Power plant for generating power for an electric grid, comprising an electrolyser powered by the electric grid - Patent application
By integrating an electrolyzer to convert excess electrical energy into hydrogen and using the gas turbine as a secondary fuel, the power plant achieves flexible power adjustment and efficient energy utilization, addressing efficiency and safety challenges.
Patent Information
- Application Number
- JP2023545736
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-02-25
- Filing Date
- 2022-02-24
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-02-24
Smart Images

Figure 0007584670000001 
Figure 0007584670000002 
Figure 0007584670000003
Abstract
Description
[Technical field]
[0001] The subject matter disclosed herein relates to a power plant comprising a gas turbine, a steam turbine, and an electrolyzer disposed to be electrically coupled to an electrical grid. [Background technology]
[0002] Power plants for generating electricity can vary and are typically connected to a local or national electrical grid to which the plants provide electrical energy.
[0003] The total amount of power provided by power generating plants to the electric grid must ensure that power supply is balanced with power demand, for example to ensure grid stability and continuity of grid operability. For example, the activity of managing and balancing the flow of power through a national grid is known as energy dispatching and is typically managed by a grid operator; in Italy, the central grid operator is Terna.
[0004] Power plants that can adjust their power output according to the demand for electricity are called "dispatchable power plants". Dispatchable power plants provide electricity for various periods of time, offering long and / or short term offers to grid operators depending on their start-up times and flexibility. For example, gas turbine or gas engine power plants have short start-up times and can be operated for many hours a day or only a few hours a year, and are started and shut down multiple times for short start-up transients.
[0005] In contrast, power plants that do not have short startup transients are usually designed for continuous operation. Examples of plants that may take days to start and shut down are nuclear plants or combined cycle (CC) plants. A combined cycle plant includes a gas turbine to generate electricity, a steam turbine to generate electricity, and a steam generating heat exchanger that uses hot exhaust gases from the gas turbine to generate steam for the steam turbine, and the gas turbine is fed with a gas fuel, often natural gas. For example, the gas turbine may generate 75% of the CC power output and the steam turbine may generate 25% of the CC power output.
[0006] In conventional combined cycle plants, the power output of the steam turbine can be slightly reduced, for example reaching a steam turbine power reduction of 30%, by steam turbine sectioning or by regulating the steam generated by the steam generating heat exchanger and delivered to the steam turbine. Steam turbine sectioning is performed by closing one or more parts of the turbine inlet annulus so that the steam passes only through one or more circular sectors. However, sectioning leads to additional dissipation due to the ventilation losses of the blades drawing the steam, and to an asymmetry of the thrust forces on the turbine wheels. Steam regulation is typically performed by using a "sliding pressure" control, i.e. by reducing the evaporating pressure in the heat exchanger, also called the "heat recovery steam generator" (HRSG). However, sliding pressure control does not work when the energy demand changes suddenly due to long transients.
[0007] If a larger reduction in power output from the CC plant is desired, for example a 25% reduction in combined cycle power output, the steam turbine is shut down (bypassed) and hot exhaust heat is wasted from the gas turbine resulting in reduced efficiency of the combined cycle. During shutdown, the steam turbine is decoupled from the HRSG, for example by a steam bypass system that dumps the steam to a condenser, or by an HRSG bypass stack that vents the hot exhaust gases to the atmosphere. These off-design conditions can occur during mismatches between energy generation and energy demand on the power grid, specifically when production exceeds demand, which typically occurs at night as manufacturing operations generally shut down.
[0008] For example, from EP 2503114 it is known to use energy, including surplus energy from power plants, by producing hydrogen through electrolysis and storing the hydrogen in large tanks for future use, for example for refuelling vehicles (including but not limited to cars, trucks, trains, ships, aircraft, etc.) - which are becoming more common. However, storing large amounts of hydrogen for long periods of time raises safety issues regarding possible explosions and / or leakage into the atmosphere. Therefore, in order to solve these problems: Summary of the Invention
[0009] It is desirable to increase the flexibility of combined cycle power plants with respect to the power they provide to the electric grid. In particular, the increased flexibility should be obtained in a relatively easy and inexpensive manner without adding safety hazards to the power plant. More particularly, the desired solution should be relatively easily applicable to power plants that are already installed and in operation.
[0010] According to one aspect, the subject matter disclosed herein relates to a power plant for generating electrical power to be provided to an electrical grid, the power plant including a gas turbine, a steam turbine, and at least one electrolyzer designed to use the electrical power to generate hydrogen from water, the electrolyzer being arranged to be selectively coupled to the electrical grid, the hydrogen being temporarily stored in a tank internal to the power plant, the volume of the tank being very small, theoretically zero, as will become apparent from the detailed description. When the energy production of the power plant exceeds the energy demand of the grid, the electrolyzer is connected to the electrical grid, thereby usefully consuming electrical power not desired by the grid operator, and generating hydrogen to be used by the gas turbine engine as a secondary fuel together with the primary fuel. Since the surplus energy is consumed locally at the plant for useful purposes, the gas turbine and / or steam turbine can be permanently maintained in the same or nearly the same operating condition, preferably in an exact or near optimal operating condition.
[0011] Advantageously, coupling / decoupling of the electrolyser to / from the electric grid is performed under the control of a control unit, capable of storing and using predefined rules and / or of receiving and using requests. [Brief description of the drawings]
[0012] A more complete understanding of the disclosed embodiments and their attendant advantages will be readily obtained as the same becomes better understood by reference to the following detailed description when considered in conjunction with the accompanying drawings, in which: [Figure 1] FIG. 1 shows a general schematic diagram of a first embodiment of a power plant connected to an electric grid and comprising an electrolyser for generating electrical power. [Diagram 2] FIG. 2 shows a detailed schematic diagram of a second embodiment of a power plant comprising an electrolyser. [Diagram 3] FIG. 3 shows a detailed schematic diagram of a third embodiment of a power plant comprising an electrolyser. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] The subject matter disclosed herein relates to power plants for generating electrical power provided to an electrical grid that are capable of reducing the amount of power provided to the grid by the plant without reducing overall cycle efficiency.
[0014] During periods of low energy demand, e.g., overnight, grid operators may require plant operators to significantly reduce the power they receive from their plants, e.g., by 10-40%. Typically, according to the prior art, to reduce power output, plant operators modify turbine operating conditions, which results in a relative reduction in overall cycle efficiency.
[0015] To achieve a reduction in the power provided by the plant to the grid and to avoid a reduction in the efficiency of the plant, in accordance with the subject matter disclosed herein, the turbines are preferably maintained at their rated capacity, i.e., maximum power production (by both the gas and steam turbines), and one or more electrical loads are connected to the grid to locally consume power that is not wanted by the grid operator at a particular time. The electrical loads have a useful purpose, i.e., to generate fuel, specifically hydrogen, which is a secondary fuel (the turbines of a power plant may burn a primary fuel, e.g., natural gas, and a secondary fuel, i.e., hydrogen), and the machines for generating hydrogen from water and electricity are known as "electrolyzers" or "electrolytic cells".
[0016] Reference will now be made in detail to the embodiments of the present disclosure, which are illustrated in the drawings.
[0017] The embodiments are provided to illustrate the present disclosure, not to limit it, and in fact, it will be apparent to those skilled in the art that various modifications and variations can be made to the present disclosure without departing from the scope or spirit of the present disclosure.
[0018] With non-limiting reference to FIG. 1 , a power plant 1000, specifically a combined cycle power plant, is arranged to generate electrical power that is provided to an electrical grid 900, which may be, for example, a national grid or a local grid (e.g., a microgrid or a nanogrid).
[0019] The power plant 1000 includes a gas turbine 110, specifically a compressor for compressing inlet air A, a combustor for receiving a gaseous fuel F, hereinafter also referred to as "primary fuel", typically natural gas, a gaseous hydrogen H, hereinafter also referred to as "secondary fuel", for combusting one or more fuels with an oxidant A, typically air-fuel, and an expander for expanding the combustion gas, the compressor and the expander having a first rotating shaft. The oxidant A is drawn by the compressor through its intake and the expanded combustion gas is discharged through the exhaust outlet of the expander. In general, the combustor can be of the premixed or diffusion type. The gas turbine is configured to selectively burn, such that at some times the combustor burns only the primary fuel and at other times the primary fuel and the secondary fuel, i.e. hydrogen, and may burn only the secondary fuel, i.e. hydrogen, for a very limited time (if any).
[0020] A first generator 120 (included in power plant 1000) is coupled to a first rotating shaft of gas turbine 110 and generates a first electrical power output. As shown in FIG 1, the electrical power output of first generator 120 is arranged to be coupled to electrical grid 900 to supply electrical power to electrical grid 900.
[0021] According to this embodiment, the exhaust outlet of the gas turbine 110, specifically its expander, discharges a hot exhaust gas stream that still has heat capacity that can be utilized by the heat exchanger 300 included in the power plant 1000.
[0022] The heat exchanger 300 is advantageously a heat recovery steam generator (HRSG) coupled to the exhaust outlet of the gas turbine 110 and uses a portion of the heat capacity of the exhaust gases to generate steam, and thus the heat exchanger 300 may also be referred to as a "steam generator". Advantageously, the steam generated by the HRSG is arranged to be delivered to a steam turbine, in particular to a steam inlet of the steam turbine.
[0023] Power plant 1000 additionally includes a steam turbine 210 having a second rotatable shaft to which a second generator 220 (included in power plant 1000) is coupled, which generates a second electrical power output. As shown in FIG. 1 , the electrical power output is arranged to be coupled to electrical grid 900 to provide electrical power to electrical grid 900.
[0024] Furthermore, the power plant 1000 includes at least a first electrolyzer 410 having a first power input arranged to be selectively coupled to the electric grid 900. In other words, the first electrolyzer 410 can be coupled / decoupled to / from the electric grid 900 and receive an electric input from the electric grid 900. Since the surplus energy is consumed locally in the plant for useful purposes, i.e. to generate hydrogen by the at least one electrolyzer 410, the gas turbine 110 and / or the steam turbine 120 can be permanently maintained in the same or nearly the same operating condition (preferably exactly or nearly optimal operating condition), which means generating the same or nearly the same electric power as the generators 120 and / or 220. FIG. 1 shows a direct connection between the power plant 1000 and the grid 900. However, it is noted that one or more generators of the plant and one or more electrolyzers of the plant can be directly or indirectly connected to the grid. For example, there may be an internal wire to shunt the generator's electrical energy from the grid directly to the electrolyser.
[0025] Preferably, the power plant 1000 comprises a first electric switch 510 positioned between a first electric input of the first electrolyser 410 and the electric grid 900, and a control unit 600 coupled to the first electric switch 510 and arranged to control the switching of the first electric switch 510, e.g. the sending of an input to the first electric switch 510. In particular, the electric switch 510 is arranged to connect the first electrolyser 410 and the electric grid 900 when in a closed state and to disconnect the first electrolyser 410 and the electric grid 900 when in an open state.
[0026] Preferably, the control unit 600 is arranged to control the switching of the first electric switch 510 according to at least one predetermined rule stored in the control unit 600 .
[0027] For example, the power plant operator may have an agreement with the grid operator whereby the periods during which the electrical switch 510 is closed and the periods during which the electrical switch 510 is open, i.e., the periods during which the electrolyser 410 is coupled to and receiving electrical input from the electrical grid 900 and the periods during which the electrolyser 410 is not coupled to the electrical grid 900, respectively, may be predetermined.
[0028] Advantageously, when the grid's demand for electrical energy from the power plant 1000 is low, the electrolyser 410 is coupled to the electrical grid 900 in such a way that a part of the power supplied by the power plant 1000 to the electrical grid 900 is immediately and locally consumed by the electrolyser 410. In this way, the power plant 1000 can advantageously always be operated at nominal conditions, even if an agreement with the grid operator provides for a reduced power supply to the electrical grid 900 at such conditions.
[0029] Alternatively or additionally, the control unit 600 is arranged to control the switching of the first electric switch 510 according to at least one request received by the control unit 600 .
[0030] For example, the control unit 600 may receive an immediate request from the grid operator or plant operator to reduce the power supply to the electrical grid 900, e.g. due to a sudden decrease in the demand for electrical energy. In this case, the control unit 600 closes the electrical switch 510 to couple the electrolyzer 410 to the electrical grid 900 in such a way that the electrolyzer 410 immediately and locally consumes a portion of the power supplied to the electrical grid 900 by the power generation plant 1000.
[0031] It should be noted that, unlike the discussion above, the power input of the first electrolyser 410 may be connected directly to the output of the generator 120, 220 without first being connected to the power grid 900. In this configuration, the electrical switch 510 is positioned between the output of the generator 120, 220 and the power input of the first electrolyser 410.
[0032] 1 , the power plant 1000 further comprises a second electrolyzer 420 having a second electrical power input selectively coupled to the electrical grid 900. In other words, the second electrolyzer 420 can connect to the electrical grid 900 to receive a second electrical input from the electrical grid 900. It should be noted that the second electrolyzer 420 can be the same as the first electrolyzer 420 or can be different.
[0033] Preferably, the power plant 1000 comprises a second electric switch 520 positioned between a first electric input of the second electrolyser 420 and the electric grid 900, and a control unit 600 coupled to the second electric switch 520 and arranged to control the switching of the second electric switch 520, e.g. the sending of an input to the second electric switch 520. In particular, the electric switch 210 is arranged to connect the second electrolyser 420 and the electric grid 900 when in a closed state and to disconnect the second electrolyser 420 and the electric grid 900 when in an open state.
[0034] Preferably, the control unit 600 is arranged to control the switching of the second electric switch 520 according to at least one predetermined rule stored in the control unit 600 .
[0035] Alternatively or additionally, the control unit 600 is arranged to control the switching of the second electric switch 520 according to at least one request received by the control unit 600 .
[0036] It should be noted that the control unit 600 coupled to the first electrical switch 510 and the control unit 600 coupled to the second electrical switch 520 can be the same control unit. In other words, the control unit 600 is arranged to control the first electrical switch 520 and the second electrical switch 520. Figure 1 shows the switches 510 and 520 assembled in a single switching arrangement 500.
[0037] Advantageously, the control unit 600 can control the first electric switch 510 and the second electric switch 520 in different ways and with different control logics, for example according to predefined rules stored in the control unit 600 or according to at least one request received by the control unit 600. For example, the control unit 600 can close the first electric switch 510 to couple the first electrolyser 410 with the electric grid 900 and open the second electric switch 520 in such a way that the second electrolyser 420 does not receive an electric input from the electric grid 900. In this way, the power immediately consumed by the power plant 1000, in particular by the electrolyzers 410 and 420, from the electric grid 900 can be modulated in at least four different ways. - Open the first electrical switch 510 and open the second electrical switch 520: both the first electrolyser 410 and the second electrolyser 420 are disconnected from the electrical grid 900. - Open the first electric switch 510 and close the second electric switch 520: the first electrolytic cell 410 is connected to the electric grid 900 and the second electrolytic cell 420 is disconnected from the electric grid 900. - Close the first electrical switch 510 and open the second electrical switch 520: the first electrolytic cell 410 is disconnected from the electrical grid 900 and the second electrolytic cell 420 is connected to the electrical grid 900. - The first electrical switch 510 is closed and the second electrical switch 520 is closed: both the first electrolyser 410 and the second electrolyser 420 are connected to the electrical grid 900.
[0038] Advantageously, the power plant 1000 may have additional electrolysers with respective electrical switches selectively coupled to the electrical grid 900 by the control unit 600 to allow finer modulation of the power immediately and locally consumed by the power plant 1000.
[0039] It should be noted that since the electrolysis performed by the electrolyzers requires water as well as electrical power, the electrolyzers 410 and / or 420 are also fluidly connected to a water source providing a water flow in addition to the electrical input provided by the electrical grid 900. The source of the water flow may be external to the power plant 1000 and may vary depending on the configuration of the plant or the amount of water required.
[0040] The power plant 1000 further comprises a tank 800 for storing hydrogen produced by the first electrolyser 410 and by the second electrolyser 420 (if present) and combusted (if necessary) by the gas turbine 110, the storage of hydrogen being preferably performed at ambient temperature (e.g. in the range of -10°C to +40°C) and the storage of hydrogen being preferably performed at a relatively low pressure, e.g. in the range of 30 bar to 100 bar, although it should be noted that the pressure fluctuations of the tank 800 may be, for example, 5 to 20 bar depending on the particular embodiment. From the perspective of temporary storage and local use of hydrogen, the tank 800 may be very small and, theoretically, its capacity may be zero, since hydrogen may be used by the combustor as soon as it is produced by the electrolyser. Typically, the tank is fluidly coupled only to the electrolyser for receiving hydrogen and to the combustor of the turbine for sending hydrogen, such coupling may be controlled through valves.
[0041] A control unit, which may advantageously correspond to the already mentioned control unit 600, may be arranged to control the primary and secondary fuel flows to the gas turbine 110, for example through one or more valves. Preferably, the control of the fuel flow or flows is performed according to one or more predefined rules stored in the control unit. This control unit may further be arranged to check the hydrogen level in the tank 800 (which may correspond to the hydrogen pressure in the tank), based on which the control unit may decide to issue an alarm and / or to appropriately adjust the fuel flow or flows.
[0042] As already foreseen, the tank 800 has a limited capacity. Its capacity is sufficient, and typically exactly sufficient, to guarantee operation of the gas turbine 110 for a predetermined time with a predetermined ratio of secondary and primary fuel. Advantageously, the predetermined time is in the range 2-20 minutes, but it should be noted that the predetermined period can be selected to guarantee smooth operation of the combustor even in the case where fluctuations in the primary and secondary fuel flows occur, taking into account the speed of the flow control valves. Advantageously, the predetermined ratio is in the range 15-25% by weight. For example, in a 12 MW power plant designed to burn CH4 and H2, if a hydrogen tank guarantees operation of the combustor for 5 minutes with a mixture ratio of about 20%, the tank should be about 25 m 3 and the pressure in the tank may vary from, for example, 30 bar to, for example, 40 bar.
[0043] According to a second embodiment 2000 of the power plant shown in Figure 2 (conceptually similar to the plant of Figure 1), the power plant further comprises a heat exchanger 2720 for heating the water stream W and producing a heated water stream that is fed to at least the first electrolyser 2410. The heat exchanger 2720 increases the efficiency of the electrolyser and allows the use of medium to high temperature electrolysers fed by the heated water stream produced by the heat exchanger 2720.
[0044] It should be noted that the heated water stream W delivered to the electrolyzer 2410 can be a water stream, a steam stream, or a mixed water vapor stream depending on the type of electrolyzer used, e.g., an alkaline cell, a proton exchange membrane (PEM) cell, or a solid oxide electrolyzer cell (SOEC).
[0045] With non-limiting reference to FIG. 2, the heat exchanger 2720 receives heat from the heat recovery steam generator 2300 and uses this heat to heat the water stream W that is delivered to the electrolyzer 2410 .
[0046] In particular, the heat received from the heat recovery steam generator 2300 is in the form of a hot water stream, in particular a steam stream, for example a steam stream extracted between the HRSG evaporator 2320 and the HRSG superheater 2310. In particular, the power plant 1000 comprises a valve 2315 downstream of the evaporator 2320, which is adapted to divert a portion of the steam stream of the steam turbine engine, for example 1-2%, to the heat exchanger 2720. Once the extracted stream has passed through the heat exchanger 2720 to give up heat to the water stream W fed to the electrolyser 2410, the extracted stream is reintroduced into the steam cycle, typically in a condensed state. Advantageously, the extracted stream is mixed with the outlet stream of the steam turbine 2210 before entering the condenser 2230.
[0047] According to a third embodiment 3000 of a power plant shown in FIG. 3 (which is conceptually similar to the plants of FIGS. 1 and 2), a heat exchanger 3720 receives heat from a heat recovery steam generator 3300 and uses this heat to heat a water stream W that is fed to an electrolyzer 3410.
[0048] Preferably, heat from the heat recovery steam generator 3300 is generated by utilizing the residual heat capacity of the exhaust gas EG before it is discharged to the atmosphere. This is accomplished by passing the exhaust gas EG through a water stream W that is delivered to an electrolyzer 3410 in the economizer 3330 of the heat recovery steam generator 3300 immediately prior to discharging it to the atmosphere. Note that as shown in FIG. 3, the heat exchanger 3720 may receive heat both by utilizing the residual heat capacity of the exhaust gas EG and by diverting a portion of the steam flow of the steam turbine engine.
[0049] The electrolyzers 2410 and 3410, which receive electrical energy from the grid 900 and a heated water stream, produce as outputs by electrolysis an oxygen stream O and a hydrogen stream H. It should be noted that the oxygen stream O and the hydrogen stream H may not be pure oxygen streams or pure hydrogen streams, in particular the hydrogen stream H may be a mixture of a hydrogen stream and a water stream (in particular steam) and / or a mixture of a hydrogen stream and an oxygen stream.
[0050] Advantageously, the power plants 2000 and 3000 further comprise a heat exchanger 2710 and 3710 by which the hydrogen stream H produced by at least the electrolyzers 2410 and 3410 is cooled. Advantageously, the heat exchanger 2710 and 3710 also serves as a preheater of the water stream W for heating the water stream W using the heat removed from the hydrogen stream H. Advantageously, the heat exchanger 2710 and 3710 is a preheater of the water stream W fed to the heat exchanger 2720 and 3720. In other words, the heat exchanger 2710 and 3710 is arranged to feed a heated water stream to the heat exchanger 2720 and 3720. With non-limiting reference to FIG. 3 , the heat exchanger 3710 is between the economizer 3330 of the heat recovery steam generator 3300 and the heat exchanger 3720.
[0051] Advantageously, the power plants 2000 and 3000 are arranged to deliver a cooled hydrogen stream to the gas turbines 2110 and 3110. In other words, the gas turbines 2110 and 3110 are arranged to receive the hydrogen stream H produced by the electrolyzers 2410 and 3410 and use it as fuel, in particular as a "secondary fuel". In particular, the hydrogen stream H is delivered to the mixers 2850 and 3850, where it is mixed with a gaseous fuel F, i.e. a "primary fuel", typically natural gas, and the hydrogen fuel mixture is then injected into the combustors 2111 and 3111 of the gas turbines 2110 and 3110.
[0052] Advantageously, the amount of hydrogen flow H fed to the mixers 2850 and 3850 can be adjusted by adjusting the valves 286 and 3860, and the amount of gaseous fuel F fed to the mixers 2850 and 3850 can be adjusted by adjusting the valves 2870 and 3870, thus allowing the gas turbines 2110 and 3110 to be replenished with mixtures that may have different amounts of hydrogen and fuel, for example a mixture of 70% fuel and 30% hydrogen, or up to 100% hydrogen flow H produced by the electrolyzers 2410 and 3410.
[0053] The power plants 2000 and 3000 are of the premixed flame combustion type. However, the technical teachings disclosed herein, in particular one or more of the technical features described with reference to Figures 2 and 3, may also be applied to power plants in which diffusion flame combustion occurs.
[0054] Advantageously, the power plants 2000 and 3000 include separators 2810 and 3810 to separate the hydrogen and water streams produced by the electrolyzers 2410 and 3410 to increase the purity level of the hydrogen stream H received by the gas turbines 2110 and 3110.
[0055] Advantageously, the power plants 2000 and 3000 include deoxygenation stations 2820 and 3820 for separating the hydrogen-oxygen streams produced by the electrolyzers 2410 and 3410 to increase the purity level of the hydrogen stream H received by the gas turbines 2110 and 3110.
[0056] Advantageously, the power plants 2000 and 3000 comprise a station for removing water from the hydrogen stream H, for example a gravity separator of entrained liquid water from the electrolyser or dehydration stations 2830 and 3830, in order to separate any water that may remain even after the separators 2810 and 3810, thereby increasing the purity level of the hydrogen stream H received by the gas turbines 2110 and 3110.
[0057] Advantageously, the power plants 2000 and 3000 also comprise tanks 2800 and 3800 for storing hydrogen produced by the electrolyzers 2410 and 3410 (or further electrolyzers as shown for example in FIG. 1). In particular, these tanks are located upstream of the combustors 2111 and 3111 and downstream of the electrolyzers 2410 and 3410, possibly with one or more of the components 2710, 2810, 2820, 2830 shown in FIG. 2 and the components 3710, 3810, 3820, 3830 shown in FIG. 3 fluidly coupled therebetween. It is noted that none of these components are compressors, i.e. machines arranged to increase the pressure of the hydrogen generated by the electrolyzer or electrolyzers.
[0058] Generally, the coupling component ensures that the pressure in the tank is lower (typically by a few percent) than the pressure at the outlet of the electrolyser, in other words, the coupling component provides a (small) pressure drop.
[0059] Furthermore, the coupling components generally result in a tank pressure that is higher (typically by a few percent) than the pressure at the inlet of the combustor, in other words, the coupling components provide a (small) pressure drop.
Claims
1. A power generation plant (1000, 2000, 3000) configured to generate electrical power provided to an electrical grid (900), the power generation plant comprising: a gas turbine (110, 2110, 3110) having a first rotating shaft and configured to combust a primary fuel, the gas turbine (110, 2110, 3110) having an exhaust outlet; a first generator (120, 2120, 3120) coupled to the first rotating shaft, the first generator (120, 2120, 3120) having a first power output; a steam turbine (210, 2210, 3210) having a second rotating shaft, the steam turbine (210, 2210, 3210) having a steam inlet; a second generator (220, 2220, 3220) coupled to the second rotating shaft, the second generator (220, 2220, 3220) having a second power output; a steam generator (300, 2300, 3300) coupled to the exhaust outlet and arranged to deliver steam to the steam inlet; a first electrolytic cell (410, 2410, 3410) having a first power input; a tank (800, 2800, 3800) for storing hydrogen produced by at least the first electrolyzer (410, 2410, 3410) and combusted by the gas turbine (110, 2110, 3110), the first power output of the first generator (120, 2120, 3120) is arranged to be coupled to the electrical grid (900); the second power output of the second generator (220, 2220, 3220) is arranged to be coupled to the electrical grid (900); the first power input of the first electrolytic cell (410, 2410, 3410) is arranged to be selectively coupled to the electrical grid (900); the tank (800, 2800, 3800) is fluidly coupled to the gas turbine (110, 2110, 3110) for selectively burning hydrogen as a secondary fuel as well; a second heat exchanger (2710, 3710) for cooling the hydrogen stream (H) produced by at least the first electrolyzer (2410, 3410) and producing a cooled hydrogen stream; The power plant (1000, 2000, 3000), wherein the power plant (2000, 3000) is arranged to deliver the cooling hydrogen stream to the gas turbine (2110, 3110).
2. The power plant (1000, 2000, 3000) of claim 1, further comprising a control unit (600) arranged to control a primary fuel flow and a secondary fuel flow to the gas turbine (110, 2110, 3110).
3. The power plant (1000, 2000, 3000) of claim 2, wherein the control unit (600) is arranged to verify the hydrogen level in the tank (800, 2800, 3800).
4. 4. The power plant (1000, 2000, 3000) of claim 1, wherein the tank (800, 2800, 3800) has a limited capacity, the limited capacity being sufficient to ensure operation of the gas turbine (110, 2110, 3110) for a predetermined time with a predetermined ratio of the secondary fuel to the primary fuel.
5. The power plant (1000, 2000, 3000) of claim 4, wherein said predetermined time is in the range of 2 to 20 minutes and said predetermined percentage is in the range of 15 to 25% by weight.
6. A first electrical switch (510) coupled between the first power input of the first electrolytic cell (410, 2410, 3410) and the electrical grid (900); The power plant (1000, 2000, 3000) of any one of claims 1 to 5, further comprising: a control unit (600) coupled to the first electric switch (510) and arranged to control switching of the first electric switch (510).
7. 7. The power plant (1000) of claim 6, wherein the control unit (600) is arranged to control switching of the first electric switch (510) according to at least one predetermined rule stored in the control unit (600).
8. 7. The power plant (1000) of claim 6, wherein the control unit (600) is arranged to control switching of the first electric switch (510) according to at least one request received by the control unit (600).
9. The method according to claim 8, further comprising:
9. The power plant (1000) of any one of claims 1 to 8, wherein the second power input of the second electrolyzer (420) is arranged to be selectively coupled to the electrical grid (900).
10. The method of claim 1, further comprising: providing a second electrical switch (520) coupled between the second power input of the second electrolytic cell (420) and the electrical grid (900); 10. The power plant (1000) of claim 9, further comprising: a control unit (600) coupled to the second electric switch (520) and arranged to control switching of the second electric switch (520).
11. 11. The power plant (1000) of claim 10, wherein the control unit (600) is arranged to control the switching of the second electric switch (520) according to at least one predetermined rule stored in the control unit (600).
12. 11. The power plant (1000) of claim 10, wherein the control unit (600) is arranged to control switching of the second electric switch (520) according to at least one request received by the control unit (600).
13. The method further comprises a first heat exchanger (2720, 3720) for heating the water flow (W) and generating a heated water flow, The power plant (2000, 3000) of any one of claims 1 to 12, wherein the power plant is arranged to deliver the heated water stream to at least the first electrolyser (2410, 3410).
14. The power plant (2000, 3000) of claim 13, wherein the first heat exchanger (2720, 3720) is positioned to receive waste heat from the steam generator (2300, 3300).
15. A power plant (2000, 3000) as described in claim 13 or 14, arranged to supply a heated water flow generated by the second heat exchanger (2710, 3710) to the first heat exchanger (2720, 3720).
16. 16. The power plant (2000, 3000) of any one of claims 1 to 15, wherein the gas turbine (2110, 3110) is arranged to receive hydrogen produced by at least the first electrolyzer (2410, 3410) and use it as fuel.
17. 17. The power plant (2000, 3000) of any one of claims 1 to 16, wherein the second heat exchanger (2710, 3710) is arranged to use heat removed from the hydrogen stream (H) to heat a water stream (W) and generate a heated water stream.
Citation Information
Patent Citations
System and method for extending minimum turn down load of combined cycle power plant
JP2014141965A
Power generation system and method of operating same
US20060053792A1