Vehicles and charging systems
The vehicle and charging system address the issue of voltage mismatch by setting a charging voltage upper limit, enabling charging to proceed even when the vehicle's maximum voltage exceeds the charging equipment's limit.
Patent Information
- Application Number
- JP2021115661
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-07-13
- Publication Date
- 2024-11-13
- Estimated Expiration
- 2041-07-13
AI Technical Summary
Charging systems fail to initiate charging when the maximum voltage of a vehicle's power storage device exceeds the maximum output voltage of the charging equipment.
A vehicle and charging system that includes a communication mechanism to set a charging voltage upper limit value equal to or less than the charging equipment's output voltage, allowing charging to proceed even if the vehicle's maximum voltage is higher.
Enables charging to commence despite voltage mismatches, ensuring the power storage device is charged to some extent.
Smart Images

Figure 0007582103000001 
Figure 0007582103000002 
Figure 0007582103000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to vehicles and charging systems. [Background technology]
[0002] 2. Description of the Related Art Conventionally, a charging system including a charging facility provided outside a vehicle and a vehicle including a power storage device has been known. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-47677 A Summary of the Invention [Problem to be solved by the invention]
[0004] In some charging systems, when the maximum voltage of the power storage device mounted on the vehicle is greater than the maximum output voltage of the charging equipment, the charging equipment may not start charging. However, there are cases where the vehicle wishes to charge the power storage device to the maximum extent possible.
[0005] The present disclosure has been made in consideration of the above-mentioned problems, and its purpose is to provide a vehicle and a charging system that can start charging at a charging equipment even if the maximum voltage of a storage device installed in the vehicle is greater than the maximum output voltage of the charging equipment. [Means for solving the problem]
[0006] The vehicle of the present disclosure, in which an on-board power storage device is charged with power from a charging facility, is provided with a communication unit that acquires a first voltage value indicating a potential output voltage value that the charging facility can output, and a processing unit that, when a second voltage value indicating a maximum voltage value of the power storage device is greater than the first voltage value, transmits a third voltage value that is less than or equal to the first voltage value to the charging facility as a charging voltage upper limit value.
[0007] The charging system of the present disclosure is a charging system including a vehicle equipped with a power storage device and a charging equipment that supplies power to the power storage device, wherein the charging equipment transmits a first voltage value indicating a maximum output voltage that the charging equipment can output to the vehicle, and when a second voltage value indicating the maximum voltage value of the power storage device is greater than the first voltage value, the vehicle transmits a third voltage value that is less than or equal to the first voltage value to the charging equipment as a charging voltage upper limit value. Effect of the Invention
[0008] According to the vehicle and charging system of the present disclosure, even if the maximum voltage of the power storage device mounted on the vehicle is greater than the maximum output voltage of the charging equipment, it is possible to cause the charging equipment to start charging. [Brief description of the drawings]
[0009] [Figure 1] 1 is a block diagram illustrating a charging system 1 according to a first embodiment. [Diagram 2] FIG. 4 is a block diagram showing a detection circuit 62. [Diagram 3] FIG. 4 is a flow diagram showing a charging flow from the connection of each connector to the start of charging. [Figure 4] FIG. 4 is a flow diagram showing a charging flow from the connection of each connector to the start of charging. [Diagram 5] FIG. 11 is a block diagram illustrating a charging system 1A according to a second embodiment. [Figure 6] FIG. 4 is a flow diagram showing an outline of a charging flow. [Figure 7] FIG. 11 is a flow diagram showing a charging specification configuration step (S214). [Figure 8] FIG. 2 is a schematic diagram showing a charging system 1B. [Figure 9] FIG. 4 is a flow diagram showing a control flow up to the start of charging. [Figure 10] FIG. 11 is a flow diagram showing a charging parameter step S404. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] A charging system and a vehicle according to the present embodiment will be described with reference to Figures 1 to 10. Among the components shown in Figures 1 to 10, the same or substantially the same components are denoted by the same reference numerals and duplicated descriptions will be omitted. (Embodiment 1) 1 is a block diagram illustrating a charging system 1 according to embodiment 1. The charging system 1 includes a vehicle 2 and a charging facility 3.
[0011] The charging equipment 3 includes a charging cable 11, an equipment side connector 12, a converter 13, an ELB (earth leakage breaker) 14, a communication unit 15, a control unit 16, a control power supply 17, relays 18 and 19, a photocoupler 20, and an input unit 21.
[0012] The charging cable 11 has a pair of charging lines 31 , a pair of communication lines 32 , and a control line 33 .
[0013] The charging lines 31, 31 are power lines that supply charging power to the vehicle 2. The communication lines 32, 32 are communication lines for communicating with the vehicle 2. The control lines 33 include a pair of charging start / stop lines 34, 34, a connector connection confirmation line 35, a charging prohibition permission line 36, and a ground line 37.
[0014] The equipment-side connector 12 is provided at the tip of the charging cable 11. The equipment-side connector 12 includes a terminal connected to a charging line 31, a terminal connected to a communication line 32, a terminal connected to a control line 33, a terminal connected to a charging start / stop line 34, a terminal connected to a connector connection confirmation line 35, a terminal connected to a charging prohibition permission line 36, and a terminal connected to a ground line 37.
[0015] The equipment-side connector 12 is provided with a latch 45 and a latch-hold circuit 44. When the equipment-side connector 12 is connected to the vehicle-side connector 52, the latch 45 engages with the vehicle-side connector 52 to prevent the equipment-side connector 12 from being detached from the vehicle-side connector 52. The latch-hold circuit 44 holds the engaged state of the latch 45 so that the equipment-side connector 12 does not become detached from the vehicle-side connector 52 during charging.
[0016] The converter 13 is connected to an AC input power source 40. The AC input power source 40 includes an AC / DC rectifier, a DC / AC inverter, an isolation transformer, and an AC / DC rectifier.
[0017] The voltmeter 41 is provided between the terminal of the facility-side connector 12 and the AC input power source 40, and measures the voltage between the charging lines 31, 31. The voltmeter 41 transmits the measured voltage value to the control unit 16. The ammeter 42 is provided on one of the charging lines 31. The voltmeter 41 transmits the measured voltage value to the control unit 16. The ground fault detector 43 is connected to each charging line 31 and the ground line 37. The ground fault detector 43 transmits the detection result to the control unit 16.
[0018] The converter 13 converts AC power supplied from the AC input power source 40 into DC power. The ELB 14 is disposed between the converter 13 and the AC input power source 40, and electrically connects and disconnects the converter 13 and the AC input power source 40.
[0019] The communication unit 15 communicates with the vehicle 2 based on a communication protocol such as CAN (Controller Area Network).
[0020] The control unit 16 controls the converter 13, the ELB 14, the communication unit 15, the relays 18 and 19, the photocoupler 20, and the like.
[0021] The control unit 16 includes a storage unit 22. The storage unit 22 stores the possible output voltage value V0 and the like.
[0022] The control power supply 17 is a power supply that supplies driving power to the communication unit 15, the control unit 16, the relays 18 and 19, the photocoupler 20, and the like.
[0023] The relay 18 is connected between the positive side of the control power supply 17 and the charging start / stop line 34, and connects and disconnects the positive electrode of the control power supply 17 and the charging start / stop line 34 based on a control signal from the control unit 16.
[0024] The relay 19 is connected between the negative electrode (ground voltage) of the control power supply 17 and the charging start / stop line 34, and connects and disconnects the negative electrode of the control power supply 17 and the charging start / stop line 34 based on a control signal from the control unit 16.
[0025] The photocoupler 20 transmits an advance preparation confirmation signal S7 to the control unit 16 according to the continuity of the connector connection confirmation line 35. When an on-current flows through the light-emitting element on the input side of the photocoupler 20, the light-receiving element on the output side outputs the advance preparation confirmation signal S7 to the control unit 16.
[0026] The input unit 21 is an interface operated by the user, and is, for example, a touch panel. The user can start charging by pressing a charge start button displayed on the input unit 21. When the charge start button is pressed on the input unit 21, a charge start trigger S0 is transmitted to the control unit 16.
[0027] Next, the vehicle 2 will be described. The vehicle 2 includes a vehicle-side connector 52 , a power storage device 53 , a communication unit 54 , a control unit 55 , a control system power supply 56 , relays 57 and 58 , photocouplers 59 and 60 , a switch 61 , and a detection circuit 62 .
[0028] Vehicle 2 also includes a pair of charging lines 71, a pair of communication lines 72, and a control line 73. Control line 73 includes a pair of charging start / stop lines 74 (74A, 74B), a connector connection line 75, and a ground line 77. Vehicle-side connector 52 is provided with terminals corresponding to each line.
[0029] When the equipment connector 12 is connected to the vehicle connector 52, terminals provided on the equipment connector 12 and the vehicle connector 52 are connected. This electrically connects the charging line 31 and the charging line 71, the communication line 32 and the communication line 72, the charging start / stop line 34 and the charging start / stop line 74, the connector connection confirmation line 35 and the connector connection line 75, the charging prohibition permission line 36 and the charging permission / prohibition line 76, and the ground line 37 and the ground line 77.
[0030] The power storage device 53 is a secondary battery that supplies power to a drive device including a drive motor and an inverter that run the vehicle 2. The communication unit 54 communicates with the charging facility 3 based on a communication protocol such as CAN.
[0031] The control unit 55 controls the driving of the communication unit 54, the control system power supply 56, the relays 57 and 58, the photocoupler 59, etc. The control system power supply 56 is a power supply that supplies power to each device such as the communication unit 54, the control unit 55, and the control system power supply 56.
[0032] Control unit 55 includes a storage unit 67, which stores information including a maximum battery voltage value V1 and a battery durability upper limit value V4 of power storage device 53. Maximum battery voltage value V1 is, for example, the voltage of power storage device 53 when fully charged. Note that maximum battery voltage value V1 may be, for example, the voltage value of power storage device 53 when the SOC is 80%.
[0033] Battery durability upper limit V4 is a voltage at which vehicle 2 stops charging to protect power storage device 53.
[0034] Relay 57 connects and disconnects charging line 71 and power storage device 53. Relay 57 is open in a normal state. When relay 58, relay 18, and relay 19 are closed, driving power is supplied to relay 57 from control power source 17 of charging equipment 3.
[0035] When drive power is supplied to relay 57, relay 57 is closed, and power storage device 53 and charging line 71 are connected to each other.
[0036] One end of relay 58 is connected to one charging start / stop line 74A connected to relay 18, and the other end of relay 58 is connected to the other charging start / stop line 74B connected to relay 19. When relays 18, 19 and relay 58 are closed, driving power is supplied to relay 57, and relay 57 is closed.
[0037] When the connectors are connected to each other and relay 18 is closed, photocoupler 59 transmits advance preparation signal S1 to control unit 55. Specifically, photocoupler 59 includes a light-emitting element connected to charging start / stop line 74A and ground potential, and a light-receiving element connected between control unit 55 and control system power supply 56.
[0038] When the connector is connected and the relay 18 is closed, the light-emitting element emits light and the light-receiving element receives the light. Then, the light-receiving element transmits a pre-preparation signal S1 to the control unit 55.
[0039] When the connectors are connected, the photocoupler 60 transmits a charging start signal S2 to the control unit 55 in accordance with the open / closed states of the relays 18, 19. Specifically, the photocoupler 60 includes a light-emitting element connected to the charging start / stop lines 74A and 74B, and a light-receiving element connected to the control system power supply 56 and the ground potential.
[0040] When the relays 18 and 19 are closed while the connectors are connected, the light-emitting element emits light and the light-receiving element receives light. The light-receiving element then transmits a charging start signal S2 to the control unit 55.
[0041] When an ON current is supplied from the control unit 55 to the switch 61 with the connectors connected, the switch 61 electrically connects the connector connection line 75 to the connector connection line 75 .
[0042] Specifically, the switch 61 is connected between the connector connection line 75 and the ground potential. When an on-current is supplied to the switch 61 from the control unit 55, the switch 61 connects the connector connection line 75 to the ground potential.
[0043] 2 is a block diagram showing the detection circuit 62. When the equipment-side connector 12 and the vehicle-side connector 52 are connected, the detection circuit 62 transmits a connector connection confirmation signal S3 to the control unit 55. The detection circuit 62 includes a switch 63, a photocoupler 64, and a switch 65. When the ignition switch of the vehicle 2 is turned ON, an ON current is supplied from the control unit 55 to the switch 63, and the switch 63 is turned ON. When the photocoupler 63 is turned ON, the switch 65 is closed, and the switch 65 electrically connects the connector connection line 75 and the photocoupler 64. The photocoupler 64 includes a light-emitting element and a light-receiving element.
[0044] When the switch 65 is closed, the light-emitting element receives driving power from the control power supply 17 and emits light. The light-receiving element receives light from the light-emitting element and transmits a connector connection confirmation signal S3 to the control unit 55.
[0045] 3 and 4 are flow diagrams showing the charging flow from when each connector is connected to when charging starts. Note that in the specification and in FIG. 3, "S" stands for "Step."
[0046] When the control unit 16 receives the charge start trigger S0 (S10) while the equipment-side connector 12 and the vehicle-side connector 52 are connected, the control unit 16 closes the relay 18 (S12). When the relay 18 is closed, a pre-preparation signal S1 is transmitted from the photocoupler 59 to the control unit 55. The charge start trigger S0 is transmitted from the input unit 21 to the control unit 16 by a user operation.
[0047] When the control unit 55 receives the advance preparation signal S1, the control unit 55 determines whether or not the control unit 55 has received the connector connection confirmation signal S3 (S112).
[0048] When the control unit 55 determines that the connector connection confirmation signal S3 has not been received (No in S112), the control unit 55 notifies the charging equipment 3 of an abnormality (S113).
[0049] When the control unit 55 determines that it has received the connector connection confirmation signal S3 (Yes in S112), the control unit 55 transmits a connector connection completion signal S4 to the control unit 16 through the communication line 72 and the communication line 32 (S114).
[0050] The control unit 16 determines whether the connector connection completion signal S4 is received within a predetermined period (S14). If the control unit 16 determines that the connector connection completion signal S4 is received within the predetermined period (Yes in S14), the control unit 16 transmits the charger CAN data D0 to the control unit 55 through the communication line 32 and the communication line 72. The charger CAN data D0 includes the possible output voltage value V0 of the charging equipment 3.
[0051] The control unit 55 judges whether the available output voltage value V0 is equal to or greater than the maximum battery voltage value V1 (S116). When the control unit 55 judges that the available output voltage value V0 is equal to or greater than the maximum battery voltage value V1 (Yes in S116), the control unit 55 transmits the charging voltage upper limit value V2 and the battery durability upper limit value V4 to the control unit 16 (S118). At this time, the charging voltage upper limit value V2 is the maximum battery voltage value V1. The charging voltage upper limit value V2 is a value transmitted from the control unit 55 to the control unit 16 as the maximum voltage value of the power storage device 53.
[0052] When the control unit 55 determines that the battery maximum voltage value V1 is greater than the available output voltage value V0 (No in S116), the control unit 55 transmits the charging voltage upper limit value V2 and the battery endurance upper limit value V4 to the control unit 16 (S120). At this time, the charging voltage upper limit value V2 is set to the maximum voltage value V3, and the maximum voltage value V3 is a value equal to or less than the available output voltage value V0. The maximum voltage value V3 may be set as the available output voltage value V0.
[0053] When the control unit 16 receives the charging voltage upper limit value V2, it performs a determination process (S22). Specifically, it is determined whether the available output voltage value V0 is equal to or greater than the upper limit charging voltage value V2 (S22). If the available output voltage value V0 is equal to or greater than the upper limit charging voltage value V2, the control unit 16 determines that the power storage device 53 can be fully charged.
[0054] On the other hand, when the charging voltage upper limit value V2 is greater than the possible output voltage value V0, the control unit 16 determines that the power storage device 53 cannot be fully charged.
[0055] Therefore, when the charging voltage upper limit value V2 is greater than the possible output voltage value V0, the control unit 16 transmits an abnormality notification to the control unit 55 (S13). This abnormality notification may include a battery incompatibility notification indicating that the power storage device 53 cannot be fully charged. Then, the control unit 16 does not start charging.
[0056] When the control unit 16 determines that the available output voltage value V0 is equal to or greater than the upper charge voltage limit value V2 (Yes in S22), the control unit 16 calculates the available output current value I0 (S26).
[0057] The available output current value I0 is calculated based on the smaller voltage value between the battery durability upper limit V4 and the available output voltage value V0. The control unit 16 transmits the available output current value I0 to the control unit 55 (S28).
[0058] When the control unit 55 receives the available output current value I0 (S122), it turns on the switch 61 (S124). When the switch 61 is turned on, the light-emitting element of the photocoupler 20 emits light and the light-receiving element of the photocoupler 20 receives the light. The light-receiving element of the photocoupler 20 transmits a preparation confirmation signal S7 to the control unit 16. As a result, the control unit 16 receives the preparation confirmation signal S7 (S30).
[0059] 4, when the control unit 16 receives the advance preparation confirmation signal S7, it performs a latch hold (S32). Specifically, it drives the latch hold circuit 44 to hold the latch 45 in the locked state.
[0060] Then, the control unit 16 checks whether the relay 57 is in an open state (S34). Specifically, if the voltage value acquired from the voltmeter 41 is equal to or lower than a predetermined voltage, the control unit 16 determines that the relay 57 is in an open state, and if the voltage value acquired from the voltmeter 41 is greater than the predetermined voltage, the control unit 16 determines that the relay 57 is in a closed state.
[0061] When the control unit 16 determines that the relay 57 is in the closed state (No in S34), the control unit 16 transmits an abnormality notification to the control unit 55 (S36).
[0062] If the control unit 16 determines that the relay 57 is in an open state (Yes in S32), the control unit 16 performs an insulation diagnosis (S38).
[0063] Specifically, the converter 13 is driven to output a predetermined voltage. Then, based on the current value acquired from the ammeter 42 and the output value from the ground fault detector 43, an insulation diagnosis is performed on the charging facility 3 side.
[0064] If the control unit 16 determines that there is an abnormality as a result of the insulation diagnosis (No in S38), it transmits an abnormality notification to the control unit 55 (S36).
[0065] When the control unit 16 determines that there is no problem as a result of the insulation diagnosis (Yes in S38), it closes the relay 19 (S40). Relay 18 is already in the closed state, and when relay 19 is closed, the light-emitting element of photocoupler 60 emits light and the light-receiving element of photocoupler 60 receives light. Then, the light-receiving element of photocoupler 60 transmits a charging start signal S2 to control unit 55. As a result, control unit 55 receives the charging start signal S2 (S126).
[0066] The control unit 16 transmits the vehicle charge possible flag S5 (S42). The vehicle charge possible flag S5 is transmitted to the control unit 16 through the communication line 32 and the communication line 72.
[0067] The control unit 55 determines whether or not the charging start signal S2 and the vehicle charging possible flag S5 have been received (S128). When the control unit 55 receives the vehicle charging possible flag S5 and the charging start signal S2 (Yes in S128), the control unit 55 closes the relay 58 (S130).
[0068] Here, when the relay 58 is closed, driving power is supplied from the control power supply 17 to the relay 57. As a result, the relay 57 is closed (S132).
[0069] The control unit 16 confirms that the relay 57 is in the closed state (S44). Specifically, when the relay 57 is in the closed state, the voltage of the power storage device 53 is applied to the voltmeter 41. Therefore, when the voltage value acquired from the voltmeter 41 is equal to or greater than a predetermined value, the control unit 16 determines that the relay 57 is in the closed state.
[0070] Control unit 55 transmits charge command value S6 to control unit 16 (S48). Control unit 55 sets charge command value S6 to a value smaller than the available output current value I0. When control unit 16 determines that relay 57 is in the closed state (Yes in S44), it starts charging based on charge command value S6 (S50).
[0071] In the charging system 1 of the present embodiment 1, when the control unit 55 determines in S18 to S20 that the maximum battery voltage value V1 is greater than the available output voltage value V0, it transmits a maximum voltage value V3 that is less than or equal to the available output voltage value V0 as the charging voltage upper limit value V2.
[0072] This makes it possible to prevent the controller 16 of the charging equipment 3 from determining that the charging voltage upper limit value V2 is greater than the available output voltage value V0, preventing charging from starting. As a result, charging starts and the power storage device 53 can be charged to a certain extent. (Embodiment 2) FIG. 5 is a block diagram illustrating a charging system 1A according to the second embodiment.
[0073] The charging system 1A includes a vehicle 102 and a charging device 103. The vehicle 102 includes a power storage device 110 , a charging inlet 113 , power wiring 114 , and a vehicle controller 137 .
[0074] Charging inlet 113 includes a DC(+) terminal 150, a DC(-) terminal 151, a PE terminal 152, an S(+) terminal 153, an S(-) terminal 154, a CC1 terminal 155, a CC2 terminal 156, and a housing 157. Each of terminals 150 to 156 is housed in housing 157, and each terminal is insulated.
[0075] The vehicle 102 includes a vehicle controller 137, a DC(+) wiring 130, a DC(-) wiring 131, a PE line 132, an S(+) signal line 133, an S(-) signal line 134, a CC1 communication line 135, a CC2 communication line 136, the vehicle controller 137, contactors K5, K6, and switches SW2, SWv.
[0076] The DC(+) wiring 130 and the DC(-) wiring 131 are connected to the power storage device 110. The DC(+) wiring 130 is connected to a DC(+) terminal 150, and the DC(-) wiring 131 is connected to a DC(-) terminal 151. The PE wire 132 is an earth wire and is connected to the PE terminal 152.
[0077] The S(+) signal line 133, the S(-) signal line 134, the CC1 communication line 135, and the CC2 communication line 136 are connected to a vehicle controller 137. The S(+) signal line 133 is connected to an S(+) terminal 153, and the S(-) signal line 134 is connected to an S(-) terminal 154. The CC1 communication line 135 is connected to a CC1 terminal 155, and the CC2 communication line 136 is connected to a CC2 terminal 156.
[0078] The contactor K5 is provided on the DC(+) wiring 130, and the contactor K6 is provided on the DC(-) wiring 131. A resistor R4 is connected to the CC1 communication line 135, and the switch SW2 and the resistor R4 are connected in series to the CC1 communication line 135. The switch SWv is provided on the CC2 communication line 136. The vehicle controller 137 controls the ON / OFF switching of the contactors K5 and K6 and the switches S2 and Sv.
[0079] The vehicle controller 137 is provided with a BMS (battery management system) 138 .
[0080] The charging device 103 includes a charger 122, a DC(+) wiring 160, a DC(-) wiring 161, a PE wire 162, an S(+) signal wire 163, an S(-) signal wire 164, a CC1 communication wire 165, a CC2 communication wire 166, a contactor K1, a contactor K2, a switch S1, a voltage measuring device 145, a bleeder circuit 146, an IMD (Insulation monitoring device) 147, and a charger controller 173.
[0081] Plug 120 includes a DC(+) terminal 180, a DC(-) terminal 181, a PE terminal 182, an S(+) terminal 183, an S(-) terminal 184, a CC1 terminal 185, a CC2 terminal 186, and a housing 187. Each terminal is accommodated within housing 187.
[0082] The DC(+) wiring 160 and the DC(-) wiring 161 are connected to the charger 122. The DC(+) wiring 160 is connected to a DC(+) terminal 180, and the DC(-) wiring 161 is connected to a DC(-) terminal 181. The PE wire 162 is an earth wire, and is connected to the PE terminal 182.
[0083] The S(+) signal line 163, the S(-) signal line 164, and the CC1 communication line 165 are connected to the charger controller 173. The S(+) signal line 163 is connected to an S(+) terminal 183, and the S(-) signal line 164 is connected to an S(-) terminal 184.
[0084] The CC1 communication line 165 is connected to a CC1 terminal 185. The CC2 communication line 166 has one end connected to the PE line 162 and the other end connected to a CC2 terminal 186.
[0085] The contactor K1 is provided on the DC(+) wiring 160, and the contactor K2 is provided on the DC(-) wiring 161. A resistor R1 is provided on the CC1 communication line 165, and the switch SW1 is connected to the CC1 communication line 165 so as to be in parallel with the resistor R1.
[0086] The voltage measuring device 145 is provided to connect the DC(+) wiring 160 and the DC(-) wiring 161. Specifically, it is connected between the DC(+) terminal 180 of the DC(+) wiring 160 and the contactor K1, and between the DC(-) terminal 181 of the DC(-) wiring 161 and the contactor K2.
[0087] The IMD 47 is provided between the charger 122 and the contactors K1, K2, and connects the DC(+) wiring 160 and the DC(-) wiring 161. The IMD 147 is also connected to the PE line 162. The bleeder circuit 146 is provided between the charger 122 and the contactors K1, K2, and connects the DC(+) wiring 160 and the DC(-) wiring 161.
[0088] When plug 120 is connected to charging inlet 113, DC(+) terminal 150 is connected to DC(+) terminal 180, and DC(-) terminal 151 is connected to DC(-) terminal 181. PE terminal 152 is connected to PE terminal 182, and S(+) terminal 153 is connected to S(+) terminal 183. S(-) terminal 154 is connected to S(-) terminal 184, and CC1 terminal 155 is connected to CC1 terminal 185. CC2 terminal 156 is connected to CC2 terminal 186.
[0089] The vehicle controller 137 periodically monitors the detection points P2 and P3, and the charger controller 173 periodically monitors the detection point P1.
[0090] The charger controller 173 controls the charger 122, the switch SW1 to switch ON / OFF, and the contactors K1 and K2 to switch ON / OFF.
[0091] The vehicle controller 137 controls the ON / OFF switching of the switches SW2 and SWv, and the ON / OFF switching of the contactors K5 and K6.
[0092] When plug 120 is connected to charging inlet 113 as described above, various controls are executed to perform charging.
[0093] Fig. 6 is a flow diagram showing an overview of the charging flow, which includes a connection confirmation stage (S210), an adhesion check stage (S211), an insulation test stage (S212), a charging handshake stage (S213), a charging specification configuration stage (S214), a charging stage (S215), and a charging end stage (S216).
[0094] Here, in the connection confirmation stage, it is confirmed whether charging inlet 113 and plug 120 are connected.
[0095] 5, in the unconnected state T0 (a state in which the charging inlet 113 and the plug 120 are not connected), the switches SW1, SW2, and SWv, the contactors K1 and K2, and the contactors K5 and K6 are in an open state. In this case, the voltage of the detection point P1 is, for example, 12 V. The voltage of the detection point P2 is 0 V.
[0096] In the connection state T1 (a state in which the plug 120 is inserted into the charging inlet 113), the switches SW1, SW2, and SWv, the contactors K1 and K2, and the contactors K5 and K6 are in an open state. The detection point P1 is 2.95 V, the detection point P2 is 2.25 V, and the detection point P3 is 0 V. That is, when the plug 120 is mated with the charging inlet 113, the voltage of the detection point P1 changes from 12 V to 2.95 V, and the voltage of the detection point P2 changes from 0 V to 2.25 V.
[0097] Then, the charger controller 173 can detect that the plug 120 has been fitted into the charging inlet 113 by detecting the voltage fluctuation at the detection point P1. The vehicle controller 137 can detect that the plug 120 has been fitted into the charging inlet 113 by detecting the voltage fluctuation at the detection point P2.
[0098] At wake-up T2 after the connection state T1, the switch SW1 is closed. Then, when the voltage at the detection point P1 becomes 8.98 V, the charger controller 173 starts transmitting a charging handshake message. Note that various messages are transmitted through the S(+) signal line 163, the S(+) signal line 133, and the S(-) signal line 164 and the S(-) signal line 134.
[0099] The vehicle controller 137 detects that the detection point P2 is 8.28 V, and confirms that the CC1 communication line 136 is connected to the CC1 communication line 166. Then, the vehicle controller 137 starts transmitting and receiving messages to and from the charger controller 173.
[0100] At wake-up T3 after wake-up T2, the charger controller 173 closes the switch SWv. After that, the vehicle controller 137 detects the voltage of the detection point P3 and determines the version of the connected charging device based on the voltage of the detection point P3. For example, if the voltage of the detection point P3 is 6V, the vehicle controller 137 determines that the vehicle is connected to a ChaoJi charger.
[0101] After the vehicle controller 137 determines the version of the charging device connected to the charging inlet 113, the vehicle controller 137 opens the switch SWv.
[0102] At wake-up T4 after wake-up T3, vehicle controller 137 turns on the electronic lock to lock charging inlet 113 and plug 120. In this manner, the connection confirmation stage (S210) is completed.
[0103] Next, the adhesion check step (S211) will be described. In the adhesion check step, it is detected whether the contactors K5 and K6 are stuck. Specifically, the contactors K5 and K6 are in an open state (OFF), and the charger controller 173 sets the contactors K1 and K2 in an open state (OFF), and the voltage measuring device 145 measures the voltage. Then, if the voltage measured by the voltage measuring device 145 does not exceed, for example, 10V, the charger controller 173 determines that the contactors K5 and K6 are not stuck.
[0104] Next, the insulation test step (S212) will be described. The vehicle controller 137 closes the contactors K1 and K2 (ON). The contactors K5 and K6 are open (OFF). The charger controller 173 then outputs power from the charger 122 and performs an insulation test using the IMD 147. For example, the insulation between the DC(+) wiring 160 and the PE wire 162 and the insulation between the DC(-) wiring 161 and the PE wire 162 are checked.
[0105] Then, when the charger controller 173 confirms that each insulation state is satisfactory, the charger controller 173 drives the bleeder circuit 146, and then opens (OFF) the contactor K1 and the contactor K2. In this way, the insulation test stage is completed.
[0106] Returning to FIG. 6, in the handshake phase (S213), the BMS 138 and the charger controller 173 exchange a version message, discharge compatibility information, and an identification message.
[0107] Next, the charging specification configuration step (S214) will be described. After the charging handshake step is completed, the charger controller 173 and the BMS 38 transmit and receive various charging specification messages to determine whether charging is possible for both. Figure 7 is a flow diagram showing the charging specification configuration step (S214).
[0108] The BMS 138 transmits a charging specifications message BCP of the power storage battery to the charger controller 173 (Step 220).
[0109] The charging specifications message BCP includes information indicating the charging voltage upper limit value (maximum allowable total charging voltage) V2 of the power storage device 10, the maximum allowable charging current value, the maximum allowable temperature, etc. Here, the charging voltage upper limit value V2 as an initial value is set to the maximum battery voltage value V1.
[0110] The charging voltage upper limit value V2 is a value transmitted from the BMS 138 to the charger controller 173 as the maximum voltage of the power storage device 110. The maximum battery voltage value V1 is, for example, the voltage of the power storage device 110 when the power storage device 110 is fully charged. The maximum battery voltage value V1 may be the voltage value of the power storage device 110 when the SOC of the power storage device 110 is 80%.
[0111] When the charger controller 173 receives the charging specifications message BCP (S250), the charger controller 173 transmits a charger time synchronization information message CTS, a charger maximum output capability message CML, and a charger charging / discharging direction request message CCD (S252).
[0112] The charger time synchronization information message CTS contains time synchronization information that the charger controller 173 sends to the BMS 138.
[0113] The charger maximum output capability message CML includes information indicating an available output voltage value (maximum output voltage) V0, a minimum output voltage value, a maximum output current value, and a minimum output current value.
[0114] The charger charge / discharge direction request message CCD includes information indicating the charge / discharge direction from the charging device 103. For example, "00" indicates charging, and "01" indicates discharging.
[0115] The BMS 138 performs a determination process based on the available output voltage value V0 included in the charger maximum output capability message CML (S224). Specifically, it is determined whether the available output voltage value V0 is equal to or greater than the upper charge voltage limit value V2. Here, the initial value of the upper charge voltage limit value V2 is set to the maximum battery voltage value V1. In the initial determination process, it is determined whether the available output voltage value V0 is equal to or greater than the maximum battery voltage value V1.
[0116] Here, when the BMS 138 determines that the available output voltage value V0 is equal to or greater than the upper charge voltage limit value V2 (Yes in S224), the BMS 138 transmits a charge preparation completion message BRO (S230).
[0117] The charge preparation completion message BRO is a message from the BM1S38 to the charging device 103 indicating that charging standby has been completed. When the BMS138 enters the standby state, it closes (ON) the contactors K5 and K6 (S232). Then, the BMS138 ends the charging specification configuration step S214.
[0118] After transmitting the charger time synchronization information message CTS and the like, the charger controller 173 performs a determination process (S254). Specifically, it determines whether the available output voltage value V0 is equal to or greater than the charging voltage upper limit value V2. Note that the initial value of the charging voltage upper limit value V2 stored in the charging specifications message BCP is the maximum battery voltage value V1. Therefore, when performing the determination process for the first time, the charger controller 173 determines whether the available output voltage value V0 is equal to or greater than the maximum battery voltage value V1.
[0119] When the charger controller 173 determines that the available output voltage value V0 is equal to or greater than the charging voltage upper limit value V2 (maximum battery voltage value V1) (Yes in S254), the charger controller 173 transmits a charger output preparation completion message CRO. The charger output preparation completion message CRO is a message that the charging device 103 sends to the BMS 38 indicating that charging standby has been completed. Then, the charger controller 173 turns on the contactors K1 and K2 (S262).
[0120] Here, if the BMS 138 determines in the above S224 that the charging voltage upper limit V2 (maximum battery voltage V1) is greater than the possible output voltage V0 (No in S224), the BMS 138 determines whether or not the retry message S10 has been transmitted (S225).
[0121] When the BMS 138 determines that the retry message S10 has not been transmitted (No in S225), the BMS 138 sets the maximum voltage value V3 as the charging voltage upper limit value V2 (S226). Specifically, the initial value of the charging voltage upper limit value V2 is set to the maximum battery voltage value V1, and the BMS 138 updates the value of the charging voltage upper limit value V2 to the maximum voltage value V3. The maximum voltage value V3 is a value equal to or less than the possible output voltage value V0. Note that the possible output voltage value V0 may be set as the maximum voltage value V3.
[0122] After the BMS 138 updates the value of the charging voltage upper limit value V2 (S226), the BMS 138 transmits a retry message S10 (S228).
[0123] Then, the BMS 138 transmits the charging specifications message BCP again (S220). At this time, the charging voltage upper limit value V2 included in the charging specifications message BCP is the maximum voltage value V3.
[0124] The BMS 138 receives the charger time synchronization information message CTS again (S222) and performs a determination process (S224). Specifically, the BMS 138 determines whether the available output voltage value V0 is equal to or greater than the upper charge voltage value V2. At this time, the upper charge voltage value V2 is the maximum voltage value V3. The maximum voltage value V3 is equal to or less than the available output voltage value V0.
[0125] Therefore, when the BMS 138 determines that the possible output voltage value V0 is equal to or greater than the charging voltage upper limit value V2 (maximum voltage value V3) (Yes in S224), the BMS 138 transmits a charging preparation completion message BRO (S230) and turns on the contactors K5 and K6 (S232).
[0126] In the above S254, when the charger controller 173 determines that the charging voltage upper limit value V2 is greater than the possible output voltage value V0 (No in S254), the charger controller 173 determines whether or not a retry message S10 has been received (S256). Note that, when the charger controller 173 performs the determination process for the first time, the charging voltage upper limit value V2 is set to the maximum battery voltage value V1.
[0127] When the charger controller 173 determines that the retry message S10 has been received (No in S256), the charger controller 173 receives a charging specifications message BCP from the BMS 138 (S250).
[0128] At this time, the BMS 138 updates the charging voltage upper limit value V2 included in the charging specifications message BCP to the maximum voltage value V3.
[0129] The charger controller 173 transmits a charger time synchronization information message CTS, a charger maximum output capability message CML, and a charger charge / discharge direction request message CCD (S252).
[0130] Then, the charger controller 173 performs the determination process again (S254). Specifically, it is determined whether the available output voltage value V0 is equal to or greater than the upper charge voltage value V2. At this time, the upper charge voltage value V2 is equal to the maximum voltage value V3, which is equal to or less than the available output voltage value V0.
[0131] Therefore, the charger controller 173 determines that the possible output voltage value V0 is equal to or greater than the charging voltage upper limit value V2.
[0132] When the charger controller 173 determines that the available output voltage value V0 is equal to or greater than the upper charging voltage limit value V2 (Yes in S254), the charger controller 173 transmits a charger output preparation completion message CRO. The charger output preparation completion message CRO is a message that the charging device 103 sends to the BMS 38 indicating that charging standby has been completed. Then, the charger controller 173 turns on the contactors K1 and K2 (S262).
[0133] In S224 above, if the BMS 138 determines that the charging voltage upper limit V2 is greater than the possible output voltage V0 (No in S224), and further determines that the retry message S10 has already been sent (Yes in S225), the BMS 138 sends an error message (S234).
[0134] Thus, in this embodiment, the BMS 138 does not transmit the second retry message S10.
[0135] In the above S254, if the charger controller 173 determines that the charging voltage upper limit value V2 is greater than the possible output voltage value V0 (No in S254) and determines that the retry message S10 has not been received (No in S256), it transmits an error message (S258).
[0136] Then, in the charging specification configuration step S214, when the contactors K1, K2, K5, and K6 are turned ON (S232, S262), the process moves to the charging step S215.
[0137] In the charging phase S215, the BMS 138 transmits a demand voltage (V) and a demand current (A) to the charger controller 173, and the charger controller 173 supplies power to the vehicle 102 based on the received demand voltage (V) and demand current (A).
[0138] Then, when the SOC of the power storage device 110 reaches the target SOC, the BMS 138 and the charger controller 173 end the charging and transition to a charging end stage S216.
[0139] In the charging termination stage S216, the BMS 138 and the charger controller 173 transmit and receive statistical data to each other. For example, the charger controller 173 transmits information such as the accumulated charging time of the semiconductor substrate to the BMS 138. (Embodiment 3) A charging system 1B according to a third embodiment will be described with reference to FIG.
[0140] FIG. 8 is a schematic diagram showing a charging system 1B. The charging system 1B includes a vehicle 201 and a charging facility 202.
[0141] Vehicle 201 includes a power storage device 210, a charging connector 211, a power line 212, a control pilot line (CPLT) 213, and an electric vehicle communication controller (EVCC) 214.
[0142] The power line 212 is connected to the power storage device 210 and the charging connector 211. The CPLT line 213 is connected to the charging connector 211 and the EVCC 214.
[0143] The charging equipment 202 includes a converter 230 , a charging cord 231 , a charging plug 232 , a power line 233 , a CPLT line 234 , and a supply equipment communication controller (SECC) 235 .
[0144] Converter 230 is connected to external power source 236. Converter 230 converts AC power supplied from external power source 236 into DC power. Charging plug 232 is provided at the tip of charging cord 231.
[0145] The power line 233 is connected to the converter 230 and the charging plug 232. The CPLT line 234 is connected to the SECC 235 and the charging plug 232.
[0146] FIG. 9 is a flow diagram showing a control flow up to the start of charging. The charging flow includes a communication setup phase S400, a service discovery phase S401, a service selection phase S402, an authentication phase S403, a charging parameters phase S404, a cable check phase S405, a pre-charge phase S406, a charging phase S407, a charging termination phase S408, a welding check phase S409, and a session termination phase S410.
[0147] In a communications setup step S400, a data link between the EVCC 214 and the SECC 235 is established.
[0148] In the service discovery stage S401, the EVCC 214 acquires the service contents provided by the charging facility 202.
[0149] In the service selection step S402, the EVCC 214 selects and determines the service content to be received from the charging equipment 202.
[0150] In the authentication step S403, the EVCC 214 transmits the billing method and the power contract information to the SECC 235. The SECC 235 has the contents of the power contract information authenticated by an external secondary actor.
[0151] In the charging parameter step S404, information regarding various charging parameters is exchanged between the EVCC214 and the SECC235.
[0152] FIG. 10 is a flow diagram showing the charging parameters step S404. The EVCC 214 transmits a charge parameter discovery request (charge parameter discovery req) S20 to the SECC 235 (S500). This charge parameter discovery request S20 includes a charge voltage upper limit value V2, a maximum charge current value, and a minimum charge current value. Here, the initial value of the charge voltage upper limit value V2 is the battery maximum voltage value V1. In the present embodiment 3, the battery maximum voltage value V1 corresponds to "EV Maximum Voltage."
[0153] When the SECC 235 receives the charging parameter discovery request S20 (Yes in S600), it performs a determination process (S602) to determine whether the available output voltage value V0 is equal to or greater than the charging voltage upper limit value V2.
[0154] If it is determined that the available output voltage value V0 is equal to or greater than the upper charge voltage limit value V2 (Yes in S602), a charge parameter discovery response (ChargeParameterDiscoveryRes) S21 is transmitted (S604). This response code S22 is included, and a code indicating "OK" is stored as the response code S22.
[0155] On the other hand, when the SECC 235 determines that the charging voltage upper limit value V2 is greater than the available output voltage value V0 (No in S602), it transmits a charging parameter discovery response S21 (S606). At this time, the response code S22 stored in the charging parameter discovery response S21 is “No”.
[0156] If the SECC 235 determines that the predetermined period has not elapsed (No in S608), the above steps S600 to S606 are repeated. Note that the predetermined period is determined as to whether it has elapsed since the charge parameter discovery request S20 was first received.
[0157] The charge parameter discovery response S21 includes an available output voltage value V0, a maximum charging power value, and a maximum charging current value. In this embodiment, the available output voltage value V0 corresponds to "EVSEMaximumVoltage."
[0158] After transmitting the charging parameter discovery request S20, the EVCC 214 waits until it receives a charging parameter discovery response S21 (S501). When the EVCC 214 receives the charging parameter discovery response S21 (Yes in S501), it performs a determination process (S502). Specifically, it determines whether the available output voltage value V0 is equal to or greater than the charging voltage upper limit value V2. In the initial state, the charging voltage upper limit value V2 is set to the maximum battery voltage value V1.
[0159] Then, when the EVCC 214 determines that the available output voltage value V0 is equal to or greater than the charging voltage upper limit value V2 (Yes in S502), it again transmits the charging parameter discovery request S20 (S503). The charging voltage upper limit value V2 in this charging parameter discovery request S20 is the maximum battery voltage value V1. Then, it proceeds to the cable check stage S405.
[0160] When EVCC214 determines that the charging voltage upper limit value V2 is greater than the available output voltage value V0 (No in S502), EVCC214 sets the charging voltage upper limit value V2 to the maximum voltage value V3 (S504). Note that the maximum voltage value V3 is a value equal to or less than the available output voltage value V0. Note that the maximum voltage value V3 may be set to the same value as the available output voltage value V0.
[0161] The EVCC 214 again transmits the charging parameter discovery request S20 (S506). At this time, the charging voltage upper limit value V2 included in the charging parameter discovery request S20 is set to the maximum voltage value V3.
[0162] Here, the SECC 235 repeats the above steps S600 to S606 until a predetermined period of time has elapsed since the first reception of the charge parameter discovery request S20.
[0163] Therefore, when the SECC 235 receives the charge parameter discovery request S20 again, it performs a determination process (S602).
[0164] At this time, the charging voltage upper limit V2 is set to a maximum voltage V3, and the maximum voltage V3 is equal to or lower than the possible output voltage V0.
[0165] Therefore, the SECC 235 determines that the possible output voltage value V0 is equal to or greater than the upper limit charge voltage value V2 (Yes in S602), and transmits a charge parameter discovery response S21 (S604). At this time, the response code S22 is "OK".
[0166] If the SECC 235 determines that the predetermined period has elapsed (Yes in S608), the SECC 235 determines whether the final response code S22 is "OK" (S610).
[0167] If the SECC 235 determines that the response code S22 of the last transmitted charge parameter discovery response S21 is "OK" (Yes in S610), it proceeds normally to the cable check step S405. If the SECC 235 determines that the response code S22 of the last transmitted charge parameter discovery response S21 is "NO" (No in S610), it transmits an error message (S612). In this case, the SECC 235 does not proceed to the cable check step S405.
[0168] 9, when the EVCC 214 and the SECC 235 move to the cable check stage S405, the EVCC 214 and the SECC 235 perform a cable check. Specifically, the EVCC 214 transmits a CableCheckReq signal to the SECC 235. Then, the SECC 235 returns a CableCheckRes signal. Then, the EVCC 214 and the SECC 235 check whether the charging plug 232 and the charging connector 211 are properly connected.
[0169] In the pre-charge stage S406, low-power electric power is supplied from the charging facility 202 to the vehicle 201.
[0170] Specifically, the EVCC 214 transmits a PreChargeReq signal. This PreChargeReq signal includes a target voltage value and the like. The SECC 235 transmits a PreChargeRes signal. In this manner, by performing pre-charging, it is possible to check in advance whether there are any problems with each component.
[0171] Then, in the charging step S407, the main charging is performed. A PowerDeliveryReq signal and a CurrentDemandReq signal are transmitted. At this time, the PowerDeliveryReq signal includes a "Start" flag requesting the start of charging. The CurrentDemandReq signal includes, for example, a maximum charging power (EVMaximumChargePower), a maximum charging current (EVMaximumChargeCurrent), a charging voltage upper limit value V2 (maximum charging voltage (EVMaximumVoltage)), and a target charging power (EVTargetEnergyRequest). The charging voltage upper limit value V2 is set to the maximum voltage value V3 when the charging parameter discovery request S20 is retransmitted in the above S506.
[0172] Then, the SECC 235 transmits a PowerDeliveryRes signal and a CurrentDemandRes signal. The PowerDeliveryRes signal includes an OK flag that indicates that charging is to start. The CurrentDemandRes signal includes an output voltage (EVSEPresentVoltage), an output voltage (EVSEPresentCurrent), an available output voltage value V0 (maximum output voltage (EVSEMaximumChargeVoltage)), a maximum output current (EVSEMaximumChargeCurrent), and a maximum output power (EVSEMaximumChargePower).
[0173] Then, when charging is completed, the EVCC 214 transmits a PowerDeliveryReq signal, which includes a "Stop" flag that requests the start of charging.
[0174] The SECC 235 returns a PowerDeliveryRes signal. The PowerDeliveryRes signal includes an OK flag indicating that charging is to be terminated. Then, the EVCC 214 terminates charging.
[0175] In a fuse check step S409, the EVCC 214 and the SECC 235 perform a fuse check, and then in a session termination step S410, the EVCC 214 and the SECC 235 terminate communication with each other.
[0176] According to the charging system 1B described above, in the charging parameter stage S404, the EVCC 214 adjusts the charging voltage upper limit value V2 based on the available output voltage value V0, thereby preventing charging from not being started.
[0177] This allows the vehicle 201 to receive power from the charging facility 202 and charge the power storage device 210.
[0178] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, and it is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0179] 1,1A,1B Charging system, 2,102,201 Vehicle, 3,202 Charging equipment, 10,53,110,210 Storage device, 11 Charging cable, 12 Equipment side connector, 13,230 Converter, 15,54 Communication unit, 16,55 Control unit, 17 Control power supply, 18,19,57,58 Relay, 20,59,60,63,64 Photocoupler, 21 Input unit, 22,67 Memory unit, 31,71 Charging line, 32,72 Communication line, 33 Control line, 34,74,74A,74B Charging start / stop line, 35 Connector connection confirmation line, 36 Charging prohibition permission line, 37,77 Ground line, 40 Input power supply, 41 Voltmeter, 42 Ammeter, 43 Earth fault detector, 44 Latch hold circuit, 45 latch, 52 vehicle side connector, 56 control system power supply, 62 detection circuit, 73 control line, 75 connector connection line, 76 charging permission / prohibition line, 103 charging device, 113 charging inlet, 114 power wiring, 120 plug, 122, CAN charger, 137 vehicle controller, 145 voltage measurement device, 146 bleeder circuit, 157, 187 housing, 173 charger controller, 211 charging connector, 212, 233 power line, 231 charging cord, 232 charging plug, 236 external power supply, BCP specifications message, BRO charging preparation completion message, CCD charger charge / discharge direction request message, CML charger maximum output capability message, CRO charger output preparation completion message, CTS charger time synchronization information message, D0 charger CAN data, I0 output possible current value, K1, K2, K5, K6 Contactor, P1, P2, P3 detection points, R1, R4 resistance, S0 charging start trigger, S1 advance preparation signal, S2 charging start signal, S3 connector connection confirmation signal, S4 connector connection completion signal, S5 vehicle charging possible flag, S6 charging command value, S7 advance preparation confirmation signal, S10 retry message, S20 charging parameter discovery request, S21 charging parameter discovery response, S22 response code, S214 specification configuration stage, S215, S407 charging stage, S216,S408 Charging end stage, S400 Communication setup stage, S401 Service discovery stage, S402 Service selection stage, S403 Authentication stage, S404 Charging parameters stage, S405 Cable check stage, S406 Precharge stage, S409 Welding check stage, S410 Session end stage, SOC target, T0 Unconnected state, T1 Connected state, T2, T3, T4 Wake-up, V0 Output voltage value, V1 Maximum battery voltage value, V2 Charging voltage upper limit value, V3 Maximum voltage value, V4 Battery endurance upper limit value.
Claims
1. A vehicle that charges an on-board power storage device with electric power from a charging facility, A communication unit that acquires a first voltage value indicating a possible output voltage value that the charging facility can output; a processing unit that, when a second voltage value indicating a maximum voltage value of the power storage device is greater than the first voltage value, transmits a third voltage value that is equal to or less than the first voltage value as a charging voltage upper limit value to the charging equipment; Equipped with the processing unit transmits the second voltage value as the charging voltage upper limit value before acquiring the first voltage value, The processing unit acquires the first voltage value, and when the second voltage value is greater than the first voltage value, transmits the third voltage value as the charging voltage upper limit value again to the charging equipment.
2. The vehicle according to claim 1 , wherein the processing unit transmits the second voltage value as the charging voltage upper limit to the charging equipment when the second voltage value is equal to or lower than the first voltage value.
3. The vehicle according to claim 1 or 2, wherein the third voltage value is the first voltage value.
4. A vehicle that charges an on-board power storage device with power from a charging facility, A communication unit that acquires a first voltage value indicating a possible output voltage value that the charging facility can output; a processing unit that, when a second voltage value indicating a maximum voltage value of the power storage device is greater than the first voltage value, transmits a third voltage value that is equal to or less than the first voltage value as a charging voltage upper limit value to the charging equipment; Equipped with the processing unit transmits the second voltage value as the charging voltage upper limit value before acquiring the first voltage value, the processing unit acquires the first voltage value, and when the second voltage value is greater than the first voltage value, transmits a retry message; After transmitting the retry message, the processing unit transmits the third voltage value as the charging voltage upper limit again to the charging facility.
5. A charging system including a vehicle equipped with a power storage device and a charging facility that supplies electric power to the power storage device, The charging facility transmits to the vehicle a first voltage value indicating a maximum output voltage that the charging facility can output; When a second voltage value indicating a maximum voltage value of the power storage device is greater than the first voltage value, the vehicle transmits a third voltage value that is equal to or less than the first voltage value as a charging voltage upper limit value to the charging equipment; the vehicle transmits the second voltage value as the charging voltage upper limit value before acquiring the first voltage value, The vehicle acquires the first voltage value, and when the second voltage value is greater than the first voltage value, transmits the third voltage value as the charging voltage upper limit value again to the charging equipment.
6. The charging system according to claim 5 , wherein, when the second voltage value is equal to or lower than the first voltage value, the preceding vehicle transmits the second voltage value as the charging voltage upper limit value to the charging equipment.
7. 7. The charging system according to claim 5, wherein the third voltage value is the first voltage value.
8. A charging system including a vehicle equipped with a power storage device and a charging facility for supplying power to the power storage device, The charging facility transmits to the vehicle a first voltage value indicating a maximum output voltage that the charging facility can output; When a second voltage value indicating a maximum voltage value of the power storage device is greater than the first voltage value, the vehicle transmits a third voltage value that is equal to or less than the first voltage value as a charging voltage upper limit value to the charging equipment; the vehicle transmits the second voltage value as the charging voltage upper limit value before acquiring the first voltage value; acquiring the first voltage value, and transmitting a retry message when the second voltage value is greater than the first voltage value; After transmitting the retry message, the charging system transmits the third voltage value as the charging voltage upper limit again to the charging equipment.
Citation Information
Patent Citations
Charging system, charger, electric mobile body, and method of charging battery for electric mobile body
JP2012209995A
Electric vehicle
JP2019047677A
Electric vehicle
JP2019140721A
Control system
JP2020048288A
Motor-driven vehicle and control method for motor-driven vehicle
US20190241085A1
