Air conditioning ventilation control device

The air conditioning ventilation command device addresses temperature control delays by using low-pass filters and current measurements to generate optimized control signals, enhancing energy efficiency and thermal management in air-conditioned spaces.

JP7581130B2Active Publication Date: 2024-11-12HITACHI GE NUCLEAR ENERGY LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021097059
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-06-10
Publication Date
2024-11-12
Estimated Expiration
2041-06-10

AI Technical Summary

Technical Problem

Existing air conditioning systems face delays in temperature control, which can lead to increased thermal load on electrical equipment and inefficient energy usage.

Method used

An air conditioning ventilation command device that includes a receiving section and a command signal outputting section, utilizing low-pass filters and current measurements to generate control signals for temperature adjustment based on electrical equipment power consumption and operational states.

Benefits of technology

Enables precise temperature control of air-conditioned spaces, reducing energy consumption and thermal load on electrical equipment by smoothing power fluctuations and optimizing ventilation system operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007581130000001
    Figure 0007581130000001
  • Figure 0007581130000002
    Figure 0007581130000002
  • Figure 0007581130000003
    Figure 0007581130000003
Patent Text Reader

Abstract

To ensure that the temperature of a space to be air-conditioned is appropriately controlled.SOLUTION: An air conditioning and ventilation command device 200 includes a receiving unit 202 for receiving measurement signals I1, I2, I3 of power or current supplied to electrical devices 31, 32, 33 provided in a space to be air-conditioned and a command signal output unit 204 for outputting a command signal SR that commands an increase or decrease in the temperature of the space to be air-conditioned on the basis of the measurement signals I1, I2, I3. Preferably, the electrical devices 31, 32, 33 receive power through circuit breakers 11, 12, 13. The receiving unit 202 may receive open / close signals S1, S2, S3 indicating the open / close state of the circuit breakers 11, 12, 13.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an air conditioning ventilation command device. [Background technology]

[0002] As background art in this technical field, the abstract of Patent Document 1 listed below states: "In the air conditioning system of the present invention, when a first temperature difference state is defined as a state in which a temperature difference, which is a value obtained by subtracting a set temperature from the temperature of the space to be air-conditioned, is a first temperature difference, and a second temperature difference state is defined as a state in which the temperature difference is a second temperature difference smaller than the first temperature difference, the temperature of the refrigerant flowing through the first heat exchanger of the indoor unit in the second temperature difference state is higher than in the first temperature difference state; when a first humidity difference state is defined as a state in which a humidity difference, which is a value obtained by subtracting a set humidity from the absolute humidity of the space to be air-conditioned, is a first humidity difference, and a second humidity difference state is defined as a state in which the humidity difference is a second humidity difference smaller than the first humidity difference, the temperature of the supply air supplied from the outdoor air supply unit in the second humidity difference state is higher than in the first humidity difference state." [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-016419 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, when temperature control is performed simply by monitoring the temperature of the space to be air-conditioned, there are cases where appropriate temperature control cannot be performed due to delays in temperature control, etc. In particular, when delays in temperature control occur, it is considered that the thermal burden on electrical equipment in the space to be air-conditioned becomes large. The present invention has been made in consideration of the above-mentioned circumstances, and has an object to provide an air conditioning ventilation command device that can appropriately control the temperature of a space to be air conditioned. [Means for solving the problem]

[0005] In order to solve the above problems, the air conditioning ventilation command device of the present invention comprises: An air conditioning ventilation command device comprising a receiving unit and a command signal output unit, Receives measurement signals of power or current supplied to electrical equipment installed in the space to be air-conditioned The command signal output unit filters the measurement signal using a low-pass filter, and outputs a command signal to increase or decrease the temperature of the air-conditioned space based on the result of the filtering. It is characterized by: Effect of the Invention

[0006] According to the present invention, the temperature of a space to be air conditioned can be appropriately controlled. [Brief description of the drawings]

[0007] [Figure 1] FIG. 2 is a block diagram of a control system according to the first embodiment. [Diagram 2] FIG. 2 is a block diagram of a command signal output unit in the first embodiment. [Diagram 3] 5A and 5B are schematic diagrams showing an example of an operation of a command signal output unit. [Figure 4] FIG. 11 is a block diagram of a command signal output unit in the second embodiment. [Diagram 5] FIG. 11 is a block diagram of a control system according to a third embodiment. [Figure 6] FIG. 13 is a block diagram of a command signal output unit in a third embodiment. [Figure 7] FIG. 13 is a block diagram of a control system according to a fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] [First embodiment] FIG. 1 is a block diagram of a control system 1 according to the first embodiment. 1, the control system 1 includes a power supply panel 10, electrical devices 31, 32, and 33, a control device 200 (air conditioning and ventilation command device), an air conditioning control device 40, and an air conditioning and ventilation device 50. The power supply panel 10 also includes circuit breakers 11, 12, 13, 14, and 15, and current measuring devices 21, 22, and 23. Each element of the control system 1 is installed in a common space to be air conditioned (not shown), and each element generates heat as it operates.

[0009] The air conditioning ventilator 50 performs air conditioning and ventilation of the space to be air conditioned. The control device 200 outputs a command signal SR corresponding to the air conditioning load of the air conditioning ventilator 50 based on the open / closed states of the circuit breakers 11, 12, and 13 and the current values ​​measured by the current measuring devices 21, 22, and 23. The air conditioning control device 40 controls the air conditioning ventilator 50 so as to realize the air conditioning load according to the command signal SR.

[0010] The circuit breakers 11, 12, and 13 are inserted in the power supply lines (without reference numerals) for the electric devices 31, 32, and 33, and supply their respective open / closed states to the control device 200 as open / close signals S1, S2, and S3. However, the control device 200 may output the open / close signals S1, S2, and S3 to control the open / close of the circuit breakers 11, 12, and 13. The power consumption (active power) of each of the electric devices 31, 32, and 33 is called P1, P2, and P3, and the current values ​​are called I1, I2, and I3 (measurement signals). The current measuring devices 21, 22, and 23 measure the current values ​​I1, I2, and I3 and supply them to the control device 200. When digital protective relays are applied as the circuit breakers 11, 12, and 13, the current values ​​I1, I2, and I3 may be the measurement values ​​of these digital protective relays.

[0011] The current values ​​I1, I2, and I3 are supplied to the control device 200 so that the control device 200 can perform control according to the power consumptions P1, P2, and P3. That is, in the illustrated example, it is assumed that the power factors of the electric devices 31, 32, and 33 and the power supply voltage applied thereto can be regarded as constant, so that the power consumptions P1, P2, and P3 can be uniquely identified by determining the current values ​​I1, I2, and I3. However, if the power supply voltage and the power factors of the electric devices 31, 32, and 33 fluctuate to a degree that cannot be ignored, a power meter (not shown) may be provided instead of the current meters 21, 22, and 23, and the power consumptions P1, P2, and P3 measured by the power meter may be supplied to the control device 200.

[0012] The control device 200 includes general computer hardware (all not shown), such as a central processing unit (CPU), random access memory (RAM), read only memory (ROM), hard disk drive (HDD), and solid state drive (SSD), and the HDD or SSD stores an operating system (OS), application programs, various data, and the like. The OS and application programs are deployed in the RAM and executed by the CPU. In FIG. 1, the inside of the control device 200 shows functions realized by application programs, etc., as blocks.

[0013] That is, the control device 200 includes a receiving unit 202 and a command signal output unit 204. The receiving unit 202 receives the above-mentioned current values ​​I1, I2, and I3 and the opening and closing signals S1, S2, and S3. The command signal output unit 204 outputs a command signal SR based on the result of adding up the current values ​​I1, I2, and I3.

[0014] FIG. 2 is a block diagram of the command signal output unit 204 in this embodiment. 2, the command signal output unit 204 includes a low-pass filter 212, a multiplication unit 214, and an HVG (High Value Gate; high value control unit) 250. The total current value IL (total value) in the figure is the total value of the current values ​​I1, I2, and I3 (see FIG. 1). The low-pass filter 212 has, for example, a one-time delay transfer function, and outputs the result of low-pass filtering of the total current value IL as a low-frequency component value IK.

[0015] The maximum allowable temperature flag ST is a flag that is set to "1" when the temperature in the air-conditioned space reaches a predetermined temperature (for example, a maximum allowable temperature), and is set to "0" otherwise. The maximum command signal value SI is a value of the command signal SR corresponding to the maximum air-conditioning load of the air-conditioning ventilator 50. The multiplication unit 214 multiplies the maximum allowable temperature flag ST by the maximum command signal value SI, and outputs the multiplication result S214. Therefore, the multiplication result S214 becomes equal to the maximum command signal value SI when the temperature in the air-conditioned space reaches the above-mentioned predetermined temperature, and becomes "0" otherwise. The HVG250 outputs the maximum value of the peak value of the low-frequency component value IK and the peak value of the multiplication result S214 as the command signal SR. Note that the logical configuration shown in FIG. 2 is an example, and any logical configuration that realizes a similar operation can be applied.

[0016] FIG. 3 is a schematic diagram showing an example of the operation of the command signal output unit 204. As shown in FIG. First, as described above, the total current value IL is the sum of the current values ​​I1, I2, and I3, and the peak value of the total current value IL is called ILp. In general, the air conditioning capacity that the air conditioning ventilator 50 should realize is calculated based on the peak heat generation amount of the electric devices 31, 32, and 33. Therefore, if the current values ​​I1, I2, and I3 do not change sharply, the command signal SR can be considered to be a value proportional to the peak value ILp. However, some of the electric devices 31, 32, and 33, such as motor-operated valves, allow current to flow for only a short time. Some of these types of electric devices do not have much effect on the temperature rise of the air-conditioned space, taking into account the heat capacity of the air-conditioned space.

[0017] In this embodiment, in order to achieve energy saving, the transient current components that do not significantly affect the temperature rise are suppressed. Specifically, the low-pass filter 212 (see FIG. 2) performs filtering on the total current value IL and outputs the result as a low-pass component value IK. The peak value of the low-pass component value IK is called IKp. If the multiplication result S214 is "0", the HVG 250 outputs this peak value IKp as a command signal SR. This makes it possible to achieve energy saving in the air conditioning ventilator 50 from the power consumption corresponding to the peak value ILp to the power consumption corresponding to the peak value IKp, and also makes it possible to reduce the capacity of the air conditioning ventilator 50.

[0018] In the above example, the control device 200 generates the command signal SR based on the current values ​​I1, I2, I3, etc., but the command signal SR may be generated based on the opening and closing signals S1, S2, S3, i.e., the on / off states of the electric devices 31, 32, 33. If the current consumption when the electric devices 31, 32, 33 are in the on state is approximately constant, the total current consumption of the electric devices 31, 32, 33 can be estimated based on the opening and closing signals S1, S2, S3, and the command signal SR can be generated based on the estimation result.

[0019] [Second embodiment] Next, a second embodiment will be described. In the following description, parts corresponding to those in the first embodiment described above are given the same reference numerals, and the description thereof may be omitted. The overall configuration of the control system according to the second embodiment is similar to that of the first embodiment (see FIG. 1). However, the configuration of the command signal output unit 204 is different from that of the first embodiment, as described below.

[0020] FIG. 4 is a block diagram of the command signal output unit 204 in this embodiment. The command signal output unit 204 in the present embodiment includes subtraction units 216 and 218 in addition to the elements of the first embodiment (see FIG. 2). The subtraction unit 216 subtracts the set temperature Ts from the measured temperature Tm and outputs a subtraction result S216. Here, the measured temperature Tm is the temperature of the air-conditioned target space, and the set temperature Ts is the target value of the measured temperature Tm.

[0021] Further, the subtraction unit 218 subtracts the set dose Qs from the measured dose Qm and outputs a subtraction result S218. Here, the measured dose Qm is the dose of radiation in the air-conditioned target space. The set dose Qs is a threshold value of the measured dose Qm such that "it is preferable that the measured dose Qm be equal to or less than this value". However, the subtraction result S218 is a value that becomes "Qm - Qs" when "Qm ≥ Qs" and becomes "0" when "Qm < Qs".

[0022] The subtraction results S216 and S218 are supplied to the HVG 250. Thereby, the HVG 250 outputs the highest value among the peak value IKp of the low-frequency component value IK, the peak value of the multiplication result S214, the peak value of the subtraction result S216, or the peak value of the subtraction result S218 as the command signal SR. Here, when the peak value of the subtraction result S216 becomes the command signal SR, the air-conditioning and ventilation device 50 (see FIG. 1) operates so as to bring the measured temperature Tm closer to the set temperature Ts. Also, when the peak value of the subtraction result S218 becomes the command signal SR, the air-conditioning and ventilation device 50 operates so that the measured dose Qm becomes equal to or less than the set dose Qs. That is, by ventilating the air-conditioned target space, the causative substances of radiation floating in the air are discharged to the outside.

[0023] [Third Embodiment] Next, the third embodiment will be described. In the following description, parts corresponding to those of the other above-described embodiments may be denoted by the same reference numerals, and the description thereof may be omitted. FIG. 5 is a block diagram of the control system 3 according to the third embodiment. 5, the control system 3 includes a power supply panel 60, electrical devices 81 and 82, a control device 200, an air conditioning control device 40, and an air conditioning ventilator 50. The power supply panel 60 also includes circuit breakers 14, 15, 61, and 62, and current measuring devices 71 and 72.

[0024] Although not shown, the control system 3 includes electrical devices 31, 32, and 33, similar to the control system 1 (see FIG. 1). Similarly, although not shown, the power supply panel 60 includes circuit breakers 11, 12, and 13 and current measuring instruments 21, 22, and 23, similar to the power supply panel 10 (see FIG. 1). These circuit breakers 11, 12, and 13 and current measuring instruments 21, 22, and 23 supply opening and closing signals S1, S2, and S3 and current values ​​I1, I2, and I3 to the control device 200, respectively.

[0025] The electric devices 81 and 82 are devices that mainly operate in an emergency. The circuit breakers 61 and 62 are automatically turned on in an emergency such as an accident, and supply power to the electric devices 81 and 82, respectively. The circuit breakers 61 and 62 supply their respective open / closed states to the control device 200 as open / close signals S61 and S62. The open / close signals S61 and S62 are signals that are "0" in the open state and "1" in the closed state. The current measuring instruments 71 and 72 measure the current values ​​supplied to the electric devices 81 and 82, and supply the results to the control device 200.

[0026] FIG. 6 is a block diagram of the command signal output unit 204 in this embodiment. The command signal output unit 204 in this embodiment includes a calculation unit 222 in addition to the elements of the first embodiment (see FIG. 2). The calculation unit 222 receives the opening and closing signals S61, S62 and the command signal maximum value SI, and when one or both of the opening and closing signals S61, S62 are "1", outputs a calculation result S222 of "S222=SI". On the other hand, when both of the opening and closing signals S61, S62 are "0", the calculation unit 222 outputs a calculation result S222 of "S222=0".

[0027] As described above, the circuit breakers 61 and 62 are automatically closed in an emergency such as an accident. At that time, the calculation result S222 becomes equal to the maximum command signal value SI, and the command signal SR also becomes equal to the maximum command signal value SI. This allows the air conditioning ventilator 50 to operate at maximum air conditioning load in an emergency such as an accident.

[0028] In the above example, an example was described where the air conditioning ventilator 50 should be operated at maximum air conditioning load, but if the values ​​of the opening and closing signals S1, S2, S3, S61, and S62 correspond to the operation mode or air conditioning load of the air conditioning ventilator 50, the air conditioning ventilator 50 may be operated in the operation mode or air conditioning load corresponding to these opening and closing signals.

[0029] [Fourth embodiment] 7 is a block diagram of a control system 4 according to the fourth embodiment. In the following description, the same reference numerals are used to designate parts corresponding to those in the other embodiments described above, and the description thereof may be omitted. 7, a control system 4 includes subsystems 4A and 4B. The subsystem 4A includes a power supply panel 10, electrical devices 31 and 32, a control device 200, an air conditioning control device 40, and an air conditioning ventilator 50. These elements are similar to those in the control system 1 of the first embodiment (see FIG. 1).

[0030] Furthermore, subsystem 4B includes elements corresponding to the elements of subsystem 4A. That is, subsystem 4B includes a power supply panel 110, electrical equipment 131, 132, a control device 220 (air conditioning and ventilation command device), an air conditioning control device 140, and an air conditioning and ventilation device 150. Subsystems 4A and 4B are disposed in separate air conditioned spaces (not shown), and air conditioning and ventilation devices 50 and 150 perform air conditioning and ventilation for each of the air conditioned spaces.

[0031] The sum of the current values ​​I1 and I2 in the subsystem 4A is called the total current value IL1. The sum of the current values ​​I1 and I2 in the subsystem 4B is called the total current value IL2. The control devices 200 and 220 are equipped with balance control units 206 and 226, respectively. The balance control units 206 and 226 have a function of switching the open / closed states of the circuit breakers 11 and 12 in the power supply panels 10 and 110 so that the total current values ​​IL1 and IL2 are balanced (approach each other).

[0032] According to this embodiment, the total current values ​​IL1, IL2 in the subsystems 4A, 4B can be balanced. This allows the heat generation from each element of the subsystems 4A, 4B to be approximately the same, and the air conditioning load of the air conditioning ventilators 50, 150 to be approximately the same. This allows the total power consumption of the air conditioning ventilators 50, 150 to be reduced. In the above example, the control system 4 includes two control devices 200, 220, but these functions may be integrated into one control device, and both subsystems 4A, 4B may be controlled by this one control device.

[0033] [Variations] The present invention is not limited to the above-mentioned embodiment, and various modifications are possible. The above-mentioned embodiment is exemplified to explain the present invention in an easy-to-understand manner, and is not necessarily limited to those having all the configurations described. In addition, it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is possible to delete a part of the configuration of each embodiment, or to add or replace other configurations. In addition, the control lines and information lines shown in the figure show those that are considered necessary for explanation, and do not necessarily show all the control lines and information lines necessary on the product. In reality, it may be considered that almost all the configurations are connected to each other. Possible modifications of the above-mentioned embodiment are, for example, as follows.

[0034] (1) The hardware of the control devices 200 and 220 in the above-described embodiments can be realized by a general computer. Therefore, the programs for executing the various processes described above may be stored on a storage medium or distributed via a transmission line.

[0035] (2) In the above embodiment, the processes shown in FIGS. 3, 4, and 6, as well as the other processes described above, have been described as software-based processes using a program. However, some or all of the processes may be replaced with hardware-based processes using an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array), etc.

[0036] (3) The various processes executed in the above-described embodiments may be executed by a server computer via a network (not shown), and the various data stored in the above-described embodiments may also be stored in the server computer.

[0037] [Effects of the embodiment] As described above, according to the embodiment, the air conditioning ventilation command device (200) includes a receiver 202 that receives measurement signals (I1, I2, I3) of power or current supplied to the electrical appliances 31, 32, 33 provided in the air conditioned space, and a command signal output unit (204) that outputs a command signal SR that commands an increase or decrease in the temperature of the air conditioned space based on the measurement signals (I1, I2, I3). This makes it possible to update the command signal SR in accordance with the timing when the electrical appliances 31, 32, 33 generate heat, and to appropriately control the temperature in the air conditioned space.

[0038] More preferably, the electric devices 31, 32, and 33 receive power via the circuit breakers 11, 12, and 13, the receiver 202 receives switching signals S1, S2, and S3 indicating the switching states of the circuit breakers 11, 12, and 13, and the command signal output unit (204) further outputs the command signal SR based on the switching signals S1, S2, and S3. This makes it possible to update the command signal SR according to the state predicted by the switching states of the circuit breakers 11, 12, and 13.

[0039] It is further preferable that the command signal output unit (204) has a function of smoothing the sum (IL) of the measurement signals (I1, I2, I3) and outputting the command signal SR based on the smoothed sum (IL). This makes it possible to suppress changes in the command signal SR based on transient current components that are not significantly affected by temperature rises in the space to be air-conditioned, thereby realizing energy savings.

[0040] 7, when a plurality of electric appliances 31, 32, 131, 132 are provided in a plurality of air-conditioned spaces and the command signal output unit (204) outputs respective command signals SR to a plurality of air-conditioning ventilators 50, 150 provided in the plurality of air-conditioned spaces, it is more preferable that the air-conditioning ventilation command device (200, 220) further includes a balance control unit 206, 226 that switches the on / off state of the plurality of electric appliances 31, 32, 131, 132 so that the air-conditioning loads of the plurality of air-conditioning ventilators 50, 150 become similar. This makes it possible to make the air-conditioning loads of the plurality of air-conditioning ventilators 50, 150 approximately the same, and to reduce the total power consumption of the plurality of air-conditioning ventilators 50, 150. [Explanation of symbols]

[0041] 31, 32, 33, 131, 132 Electrical equipment 50 Air conditioning and ventilation equipment 50,150 Air conditioning ventilation equipment 200, 220 Control device (air conditioning ventilation command device) 202 Receiving unit 204 Command signal output section 206,226 Balance control section IL Total current value (total value) SR command signal I1, I2, I3 Current value (measurement signal) S1, S2, S3 Open / Close Signal

Claims

1. An air conditioning ventilation command device comprising a receiving unit and a command signal output unit, The receiving unit receives a measurement signal of power or current supplied to an electrical device installed in the space to be air conditioned, The command signal output unit filters the measurement signal using a low-pass filter, and outputs a command signal for instructing an increase or decrease in temperature of the air-conditioned space based on the result of the filtering. An air conditioning ventilation command device characterized by:

2. An air conditioning ventilation command device comprising a receiving unit and a command signal output unit, The receiving unit receives an opening / closing signal indicating an opening / closing state of a circuit breaker inserted in a power line for an electrical device provided in the space to be air conditioned, The command signal output unit estimates a current consumption of the electrical device based on the opening and closing signal, filters the estimated current consumption using a low-pass filter, and outputs a command signal for instructing an increase or decrease in temperature of the air-conditioned space based on the result of the filtering. An air conditioning ventilation command device characterized by:

3. The air conditioning and ventilation command device outputs the command signal to control the air conditioning and ventilation of the plurality of air-conditioned spaces each of which is provided with the electrical equipment that receives power via a circuit breaker, The receiving unit receives the measurement signals corresponding to the electrical devices installed in the plurality of air conditioned spaces, the command signal output unit outputs the command signal to each of the air conditioning ventilators provided in the plurality of air conditioned spaces, A balance control unit is further configured to calculate a total value of the power values ​​or current values ​​acquired by the receiving unit for each of the plurality of air-conditioned spaces, and to switch an open / closed state of a circuit breaker of the plurality of electrical devices so as to reduce a difference in the total value between the plurality of air-conditioned spaces.

2. The air conditioning ventilation command device according to claim 1 .

Citation Information

Patent Citations

  • Controller for ventilating fan

    JP1997079621A

  • Data center

    JP2015158325A

  • Air conditioning system

    JP2020016419A

  • Nuclear power plant ventilation air-conditioning system, and ventilation air-conditioning method

    JP2020038080A