Air conditioner control system, air conditioner control method, and server device
The air conditioner control system reduces the risk of failure by stopping emergency operation before a predetermined period through a server device that manages and instructs the air conditioner to stop, facilitating timely maintenance.
Patent Information
- Application Number
- JP2020199577
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-01
- Publication Date
- 2024-11-14
- Estimated Expiration
- 2040-12-01
AI Technical Summary
Emergency operation in air conditioners increases the risk of further failure if continued for a long time.
An air conditioner control system that includes a server device communicably connected to the air conditioner, which transmits setting information for emergency operation and instructs to stop the operation when it continues for a predetermined period, allowing for maintenance before the period elapses.
Prevents emergency operation from exceeding a predetermined time, reducing the risk of air conditioner failure by enabling timely maintenance.
Smart Images

Figure 0007583255000001 
Figure 0007583255000002 
Figure 0007583255000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to an air conditioner control system, an air conditioner control method, and a server device. [Background technology]
[0002] There is known an air conditioner control system that connects an air conditioner to a server device via a public line such as the Internet and controls the air conditioner remotely. With this air conditioner control system, for example, if an abnormality occurs in the air conditioner, emergency operation can be started remotely before a maintenance worker arrives at the site. This makes it possible to shorten the time the air conditioner is stopped before emergency operation starts. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2006-125647 A [Patent Document 2] JP 2004-077078 A [Patent Document 3] JP 2004-069080 A Summary of the Invention [Problem to be solved by the invention]
[0004] On the other hand, emergency operation is only a temporarily permitted operating method, and if emergency operation continues for a long period of time, the risk of further breakdowns occurring in the air conditioner increases.
[0005] The present disclosure provides an air conditioner control system, an air conditioner control method, and a server device that reduce the risk of air conditioner failure during emergency operation. [Means for solving the problem]
[0006] In a first aspect of the present disclosure, an air conditioner control system includes: An air conditioner control system in which an air conditioner and a server device are communicatively connected, a control unit that transmits setting information for emergency operation to the air conditioner when a notification indicating an abnormality is received from the air conditioner, and instructs the air conditioner to stop the emergency operation when the emergency operation based on the setting information continues for a predetermined period of time; The control unit further If maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time, an instruction to stop the emergency operation is issued.
[0007] According to the first aspect of the present disclosure, it is possible to prevent emergency operation from continuing for a predetermined period or longer, and if maintenance is performed before the predetermined period, it is possible to end emergency operation without waiting for the passage of the predetermined period. In this way, according to the first aspect of the present disclosure, it is possible to provide an air conditioner control system that reduces the risk of air conditioner failure during emergency operation.
[0008] A second aspect of the present disclosure is an air conditioner control system according to the first aspect, The control unit is If there is no history indicating that emergency operation was performed due to the abnormality in the air conditioner, setting information for emergency operation is transmitted to the air conditioner.
[0009] A third aspect of the present disclosure is an air conditioner control system according to the first aspect, The control unit is The system notifies the user that the air conditioner has stopped based on an instruction to stop the emergency operation when the emergency operation has continued for a predetermined period of time.
[0010] A fourth aspect of the present disclosure is an air conditioner control system according to the third aspect, The control unit is Before the emergency operation continues for a predetermined period of time, a prior notice is given that the emergency operation is to be stopped.
[0011] A fifth aspect of the present disclosure is an air conditioner control system according to the first aspect, The control unit is When a user permits the air conditioner to perform emergency operation based on the setting information, setting information for emergency operation is transmitted to the air conditioner.
[0012] A sixth aspect of the present disclosure is an air conditioner control system according to the first aspect, The setting information for emergency operation includes information regarding the predetermined period.
[0013] In addition, an air conditioner control method according to a seventh aspect of the present disclosure includes: An air conditioner control method in an air conditioner control system in which an air conditioner and a server device are communicatively connected, comprising: a control step of transmitting setting information for emergency operation to the air conditioner when a notification indicating an abnormality is received from the air conditioner, and instructing the air conditioner to stop the emergency operation when the emergency operation based on the setting information continues for a predetermined period of time; The control step further comprises: If maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time, an instruction to stop the emergency operation is issued.
[0014] According to the seventh aspect of the present disclosure, it is possible to prevent emergency operation from continuing for a predetermined period or longer, and if maintenance is performed before the predetermined period, it is possible to end emergency operation without waiting for the passage of the predetermined period. In this way, according to the seventh aspect of the present disclosure, it is possible to provide an air conditioner control method that reduces the risk of air conditioner failure during emergency operation.
[0015] In addition, a server device according to an eighth aspect of the present disclosure includes: A server device communicably connected to an air conditioner, a control unit that transmits setting information for emergency operation to the air conditioner when a notification indicating an abnormality is received from the air conditioner, and instructs the air conditioner to stop the emergency operation when the emergency operation based on the setting information continues for a predetermined period of time; The control unit further If maintenance information is received before the emergency operation continues for a predetermined period of time, an instruction to stop the emergency operation is issued.
[0016] According to the eighth aspect of the present disclosure, it is possible to prevent emergency operation from continuing for a predetermined period or longer, and if maintenance is performed before the predetermined period, it is possible to end emergency operation without waiting for the passage of the predetermined period. In this way, according to the eighth aspect of the present disclosure, it is possible to provide a server device that reduces the risk of air conditioner failure during emergency operation. [Brief description of the drawings]
[0017] [Figure 1] FIG. 1 is a diagram illustrating an example of a system configuration of an air conditioner control system. [Figure 2A] FIG. 2 illustrates an example of a hardware configuration of an edge device. [Figure 2B] FIG. 2 illustrates an example of a hardware configuration of a server device. [Diagram 3] 4 is an example of a flowchart showing the flow of an air conditioner control process performed by the air conditioner control system. [Figure 4] 11 is an example of a sequence diagram showing a flow of emergency operation start processing. [Diagram 5] 11 is an example of a sequence diagram showing a flow of a first emergency operation ending process. [Figure 6] 11 is an example of a sequence diagram showing the flow of advance notice processing and second emergency operation termination processing. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] Hereinafter, each embodiment will be described with reference to the accompanying drawings. In this specification and the drawings, components having substantially the same functional configurations are denoted by the same reference numerals, and redundant description will be omitted.
[0019] [First embodiment] <System configuration of air conditioner control system> First, the system configuration of the air conditioner control system will be described. Fig. 1 is a diagram showing an example of the system configuration of the air conditioner control system.
[0020] 1, the air conditioner control system 100 includes an air conditioner 110, an edge device 120, a server device 130, and an administrator terminal 140. In the air conditioner control system 100, the air conditioner 110 and the edge device 120 are communicatively connected via a dedicated communication line. Furthermore, the edge device 120 and the server device 130, and the administrator terminal 140 and the server device 130 are communicatively connected via a public line such as the Internet 150.
[0021] The air conditioner 110 has indoor units 111 and 112 and outdoor units 113, 114, and 115. Note that the number of indoor units and outdoor units shown in Fig. 1 is an example, and the air conditioner 110 in this embodiment has multiple indoor units and multiple outdoor units and is configured to be capable of emergency operation.
[0022] The example in FIG. 1 shows a situation in which an abnormality occurs in outdoor unit 113, which is a parent unit, and the remaining two child units, outdoor units 114 and 115, excluding outdoor unit 113 (one of the outdoor units in which the abnormality occurred), work together to perform emergency operation.
[0023] The edge device 120 transmits the air conditioner information output by the air conditioner 110 to the server device 130 via the Internet 150. The air conditioner information output by the air conditioner 110 includes, for example, abnormality information (notification) indicating that an abnormality has occurred, and information indicating the state of the air conditioner 110 during emergency operation. Furthermore, the air conditioner information output by the air conditioner 110 includes information (maintenance information) indicating that maintenance work has been performed by a worker 161 who performs maintenance on the air conditioner 110.
[0024] Furthermore, the edge device 120 transmits instruction information transmitted from the server device 130 via the Internet 150 to the air conditioner 110. The instruction information transmitted by the server device 130 to the edge device 120 includes, for example, information instructing to stop operation of all indoor units, information instructing to set emergency operation, information instructing to stop emergency operation, and the like.
[0025] A control program is installed in the server device 130, and the server device 130 functions as a control unit 131 by executing the program.
[0026] The control unit 131 controls the air conditioner 110 remotely via the Internet 150. Specifically, the control unit 131 receives air conditioner information that is output by the air conditioner 110 and transmitted by the edge device 120 via the Internet 150. The control unit 131 also transmits instruction information corresponding to the received air conditioner information to the edge device 120 via the Internet 150, either automatically or by input by the device manager 162. In this way, the server device 130 functioning as the control unit 131 can control the air conditioner 110 remotely.
[0027] Furthermore, the control unit 131 transmits notification information corresponding to the received air conditioner information to the manager terminal 140 via the Internet 150. The notification information transmitted to the manager terminal 140 includes, for example, information notifying a guide for starting emergency operation, information notifying successful setting of setting information for emergency operation, information notifying advance notice of the stop of emergency operation, information notifying the stop of emergency operation, and the like.
[0028] Furthermore, in response to transmitting the notification information to the manager terminal 140, the control unit 131 receives permission / prohibition information for emergency operation input by the air conditioner manager 163. Note that, when the permission / prohibition information is received, a part of the instruction information is transmitted to the edge device 120.
[0029] The manager terminal 140 is a terminal operated by an air conditioner manager 163 (an example of a user, for example, a manager managing a building in which the air conditioner 110 is installed) who manages the air conditioner 110. The manager terminal 140 notifies the air conditioner manager 163 of the notification information received from the server device 130.
[0030] When the manager terminal 140 issues a notification to start emergency operation, the air conditioner manager 163 requests the worker 161 to perform maintenance work and inputs permission / rejection information for emergency operation. As a result, the permission / rejection information is transmitted to the server device 130 via the Internet 150.
[0031] <Hardware configuration of edge device and server device> Next, the hardware configuration of the edge device 120 and the server device 130 will be described.
[0032] (1) Hardware Configuration of Edge Device 120 2A is a diagram showing an example of a hardware configuration of an edge device. As shown in FIG. 2A, the edge device 120 includes a processor 201, a memory 202, an auxiliary storage device 203, an I / F (Interface) device 204, a communication device 205, and a drive device 206. The hardware components of the edge device 120 are connected to each other via a bus 207.
[0033] The processor 201 has various arithmetic devices such as a CPU (Central Processing Unit), a GPU (Graphics Processing Unit), etc. The processor 201 reads various programs (programs for realizing the above-mentioned functions of the edge device 120) onto the memory 202 and executes them.
[0034] The memory 202 includes a main storage device such as a Read Only Memory (ROM) and a Random Access Memory (RAM), etc. The processor 201 and the memory 202 form a so-called computer.
[0035] The auxiliary storage device 203 stores various programs and various data used when the processor 201 executes the various programs.
[0036] The I / F device 204 is a device that enables the edge device 120 to communicate with the air conditioner 110 via a dedicated communication line.
[0037] The communication apparatus 205 is a device for the edge apparatus 120 to communicate with other apparatuses (eg, the server apparatus 130) via the Internet 150.
[0038] The drive device 206 is a device for setting the recording medium 210. The recording medium 210 here includes media that record information optically, electrically, or magnetically, such as a CD-ROM, a flexible disk, a magneto-optical disk, etc. The recording medium 210 may also include semiconductor memories that record information electrically, such as ROM, flash memory, etc.
[0039] The various programs to be installed in the auxiliary storage device 203 are installed, for example, by setting the distributed recording medium 210 in the drive device 206 and reading out the various programs recorded in the recording medium 210 by the drive device 206. Alternatively, the various programs to be installed in the auxiliary storage device 203 may be installed by being downloaded from the Internet 150 via the communication device 205.
[0040] (2) Hardware Configuration of Server Device 130 2B is a diagram showing an example of the hardware configuration of the server device 130. Note that the hardware configuration of the server device 130 is generally the same as the hardware configuration of the edge device 120, so the following description will focus on the differences from the hardware configuration of the edge device 120.
[0041] The processor 221 reads various programs (for example, a control program, etc.) onto the memory 222 and executes them.
[0042] The memory 222 has a main storage device such as a ROM (Read Only Memory), a RAM (Random Access Memory), etc. The processor 221 and the memory 222 form a so-called computer, and the processor 221 executes various programs read onto the memory 222, whereby the computer realizes the control unit 131.
[0043] The auxiliary storage device 223 stores various programs and various data used when the various programs are executed by the processor 221 (for example, an emergency driving history, which will be described later, and the like).
[0044] The I / F device 224 is a connection device that connects the operation device 230, which is an example of an external device, the display device 240, and the server device 130. The I / F device 224 accepts operations on the server device 130 by the device administrator 162 via the operation device 230. In addition, the I / F device 224 displays the results of various processes performed by the server device 130 to the device administrator 162 via the display device 240.
[0045] The communication apparatus 225 is a communication device for communicating with other apparatuses (eg, the edge apparatus 120, the administrator terminal 140, etc.) via the Internet 150.
[0046] <Flow of air conditioner control process> Next, it will be described how the air conditioner control process is carried out by the air conditioner control system 100. Fig. 3 is an example of a flowchart showing how the air conditioner control process is carried out by the air conditioner control system.
[0047] In step S301, the air conditioner 110 determines whether or not an abnormality has occurred. If it is determined in step S301 that no abnormality has occurred (NO in step S301), the air conditioner 110 waits until an abnormality occurs.
[0048] On the other hand, if it is determined in step S301 that an abnormality has occurred (YES in step S301), the process proceeds to step S302.
[0049] In step S302, the air conditioner 110, the edge device 120, the server device 130, and the manager terminal 140 perform emergency operation start processing. Details of the emergency operation start processing will be described later with reference to FIG.
[0050] In step S303, the air conditioner 110 determines whether or not maintenance has been performed by the worker 161. If it is determined in step S303 that maintenance has been performed (YES in step S303), the process proceeds to step S304.
[0051] In step S304, the air conditioner 110, the edge device 120, the server device 130, and the manager terminal 140 perform a first emergency operation ending process. The first emergency operation ending process will be described in detail later with reference to FIG.
[0052] On the other hand, if it is determined in step S303 that maintenance has not been performed (NO in step S303), the process proceeds to step S305.
[0053] In step S305, the server device 130 determines whether or not the timing for advance notification has arrived. Advance notification refers to notifying the manager terminal 140 that emergency operation will automatically stop before the emergency operation started in step S302 continues for a predetermined period of time (when a predetermined emergency operation period has elapsed). In this embodiment, the emergency operation period is seven days, and the advance notification is made the day before the last day of the emergency operation period. That is, in this embodiment, the advance notification is made on the sixth day after the emergency operation is started.
[0054] If it is determined in step S305 that the advance notification timing has arrived (YES in step S305), the process proceeds to step S306. In step S306, the server device 130 and the administrator terminal 140 perform advance notification processing, and then proceeds to step S307. Details of the advance notification processing will be described later with reference to FIG. 6.
[0055] On the other hand, if it is determined in step S305 that the advance notification timing has not yet arrived or that the advance notification timing has already passed (NO in step S305), the process proceeds directly to step S307.
[0056] In step S307, the server device 130 determines whether the emergency operation has continued for a predetermined period (whether a predetermined emergency operation period has elapsed). If it is determined in step S307 that the emergency operation has not continued for the predetermined period (the predetermined emergency operation period has not elapsed) (NO in step S307), the process returns to step S303.
[0057] On the other hand, if it is determined in step S307 that the predetermined period has continued (the predetermined emergency operation period has elapsed) (if YES in step S307), the process proceeds to step S308.
[0058] In step S308, the air conditioner 110, the edge device 120, the server device 130, and the manager terminal 140 perform a second emergency operation ending process. The second emergency operation ending process will be described in detail later with reference to FIG.
[0059] In this way, when emergency operation is started, the air conditioner control system 100 starts timing the emergency operation period, and when the emergency operation period has elapsed, the emergency operation is automatically stopped (second emergency operation termination process in step S308). As a result, the air conditioner control system 100 can prevent emergency operation from continuing for a predetermined period of time or longer, and can reduce the risk of air conditioner failure during emergency operation.
[0060] Furthermore, in the air conditioner control system 100, if maintenance is performed by the worker 161 during the emergency operation period, the emergency operation is stopped (first emergency operation termination process in steps S303 and S304). As a result, the air conditioner control system 100 can terminate emergency operation without waiting for the emergency operation period to elapse, reducing the risk of air conditioner failure occurring during emergency operation.
[0061] <Emergency operation start process flow> Next, the details of the emergency operation start process (step S302 in FIG. 3) will be described. FIG. 4 is an example of a sequence diagram showing the flow of the emergency operation start process. As described above, when it is determined that an abnormality has occurred in the air conditioner 110 (YES in step S301 in FIG. 3), the emergency operation start process shown in FIG. 4 is performed.
[0062] In step S401, the air conditioner 110 transmits abnormality information to the edge device 120.
[0063] In step S402, the edge device 120 transmits the anomaly information transmitted from the air conditioner 110 to the server device 130 via the Internet 150.
[0064] In step S403, the control unit 131 of the server device 130 checks the contents of the abnormality information transmitted from the edge device 120 and determines whether or not emergency operation is possible. If the control unit 131 of the server device 130 determines that emergency operation is possible, the control unit 131 refers to the past emergency operation history and determines whether or not a predetermined condition is met.
[0065] The control unit 131 of the server device 130 determines that the predetermined condition is met, for example, if emergency operation has been performed within a predetermined period (e.g., 30 days) in the same air conditioner 110 due to the same abnormality information (abnormality code). On the other hand, the control unit 131 of the server device 130 determines that the predetermined condition is not met, for example, if emergency operation has not been performed within a predetermined period (e.g., 30 days) in the same air conditioner 110 due to the same abnormality information (abnormality code).
[0066] If it is determined that the predetermined condition is not met, in step S404, the control unit 131 of the server device 130 transmits information notifying the manager terminal 140 of the start of emergency operation. As a result, the manager terminal 140 notifies the air conditioner manager 163 of the start of emergency operation.
[0067] In step S405, in response to being notified of the notification to start emergency operation, the air conditioner manager 163 requests the worker 161 to perform maintenance work, and inputs an instruction to the manager terminal 140 to permit or not permit emergency operation.
[0068] In step S406, the manager terminal 140 transmits emergency operation permission information to the server device 130.
[0069] In step S407, the control unit 131 of the server device 130 checks whether the content of the abnormality information has changed, and also checks whether the air conditioner manager 163 has permitted or disallowed emergency operation based on the emergency operation permission information.
[0070] If the content of the abnormality information has not changed and the air conditioner manager 163 has permitted emergency operation, in step S408, the control unit 131 of the server device 130 transmits information instructing the stop of operation of all indoor units to the edge device 120 via the Internet 150.
[0071] In step S409, the edge device 120 receives information instructing the operation of all indoor units to be stopped from the server device 130, and transmits this information to the air conditioner 110. When the information instructing the operation of all indoor units to be stopped is transmitted, the air conditioner 110 stops the operation of all indoor units (indoor units 111, 112). As a result, the operation of all indoor units is stopped (however, the cooling / heating mode settings, temperature settings, etc., that are set in all indoor units are maintained).
[0072] In step S410, the air conditioner 110 transmits to the edge device 120 information indicating the state of the air conditioner 110 during emergency operation (that the operation of all indoor units has stopped).
[0073] In step S411, the edge device 120 transmits information indicating the state of the air conditioner 110 during emergency operation (that the operation of all indoor units has stopped) to the server device 130 via the Internet 150.
[0074] In step S412, the control unit 131 of the server device 130 transmits information instructing the setting of the emergency operation to the edge device 120 via the Internet 150.
[0075] The information instructing the setting of emergency operation, which is transmitted from the control unit 131 of the server device 130 to the edge device 120, includes setting information for emergency operation (for example, a setting for prohibiting operation of the outdoor unit 113 and masking abnormality information of the outdoor unit 113). The information instructing the setting of emergency operation may also include information related to the emergency operation period (7 days in this embodiment).
[0076] In step S413, the edge device 120 transmits to the air conditioner 110 information instructing the setting of emergency operation.
[0077] In step S414, the air conditioner 110 validates the setting information for emergency operation that is included in the information received from the edge device 120 and instructing the setting of emergency operation.
[0078] When the setting information for emergency operation is enabled, in step S415, the air conditioner 110 transmits information (notification of setting completion) indicating the state of the air conditioner 110 during emergency operation (that the setting for emergency operation has been completed) to the edge device 120.
[0079] In step S416, the edge device 120 transmits information indicating the state of the air conditioner 110 during emergency operation (that the setting of emergency operation has been completed) to the server device 130 via the Internet 150.
[0080] In step S417, the control unit 131 of the server device 130 confirms that the setting of the emergency operation in the air conditioner 110 has been completed.
[0081] In step S418, the control unit 131 of the server device 130 transmits to the manager terminal 140 information notifying the successful setting of the setting information for emergency operation in the air conditioner 110. As a result, the manager terminal 140 notifies the air conditioner manager 163 that the setting information for emergency operation in the air conditioner 110 has been set.
[0082] In step S419, the worker 161 or the air conditioner manager 163 operates the remote control of the indoor unit to instruct the start of emergency operation based on the setting information for emergency operation. As a result, the air conditioner 110 starts emergency operation.
[0083] When emergency operation is started, the air conditioner 110 transmits, in step S420, information indicating the state of the air conditioner 110 during emergency operation (that emergency operation has started) to the edge device 120.
[0084] In step S421, the edge device 120 receives, from the air conditioner 110, information indicating the state of the air conditioner 110 during emergency operation (that emergency operation has started), and transmits this information to the server device 130 via the Internet 150.
[0085] In step S422, the control unit 131 of the server device 130 starts measuring the time of the emergency operation period.
[0086] In this way, the air conditioner control system 100 transmits information instructing the stopping of operation of all indoor units (indoor units 111, 112) of the air conditioner 110, and then transmits information instructing the setting of emergency operation. As a result, according to the air conditioner control system 100, emergency operation will not start immediately even if the setting information for emergency operation is enabled in the air conditioner 110. Emergency operation will not start until the worker 161 or air conditioner manager 163 operates the remote control of the indoor unit.
[0087] As a result, the air conditioner control system 100 can avoid a situation where emergency operation is started unintentionally when, for example, the worker 161 is about to start maintenance near the air conditioner 110 on-site. In other words, the air conditioner control system 100 can ensure the safety of the worker 161 when starting emergency operation.
[0088] In the example of FIG. 4, the server device 130 starts timing the emergency operation period after receiving information indicating the state of the air conditioner 110 during emergency operation (that emergency operation has started), but the timing for starting to clock the emergency operation period is not limited to this.
[0089] For example, timing of the emergency operation period may start when information notifying the start of emergency operation is sent to the manager terminal 140 (step S404) or when emergency operation permission information is received from the manager terminal 140 (step S406).
[0090] <First emergency operation termination process flow> Next, the first emergency operation end process (step S304 in FIG. 3) will be described in detail. FIG. 5 is an example of a sequence diagram showing the flow of the first emergency operation end process. As described above, when it is determined that maintenance has been performed by the worker 161 on the air conditioner 110 (YES in step S303 in FIG. 3), the first emergency operation end process shown in FIG. 5 is performed.
[0091] In step S501, the air conditioner 110 transmits to the edge device 120 information indicating that maintenance work has been performed by the worker 161.
[0092] In step S502, the edge device 120 transmits information indicating that the maintenance work has been performed to the server device 130 via the Internet 150.
[0093] In step S503, in response to information transmitted from the edge device 120 indicating that maintenance work has been performed, the control unit 131 of the server device 130 transmits information to the edge device 120 via the Internet 150, instructing the operation of all indoor units to be stopped.
[0094] In step S504, the edge device 120 transmits information to the air conditioner 110 instructing the operation of all indoor units to be stopped. When the information to instruct the operation of all indoor units to be stopped is transmitted, the air conditioner 110 stops the operation of all indoor units (indoor units 111, 112). In addition, as the operation of all indoor units has been stopped, the operation of the outdoor units 114, 115 is also stopped.
[0095] In step S505, the air conditioner 110 transmits to the edge device 120 information indicating the state of the air conditioner 110 during emergency operation (that the operation of all indoor units has stopped).
[0096] In step S506, the edge device 120 transmits, to the server device 130 via the Internet 150, information indicating that the operation of all indoor units has stopped.
[0097] In step S507, the control unit 131 of the server device 130 transmits information instructing the stop of emergency operation (for example, lifting the prohibition on operation of the outdoor unit 113, and lifting the mask of the abnormality information of the outdoor unit 113) to the edge device 120 via the Internet 150.
[0098] In step S508, the edge device 120 transmits information instructing the air conditioner 110 to stop emergency operation. As a result, in the air conditioner 110, the setting information for emergency operation is invalidated.
[0099] Furthermore, in step S509, the control unit 131 of the server device 130 stops timing the emergency operation period. As a result, even if the emergency operation period has elapsed thereafter, the server device 130 will not again transmit information to the air conditioner 110 instructing it to stop emergency operation.
[0100] In this way, according to the air conditioner control system 100, emergency operation can be ended without waiting for the emergency operation period to elapse, thereby reducing the risk of air conditioner failure occurring during emergency operation.
[0101] <Flow of advance notice processing and second emergency operation termination processing> Next, the details of the advance notice processing (step S306 in FIG. 3) and the second emergency operation end processing (step S308 in FIG. 3) will be described. FIG. 6 is an example of a sequence diagram showing the flow of the advance notice processing and the second emergency operation end processing. Of these, FIG. 6(a) is a diagram showing an example of a sequence diagram showing the flow of the advance notice processing.
[0102] As described above, when it is determined in server device 130 that the advance notification timing has arrived (YES in step S305 in FIG. 3), the advance notification process shown in FIG. 6(a) is performed.
[0103] In step S601, the control unit 131 of the server device 130 transmits information notifying in advance that emergency operation will be stopped to the manager terminal 140. As a result, the manager terminal 140 notifies the air conditioner manager 163 in advance that emergency operation will be stopped, and the air conditioner manager 163 requests the worker 161 to perform maintenance work.
[0104] On the other hand, Fig. 6(b) is an example of a sequence diagram showing the flow of the second emergency operation end process. As described above, when the server device 130 determines that the emergency operation period has elapsed (YES in step S307 in Fig. 3), the second emergency operation end process shown in Fig. 6(b) is performed.
[0105] In step S611, the control unit 131 of the server device 130 stops timing the emergency operation period.
[0106] In step S612, the control unit 131 of the server device 130 transmits information to the edge device 120 via the Internet 150 instructing the operation of all indoor units to be stopped.
[0107] In step S613, the edge device 120 transmits information to the air conditioner 110 instructing the operation of all indoor units to be stopped. When the information to instruct the operation of all indoor units to be stopped is transmitted, the air conditioner 110 stops the operation of all indoor units (indoor units 111, 112). In addition, as the operation of all indoor units has been stopped, the operation of the outdoor units 114, 115 is also stopped.
[0108] In step S614, the air conditioner 110 transmits to the edge device 120 information indicating the state of the air conditioner 110 during emergency operation (that the operation of all indoor units has stopped).
[0109] In step S615, the edge device 120 transmits, to the server device 130 via the Internet 150, information indicating that the operation of all indoor units has stopped.
[0110] In step S616, the control unit 131 of the server device 130 transmits information instructing the stop of emergency operation (for example, lifting the prohibition on operation of the outdoor unit 113, and lifting the mask of the abnormality information of the outdoor unit 113) to the edge device 120 via the Internet 150.
[0111] In step S617, the edge device 120 transmits information instructing the air conditioner 110 to stop emergency operation. As a result, in the air conditioner 110, the setting information for emergency operation is invalidated.
[0112] Furthermore, in step S618, the control unit 131 of the server device 130 transmits information notifying the stop of emergency operation to the manager terminal 140. As a result, the manager terminal 140 notifies the air conditioner manager 163 of the stop of emergency operation, and the air conditioner manager 163 recognizes that emergency operation has stopped because the emergency operation period has elapsed.
[0113] In addition, in the case of the second emergency operation termination process, in step S617, the setting information for emergency operation is invalidated, and the masking of the abnormality information of the outdoor unit 113 is released, so that the abnormality information is again transmitted to the server device 130.
[0114] However, the abnormality information transmitted at this time is the same as the abnormality information transmitted before the emergency operation was started (same air conditioner, same abnormality code). Therefore, the server device 130 determines that the predetermined condition is met, and does not transmit information notifying the start of emergency operation to the manager terminal 140 again.
[0115] <Summary> As is clear from the above explanation, when the air conditioner control system 100 receives abnormality information from the air conditioner, it transmits information to the air conditioner instructing it to set emergency operation, and when the emergency operation period has elapsed, it transmits information instructing it to stop emergency operation. Furthermore, when the air conditioner control system 100 receives information from the air conditioner indicating that maintenance work has been performed during the emergency operation period, it transmits information instructing it to stop emergency operation.
[0116] In this way, when the emergency operation period has elapsed, the air conditioner control system 100 automatically stops emergency operation. As a result, the air conditioner control system 100 can prevent emergency operation from continuing for a predetermined period of time or longer, and can reduce the risk of air conditioner failure during emergency operation.
[0117] Furthermore, according to the air conditioner control system 100, emergency operation can be ended without waiting for the emergency operation period to elapse, thereby reducing the risk of air conditioner failure occurring during emergency operation.
[0118] In addition, when the air conditioner control system 100 receives abnormality information from the air conditioner, it transmits information instructing the air conditioner to stop operation of all indoor units, and then transmits information instructing the air conditioner to set to emergency operation.
[0119] As a result, according to the air conditioner control system 100, even if the setting information for emergency operation is enabled in the air conditioner, emergency operation will not start immediately, but will start only when the remote control of the indoor unit is operated.
[0120] As a result, with air conditioner control system 100, it is possible to avoid a situation in which emergency operation is unintentionally started when, for example, an operator is about to start maintenance near an air conditioner. In other words, with air conditioner control system 100, it is possible to ensure the safety of the operator when starting emergency operation.
[0121] [Second embodiment] In the first embodiment described above, the control unit 131 of the server device 130 refers to the past emergency operation history, and determines that a predetermined condition is met if an emergency operation has been performed for the same air conditioner and due to the same abnormality code.
[0122] However, the method of determining whether or not the specified conditions are met is not limited to this. For example, even if the abnormality codes are different, if emergency operation is being performed due to the same air conditioner, it may be determined that the specified conditions are met.
[0123] In the above first embodiment, the control unit 131 of the server device 130 has been described as transmitting information instructing the air conditioners to set emergency operation after transmitting information instructing the air conditioners to stop operating all indoor units of the air conditioners. However, the edge device 120 may be the main party in transmitting the information instructing the air conditioners to stop operating all indoor units of the air conditioners.
[0124] For example, server device 130 may transmit information instructing the setting of emergency operation to edge device 120, without transmitting information instructing the stopping of operation of all indoor units of the air conditioners. Then, edge device 120 may be configured to use the reception of information instructing the setting of emergency operation as a trigger to transmit information instructing the stopping of operation of all indoor units, and then transmit information instructing the setting of emergency operation.
[0125] Also, in the above first embodiment, the edge device 120 has been described as having a function of transmitting air conditioner information output by the air conditioner 110 to the server device 130, and transmitting instruction information transmitted from the server device 130 to the air conditioner 110. However, the functions possessed by the edge device 120 are not limited to this, and for example, the edge device 120 may have some or all of the functions of the control unit 131 of the server device 130.
[0126] That is, the function of the control unit 131 of the server device 130 may be realized by the processor 221 of the server device 130, or may be realized by the processor 201 of the edge device 120. Alternatively, the function may be realized by the processor 221 of the server device 130 and the processor 201 of the edge device 120 working together.
[0127] An example of a case in which the edge device 120 realizes some of the functions of the control unit 131 of the server device 130 is when the edge device 120 performs timing of the emergency operation period when information instructing the setting of emergency operation includes information regarding the emergency operation period.
[0128] Although the embodiments have been described above, it will be understood that various changes in form and details are possible without departing from the spirit and scope of the claims. [Explanation of symbols]
[0129] 100: Air conditioner control system 111, 112: Indoor unit 113~115: Outdoor unit 120: Edge device 130: Server device 131: Control unit 140: Administrator terminal
Claims
1. An air conditioner control system in which an air conditioner and a server device are communicatively connected, a control unit that transmits setting information for emergency operation to the air conditioner when a notification indicating an abnormality is received from the air conditioner and there is no history of the air conditioner indicating that emergency operation was performed due to the abnormality, and that instructs the air conditioner to stop the emergency operation when the emergency operation based on the setting information continues for a predetermined period of time; The control unit further an air conditioner control system that instructs stopping the emergency operation when maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time.
2. An air conditioner control system in which an air conditioner and a server device are communicatively connected, a control unit that, when receiving a notification indicating an abnormality from the air conditioner, transmits setting information for emergency operation to the air conditioner, and, when the emergency operation based on the setting information continues for a predetermined period, instructs the air conditioner to stop the emergency operation, and notifies the air conditioner that the air conditioner has stopped based on the instruction to stop the emergency operation when the emergency operation has continued for the predetermined period; The control unit further an air conditioner control system that instructs stopping the emergency operation when maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time.
3. An air conditioner control system in which an air conditioner and a server device are communicatively connected, a control unit that, when receiving a notification indicating an abnormality from the air conditioner, transmits setting information for emergency operation to the air conditioner, notifies in advance that an instruction to stop the emergency operation will be issued before the emergency operation continues for a predetermined period of time, and issues an instruction to stop the emergency operation when the emergency operation based on the setting information continues for the predetermined period of time; The control unit further an air conditioner control system that instructs stopping the emergency operation when maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time.
4. The control unit is The air conditioner control system according to claim 1 , further comprising: transmitting setting information for emergency operation to the air conditioner when a user permits the air conditioner to perform emergency operation based on the setting information.
5. An air conditioner control system in which an air conditioner and a server device are communicatively connected, a control unit that, when receiving a notification indicating an abnormality from the air conditioner, transmits setting information for emergency operation including information related to a predetermined period to the air conditioner, and, when emergency operation based on the setting information continues for the predetermined period, issues an instruction to stop the emergency operation; The control unit further an air conditioner control system that instructs stopping the emergency operation when maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time.
6. An air conditioner control method in an air conditioner control system in which an air conditioner and a server device are communicatively connected, comprising: a control process for transmitting setting information for emergency operation to the air conditioner when a notification indicating an abnormality is received from the air conditioner and there is no history of the air conditioner indicating that emergency operation was performed due to the abnormality, and for issuing an instruction to stop the emergency operation when the emergency operation based on the setting information continues for a predetermined period of time; The control step further comprises: an instruction to stop the emergency operation when maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time;
7. An air conditioner control method in an air conditioner control system in which an air conditioner and a server device are communicatively connected, comprising: a control process for transmitting setting information for emergency operation to the air conditioner when a notification indicating an abnormality is received from the air conditioner, instructing the air conditioner to stop the emergency operation when the emergency operation based on the setting information continues for a predetermined period of time, and notifying the air conditioner that the air conditioner has stopped based on the instruction to stop the emergency operation when the emergency operation has continued for the predetermined period of time, The control step further comprises: an instruction to stop the emergency operation when maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time;
8. An air conditioner control method in an air conditioner control system in which an air conditioner and a server device are communicatively connected, comprising: a control process for transmitting setting information for emergency operation to the air conditioner when a notification indicating an abnormality is received from the air conditioner, notifying the air conditioner of an instruction to stop the emergency operation before the emergency operation continues for a predetermined period of time, and instructing the air conditioner to stop the emergency operation when the emergency operation based on the setting information continues for the predetermined period of time; The control step further comprises: an instruction to stop the emergency operation when maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time;
9. An air conditioner control method in an air conditioner control system in which an air conditioner and a server device are communicatively connected, comprising: a control step of transmitting setting information for emergency operation, including information related to a predetermined period, to the air conditioner when a notification indicating an abnormality is received from the air conditioner, and instructing the air conditioner to stop the emergency operation when the emergency operation based on the setting information continues for the predetermined period; The control step further comprises: an instruction to stop the emergency operation when maintenance information is received from the air conditioner before the emergency operation continues for a predetermined period of time;
10. A server device communicably connected to an air conditioner, a control unit that transmits setting information for emergency operation to the air conditioner when a notification indicating an abnormality is received from the air conditioner and there is no history of the air conditioner indicating that emergency operation was performed due to the abnormality, and that instructs the air conditioner to stop the emergency operation when the emergency operation based on the setting information continues for a predetermined period of time; The control unit further The server device instructs the emergency operation to be stopped when maintenance information is received before the emergency operation continues for a predetermined period of time.
11. A server device communicably connected to an air conditioner, a control unit that, when receiving a notification indicating an abnormality from the air conditioner, transmits setting information for emergency operation to the air conditioner, and, when the emergency operation based on the setting information continues for a predetermined period, instructs the air conditioner to stop the emergency operation, and notifies the air conditioner that the air conditioner has stopped based on the instruction to stop the emergency operation when the emergency operation has continued for the predetermined period; The control unit further The server device instructs the emergency operation to be stopped when maintenance information is received before the emergency operation continues for a predetermined period of time.
12. A server device communicably connected to an air conditioner, a control unit that, when receiving a notification indicating an abnormality from the air conditioner, transmits setting information for emergency operation to the air conditioner, notifies in advance that an instruction to stop the emergency operation will be issued before the emergency operation continues for a predetermined period of time, and issues an instruction to stop the emergency operation when the emergency operation based on the setting information continues for the predetermined period of time; The control unit further The server device instructs the emergency operation to be stopped when maintenance information is received before the emergency operation continues for a predetermined period of time.
13. A server device communicably connected to an air conditioner, a control unit that, when receiving a notification indicating an abnormality from the air conditioner, transmits setting information for emergency operation including information related to a predetermined period to the air conditioner, and, when emergency operation based on the setting information continues for the predetermined period, issues an instruction to stop the emergency operation; The control unit further The server device instructs the emergency operation to be stopped when maintenance information is received before the emergency operation continues for a predetermined period of time.
Citation Information
Patent Citations
Controller for air conditioner
JP1993187683A
Air conditioner
JP1999037532A
Method and device for equipment control and equipment repair system
JP2001357151A
Facility operating method, its device, facility operating system, management method, its device and facility
JP2002312456A
Air conditioning monitoring device
JP2004069080A
