Determination device and determination method
The determination device optimizes power distribution between homes using private and general transmission lines, addressing wheeling fees and power loss by leveraging supply and demand information and consumer attributes, enhancing grid connectivity and efficiency.
Patent Information
- Application Number
- JP2021002123
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-01-08
- Publication Date
- 2024-11-14
- Estimated Expiration
- 2041-01-08
AI Technical Summary
Existing power transmission networks incur wheeling fees and power loss due to charging and discharging storage batteries, limiting the optimization of electricity consumption and generation between homes connected to the grid.
A determination device and method that enables power exchange between consumers through private transmission lines, utilizing supply and demand information to optimize power distribution among groups connected via both private and general transmission lines, considering attributes and time-based consumption patterns.
Enhances control over power supply and distribution, minimizing wheeling fees, power loss, and optimizing electricity usage between homes, while reducing reliance on retail purchases and storage costs.
Smart Images

Figure 0007583617000001 
Figure 0007583617000002 
Figure 0007583617000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a determination device and a determination method. [Background technology]
[0002] Conventionally, there has been technology for optimizing the amount of electricity purchased from and sold to retail electricity suppliers by consuming electricity generated by solar power generation or other means by multiple homes connected to a power transmission network supplied by an electricity transmission and distribution company (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2017-211836 A Summary of the Invention [Problem to be solved by the invention]
[0004] According to the above-mentioned technology, when a power transmission network provided by a power transmission and distribution company is used, a wheeling charge to be paid to the power transmission and distribution company is generated. In addition, when charging and discharging a storage battery, a power loss may occur due to charging and discharging. Therefore, even if the amount of power purchased from a retail electricity company is minimized, it may not be considered to be optimized overall when the amount of power effectively utilized and the wheeling charge to be paid to the power transmission and distribution company are comprehensively considered.
[0005] Therefore, an object of the present invention is to provide a technique for suitably controlling the supply of power among a plurality of homes connected to a power transmission network. [Means for solving the problem]
[0006] A determination device according to one embodiment of the present invention includes a power transmission network including a first group, which is a group of multiple consumers that can supply power to each other via a private power transmission line that is different from a general power transmission line that is a transmission line provided by an electricity transmission and distribution business operator, and a second group, which is a group of multiple consumers that can supply power to each other via the general power transmission line and consumers belonging to the first group. The determination device includes a first supply and demand information acquisition unit that acquires first supply and demand information that is information including an amount of power generated by the consumers belonging to the first group and an amount of power consumed by the consumers belonging to the first group, a second supply and demand information acquisition unit that acquires second supply and demand information that is information including an amount of power generated by the consumers belonging to the second group and an amount of power consumed by the consumers belonging to the second group, a determination unit that determines at least one of a supplier of power required by the consumers belonging to the first group or a destination of power generated by the consumers belonging to the first group based on the first supply and demand information and the second supply and demand information, and an output unit that outputs power distribution information that is information determined by the determination unit.
[0007] In addition, in a determination device according to one embodiment of the present invention, the first supply and demand information acquisition unit includes a supply information acquisition unit that acquires supply information including information on the amount of electricity generated by consumers belonging to the first group, and a demand information acquisition unit that acquires demand information including information on the amount of electricity consumed by consumers belonging to the first group, and the determination unit determines at least one of a supplier of the electricity required by each of the consumers belonging to the first group or a destination of the electricity generated by each of the consumers belonging to the first group based on the acquired supply information and demand information.
[0008] In addition, in a determination device according to one embodiment of the present invention, the first supply and demand information acquisition unit includes a consumer information acquisition unit that acquires attributes of each consumer among a plurality of consumers belonging to the first group, and a time information acquisition unit that acquires the current time, and estimates the amount of electricity consumed by the consumers belonging to the first group from the first supply and demand information.
[0009] In addition, in a determination device according to one embodiment of the present invention, the determination unit determines whether the source of electricity required by consumers belonging to the first group is to purchase electricity from a retail electricity supplier or to receive electricity from the second group.
[0010] In addition, in a determination device according to one embodiment of the present invention, the determination unit determines the destination of electricity generated by a consumer belonging to the first group to be either storage in a storage battery belonging to the first group, sale of the electricity to a retail electricity supplier, or supply of electricity to the second group.
[0011] In addition, in a determination device according to one aspect of the present invention, the determination unit determines to which consumer, among a plurality of consumers belonging to the first group, electric power generated by a consumer belonging to the first group should be transmitted.
[0014] Moreover, a determination method according to one embodiment of the present invention includes a first supply and demand information acquisition step of acquiring first supply and demand information which is information including an amount of power generated by a consumer belonging to the first group and an amount of power consumed by the consumer belonging to the first group, in a power transmission network including a first group which is a group of multiple consumers that can supply power to each other via a private power transmission line that is different from a general power transmission line that is a transmission line provided by an electricity transmission and distribution business operator, and a second group which is a group of multiple consumers that can supply power to each other via the general power transmission line and a consumer belonging to the first group; a second supply and demand information acquisition step of acquiring second supply and demand information which is information including an amount of power generated by a consumer belonging to the second group and an amount of power consumed by the consumer belonging to the second group; a determination step of determining at least one of a supplier of power required by the consumer belonging to the first group or a transmission destination of power generated by the consumer belonging to the first group based on the first supply and demand information and the second supply and demand information; and an output step of outputting power distribution information which is information determined by the determination step. Effect of the Invention
[0015] According to the present invention, it is possible to provide a technique for appropriately controlling the supply of power among a plurality of homes connected to a power transmission network. [Brief description of the drawings]
[0016] [Figure 1] FIG. 2 is a diagram for explaining the supply of power between consumers according to the embodiment. [Diagram 2] FIG. 2 is a diagram for explaining distribution of power according to the embodiment. [Diagram 3] FIG. 2 is a diagram for explaining an example of components connected to a power transmission network according to an embodiment. [Figure 4] FIG. 1 is a diagram for explaining an example of an apartment building according to an embodiment. [Diagram 5] FIG. 2 is a diagram for explaining an example of a detached house according to an embodiment. [Figure 6] FIG. 2 is a block diagram for explaining a functional configuration of a determination device according to an embodiment. [Figure 7] 4 is a diagram for explaining an example of demand information and supply information according to the embodiment. FIG. [Figure 8] FIG. 2 is a diagram for explaining an example of consumer information and power consumption according to the embodiment. [Figure 9] FIG. 11 is a diagram for explaining an example of an optimization method according to the embodiment. [Figure 10] 1 is a flowchart for explaining a determination method according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. The embodiment described below is merely an example, and the embodiment to which the present invention is applied is not limited to the following embodiment.
[0018] [Electricity supply between consumers] FIG. 1 is a diagram for explaining the supply of power between consumers according to an embodiment. The supply of power between consumers will be explained with reference to the diagram. The power transmission network in this embodiment includes a general power transmission line GL and a private line (private power transmission line) PL. The general power transmission line GL and the private power transmission line PL connect multiple consumers C and transmit power between the consumers C.
[0019] A general transmission line GL is a transmission line provided by a licensed electricity transmission and distribution business operator (general electricity transmission and distribution business operator). The electricity transmission and distribution business operator operates a business of delivering electricity generated at power plants to the point where consumer C uses the electricity. In addition, if consumer C has its own power generation equipment, the electricity transmission and distribution business operator transmits the electricity generated by consumer C to other consumers C.
[0020] A private line PL is a transmission line that is different from a general transmission line GL. A private line PL is, for example, a transmission line that is set up by a consumer C himself. Consumer C sets up, operates and manages the private line PL, and transmits electricity generated by its own power generation equipment to other consumers C connected to the private line PL without passing through a general transmission line GL.
[0021] A consumer C is a person who uses electricity. Consumer C may have power generation facilities. If consumer C has power generation facilities, consumer C supplies electricity to other consumers C only through private lines PL, or through general transmission lines GL and private lines PL. If consumer C transmits electricity to other consumers C using general transmission lines GL, consumer C is required to pay wheeling charges to the electricity transmission and distribution company. If consumer C transmits electricity to other consumers C using private lines PL, consumer C is not required to pay wheeling charges. In addition, consumer C can purchase electricity from the electricity retailer via the general transmission line GL. In the following explanation, consumer C's purchase of electricity from the electricity retailer may be referred to as "buying electricity." In addition, consumer C can sell electricity to the electricity retailer via the general transmission line GL. In the following explanation, consumer C's sale of electricity to the electricity retailer may be referred to as "selling electricity."
[0022] In the example shown in FIG. 1, consumers C11, C12, and C13 are connected to each other by a private line PL. Consumers C11, C12, and C13 are a group that can supply power to each other via the private line PL without going through a general transmission line GL. In this case, the group to which consumers C11, C12, and C13 belong is referred to as a first group GR1. The first group GR1 is a group of multiple consumers C that can supply power to each other via the private line PL.
[0023] A group including consumers C to which power can be supplied via a general power transmission line GL from the viewpoint of consumers C belonging to the first group GR1 is referred to as a second group GR2. In the example shown in Fig. 1, consumers C21, C22, and C23, which are consumers C, can be supplied with power via a general power transmission line GL from the viewpoint of consumers C belonging to the first group GR1. That is, consumers C21, C22, and C23 belong to the second group GR2. In addition, when there is no need to distinguish between the first group GR1 and the second group GR2, they may be simply referred to as groups.
[0024] 2 is a diagram for explaining distribution of power according to the embodiment. With reference to the figure, distribution of power within each group and distribution of power between groups will be explained. In the figure, components such as a consumer C, a power generation facility, and a circuit breaker are shown as nodes N, and a transmission line that is a general transmission line GL or a private line PL is shown as a branch B.
[0025] Node 1, node N11, node N12, node N111, node N112, node N121, and node N122 belong to the first group GR1. Node N2, node N21, node N22, node N211, node N212, node N221, and node N222 belong to the second group GR2. From the viewpoint of node N11, node N1 may be described as a higher-level node, and node N111 as a lower-level node. In this example, since the first group GR1 and the second group GR2 have a symmetrical configuration, only the first group GR1 will be described, but the second group GR2 is similar to the first group GR1. In this example, for convenience, a case where the first group GR1 and the second group GR2 have a symmetrical configuration will be described, but the present invention is not limited to this example, and the first group GR1 and the second group GR2 may have an asymmetrical configuration. The commercial power CP is power supplied via a general power transmission line GL. In the explanation of Fig. 2, the commercial power CP is treated as the highest node.
[0026] Node N1 is the highest node in the first group GR1. In a node N lower than node N1, when the sum of power supply and demand is negative (i.e., when the demand for power is greater than the supply of power), node N1 receives a supply of power from a commercial power source CP. The supply of power from the commercial power source CP may mean, for example, purchasing power from a retail electricity supplier, or receiving a supply of power from the second group GR2. When node N1 receives a supply of power from node N2, a wheeling charge is incurred because the power is supplied via a general power transmission line GL. In a node N that is lower than the node N1, when the sum of the power supply and demand is positive (i.e., when the power demand is smaller than the power supply), the node N1 supplies power to the commercial power CP. Supplying power to the commercial power CP may mean, for example, selling power to a retail electricity supplier.
[0027] Nodes N11 and N12 are lower-level nodes than node N1. Since nodes N11 and N12 have symmetrical configurations, node N11 will be described as an example. In a node N lower than node N11, when the sum of the supply and demand of electricity is negative, node N11 can receive a supply of electricity from node N12 via node N1. When node N11 receives a supply of electricity from node N12 via node N1, no wheeling charge is incurred because the electricity does not go through the general transmission line GL. In a node N that is lower than node N11, when the sum of the supply and demand of electricity is positive, node N11 can supply electricity to node N12 via node N1. When node N11 supplies electricity to node N12 via node N1, no wheeling charge is incurred because the electricity does not go through the general transmission line GL.
[0028] Node N111, node N112, node N121, and node N122 are the lowest level nodes in the example shown in Fig. 2. Node N111, node N112, node N121, and node N122 have a symmetrical configuration, so node N111 will be described as an example. When the sum of the supply and demand of power in node N111 is negative, node N111 can receive power from node N112 via node N11. When node N111 receives power from node N112 via node N11, no wheeling charge is incurred because the power does not go through the general transmission line GL. When the sum of the supply and demand of electricity in node N111 is positive, node N111 can supply electricity to node N112 via node N11. When node N111 supplies electricity to node N112 via node N11, no wheeling charge is incurred because the electricity does not go through the general transmission line GL.
[0029] [An example of a component connected to the power grid] 3 is a diagram for explaining an example of components connected to a power transmission network according to an embodiment. With reference to the same figure, an example of the components connected to the power transmission network will be explained. In the example shown in the figure, a plurality of apartment buildings 20, a plurality of detached houses 30, and a storage battery 40 are connected to the first group GR1 via a private line PL. Specifically, the apartment buildings 20-1, 20-2, and 20-3 are connected as the apartment buildings 20, and the detached houses 30-1, 30-2, and 30-3 are connected as the detached houses 30. In this embodiment, for convenience, an example in which a single storage battery 40 is connected to the first group GR1 will be described, but a plurality of storage batteries 40 may be connected. Components other than the apartment buildings 20, the detached houses 30, and the storage battery 40 may be connected to the first group GR1.
[0030] 4 is a diagram for explaining an example of an apartment house 20 according to an embodiment. With reference to the same figure, an example of an apartment house 20 according to an embodiment will be explained. The apartment building 20 is a house in which multiple households can live in one building. The apartment building 20 may be, for example, an apartment, a condominium, a mansion, etc. The apartment building 20 includes a solar panel 21 and a load 22.
[0031] The solar panel 21 is an example of a power generation facility provided by the consumer C itself. The solar panel 21 performs photovoltaic power generation (solar power generation) by converting sunlight emitted from the sun into electric power. The solar panel 21 supplies the converted electric power to the private line PL. The solar panel 21 may be connected to the private line PL via a voltage conversion device for converting the voltage when supplying the converted electric power to the private line PL. Incidentally, instead of the solar panels 21 which are equipment for generating solar power, the apartment house 20 may be equipped with power generation equipment using other power generation methods such as wind power generation, geothermal power generation, biomass power generation, manual power generation, etc. Also, the apartment house 20 does not necessarily have to be equipped with a power generation equipment.
[0032] The load 22 receives power from the private line PL and consumes the power. The load 22 includes a shared unit 221 and a plurality of dedicated units 222. The common area 221 is a load that consumes electricity in a portion commonly used by the residents of the apartment building 20. The common area 221 may be, for example, a light in a passageway, an elevator, an automatic door at the entrance, an air conditioner, and the like. The common area 221 is a load that consumes power in an area that is occupied and used by each resident of the apartment building 20. The private area 222 may be, for example, a tenant. In the example illustrated in Fig. 4, the apartment building 20 includes a common area 221, a dedicated area 222-1, a dedicated area 222-2, a dedicated area 222-3, and a dedicated area 222-4 as the load 22. That is, the apartment building 20 illustrated in Fig. 4 is occupied by four households.
[0033] 5 is a diagram for explaining an example of a detached house according to an embodiment. With reference to the drawing, an example of a detached house 30 according to an embodiment will be explained. The detached house 30 is a building with one house per building, unlike the apartment building 20. The detached house 30 may be, for example, a so-called single-family home. The detached house 30 includes a solar panel 31 and a load 32.
[0034] The solar panel 31 is an example of a power generation facility. The solar panel 31 generates solar power by converting sunlight emitted from the sun into electric power. The solar panel 31 supplies the converted electric power to the private power line PL. The solar panel 31 may be connected to the private power line PL via a voltage conversion device for converting the voltage when supplying the converted electric power to the private power line PL. Note that the detached house 30 may be equipped with power generation equipment using other power generation methods such as wind power generation, geothermal power generation, biomass power generation, manual power generation, etc., instead of the solar panel 31, which is equipment for generating solar power. Also, the detached house 30 does not have to be equipped with a power generation equipment.
[0035] The load 32 receives a supply of electric power from the private line PL and consumes the electric power. Since the detached house 30 is a building with only one dwelling unit, it does not have any common areas shared with other households. Therefore, the loads of the detached house 30 are loads that consume electric power in areas occupied and used by the residents of the detached house 30.
[0036] [Functional configuration of the judgment device] 6 is a block diagram for explaining the functional configuration of the determination device 10 according to the embodiment. The functional configuration of the determination device 10 according to the embodiment will be explained with reference to the same figure. The determination device 10 includes a first supply and demand information acquisition unit 110, a second supply and demand information acquisition unit 120, a determination unit 160, and an output unit 170.
[0037] The first supply and demand information acquisition unit 110 acquires first supply and demand information DSI1, which is information related to the demand and supply of electricity for the consumer C belonging to the first group GR1. The first supply and demand information DSI1 includes information on the amount of electricity generated by the consumer C belonging to the first group GR1 and the amount of electricity consumed by the consumer C belonging to the first group GR1. In other words, the first supply and demand information acquisition unit 110 acquires the first supply and demand information DSI1, which is information including the amount of electricity generated by the consumer C belonging to the first group GR1 and the amount of electricity consumed by the consumer C belonging to the first group GR1.
[0038] The first supply and demand information acquiring unit 110 may include a supply information acquiring unit 111 and a demand information acquiring unit 112. The supply information acquisition unit 111 acquires supply information SI including information on the amount of power generated by the consumer C belonging to the first group GR1. The demand information acquisition unit 112 acquires demand information DI including information on the amount of power consumed by the consumer C belonging to the first group GR1. The first supply and demand information acquisition unit 110 calculates first supply and demand information DSI1 based on the acquired supply information SI and demand information DI.
[0039] 7 is a diagram for explaining an example of the demand information DI and the supply information SI according to the embodiment. With reference to the drawing, an example of the demand information DI and the supply information SI will be explained. An example of the demand information DI is shown in the upper part of Fig. 7. As an example of the demand information DI, the figure shows information on hourly changes in the demand power required by consumer C. The demand power required by consumer C may be the value of the power actually consumed by consumer C, or may be a value predicted from the value of the power actually consumed by consumer C. In the example shown in the figure, the power demand is small between midnight and 6 a.m., since many people are asleep. Around 6 a.m., power demand gradually increases, since people who have just woken up start using power. Furthermore, the power demand is low between 6 p.m. and 6 p.m., since many people leave the house. Furthermore, the power demand gradually increases between 6 p.m. and midnight, since people who have just returned home start using power.
[0040] An example of the supply information SI is shown in the lower part of Fig. 7. As an example of the supply information SI, the figure shows information on the hourly change in the supply power generated by the consumer C. The supply power generated by the consumer C may be the value of the power actually generated by the consumer C, or may be a value predicted from the value of the power actually generated by the consumer C. As an example, the figure shows a case where consumer C generates power through solar power generation. In the example shown in the figure, between midnight and 6:00, solar power generation is not performed before sunrise, and the power supply is approximately zero. Around 6:00, when the sun rises, the power supply increases as the sun rises. Around 12:00, the power supply reaches its peak. Between 12:00 and 18:00, the power supply decreases as the sun sets. After 18:00, the sun sets and the power supply is approximately zero.
[0041] 6, the demand information acquisition unit 112 may include a consumer information acquisition unit 1121, a time acquisition unit 1122, and an estimation unit 1123. The demand information acquisition unit 112 includes the consumer information acquisition unit 1121, the time acquisition unit 1122, and the estimation unit 1123, thereby estimating demand information DI.
[0042] The consumer information acquisition unit 1121 acquires information about the house and household of each consumer C among the multiple consumers C belonging to the first group GR1. The information about the household may be, for example, information about the house, such as whether the resident lives in an apartment building 20 or a detached house 30, and information about the household, such as whether the resident is single, has both parents working, is of child-rearing generation, or lives in a two-generation home. The information about the house of consumer C and the information about the household are referred to as the attributes of consumer C or consumer information CI. That is, the consumer information acquisition unit 1121 acquires attributes (consumer information CI) of each of the consumers C among the multiple consumers C belonging to the first group GR1.
[0043] 8 is a diagram for explaining an example of customer information CI and power consumption according to the embodiment. With reference to the drawing, an example of customer information CI and power consumption will be explained. In the figure, examples of consumer information CI are shown, including characteristics and examples of power usage for "apartment building-single resident," "apartment building-dual income," "detached house-child-rearing generation," and "detached house-two-generation home." In the example of power usage, the hourly change in power usage in a day is shown with the vertical axis representing power consumption and the horizontal axis representing time.
[0044] When the consumer information CI is "Apartment building-single occupant", residents often return home only to sleep at night and spend little time at home. In this case, it is characteristic that power consumption is generally small and the time when power consumption is close to zero is long. An example of power consumption when the consumer information CI is "apartment building-single resident" will be described. Power consumption is close to zero for a long period of time, and increases at two times each day: before going out and after returning home. In the example shown in the figure, power consumption increases at 6:00 when the resident wakes up, and increases again between 8:00 p.m. and midnight, which is the time between when the resident returns home and when they go to sleep.
[0045] When the consumer information CI is "apartment building-dual income," both the husband and wife go to work during the day, but spend some time at home in the evening. In this case, the power consumption during the day is roughly the same as when the consumer information CI is "apartment building-single resident," but the power consumption after the evening is greater than when the consumer information CI is "apartment building-single resident." An example of power consumption when the consumer information CI is "apartment-dwelling-dual-income" will be described in comparison with the case where the consumer information CI is "apartment-dwelling-single-resident". When the consumer information CI is "apartment-dwelling-dual-income", the power consumption from when the resident wakes up to when they go out is greater than when the consumer information CI is "apartment-dwelling-single-resident". Also, when the consumer information CI is "apartment-dwelling-dual-income", the time when the resident returns home is earlier than when the consumer information CI is "apartment-dwelling-single-resident", and the power consumption from when the resident returns home to when they go to bed is greater than when the consumer information CI is "apartment-dwelling-single-resident". In the example shown in the figure, the power consumption increases at 6:00 when the resident wakes up, and increases from 18:00 to 24:00, which is the time when the resident returns home to when they go to bed.
[0046] When the consumer information CI is “detached house - child-rearing generation”, one of the parents and the child are often at home during the day, and it is characteristic that daytime electricity consumption is higher than when the consumer information CI is “apartment building - single resident” or “apartment building - dual-income household”. An example of power consumption when the consumer information CI is "detached house-child-rearing generation" will be described. Power consumption is lowest during sleep during the day, and power consumption during the day is always somewhat high. Power consumption is also high at breakfast before one of the parents leaves for work, and from dinner after returning home until sleep. In the example shown in the figure, power consumption increases at 6:00 when the resident wakes up, and is somewhat high from 6:00 to 12:00. Power consumption also increases from 18:00 to 24:00, which is the time from dinner time at 18:00 to sleep.
[0047] When the consumer information CI is "detached house - two-generation house," it is characteristic that power consumption is always large during the day because the parent generation is often always at home. An example of power consumption when the consumer information CI is "detached house - two-generation home" will be described. When the consumer information CI is "detached house - two-generation home", the power consumption from when the resident wakes up until when they go to bed is approximately constant throughout the day. In the example shown in the figure, the power consumption is constant and high from 6:00 when the resident wakes up until 8:00 when they go to bed. Also, the power consumption is low from when the resident starts to sleep until they wake up.
[0048] The above-mentioned example of the amount of power consumption may vary depending on the season, and the consumer information CI may use more detailed attributes of residents.
[0049] 6, the time acquisition unit 1122 acquires the current time. Hereinafter, information including the current time will be referred to as time information TI. The time acquisition unit 1122 acquires the time information TI via a network such as the Internet, for example. If the determination device 10 includes a clock, the time acquisition unit 1122 may acquire the time information TI from the clock included in the determination device 10.
[0050] The estimation unit 1123 estimates demand information DI, which is the amount of power consumed by the consumer C belonging to the first group GR1, based on the consumer information CI and the time information TI. The first supply and demand information DSI1 is information including the supply information SI and the demand information DI. That is, the estimation unit 1123 estimates the amount of power consumed by the consumer C belonging to the first group GR1 from the first supply and demand information DSI1.
[0051] The second supply and demand information acquisition unit 120 acquires second supply and demand information DSI2, which is information related to the demand and supply of electricity for consumers C belonging to the second group GR2. The second supply and demand information DSI2 includes the amount of electricity generated by the consumers C belonging to the second group GR2 and the amount of electricity consumed by the consumers C belonging to the second group GR2. In other words, the second supply and demand information acquisition unit 120 acquires second supply and demand information DSI2, which is information including the amount of electricity generated by the consumers C belonging to the second group GR2 and the amount of electricity consumed by the consumers C belonging to the second group GR2.
[0052] The determination unit 160 determines a source of electricity required by the consumer C belonging to the first group GR1. The source of electricity is, for example, purchasing electricity from an electricity retailer or supply of electricity from the second group GR2. That is, the determination unit 160 determines whether the source of electricity required by the consumer C belonging to the first group GR1 is purchasing electricity from an electricity retailer or supply of electricity from the second group GR2. Furthermore, the determination unit 160 determines the destination of the power required by the consumer C belonging to the first group GR1. The destination of the power is, for example, storage in a storage battery belonging to the first group GR1, sale to an electricity retailer, or supply of power to the second group GR2. That is, the determination unit 160 determines the destination of the power generated by the consumer C belonging to the first group GR1 to be storage in a storage battery belonging to the first group GR1, sale to an electricity retailer, or supply of power to the second group GR2.
[0053] The determination unit 160 determines at least one of a supplier of power required by the consumer C belonging to the first group GR1 or a destination of power generated by the consumer C belonging to the first group GR1 based on the first supply and demand information DSI1 and the second supply and demand information DSI2. The information determined by the determination unit 160 is described as power distribution information DPI. The power distribution information DPI includes at least one of a supplier of power or a destination of power.
[0054] In addition, in a case where the first supply and demand information acquisition unit 110 includes the supply information acquisition unit 111 and the demand information acquisition unit 112, the determination unit 160 determines the distribution destination of the power in the first group GR1. The distribution of the power in the first group GR1 means, for example, transmitting the power generated by the consumer C belonging to the first group GR1 to the other consumer C belonging to the same first group GR1. That is, the determination unit 160 determines at least one of the procurement destination of the power required by each of the consumers C belonging to the first group GR1 or the transmission destination of the power generated by each of the consumers C belonging to the first group GR1 based on the acquired supply information SI and demand information DI. In addition, the determination unit 160 determines to which of the multiple consumers C belonging to the first group GR1 the power generated by the consumer C belonging to the first group GR1 is to be transmitted.
[0055] The determination unit 160 may determine the electricity procurement destination or the electricity transmission destination so as to reduce any one of the wheeling charge, the amount of electricity purchased, or the amount of electricity stored. 9 is a diagram for explaining an example of an optimization method according to an embodiment, which will be described with reference to the drawing. Optimization method A is an optimization method that minimizes the wheeling charge. When the determination unit 160 determines using optimization method A, it prioritizes the interchange of power between houses that do not require the payment of wheeling charges for power transmission, and refrains from interchange of power between houses that require wheeling charges. That is, according to optimization method A, the determination unit 160 prioritizes the transmission of power between consumers C belonging to the first group GR1, and when the sum of the supply and demand of power in the consumer C belonging to the first group GR1 becomes negative, the determination unit 160 purchases power from the retail electricity supplier. Also, according to optimization method A, when the sum of the supply and demand of power in the consumer C belonging to the first group GR1 becomes positive, the determination unit 160 stores the power in the storage battery 40 without transmitting the power to the consumer C belonging to the second group GR2.
[0056] Optimization method B is an optimization method that minimizes the amount of power purchased from the electricity retailer. When making a determination using optimization method B, the determination unit 160 prioritizes receiving power supply from other groups connected by the general power transmission line GL, and refrains from purchasing power from the electricity retailer. That is, according to optimization method B, when the sum of the power supply and demand of the consumer C belonging to the first group GR1 becomes negative, the determination unit 160 receives power supply from the consumer C belonging to the second group GR2. Also, according to optimization method B, when the sum of the power supply and demand of the consumer C belonging to the first group GR1 becomes positive, the determination unit 160 transmits power to the consumer C belonging to the second group GR2 or stores the power in the storage battery 40.
[0057] Optimization method C is an optimization method that minimizes the amount of power stored in the storage battery 40. When making a determination using optimization method C, the determination unit 160 minimizes the amount of power stored in the storage battery 40 in order to suppress power loss. That is, according to optimization method C, when the sum of the supply and demand of power in the consumer C belonging to the first group GR1 becomes negative, the determination unit 160 purchases power from the retail electricity supplier or receives power from the consumer C belonging to the second group GR2. Also, according to optimization method B, when the sum of the supply and demand of power in the consumer C belonging to the first group GR1 becomes positive, the determination unit 160 purchases power from the retail electricity supplier or supplies power to the consumer C belonging to the second group GR2. Optimization method B is environmentally friendly because it can suppress power loss.
[0058] The determination unit 160 determines the supplier of power or the transmission destination of power by any one of optimization method A, optimization method B, and optimization method C. That is, the determination unit 160 determines the supplier of power required by the consumer C belonging to the first group GR1 or the transmission destination of power generated by the consumer C belonging to the first group GR1 so as to reduce any one of the wheeling charge when transmitting power to the consumer C belonging to the second group GR2, the power purchase charge when purchasing power from a retail electricity supplier, or the amount of power stored in the storage battery belonging to the first group GR1.
[0059] Returning to Fig. 6, a description will be given of an example in which the determination unit 160 includes the optimization method selection unit 161. By including the optimization method selection unit 161, the determination unit 160 selects which optimization method to use from among optimization method A, optimization method B, and optimization method C to determine the power procurement destination or the power transmission destination. The optimization method selection unit 161 selects which of the wheeling charge when transmitting electricity to the consumer C belonging to the second group GR2, the electricity purchase charge when purchasing electricity from an electricity retailer, or the amount of electricity stored in the storage battery 40 to be reduced. That is, the determination unit 160 includes an optimization method selection unit that selects which of the wheeling charge when transmitting electricity to the consumer C belonging to the second group, the electricity purchase charge when purchasing electricity from an electricity retailer, or the amount of electricity stored in the storage battery to be reduced. Based on the optimization method selected by the optimization method selection unit 161, the determination unit 160 determines at least one of the supplier of the electricity required by consumer C belonging to the first group GR1 or the destination of the electricity generated by consumer C belonging to the first group GR1.
[0060] The optimization method selection unit 161 acquires, for example, by an input device (not shown), information on which optimization method to select from optimization method A, optimization method B, and optimization method C. The optimization method selection unit 161 may be configured to store the acquired selection method.
[0061] Returning to FIG. 6, the output unit 170 outputs the power distribution information DPI, which is the information determined by the determination unit 160.
[0062] [A series of operations of the judgment device] 10 is a flowchart for explaining the determination method according to the embodiment. A series of operations of the determination device 10, that is, the determination method, will be explained with reference to the same figure. (Step S111) The supply information acquisition unit 111 acquires supply information SI including information on the amount of power generated by the consumer C belonging to the first group GR1. (Step S113) The consumer information acquisition unit 1121 acquires attributes (consumer information CI) of each of the consumers C among the multiple consumers C belonging to the first group GR1. (Step S114) The time acquiring unit 1122 acquires time information TI which is information including the current time.
[0063] Steps S111 to S114 are also referred to as step S110. Step S110 is a step for acquiring the first supply and demand information DSI1. Step S113 and step S114 are also referred to as step S112. Step S112 is a step for acquiring demand information DI.
[0064] (Step S120) The second supply and demand information acquisition unit 120 acquires second supply and demand information DSI2 which is information related to the demand and supply of electricity for the consumer C belonging to the second group GR2. (Step S130) Based on the acquired first supply and demand information DSI1 and second supply and demand information DSI2, the determination unit 160 determines at least one of the supplier of the electricity required by consumer C belonging to the first group GR1 or the destination of the electricity generated by consumer C belonging to the first group GR1. (Step S140) The output unit 170 outputs the information determined by the determining unit 160 as power distribution information DPI.
[0065] [Summary of the embodiment] According to the embodiment described above, the determination device 10 includes the first supply and demand information acquisition unit 110, the second supply and demand information acquisition unit 120, the determination unit 160, and the output unit 170. The determination device 10 includes the first supply and demand information acquisition unit 110 to acquire the first supply and demand information DSI1 of the consumer C belonging to the first group GR1, includes the second supply and demand information acquisition unit 120 to acquire the second supply and demand information DSI2 of the consumer C belonging to the second group GR2, includes the determination unit 160 to determine at least one of the procurement destination of the power required by the consumer C belonging to the first group GR1 or the transmission destination of the power generated by the consumer C belonging to the first group GR1 based on the acquired first supply and demand information DSI1 and second supply and demand information DSI2, and includes the output unit 170 to output the power distribution information DPI. Here, the first group GR1 and the second group GR2 are each composed of a plurality of consumers C connected by a private line PL, and the first group GR1 and the second group GR2 can supply power to each other via a general transmission line GL. That is, the determination device 10 acquires information on the supply and demand of electricity from each of two different groups connected by a general electricity transmission line GL, and determines the electricity procurement destination or electricity transmission destination based on the acquired information. Therefore, according to the present invention, the determination device 10 can suitably control the supply of electricity between a plurality of houses connected to the electricity transmission network.
[0066] According to the embodiment described above, the determination device 10 includes the supply information acquisition unit 111 to acquire supply information SI including information on the amount of power generated by the consumers C belonging to the first group GR1, and includes the demand information acquisition unit 112 to acquire demand information DI including information on the amount of power consumed by the consumers C belonging to the first group GR1. The determination unit 160 determines at least one of the procurement source of the power required by each of the multiple consumers C belonging to the first group GR1 or the transmission destination of the power generated by each of the multiple consumers C belonging to the first group GR1, based on the acquired supply information SI and demand information DI. Thus, according to the present invention, the demand information DI and the supply information SI are acquired separately, so that the amount of demand and supply can be grasped, and the supply of power between multiple houses connected to the power transmission network can be more appropriately controlled.
[0067] Furthermore, according to the embodiment described above, the determination device 10 includes the consumer information acquisition unit 1121 to acquire attributes of each of the multiple consumers C belonging to the first group GR1, the time acquisition unit 1122 to acquire the current time, and the estimation unit 1123 to estimate the amount of power that will be consumed by the consumers C belonging to the first group GR1 based on the acquired consumer information acquisition unit 1121 and time information TI. Thus, according to the present invention, the determination device 10 can estimate the amount of power consumption according to time based on the attributes of the residents. Therefore, according to the present invention, the supply of power between multiple houses connected to the power transmission network can be more appropriately controlled.
[0068] According to the embodiment described above, the determination device 10 determines whether the power required by the consumer C belonging to the first group GR1 should be purchased from a retail electricity supplier or supplied with power from the second group GR2. Therefore, according to the present invention, the determination device 10 can determine whether to purchase the shortage of power by purchasing power or to procure the shortage of power from another group by paying a wheeling charge. Therefore, according to the present invention, the supply of power between multiple houses connected to the power transmission network can be more appropriately controlled.
[0069] Furthermore, according to the embodiment described above, the determination device 10 determines the destination of the electricity generated by the consumer C belonging to the first group GR1 to be either storage in the storage battery 40 belonging to the first group GR1, sale of the electricity to a retail electricity supplier, or supply of the electricity to the second group GR2. For example, when the total power in the first group GR1 is positive and an increase in power consumption by consumer C belonging to the first group GR1 is expected in the near future, the determination device 10 can distribute power more efficiently by storing the power in the storage battery 40 without paying a transmission fee to transmit the power to the second group GR2. Furthermore, for example, when environmental considerations are important, the amount of power stored in the storage battery 40 can be reduced, thereby reducing the amount of power lost. Therefore, according to the present invention, it is possible to more appropriately control the supply of power among a plurality of homes connected to a power transmission network.
[0070] Furthermore, according to the embodiment described above, the determination device 10 determines to which of the multiple consumers C belonging to the first group GR1 the power generated by the consumer C belonging to the first group GR1 should be transmitted. Therefore, according to the present invention, it is possible to more appropriately control the supply of power even among a plurality of residences connected by a private power line PL.
[0071] According to the embodiment described above, the determination device 10 determines a supplier of power required by the consumer C belonging to the first group GR1 or a transmission destination of power generated by the consumer C belonging to the first group GR1, so as to reduce any one of the wheeling charge when transmitting power to the consumer C belonging to the second group GR2, the power purchase charge when purchasing power from an electricity retailer, or the amount of power stored in the storage battery 40 belonging to the first group GR1. That is, the determination device 10 has a plurality of different optimization methods. Therefore, according to the present invention, it is possible to more appropriately control the supply of power even among a plurality of residences connected by a private power line PL.
[0072] Moreover, according to the embodiment described above, the determination device 10 includes the optimization method selection unit 161, and thereby selects which of the wheeling charge when transmitting electricity to the consumer C belonging to the second group GR2, the electricity purchase charge when purchasing electricity from an electricity retailer, or the amount of electricity stored in the storage battery 40 to be reduced. That is, according to the present embodiment, the determination device 10 can employ different optimization methods depending on what is to be prioritized. Therefore, according to the present invention, it is possible to more appropriately control the supply of power even among a plurality of residences connected by a private power line PL.
[0073] In addition, all or part of the functions of each unit of the determination device 10 in the above-mentioned embodiment may be realized by recording a program for realizing these functions in a computer-readable recording medium, reading the program recorded in the recording medium into a computer system, and executing it. Note that the "computer system" referred to here includes hardware such as an OS and peripheral devices. In addition, the term "computer-readable recording medium" refers to portable media such as flexible disks, optical magnetic disks, ROMs, and CD-ROMs, and storage units such as hard disks built into computer systems. Furthermore, the term "computer-readable recording medium" may also include those that dynamically hold a program for a short period of time, such as a communication line when transmitting a program via a network such as the Internet or a communication line such as a telephone line, and those that hold a program for a certain period of time, such as a volatile memory inside a computer system that serves as a server or client in such cases. Furthermore, the above program may be one that realizes part of the above-mentioned functions, or may be one that can realize the above-mentioned functions in combination with a program already recorded in the computer system.
[0074] In addition, the effects described in this specification are merely explanatory or exemplary and are not limiting. In other words, the technology according to the present disclosure may achieve other effects that are apparent to a person skilled in the art from the description of this specification, in addition to or in place of the above effects. In addition, the present invention is not limited to these embodiments, and various modifications and substitutions can be made within the scope of the present invention. [Explanation of symbols]
[0075] 1...judgment system, 10...judgment device, 20...apartment building, 21...solar panel, 22...load, 221...common area, 222...dedicated area, 30...detached house, 31...solar panel, 32...load, 40...storage battery, 110...first supply and demand information acquisition unit, 111...supply information acquisition unit, 112...demand information acquisition unit, 1121...customer information acquisition unit, 1122...time acquisition unit, 1123...estimation unit, 120...second supply and demand information acquisition unit, 160...judgment unit, 170...output unit, CP...commercial power, PL...private line, GL...general transmission line, CI...customer information, TI...time information, DI...demand information, SI...supply information, DSI1...first supply and demand information, DSI2...second supply and demand information, DPI...power distribution information
Claims
1. a first supply and demand information acquisition unit that acquires first supply and demand information, the first supply and demand information being information including an amount of power generated by each of the consumers belonging to the first group and an amount of power consumed by each of the consumers belonging to the first group, in a power transmission network including a first group which is a group of multiple consumers that can supply power to each other via a private transmission line that is different from a general transmission line that is a transmission line provided by a power transmission and distribution company, and a second group which is a group of multiple consumers that can supply power to each other via the general transmission line and the consumers belonging to the first group; a second supply and demand information acquisition unit that acquires second supply and demand information including an amount of power generated by each of the consumers belonging to the second group and an amount of power consumed by each of the consumers belonging to the second group; a determination unit that determines, based on the first supply and demand information and the second supply and demand information, whether a source of electricity required by each of the consumers belonging to the first group or a source of electricity required by the first group as a whole should be purchased from an electricity retailer or supplied with electricity from the second group, and that determines a destination of electricity generated by each of the consumers belonging to the first group or a destination of electricity generated by the first group as a whole should be stored in a storage battery belonging to the first group, sold to an electricity retailer, or supplied to the second group; an output unit that outputs power distribution information that is the information determined by the determination unit; Equipped with The determination unit is An optimization method selection unit that selects which of a wheeling charge when transmitting electricity to the consumer belonging to the second group, a power purchase charge when purchasing electricity from a retail electricity supplier, or an amount of electricity stored in the storage battery to be reduced, determining at least one of a supplier of power required by the consumers belonging to the first group and a destination of power generated by the consumers belonging to the first group, based on the optimization method selected by the optimization method selection unit; Judgment device.
2. The first supply and demand information acquisition unit, a supply information acquisition unit that acquires supply information including information on the amount of power generated by the consumers belonging to the first group; a demand information acquisition unit that acquires demand information including information on an amount of power consumed by the consumers belonging to the first group, The determination unit determines at least one of a supplier of power required by each of the consumers belonging to the first group and a transmission destination of power generated by each of the consumers belonging to the first group, based on the acquired supply information and the demand information. The determination device according to claim 1 .
3. The first supply and demand information acquisition unit, A consumer information acquisition unit that acquires attributes of each of the consumers among the plurality of consumers belonging to the first group; A time information acquisition unit that acquires a current time, Based on the attributes of the consumers acquired by the consumer information acquisition unit and the current time acquired by the time information acquisition unit, an amount of power consumed by the consumers belonging to the first group is estimated from the first supply and demand information. The determination device according to claim 1 or 2.
4. The determination unit determines whether the consumer belonging to the first group will purchase electricity from a retail electricity supplier or receive electricity from the second group as a source of electricity required by the consumer belonging to the first group. The determination device according to any one of claims 1 to 3.
5. The determination unit determines, as a transmission destination of the power generated by the consumer belonging to the first group, whether the power is stored in a storage battery belonging to the first group, sold to an electricity retailer, or supplied to the second group. The determination device according to any one of claims 1 to 4.
6. The determination unit determines to which of the plurality of consumers belonging to the first group the power generated by the consumer belonging to the first group is to be transmitted. The determination device according to any one of claims 1 to 5.
7. A first supply and demand information acquisition process in which a computer acquires first supply and demand information, which is information including the amount of electricity generated by each consumer belonging to the first group and the amount of electricity consumed by each consumer belonging to the first group, in a transmission network including a first group which is a group of multiple consumers that can supply electricity to each other via a private transmission line that is different from a general transmission line that is a transmission line provided by an electricity transmission and distribution company, and a second group which is a group of multiple consumers that can supply electricity to each other via the general transmission line and the consumers belonging to the first group; a second supply and demand information acquisition step in which a computer acquires second supply and demand information including an amount of power generated by each of the consumers belonging to the second group and an amount of power consumed by each of the consumers belonging to the second group; a determination process in which a computer determines, based on the first supply and demand information and the second supply and demand information, whether a procurement source for the power required by each of the consumers belonging to the first group or the power required by the first group as a whole should be purchasing power from a retail electricity supplier or supplying power from the second group, and determines a transmission destination for the power generated by each of the consumers belonging to the first group or the power generated by the first group as a whole should be storing the power in a storage battery belonging to the first group, selling the power to a retail electricity supplier, or supplying the power to the second group; an output step of the computer outputting power distribution information that is the information determined by the determination step, The determination step includes: An optimization method selection step of selecting which of a wheeling charge when transmitting electricity to the consumers belonging to the second group, a power purchase charge when purchasing electricity from a retail electricity supplier, or an amount of electricity stored in the storage battery should be reduced, determining at least one of a supplier of power required by the consumers belonging to the first group and a destination of power generated by the consumers belonging to the first group based on the optimization method selected by the optimization method selection step; A method for determining whether or not this is the case.
Citation Information
Patent Citations
Copy protection for software
JP1986072345A
Small fuel cell system
JP2004342440A
Local electric power interchange system
JP2012060761A
Energy management system for adjusting energy supply and demand of plural blocks and energy management method
JP2015077014A
Electric power consignment control system
JP2017211836A