Boiler control system and boiler control method
The boiler control system addresses unstable raw water quality by continuously measuring and estimating water quality parameters to accurately set the blow rate, enhancing operational efficiency and reducing heat loss.
Patent Information
- Application Number
- JP2021064886
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-04-06
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-04-06
AI Technical Summary
In emerging countries, the unstable quality of raw water and inadequate management of water treatment equipment for low-pressure boiler systems lead to fluctuating boiler feed water quality, making it difficult to accurately calculate the blow rate, resulting in high heat loss and uneconomical operation.
A boiler control system that continuously measures water quality parameters such as pH, electrical conductivity, and acid consumption, estimates chloride ion concentration using equations based on these parameters, and adjusts the blow rate accordingly, with varying measurement intervals for different parameters to maintain accuracy.
Enables precise calculation of the blow rate even with unstable raw water quality, reducing heat loss and improving operational efficiency.
Smart Images

Figure 0007584346000001 
Figure 0007584346000002 
Figure 0007584346000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a boiler control system and a boiler control method. [Background technology]
[0002] As impurities in boiler water evaporate, they become concentrated. As the concentration progresses, problems such as scale formation occur, so it is necessary to continuously or intermittently blow out some of the boiler water to reduce the concentration factor (degree of concentration).
[0003] In general, the blow water flow rate is adjusted so that the ratio of the blow water flow rate to the boiler feed water flow rate (blow rate) is constant. The blow rate is generally set so that the quality of the boiler water is constant.
[0004] Patent Document 1 discloses a method for controlling a blow rate in a boiler water system, which comprises setting a boiler water control standard value for at least one water quality control item selected from electrical conductivity, chloride ion concentration, sulfate ion concentration, and silica concentration, measuring the Na ion concentration of make-up water and the value of the selected water quality control item, measuring the Na ion concentration of the feed water, calculating the value of the water quality control item in the feed water from the Na ion concentration of the feed water and the Na ion concentration of the make-up water, selecting one water quality control item that will deviate from the control standard value at the lowest concentration factor, and performing blow control so that the value of the selected water quality control item in the boiler water is within the range of the control standard value. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2009-30817 A Summary of the Invention [Problem to be solved by the invention]
[0006] In emerging countries, the quality of raw water is not stable and fluctuates greatly. In addition, the management of water treatment equipment such as water softeners for low-pressure boiler equipment is also insufficient. As a result, the quality of boiler feedwater fluctuates greatly.
[0007] It is difficult to continuously measure the concentration of some ions (e.g., chloride ions) used to calculate the blow rate due to interference from ions in the boiler feed water. In emerging countries where the quality of raw water is unstable, the method of Patent Document 1 has a problem that it is difficult to calculate the blow rate with high accuracy because it is difficult to continuously measure the concentration of some ions used to calculate the blow rate.
[0008] In addition, the boiler blow-down rate (=1 / concentration rate) is usually set based on the various water quality components in the feed water. Specifically, the blow-down rate is determined based on the data measured every month over the course of a year, when the water quality was at its worst. In emerging countries where the quality of raw water is not stable, a high blow-down rate is set all the time, resulting in large heat losses and poor economic operation.
[0009] The present invention has been made in consideration of the above problems, and aims to provide a boiler control system and a boiler control method that can calculate a blow rate with high accuracy even when the quality of the raw water is unstable. [Means for solving the problem]
[0010] The gist of the present invention is as follows. <1> A boiler control system according to one aspect of the present invention includes a sensor that continuously measures water quality information of boiler feedwater over time, and sets a blow rate continuously over time based on measured water quality information, which is the water quality information obtained by the sensor, and estimated water quality information estimated from the measured water quality information. death, The measured water quality information is pH, electrical conductivity, total hardness, and acid consumption, The estimated water quality information is a chloride ion concentration, The chloride ion concentration is estimated based on the pH, the electrical conductivity, the total hardness, and the acid consumption. . <2> the above <1> In the boiler control system described above, the timing for updating the measured water quality information and the estimated water quality information used to set the blow rate may be set for each type of measured water quality information. <3 >Above< 1 In the boiler control system described above, the measurement intervals of the electrical conductivity and the pH may be shorter than the measurement intervals of the total hardness and the acid consumption. <4 >Above< 1 The boiler control system described in may calculate the chloride ion concentration from the pH, the electrical conductivity, the total hardness, and the acid consumption using an equation relating to the amount of charge of ions in the boiler feedwater and an equation relating to the electrical conductivity of the boiler feedwater. < 5 >Above< 4 The boiler control system described in the above may estimate the chloride ion concentration using the following equations (1) and (2), when all of the cations in the boiler feedwater other than the cations contributing to the total hardness are sodium ions, and the other anions in the boiler feedwater other than the anions contributing to the acid consumption are chloride ions and sulfate ions. Charge of ions contributing to total hardness + charge of other cations = charge of ions contributing to acid consumption + charge of other anions (1) Electrical conductivity of boiler feed water = Electrical conductivity of cations contributing to total hardness + Electrical conductivity of ions contributing to acid consumption + Electrical conductivity of other cations + Electrical conductivity of other anions (2) Here, the charge of each ion in the above formula (1) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the above formula (2) is the concentration of each ion (mg / L) × conductivity per 1 mg / L ((μS / cm) / (mg / L)). < 6 >Above< 5 The boiler control system described in the above is configured to calculate a calcium ion concentration from the total hardness assuming that only calcium ions contribute to the total hardness, and to calculate a CO3 2-, HCO3 - , determine the proportion of H2CO3 present, and the ions that contribute to the acid consumption are CO3 2- and HCO3 - From the ratio of the acids present and the amount of acid consumed, 2- and HCO3 - The concentration of chloride ions may be calculated, the ratio of the chloride ions and the sulfate ions may be determined based on the concentration data of chloride ions and sulfate ions in the boiler feed water, and the chloride ion concentration may be estimated from the following formula (3) and the following formula (4) and the ratio of the chloride ions and the sulfate ions. Ca 2+ Charge of +Na + Charge of CO3 2- Charge of +HCO3 - Charge of +Cl - Charge of +SO4 2- Charge of (3) Electrical conductivity of boiler feed water = Ca 2+ Electrical conductivity of +Na + Electrical conductivity of +CO3 2- Electrical conductivity of +HCO3 - Electrical conductivity of +Cl - Electrical conductivity of +SO4 2- Electrical conductivity of...(4) Here, the charge of each ion in the above formula (3) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the above formula (4) is the concentration of each ion (mg / L) × conductivity per 1 mg / L ((μS / cm) / (mg / L)). < 7 >Above< 6 The boiler control system described in Determining the ratio of chloride ions and sulfate ions The measurement interval for the concentration data of chloride ions and sulfate ions in the boiler feedwater may be longer than the measurement intervals for the electrical conductivity, the pH, the total hardness, and the acid consumption amount, respectively. < 8 >Above< 1 >~< 7 The boiler control system described in any one of the above items may issue maintenance information when the total hardness exceeds a predetermined threshold. < 9> Above <1> ~< 8 The boiler control system described in any one of the above items 1 to 5 may set an amount of chemical to be fed to the boiler feedwater in accordance with the blow rate. < 10 The boiler control method according to one aspect of the present invention includes measuring water quality information of boiler feed water, the water quality information being obtained by a sensor that continuously measures water quality information of the boiler feed water in time, and measurement The blow rate is set continuously over time based on the estimated water quality information. death, The measured water quality information is pH, electrical conductivity, total hardness, and acid consumption, The estimated water quality information is a chloride ion concentration, The chloride ion concentration is estimated based on the pH, the electrical conductivity, the total hardness, and the acid consumption. . < 11 >Above< 10 In the boiler control method described above, the timing of updating the measured water quality information used to set the blow rate may be set for each type of measured water quality information. <12 >Above< 10 In the boiler control method described above, the measurement intervals of the electrical conductivity and the pH may be shorter than the measurement intervals of the total hardness and the acid consumption amount. <13 >Above< 10 The boiler control method described in may calculate the chloride ion concentration from the pH, the electrical conductivity, the total hardness, and the acid consumption amount using an equation related to the amount of charge and an equation related to the electrical conductivity. < 14 >Above< 13 In the boiler control method described above, when all other cations in the boiler feedwater other than the cations contributing to the total hardness are sodium ions, and other anions in the boiler feedwater other than the anions contributing to the acid consumption are chloride ions and sulfate ions, the chloride ion concentration may be estimated using the following equations (5) and (6): Charge of ions contributing to total hardness + charge of other cations = charge of ions contributing to acid consumption + charge of other anions (5) Electrical conductivity of boiler feed water = Electrical conductivity of ions contributing to total hardness + Electrical conductivity of ions contributing to acid consumption + Electrical conductivity of other cations + Electrical conductivity of other anions (6) Here, the charge of each ion in the above formula (5) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the above formula (6) is the concentration of each ion (mg / L) × conductivity per 1 mg / L ((μS / cm) / (mg / L)). < 15 >Above< 14 The boiler control method described in the above is characterized in that the ions contributing to the total hardness are only calcium ions, the calcium ion concentration is calculated from the total hardness, and the CO3 2- , HCO3 - , determine the proportion of H2CO3 present, and the ions that contribute to the acid consumption are CO3 2- and HCO3 - From the ratio of the acids present and the amount of acid consumed, 2- and HCO3 - The concentration of chloride ions may be calculated, the ratio of the chloride ions and the sulfate ions may be determined based on concentration data of chloride ions and sulfate ions in the boiler feed water, and the chloride ion concentration may be estimated from the following formula (7) and the following formula (8) and the ratio of the chloride ions and the sulfate ions. Ca 2+ Charge of +Na + Charge of CO3 2- Charge of +HCO3 - Charge of +Cl - Charge of +SO4 2- Charge of...(7) Electrical conductivity of boiler feed water = Ca 2+ Electrical conductivity of +Na + Electrical conductivity of +CO3 2- Electrical conductivity of +HCO3 - Electrical conductivity of +Cl - Electrical conductivity of +SO4 2- Electrical conductivity of...(8) Here, the charge of each ion in the above formula (7) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the above formula (8) is the concentration of each ion (mg / L) × conductivity per 1 mg / L ((μS / cm) / (mg / L)). Effect of the Invention
[0011] According to the above aspects of the present invention, it is possible to provide a boiler control system and a boiler control method that are capable of calculating the blow rate with high accuracy even when the quality of the raw water is unstable. [Brief description of the drawings]
[0012] [Figure 1] 1 is a schematic diagram of a boiler control system according to a first embodiment of the present invention. [Diagram 2] FIG. 4 is a schematic diagram of a boiler control system according to a second embodiment of the present invention. [Diagram 3] FIG. 3 is a diagram comparing a chloride ion concentration estimated using the boiler control system according to the first embodiment of the present invention with an actually measured chloride concentration. [Figure 4] FIG. 2 is a diagram comparing a blow rate estimated using the boiler control system according to the first embodiment of the present invention with a blow rate estimated using a conventional method. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] First Embodiment As shown in FIG. 1, a boiler control system 100 according to the first embodiment includes a boiler feedwater sensor 1, a control unit 2, a blow water flow rate adjustment valve 3, and a boiler feedwater flow meter 4.
[0014] (Boiler feedwater sensor) The boiler feedwater sensor 1 is a sensor that measures water quality information of the boiler feedwater continuously over time. The boiler feedwater is water after raw water is treated by the water treatment facility 20. Here, "measure continuously over time" means that parameters such as pH, electrical conductivity, total hardness, and acid consumption of the boiler feedwater are continuously measured for each parameter (for each type of water quality information), and does not mean that the parameters are measured in order, such as measuring electrical conductivity after measuring pH. In the present invention, "measure continuously over time" means that measurements are made at a predetermined measurement interval. The predetermined measurement interval is, for example, within one day. Water quality may vary depending on weather such as sunny weather and rainy weather, but if the measurement interval is within one day, it is possible to respond to water quality fluctuations due to such weather changes. In addition, water quality may vary within a day due to tides. In order to respond to such water quality fluctuations due to tides, it is preferable to set the measurement interval to one hour or less. The water quality information obtained by the boiler feedwater sensor 1 (hereinafter sometimes referred to as “measured water quality information”) is sent to the control unit 2.
[0015] The method for sampling the boiler feedwater is not particularly limited as long as it is possible to measure the measured water quality information of the boiler feedwater. For example, a part of the boiler feedwater may be sampled from a pipe 22 that branches off from a pipe 21 that connects the water treatment facility 20 and the boiler 30.
[0016] Examples of measured water quality information of the boiler feedwater measured by the boiler feedwater sensor 1 include pH, electrical conductivity, total hardness, and acid consumption. The timing of updating the measured water quality information of the boiler feedwater measured by the boiler feedwater sensor 1 and used to set the blow rate may be set according to the type of measured water quality information. The update timing (measurement interval) for each type of measured water quality information can be set taking into consideration the performance of each sensor, the time required for analysis, and fluctuations in water quality. By determining the measurement interval for each type of measured water quality information, real-time control that tracks fluctuations in the boiler water quality becomes possible. Below, a method for measuring each parameter is described, but the present invention is not limited to the following method.
[0017] The pH of the boiler feedwater can be measured by a known method. The method for measuring the pH of the boiler feedwater is not particularly limited, but examples thereof include the hydrogen electrode method, the quinhydrone electrode method, the antimony electrode method, and the glass electrode method. As a sensor for measuring the pH of the boiler feedwater, a sensor using the glass electrode method is preferable. The measurement interval of the pH of the boiler feedwater is not particularly limited as long as it is within one day, but may be measured, for example, every second.
[0018] The electric conductivity of the boiler feed water can be measured by a known method. The method for measuring the electric conductivity of the boiler feed water is not particularly limited, but examples thereof include an AC two-electrode method and an electromagnetic induction method. As a sensor used for measuring the electric conductivity, a sensor using an AC two-electrode method is preferable. The interval for measuring the electric conductivity of the boiler feed water is not particularly limited as long as it is within one day, but for example, it may be measured every second.
[0019] The total hardness of the boiler feedwater can be measured by a known method. The method for measuring the total hardness of the boiler feedwater is not particularly limited, but may be a colorimetric method in which the hardness is detected by a color reaction when a reagent containing a dye such as Calmagite is added to sample water. As a sensor for measuring the total hardness of the boiler feedwater, a sensor using a colorimetric method is preferred. The interval for measuring the total hardness of the boiler feedwater is not particularly limited as long as it is within one day, but may be, for example, every 10 minutes.
[0020] The acid consumption of the boiler feedwater can be measured by a known method. The method for measuring the acid consumption of the boiler feedwater is not particularly limited, but includes neutralization titration and colorimetry. As a sensor for measuring the acid consumption of the boiler feedwater, a sensor using neutralization titration is preferred. The interval for measuring the acid consumption of the boiler feedwater is not particularly limited as long as it is within one day, but is, for example, every 10 minutes.
[0021] The measurement intervals of the electrical conductivity and pH of the boiler feedwater may be shorter than the measurement intervals of the total hardness and acid consumption of the boiler feedwater. By making the measurement intervals of the electrical conductivity and pH shorter than the measurement intervals of the total hardness and acid consumption of the boiler feedwater, the estimated water quality information described below can be continuously estimated with high accuracy even if the total hardness and acid consumption, which are measured at long measurement intervals, are used. The shorter the measurement interval, the greater the need for a larger capacity memory unit for storing the measurement data and the greater the processing burden on the control unit 2, such as an increased calculation load. However, by changing the measurement interval for each type of measured water quality information according to its characteristics, the estimated water quality information can be continuously estimated with high accuracy without any extra burden on the control unit 2.
[0022] (Control unit) The control unit 2 estimates estimated water quality information based on the measured water quality information of the boiler feedwater sent from the boiler feedwater sensor 1. The control unit 2 also sets the blow rate continuously over time based on the measured water quality information measured by the boiler feedwater sensor 1 and the estimated water quality information estimated by the control unit 2. In the present invention, "continuously set over time" means setting at a predetermined set interval (update timing). As with the measurement interval described above, if the predetermined set interval is set to within one day and the blow rate is set, it is possible to respond to water quality fluctuations due to weather changes, etc. Furthermore, by setting the set interval to one hour or less, it is possible to respond to water quality fluctuations due to tides, etc. The control unit 2 is composed of, for example, a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), a communication device, etc. Furthermore, the control unit 2 may be a boiler control system such as a plant management system.
[0023] The control unit 2 includes an information acquisition unit (not shown) that receives measured water quality information of the boiler feedwater and information on the flow rate of the boiler feedwater, a memory unit (not shown) that stores the measured water quality information of the boiler feedwater acquired by the information acquisition unit, a water quality information estimation unit (not shown) that estimates estimated water quality information of the boiler feedwater, a blow rate calculation unit (not shown) that calculates the blow rate, and a blow water flow rate adjustment unit (not shown) that adjusts the blow water flow rate.
[0024] The information acquisition section of the control section 2 receives the measured water quality information sent from the boiler feedwater sensor 1 and the flow rate of the boiler feedwater sent from the boiler feedwater flowmeter 4, and sends them to the memory section.
[0025] The memory section of the control section 2 stores the measured water quality information sent from the boiler feedwater sensor 1 and the flow rate sent from the boiler feedwater flowmeter 4. The memory section of the control section 2 sends the stored measured water quality information to the water quality information estimation section or the blow rate calculation section. The memory section of the control section 2 also stores estimated water quality information of the boiler feedwater estimated by the water quality information estimation section and sends it to the blow rate calculation section. The memory section of the control section 2 stores reference values for the measured water quality information and estimated water quality information for calculating the blow rate and sends these reference values to the blow rate calculation section. The memory section of the control section 2 also sends the flow rate of the boiler feedwater to the blow water flow rate adjustment section. The memory section of the control section 2 also stores the chloride ion (Cl) concentration of the boiler feedwater, which will be described later, as necessary. - ) and sulfate ion (SO4 2- ) and send it to the water quality information estimation unit.
[0026] The water quality information estimation unit of the control unit 2 estimates another water quality information (estimated water quality information) from the measured water quality information of the boiler feedwater sent from the memory unit. The estimated water quality information is not particularly limited, but is, for example, chloride ion concentration. When the water quality information estimation unit estimates the chloride ion concentration in the boiler feedwater, the water quality information estimation unit of the control unit 2 may estimate the chloride ion concentration based on pH, electrical conductivity, total hardness, and acid consumption. The water quality information estimation unit of the control unit 2 may estimate the estimated water quality information continuously in time from the measured water quality information measured continuously in time by the boiler feedwater sensor 1.
[0027] The method by which the water quality information estimation unit estimates the chloride ion concentration in the boiler feedwater based on the pH, electrical conductivity, total hardness, and acid consumption is not particularly limited. For example, the chloride ion concentration may be estimated by using an equation relating to the charge amount of ions in the boiler feedwater and an equation relating to the electrical conductivity of the boiler feedwater.
[0028] "Method for estimating chloride ion concentration in boiler control systems" An example of estimating the chloride ion concentration using an equation related to the charge of ions in the boiler feedwater and an equation related to the electrical conductivity of the boiler feedwater will be described below. For example, at pH 7 to 9, anions and cations are electrically equivalent, so the following equation (1) can be used as an equation related to the charge in the feedwater boiler. In addition, the sum of the electrical conductivities of the ions in the boiler feedwater is equal to the measured electrical conductivity of the feedwater boiler, so the following equation (2) can be used as an equation related to the electrical conductivity. The water quality information estimation unit may estimate the chloride ion concentration by using the following equations (1) and (2). Here, the charge of each ion in the following equation (1) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the following equation (2) is the concentration of each ion (mg / L)×conductivity per 1 mg / L ((μS / cm) / (mg / L)). Publicly known data can be used for the equivalent (eq) of each ion and the conductivity (α (coefficient) × equivalent (eq)) per 1 mg / L of each ion. Charge of ions contributing to total hardness + charge of other cations = charge of ions contributing to acid consumption + charge of other anions (1) Electrical conductivity of boiler feed water = Electrical conductivity of cations contributing to total hardness + Electrical conductivity of ions contributing to acid consumption + Electrical conductivity of other cations + Electrical conductivity of other anions (2)
[0029] In the above formulas (1) and (2), all of the "other cations" that contribute to the total hardness in the boiler feedwater are sodium ions (Na +) and the "other anions" other than the anions that contribute to the acid consumption in the boiler feed water may be chloride ions and sulfate ions.
[0030] In the above formulas (1) and (2), it is possible to calculate the calcium concentration from the total hardness by assuming that the only ions that contribute to the total hardness of the boiler feedwater are calcium ions.
[0031] In the above formulas (1) and (2), the ions that contribute to the acid consumption of the boiler feedwater are carbonate ions (CO3 2- ) and bicarbonate ion (HCO3 - ) may be used. Also, from the pH and acid consumption, CO3 2- and HCO3 - The concentration of CO3 can be calculated from the pH and the acid consumption. 2- and HCO3 - The method for calculating the concentration of CO3 is not particularly limited. For example, the water quality information estimation unit of the control unit 2 may calculate the concentration of CO3 2- , HCO3 - , determine the proportion of H2CO3 present, and calculate the acid consumption and the determined CO3 2- , HCO3 - , H2CO3 and CO3 2- and HCO3 - The concentration of may be calculated.
[0032] Based on pH, CO3 2- , HCO3 - The method for determining the proportion of H2CO3 is not particularly limited, but for example, 2- , HCO3 - The method of determining the ratio of H2CO3 to temperature and pH is based on the data showing the relationship between the ratio of H2CO3 and the concentration of CO3. 2- , HCO3 - As an example of data showing the relationship between the amount of H2CO3 and the amount of H2CO3 present, there may be mentioned a table on page 104 of the Japanese Chemical Journal, Vol. 76, No. 11.
[0033] The water quality information estimation unit of the control unit 2 may determine the ratio of chloride ions and sulfate ions based on the concentration data of chloride ions and sulfate ions in the boiler feedwater stored in the storage unit. The concentration data of chloride ions and sulfate ions in the boiler feedwater is not particularly limited, but may be, for example, concentration data of chloride ions and sulfate ions measured by regular measurement separately from the boiler control system according to the first embodiment, or may be publicly known data. The concentration data of chloride ions and sulfate ions in the boiler feedwater may be data obtained by providing a measurement device for acquiring these data in the boiler control system according to the first embodiment and measuring the concentration data using the measurement device. The measurement interval of the chloride ion and sulfate ion concentrations is not particularly limited, and may be, for example, once a month. The measurement interval of the ratio data of chloride ions and sulfate ions in the boiler feedwater may be longer than the measurement interval of the electric conductivity, pH, total hardness, and acid consumption of the boiler feedwater. By shortening the measurement interval of some parameters such as pH and electric conductivity, the chloride ion concentration can be estimated with high accuracy even if the measurement interval of the ratio data of chloride ions and sulfate ions in the boiler feedwater is long. The chloride ion concentration may be estimated based on the latest measured values of each parameter and the ratio data of chloride ions and sulfate ions in the boiler feedwater. That is, the chloride ion concentration may be estimated based on the latest data after the measured water quality information and the ratio data of chloride ions and sulfate ions are updated at the update timing.
[0034] In the above formulas (1) and (2), the ions that contribute to the total hardness of the boiler feedwater are assumed to be only calcium ions, and all "other cations" other than the cations that contribute to the total hardness of the boiler feedwater are assumed to be sodium ions. The ions that contribute to the acid consumption of the boiler feedwater are assumed to be CO3 2- and HCO3 -and "other anions" other than those contributing to acid consumption in the boiler feedwater are taken to be chloride ions and sulfate ions, the following equations (3) and (4) are obtained. The water quality information estimation unit of the control unit 2 may calculate the chloride ion concentration from the following equations (3) and (4) and the ratio of chloride ions and sulfate ions. By solving the simultaneous equations of the following equations (3) and (4), the chloride ion concentration can be calculated with high accuracy. Ca 2+ Charge of +Na + Charge of CO3 2- Charge of +HCO3 - Charge of +Cl - Charge of +SO4 2- Charge of (3) Electrical conductivity of boiler feed water = Ca 2+ Electrical conductivity of +Na + Electrical conductivity of +CO3 2- Electrical conductivity of +HCO3 - Electrical conductivity of +Cl - Electrical conductivity of +SO4 2- Electrical conductivity of...(4) Here, the charge of each ion in the above formula (3) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the above formula (4) is the concentration of each ion (mg / L) × conductivity per 1 mg / L ((μS / cm) / (mg / L)).
[0035] The blow rate calculation unit of the control unit 2 calculates the blow rate for each measured water quality information and each estimated water quality information based on the measured water quality information obtained by the boiler feedwater sensor 1 and the estimated water quality information estimated by the water quality information estimation unit. After that, the blow rate calculation unit of the control unit 2 selects the case where the blow rate is the highest and sets the blow rate. The set blow rate is sent to the blow water flow rate adjustment unit. The measured water quality information of the boiler feedwater used to calculate the blow rate is, for example, electrical conductivity (μS / cm) and acid consumption (mg / L). The estimated water quality information of the boiler feedwater used to calculate the blow rate is, for example, chloride ions. The blow rate is calculated based on the reference values of the measured water quality information and estimated water quality information stored in the memory unit. For example, when calculating based on electrical conductivity, the measured value of electrical conductivity divided by the reference value of electrical conductivity becomes the blow rate based on electrical conductivity. The highest value among the blow rates calculated for each parameter is set as the blow rate.
[0036] The blow rate calculation section of the control section 2 may set the blow rate continuously over time based on the measured water quality information measured continuously over time by the boiler feedwater sensor 1 and the estimated water quality information estimated by the water quality information estimation section.
[0037] The blow water flow rate adjustment section of the control section 2 calculates the blow water flow rate (boiler feed water flow rate × blow rate) based on the boiler feed water flow rate measured by the boiler feed water flow meter 4 and the blow rate set by the blow rate calculation section, and controls the opening of the blow water flow rate adjustment valve 3.
[0038] The opening degree of the blow water flow rate regulating valve 3 is adjusted by the control of the blow water flow rate adjusting section of the control section 2. The blow water flow rate regulating valve 3 is provided midway through the piping 31 connected to the boiler 30. A known blow water flow rate regulating valve can be used as the blow water flow rate regulating valve 3. The water that has passed through the blow water flow rate regulating valve 3 passes through the piping 31 and is discharged as blow water.
[0039] The boiler feedwater flowmeter 4 measures the flow rate of the boiler feedwater and sends it to the control unit 2. The boiler feedwater flowmeter 4 is provided midway through the piping 21 that connects the water treatment facility 20 and the boiler 30. There are no particular limitations on the method for measuring the flow rate of the boiler feedwater, and any known method can be used. As the boiler feedwater flowmeter 4, for example, an ultrasonic flowmeter can be used.
[0040] <Boiler control method> The boiler control method according to the first embodiment will be described below. The boiler control method according to the first embodiment sets the blow rate continuously in time based on the measured water quality information of the boiler feedwater obtained by a sensor that continuously measures the measured water quality information of the boiler feedwater in time and the estimated water quality information estimated from the measured water quality information of the boiler feedwater. For example, the boiler control method according to the first embodiment includes a water quality information measurement step of measuring the measured water quality information by the boiler feedwater sensor 1, a boiler feedwater flow rate measurement step of measuring the flow rate of the boiler feedwater using the boiler feedwater flow meter 4, an estimated water quality information estimation step of estimating the estimated water quality information from the measured water quality information obtained in the water quality information measurement step, a blow rate setting step of setting the blow rate from the measured water quality information of the boiler feedwater and the estimated water quality information, and a blow water flow rate adjustment step of adjusting the blow water flow rate from the set blow rate and the flow rate of the boiler feedwater. Each step will be described below.
[0041] (Water quality information measurement process) In the water quality information measurement process, the boiler feedwater sensor 1 measures the measured water quality information of the boiler feedwater after the raw water is treated by the water treatment facility 20. For example, a portion of the boiler feedwater is obtained from a pipe 22 branched off from a boiler feedwater pipe 21, and various measurements are performed. The measured water quality information obtained by the measurements includes, for example, pH, electrical conductivity, total hardness, and acid consumption.
[0042] (Boiler feedwater flow rate measurement process) In the boiler feedwater flow rate measuring step, the flow rate of the boiler feedwater after the raw water is treated in the water treatment facility 20 is measured by the boiler feedwater flow meter 4 .
[0043] (Estimated water quality information estimation process) In the estimated water quality information estimation step, the estimated water quality information is estimated based on the water quality information measured by the boiler feedwater sensor 1. The estimated water quality information is not particularly limited, but is, for example, chloride ion concentration. Here, an example of a method for calculating chloride ion concentration as the estimated water quality information will be described.
[0044] When estimating the chloride ion concentration in the boiler feedwater, for example, the chloride ion concentration is estimated based on the pH, electrical conductivity, total hardness, and acid consumption of the boiler feedwater. Estimated water quality information may be estimated continuously over time from measured water quality information measured continuously over time by the boiler feedwater sensor 1.
[0045] In the estimated water quality information estimation step, the method of estimating the chloride ion concentration in the boiler feedwater based on the pH, electrical conductivity, total hardness, and acid consumption of the boiler feedwater is not particularly limited. For example, the chloride ion concentration may be estimated by using an equation relating to the charge amount of ions in the boiler feedwater and an equation relating to the electrical conductivity of the boiler feedwater.
[0046] "Method of estimating chloride ion concentration in boiler control method" An example of estimating the chloride ion concentration using an equation related to the charge of ions in the boiler feedwater and an equation related to the electrical conductivity of the boiler feedwater will be described below. For example, at pH 7 to 9, anions and cations are electrically equivalent, so the following equation (5) can be used as an equation related to the charge in the feedwater boiler. In addition, the sum of the electrical conductivities of the ions in the boiler feedwater is equal to the measured electrical conductivity of the feedwater boiler, so the following equation (6) can be used as an equation related to the electrical conductivity. The water quality information estimation unit may estimate the chloride ion concentration by using the following equations (5) and (6). Here, the charge of each ion in the following equation (5) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the following equation (6) is the concentration of each ion (mg / L)×conductivity per 1 mg / L ((μS / cm) / (mg / L)). Publicly known data can be used for the equivalent (eq) of each ion and the conductivity (α (coefficient) × equivalent (eq)) per 1 mg / L of each ion. Charge of ions contributing to total hardness + charge of other cations = charge of ions contributing to acid consumption + charge of other anions (5) Electrical conductivity of boiler feed water = Electrical conductivity of cations contributing to total hardness + Electrical conductivity of ions contributing to acid consumption + Electrical conductivity of other cations + Electrical conductivity of other anions (6)
[0047] In the above formulas (5) and (6), the "other cations" other than the cations contributing to the total hardness in the boiler feedwater may all be sodium ions, and the "other anions" other than the anions contributing to the acid consumption in the boiler feedwater may be chloride ions and sulfate ions.
[0048] In the above formulas (5) and (6), it is possible to calculate the calcium concentration from the total hardness by assuming that the only ions that contribute to the total hardness of the boiler feedwater are calcium ions.
[0049] In the above equations (5) and (6), the ions that contribute to the acid consumption of the boiler feed water are CO3 2-and HCO3 - Also, from the pH and acid consumption, CO3 2- and HCO3 - The concentration of CO3 can be calculated from the pH and the acid consumption. 2- and HCO3 - The method for calculating the concentration of CO3 is not particularly limited. For example, the water quality information estimation unit of the control unit 2 may calculate the concentration of CO3 2- , HCO3 - , determine the proportion of H2CO3 present, and calculate the acid consumption and the determined CO3 2- , HCO3 - , H2CO3 and CO3 2- and HCO3 - The concentration of may be calculated.
[0050] Based on pH, CO3 2- , HCO3 - The method for determining the proportion of H2CO3 is not particularly limited, but for example, 2- , HCO3 - A method for determining the amount of H2CO3 present based on data showing the relationship between the amount of H2CO3 and the amount of H2CO3 present can be used.
[0051] In the estimated water quality information estimation step, the ratio of chloride ions and sulfate ions may be determined based on the concentration data of chloride ions and sulfate ions in the boiler feedwater. The concentration data of chloride ions and sulfate ions in the boiler feedwater is not particularly limited, but may be, for example, concentration data of chloride ions and sulfate ions measured by regular measurement separately from the control system according to the first embodiment, or may be publicly known data. The concentration data of chloride ions and sulfate ions in the boiler feedwater may be data obtained by providing a measurement device for acquiring these data in the control system according to the first embodiment and measuring the concentration data using the measurement device. The measurement interval of the chloride ion and sulfate ion concentrations is not particularly limited, and may be, for example, once a month. The measurement interval of the ratio data of chloride ions and sulfate ions in the boiler feedwater may be longer than the measurement interval of the electric conductivity, pH, total hardness, and acid consumption of the boiler feedwater. By shortening the measurement interval of some parameters such as pH and electric conductivity, the chloride ion concentration can be estimated with high accuracy even if the measurement interval of the ratio data of chloride ions and sulfate ions in the boiler feedwater is long. The chloride ion concentration may be estimated based on the latest measured values of each parameter and the data on the proportions of chloride ions and sulfate ions in the boiler feedwater. That is, the chloride ion concentration may be estimated based on the latest data after the measured water quality information and the data on the proportions of chloride ions and sulfate ions are updated at the update timing.
[0052] In the above formulas (5) and (6), the ions that contribute to the total hardness of the boiler feedwater are assumed to be only calcium ions, and all "other cations" other than the cations that contribute to the total hardness of the boiler feedwater are assumed to be sodium ions. The ions that contribute to the acid consumption of the boiler feedwater are assumed to be CO3 2- and HCO3 -and "other anions" other than those contributing to acid consumption in the boiler feedwater are taken to be chloride ions and sulfate ions, the following formulas (7) and (8) are obtained. The water quality information estimation unit of the control unit 2 may calculate the chloride ion concentration from the following formulas (7) and (8) and the ratio of chloride ions and sulfate ions. By using the following formulas (7) and (8), the chloride ion concentration can be calculated with high accuracy. Ca 2+ Charge of +Na + Charge of CO3 2- Charge of +HCO3 - Charge of +Cl - Charge of +SO4 2- Charge of...(7) Electrical conductivity of boiler feed water = Ca 2+ Electrical conductivity of +Na + Electrical conductivity of +CO3 2- Electrical conductivity of +HCO3 - Electrical conductivity of +Cl - Electrical conductivity of +SO4 2- Electrical conductivity of...(8) Here, the charge of each ion in the above formula (7) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the above formula (8) is the concentration of each ion (mg / L) × conductivity per 1 mg / L ((μS / cm) / (mg / L)).
[0053] (Blow rate setting process) In the blow rate setting step, the blow rate is calculated for each measured water quality information and each estimated water quality information based on the measured water quality information obtained in the water quality information measuring step and the estimated water quality information estimated in the estimated water quality information estimating step. After calculating each blow rate, the highest blow rate is selected and the blow rate is set. The measured water quality information of the boiler feedwater used to calculate the blow rate is, for example, electrical conductivity (μS / cm) and acid consumption (mg / L). The estimated water quality information of the boiler feedwater used to calculate the blow rate is, for example, chloride ions. The blow rate is calculated based on the reference values of the measured water quality information and the estimated water quality information. For example, when calculating based on electrical conductivity, the measured electrical conductivity divided by the reference value of electrical conductivity is the blow rate based on electrical conductivity.
[0054] (Blow water flow rate adjustment process) In the blow water flow rate adjustment process, the blow water flow rate (boiler feed water flow rate x blow rate) is calculated based on the boiler feed water flow rate measured in the boiler feed water flow rate measurement process and the blow rate set in the blow rate setting process, and the opening of the blow water flow rate adjustment valve 3 is controlled to adjust the blow water flow rate.
[0055] (Action and effect) In the first embodiment described above, the blow rate can be set continuously and accurately according to the quality of the boiler feed water, so that it can also handle cases where the quality of the boiler feed water fluctuates greatly. This makes it possible to control the blow water flow rate in an economical manner.
[0056] The first embodiment has been described above in detail. The first embodiment may further include a notification unit that issues maintenance information (e.g., information indicating that maintenance of a water treatment facility that treats raw water is required) when the total hardness exceeds a predetermined threshold value (e.g., 1 mg / L). The maintenance information may be, for example, a maintenance time.
[0057] The water treatment facility 20 and the boiler 30 of the first embodiment may be publicly known.
[0058] In the first embodiment, a blow water sensor (not shown) for measuring the pH and electrical conductivity of the blow water may be provided midway along the piping 31. By providing the blow water sensor, the water quality can be continuously monitored. The pH and electrical conductivity of the blow water are preferably measured after the blow water has passed through the blow water flow rate regulating valve 3.
[0059] <Second embodiment> 2, the boiler control system 110 according to the second embodiment includes a boiler feedwater sensor 1, a control unit 2a, a blow water flow rate control valve 3, a boiler feedwater flow meter 4, and a chemical injection facility 5. In the following description, components having the same or similar functions are denoted by the same reference numerals. Components having the same or similar functions may not be described repeatedly.
[0060] (Control unit) The control unit 2a estimates estimated water quality information based on the measured water quality information of the boiler feedwater sent from the boiler feedwater sensor 1. The control unit 2a also sets the blow rate continuously over time based on the measured water quality information measured by the boiler feedwater sensor 1 and the estimated water quality information estimated by the control unit 2a. The control unit 2a is composed of, for example, a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), a communication device, etc.
[0061] The control unit 2a includes an information acquisition unit (not shown) that receives measured water quality information of the boiler feedwater and the flow rate of the boiler feedwater, a memory unit (not shown) that stores the measured water quality information of the boiler feedwater acquired by the information acquisition unit, a water quality information estimation unit (not shown) that estimates estimated water quality information of the boiler feedwater, a blow rate calculation unit (not shown) that calculates the blow rate, a blow water flow rate adjustment unit (not shown) that adjusts the blow water flow rate, and a chemical injection amount adjustment unit (not shown) that sets the chemical injection amount.
[0062] The information acquisition section of the control section 2a receives the measured water quality information sent from the boiler feedwater sensor 1 and the flow rate of the boiler feedwater sent from the boiler feedwater flowmeter 4, and sends them to the memory section.
[0063] The memory section of the control section 2a stores the measured water quality information sent from the boiler feedwater sensor 1 and the flow rate sent from the boiler feedwater flowmeter 4. It sends the stored measured water quality information to the water quality information estimation section or the blow rate calculation section. The memory section of the control section 2a also stores the estimated water quality information of the boiler feedwater estimated by the water quality information estimation section and sends it to the blow rate calculation section. The memory section of the control section 2a stores the reference values of the measured water quality information and the estimated water quality information for calculating the blow rate and sends these reference values to the blow rate calculation section. The memory section of the control section 2a sends the flow rate of the boiler feedwater to the blow water flow rate adjustment section. It also stores the ratio data of chloride ions and sulfate ions in the boiler feedwater as necessary and sends it to the water quality information estimation section.
[0064] The water quality information estimation unit of the control unit 2a estimates another water quality information (estimated water quality information) from the measured water quality information of the boiler feedwater sent from the memory unit. The estimated water quality information is not particularly limited, but is, for example, chloride ion concentration. When the water quality information estimation unit estimates the chloride ion concentration in the boiler feedwater, the water quality information estimation unit of the control unit 2a may estimate the chloride ion concentration based on pH, electrical conductivity, total hardness, and acid consumption. The water quality information estimation unit of the control unit 2a may estimate the estimated water quality information continuously in time from the measured water quality information measured continuously in time by the boiler feedwater sensor 1.
[0065] The method by which the water quality information estimation unit estimates the chloride ion concentration in the boiler feedwater based on the pH, electrical conductivity, total hardness, and acid consumption is not particularly limited. For example, the chloride ion concentration may be estimated by using an equation relating to the charge amount of ions in the boiler feedwater and an equation relating to the electrical conductivity of the boiler feedwater. The chloride ion concentration can be estimated using the above-mentioned method for estimating the chloride ion concentration in the boiler control system.
[0066] The blow rate calculation unit of the control unit 2a calculates the blow rate for each measured water quality information and each estimated water quality information based on the measured water quality information obtained by the boiler feedwater sensor 1 and the estimated water quality information estimated by the water quality information estimation unit. After that, the blow rate calculation unit of the control unit 2a selects the case where the blow rate is the highest and sets the blow rate. The set blow rate is sent to the blow water flow rate adjustment unit. The measured water quality information of the boiler feedwater used to calculate the blow rate is, for example, electrical conductivity (μS / cm) and acid consumption (mg / L). The estimated water quality information of the boiler feedwater used to calculate the blow rate is chloride ions. The blow rate is calculated based on the reference values of the measured water quality information and estimated water quality information stored in the memory unit. For example, when calculating based on electrical conductivity, the measured value of electrical conductivity divided by the reference value of electrical conductivity becomes the blow rate based on electrical conductivity. The highest value among the blow rates calculated for each parameter is set as the blow rate.
[0067] The blow rate calculation section of the control section 2a sets the blow rate continuously over time based on the measured water quality information measured continuously over time by the boiler feedwater sensor 1 and the estimated water quality information estimated by the water quality information estimation section.
[0068] The blow water flow rate adjustment section of the control section 2a calculates the blow water flow rate (boiler feed water flow rate × blow rate) based on the flow rate of the boiler feed water measured by the boiler feed water flow meter 4 and the blow rate set by the blow rate calculation section, and controls the opening of the blow water flow rate adjustment valve 3.
[0069] The chemical injection amount adjustment unit of the control unit 2a calculates the chemical concentration in the boiler feedwater according to the set blow rate so as to satisfy the chemical concentration required in the concentrated boiler boiler water. The chemical injection amount adjustment unit of the control unit 2a sets the chemical injection amount for the boiler feedwater by multiplying the calculated chemical concentration by the water flow rate of the boiler feedwater. The chemical injection amount adjustment unit of the control unit 2a controls the chemical injection equipment 5 according to the set chemical injection amount.
[0070] The opening degree of the blow water flow rate regulating valve 3 is adjusted by the control of the blow water flow rate adjusting section of the control section 2a. The blow water flow rate regulating valve 3 is provided midway through the piping 31 connected to the boiler 30. A known blow water flow rate regulating valve can be used as the blow water flow rate regulating valve 3. The water that has passed through the blow water flow rate regulating valve 3 passes through the piping 31 and is discharged as blow water.
[0071] The boiler feedwater flowmeter 4 measures the flow rate of the boiler feedwater and sends it to the control unit 2a. The boiler feedwater flowmeter 4 is provided midway through the pipe 21 that connects the water treatment facility 20 and the boiler 30. There are no particular limitations on the method for measuring the flow rate of the boiler feedwater, and any known method can be used. As the boiler feedwater flowmeter 4, for example, an ultrasonic flowmeter can be used.
[0072] The chemical injection equipment 5 injects a chemical into the boiler feed water via the pipe 22a under the control of the chemical injection amount adjustment unit of the control unit 2a. The chemical injection equipment 5 may be a known one.
[0073] <Boiler control method> A boiler control method according to the second embodiment will be described below. The boiler control method according to the second embodiment sets the blow rate continuously in time based on the measured water quality information of the boiler feedwater obtained by a sensor that continuously measures the measured water quality information of the boiler feedwater in time and the estimated water quality information estimated from the measured water quality information, and adjusts the blow water flow rate. The boiler control method according to the second embodiment includes a water quality information measurement step of acquiring measured water quality information by the boiler feedwater sensor 1, a boiler feedwater flow rate measurement step of measuring the flow rate of the boiler feedwater using the boiler feedwater flow meter 4, an estimated water quality information estimation step of estimating the estimated water quality information from the measured water quality information obtained in the water quality information measurement step, a blow rate setting step of setting the blow rate from the measured water quality information of the boiler feedwater and the estimated water quality information, a blow water flow rate adjustment step of adjusting the blow water flow rate from the set blow rate and the flow rate of the boiler feedwater, and a chemical injection amount setting step of setting the chemical injection amount from the set blow rate and the flow rate of the boiler feedwater. Each step will be described below.
[0074] (Water quality information measurement process) In the water quality information measurement process, the boiler feedwater sensor 1 measures the measured water quality information of the boiler feedwater after the raw water is treated by the water treatment facility 20. For example, a portion of the boiler feedwater is obtained from a pipe 22 branched off from a boiler feedwater pipe 21, and various measurements are performed. The measured water quality information obtained by the measurements includes, for example, pH, electrical conductivity, total hardness, and acid consumption.
[0075] (Boiler feedwater flow rate measurement process) In the boiler feedwater flow rate measuring step, the flow rate of the boiler feedwater after the raw water is treated in the water treatment facility 20 is measured by the boiler feedwater flow meter 4 .
[0076] (Estimated water quality information estimation process) In the estimated water quality information estimation step, the control unit 2a estimates the estimated water quality information based on the measured water quality information measured by the boiler feedwater sensor 1. The estimated water quality information is not particularly limited, but is, for example, chloride ion concentration. Here, an example of a method for calculating chloride ion concentration as the estimated water quality information will be described.
[0077] When estimating the chloride ion concentration in the boiler feedwater, for example, the chloride ion concentration is estimated based on the pH, electrical conductivity, total hardness, and acid consumption of the boiler feedwater. Estimated water quality information may be estimated continuously over time from measured water quality information measured continuously over time by the boiler feedwater sensor 1.
[0078] In the estimated water quality information estimation step, the method of estimating the chloride ion concentration in the boiler feedwater based on the pH, electrical conductivity, total hardness, and acid consumption of the boiler feedwater is not particularly limited. For example, the chloride ion concentration may be estimated by using an equation relating to the charge amount of ions in the boiler feedwater and an equation relating to the electrical conductivity of the boiler feedwater. The chloride ion concentration can be estimated using the method of estimating the chloride ion concentration in the boiler control method described above.
[0079] (Blow rate setting process) In the blow rate setting step, the control unit 2a calculates the blow rate based on the measured water quality information obtained in the water quality information measuring step and the estimated water quality information estimated in the estimated water quality information estimating step. After calculating the blow rate, the case where the blow rate is the highest is selected and the blow rate is set. The measured water quality information of the boiler feed water used to calculate the blow rate is, for example, electrical conductivity (μS / cm) and acid consumption (mg / L). The estimated water quality information of the boiler feed water used to calculate the blow rate is chloride ions. The blow rate is calculated based on the measured water quality information and the reference value of the estimated water quality information. For example, when calculating based on electrical conductivity, the measured value of electrical conductivity divided by the reference value of electrical conductivity becomes the blow rate based on electrical conductivity.
[0080] (Blow water flow rate adjustment process) In the blow water flow rate adjusting process, the control unit 2a calculates the blow water flow rate (boiler feed water flow rate × blow rate) based on the boiler feed water flow rate measured in the boiler feed water flow rate measuring process and the blow rate set in the blow rate setting process, controls the opening of the blow water flow rate adjusting valve 3, and adjusts the blow water flow rate.
[0081] (Medicine injection amount setting process) In the chemical dosing amount setting process, the control unit 2a calculates the chemical concentration from the blow rate set in the blow rate setting process so as to satisfy the required chemical concentration. The control unit 2a calculates the chemical dosing amount to be added by multiplying the calculated chemical concentration by the feedwater volume. The control unit 2a controls the chemical dosing equipment 5 according to the calculated chemical dosing amount so that the chemical concentration in the boiler water satisfies the required concentration.
[0082] (Action and effect) In the boiler control system and boiler control method of the second embodiment described above, the blow rate can be set continuously with high accuracy according to the water quality of the boiler feed water, so that it can also handle cases where the water quality of the boiler feed water fluctuates greatly. This enables economical control of the blow water flow rate. In addition, it also enables economical setting of the chemical injection amount based on the continuously set blow rate.
[0083] The boiler control system and the boiler control method according to the present embodiment have been described in detail above. The boiler control system and the boiler control method according to the present disclosure are not limited to the above-described embodiment, and various modifications and changes are possible within the gist of the present invention. EXAMPLES
[0084] The present invention will be described in detail below with reference to examples, but the present invention is not limited to these.
[0085] (Estimation of chloride ion concentration) The pH of the boiler feedwater (glass electrode method, measurement interval: 1 second), electrical conductivity (AC two-electrode method, measurement interval: 1 second), total hardness (colorimetry, measurement interval: 10 minutes), and acid consumption (neutralization titration method, measurement interval: 10 minutes) were measured continuously over time for each parameter, and the chloride ion concentration was estimated continuously over time from the above equations (3) and (4) and separately obtained data on chloride ion concentration and sulfate ion concentration (monthly data obtained from a soft water quality analysis at a factory in Thailand, i.e., measurement interval: 1 month). The estimated chloride ion concentration is shown in Figure 3. The actually measured chloride ion concentration is also shown in Figure 3. In the above equations (3) and (4), calcium (Ca + The CO3 ion concentration was calculated from the table in the Japanese Chemical Journal, Vol. 76, No. 11, p. 104. 2- , HCO3 - The ratio of H2CO3 present was determined, and the ratio of CO3 2- Concentration and HCO3 -The concentration was calculated. The sulfate ion concentration was converted to the chloride ion concentration from the ratio of the chloride ion concentration to the sulfate ion concentration, and the sodium ion and chloride ion that satisfy the above formula (3) and formula (4) were calculated. The calcium ion equivalent was set to 22 g / eq, and the conductivity per 1 mg / L of calcium ion was set to 2.70 ((μS / cm) / (mg / L)). The chloride ion equivalent was set to 35.46 g / eq, and the conductivity per 1 mg / L of chloride ion was set to 2.15 ((μS / cm) / (mg / L)). The sulfate ion equivalent was set to 48.03 g / eq, and the conductivity per 1 mg / L of sulfate ion was set to 1.67 ((μS / cm) / (mg / L)). The carbonate ion equivalent was set to 30.01 g / eq, and the conductivity per 1 mg / L of calcium ion was set to 2.40 ((μS / cm) / (mg / L)). The bicarbonate ion equivalent was set to 61.02 g / eq, and the conductivity per 1 mg / L of bicarbonate ion was set to 0.73 ((μS / cm) / (mg / L)). Here, the sodium ion equivalent was set to 23 g / eq, and the conductivity per 1 mg / L of sodium ion was set to 2.18 ((μS / cm) / (mg / L)).
[0086] (Calculation of blow rate) The blow rate was calculated based on the continuously measured acid consumption and electrical conductivity, and the continuously estimated chloride ion concentration. Specifically, the blow rate of acid consumption was calculated by dividing the measured acid consumption in the boiler feedwater by the standard value of acid consumption. The blow rate of electrical conductivity was calculated by dividing the measured electrical conductivity in the boiler feedwater by the standard value of electrical conductivity. The blow rate of chloride ion concentration was calculated by dividing the estimated chloride ion concentration in the boiler feedwater by the standard value of chloride ion concentration. Of these, the highest value was set as the blow rate. The results are shown in Figure 4. Figure 4 also shows the blow rate when set using the conventional method.
[0087] As shown in Fig. 3, the chloride ion concentration estimated using the boiler control system of the present disclosure coincided with the actually measured chloride ion concentration with high accuracy. Furthermore, as shown in Fig. 4, the conventional blow rate had been set to the highest value for more than a year. In the boiler control system of the present disclosure, the estimated water quality information (here, the chloride ion concentration) is calculated with high accuracy, so the blow rate can be calculated continuously and accurately over time. From the above, it was confirmed that the boiler control system of the present disclosure can set the blow rate continuously and with higher accuracy than the conventional system. [Industrial Applicability]
[0088] According to the boiler control system and boiler control method disclosed herein, even when the quality of the raw water is unstable, the blow rate can be calculated with high accuracy, and therefore, the system and method have high industrial applicability. [Explanation of symbols]
[0089] 1 boiler feed water sensor, 2 control unit, 3 blow water flow control valve, 4 boiler feed water flow meter, 5 chemical injection equipment, 20 water treatment equipment, 21, 22 piping, 30 boiler, 31 piping 100 boiler control system.
Claims
1. Equipped with a sensor that continuously measures the water quality information of the boiler feedwater over time, A blow rate is set continuously over time based on measured water quality information, which is the water quality information obtained by the sensor, and estimated water quality information estimated from the measured water quality information; The measured water quality information is pH, electrical conductivity, total hardness, and acid consumption, The estimated water quality information is a chloride ion concentration, A boiler control system that estimates the chloride ion concentration based on the pH, the electrical conductivity, the total hardness, and the acid consumption.
2. The boiler control system according to claim 1 , wherein the timing of updating the measured water quality information and the estimated water quality information used to set the blow rate is set for each type of the measured water quality information.
3. The boiler control system according to claim 1 , wherein the measurement intervals of the electrical conductivity and the pH are shorter than the measurement intervals of the total hardness and the acid consumption.
4. 2. The boiler control system according to claim 1, wherein the chloride ion concentration is calculated from the pH, the electrical conductivity, the total hardness, and the acid consumption amount using an equation relating to the charge amount of ions in the boiler feedwater and an equation relating to the electrical conductivity of the boiler feedwater.
5. all other cations that are cations other than the cations that contribute to the total hardness in the boiler feedwater are sodium ions; 5. The boiler control system according to claim 4, wherein the chloride ion concentration is estimated by using the following formulas (1) and (2), where the other anions in the boiler feedwater other than the anions that contribute to the acid consumption amount are chloride ions and sulfate ions. Charge of ions contributing to total hardness + charge of other cations = charge of ions contributing to acid consumption + charge of other anions (1) Electrical conductivity of boiler feed water = Electrical conductivity of cations contributing to total hardness + Electrical conductivity of ions contributing to acid consumption + Electrical conductivity of other cations + Electrical conductivity of other anions (2) Here, the charge of each ion in the above formula (1) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the above formula (2) is the concentration of each ion (mg / L) x conductivity per 1 mg / L ((μS / cm) / (mg / L)).
6. Calculating a calcium ion concentration from the total hardness assuming that calcium ions are the only ions contributing to the total hardness; Based on the pH, 3 2- , HCO 3 - , H 2 CO 3 Determine the proportion of The ions that contribute to the acid consumption are CO 3 2- and HCO 3 - As, From the ratio and the amount of acid consumed, CO 3 2- and HCO 3 - Calculate the concentration of determining a ratio of the chloride ions and the sulfate ions based on concentration data of the chloride ions and the sulfate ions in the boiler feedwater; 6. The boiler control system according to claim 5, wherein the chloride ion concentration is estimated from the following formula (3) and formula (4) and the ratio of the chloride ions and sulfate ions: Ca 2+ Charge of +Na + Charge of = CO 3 2- Charge of + HCO 3 - Charge of +Cl - Charge of +SO 4 2- Charge of ... (3) Electrical conductivity of boiler feed water = Ca 2+ Electrical conductivity of +Na + Electrical conductivity of +CO 3 2- Electrical conductivity of + HCO 3 - Electrical conductivity of +Cl - Electrical conductivity of +SO 4 2- Electrical conductivity of... (4) Here, the charge of each ion in the above formula (3) is the concentration of each ion (mg / L) / 1 equivalent (g / eq), and the electrical conductivity of each ion in the above formula (4) is the concentration of each ion (mg / L) x conductivity per 1 mg / L ((μS / cm) / (mg / L)).
7. A boiler control system as described in claim 6, wherein the measurement interval for concentration data of chloride ions and sulfate ions in the boiler feedwater to determine the ratio of chloride ions and sulfate ions is longer than the respective measurement intervals for the electrical conductivity, the pH, the total hardness, and the acid consumption.
8. The boiler control system according to any one of claims 1 to 7, wherein maintenance information is issued when the total hardness exceeds a predetermined threshold value.
9. The boiler control system according to any one of claims 1 to 8, further comprising a step of setting an amount of chemicals to be fed to the boiler feed water in accordance with the blow rate.
10. A blow rate is set continuously over time based on measured water quality information, which is water quality information obtained by a sensor that continuously measures water quality information of boiler feedwater over time, and estimated water quality information estimated from the measured water quality information; The measured water quality information is pH, electrical conductivity, total hardness, and acid consumption, The estimated water quality information is a chloride ion concentration, The boiler control method includes estimating the chloride ion concentration based on the pH, the electrical conductivity, the total hardness, and the acid consumption.
Citation Information
Patent Citations
Blow control method in boiler water system
JP2009030817A
Boiler water quality management device and boiler water quality management method
JP2009139047A
Control method, boiler control device, and program
JP2016031154A
Steam boiler system
US4938174A