Pile load test jig and pile load test method

The pile loading test jig and method improve workability by using a tubular reaction pile with a stress transmission member and rod-like members to transmit stress efficiently, reducing equipment size and preventing component deviation, thereby enhancing the efficiency of pile loading tests.

JP7583628B2Active Publication Date: 2024-11-14NIPPON STEEL METAL PROD CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021014293
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-01
Publication Date
2024-11-14
Estimated Expiration
2041-02-01

AI Technical Summary

Technical Problem

Existing pile loading tests face challenges with large-scale equipment requirements, difficulty in installation and wiring, and the need for precise jack alignment due to the placement of jacks inside or around the reaction pile, leading to reduced workability.

Method used

A pile loading test jig and method utilizing a tubular reaction pile with a stress transmission member and rod-like members arranged circumferentially, allowing for stress transmission without welding, and incorporating guide rods to prevent deviation of components during testing.

Benefits of technology

Enhances workability by minimizing reaction pile diameter, facilitating installation and troubleshooting, and preventing component scattering, thus improving the efficiency of pile loading tests.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007583628000001
    Figure 0007583628000001
  • Figure 0007583628000002
    Figure 0007583628000002
  • Figure 0007583628000003
    Figure 0007583628000003
Patent Text Reader

Abstract

To provide a loading test jig improved in workability of a loading test of a pile.SOLUTION: A loading test jig of a pile comprises: a stress transmission member which abuts a jack placed at an upper end of a test pile intruded into the ground inside a tubular reaction pile intruded into the ground from above; and multiple rod-like members which have upper ends locked to the stress transmission member and lower ends locked to the reaction pile, and are arranged in a circumferential direction of the reaction pile. The loading test jig of the pile also comprises: a stress transmission member which abuts a jack placed at the upper end of the tubular reaction pile intruded into the ground from above; and multiple rod-like members which have upper ends locked to the stress transmission member and lower ends locked to the test pile intruded into the ground inside the reaction pile, and are arranged in the circumferential direction of the test pile.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a pile load test jig and a pile load test method. [Background technology]

[0002] Patent Document 1 describes a technique for carrying out a pile load test in a small area using a general reaction pile that does not have a special shape, without the need to penetrate the reaction pile to the tip of the supporting layer. Specifically, Patent Document 1 uses a reaction pile that is cylindrical and does not reach the supporting layer, and has a larger pile diameter and shorter pile length than the test pile, into which the test pile is inserted. A pile load test device is provided in which a jack that applies a reaction force to the reaction pile and pushes or pulls out the test pile is disposed at the head of the reaction pile. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2017-166137 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, in the embodiment described in the above Patent Document 1, in the push-in test, the jack is placed inside the reaction pile, so the diameter of the reaction pile becomes large, and large-scale equipment is required to transport and install the reaction pile. In addition, if the jack is placed inside the reaction pile, it is not easy to wire it during installation or to deal with problems after installation. On the other hand, in the pull-out test, multiple jacks are lined up on the reaction pile, so the load amount needs to be finely adjusted between each jack. In addition, since the jacks are placed on the outer periphery of the test device, the installation accuracy needs to be high to prevent the jacks from falling off during loading.

[0005] Therefore, an object of the present invention is to provide a pile load test jig and a pile load test method that can improve the ease of carrying out pile load tests. [Means for solving the problem]

[0006] [1] A pile loading test jig comprising: a stress transfer member that is abutted from above against a jack placed on the upper end of a test pile that has penetrated the ground inside a tubular reaction pile that has penetrated the ground; and a number of rod-shaped members whose upper ends are engaged with the stress transfer member and whose lower ends are engaged with the reaction pile and that are arranged circumferentially around the reaction pile. [2] A pile loading test jig comprising: a stress transfer member that is abutted from above against a jack placed on the upper end of a tubular reaction pile that has penetrated the ground; and a plurality of rod-shaped members whose upper ends are engaged with the stress transfer member and whose lower ends are engaged with test piles that have penetrated the ground inside the reaction pile, and are arranged circumferentially around the test pile. [3] The load test fixture described in [2] further comprises a tubular member arranged outside the engagement portion between the multiple rod-shaped members and the test pile, a bottom plate abutting against the lower end of the tubular member and the upper end of the reaction pile, respectively, and having an opening through which the upper end of the test pile passes, and a cover plate abutting against the upper end of the tubular member, having an opening through which the multiple rod-shaped members pass, and on which a jack is placed. [4] A pile load test jig as described in any one of [1] to [3], wherein the upper end of each of the multiple rod-shaped members is inserted into an opening formed in the stress transfer member and a nut is screwed onto the upper end. [5] A pile load test jig as described in any one of [1] to [4], in which the lower end of each of the multiple rod-shaped members is inserted into an opening formed in a flange plate fixed to the reaction pile or the test pile, and a nut is screwed onto the lower end. [6] A pile load test jig described in any one of [1] to [5], in which at least one of a load cell or a spacing adjustment member is interposed between the jack and the stress transmission member, or between the jack and the test pile or the reaction pile. [7] A pile load test jig described in any one of [1] to [6], further comprising a plurality of intermediate reinforcing plates interposed between the jack and the stress transmission member, or between the jack and the test pile or the reaction pile, and a plurality of guide rods slidably inserted into openings formed in each of the plurality of intermediate reinforcing plates. [8] A method for loading tests on piles, comprising the steps of: placing a jack on the upper end of a test pile that has penetrated the ground inside a tubular reaction pile that has penetrated the ground; arranging a plurality of rod-shaped members circumferentially around the reaction pile and engaging the lower ends of each of the plurality of rod-shaped members to the reaction pile; abutting a stress transmission member against the jack from above; engaging the upper ends of each of the plurality of rod-shaped members to the stress transmission members; and extending the jack to apply a reaction force in the pull-out direction to the reaction pile while applying a force in the push-in direction to the test pile. [9] A method for loading tests on piles, comprising the steps of: placing a jack on the upper end of a tubular reaction pile that has been inserted into the ground; arranging a plurality of rod-shaped members in the circumferential direction of the test pile that has been inserted into the ground inside the reaction pile and engaging the lower ends of each of the plurality of rod-shaped members to the test pile; abutting a stress transmission member against the jack from above; engaging the upper ends of each of the plurality of rod-shaped members to the stress transmission members; and extending the jack to apply a reaction force in the pushing direction to the reaction pile while applying a force in the pulling direction to the test pile. Effect of the Invention

[0007] According to the above configuration, by locking the multiple rod-shaped members with the stress transmission members and the reaction piles or test piles, respectively, it is possible to transmit tensile force without the need for welding. In addition, since the members such as the jack are placed inside the multiple rod-shaped members arranged in a cage shape, even if the members such as the jack deviate from their designated positions for some reason, they are prevented from scattering to the outside. Therefore, it is possible to improve the ease of carrying out the load test of the piles. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a side view of a pile load test jig according to a first embodiment of the present invention. [Diagram 2]FIG. 2 is a cross-sectional view taken along line II-II in FIG. [Figure 3A] FIG. 2 is a diagram showing an example of a method for assembling a pile load test jig according to the first embodiment of the present invention. [Figure 3B] FIG. 2 is a diagram showing an example of a method for assembling a pile load test jig according to the first embodiment of the present invention. [Figure 4] FIG. 11 is a side view of a pile load test jig according to a second embodiment of the present invention. [Diagram 5] 5 is a cross-sectional view taken along line VV in FIG. 4. [Figure 6A] FIG. 11 is a diagram showing an example of a method for assembling a pile load test jig according to a second embodiment of the present invention. [Figure 6B] FIG. 11 is a diagram showing an example of a method for assembling a pile load test jig according to a second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In this specification and the drawings, components having substantially the same functional configurations are designated by the same reference numerals, and redundant description will be omitted.

[0010] (First embodiment: Jig for indentation load test) FIG. 1 is a side view of a pile load test jig according to a first embodiment of the present invention, and FIG. 2 is a cross-sectional view taken along line II-II in FIG. 1. In the illustrated example, the load test jig 10 includes a stress transmission member 11 that is abutted from above against a jack 3 placed on the upper end of a test pile 2 that has penetrated into the ground inside a tubular reaction pile 1 that has penetrated into the ground, and steel rods 12A-12D (collectively referred to as steel rods 12) whose upper ends are engaged with the stress transmission member 11 and whose lower ends are engaged with the reaction pile 1. The steel rods 12A-12D are arranged in the circumferential direction of the reaction pile 1. In the illustrated example, the stress transmission member 11 is abutted from above against the jack 3 via a load cell 4, a spacing adjustment member 13, and intermediate reinforcing plates 14A, 14B, and 14C that are interposed between the load cell 4 and the spacing adjustment member 13. The jack 3 is placed on the upper end of the test pile 2 via an intermediate reinforcing plate 14D.

[0011] In this specification, the rod-shaped member means a long and thin member such as the steel rods 12A to 12D, which can transmit a force from one side to the other. The rod-shaped member is not limited to a solid member such as a steel rod, but may be a hollow member such as a steel pipe. The cross-sectional shape of the rod-shaped member is not limited to a circular shape, but may be a shape called a square bar, a square pipe, or a flat bar. The surfaces of the steel rods 12A to 12D are illustrated as being smooth, but the surface of the rod-shaped member may be uneven, for example, as in the case of a deformed bar. In addition, the end of the rod-shaped member being engaged with another member means that the rod-shaped member is connected to the other member so as to be able to transmit a tensile force. Specifically, a threaded portion is formed at the upper end of the steel rod 12, and the steel rod 12 is inserted into an opening formed in the stress transmission member 11, and then the nut 121 is screwed onto the threaded portion from above, whereby the steel rod 12 is engaged with the stress transmission member 11. Meanwhile, a threaded portion is also formed at the lower end of the steel rod 12, and the steel rod 12 is engaged with the reaction pile 1 by inserting the steel rod 12 into an opening formed in a flange plate 122 fixed to the upper end of the reaction pile 1 and then screwing a nut 123 into the threaded portion from below. By engaging the steel rod 12 with each member in this manner, the upward force acting on the stress transmission member 11 when the jack 3 is extended is transmitted to the reaction pile 1 as a tensile force acting on the steel rod 12. Therefore, in this embodiment, a pile compression load test is carried out in which a reaction force in the pull-out direction is applied to the reaction pile 1 and a force in the push-in direction is applied to the test pile 2.

[0012] In addition, in the illustrated example, guide rods 15A to 15D (collectively referred to as guide rods 15) are provided, which are attached to the flange plate 122 and extend upward. The guide rods 15 are slidably inserted into openings formed in the intermediate reinforcing plates 14A to 14D. The intermediate reinforcing plates 14A to 14D move along the guide rods 15, but are not restricted in their vertical displacement. By providing the guide rods 15, horizontal positional deviation of the intermediate reinforcing plates 14A to 14D can be prevented, and force can be stably transmitted between members including the stress transmission member 11 and the jack 3 as described above.

[0013] 3A and 3B are diagrams showing an example of a method for assembling a pile load test jig according to the first embodiment of the present invention. As shown in FIG. 3A, first, steel bars 12A-12D are inserted into openings formed in a flange plate 122 that is fixed in advance by welding or bolting to a reaction pile 1 that has penetrated into the ground. At this point, the steel bar 12 is not fixed against downward movement, so that it may be prevented from falling by wrapping an adhesive tape around the steel bar 12, for example. Furthermore, an intermediate reinforcing plate 14D is arranged while the steel bars 12A-12D are inserted into the openings, and a jack 3 is placed on the intermediate reinforcing plate 14D.

[0014] Next, as shown in Fig. 3B, the intermediate reinforcing plate 14C is placed on the jack 3 while inserting the steel bars 12A-12D into the openings, and the load cell 4 is placed on the intermediate reinforcing plate 14C. Similarly, the intermediate reinforcing plate 14B, the interval adjustment member 13, the intermediate reinforcing plate 14A, and the stress transmission member 11 are placed in this order, and the nuts 121 are screwed into the threaded portions on the upper ends of the steel bars 12A-12D inserted into the openings of the stress transmission member 11, completing the load test jig 10 as shown in Fig. 1. Note that the guide bars 15A-15D may be placed when some intermediate reinforcing plates have been placed as in the illustrated example, or may be attached to the flange plate 122 in advance, or may be placed after the above-mentioned process.

[0015] In this embodiment, the jack 3 can be placed above the reaction pile 1 by transmitting stress through the steel rod 12, so the diameter of the reaction pile 1 can be minimized. In addition, since the jack 3 is exposed between the steel rods 12, wiring during installation and troubleshooting after installation are easy. In addition, by locking the steel rods 12 with the stress transmission member 11 and the reaction pile 1, welding is not required while still allowing the transmission of tensile force. In addition, since the jack 3 and other members are placed inside the steel rods 12 (and the guide rods 15) arranged in a cage shape, even if the jack 3 and other members deviate from their designated positions for some reason, they are prevented from scattering to the outside. Therefore, in this embodiment, the ease of construction of the load test of the pile can be improved.

[0016] (Second embodiment: Jig for tensile load test) Fig. 4 is a side view of a pile load test jig according to a second embodiment of the present invention, and Fig. 5 is a cross-sectional view taken along line VV in Fig. 4. In the illustrated example, the load test jig 20 includes a stress transmission member 11 that is brought into contact from above with a jack 3 placed on the upper end of a reaction pile 1 that has penetrated into the ground, and steel rods 12A-12D whose upper ends are engaged with the stress transmission member 11 and whose lower ends are engaged with a test pile 2 that has penetrated into the ground. The steel rods 12A-12D are arranged in the circumferential direction of the test pile 2. In the illustrated example, the stress transmission member 11 is brought into contact from above with the jack 3 via the load cell 4 and the interval adjustment member 23, as well as intermediate reinforcing plates 14A, 14B, and 14C that are interposed between them.

[0017] In the illustrated example, the jack 3 is placed on the upper end of the reaction pile 1 via the bottom plate 26, the steel pipe 27, and the cover plate 28. The bottom plate 26 is placed on the flange plate 122 fixed to the upper end of the reaction pile 1, the steel pipe 27 is placed on the bottom plate 26, and the cover plate 28 is placed on the steel pipe 27. An opening is formed in the center of the bottom plate 26 through which the upper end of the test pile 2 passes. The steel pipe 27 is open at both the upper and lower ends, and has a diameter that allows the engagement parts of the test pile 2 and the steel rods 12A to 12D to be arranged inside. In addition, the cover plate 28 is formed with an opening through which the steel rods 12A to 12D pass. As a result, in this embodiment, the jack 3 can be placed on the upper end of the reaction pile 1 without interfering with the test pile 2 and the steel rods 12A to 12D.

[0018] In this embodiment, the steel rod 12 is inserted into an opening formed in the stress transfer member 11, and then a nut 121 is screwed into a threaded portion formed at the upper end of the steel rod 12, so that the steel rod 12 is engaged with the stress transfer member 11. Also, the steel rod 12 is inserted into an opening formed in a flange plate 124 fixed to the upper end of the test pile 2, and then a nut 123 is screwed into a threaded portion formed at the lower end of the steel rod 12, so that the steel rod 12 is engaged with the test pile 2. By engaging the steel rod 12 with each member in this manner, the upward force acting on the stress transfer member 11 when the jack 3 is extended is transmitted to the test pile 2 as a tensile force acting on the steel rod 12. Therefore, in this embodiment, a pull-out load test of the pile is carried out in which a reaction force in the pushing direction acts on the reaction pile 1, and a force in the pulling direction acts on the test pile 2.

[0019] Additionally, in the illustrated example, guide rods 15A-15D are attached to the cover plate 28 and extend upward. The guide rods 15 are inserted into openings formed in the intermediate reinforcing plates 14A-14C. The intermediate reinforcing plates 14A-14C move along the guide rods 15, but are not restricted in their vertical displacement. By providing the guide rods 15, horizontal displacement of the intermediate reinforcing plates 14A-14C can be prevented, and force can be stably transmitted between members including the stress transmission members 11 and the jacks 3 as described above.

[0020] 6A and 6B are diagrams showing an example of a method for assembling a pile load test jig according to the second embodiment of the present invention. As shown in FIG. 6A, first, the steel rods 12A to 12D are inserted into openings formed in a flange plate 124 that is fixed in advance to the test pile 2 penetrated into the ground by welding, bolting, or the like. At this point, the steel rod 12 is not fixed against downward movement, so that it may be prevented from falling by wrapping an adhesive tape around the steel rod 12, for example. In addition, the bottom plate 26 is placed on the flange plate 122 that is fixed in advance to the reaction pile 1 by welding, bolting, or the like.

[0021] Next, as shown in FIG. 6B, the steel pipe 27 and the cover plate 28 are placed on the bottom plate 26, and the jack 3 and the intermediate reinforcing plate 14C are placed on the cover plate 28. The cover plate 28 and the intermediate reinforcing plate 14C are placed while the steel bars 12A to 12D are inserted into the openings. Similarly, the load cell 4, the intermediate reinforcing plate 14B, the interval adjustment member 23, the intermediate reinforcing plate 14A, and the stress transmission member 11 are placed in this order, and the nuts 123 are screwed into the threaded portions on the upper ends of the steel bars 12A to 12D inserted into the openings of the stress transmission member 11, completing the load test jig 20 as shown in FIG. 4. The guide bars 15A to 15D may be placed when some intermediate reinforcing plates are placed as in the illustrated example, or may be attached to the cover plate 28 in advance, or may be placed after the above-mentioned process.

[0022] In this embodiment, since the jack 3 can be placed on the axis of the reaction pile 1 and the test pile 2 by transmitting the stress through the steel rod 12, there is no need to place multiple jacks, and processes such as fine adjustment of the load amount are not required. In addition, since the jack 3 placed on the axis of the reaction pile 1 and the test pile 2 is unlikely to fall off even when loaded, the installation precision is not required compared to the case where the jack is placed on the outer periphery of the test device. In addition, by locking the steel rod 12 with the stress transmission member 11 and the test pile 2, respectively, welding is not required while making it possible to transmit the tensile force. In addition, in this embodiment, the members such as the jack 3 are placed inside the steel rod 12 (and the guide rod 15) arranged in a cage shape, so that even if the jack 3 deviates from the specified position for some reason, it is prevented from scattering to the outside. Therefore, in this embodiment, the workability of the load test of the pile can be improved.

[0023] Although the preferred embodiments of the present invention have been described in detail above with reference to the accompanying drawings, the present invention is not limited to these examples. It is clear that a person skilled in the art in the technical field to which the present invention pertains can come up with various modified or altered examples within the scope of the technical ideas described in the claims, and it is understood that these also naturally fall within the technical scope of the present invention. [Explanation of symbols]

[0024] 1...reaction pile, 2...test pile, 3...jack, 4...load cell, 10, 20...load test jig, 11...stress transfer member, 12A-12D...steel rod, 121, 123...nut, 122, 124...flange plate, 13, 23...spacing adjustment member, 14A-14D...intermediate reinforcing plate, 15A-15D...guide rod, 26...bottom plate, 27...steel pipe, 28...cover plate.

Claims

1. A stress transmission member that is abutted against a jack placed on the upper end of a test pile that has penetrated the ground inside a tubular reaction pile that has penetrated the ground from above the jack; A plurality of rod-shaped members each having an upper end engaged with the stress transmission member and a lower end engaged with the reaction pile, the rod-shaped members being arranged in a cage-like shape in the circumferential direction of the reaction pile; A plurality of intermediate reinforcing plates interposed between the jack and the stress transmission member, or between the jack and the test pile or the reaction pile; A plurality of guide rods are arranged in a cage shape in the circumferential direction of the reaction pile or the test pile together with the plurality of rod-shaped members and slidably inserted into openings formed in each of the plurality of intermediate reinforcing plates; Equipped with A pile load test jig in which the distance between one of the multiple rod-shaped members and one of the adjacent multiple guide rods is narrower than the outer diameter of the jack arranged inside the multiple rod-shaped members and the multiple guide rods arranged in the cage shape.

2. A tubular member disposed outside the engagement portion between the rod members and the test pile; A bottom plate that is abutted against the lower end of the tubular member and the upper end of the reaction pile, and has an opening through which the upper end of the test pile passes; a cover plate that is in contact with an upper end of the tubular member, has openings through which the rod members pass, and on which the jack is placed; The pile load test fixture of claim 1 further comprising:

3. 3. The pile load test jig according to claim 1, wherein the upper end of each of the plurality of rod-shaped members is inserted into an opening formed in the stress transmission member, and a nut is screwed onto the upper end.

4. A pile load test jig as described in any one of claims 1 to 3, wherein the lower end of each of the multiple rod-shaped members is inserted into an opening formed in a flange plate fixed to the reaction pile or the test pile, and a nut is screwed onto the lower end.

5. At least one of a load cell and a distance adjustment member is interposed between the jack and the stress transmission member, or between the jack and the test pile or the reaction pile. A pile load test jig according to any one of claims 1 to 4.

6. A step of placing a jack on an upper end of a test pile penetrating the ground inside a tubular reaction pile penetrating the ground; A step of arranging a plurality of rod-shaped members in a cage shape in the circumferential direction of the reaction pile and engaging the lower end portions of the plurality of rod-shaped members with the reaction pile; a step of bringing a stress transmission member into contact with the jack from above the jack; a step of engaging an upper end portion of each of the plurality of rod-shaped members with the stress transmission member; A step of inserting a plurality of intermediate reinforcing plates between the jack and the stress transmission member, or between the jack and the test pile or the reaction pile while inserting the rod-shaped member through the opening; a step of slidably inserting a plurality of guide rods, which are arranged in a cage-like shape together with the plurality of rod-shaped members in the circumferential direction of the reaction pile or the test pile, such that a distance between one of the plurality of rod-shaped members and one of the plurality of adjacent guide rods is narrower than an outer diameter of the jack arranged inside the plurality of rod-shaped members and the plurality of guide rods arranged in the cage-like shape, into openings formed in the plurality of intermediate reinforcing plates; a step of extending the jack to apply a force in a pushing direction to the test pile while applying a reaction force in a pulling direction to the reaction pile; A method for load testing of piles, including:

Citation Information

Patent Citations

  • Method and device for test loading of pile

    JP1989169012A

  • Method and apparatus for measurement of foundation support force

    JP1997145572A

  • Load carrying test method using double vane type pile and its device

    JP2002047677A

  • Foundation load testing method

    JP2012255305A

  • Loading test method and loading test device for composite reinforcement ground

    JP2014088689A