 ends the process and waits until the time of the next reference period Tref arrives. On the other hand, if the time of the reference period Tref has arrived (step S001: Yes), the timer 17 notifies the information acquisition means 21, the presence management means 23, and the network management means 22 that the time of the reference period Tref has arrived.

[0061] When the information acquiring means 21 receives a notification from the timer 17, it acquires conference reservation information from the information processing terminals 4-1 to 4-m via the local network NW2, the wide area network NW1, and the server 5 (step S002-1). The information acquiring means 21 creates schedule information using the acquired conference reservation information (step S003-1), and stores the created schedule information in the main memory unit 102 (step S004-1).

[0062] When the presence management means 23 receives a notification from the timer 17, it acquires detection information from the human sensors 6-1 to 6-q (step S002-2). The presence management means 23 creates presence information using the acquired detection information (step S003-2) and stores the created presence information in the main memory unit 102 (step S004-2).

[0063] The network management means 22 acquires information on the number of connections Ct of the information processing terminal 4-i from the routers 3-1 to 3-n (step S002-3). The network management means 22 creates connection information using the acquired information on the number of connections Ct (step S003-3) and stores the created connection information in the main storage unit 102 (step S004-3).

[0064] In this way, the control device 1 periodically updates the control data. Although the control device 1 has been described as acquiring information from the motion sensors 6-1 to 6-q and the routers 3-1 to 3-n by polling, when the presence status or number of connections status of these devices changes, the control device 1 may transmit information indicating the changed status. Furthermore, the control device 1 may use both polling and receiving information when the status changes when collecting information from devices such as the motion sensor 6. Furthermore, although FIG. 15 shows a case where the control device 1 performs parallel processing on the schedule information, presence information, and connection information, sequential processing may also be performed.

[0065] Next, the ventilation control executed by the control device 1 in the air conditioning system 10 shown in Fig. 3 will be described with reference to Figs. 16 to 18. Figs. 16 to 18 are flowcharts showing the operation procedure of ventilation control by the control device in the air conditioning system according to embodiment 1. The operation of the air conditioning system 10 before the start time of use of the conference room CR will be described with reference to Fig. 16.

[0066] The estimation means 24 refers to the schedule information stored in the main storage unit 102 and checks the use start time of each conference room CR (step S101). The estimation means 24 obtains information on the current time from the timer 17 and determines whether the current time is before the use start time of each conference room CR (step S102). If the current time is before the use start time of each conference room CR (step S102: Yes), the estimation means 24 refers to the history information stored in the main storage unit 102 (step S103). The history information records information such as the actual number of people who participated in each conference held in the past for each conference room CR. Furthermore, in step S103, the estimation means 24 refers to the schedule information and identifies the conference whose use start time is closest to the current time. The conference room CR in which the identified conference will be held is designated as conference room CRj.

[0067] The estimation means 24 reads out the user name associated with the schedule information for the identified conference. The estimation means 24 judges whether or not the same user name as the read out user name is present in the history information (step S104). If the same user name as the user name associated with the schedule information is present in the history information (step S104: Yes), the estimation means 24 reads out the number of people who attended the conference of that user name from the history information as the actual number of people, and notifies the calculation means 25 of the read actual number of people. When the calculation means 25 is notified of the actual number of people by the estimation means 24, the calculation means 25 proceeds to the process of step S106.

[0068] On the other hand, in step S104, if the history information does not contain a user name that is the same as the user name associated with the schedule information (step S104: No), the estimation means 24 reads out the conference name associated with the schedule information. Then, the estimation means 24 determines whether the history information contains a conference name that is the same as the conference name associated with the schedule information (step S105). If the history information contains a conference name that is the same as the conference name associated with the schedule information (step S105: Yes), the estimation means 24 reads out the number of participants of a conference held in the past with the same conference name from the history information as the actual number of participants, and notifies the calculation means 25 of the read actual number of participants. When the calculation means 25 is notified of the actual number of participants by the estimation means 24, the calculation means 25 proceeds to the process of step S106.

[0069] In step S106, the calculation means 25 reads the area of ​​the conference room CRj from the environmental information. The calculation means 25 calculates the congestion Den by dividing the actual number of people notified by the estimation means 24 by the area of ​​the conference room CRj (step S107). The determination means 26 determines whether the congestion Den is equal to or greater than a first threshold thd1 (step S108). In the process of step S108, the determination means 26 determines whether or not there is a possibility that people will be so crowded that ventilation will be required when the conference room CRj starts.

[0070] If the result of the determination in step S108 is that the congestion degree Den is equal to or greater than the first threshold value thd1 (step S108: Yes), the determination means 26 determines that there is a possibility that people will be so crowded in the conference room CRj that ventilation will be required when the conference starts. In this case, the device control means 27 transmits command information to instruct the air conditioning device 2-j installed in the conference room CRj to perform ventilation operation (step S109).

[0071] On the other hand, if the result of the judgment in step S108 is that the congestion degree Den is less than the first threshold thd1 (step S108: No), the judgment means 26 judges that the possibility of people being crowded in the conference room CRj is low and ventilation is unnecessary. In this case, the control device 1 ends the process. Also, if the result of the judgment in step S105 is that the history information does not contain the same conference name as the conference name associated with the schedule information (step S105: No), the control device 1 also ends the process.

[0072] In this way, when there is a meeting where the density is expected to be high, the air conditioner 2-j automatically starts ventilation operation before the meeting starts. Note that the meeting name and user name of the meeting room CRj are an example of information related to the use of the meeting room CRj for identifying the meeting room CRj that matches the conditions. The information related to the use of the meeting room CRj is not limited to the meeting name and user name.

[0073] Next, the process in the judgment of step S102 shown in Fig. 16 when the current time is after the start time of use of conference room CRj, for example, will be described with reference to Fig. 17 and Fig. 18. Conference room CRj is a conference room where the current time is the same as the start time of use of the reserved conference, or where the current time is past the start time of use. Here, the case will be described where conference room CRj is within the communication range of local network NW2 defined by router 3-j, but conference rooms other than conference room CRj are not within the communication range of local network NW2 defined by router 3-j.

[0074] 16, if the current time is after the start time of use of the conference room CRj (step S102: No), the estimation means 24 reads out the schedule information, the presence information, and the connection information from the main storage unit 102 (step S151). Based on this information, the estimation means 24 estimates the number of users of the conference room CRj as follows. Also, if the current time is after the start time of use of the conference room CRj (step S102: No), the determination means 26 monitors the elapsed time tp measured by the timer 17.

[0075] The estimation unit 24 refers to the presence information of the conference room CRj and determines whether or not there is a person in the conference room CRj (step S152). If the presence information indicates that there is a person in the conference room CRj (step S152: Yes), the estimation unit 24 provisionally sets the number of users scheduled to use the conference room CRj in the schedule information to the number of users of the conference room CRj (step S153).

[0076] Next, the estimation means 24 estimates the number of users of the conference room CRj based on a combination of the number of connections Ct of the router 3-j and whether the conference room CRj is reserved. Specifically, the estimation means 24 refers to the connection information and determines whether the number of connections Ct of the router 3-j is 1 or more (step S154). If the number of connections Ct of the router 3-j is not 1 or more (step S154: No), that is, if the number of connections Ct is zero, the estimation means 24 refers to the schedule information and determines whether the conference room CRj is reserved. If the conference room CRj is reserved, the number of users scheduled to use is 1 or more, but if the conference room CRj is not reserved, the number of users scheduled to use is zero. The estimation means 24 refers to the schedule information and determines whether the number of users scheduled to use is zero (step S155), thereby determining whether the conference room CRj is reserved.

[0077] If the conference room CRj is reserved and the number of people scheduled to use is not zero (step S155: No), the estimation means 24 estimates the number of people scheduled to use as the number of users of the conference room CRj (step S156). On the other hand, if the result of the determination in step S155 is that the conference room CRj is not reserved and the number of people scheduled to use is zero (step S155: Yes), the estimation means 24 refers to the environment information and estimates the maximum capacity of the conference room CRj as the number of users (step S157).

[0078] As a result of the judgment in step S154, if the number of connections Ct of the router 3-j is 1 or more (step S154: Yes), the estimation means 24 judges whether the conference room CRj is reserved or not. Specifically, the estimation means 24 judges whether the number of users scheduled to use is zero or not (step S158) by referring to the schedule information, as in step S155. If the conference room CRj is reserved and the number of users scheduled to use is not zero (step S158: No), the estimation means 24 estimates the number of users scheduled to use as the number of users of the conference room CRj (step S159). On the other hand, as a result of the judgment in step S158, if the conference room CRj is not reserved and the number of users scheduled to use is zero (step S158: Yes), the estimation means 24 estimates the number of connections Ct of the router 3-j as the number of users of the conference room CRj (step S160).

[0079] As a result of the judgment in step S152, if the presence information indicates that no one is in the conference room CRj (step S152: No), the estimation means 24 refers to the environment information and provisionally sets the number of users to an initial value (step S161). The initial value is a predetermined number of people, for example, zero. Next, the connection information is referred to and it is judged whether the number of connections Ct of the router 3-j is 1 or more (step S162). As a result of the judgment in step S162, if the number of connections Ct of the router 3-j is 1 or more (step S162: Yes), the estimation means 24 estimates the number of connections Ct of the router 3-j as the number of users of the conference room CRj regardless of whether the conference room CRj is reserved (step S160). On the other hand, as a result of the judgment in step S162, if the number of connections Ct of the router 3-j is not 1 or more (step S162: No), the estimation means 24 estimates the number of users to be the initial value (step S163). Here, the estimation means 24 estimates that the number of users is zero.

[0080] When the estimation means 24 estimates the number of users, it notifies the calculation means 25 of the estimated number of users. When the calculation means 25 is notified of the number of users from the estimation means 24, it reads the area of ​​the conference room CRj from the environmental information. Then, the calculation means 25 divides the number of users notified from the estimation means 24 by the area of ​​the conference room CRj to calculate the congestion Den (step S164). The determination means 26 determines whether the congestion Den calculated by the calculation means 25 is equal to or greater than a first threshold thd1 (step S165).

[0081] If the result of the determination in step S165 is that the density Den is equal to or greater than the first threshold thd1 (step S165: Yes), the determination means 26 determines that the conference room CRj is crowded enough that ventilation is necessary. In this case, the device control means 27 transmits command information to the air conditioning device 2-j installed in the conference room CRj to instruct it to perform ventilation operation (step S169).

[0082] On the other hand, if the result of the judgment in step S165 is that the density Den is less than the first threshold thd1 (step S165: No), the judgment means 26 judges whether the density Den is less than the first threshold thd1 and equal to or greater than the second threshold thd2 (step S166). If the density Den is less than the first threshold thd1 and equal to or greater than the second threshold thd2 (step S166: Yes), the judgment means 26 sets the ventilation start time ts and the ventilation time tv (step S167). The judgment means 26 judges whether the elapsed time tp measured by the timer 17 is equal to or greater than the ventilation start time ts (step S168). When the elapsed time tp reaches the ventilation start time ts (step S168: Yes), the device control means 27 transmits command information including information on the ventilation time tv to the air conditioning device 2-j installed in the conference room CRj (step S169). If the result of the determination in step S166 is that the congestion degree Den is less than the second threshold value thd2, the determination means 26 determines that people are not crowded in the conference room CRj and ventilation is not necessary.

[0083] Regardless of whether the conference room CRj is crowded with people or not, the calculation means 25 records the number of users estimated by the estimation means 24 in the history information as the actual number of users of the conference room CRj (step S170). For example, the calculation means 25 creates history information in which the number of users scheduled to use the conference room CRj described in the schedule information is rewritten as the actual number of users to the number of users estimated by the estimation means 24, and stores the created history information in the main storage unit 102. In this way, the calculation means 25 adds the actual number of users to the history information for each conference room CR and each meeting, thereby sequentially updating the history information.

[0084] Fig. 19 is a table showing the number of users estimated by the control device executing the flows shown in Fig. 17 and Fig. 18. Fig. 19 shows the relationship between the presence information, connection information, and reservation information, and the number of users estimated by the estimation means 24.

[0085] In this way, after the start time of use of the conference room CR, the number of users of the conference room is more accurately estimated based on the number of users scheduled to use registered in the schedule information and the number of connections Ct in the connection information, and appropriate ventilation can be performed when the congestion is high. Even if a person using the conference room CR forgets to reserve the conference room, the number of users is estimated based on the number of connections Ct in step S158. As a result, it is possible to avoid a conference being held for a long time in a highly crowded state.

[0086] Also, even if the number of connections Ct is zero, if the human presence sensor 6 determines that a user is present in the conference room CR, it is considered that the user is participating in the conference room CR without carrying the information processing terminal 4-i therewith. Therefore, in step S156, the number of users scheduled to use the schedule information is estimated as the number of users. As a result, the degree of congestion is more appropriately determined. Also, in step S157, by estimating the maximum capacity of the conference room CR as the number of users, it is possible to prevent the air environment in the room from deteriorating even if someone uses the conference room CR without reserving it in advance.

[0087] Even if the motion sensor 6 malfunctions and determines that the conference room CR is unoccupied despite the presence of people in the room, the number of users is estimated based on the number of connections Ct. As a result, it is possible to avoid a conference being held for a long time in a highly crowded state. Furthermore, if the motion sensor 6 determines that the conference room CR is unoccupied and the number of connections Ct is zero, it is considered that the reserved conference is not actually being held, and in step S163, the number of users is estimated to be the initial value. In this case, ventilation operation is not required.

[0088] The air conditioning system 10 of the present embodiment 1 includes an air conditioner 2 that ventilates the air in the room, a router 3 that connects the information processing terminal 4-i in the room to a network, a human presence sensor 6 that detects whether or not there is a person in the room and outputs detection information indicating whether or not there is a person, and a control device 1 that is connected to the air conditioner 2, the router 3, and the human presence sensor 6 and controls the air conditioner 2. The control device 1 includes a storage means, a network management means 22, an estimation means 24, a calculation means 25, a determination means 26, and a device control means 27. The storage means stores schedule information including information on the number of people scheduled to use the room and environmental information including information on the area of ​​the room. The network management means 22 acquires information on the number of connections Ct, which is the number of information processing terminals 4-i connected to the router 3. The estimation means 24 estimates the number of users of the room based on the detection information, the number of connections, and the number of people scheduled to use. The calculation means 25 calculates the density Den, which is the number of people per unit area, using the information on the area of ​​the room included in the environmental information and the number of users estimated by the estimation means 24. The determination means 26 determines whether or not ventilation of the room is necessary based on the density Den calculated by the calculation means 25. When the determination means 26 determines that ventilation is necessary, the equipment control means 27 causes the air conditioner 2 to perform ventilation operation.

[0089] According to the first embodiment, the number of users is estimated based on the schedule information including the information on the number of people scheduled to use the room, the number of connections Ct of the router 3, and the detection information of the human sensor 6, and it is determined whether or not ventilation of the room is necessary based on the estimated number of users and the density calculated from the area of ​​the room. If it is determined that ventilation of the room is necessary, the air conditioner installed in the room performs ventilation operation. Therefore, even if there is no special sensor for measuring the concentration of the polluting element, the room is automatically ventilated when the density increases. As a result, the air environment in the room can be maintained in a state in which the polluting element is suppressed. Even if the polluting element is airborne droplets such as infectious pathogens, sufficient ventilation is automatically performed to avoid droplet infection when the density increases, so that an air environment that suppresses droplet infection can be provided.

[0090] Furthermore, in the air conditioning system 10 of the first embodiment, the need for ventilation may be determined for a similar conference to a conference that is about to start, using the number of people who have attended in the past, and ventilation operation may be performed before the conference starts. In this case, not only can the safety and hygiene of the air environment in a room where many people gather be improved in advance, but the efficiency of ventilation can also be improved.

[0091] Embodiment 2 The air conditioning system of the second embodiment corrects the number of users estimated by the estimation means 24. In the second embodiment, the same components as those described in the first embodiment are denoted by the same reference numerals, and detailed descriptions thereof will be omitted. Also, in the second embodiment, detailed descriptions of the components and operations described in the first embodiment will be omitted, and components and operations different from those in the first embodiment will be described in detail.

[0092] The configuration of the air conditioning system of the second embodiment will be described. Fig. 20 is a functional block diagram showing an example of the configuration of a processor included in a control device of the air conditioning system according to the second embodiment. The calculation means 16a of the processor 101 shown in Fig. 20 has a correction means 29 in addition to the configuration shown in Fig. 8. The correction means 29 corrects the number of users estimated by the estimation means 24, and notifies the calculation means 25 of the corrected number of users.

[0093] The operation of ventilation control in the air conditioning system 10 of the second embodiment will be described. Fig. 21 and Fig. 22 are flowcharts showing the operation procedure of ventilation control by the control device in the air conditioning system according to the second embodiment. The control device 1 executes processing according to the flowchart shown in Fig. 16 described in the first embodiment and the flowcharts shown in Fig. 21 and Fig. 22, but in the second embodiment, detailed description of processing similar to that described in the first embodiment will be omitted.

[0094] In any of the processes of steps S156, S157, S159, S160, and S163 shown in Fig. 21, the estimation means 24 estimates the number of users of the conference room CRj. Then, the estimation means 24 notifies the correction means 29 of the information on the estimated number of users. In step S201 shown in Fig. 22, when the correction means 29 is notified of the information on the estimated number of users from the estimation means 24, the correction means 29 performs a process of correcting the estimated number of users.

[0095] For example, a person who was not expected to attend the conference when the conference was booked may end up attending the conference. In this case, the actual number of users will be greater than the number of people expected to use the conference. If the difference between the number of people expected to use the conference and the actual number of users is large in this way, the accuracy of determining whether or not the conference is crowded will be low. Therefore, the correction means 29 corrects the number of users estimated by the estimation means 24.

[0096] The correction process performed by the correction means 29 in step S201 shown in Fig. 22 will be described in detail with reference to Fig. 23. Fig. 23 is a flowchart showing the operation procedure by the correction means in step S201 shown in Fig. 22. Here, the conference room that is the subject of the number of users notified from the estimation means 24 is assumed to be conference room CRj.

[0097] First, the correction means 29 sets the initial value of the user coefficient, which serves as a weighting coefficient, to 1.0 (step S210). The correction means 29 reads out the environment information from the main storage unit 102 (step S211). The correction means 29 refers to the environment information and the presence information, and judges whether or not there is a conference room in an occupied state among other conference rooms in which the router 3-k (k is an arbitrary integer from 1 to n) connected to the information processing terminal 4-i in the conference room CRj is used (step S212). If there is no other conference room in an occupied state (step S212: No), the correction means 29 proceeds to the process of step S214. On the other hand, if there is another conference room in an occupied state (step S212: Yes), the correction means 29 obtains the total number N of conference rooms CR in which the router 3-k is used and which are occupied. Then, the correction means 29 calculates the reciprocal of the total number N as the user coefficient (step S213). After that, the correction means 29 proceeds to the process of step S214.

[0098] For example, when k=3, three conference rooms CR, the third conference room CR3 to the fifth conference room CR5, are included in the communication range Cell3 of the router 3-3 as shown in Figure 4. If the presence information of the third conference room CR3 to the fifth conference room CR5 is all in the presence state, N=3.

[0099] In step S214, the correction means 29 calculates the provisional number of users according to a predetermined calculation formula, for example, the following formula (1). Provisional number of users = Number of connections Ct × User coefficient + Number of planned users (1)

[0100] The correction means 29 calculates the number of provisional participants by adding the number of users who have reserved to the value obtained by multiplying the number of connections Ct and the user coefficient according to formula (1) (step S214). The correction means 29 compares the number of users estimated by the estimation means 24 with the number of provisional participants, and determines whether the number of provisional users is greater than the number of users (step S215). If the number of provisional users is greater than the estimated number of users (step S215: Yes), the correction means 29 changes the number of provisional participants to the number of users (step S216). If the number of provisional users is equal to or less than the estimated number of users (step S215: No), the correction means 29 adopts the number of users estimated by the estimation means 24.

[0101] In the algorithm for correcting the number of users explained with reference to Figure 23, the user coefficient is the inverse of the number of occupied conference rooms. However, the user coefficient may be weighted in detail according to the installation conditions and usage history, for example by setting a user coefficient for each conference room.

[0102] As described in the configuration of auxiliary storage unit 103 in the first embodiment, the program of control device 1 can be changed even after operation of air conditioning system 10 has begun, so that the algorithm of the process for correcting the number of occupants can be easily changed. For example, server 5 stores an update program that changes the algorithm of the process executed by correction means 29. Boot loader 106 reads the update program from server 5 and rewrites the program stored in auxiliary storage unit 103 with the update program.

[0103] Furthermore, when the motion sensor 6 is a pyroelectric sensor, there is a pyroelectric sensor having an element that can simply detect the density of people by using the floor surface of a space such as a conference room CR as a two-dimensional coordinate system represented by X-axis coordinates and Y-axis coordinates. The density detected by this motion sensor 6 is called a simplified density. The correction means 29 may weight the user coefficient in step S213 shown in FIG. 23 according to the simplified density. A specific description will be given below.

[0104] The human sensor 6 determines that a part of the detected two-dimensional temperature distribution that is higher than the temperature of the floor surface is a person, based on the temperature of the floor surface, and outputs the ratio of the area of ​​the part determined to be a person to the area of ​​the detection range as a value indicating the simplified crowding to the control device 1. For example, if the area of ​​the detection range is 10 and the area of ​​the part determined to be a person is 1.5, the simplified crowding is expressed as 0.15. The presence management means 23 records the information of the simplified crowding in the presence information. The correction means 29 classifies the number of people in each conference room CR into three ranks corresponding to the value of the simplified crowding. The three ranks are a first rank with fewer people, a second rank with more people than the first rank, and a third rank with more people than the second rank. Then, the correction means 29 multiplies the user coefficient by a ratio that increases as the rank of the number of people in each conference room CR increases. As a result, a weight is set in accordance with the simplified crowding for each conference room CR, and the accuracy of the crowding Den calculated for each conference room CR is improved.

[0105] According to the air conditioning system 10 of the second embodiment, in various cases, the accuracy of determining whether or not people are crowded can be suppressed from decreasing, and the effect of avoiding droplet infection can be improved. The various cases are, for example, a case where a person who is scheduled to participate in a conference does not participate in the conference and connects the information processing terminal 4-i to the local network NW2. Another case is a case where a person who was not scheduled to participate in a conference does participate in the conference and connects the information processing terminal 4-i to the local network NW2. Another case is a case where a person who is scheduled to participate in a conference does participate in the conference but does not connect the information processing terminal 4-i to the local network NW2. Another case is a case where a person who is scheduled to participate in a conference does not participate in the conference. In any of these cases, the effect of avoiding droplet infection can be improved.

[0106] Moreover, by changing the weighting coefficient, the algorithm for correcting the number of users can be changed. Therefore, it is possible to accommodate a wide variety of environments in the conference room CR, and convenience can be improved without changing the equipment of the air-conditioning system 10. In addition, since the program can be rewritten by remote control from the server 5 to the control device 1, the algorithm for correcting the number of users can be changed even after the air-conditioning system 10 has started operating, which has the effect of improving maintainability.

[0107] Embodiment 3 In the air conditioning system of the third embodiment, the server 5 stores conference reservation information, and the user can edit the conference reservation information stored in the server 5 via the information processing terminal 4-i. In the third embodiment, the same components as those described in the first embodiment are given the same reference numerals, and detailed descriptions thereof will be omitted. Also, in the third embodiment, detailed descriptions of the components and operations described in the first embodiment will be omitted, and components and operations different from those in the first embodiment will be described in detail.

[0108] The configuration of the air conditioning system of the present embodiment 3 will be described. In the air conditioning system 10 of the present embodiment 3, the server 5 stores conference reservation information in the configuration example shown in Fig. 3. A user operates the information processing terminal 4-i to read out the information stored in the server 5 and to write information to the server 5.

[0109] The configuration of the server 5 in the third embodiment will be described. FIG. 24 is a block diagram showing an example of the configuration of the server shown in FIG. 3 in the air conditioning system according to the third embodiment. The server 5 has a storage unit 51 and a control unit 52. The control unit 52 has a memory (not shown) that stores a program, and a processor (not shown) that executes processing in accordance with the program stored in the memory. The storage unit 51 is, for example, a storage device such as an HDD.

[0110] The storage unit 51 stores conference reservation information including environmental information of the conference room CR. The environmental information is, for example, information indicating the state of ventilation operation of the conference room CR. The state of ventilation operation is a state in which ventilation operation is being performed or a state in which ventilation is not being performed.

[0111] The control unit 52 is connected to the control device 1 and the information processing terminals 4-1 to 4-m via the wide area network NW1, the router 3 or 13, and the local network NW2. The control unit 52 executes authentication processing for the control device 1 and the information processing terminals 4-1 to 4-m. The control unit 52 also receives the ventilation operation status of the air conditioners 2-1 to 2-q from the control device 1 at regular intervals. If the ventilation operation status of any of the air conditioners 2-1 to 2-q has changed, the control unit 52 records the changed status in the conference reservation information stored in the storage unit 51. Furthermore, when the control unit 52 receives status change information including information for changing the ventilation operation status of the air conditioners from any of the information processing terminals 4-1 to 4-m, the control unit 52 records the status change information in the conference reservation information stored in the storage unit 51.

[0112] Fig. 25 is a table showing an example of conference reservation information stored in the storage unit shown in Fig. 24. As shown in Fig. 25, the conference reservation information is information in which the conference room name, the conference use start time and the conference use end time, and the ventilation operation status are registered in correspondence with the terminal identifiers T4-1 to T4-m of the information processing terminals 4-1 to 4-m. As the ventilation operation status, "ventilating", which indicates that the ventilation operation is being performed, or "ventilation not being performed", which indicates that ventilation is not being performed, is written. In the third conference room CR3, "ventilation ended" is recorded as the ventilation operation status for the completed process conference.

[0113] Next, the configuration of the control device 1 in the third embodiment will be described with reference to Fig. 8. In the functional block diagram shown in Fig. 8, the control device 1 is connected to the server 5 shown in Fig. 24 via the local network NW2 and the wide area network NW1 shown in Fig. 3.

[0114] The information acquiring means 21 acquires conference reservation information at regular intervals from the server 5 shown in Fig. 24. The information acquiring means 21 creates schedule information using the acquired conference reservation information. The information acquiring means 21 stores the created schedule information in the main storage unit 102.

[0115] The estimation means 24 refers to the conference reservation information linked to the schedule information and judges whether or not there is a change in the state of ventilation operation recorded in the conference reservation information. If there is a change in the state of ventilation operation in the conference reservation information, the device control means 27 controls the operation of the target air conditioner 2 in response to the changed state.

[0116] Next, the operation of the information processing terminal 4-i will be described with reference to Fig. 26. Fig. 26 is a flowchart showing the operation procedure of the information processing terminal in the air conditioning system according to embodiment 3. Although detailed explanation will be omitted here, when reserving a conference room CR, the users of the information processing terminals 4-1 to 4-m operate their own information processing terminals 4-i to register conference reservation information in advance in the server 5.

[0117] The terminal control unit 42 of the information processing terminal 4-i receives conference reservation information from the server 5 at regular intervals. The terminal control unit 42 compares the currently received conference reservation information with the previously received conference reservation information, and determines whether or not there is a change in the conference reservation information (step S301). If there is no change in the conference reservation information (step S301: No), the terminal control unit 42 proceeds to the process of step S304. On the other hand, if there is a change in the conference reservation information (step S301: Yes), the terminal control unit 42 determines whether or not there is a change in the ventilation operation status of the conference reservation information (step S302).

[0118] If the result of the determination in step S302 is that there is no change in the ventilation operation state of the conference reservation information (step S302: No), the terminal control unit 42 proceeds to the process of step S304. On the other hand, if there is a change in the ventilation operation state of the conference reservation information (step S302: Yes), the terminal control unit 42 displays the ventilation operation state on the display unit 44 (step S303). The terminal control unit 42 determines whether or not an instruction to change the ventilation operation state of the air conditioner 2 has been input by the user via the operation unit 43 (step S304). If an instruction to change the ventilation operation has been input (step S304: Yes), the terminal control unit 42 transmits state change information to the server 5 in order to update the information on the ventilation operation state of the conference reservation information stored in the server 5 (step S305). If an instruction to change the ventilation operation has not been input (step S304: No), the terminal control unit 42 ends the process.

[0119] Next, the operation of the control device 1 will be described with reference to Fig. 27. Fig. 27 is a flowchart showing the operation procedure of the control device in the air conditioning system according to the third embodiment. For example, the flow shown in Fig. 27 is started when the control device 1 is powered on. Note that in the third embodiment, detailed description of the same processes as those described with reference to Fig. 15 in the first embodiment will be omitted.

[0120] The timer 17 judges whether or not a time of a preset reference period Tref has been reached (step S001). If the time of the reference period Tref has been reached (step S001: Yes), the timer 17 notifies the information acquisition means 21, the presence management means 23, and the network management means 22 that the time of the reference period Tref has been reached.

[0121] When the information acquiring means 21 receives the notification from the timer 17, it acquires the conference reservation information from the server 5 (step S311). The information acquiring means 21 creates schedule information using the acquired conference reservation information (step S003-1), and stores the created schedule information in the main memory unit 102 (step S004-1).

[0122] After the processing of steps S004-1 to S004-3, the estimation means 24 refers to the conference reservation information and determines whether or not there is a change in the state of ventilation operation recorded in the conference reservation information (step S321). If there is a change in the state of ventilation operation in the conference reservation information (step S321: Yes), the equipment control means 27 transmits command information for changing the state of ventilation operation in accordance with the state change information to the target air conditioner 2 (step S322). If there is no change in the state of ventilation operation in the conference reservation information (step S321: No), the control device 1 ends the processing.

[0123] According to the air conditioning system 10 of the third embodiment, information on the environmental state of each conference room CR, such as ventilation in progress or ventilation not in progress, is shared between the control device 1 and the information processing terminals 4-1 to 4-m. Therefore, the user can know the ventilation state of the conference room CR that he or she is going to use before the start of the conference. In addition, the user can remotely control the ventilation operation via the information processing terminal 4-i. This has the effect of increasing convenience.

[0124] In the above-mentioned second and third embodiments, the configuration and operation different from those of the first embodiment have been described based on the first embodiment, but the second embodiment and the third embodiment may be combined. [Industrial Applicability]

[0125] The above-mentioned first to third embodiments are suitable for a remotely controlled air conditioning system. [Explanation of symbols]

[0126] 1 Control device, 2, 2-1 to 2-q Air conditioning equipment, 3, 3-1 to 3-n Router, 4-1 to 4-m Information processing terminal, 5 Server, 6, 6-1 to 6-q Human presence sensor, 10 Air conditioning system, 13 Router, 15 Memory unit, 16, 16a Calculation means, 17 Timer, 21 Information acquisition means, 22 Network management means, 23 Occupancy management means, 24 Estimation means, 25 Calculation means, 26 Determination means, 27 Equipment control means, 29 Correction means, 41 Terminal memory unit, 42 Terminal control unit, 43 Operation unit, 44 Display unit, 51 Memory unit, 52 Control unit, 101 Processor, 102 Main memory unit, 103 Auxiliary memory unit, 104 First communication interface, 105 Second communication interface, 106 Boot loader, 109 Bus, Cell1 to Cell3 Communication range, NW1 wide area network, NW2 local area network.

Claims

1. Air conditioning equipment to ventilate the room, a router for connecting the information processing terminal in the room to a network; a human presence sensor that detects whether or not there is a person in the room and outputs detection information indicating whether or not there is a person in the room; a control device connected to the air conditioning equipment, the router, and the human presence sensor and controlling the air conditioning equipment; The control device includes: A storage means for storing schedule information including information on the number of people expected to use the room and environmental information including information on the area of ​​the room; a network management means for acquiring information on the number of connections, which is the number of the information processing terminals connected to the router; an estimation means for estimating the number of users of the room based on the detection information, the number of connections, and the number of users scheduled to use the room; a calculation means for calculating a density, which is the number of people per unit area, using information on the area of ​​the room included in the environmental information and the number of users estimated by the estimation means; a determination means for comparing the density calculated by the calculation means with a first threshold and a second threshold lower than the first threshold, determining that ventilation is necessary when the density is equal to or greater than the first threshold, determining that ventilation is unnecessary when the density is less than the second threshold, and determining that ventilation is necessary within a certain period of time when the density is equal to or greater than the second threshold and less than the first threshold, and setting a ventilation start time and ventilation time, thereby determining whether ventilation of the room is necessary or not; and a device control means for causing the air conditioning device to perform a ventilation operation when the determination means determines that ventilation is necessary. Air conditioning system.

2. The storage means stores the environmental information including information on the maximum occupancy of the room, The estimation means includes: When the detection information indicates that someone is present in the room, it is determined whether the number of people scheduled to use the room is zero, and when the number of people scheduled to use the room is not zero, the number of people scheduled to use the room is estimated as the number of people using the room; as a result of judging whether the number of expected users is zero, if the number of expected users is zero, judging whether the number of connections is one or more, if the number of connections is one or more, estimating the number of connections as the number of users in the room, and if the number of connections is zero, estimating the maximum occupancy as the number of users in the room.

2. The air conditioning system of claim 1.

3. The estimation means includes: When the detection information indicates an unoccupied state in which no one is present in the room, it is determined whether the number of connections is 1 or more, and when the number of connections is 1 or more, the number of connections is estimated to be the number of users in the room, and when the number of connections is zero, a predetermined number of people is estimated to be the number of users in the room.

3. An air conditioning system according to claim 1 or 2.

4. A plurality of the air conditioners, each of which is provided in a respective one of the rooms; A plurality of the human presence sensors each provided in each of the plurality of rooms; A plurality of the routers; each router is connected to the information processing terminal in one or more of the plurality of rooms; the storage means stores the schedule information and the environmental information for each of the plurality of rooms; The estimation means includes: estimating the number of users for each of the plurality of rooms based on the detection information, the number of connections, and the number of users scheduled to use the room; An air conditioning system according to any one of claims 1 to 3.

5. The communication range of each of the routers covers the room in which the router is installed.

5. An air conditioning system according to claim 4.

6. The calculation means is creating history information by rewriting the number of users scheduled to use described for each of the plurality of rooms in the schedule information to the number of users estimated for each of the plurality of rooms as an actual number of users, and storing the created history information in the storage means; 6. An air conditioning system according to claim 4 or 5.

7. The control device has a timer that measures time, the schedule information and the history information include, for each of the plurality of rooms, a time when the room is to be used and information related to the use of the room; The estimation means includes: referring to the schedule information and the history information, identifying a room for which information related to the use of the room included in the schedule information and the history information respectively matches, and if the start time of the use of the identified room is before the time measured by the timer, estimating the actual number of users recorded in the history information to be the number of users of the identified room; The device control means includes: When the determination means determines that ventilation of the specified room is necessary, the air conditioner installed in the specified room is caused to perform a ventilation operation before the use start time.

7. An air conditioning system according to claim 6.

8. the control device has a correction means for correcting the number of users estimated by the estimation means and notifying the calculation means of the corrected number of users; the storage means stores the environmental information including information on a communication range of each of the routers for the plurality of rooms; The correction means is correcting the number of users estimated by the estimation means using a weighting coefficient corresponding to a predetermined calculation formula, the number of connections, the number of planned users, and the environmental information; An air conditioning system according to any one of claims 4 to 7.

9. a server connected to the control device and configured to store an update program for changing an algorithm of the process executed by the correction means; The storage means stores a program, The control device includes: A processor that executes processing according to the program; a boot loader for updating the program stored in the storage means; The processor executes the program to realize at least the function of the correction means, the boot loader reads the update program from the server and rewrites the program stored in the storage means with the update program; 9. An air conditioning system according to claim 8.

10. a server connected to the control device and the information processing terminal, and storing reservation information including information on the ventilation operation status of the air conditioner installed in the room; The information processing terminal includes: A display unit that displays a ventilation operation state of the air conditioner; A terminal control unit that transmits state change information including information for changing the state of the ventilation operation to the server when an instruction to change the state of the ventilation operation is input, The device control means includes: When the state change information is recorded in the reservation information stored in the server, the state of the ventilation operation of the air conditioner is changed in response to the state change information. An air conditioning system according to any one of claims 1 to 9.

11. A control device connected to an air conditioner that ventilates air in a room, a router that connects an information processing terminal in the room to a network, and a human presence sensor that outputs detection information indicating whether or not a person is present in the room, and controls the air conditioner, A storage means for storing schedule information including information on the number of people expected to use the room and environmental information including information on the area of ​​the room; a network management means for acquiring information on the number of connections, which is the number of the information processing terminals connected to the router; an estimation means for estimating the number of users of the room based on the detection information, the number of connections, and the number of users scheduled to use the room; a calculation means for calculating a density, which is the number of people per unit area, using the area of ​​the room included in the environmental information and the number of users estimated by the estimation means; a determination means for comparing the density calculated by the calculation means with a first threshold and a second threshold lower than the first threshold, determining that ventilation is necessary when the density is equal to or greater than the first threshold, determining that ventilation is unnecessary when the density is less than the second threshold, and determining that ventilation is necessary within a certain period of time when the density is equal to or greater than the second threshold and less than the first threshold, and setting a ventilation start time and ventilation time, thereby determining whether ventilation of the room is necessary or not; a device control means for causing the air conditioner to perform a ventilation operation when the determination means determines that ventilation is necessary; A control device having the above configuration.

12. An air conditioning control method using a control device connected to an air conditioner that ventilates air in a room, a router that connects an information processing terminal in the room to a network, and a human presence sensor that outputs detection information indicating whether or not a person is present in the room, comprising: storing schedule information including information on the number of people expected to use the room and environmental information including information on the area of ​​the room; acquiring information on the number of connections, which is the number of the information processing terminals connected to the router; estimating the number of users of the room based on the detection information, the number of connections, and the number of users expected to use the room; calculating a density, which is the number of people per unit area, using the area of ​​the room included in the environment information and the estimated number of users; a step of comparing the calculated density with a first threshold and a second threshold lower than the first threshold, determining that ventilation is necessary when the density is equal to or greater than the first threshold, determining that ventilation is unnecessary when the density is less than the second threshold, and determining that ventilation is necessary within a certain period of time when the density is equal to or greater than the second threshold and less than the first threshold, and setting a ventilation start time and a ventilation time to determine whether ventilation of the room is necessary or not; When it is determined that ventilation is necessary by the determination, causing the air conditioner to perform a ventilation operation; An air conditioning control method comprising the steps of:

13. A computer connected to an air conditioner that ventilates the air in a room, a router that connects an information processing terminal in the room to a network, and a human presence sensor that outputs detection information indicating whether or not a person is in the room, A storage means for storing schedule information including information on the number of people expected to use the room and environmental information including information on the area of ​​the room; a network management means for acquiring information on the number of connections, which is the number of the information processing terminals connected to the router; an estimation means for estimating the number of users of the room based on the detection information, the number of connections, and the number of users scheduled to use the room; a calculation means for calculating a density, which is the number of people per unit area, using the area of ​​the room included in the environmental information and the number of users estimated by the estimation means; a determination means for comparing the density calculated by the calculation means with a first threshold and a second threshold lower than the first threshold, determining that ventilation is necessary when the density is equal to or greater than the first threshold, determining that ventilation is unnecessary when the density is less than the second threshold, and determining that ventilation is necessary within a certain period of time when the density is equal to or greater than the second threshold and less than the first threshold, and setting a ventilation start time and ventilation time, thereby determining whether ventilation of the room is necessary or not; a device control means for causing the air conditioner to perform a ventilation operation when the determination means determines that ventilation is necessary; and a program for causing the air conditioner to perform the ventilation operation.

Citation Information

Patent Citations

  • Ventilating and air conditioning system, and ventilating and air conditioning control method

    JP2006098007A

  • A system and method for controlling access to a networked control system.

    JP2012517727A

  • Remote controller and indoor machine for air conditioner including the same

    JP2014055743A

  • Air-conditioning control system, air-conditioning control device, air-conditioning control method, and program

    JP2014085077A

  • Thermal environment reproduction system

    JP2015197241A