Network management device, method and program

The network management device addresses the challenge of prioritizing fuel delivery in redundant communication networks by calculating failure impact and generating deployment plans, ensuring efficient recovery from network failures.

JP7589810B2Active Publication Date: 2024-11-26NIPPON TELEGRAPH & TELEPHONE CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023527142
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-06-07
Publication Date
2024-11-26
Estimated Expiration
2041-06-07

AI Technical Summary

Technical Problem

Existing technologies fail to appropriately prioritize communication buildings for fuel delivery during network failures due to the lack of consideration for redundant network configurations, leading to inefficient fuel distribution and prolonged communication outages.

Method used

A network management device and method that calculates the impact of communication failures across a redundant network configuration, determining priority for fuel delivery based on the number of affected users and the potential ripple effect, and generating a deployment plan for recovery work vehicles.

Benefits of technology

Facilitates quick and efficient fuel delivery to critical communication buildings, minimizing communication outages by prioritizing recovery efforts based on the network's redundant structure, thereby reducing the impact on users.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007589810000001
    Figure 0007589810000001
  • Figure 0007589810000002
    Figure 0007589810000002
  • Figure 0007589810000003
    Figure 0007589810000003
Patent Text Reader

Abstract

A network management device according to one embodiment of the present invention comprises: a failure effect calculation unit that, when a failure has occurred in communication among a plurality of buildings in which communication equipment is housed and which correspond to an upper hierarchy of a network, calculates the effect of the communication failure, said effect caused by the occurred failure also affecting another building which corresponds to a lower hierarchy of the network; and a priority level computation unit that, under the condition that the failure that occurred and the effect calculated by the failure effect calculation unit are applied, computes a priority level for, from among the buildings of the upper hierarchy where the failure occurred, a building candidate for actual restoration from the failure that occurred, the priority level being computed on the basis of the extent of the communication failures continually occurring at any building in the network when a condition, where it has been assumed that the failure that occurred in a building corresponding to the upper hierarchy where the failure occurred was restored through restoration work on the communication equipment housed in the building, has been applied.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] An embodiment of the present invention relates to a network management apparatus, a method, and a program. [Background technology]

[0002] In a building (sometimes called a communications building) that houses communications equipment and provides communications with the outside world, if communications in the building are cut off due to a disaster such as an earthquake or typhoon cutting off the power supply from a power plant, the power supply to the communications equipment can be restored by operating a fuel-powered emergency power generator or the like installed in the building, and communications can be resumed.

[0003] If the fuel stored in the building runs out due to the long operation of the emergency generator, the operation of the emergency generator will stop, and the power supply will be cut off again, causing communication to be cut off. Therefore, the communication carrier delivers and supplies fuel to the communication building by vehicle or the like.

[0004] Telecommunications carriers need to prevent communication interruptions and resume communication services as soon as possible by using fuel delivery vehicles to deliver fuel in advance to communication buildings before their fuel runs out, and by using fuel delivery vehicles to quickly deliver fuel to communication buildings that have run out of fuel.

[0005] In order to minimize the impact of a communications outage under conditions of limited fuel resources, a telecommunications operator must quickly select a relief building (sometimes called a relief building) to which fuel will be delivered from among the many telecommunications buildings that have lost power and have run out of the above-mentioned fuel.

[0006] The rescue building must be selected based on various factors, such as the damaged building, the impact on the communication network services that the building provides, its location, fuel conditions, and traffic conditions, and manual review of the selection process requires a great deal of time and advanced skills.

[0007] Responding to disasters is an emergency, they occur infrequently, and it is difficult to train skilled personnel, so there is a need for technology that can select a relief building based on the situation at the time a disaster occurs and automatically and quickly determine a fuel delivery plan to this building.

[0008] For example, Patent Document 1 discloses a technology for obtaining network configuration information and fault impact information, and based on this fault impact information, the buildings that should be given priority for relief are evaluated, and the above-mentioned delivery plan can be determined. [Prior art documents] [Patent documents]

[0009] [Patent Document 1] Japanese Patent Publication No. 2020-65202 Summary of the Invention [Problem to be solved by the invention]

[0010] However, the above technology does not take into account the redundant configuration of the communication network, and therefore does not calculate an appropriate priority for each building as a target for failure recovery.

[0011] The present invention has been made in light of the above-mentioned circumstances, and has as its object to provide a network management device, method, and program that, when a communication failure occurs in a redundant network configuration, makes it possible to appropriately determine the target for recovery from the failure. [Means for solving the problem]

[0012] A network management device according to one embodiment of the present invention comprises a failure impact calculation unit that calculates the impact of a communication failure, which is the impact that the failure has on other buildings corresponding to lower hierarchical levels of the network, when a communication failure occurs in a plurality of buildings that house communication equipment and correspond to a higher hierarchical level of the network, and a priority calculation unit that calculates a priority of a candidate building among the buildings in the higher hierarchical level in which the failure occurred, based on the degree of the communication failure that continues to occur in any of the buildings of the network when a condition is applied in which it is assumed that the failure has been restored in the building corresponding to the higher hierarchical level in which the failure occurred by restoration work on communication equipment housed in the building, under conditions in which the failure and the impact calculated by the failure impact calculation unit are applied.

[0013] A network management method according to one aspect of the present invention includes the steps of: A method performed by a network management device, comprising: The method includes calculating an impact of a communication failure, which is an impact on other buildings corresponding to lower hierarchical levels of the network, when a communication failure occurs in a plurality of buildings that accommodate communication equipment and correspond to a higher hierarchical level of the network, and calculating a priority of a candidate building in the higher hierarchical level where the failure has occurred, based on the degree of the communication failure that continues to occur in any of the buildings in the network when a condition is applied in which it is assumed that the failure has been restored in the building corresponding to the higher hierarchical level where the failure has occurred by restoration work on communication equipment accommodated in the building, under conditions in which the occurred failure and the calculated impact are applied. Effect of the Invention

[0014] According to the present invention, when a communication failure occurs in a redundant network configuration, the effect of the failure can be appropriately calculated. [Brief description of the drawings]

[0015] [Figure 1] FIG. 1 is a diagram showing an application example of a network management device according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a flow chart showing an example of a processing procedure performed by the network management device according to one embodiment of the present invention. [Diagram 3] FIG. 3 is a diagram illustrating an example of the functions of the priority calculation unit and the deployment plan processing unit. [Figure 4] FIG. 4 is a diagram illustrating an example of a building having a redundant network configuration and accommodating communication facilities. [Diagram 5] FIG. 5 is a diagram showing an example of the influence when a communication failure occurs in a single building and the failure is restored. [Figure 6] FIG. 6 is a diagram illustrating an example of the influence when a recovery is made to a building in which a communication failure has occurred. [Figure 7] FIG. 7 is a diagram illustrating a first example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. [Figure 8] FIG. 8 is a diagram illustrating a second example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. [Figure 9] FIG. 9 is a diagram illustrating a third example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. [Figure 10] FIG. 10 is a diagram illustrating a fourth example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. [Figure 11] FIG. 11 is a diagram illustrating a fifth example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. [Figure 12] FIG. 12 is a diagram illustrating an example of generation of a deployment plan of recovery work vehicles for the restoration of a salvaged building by the deployment plan processing unit according to one embodiment of the present invention. [Figure 13] FIG. 13 is a diagram showing an example of a result of a determination made by the deployment plan processing unit according to an embodiment of the present invention as to whether or not a recovery work vehicle can be deployed. [Figure 14] FIG. 14 is a block diagram showing an example of the hardware configuration of a network management device according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a diagram showing an application example of a network management device according to an embodiment of the present invention. As shown in FIG. 1, a network management device 10 according to an embodiment of the present invention includes a user input unit 11, a failure effect calculation unit 12, a priority calculation unit 13, a deployment plan processing unit 14, and a deployment plan output unit 15.

[0017] FIG. 2 is a flowchart showing an example of a processing procedure performed by the network management device according to an embodiment of the present invention. The user input unit 11 inputs (S11) fault information indicating a communication fault occurring in one of a number of buildings which house communication equipment and form a network redundant configuration, the power supply (electricity) supply status relating to the restoration of the communication fault that has occurred, and vehicle deployment information relating to restoration work vehicles which will be deployed to restore the communication fault. The power supply status is, for example, the amount of fuel that needs to be replenished to the emergency generators (described later) stored in each building, the time elapsed since the occurrence of a communication failure in each building, etc. Furthermore, the vehicle deployment information is, for example, the current location of the recovery work vehicles, the number of recovery work vehicles that can be moved to the building, the amount of fuel that can be transported and supplied by each recovery work vehicle, etc.

[0018] Based on the fault information input in S11, the fault impact calculation unit 12 calculates the impact of a communication failure, which is the impact on other buildings in the same network configuration due to a communication failure that occurs due to, for example, the interruption of power supply to communication equipment housed in some buildings in the network configuration (S12).

[0019] The priority calculation unit 13 generates all patterns of combinations of buildings that are targets for rescue, i.e., targets for restoration of communication failure, from combinations of buildings in which communication failures have occurred under the conditions indicated by the failure information input in S11 and the calculation results in S12 are applied (S13).

[0020] For each of the generated patterns, the priority calculation unit 13 calculates a value indicating the communication failure that will continue to occur in any of the buildings and the degree of its impact when a condition is applied that assumes that the building has been rescued according to the pattern, for example, that the power supply to the communication equipment housed in the building has been restored (S14).

[0021] If the calculation in S14 has not been completed for all patterns (No in S15), the process in S14 is performed for another pattern. Furthermore, when the calculation in S14 has been completed for all patterns (Yes in S15), the priority calculation unit 13 generates information in which each pattern is sorted in order of the lowest value indicating the communication failure and the degree of its impact, so that the priority of the candidate building that is the target for actually restoring the failure that has occurred is set high (S16).

[0022] The deployment plan processing unit 14 prioritizes patterns with high priorities among the sorted patterns, and searches for recovery work vehicles and appropriate deployment routes for these vehicles for each building in the pattern according to this priority, based on the power supply status and vehicle deployment information input in S11 (S17).

[0023] In response to the search results in S17, the deployment plan output unit 15 outputs information indicating the name of the building to be rescued and the deployment route, that is, the movement route, of the recovery work vehicle to the relevant building (S18). The details of each process are described below.

[0024] The user input unit 11 inputs, through input operations by an operator or the like, information relating to each building that constitutes a redundant configuration of the communication network to which communications are provided, such as the connection relationships of each building in the network redundant configuration, the type of emergency power source in each building, the location of each building, information indicating the degree of impact when a communication failure occurs in a building, and the elapsed time since the communication failure occurred in the building.

[0025] Providing communications in a building means, for example, communications between communications devices within the building and communications between communications devices within the building and external communications devices. The above communication failure may be, for example, a communication interruption caused by a power supply interruption to communication equipment in a building, or a communication interruption caused by a failure of communication equipment such as a server, damage to a communication cable, etc. In the following description of this embodiment, a communication interruption caused by a power supply interruption to communication equipment in a building will be described as an example.

[0026] The types of emergency power sources in each building include emergency generators that run on fuel and emergency power supply devices that run on rechargeable batteries. The emergency generators are, for example, diesel engines. The building may take other forms as long as it is a facility that provides communications.

[0027] The connection relationship of each building may include, for example, information indicating a higher hierarchy (sometimes simply referred to as "upper") and a lower hierarchy (sometimes simply referred to as "lower") in a network topology. The degree of impact of the communication failure may include the number of users who use communication (sometimes referred to as "accommodated users") that can be accommodated in the building where the communication failure occurred, the number of communication devices installed in the building, or the amount of data transmitted and received by the communication devices installed in the building.

[0028] Furthermore, the user input unit 11 inputs, by the above-mentioned input operation, the number of vehicles, vehicle type, each vehicle's position information, the amount of fuel each vehicle can supply for an emergency generator, and the traffic conditions in the driving area of ​​each vehicle, etc., related to vehicles used in the work of restoring communication to a building where a communication failure has occurred (hereinafter sometimes referred to as restoration work vehicles), etc. Examples of the traffic conditions include information indicating the traffic volume in the driving area, and information indicating whether roads are passable due to construction or disaster, etc.

[0029] The types of vehicles include fuel delivery vehicles and power supply vehicles. The fuel delivery truck is a vehicle that carries fuel for the emergency generator when the emergency power source in the building is the emergency generator described above, and has equipment for filling the emergency generator with this fuel. In addition, the power supply vehicle is a vehicle having a charging device for the storage battery when the emergency power source in the building is the emergency power supply device, or a vehicle carrying a replacement battery, i.e., a new, charged storage battery, when the storage battery is replaceable.

[0030] Based on the information input by the user input unit 11, the failure impact calculation unit 12 identifies multiple lower-level buildings in the network topology that will be affected by a communication failure occurring in multiple higher-level buildings in the network topology and will experience a communication interruption among the buildings in the network redundant configuration. The technology for identifying the equipment affected and causing communication to be cut off is a known technology, for example, disclosed in Patent Document 1 mentioned above.

[0031] Then, the failure impact calculation unit 12 calculates the degree of impact when a communication failure occurs under conditions assumed after the failure in part or all of the building where the failure occurred has been restored, for example, the number of users accommodated in a lower-level building who will continue to be affected by the failure under conditions assumed after the restoration has been made. FIG. 3 is a diagram illustrating an example of the functions of the priority calculation unit and the deployment plan processing unit. The priority calculation unit 13 calculates a priority for recovery from a communication failure for each of the combination patterns consisting of some or all of the identified multiple buildings, based on the magnitude of the impact of the calculated communication failure occurring in the combination pattern.

[0032] In the example shown in FIG. 3, the buildings in which communication failures have occurred are "Building A," "Building B," "Building C," "Building D," "Building E," and "Building F." Of these buildings, the combination of buildings in which communication failures will be restored, and the buildings in which communication failures will continue to occur after work to restore communication failures in each building in this combination has been carried out and recovery has been achieved, and the total number of users accommodated in these buildings, are, for example, "Building A, Building B, Building C, Building D, Building E, Building F: 0 people," "Building A, Building B, Building C, Building D, Building E: 50 people," "Building A, Building B, Building C, Building D: 100 people," "Building A, Building C, Building D, Building F: 110 people," or "Building C, Building D, Building E, Building F: 180 people." Of the above combinations, combinations with a smaller number of accommodated users are combinations in which the effectiveness of recovery work is high, and therefore have a high priority for the implementation of recovery work.

[0033] The deployment plan processing unit 14 determines whether or not to deploy a recovery work vehicle, which is a vehicle to be sent to each building belonging to a building combination pattern related to this priority in descending order of priority calculated by the priority calculation unit 13, for each pattern of a combination of buildings forming a redundant configuration of the network, based on the location of the buildings, traffic conditions, etc. Based on the result of this determination, the deployment plan processing unit 14 generates deployment plan information that is information indicating the recovery work vehicle that is actually sent to the building for recovery work, as well as the vehicle's travel schedule and travel route, etc. The deployment plan output unit 15 outputs the deployment plan information generated by the deployment plan processing unit 14 by displaying it on a display device (not shown).

[0034] In this embodiment, a deployment plan for recovery work vehicles is generated for each combination of buildings that form a redundant network configuration among buildings that have experienced a communication failure, rather than for an individual building where a communication failure has occurred, thereby generating an appropriate deployment plan for recovery work vehicles.

[0035] This makes it possible to automatically and quickly determine a deployment plan that can significantly shorten the time that a communications outage occurs in a building that is the target of communications restoration, eliminating the need for advanced skills to create the deployment plan and significantly reducing the time required to create the plan.

[0036] FIG. 4 is a diagram illustrating an example of a building having a redundant network configuration and accommodating communication facilities. In the example shown in Figure 4, the network management device of this embodiment can be applied to a network having a redundant configuration, and the buildings housing the communication equipment are a group of buildings forming a communication network in a ring configuration in which the communication equipment between the buildings can be connected so as to be able to communicate with each other. In the example shown in FIG. 4, building A and building B, which are part of a group of buildings connected in a ring shape, are set as upper-level buildings in the network topology.

[0037] (For Building A, Building B, and the sub-buildings) In this ring-shaped configuration, between building A and building B, a first building is provided closer to building A and a second building is provided closer to building B, and these four buildings form a first ring-shaped group of buildings.

[0038] Furthermore, the four buildings consisting of the first building and the other three buildings are provided as a second ring-shaped group of buildings separate from the first ring-shaped group of buildings, and the four buildings consisting of the second building and the other three buildings are provided as a third ring-shaped group of buildings separate from the first and second ring-shaped groups of buildings. That is, the first building is related to the first ring-shaped group of buildings and the second ring-shaped group of buildings, and the second building is related to the first ring-shaped group of buildings and the third ring-shaped group of buildings.

[0039] Of these buildings, the eight buildings other than Building A and Building B are set up as lower-level buildings in the network topology, and Building A, Building B, and the lower-level buildings form an independent network configuration. These lower-level buildings are sometimes called lower-level buildings of Buildings A and B.

[0040] The number of users (sometimes referred to as accommodated users) that can be accommodated in Building A is 50, the number of users that can be accommodated in Building B is 30, and the total number of users that can be accommodated in the subordinate buildings of Buildings A and B is 100.

[0041] (For Building C, Building D and the lower buildings) In the example shown in FIG. 4, buildings C and D, which are part of a group of buildings connected in a ring shape, are set as upper buildings in the network topology. D In the network topology, a group of lower-level buildings with the same configuration as the lower-level buildings of buildings A and B are provided as lower-level buildings, and an independent network configuration is formed with buildings C, D, and the lower-level buildings. These lower-level buildings are sometimes referred to as the lower-level buildings of buildings C and D. The number of users that can be accommodated in building C is 160, the number of users that can be accommodated in building D is 200, and the total number of users that can be accommodated in the lower buildings of buildings C and D is 200.

[0042] (For Building E, Building F, and the lower buildings) 4, buildings E and F, which are part of a group of buildings connected in a ring shape, are provided as higher-level buildings in the network topology, and a group of lower-level buildings having the same configuration as the lower-level buildings of buildings A and B are provided as lower-level buildings in the network topology relative to buildings E and F, and buildings E, F, and the lower-level buildings form an independent network configuration. These lower-level buildings are sometimes referred to as lower-level buildings of buildings E and F.

[0043] The number of users that can be accommodated in building E is 80, the number of users that can be accommodated in building F is 150, and the total number of users that can be accommodated in the lower buildings of buildings E and F is 250. In the example shown in Figure 4, the power supply to the communications equipment in a total of six buildings consisting of upper-level buildings A to F has been cut off due to a loss of power, and the communications functions of the communications equipment housed in these buildings have been stopped.

[0044] Furthermore, as viewed from the higher-level buildings A to F, the lower-level buildings in the network topology, namely the lower-level buildings of buildings A and B, the lower-level buildings of buildings C and D, and the lower-level buildings of buildings E and F, have not experienced a power outage to their own communications equipment. However, due to the outage of the communications functions of the higher-level buildings, normal communications are not possible via the communications equipment contained in these buildings.

[0045] Among the above-mentioned higher-ranked buildings A to F, the priority of rescue, that is, the priority of restoration of communication functions, is higher the greater the impact on users accommodated in the building. In this embodiment, it is assumed that the communication failure in some of the upper-level buildings has been restored, and the communication function but Continued tree The number of users accommodated in the stopped building, i.e., the number of users who will continue to be affected by the stop of communication functions after the above-mentioned rescue (sometimes referred to as the number of affected users), is defined as the degree of impact. And, since the smaller the value of this degree of impact, the greater the effect of rescue, in this embodiment, the smaller the value of the degree of impact, the higher the priority for rescue of the building is set.

[0046] Next, a description will be given of calculation of restoration priority based on the impact when restoration is performed on a single building where a communication failure has occurred. Fig. 5 is a diagram showing an example of the impact when a communication failure occurs in a single building and the failure is restored. The number of users accommodated in each building in the configuration shown in Fig. 5 is the number of users described in Fig. 4.

[0047] (Bill A relief only) Assume that a communication failure occurs in buildings A and B among buildings A and B shown in FIG. 5, and only building A is restored. This restoration restores the communication failure in the buildings below buildings A and B. Therefore, the priority calculation unit 13 calculates the priority of buildings A, B, and the buildings below buildings A and B. Number of users accommodated Of these, the number of users who will continue to be affected by the communication failure (sometimes referred to as the number of users affected by the ripple effect) is calculated to be the number of users accommodated in Building B that has not been rescued, i.e., 30 people.

[0048] (Bill B relief only) Assume that a communication failure occurs in building A and building B among the buildings A and B shown in FIG. 5, and that only building B is rescued. As a result of this rescue, the communication failure in the lower-level buildings of buildings A and B is restored, and the priority calculation unit 13 calculates that the number of users who will continue to be affected by the communication failure among the total number of users accommodated in building A, building B, and the lower-level buildings of buildings A and B is the number of users accommodated in building A that has not been rescued, i.e., 50 people.

[0049] (Bill C relief only) Assume that when a communication failure occurs in buildings C and D among buildings C, D, and the lower-level buildings of buildings C and D shown in FIG. 5, and only building C is rescued. As a result of this rescue, the communication failure in the lower-level buildings of buildings C and D is restored, and the priority calculation unit 13 calculates that the number of users who will continue to be affected by the communication failure among the total number of users accommodated in building C, building D, and the lower-level buildings of buildings C and D is the number of users accommodated in building D that has not been rescued, i.e., 200 people.

[0050] (Relief for Bill D only) Assume that when a communication failure occurs in buildings C and D among buildings C, D, and lower-level buildings of buildings C and D shown in FIG. 5, and only building D is rescued. As a result of this rescue, the communication failure in the lower-level buildings of buildings C and D is restored, and the priority calculation unit 13 calculates that the number of users who will continue to be affected by the communication failure among the total number of users accommodated in building C, building D, and the lower-level buildings of buildings C and D is the number of users accommodated in unrelieved building C, i.e., 160 people.

[0051] (Bill E only relief) Assume that when a communication failure occurs in buildings E and F among buildings E, F, and lower-level buildings of buildings E and F shown in FIG. 5, and only building E is relieved. As a result of this rescue, the communication failure in the lower-level buildings of buildings E and F is restored, and the priority calculation unit 13 calculates that the number of users who will continue to be affected by the communication failure among the total number of users accommodated in building E, building F, and the lower-level buildings of buildings E and F is the number of users accommodated in building F that has not been rescued, i.e., 150 people.

[0052] (Bill F relief only) Assume that when a communication failure occurs in buildings E and F among buildings E, F, and lower-level buildings of buildings E and F shown in FIG. 5, and only building F is relieved. As a result of this rescue, the communication failure in the lower-level buildings of buildings E and F is restored, and the priority calculation unit 13 calculates that the number of users who will continue to be affected by the communication failure among the total number of users accommodated in building E, building F, and the lower-level buildings of buildings E and F is the number of users accommodated in building E that has not been rescued, i.e., 80 people.

[0053] (About priority calculation) In the above calculation results, the number of affected users was highest when only Building C was repaired, in the following order: (1) when only Building C was repaired, (2) when only Building D was repaired, (3) when only Building E was repaired, (4) when only Building F was repaired, (5) when only Building B was repaired, and (6) when only Building A was repaired. The number of affected users was highest when only Building C was repaired, and lowest when only Building A was repaired. As a result, the priority calculation unit 13 calculates that the recovery priorities are Building C first, Building D second, Building E third, Building F fourth, Building B fifth, and Building A sixth.

[0054] (Number of users affected when multiple buildings are saved) Let us assume that restoration work vehicles are sent to the first through fourth ranked buildings C, D, E, and F to restore them. As a result of this restoration, the communication failure in the buildings below buildings C and D and the buildings below buildings E and F are restored, so the number of users who will continue to be affected by the communication failure in buildings A through F and their subordinate buildings is the sum of the number of users accommodated in unrelieved building A, the number of users accommodated in building B, and the number of users accommodated in the buildings below buildings A and B, i.e., 180 people. In other words, as shown by the symbol a in FIG. 5, the effect of the communication failure is not achieved because no relief is provided for buildings A, B, and the lower-level buildings of buildings A and B. but It continues to be widespread.

[0055] Next, calculation of restoration priority based on the impact when restoration is performed on a building where a communication failure has occurred will be described. Fig. 6 is a diagram showing an example of the impact when a building where a communication failure occurred is restored. The number of users accommodated in each building in the configuration shown in Fig. 6 is the number of users described in Fig. 4. Here, it is assumed that a communication failure occurs in the six upper-level buildings A through F shown in FIG. 6, and that fuel delivery trucks are deployed to Buildings A, C, D, and F to refuel the emergency generators housed in these buildings, thereby providing relief to these buildings.

[0056] This recovery will restore the communication failures in Building A, Building C, Building D, and Building F. Therefore, as shown by symbol a in Figure 6, after the recovery, the communication failures in the higher-level buildings will no longer affect the lower-level buildings of Buildings A and B, and the communication failures in the lower-level buildings of Buildings A and B, the communication failures in the lower-level buildings of Buildings C and D, and the communication failures in the lower-level buildings of Buildings E and F, i.e., the communication failures in all the lower-level buildings, will be restored.

[0057] Therefore, the priority calculation unit 13 calculates that the number of users who will continue to be affected by the communication failure among the number of users accommodated in the higher-level buildings A to F and the lower-level buildings is the sum of the number of users accommodated in the unrelieved building B and the number of users accommodated in building E, i.e., 110 people. This calculated number of people is less than the final calculated number of people in the example of FIG. 5, which means that the above buildings A, C, D, and F are suitable as a combination of buildings to be rescued.

[0058] In the example shown in Fig. 5, building E is rescued as a building with a high priority, while building A is not rescued as a building with a low priority. In contrast, in the example shown in Fig. 6, the network topology is taken into consideration, and building A, which was not rescued as a building with a low priority in the description of Fig. 5, is rescued, thereby suppressing the impact on buildings lower than buildings A and B, and therefore the number of affected users after rescue can be reduced compared to the example shown in Fig. 5.

[0059] Next, the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit 13 according to one embodiment of the present invention will be described. FIG. 7 is a diagram illustrating a first example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. Here, we assume that fuel delivery trucks are deployed to all of the upper-level buildings experiencing communication failures, as shown in Figure 4, and that each building is provided with relief by refueling the emergency generators housed in these buildings.

[0060] In the present embodiment, when relief is provided for the upper-level buildings A to F in which a communication failure has occurred, the priority calculation unit 13 of the network management device 10 calculates that the communication failures in the upper-level buildings A to F, the communication failures in the lower-level buildings of buildings A and B, the communication failures in the lower-level buildings of buildings C and D, and the communication failures in the lower-level buildings of buildings E and F, i.e., the communication failures in all the lower-level buildings, are restored as shown in FIG. 7 As shown in Fig. 1, we calculate whether communication is possible for all buildings.

[0061] As a result, the priority calculation unit 13 calculates that the number of affected users, which is the number of users who will continue to be affected by the communication failure, when it is assumed that relief has been provided for buildings A to F, is zero.

[0062] FIG. 8 is a diagram illustrating a second example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. Here, we assume that fuel delivery trucks are deployed to Building A and Building C to Building F, a total of five buildings among the top buildings A to F where communication failures are occurring, as shown in Figure 4, and that each building is relieved by refueling the emergency generators housed in these buildings.

[0063] The priority calculation unit 13 of the network management device 10 in this embodiment calculates that when relief is provided for the higher-level buildings A and buildings C to F where a communication failure is occurring, as shown in Figure 8, the communication failures in the higher-level buildings A and buildings C to F, as well as the communication failures in the lower-level buildings of buildings A and B, the communication failures in the lower-level buildings of buildings C and D, and the communication failures in the lower-level buildings of buildings E and F, i.e., the communication failures in all lower-level buildings, will be restored, and the lower-level buildings of buildings A and B will be able to continue communicating on one system, so that communication will be possible for all buildings except building B, as shown in Figure 8.

[0064] As a result, the priority calculation unit 13 calculates that the number of affected users, which is the number of users who will continue to be affected by the communication failure, when assuming that relief is provided for buildings A and C to F, is the number of users accommodated in building B, i.e., 30 people.

[0065] FIG. 9 is a diagram illustrating a third example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. Here, we assume that fuel delivery trucks are deployed to five buildings, Buildings B to F, of the top buildings A to F where communication failures are occurring, as shown in Figure 4, and that relief for each building is provided by refueling the emergency generators housed in these buildings.

[0066] The priority calculation unit 13 of the network management device 10 of this embodiment calculates that when relief is provided for the higher-level buildings B to F where a communication failure is occurring, as shown in Figure 9, the communication failures in the higher-level buildings B to F, the communication failures in the lower buildings of buildings A and B, the communication failures in the lower buildings of buildings C and D, and the communication failures in the lower buildings of buildings E and F, i.e., the communication failures in all lower-level buildings, will be restored and the lower buildings of buildings A and B will be able to continue communicating on one system, so that communication will be possible for all buildings except building A, as shown in Figure 9.

[0067] As a result, the priority calculation unit 13 calculates that the number of affected users, which is the number of users who will continue to be affected by the communication failure, when it is assumed that relief is provided for buildings B to F, is the number of users accommodated in building A, i.e., 50 people.

[0068] FIG. 10 is a diagram illustrating a fourth example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. Here, we assume that fuel delivery trucks are deployed to Buildings C to F, four of the top buildings A to F where communication failures are occurring, as shown in Figure 4, and that relief for each building is provided by refueling the emergency generators housed in these buildings.

[0069] The priority calculation unit 13 of the network management device 10 of this embodiment calculates that when relief is provided for the higher-level buildings C to F where a communication failure is occurring, the communication failure in the higher-level buildings C to F, the communication failure in the lower-level buildings of buildings C and D, and the communication failure in the lower-level buildings of buildings E and F will be restored, as shown in Figure 10, and communication will be possible for the other buildings except for building A, building B, and the lower-level buildings of buildings A and B, as shown in Figure 10.

[0070] As a result, the priority calculation unit 13 calculates that the number of affected users, which is the number of users who will continue to be affected by the communication failure, when assuming that relief has been provided for buildings C to F, is the sum of the number of users accommodated in building A, the number of users accommodated in building B, and the number of users accommodated in the lower-level buildings of buildings A and B, i.e., 180 people.

[0071] FIG. 11 is a diagram illustrating a fifth example of the number of affected users calculated for each combination of buildings to be rescued by the priority calculation unit according to one embodiment of the present invention. Here, we assume that fuel delivery trucks are deployed to four of the top buildings A to F where communication failures are occurring, namely Building A, Building C, Building D, and Building F, as shown in Figure 4, and that relief for each building is provided by refueling the emergency generators housed in these buildings.

[0072] In the present embodiment, when relief is given to the upper-level buildings A, C, D, and F in which a communication failure has occurred, as shown in FIG. 11 , the communication failures in the upper-level buildings A, C, D, and F, the communication failures in the lower-level buildings of buildings A and B, the communication failures in the lower-level buildings of buildings C and D, and the communication failures in the lower-level buildings of buildings E and F, i.e., the communication failures in all the lower-level buildings, are restored. Therefore, the lower-level buildings of buildings A and B and the lower-level buildings of buildings E and F can continue communication on one system, and as shown in FIG. B It is calculated that communication is possible for all buildings excluding building A and building B.

[0073] As a result, the priority calculation unit 13 calculates the number of affected users, which is the number of users who will continue to be affected by the communication failure, when it is assumed that relief has been provided for buildings A, C, D, and F. B The total number of users in Building A and Building B is calculated to be 110. 6 This is the same number as stated in the explanation.

[0074] In other words, when four buildings are salvageable, the number of affected users after rescue is smaller for the combination of rescued buildings shown in Figure 11 compared to the number of affected users after rescue for the combination of rescued buildings shown in Figure 10, so it is shown that the combination shown in Figure 11 is appropriate and has a high priority as a combination of rescued buildings.

[0075] Next, a deployment plan for recovery work vehicles for the restoration of a salvaged building, which is performed by the deployment plan processing unit 14 according to one embodiment of the present invention, will be described. FIG. 12 is a diagram illustrating an example of generation of a deployment plan of recovery work vehicles for the restoration of a salvaged building by the deployment plan processing unit according to one embodiment of the present invention. For all combinations of buildings to be rescued in the “Rescue Building List” shown in FIG. 12, the priority calculation unit 13 calculates the number of affected users after rescue, and calculates the priority of the combination of buildings to be rescued based on the impact degree, which is the number of affected users. is calculated do.

[0076] After this priority has been calculated, the deployment plan processing unit 14 selects, based on the power supply status and fuel delivery vehicle information input by the user input unit 11, from among the various combinations of relief destination buildings, the pattern with the highest priority before selection. The fuel delivery vehicle information includes, for example, the current location of fuel delivery vehicles that are candidates for recovery work vehicles, the number of fuel delivery vehicles that can move to the building, and the amount of fuel that can be transported and supplied by each fuel delivery vehicle.

[0077] The deployment plan processing unit 14 determines whether or not a fuel delivery vehicle can actually be deployed in each of the relief destination buildings related to this pattern, and if so, searches for an optimal travel route for the fuel delivery vehicle to each of the relief destination buildings. The deployment plan output unit 15 outputs information indicating this route by displaying it on a display device or the like.

[0078] In addition, when the deployment plan processing unit 14 determines that a fuel delivery vehicle cannot actually be deployed in each building related to the pattern selected as described above, it determines whether a fuel delivery vehicle can actually be deployed in each relief destination building related to the next priority pattern, and if deployment is possible, searches for the optimal route for the fuel delivery vehicle to each relief destination building.

[0079] FIG. 13 is a diagram showing an example of a result of a determination made by the deployment plan processing unit according to an embodiment of the present invention as to whether or not a recovery work vehicle can be deployed. In the example shown in Figure 13, for a relief building with a priority of "1" calculated as described above, a determination is made as to whether or not to deploy a fuel delivery vehicle to each building related to this pattern, with the pattern having a low priority, and the result of this determination is reflected in the deployment plan column of the table shown in Figure 13.

[0080] An "O" in the deployment plan column of the table shown in FIG. 13 indicates that the deployment was determined to be possible, and an "X" in the same column indicates that the deployment was determined to be not possible. In the table shown in FIG. 13, the rows marked with “◯” in the deployment plan column can be output by the deployment plan output unit 15.

[0081] As described above, in a network management system according to one embodiment of the present invention, when a communication failure occurs in a plurality of buildings that house communication equipment and correspond to a higher hierarchy of the network, the impact of the communication failure on other buildings that correspond to lower hierarchical levels of the network is calculated. This system then calculates the priority of candidate buildings among the buildings on the upper level where the failure occurred that will actually restore the failure, based on the degree of communication failure that continues to occur in one of the buildings in the network when conditions are applied in which it is assumed that the failure that occurred in the building corresponding to the upper level where the failure occurred is restored by restoration work on the communications equipment housed in that building, under conditions in which the occurred failure and the calculated impact are applied. This makes it possible to appropriately determine the target for recovery from a communication failure that occurs in a redundant network configuration.

[0082] Furthermore, the above system plans actual restoration work for the occurred failure based on the conditions related to the restoration work for the building corresponding to the calculated priority, thereby making it possible to appropriately determine the plan for restoration work for the communication failure.

[0083] FIG. 14 is a block diagram showing an example of a hardware configuration of a network management device according to an embodiment of the present invention. 14, the network management device 10 according to the above embodiment is configured, for example, by a server computer or a personal computer, and has a hardware processor 111A such as a CPU. A program memory 111B, a data memory 112, an input / output interface 113, and a communication interface 114 are connected to this hardware processor 111A via a bus 120.

[0084] The communication interface 114 includes, for example, one or more wireless communication interface units, and enables transmission and reception of information to and from the communication network NW. As the wireless interface, for example, an interface that adopts a low-power wireless data communication standard such as a wireless LAN (Local Area Network) is used.

[0085] An input device 30 and an output device 40 that are attached to the network management device 10 and used by a user or the like are connected to the input / output interface 113 . The input / output interface 113 can take in operation data input by a user or the like through an input device 30 such as a keyboard, a touch panel, a touchpad, a mouse, etc., and can also perform processing for outputting and displaying output data to an output device 40 including a display device using liquid crystal or organic EL (Electro Luminescence), etc. Note that the input device 30 and the output device 40 may be devices built into the network management device 10, or may be input devices and output devices of other information terminals that can communicate with the network management device 10 via the network NW.

[0086] The program memory 111B is a non-transient tangible storage medium that is a combination of a non-volatile memory that can be written to and read from at any time, such as a hard disk drive (HDD) or a solid state drive (SSD), and a non-volatile memory such as a read only memory (ROM), and can store programs necessary for executing various control processes, etc. according to one embodiment.

[0087] The data memory 112 is a tangible storage medium, for example, a combination of the above-mentioned nonvolatile memory and a volatile memory such as RAM (Random Access Memory), and can be used to store various data or information acquired and created in the course of various processes.

[0088] A network management device 10 according to one embodiment of the present invention can be configured as a data processing device having a user input unit 11, a failure impact calculation unit 12, a priority calculation unit 13, a deployment plan processing unit 14, and a deployment plan output unit 15 shown in FIG. 1 as software-based processing function units.

[0089] Each information storage unit used as a work memory or the like by each unit of the network management device 10 can be configured by using the data memory 112 shown in Fig. 14. However, these configured storage areas are not essential components within the network management device 10, and may be areas provided in, for example, an external storage medium such as a Universal Serial Bus (USB) memory, or a storage device such as a database server located in the cloud.

[0090] The processing function units in each of the above-mentioned user input unit 11, failure impact calculation unit 12, priority calculation unit 13, deployment plan processing unit 14, and deployment plan output unit 15 can all be realized by reading and executing a program stored in the program memory 111B by the above-mentioned hardware processor 111A. Note that some or all of these processing function units may be realized in various other forms, including integrated circuits such as an application specific integrated circuit (ASIC) or a field-programmable gate array (FPGA).

[0091] The methods described in each embodiment may be stored as a program (software means) that can be executed by a computer on a recording medium such as a magnetic disk (floppy disk, hard disk, etc.), an optical disc (CD-ROM, DVD, MO, etc.), or a semiconductor memory (ROM, RAM, flash memory, etc.), and may be distributed by transmitting the program via a communication medium. The programs stored on the medium include a setting program that configures the software means (including not only execution programs but also tables and data structures) that the computer executes. The computer that realizes the present device reads the program recorded on the recording medium, and in some cases, configures the software means by the setting program, and executes the above-mentioned processing by controlling the operation of the software means. The recording medium in this specification is not limited to a recording medium for distribution, but also includes a storage medium such as a magnetic disk or semiconductor memory provided inside the computer or in a device connected via a network.

[0092] The present invention is not limited to the above-mentioned embodiment, and can be modified in various ways without departing from the gist of the present invention. The embodiments may be combined as appropriate, and in that case, the combined effect can be obtained. Furthermore, the above-mentioned embodiment includes various inventions, and various inventions can be extracted by combinations selected from the multiple components disclosed. For example, if the problem can be solved and the effect can be obtained even if some components are deleted from all the components shown in the embodiment, the configuration from which the components are deleted can be extracted as an invention. [Explanation of symbols]

[0093] 10...Network management device 11...User input section 12…Failure Impact Calculation Section 13…Priority calculation unit 14...Deployment planning processing unit 15...Deployment plan output section

Claims

1. a failure impact calculation unit that calculates the impact of a communication failure, which is the impact of the communication failure on other buildings corresponding to lower layers of the network, when a failure occurs in communication in a plurality of buildings corresponding to higher layers of the network in which communication facilities are accommodated; a priority calculation unit that calculates a priority of a candidate building that will actually recover from the failure among the buildings in the upper hierarchy where the failure has occurred, based on the degree of the communication failure that continues to occur in any of the buildings in the network when a condition is applied in which it is assumed that the failure that has occurred in the building corresponding to the upper hierarchy where the failure has occurred is recovered from by recovery work on communication equipment accommodated in the building, under a condition in which the failure that has occurred and the impact calculated by the failure impact calculation unit are applied; A network management device comprising:

2. and a planning processing unit that plans an actual restoration work for the failure that has occurred based on a condition related to the restoration work for the building corresponding to the priority calculated by the priority calculation unit. The network management device according to claim 1 .

3. The failure effect calculation unit is calculating an impact of the communication failure, which is an impact on other buildings corresponding to the lower level due to the occurrence of the failure caused by a stop of power supply to communication facilities housed in the plurality of buildings corresponding to the upper level; The priority calculation unit calculate a priority of a candidate building to which the power supply is to be actually restored, among the buildings in the upper hierarchy where the failure has occurred, based on the degree of the communication failure that continues to occur in any of the buildings in the network when a condition is applied in which it is assumed that the power supply to the communication equipment accommodated in the building corresponding to the upper hierarchy where the failure has occurred is restored under a condition in which the failure that has occurred and the impact calculated by the failure impact calculation unit are applied; The network management device according to claim 1 .

4. The plan processing unit is giving priority to a building with a high priority calculated by the priority calculation unit, planning information indicating a vehicle to be actually deployed to the building and a movement route of the vehicle to the building based on information related to the failure in the building and information related to candidates for vehicles to be deployed for work to restore the building from the failure; The network management device according to claim 2.

5. A method performed by a network management device, comprising: When a failure occurs in communication in a plurality of buildings that accommodate communication facilities and correspond to a higher layer of the network, calculating an impact of the failure on other buildings that correspond to a lower layer of the network due to the failure; calculating a priority of a candidate building among the buildings in the upper hierarchy where the failure has occurred that will actually recover from the failure, based on the degree of the communication failure that continues to occur in any of the buildings in the network when a condition is applied in which it is assumed that the failure has been recovered from in the building corresponding to the upper hierarchy where the failure has occurred through recovery work on communication equipment accommodated in the building, under a condition in which the failure has been applied and the calculated impact has been applied; A network management method comprising:

6. The method further includes planning an actual restoration work for the failure that has occurred based on a condition related to the restoration work for the failure for the building corresponding to the calculated priority. The network management method according to claim 5.

7. Calculating the effect of the impairment and calculating an impact of the communication failure, which is an impact on other buildings corresponding to the lower level due to the occurrence of the failure caused by a stop of power supply to communication facilities housed in the plurality of buildings corresponding to the upper level; Calculating the priority calculating a priority of a candidate building for actually restoring the power supply among the buildings in the upper hierarchy where the failure has occurred, based on the degree of the communication failure that continues to occur in any of the buildings in the network when a condition is applied in which it is assumed that the power supply to the communication equipment accommodated in the building corresponding to the upper hierarchy where the failure has occurred is restored under a condition in which the failure that has occurred and the calculated impact are applied; The network management method according to claim 5.

8. A network management processing program that causes a processor to function as the failure impact calculation unit and the priority calculation unit of a network management device described in claim 1 or claim 3, or as the failure impact calculation unit, the priority calculation unit, and the planning processing unit of a network management device described in claim 2 or claim 4.

Citation Information

Patent Citations

  • Method and device for deciding priority of fault processing and recording medium recording priority deciding program

    JP1999313130A

  • Network system, network management server, network management program, and power supply management method

    JP2010212829A

  • Monitoring device, and monitoring method

    JP2014241536A

  • Network management apparatus, method and program

    JP2020065202A

  • Optical communication system, communication device and communication method

    JP2020089256A