Information processing system, information processing method, and program

The information processing system addresses the lack of incentives for consumers by calculating and granting rewards based on market price differences, enhancing the use of power storage equipment through efficient charging and discharging strategies.

JP7581303B2Active Publication Date: 2024-11-12RAKUTEN GROUP INC
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2022187093
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-11-24
Publication Date
2024-11-12
Estimated Expiration
2042-11-24

AI Technical Summary

Technical Problem

Consumers lack sufficient incentive to use power storage equipment as they only receive remuneration for responding to demand response requests.

Method used

An information processing system that includes a battery control unit, performance acquisition unit, and remuneration calculation unit to determine and grant rewards based on the price difference between charging and discharging periods, using market prices and charging/discharging performance.

Benefits of technology

Increases incentives for consumers to use power storage equipment by providing rewards based on discharge performance, reducing costs, and enhancing user satisfaction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007581303000001
    Figure 0007581303000001
  • Figure 0007581303000002
    Figure 0007581303000002
  • Figure 0007581303000003
    Figure 0007581303000003
Patent Text Reader

Abstract

To enhance an incentive when a user as a consumer uses a power storage facility.SOLUTION: A user management server 11 includes: an achievement acquisition unit that acquires a charge / discharge achievement including a charge achievement obtained by charging a storage battery 16 by power supplied from a commercial power system, and a discharge achievement obtained when the storage battery 16 is discharged, from a battery control unit that controls charge / discharge of the storage battery 16 related to a user; an identification unit that calculates a reward granting ratio by using a profit obtained by a price difference between a power market price per unit power in a charge period when the storage battery 16 is charged by power supplied from the commercial power system and a power market price per unit power in a discharge period when the storage battery 16 is discharged; and a reward granting unit that calculates a reward to be granted to the user by using accumulated discharge power of the storage battery 16 based on the charge / discharge achievement and the reward granting ratio to record a calculated reward in association with the user in a storage unit.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an information processing system, an information processing method, and a program. [Background technology]

[0002] In recent years, energy storage equipment that stores power supplied from a commercial power system has been installed in ordinary homes or facilities such as stores (for example, Patent Document 1). In the system described in Patent Document 1, a consumer receiving power from the commercial power system uses power from a storage battery in response to a request (demand response) from an aggregator or the like, thereby reducing the amount of power supplied from the commercial power system. In addition, this system calculates an appropriate remuneration according to the amount of regulated power as a remuneration for a consumer who complies with the request. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-170925 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, in the above system, consumers can only receive rewards if they respond to demand response, which means that consumers do not have a sufficient incentive to use the energy storage facilities. [Means for solving the problem]

[0005] In one aspect, an information providing system for solving the above-mentioned problems is provided, the information providing system includes: a result acquiring unit that acquires, from a battery control unit that controls charging and discharging of a storage battery associated with a user, a charge result including a charging result of the storage battery being charged with power supplied from a commercial power system and a discharging result of the storage battery being discharged, a specifying unit that calculates a reward grant rate using a profit obtained by a price difference between a market price of electricity per unit power in a charging period in which the storage battery is charged with power supplied from the commercial power system and a market price of electricity per unit power in a discharging period in which the storage battery is discharged, and a reward granting unit that calculates a reward to be granted to the user using the discharge result based on the charge and discharge results and the reward grant rate, and associates the calculated reward with the user and records it in a storage unit.

[0006] In one aspect, an information processing method for solving the above problem is provided. The information processing method includes a result acquisition process in which one or more computers acquire, from a battery control unit that controls charging and discharging of a storage battery associated with a user, a charge result including a charging result of the storage battery being charged with power supplied from a commercial power system and a discharging result of the storage battery being discharged, a determination process in which a reward grant rate is calculated using a profit obtained by a price difference between a market price of electricity per unit power in a charging period in which the storage battery is charged with power supplied from the commercial power system and a market price of electricity per unit power in a discharging period in which the storage battery is discharged, and a reward grant process in which a reward to be granted to the user is calculated using a discharge result based on the charge and discharge results and the reward grant rate, and the calculated reward is recorded in a storage unit in association with the user.

[0007] In one aspect, a program for solving the above problem is provided, which causes one or more computers to function as: a result acquisition unit that acquires, from a battery control unit that controls charging and discharging of a storage battery associated with a user, a charge result including a charge result of the storage battery being charged with power supplied from a commercial power grid and a discharge result of the storage battery being discharged, a determination unit that calculates a reward grant rate using a profit obtained from a price difference between a market price of electricity per unit power in a charging period in which the storage battery is charged with power supplied from the commercial power grid and a market price of electricity per unit power in a discharging period in which the storage battery is discharged, and a reward grant unit that calculates a reward to be granted to the user using a discharge result based on the charge and discharge results and the reward grant rate, and records the calculated reward in a storage unit in association with the user. Effect of the Invention

[0008] According to the present invention, it is possible to increase the incentive for users, who are consumers, to use power storage facilities. [Brief description of the drawings]

[0009] [Figure 1] FIG. 1 is a diagram illustrating a schematic configuration of an information processing system according to an embodiment. [Diagram 2] FIG. 2 is a diagram illustrating a hardware configuration of the information processing apparatus according to the embodiment. [Diagram 3] FIG. 2 is a block diagram showing functions of a charge / discharge management server according to the embodiment. [Figure 4] FIG. 4 is a diagram showing a charge / discharge plan according to the embodiment. [Diagram 5] FIG. 2 is a block diagram showing functions of a user management server of the embodiment. [Figure 6] 4 is a schematic diagram showing a structure of user information in the embodiment; FIG. [Figure 7] 4 is a schematic diagram showing a structure of charge / discharge management information in the embodiment; FIG. [Figure 8] 13 is a flowchart showing the procedure of a reward granting process according to the embodiment. [Figure 9]FIG. 13 is a diagram showing a discharge record screen in the embodiment; [Figure 10] FIG. 13 is a diagram showing an EC site screen of another embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] An embodiment of an information processing system, an information processing method, and a program will be described. <Information Processing System> As shown in FIG. 1, a consumer 20 uses a power storage facility 14, a private power generation facility 18, and an electric power consuming device 19. The power storage facility 14 charges a storage battery 16 with power supplied from a commercial power system or power supplied from the private power generation facility 18. The consumer 20 receives electric power at a price (electricity rate) designated by an electric power utility, such as a retail electric power supplier, by entering into a contract for receiving electric services with the electric power utility. The electricity rate per unit amount of electric power may change in conjunction with the transaction price in the electric power trading market or the amount of electric power used, or may be constant. The electric power trading market is, for example, a spot market. In the spot market, electricity to be generated or sold the next day is bid on by the day before, and the transaction is concluded.

[0011] The private power generation facility 18 is a known facility such as a solar power generation facility used by a consumer 20. The power consumption equipment 19 can be powered by power supplied from a commercial power system and power supplied from the power storage facility 14. In this embodiment, the consumer 20 is an ordinary household or a facility. The facility is a store, a factory, a school, a building, etc. The power consumption equipment 19 is an air conditioner, a home appliance such as a refrigerator or a washing machine, an electric vehicle, etc. In the following, the consumer 20 will be described as a "user."

[0012] The power management system 10 is a system separate from the commercial power system. The power management system 10 controls the charging and discharging of the power storage facility 14 according to a charging and discharging plan. The power management system 10 also returns a portion of the profits earned by the power company to the user.

[0013] The power management system 10 includes a user management server 11, a charge / discharge management server 12, a power storage facility 14, and a user device 13. These devices are connected to each other via a network NW such as the Internet so as to be able to transmit and receive various data.

[0014] The charge / discharge management server 12 creates a charge / discharge plan for the power storage equipment 14 for each user. The charge / discharge plan is a predetermined schedule for charging and discharging the storage battery 16. The charge / discharge plan includes a charging period and a target value for charging, and a discharging period and a target value for discharging. The target value indicates a state of charge indicating the remaining charge or an amount of stored power. The charge / discharge management server 12 also transmits charge commands and discharge commands to the power storage equipment 14 according to the charge / discharge plan. The charge / discharge management server 12 also acquires charge / discharge records from the power storage equipment 14. The charge / discharge management server 12 constitutes an information processing system.

[0015] The user management server 11 acquires the charge / discharge record from the charge / discharge management server 12. In addition, the user management server 11 distributes to each user as a reward the profit of the electric utility company obtained by charging / discharging the power storage facility 14. In this embodiment, the user management server 11 configures an information processing system.

[0016] The power storage facility 14 controls charging and discharging of the storage battery 16 based on a request from the charge and discharge management server 12. The power storage facility 14 charges when electricity rates are low, and discharges when electricity rates are high.

[0017] The power storage facility 14 includes a battery control unit 15, a storage battery 16, and a power measurement unit 17. The battery control unit 15 charges and discharges the storage battery 16 according to a charge command and a discharge command received from the charge / discharge management server 12. The storage battery 16 is a secondary battery that can be charged and discharged. The storage battery 16 is associated with a user. For example, the storage battery 16 is owned by the user or rented from an electric utility. The power measurement unit 17 includes a measurement unit that measures the amount of power received from a commercial power system, and a measurement unit that measures the charging power charged by the storage battery 16 and the discharging power discharged by the storage battery 16. The power measurement unit 17 includes a meter that measures the amount of power received (kWh) by the user every predetermined period (for example, 30 minutes). This meter is a certified meter that complies with the Measurement Act. The power measurement unit 17 also includes a meter that measures the charging and discharging performance of the storage battery 16 every predetermined period. For example, the meter measures the discharge power (kW) of the storage battery 16 at predetermined time intervals (for example, every 10 minutes). The power measurement unit 17 transmits the charge / discharge record including the measurement result to the charge / discharge management server 12.

[0018] The user device 13 is a device used by a user, and is, for example, a personal computer, a multifunction telephone such as a smartphone, etc. The user device 13 displays, on a screen, the electricity fee to be paid by the user, the remuneration given to the user, etc.

[0019] <Hardware configuration> 2, the hardware configuration of the information processing device H10 constituting the user management server 11 will be described. The information processing device H10 includes a communication device H11, an input device H12, a display device H13, a storage device H14, and a processor H15. Note that this hardware configuration is an example, and it can also be realized by other hardware. Note that the input device H12 and the display device H13 may be omitted.

[0020] The communication device H11 is an interface that executes data transmission and reception by establishing a communication path with another device, for example, a network interface or a wireless interface.

[0021] The input device H12 is a device that accepts input of various information based on the operation of a person in charge. The input device H12 is, for example, a touch panel, a mouse, a keyboard, etc. The display device H13 is, for example, a display that displays various information.

[0022] The storage device H14 (computer-readable medium) stores data and various programs for executing various functions of the user device 13. Examples of the storage device H14 include a ROM, a RAM, a hard disk, etc. The storage device H14 includes any available recording medium that can be accessed by a general-purpose or dedicated computer. The storage device H14 stores a program for distributing the profits of the electric utility obtained by charging and discharging the power storage facility 14 to each user as a reward, and various data used to execute the program.

[0023] The processor H15 uses programs and data stored in the storage device H14 to control each process in the user device 13. Examples of the processor H15 include a CPU and an MPU. The processor H15 loads the programs into the RAM and executes various processes for each process.

[0024] The processor H15 is not limited to a processor that performs software processing for all the processes it executes. For example, the processor H15 may be equipped with a dedicated hardware circuit (e.g., an application specific integrated circuit (ASIC)) that performs hardware processing for at least a part of the processes it executes. That is, the processor H15 may be configured as any of the following:

[0025] [1] One or more processors that operate according to a computer program (software). [2] One or more dedicated hardware circuits that perform at least some of the various processes [3] Circuits that include combinations of these The hardware configuration of the charge / discharge management server 12 and the hardware configuration of the user device 13 are similar to that of the information processing device H10, and therefore the description thereof will be omitted.

[0026] <Charge / discharge management server functions> The functions of the charge and discharge management server 12 will be described with reference to Fig. 3. The charge and discharge management server 12 includes a prediction unit 21, a plan creation unit 22, a command unit 23, a price acquisition unit 24, a performance acquisition unit 26, and a profit calculation unit 25.

[0027] The prediction unit 21 predicts the trading price of electricity in the electricity trading market during the prediction target period. The prediction unit 21 also predicts the amount of electricity demand of users and the amount of power generated by the private power generation facility 18 based on past charging and discharging records, weather forecasts, etc.

[0028] The plan creation unit 22 creates a charge / discharge plan for the storage battery 16 based on the information predicted by the prediction unit 21 and the charge / discharge record of the power storage facility 14. For example, the charge / discharge plan may be a plan for the next day after the plan is created, or a plan for one hour after the plan is created. The plan creation unit 22 records the created charge / discharge plan in a storage unit (not shown).

[0029] The command unit 23 transmits control commands to the battery control unit 15 based on the charge / discharge plan. For example, the command unit 23 generates charge commands and discharge commands for each predetermined time based on the charge / discharge plan. The charge commands include a target value for charging. The discharge commands include a target value for discharging. The power storage equipment 14 performs charging and discharging based on the received charge commands and discharge commands so as to reach the target values.

[0030] The price acquisition unit 24 acquires the trading price per unit of electricity in the electricity trading market. The trading price is the electricity price for each predetermined time period (for example, 30 minutes). The result acquisition unit 26 acquires the charge / discharge record of the storage battery 16 from the battery control unit 15. The charge / discharge record includes information that can identify the amount of received power, the charging power, and the discharging power for each predetermined period (e.g., 30 minutes). The result acquisition unit 26 records the acquired charge / discharge record in the charge / discharge information storage unit 27.

[0031] The revenue calculation unit 25 calculates the revenue of the electric utility based on a plurality of cases. The calculated revenue is recorded in the charge / discharge information storage unit 27. The charge / discharge plan created by the plan creation unit 22 will be described with reference to Fig. 4. The plan creation unit 22 creates a plan so that the storage battery 16 is charged during a time period when the trading price of electricity is low, and the amount of power received from the commercial power grid is reduced during a time period when the trading price is high. In addition, the plan is created so that the amount of received power can be reduced during a time period when a demand response request, which is a request to reduce the amount of received power, is likely to be issued.

[0032] FIG. 4 is an example of a charge / discharge plan for winter. The plan creation unit 22 identifies a lower limit value of the state of charge of the storage battery 16. The lower limit value is 0% or a value greater than 0%. The lower limit value of the state of charge may be set to a value such as "30%" so that the power of the storage battery 16 can be used even in an emergency such as a power outage. The plan creation unit 22 creates a charge / discharge plan so that the state of charge of the storage battery 16 is efficiently maintained between the lower limit value and an upper limit value (e.g., 100%).

[0033] The plan creation unit 22 determines a period T1 from night to early morning when the trading price in the electricity trading market (hereinafter referred to as the market price) is low as a period in which the storage battery 16 is charged with power supplied via the commercial power grid. The plan creation unit 22 determines a period T2 when the market price is high and the amount of power consumed by the user is large as a period in which the storage battery 16 is discharged to suppress power reception from the commercial power grid. The plan creation unit 22 also determines a period T3 when the amount of solar radiation is high and the user's demand for power is low as a period in which the storage battery 16 is charged with power generated by the private power generation facility 18 (here, photovoltaic power generation facility). The plan creation unit 22 determines a period T4 when discharging is stopped assuming the possibility of a demand response being activated. The plan creation unit 22 determines a period T5 when the market price is high and the amount of power consumed is large as a period in which the storage battery 16 is discharged to suppress power reception from the commercial power grid.

[0034] The command unit 23 outputs a charge command for the charge periods T1 and T3, and a discharge command for the discharge periods T2 and T5. <User management server functions> The functions of the user management server 11 will be described with reference to Fig. 5. The user management server 11 includes a performance acquisition unit 30, a specification unit 31, and a reward granting unit 32. The user management server 11 also includes a user information storage unit 33.

[0035] The result acquisition unit 30 acquires a charge / discharge result including a charge result of charging the storage battery 16 with power supplied from the commercial power system, and a discharge result of discharging the storage battery 16. The charge / discharge result includes the amount of power received from the commercial power system, a charge result and a charging period indicating the charging power charged into the storage battery 16, and a discharge result and a discharging period indicating the discharging power discharged from the storage battery 16.

[0036] The determination unit 31 calculates the reward grant rate using the profit obtained by the price difference ΔP (P2-P1) between the market price P1 per unit power during the charging period when the storage battery 16 is charged with power supplied from the commercial power system and the market price P2 per unit power during the discharging period when the storage battery 16 is discharged. In other words, a difference occurs in the market price of electricity per unit power between a time period when the electricity rate is low and a time period when the electricity rate is high. Therefore, if the storage battery 16 is charged during a time period when the electricity rate is low and then discharged during a time period when the electricity rate is high, the electricity rate can be reduced compared to the case where the power consumption device 19 is operated with power received from the commercial power system without going through the storage battery 16 during a time period when the electricity rate is high. The determination unit 31 calculates the reward grant rate using the reduced electricity rate as the profit.

[0037] The reward grant rate is a point rate in this embodiment. The points can be acquired, held, used, etc. by the user 100. The points can be used in an electric service using the storage battery 16 or other services. For example, the user 100 can obtain a product in exchange for the points held by the user in an electronic commerce system (not shown). The specification unit 31 determines the reward grant rate as a value obtained by dividing a predetermined percentage of the profit of the electric utility company in the target period by the discharged power (kW) of the storage battery 16 of all users who use the electric service. When the target period is one year, the reward grant rate (points / kW) is calculated by dividing the predetermined percentage of the profit by the annual discharged power of all users. The target period for calculating the reward grant rate is not particularly limited. For example, the target period may be one month or one year.

[0038] The determination unit 31 also acquires an operating capacity that is a permissible range of the capacity of the storage battery 16 that allows control by the battery control unit 15 and is preset by the user 100. The determination unit 31 then increases the reward as the operating capacity increases. Specifically, the determination unit 31 associates with the user 100 a fixed amount of reward based on the operating capacity in addition to a pay-per-use reward based on the reward grant rate and the discharge performance of each user 100.

[0039] The reward granting unit 32 calculates a reward using the accumulated discharge power (kW) of each user 100 as a discharge performance based on the charge and discharge performance and a reward granting rate. Then, the calculated reward is granted to the user 100. Specifically, the reward granting unit 32 calculates the reward by multiplying the reward granting rate by the accumulated discharge power of the user 100 within the granting period for which the reward is calculated. The granting period is, for example, one month. The accumulated discharge power used at this time is the accumulated power (kW) discharged by the storage battery 16 within the granting period.

[0040] That is, since the storage battery 16 stores the power supplied from the private power generation facility 18 in addition to the power supplied from the commercial power system, the amount of discharged power of the storage battery 16 is not equal to the amount of power received via the commercial power system. When measuring the amount of discharged power (kWh) of the storage battery 16 to calculate the reward, a certified meter must be used due to restrictions on power measurement. However, if a certified meter for the storage battery 16 is provided in the power storage facility 14 in addition to a certified meter that measures the amount of power received from the commercial power system, the cost increases. For this reason, in this embodiment, the discharged power included in the charge and discharge results is accumulated to calculate the accumulated discharged power. For example, when the meter of the power measurement unit 17 measures the discharged power of the storage battery 16 every 10 minutes, the result acquisition unit 30 assumes that the discharged power is constant for 10 minutes and calculates the amount of discharged power for 10 minutes for each measurement value. Furthermore, the amount of discharged power for 10 minutes based on each measurement value is added six times to obtain the accumulated discharged power for 60 minutes. This accumulated discharge power can be regarded as the amount of discharged power (kWh). The larger the accumulated discharge power, the larger the amount of discharged power. In this way, even if the amount of discharged power of the storage battery 16 is not measured, by using the discharged power, it is possible to estimate the amount of discharged power of the storage battery 16 even if there are restrictions on measuring the amount of power or if there are circumstances that make it difficult to measure the amount of power.

[0041] The reward granting unit 32 associates the calculated reward with the user 100 and records it in the user information storage unit 33. In this embodiment, the reward is points. That is, the greater the cumulative discharge power, the more points are granted to the user 100. Also, the greater the reward grant rate, the more points are granted to the user 100.

[0042] A method for determining the reward award rate by the determination unit 31 will now be described in detail. The reward rate is used commonly within the target period. For example, the reward rate may be constant or updated every year. Alternatively, the reward rate may be updated every reward period (every month).

[0043] The reward rate is calculated based on multiple cases within the period for which the reward rate is calculated. In each case, values ​​V1 to V5, which are the revenues of the electric utility, are created. The determination unit 31 calculates a rebate value Vc, which is a predetermined ratio of the value Vall, which is the total of the values ​​V1 to V5 per unit power. This rebate value Vc is a value to be rebated to the user 100. Furthermore, the determination unit 31 divides the rebate value Vc by the discharged power E, which is the cumulative amount of discharged power of all users 100 within the calculation target period (Vc / E). As a result, the determination unit 31 obtains a reward grant rate.

[0044] Each case used in calculating values ​​V1 to V5 will be explained. The first case is arbitrage trading. The value V1 (yen / kWh) obtained in this case is calculated by multiplying the price difference ΔP (yen) between the above-mentioned market prices P1 and P2 by the number of times N1 that arbitrage trading was performed within the target period. In other words, the value V1 in the first case is the value obtained by charging during a period when electricity rates are low and discharging during a period when electricity rates are high.

[0045] The second case is a reduction in the imbalance charge. The imbalance charge is a charge imposed on the electric utility for the difference between the supply plan of the electric utility and the amount of power actually supplied when the balance cannot be achieved. The value V2 (yen / kWh) obtained in this case is calculated by multiplying the imbalance charge reduced by controlling the charging and discharging of the storage battery 16 by the number N2 of times in response to the power reduction command.

[0046] The third case is responding to a demand response request. Note that the demand response command (reduction request) and the collection of actual results including the amount of power reduction in response may be managed by an aggregator other than the electric utility. By responding to the demand response, the electric utility can receive a response fee. The value V3 (yen / kWh) obtained in this case is calculated by multiplying the response fee per unit of power by the number of times N3 occurred during the target period.

[0047] The fourth case is a response to a capacity market command. When power becomes tight and there is an activation command (request for reduction) from the general electricity transmission and distribution company, a response remuneration can be obtained by responding appropriately. For example, the battery control unit 15 reduces the amount of discharged power or supplies surplus power to the commercial power grid (reverse power flow). The value V4 (yen / kWh) obtained in this case is calculated by multiplying the response remuneration per unit power by the number of times N4 that occurred during the target period.

[0048] The fifth case is a reduction in wheeling charges. Wheeling charges are fees paid by businesses to general electricity transmission and distribution businesses as a fee for using the electricity transmission and distribution network. Wheeling charges vary depending on the time of day. The value V5 (yen / kWh) obtained in this case is calculated by multiplying the usage charge per unit of electricity that can be reduced by using the electricity transmission and distribution network during times when wheeling charges are low by the number of usages N5 during the target period. Note that the number of times used in each case is the number that applies to all 100 users.

[0049] <Data used by the power management system> The user information 40 and the charge / discharge management information 41 used by the power management system 10 will be described with reference to FIGS.

[0050] FIG. 6 is an example of user information 40. The user information 40 is recorded for each user in the user information storage unit 33. The user information 40 includes a user ID, accumulated discharged power, planned remuneration, and retained remuneration. The accumulated discharged power is a value obtained by accumulating the power discharged by the storage battery 16 within the remuneration period for which the remuneration is granted. The planned remuneration indicates the remuneration that is scheduled to be granted to the user on the determined date for which the remuneration is granted. The retained remuneration is the remuneration that the user retains. The remuneration increases when a new remuneration is granted. In addition, the retained remuneration decreases when the user purchases a product, etc.

[0051] 7 shows the charge / discharge management information 41. The charge / discharge management information 41 is recorded in the charge / discharge information storage unit 27. The charge / discharge management information 41 includes a user ID, charge / discharge record, and a charge / discharge plan. The charge / discharge record is information acquired from the battery control unit 15. The charge / discharge plan specifies whether charging, discharging, or no charging / discharging will be performed at each specified time.

[0052] <Operation> The procedure by which the user management server 11 calculates the reward to be given to the user will be described with reference to FIG.

[0053] The result acquisition unit 30 acquires the accumulated discharge power (step S1). The accumulated discharge power acquired here is the accumulated discharge power for each user. The result acquisition unit 30 accumulates the discharge power included in the discharge result during the remuneration period to obtain the accumulated discharge power.

[0054] The determination unit 31 determines a reward grant rate calculated in advance (step S2). Furthermore, the reward grant unit 32 calculates points, which are rewards, by multiplying the accumulated discharge power included in the charge / discharge performance by the reward grant rate (step S3). The reward grant unit 32 calculates points, for example, by multiplying the accumulated discharge power by the reward grant rate. The reward grant unit 32 registers the calculated reward by adding it to the owned reward in the user information 40 (step S4).

[0055] FIG. 9 shows a usage history screen 50 displayed by the display device H13 of the user device 13. The user device 13 displays the usage history screen 50 using an application installed in the user device 13. In this case, the application requests usage history information from a web server. The web server obtains the electricity fee paid by the user from at least one of the user management server 11 and the charge / discharge management server 12. The web server also obtains the planned remuneration and the possession remuneration from the user management server 11. The web server then transmits this information to the user device 13. The user device 13 displays this information on the usage history screen 50. Alternatively, the user device 13 displays the usage history screen 50 by reading web data using a browser program installed in the user device 13. The web data includes a file written in a markup language such as HTML, image data embedded in the file, a JavaScript (registered trademark) program, and the like.

[0056] The usage history screen 50 includes an owned reward 51 (owned points) and a planned reward 52 (planned points to be acquired). The usage history screen 50 also includes an electricity bill 53 and an amount of electricity used 54 supplied from the commercial power system for the period including the day the screen was viewed.

[0057] The effects of the above embodiment will be described. (1) The storage battery 16 connected to the commercial power system is charged with power supplied from the commercial power system and discharged on a daily basis. According to the above embodiment, the battery control unit 15 controls the storage battery 16 to charge when the electricity rate is low and discharge when the electricity rate is high. In addition, the specification unit 31 calculates the reward grant rate using the profit obtained by the price difference ΔP between the market price P1 during the period when the storage battery 16 is charged in the time period when the electricity rate is low and the market price P2 per unit power during the period when the storage battery 16 is discharged. In other words, since the reward grant rate is calculated according to the charging and discharging performed on a daily basis, it is possible to increase the profit (reward) returned to the user. Therefore, it is possible to make the user feel that there is a high incentive to use the storage battery 16. This makes it possible to increase the number of storage batteries 16 in use. In addition, since the reward is calculated based on the discharge record of each user, it is possible to increase the reward when the discharge record is large. Therefore, it is possible to increase the satisfaction level of the user.

[0058] (2) The reward granting unit 32 calculates the reward using the accumulated discharged power (kW) obtained by accumulating the discharged power of the storage battery 16 for each predetermined time period as the discharge performance. This makes it possible to estimate the amount of discharged power of the storage battery 16 without using a certified meter for measuring the amount of discharged power of the storage battery 16, thereby reducing the cost required for installing the power storage facility 14.

[0059] (3) Since the charging / discharging plan is created based on the market price predicted by the prediction unit 21 of the charging / discharging management server 12, the storage battery 16 can be charged when the market price is low and the power of the storage battery 16 can be consumed when the market price is high.

[0060] (4) According to the above embodiment, the reward rate is calculated using the reward given when a power reduction request is complied with, which makes it possible to increase the reward given to the user. (5) According to the above embodiment, the reward rate is calculated based on the imbalance charge that can be reduced by controlling the storage battery 16 in response to a request to reduce power transmitted to balance the power supply plan of the electric utility company with the actual supply amount. This makes it possible to increase the profit (reward) returned to the user.

[0061] (6) According to the above embodiment, the reward award rate is calculated using the fee difference between the wheeling fee rates, which makes it possible to increase the profit (reward) returned to the user. (7) According to the above embodiment, the storage battery 16 is charged with power supplied by the private power generation facility 18. This allows the user to reduce the electricity bill for power received from the commercial power grid. In addition, since the reward grant rate uses the discharge record of the storage battery 16, even if the power charged by the power supplied by the private power generation facility 18 is used for the power consumption device 19, the reward grant rate can be reflected.

[0062] The above-described embodiments may be modified as follows: The above-described embodiments and the following modifications may be combined with each other to the extent that no technical contradiction occurs. <Granting rewards for selling electricity> In the above embodiment, the user uses the power charged by the power storage facility 14 as the power for the power consumption device 19. Instead of or in addition to this, the power charged to the storage battery 16 may be used as the power for power sale. In this embodiment, the battery control unit 15 causes the power charged to the storage battery 16 to be discharged as the power for power sale. The result acquisition unit 30 acquires the power sales result of the storage battery 16. The determination unit 31 calculates the reward grant rate based on the power sales result. For example, the plan creation unit 22 creates a charge / discharge plan so that the power storage facility 14 discharges during a period when the power selling price is high. Then, the determination unit 31 calculates the generated profit based on the number of times power is sold within the target period. Furthermore, the determination unit 31 calculates the reward grant rate using the calculated profit.

[0063] The user management server 11 acquires the power selling record including the amount of power sold, which is the amount of power transmitted by the power storage facility 14, from the battery control unit 15. The user management server 11 also calculates the reward for selling power by multiplying the amount of power sold by a reward grant rate. The reward grant rate used at this time may be the same as or different from the reward grant rate for discharged power in the above embodiment. This allows the user to obtain a reward even when selling power, thereby increasing the user's satisfaction.

[0064] <Charging and discharging plan> In the above embodiment, the charge / discharge management server 12 creates a charge / discharge plan for the power storage facility 14 for each user. Alternatively, the charge / discharge management server 12 may create a charge / discharge plan for all users or for each group to which a plurality of users belong. For example, a group is created for each region. The region is divided into areas based on whether there is a commonality in the amount of solar radiation or the amount of power demand, such as cold regions. Alternatively, the region may be divided into areas within the jurisdiction of a power transmission and distribution company. In this aspect, it is possible to reduce the processing load on the charge / discharge management server 12 due to the complexity of the processing.

[0065] The user management server 11 may record the user's schedule in the user information 40. In this embodiment, the user management server 11 includes a registration unit (not shown) that registers a schedule including a date and time when the consumption of the power discharged by the storage battery 16 is low. The battery control unit 15 controls the storage battery 16 based on a charge / discharge plan based on the schedule. Specifically, the charge / discharge management server 12 acquires the user's schedule from the user management server 11. Then, the plan creation unit 22 creates a charge / discharge plan based on the schedule. In addition, the command unit 23 transmits a command to the battery control unit 15 based on the charge / discharge plan. The schedule may be registered in the user management server 11 by the user himself / herself using the user device 13. Alternatively, the schedule may be determined from a product purchase history on an EC (Electronic Commerce) site or the like. For example, the purchase history for determining the schedule is a reservation for accommodation or a reservation for transportation. For example, an electronic commerce server (not shown) that provides an EC site transmits the schedule of the travel plan to the user management server 11 when a user makes a reservation for a trip. The user management server 11 transmits the user's schedule (planned at home or scheduled out of home) to the charge / discharge management server 12. Based on the user's schedule, when the user is not at home, the charge / discharge management server 12 creates a charge / discharge plan that reduces the overall amount of power received from the commercial power system compared to when the user is at home. In addition, the charge / discharge management server 12 may create a charge / discharge plan to charge to a target charge state according to a target time such as the scheduled time when the user is to return home.

[0066] In the above embodiment, the charge / discharge management server 12 creates a charge / discharge plan for the next day or thereafter based on the charge / discharge record, so that if the user is absent for a long period of time, the charge / discharge plan is gradually updated to one that is suited to the absence. However, the charge / discharge management server 12 can create a charge / discharge plan that matches the schedule in advance by acquiring the user's schedule in advance. This controls the storage battery 16 based on a charge / discharge plan that matches the user's schedule, so that it is possible to prevent the user from receiving an amount of power that far exceeds the amount of power that needs to be received during the absence period (for example, the amount of power consumed by home appliances that operate even when the user is absent). This makes it possible to reduce the electricity fee that the user pays as a compensation.

[0067] <Reward rate> In the above embodiment, the reward grant rate is calculated using the values ​​V1 to V5 corresponding to the above cases 1 to 5. Instead of this, the reward grant rate may be calculated using at least one of the values ​​V1 and V2 to V5 corresponding to the above cases 1 to 5.

[0068] The reward grant rate may be a different value for each user. In the above embodiment, the determination unit 31 calculates the reward grant rate using the values ​​V1 to V5 for all users. Instead, the determination unit 31 may calculate the reward grant rate using the values ​​V1 to V5 calculated for each user.

[0069] In the above embodiment, the reward rate is a value obtained by dividing a predetermined percentage of the revenue of the electric utility by the discharged power of all users during the target period. Alternatively, the specification unit 31 may calculate the reward rate by dividing the predetermined percentage of the revenue by the total value of the discharged power of each user belonging to a predetermined segment. The criteria for dividing the segments are not particularly limited, and user attributes can be used. For example, the user attributes can be the type of contract between the user and the electric utility, or the user's loyalty status (user rank) in the electric service or a service including the electric service. Alternatively, the above segments can be segments used in targeted advertising, etc. Alternatively, the segments can be divided by geographical information such as the area including the user's address (the location where the storage battery 16 is installed) or the area under the jurisdiction of the electric power transmission and distribution company.

[0070] The reward rate may be increased in stages according to the period of use of the storage battery 16. The reward rate may also be changed depending on whether the user rents or purchases the storage battery 16 from the electric utility company.

[0071] <Charging and discharging performance> In the above embodiment, the result acquiring unit 30 calculates the cumulative discharged power using the discharged power of the storage battery 16 included in the discharge result. Alternatively, the power measurement unit 17 of the power storage equipment 14 or the result acquiring unit 26 of the charge / discharge management server 12 may calculate the cumulative discharged power using the discharged power of the storage battery 16.

[0072] <Electricity storage equipment> In the above embodiment, the power measurement unit 17 of the power storage equipment 14 measures the discharged power (kW) of the storage battery 16 at predetermined time intervals. Alternatively, the power measurement unit 17 may measure the amount of discharged power (kWh) of the storage battery 16. In this case, the power measurement unit 17 measures the amount of discharged power using a certified meter that complies with the Measurement Act.

[0073] <ECサイト> The power management system 10 may include an electronic commerce server (not shown) that provides an EC site (website) that sells products. The electronic commerce server displays advertisements for products according to the user's charge / discharge record on a home screen or the like that is viewed by the user. Note that the advertisement referred to here includes any advertisement that serves as an entry point for the user to purchase products.

[0074] An embodiment of displaying an advertisement for a product will be described. When the electronic commerce server receives a request for web data from the user device 13, it determines whether the user uses the storage battery 16 and also uses an electricity service that purchases electricity from the electric utility. Alternatively, it determines whether the user's purchase history includes a purchase history of the storage battery 16. When it is determined that the user 100 uses the electricity service or the user's purchase history includes a purchase history of the storage battery 16, the electronic commerce server transmits the web data to the user device 13, including advertisement content in which an electricity consuming device is posted. The electricity consuming device may not be included in the user's purchase history.

[0075] FIG. 10 shows an example of a home screen 60. The home screen 60 includes advertising content 61 for home appliances as power consuming devices. Furthermore, the electronic commerce server provides a reward such as points (purchase reward) when a user purchases a product listed in the advertising content 61. At this time, the purchase reward for a user who uses an electricity service may be greater than that of a user who purchases the same product without using the electricity service. This allows a user who uses an electricity service to be given a special privilege when purchasing a product.

[0076] <Information Processing System> In the above embodiment, the result obtaining unit 30 receives the charge / discharge result from the charge / discharge management server 12. Alternatively, the result obtaining unit 30 of the user management server 11 may receive the charge / discharge result from the battery control unit 15 without going through the charge / discharge management server 12.

[0077] In the above embodiment, the user management server 11 is provided with the result acquisition unit 30, the identification unit 31, and the reward granting unit 32. These configurations may be distributed between the user management server 11 and the charge / discharge management server 12, or may be provided in either the user management server 11 or the charge / discharge management server 12. The user management server 11 may also be provided with at least one of the prediction unit 21, the plan creation unit 22, the command unit 23, the price acquisition unit 24, and the profit calculation unit 25. Furthermore, the user management server 11 may function as the electronic commerce server. Furthermore, the information processing system of the claims may be provided with a power storage facility 14.

[0078] In the above embodiment, the determination unit 31 of the user management server 11 calculates the reward grant rate based on the price difference ΔP between the market prices P1 and P2. Alternatively, the user device 13 may be configured to include the determination unit 31. In this embodiment, the user device 13 acquires the market prices P1 and P2 and the charge / discharge record. The source of information is at least one of the charge / discharge management server 12, the user management server 11, and the power storage facility 14. The user device 13 then calculates a reward grant rate for a user who uses the user device 13. The user device 13 transmits the calculated reward grant rate to the user management server 11. In this manner, the processing load of the user management server 11 can be reduced.

[0079] In the above embodiment, the determination unit 31 of the user management server 11 calculates the reward grant rate based on the price difference ΔP between the market prices P1 and P2. Alternatively, the determination unit 31 may obtain the reward grant rate calculated by the charge / discharge management server 12 or a reward grant rate calculated by another device.

[0080] Next, the technical ideas that can be understood from the above-described embodiment and other examples will be described below. [A] a record acquiring unit that acquires, from a battery control unit that controls charging and discharging of a storage battery associated with a user, a charge record including a charge record of the storage battery being charged with power supplied from a commercial power system and a discharge record of the storage battery being discharged; a determination unit that calculates a reward grant rate using a profit obtained from a price difference between a market price of electricity per unit power during a charging period in which the storage battery is charged with power supplied from the commercial power grid and a market price of electricity per unit power during a discharging period in which the storage battery is discharged; an information processing system comprising: a reward granting unit that calculates a reward to be granted to the user using the discharge history of the storage battery based on the charge and discharge history and the reward granting rate, and associates the calculated reward with the user and records it in a memory unit.

[0081] [B] The information processing system according to [A], wherein the reward granting unit uses, as the discharge performance, an accumulated discharge power obtained by accumulating the discharge power of the storage battery for each predetermined time period. [C] a prediction unit that predicts the market price of electricity in the electricity trading market during a prediction period; A plan creation unit that creates a charge / discharge plan for the storage battery for the prediction target period based on the predicted market price; The information processing system according to [A] or [B], further comprising: a command unit that transmits commands to the battery control unit based on the charge and discharge plan.

[0082] [D] An information processing system described in any one of [A] to [C], wherein the identification unit calculates the reward grant rate using a corresponding reward obtained when the storage battery is controlled in response to a request to reduce power.

[0083] [E] An information processing system described in any one of [A] to [D], wherein the identification unit calculates the reward grant rate using the fee that can be reduced when the storage battery is controlled in accordance with a request for power reduction transmitted in order to balance the electric power utility's supply plan with the actual supply amount.

[0084] [F] An information processing system described in any one of [A] to [E], wherein the identification unit calculates the reward grant rate using revenue obtained by the difference between the wheeling charge per unit power during the charging period and the wheeling charge per unit power during the discharging period.

[0085] [G] The information processing system according to any one of [A] to [F], wherein the battery control unit charges the storage battery with power supplied by a private power generation facility used by the user. [H] the battery control unit discharges the power charged in the storage battery as power to be sold; The information processing system according to any one of [A] to [G], wherein the record acquiring unit acquires a power selling record of the storage battery, and the identifying unit calculates the reward grant rate based on the power selling record.

[0086] [I] further comprising an e-commerce server providing a website for selling products; The electronic commerce server includes: The information processing system described in any one of [A] to [H], wherein when a user device used by the user accesses the website, web data including advertising content for products based on the charging and discharging performance is transmitted to the user device.

[0087] [J] the electronic commerce server, The information processing system described in [I], in which a purchase reward is made higher when the user purchases the product featured in the advertising content than for a user who does not use the storage battery.

[0088] [K] a registration unit that registers a schedule including a date and time when the consumption of the power discharged from the storage battery is reduced; The information processing system according to any one of [A] to [J], wherein the battery control unit controls the storage battery based on a charge and discharge plan based on the schedule.

[0089] [L] one or more computers: a performance acquisition process for acquiring, from a battery control unit that controls charging and discharging of a storage battery associated with a user, a charging performance including a charging performance of the storage battery being charged with power supplied from a commercial power system and a discharging performance of the storage battery being discharged; A determination process for calculating a reward rate using a profit obtained from a price difference between a market price of electricity per unit power during a charging period in which the storage battery is charged with electricity supplied from the commercial power system and a market price of electricity per unit power during a discharging period in which the storage battery is discharged; An information processing method that executes a reward granting process that calculates a reward to be granted to the user using the discharge history of the storage battery based on the charge and discharge history and the reward granting rate, and associates the calculated reward with the user and records it in a memory unit.

[0090] [M] one or more computers, a record acquiring unit that acquires, from a battery control unit that controls charging and discharging of a storage battery associated with a user, a charge record including a charge record of the storage battery being charged with power supplied from a commercial power system and a discharge record of the storage battery being discharged; a determination unit that calculates a reward grant rate using a profit obtained from a price difference between a market price of electricity per unit power during a charging period in which the storage battery is charged with power supplied from the commercial power grid and a market price of electricity per unit power during a discharging period in which the storage battery is discharged; A program that functions as a reward granting unit that calculates a reward to be granted to the user using the discharge history of the storage battery based on the charge and discharge history and the reward granting rate, and associates the calculated reward with the user and records it in a memory unit. [Explanation of symbols]

[0091] 10...Power management system 11...User management server

Claims

1. A user in which a reward is stored in a memory unit in association with user identification information, the user comprising: a battery control unit that controls the charging and discharging of a storage battery that can be charged with power supplied by a private power generation facility used by the user and can also be charged with power supplied from a commercial power grid, and a performance acquisition unit that acquires charging and discharging performance including a charging performance of the storage battery being charged with power supplied from the commercial power grid and a discharging performance of the storage battery being discharged; and a determination unit that calculates a reward grant rate to be set for the user using a profit obtained from a price difference between a market price of electricity per unit power during a charging period in which the storage battery is charged with power supplied from the commercial power grid and a market price of electricity per unit power during a discharging period in which the storage battery is discharged; a reward granting unit that calculates a reward that can be used in services other than the service that uses the revenue, using the discharge record of the storage battery based on the charge and discharge record and the reward granting rate, and associates the calculated reward with the user and records it in the storage unit; The reward granting unit regards the cumulative discharged power amount, which is the accumulated discharged power measured at predetermined time intervals of the storage battery as the discharge performance, as the discharged power amount, and calculates the reward by multiplying the deemed discharged power amount by the reward granting rate.

2. A prediction unit that predicts a market price of electricity in the electricity trading market during a prediction period; A plan creation unit that creates a charge / discharge plan for the storage battery for the prediction target period based on the predicted market price; The information processing system according to claim 1 , further comprising: a command unit that transmits a command to the battery control unit based on the charge and discharge plan.

3. The information processing system according to claim 1 , wherein the specifying unit calculates the reward grant rate using a corresponding reward that is obtained when the storage battery is controlled in response to a request to reduce power.

4. The information processing system of claim 1, wherein the determination unit calculates the reward grant rate using the fee that can be reduced when the storage battery is controlled in accordance with a request for power reduction transmitted to balance an electric power utility's supply plan with an actual supply amount.

5. The revenue obtained from the price difference includes revenue obtained from the price difference between the wheeling charge per unit power during the charging period and the wheeling charge per unit power during the discharging period, The information processing system according to claim 1 , wherein the specifying unit calculates the reward award rate using a return value that is a predetermined ratio of the profit obtained from the price difference.

6. The battery control unit discharges the power charged in the storage battery as power to be sold, The record acquisition unit acquires a record of electricity sales of the storage battery, The information processing system according to claim 1 , wherein the specifying unit calculates the reward grant rate based on the power selling record.

7. An electronic commerce server providing a website for selling products; The electronic commerce server includes: The information processing system according to claim 1 , wherein when a user device used by the user accesses the website, web data including advertising content for a product based on the charge / discharge record is transmitted to the user device.

8. The electronic commerce server includes: The information processing system according to claim 7 , wherein a purchase remuneration for a user who purchases the product published in the advertising content is set to be higher than that for a user who does not use the storage battery.

9. a registration unit that registers a schedule including a date and time when the consumption of the power discharged from the storage battery is reduced for each user; 2. The information processing system according to claim 1, wherein the battery control unit controls the storage battery so that the amount of power received from the commercial power grid is reduced on days and times when the user's power consumption is low, based on a charging and discharging plan based on the schedule.

10. One or more computers a performance acquisition process for acquiring, from a battery control unit that controls charging and discharging of a storage battery that is chargeable by power supplied from a private power generation facility used by the user and that is chargeable by power supplied from a commercial power system, a performance acquisition process for acquiring a charging and discharging performance including a charging performance of the storage battery being charged by power supplied from the commercial power system and a discharging performance of the storage battery being discharged; a determination process for calculating a reward grant rate to be set for the user using a profit obtained from a price difference between a market price of electricity per unit power during a charging period in which the storage battery is charged with electricity supplied from the commercial power grid and a market price of electricity per unit power during a discharging period in which the storage battery is discharged; a reward granting process for calculating a reward that can be used in services other than the service using the revenue, using the discharge record of the storage battery based on the charge / discharge record and the reward granting rate, and recording the calculated reward in the storage unit in association with the user; In the reward granting process, the cumulative discharged power amount obtained by accumulating the discharged power measured at predetermined time intervals of the storage battery as the discharge performance is regarded as the discharged power amount, and the reward is calculated by multiplying the deemed discharged power amount by the reward granting rate.

11. One or more computers, a battery control unit that controls charging and discharging of a storage battery that is chargeable with power supplied from a private power generation facility used by the user and is chargeable with power supplied from a commercial power system, and that acquires charge and discharge records including a charging record of charging the storage battery with power supplied from the commercial power system and a discharging record of discharging the storage battery from the battery control unit that controls charging and discharging of the storage battery, the charging record including a charging record of charging the storage battery with power supplied from the commercial power system and a discharging record of discharging the storage battery; a determination unit that calculates a reward grant rate to be set for the user using a profit obtained from a price difference between a market price of electricity per unit power during a charging period in which the storage battery is charged with power supplied from the commercial power grid and a market price of electricity per unit power during a discharging period in which the storage battery is discharged; a reward granting unit that calculates a reward that can be used in services other than the service that uses the revenue, using the discharge record of the storage battery based on the charge and discharge record and the reward granting rate, and associates the calculated reward with the user and records it in the storage unit; The reward granting unit is a program that regards the cumulative discharged power amount, which is the accumulated discharged power measured at predetermined time intervals of the storage battery as the discharge performance, as the discharged power amount, and multiplies the deemed discharged power amount by the reward granting rate to calculate the reward.

Citation Information

Patent Citations

  • Storage battery control device and method thereof

    JP2015156195A

  • Charge / discharge planning device, method and program

    JP2018093652A

  • Demand response system

    JP2018170925A