Virtualization infrastructure system, control program for virtualization infrastructure system, and control method for virtualization infrastructure system
The virtualization infrastructure system optimizes computing device allocation for communication functions by analyzing resource and power consumption, addressing resource scarcity and maintaining service levels.
Patent Information
- Application Number
- JP2021156804
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-09-27
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-09-27
AI Technical Summary
The increasing demand for communication functions in virtualized infrastructure systems leads to scarcity of computing resources and power, with existing technologies failing to efficiently allocate virtual network functions while maintaining service levels and considering power consumption.
A virtualization infrastructure system that includes a server performance monitoring unit to analyze computer resources and power consumption, using CPUs and hardware accelerators to optimize deployment of communication function software based on surplus resources and power considerations.
This system enables efficient allocation of computing devices that maintain service levels, conserve power, and optimize resource usage by selecting optimal computing devices for communication function software deployment.
Smart Images

Figure 0007590301000001 
Figure 0007590301000002 
Figure 0007590301000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a virtualization infrastructure system that deploys communication function software in a virtualization infrastructure, a control program for the virtualization infrastructure system, and a control method for the virtualization infrastructure system. [Background technology]
[0002] Network-based ICT (Information and Communication Technology) systems have become indispensable in people's lives and businesses, and the demand for communications is increasing. In recent years, the virtualization of communication functions, such as NFV (Network Functions Virtualization), has progressed, and the frequency of providing ICT systems that run virtual network functions on general-purpose servers is increasing. This strong demand for ICT systems and the virtualization of communication functions are causing a shortage of computing resources, computer installation space, and computer power for communication carriers.
[0003] Virtualization technology often operates on general-purpose servers rather than on dedicated hardware. As a result, the functions of communication devices that were previously processed by ASICs (Application Specific Integrated Circuits) are now processed by general-purpose CPUs (Central Processing Units), resulting in problems such as slower processing speeds.
[0004] For these reasons, in order to alleviate the decline in computer resources and processing speed, there are hopes for a method of offloading calculations that were previously processed by the CPU to hardware accelerators such as FPGAs (Field-Programmable Gate Arrays) and GPUs (Graphics Processing Units).
[0005] In the invention described in Patent Document 1, when deploying virtual network functions on a general-purpose server, a clear distinction is made between servers that support FPGAs and those that do not, and a server that supports FPGAs is selected as the deployment destination for the virtual network functions that use FPGAs.
[0006] In the invention described in Patent Document 2, a data processing task is provided with a task load determination unit that interprets a task processing command and determines the load, and a resource performance determination unit that determines the data processing performance, and an appropriate computing device is selected from a CPU or a hardware accelerator. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] Patent No. 6687106 [Patent Document 2] Patent No. 6753999 Summary of the Invention [Problem to be solved by the invention]
[0008] However, as mentioned above, the recent strong demand for communication is causing a shortage not only of computer resources but also of computer power. Therefore, there is an increasing demand for technology that efficiently deploys virtual network functions on virtualized infrastructure while taking power consumption into consideration. In addition to computer resources and power consumption, it is also necessary to consider maintaining service levels.
[0009] The invention described in Patent Document 1 does not have a mechanism for determining whether it is appropriate to have the virtual network function processed by the CPU or the FPGA server depending on the content of calculations and communication demand, in terms of computer resources and power consumption, which results in the problem of wasting computer resources and power.
[0010] In addition, the invention described in Patent Document 2 is an invention of a distributed database system, and its purpose is to shorten the data processing time of the entire system. However, when applied to the deployment of virtual network functions, there is a risk of degradation in processing quality because there is no mechanism for maintaining service levels.
[0011] The present invention has been made in consideration of the above circumstances, and has an object to provide a virtualization infrastructure system capable of allocating optimal computing devices while taking into consideration maintenance of service levels, computing resources, and power consumption. [Means for solving the problem]
[0012] According to one aspect of the present invention, a virtualization infrastructure system for deploying communication function software in a virtualization infrastructure includes a server performance monitoring unit that grasps a surplus of computer resources of a commercial server constituting the virtualization infrastructure; an allocation control unit that deploys the communication function software for each computing device of a test server including a CPU and one or more hardware accelerators, and determines a computing device of the commercial server to which the communication function software requested to be deployed is assigned so that at least power consumption is reduced based on a result of analyzing the computer resource consumption, power consumption, and delay time of the communication function software for each computing device, and determines the computing device to which the communication function software requested to be deployed is assigned by confirming whether the communication function software requested to be deployed can be deployed in the determined computing device based on the grasped surplus of computer resources; and a communication function deployment unit that deploys the communication function software requested to be deployed in the determined computing device. .
[0025] This allows priority to be given to satisfying the deployment conditions for the communication function software and power consumption. Also, by checking whether the communication function software can be deployed on a specified computing device, the computing device to which the communication function software is assigned is determined, so that it is possible to prevent a shortage of computing resources when the communication function software is deployed on a computing device. Effect of the Invention
[0036] According to the present invention, it is possible to allocate optimal computing devices while taking into consideration the maintenance of service levels, computing resources, and power consumption. [Brief description of the drawings]
[0037] [Figure 1] 1 is a schematic diagram showing an overview of a virtualization infrastructure system according to an embodiment of the present invention; [Diagram 2] 11 is a diagram showing an example of data transmitted from a communication function software storage unit according to the embodiment; FIG. [Diagram 3] FIG. 11 is a diagram showing an example of an analysis result according to the present embodiment. [Figure 4]11 is a schematic diagram showing a state in which an operator requests an allocation control unit to deploy communication function software; FIG. [Diagram 5] FIG. 13 is a schematic diagram showing a state in which a request is made to confirm surplus computer resources according to computing characteristics. [Figure 6] FIG. 13 is a schematic diagram showing an example of checking surplus computer resources in a target commercial server. [Figure 7] FIG. 11 is a sequence diagram showing the processing procedure of the virtualization infrastructure system according to the embodiment, showing the processing procedure from storing the communication function software to notifying that the communication function software is available. [Figure 8] FIG. 2 is a sequence diagram showing the processing procedure of the virtualization infrastructure system according to the embodiment, showing the processing procedure from a request for constructing a communication function to a construction completion notification. [Figure 9] FIG. 11 is a sequence diagram showing the processing procedure of the virtualization infrastructure system according to the embodiment, showing the processing procedure from a request for establishing a communication function to a notification of a shortage of computer resources. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0038] The inventors discovered that before deploying communication function software to a commercial server, they first analyzed the consumption of computing resources, power consumption, and delay time when the software was deployed to each computing device using a test server, and then selected the computing device to which the communication function software was assigned based on the results of the analysis, thereby making it possible to efficiently utilize computing resources and computing power, which led to the invention.
[0039] In other words, the virtualization infrastructure system of the present invention is a virtualization infrastructure system for a telecommunications business that deploys communication function software into a virtualization infrastructure, and is characterized in that it deploys the communication function software to a test server having a CPU and one or more hardware accelerators as a computing device, and includes a communication function software analysis unit that analyzes the computing resource consumption, power consumption, and delay time of the communication function software for each computing device.
[0040] As a result, the inventors have made it possible to allocate communication function software to the optimum computing device while taking into consideration the maintenance of service levels, computing resources, and power consumption. Hereinafter, an embodiment of the present invention will be specifically described with reference to the drawings.
[0041] [Virtualization Infrastructure System Configuration] 1 is a block diagram showing an example of a schematic configuration of a virtualization infrastructure system according to this embodiment. The virtualization infrastructure system 100 analyzes the computation characteristics of the communication function software 111 before deploying the communication function software 111 in a computer resource pool 200 including two or more commercial servers. Based on the analysis results of the communication function software 111, the virtualization infrastructure system 100 determines the optimal allocation to the computing device 1 in consideration of maintaining the service level, computer resources, and power consumption, and then deploys the communication function software 111.
[0042] The computing device 1 includes a CPU 5 and one or more hardware accelerators. The hardware accelerator is a device that replaces the processing of the CPU 5 to improve the efficiency of the processing, and is, for example, a GPU 6 or an FPGA 7.
[0043] The virtualization infrastructure system 100 is composed of a communication function software storage unit 110, a communication function software analysis unit 120, a test server 130, a server performance monitoring unit 140, an analysis result storage unit 150, an allocation control unit 160, a remaining resource management unit 170, and a communication function deployment unit 180.
[0044] Furthermore, the virtualization infrastructure system 100 has an input / output interface (not shown), and the operator 10 can input and output information via the input / output interface.
[0045] The communication function software storage unit 110 stores communication function software 111 by the operator 10. The communication function software storage unit 110 is, for example, a storage device such as a memory or storage. The communication function software 111 is software that realizes a communication function, and includes, for example, programs such as source code and binaries.
[0046] The communication function software analysis unit 120 analyzes the arithmetic characteristics of each piece of communication function software 111 stored in the communication function software storage unit 110 , and prepares the software so that it can be deployed on the commercial server 230 .
[0047] In order to analyze the communication function software 111, the communication function software analysis unit 120 deploys the communication function software on the test server 130, and acquires the results of deploying the communication function software 111 for each module in each computing device 1 of the test server 130 from the server performance monitoring unit 140. The communication function software analysis unit 120 analyzes the data acquired from the server performance monitoring unit 140, and calculates at least the expected computer resource consumption, power consumption, and delay time as the computation characteristics of the communication function software 111.
[0048] The communication function software analysis unit 120 may analyze the calculation characteristics of the communication function software 111 by changing the load pattern. For example, the communication function software analysis unit 120 may analyze the calculation characteristics when changing the pattern with the call volume as the load.
[0049] In addition, taking into account the possibility of a sudden increase in load, the communication function software analysis unit 120 may record, for example, the maximum consumption of computer resources, the maximum power consumption, and the maximum delay time while the communication function software 111 is being deployed to the test server 130.
[0050] The communication function software analysis unit 120 may also reanalyze the computation characteristics of the deployable communication function software 111 using data on each commercial server 230 acquired by the server performance monitoring unit 140. Furthermore, machine learning may be performed based on multiple data on the performance of the commercial server 230 when the communication function software 111 is deployed and information on the allocation of the communication function software 111 at the time of data acquisition. This allows for more appropriate selection of the computing device 1 to which the communication function software 111 is allocated.
[0051] The test server 130 is a server that deploys the communication function software 111 in order to analyze the computation characteristics of the communication function software 111 stored in the communication function software storage unit 110. The test server 130 has at least a CPU 5 and one or more hardware accelerators, and preferably includes all of the computing devices 1 to which the communication function software 111 can be assigned.
[0052] The communication function software 111 is composed of a plurality of modules, and the data transmitted from the communication function software storage unit 110 is also composed of a plurality of module binaries as shown in Fig. 2. The data transmitted from the communication function software storage unit 110 is composed of, for example, "IFFT module binary" which is binary data related to Inverse Fast Fourier Transform processing, "MIMO module binary" which is binary data related to MIMO (Multiple-input and multiple-output) processing, "DRB module binary" which is binary data related to the establishment of Data Radio Bearers (DRBs), and "IP forwarding module binary" which is binary data related to IP forwarding. The modules constituting each communication function software 111 are configured according to the communication function to be realized.
[0053] The server performance monitoring unit 140 monitors the performance of the test server 130 and the commercial server 230 that constitute the virtualization infrastructure system. The server performance monitoring unit 140 transmits data on the test server 130 to the communication function software analysis unit 120, and transmits data on the commercial server 230 to the remaining resource management unit 170.
[0054] The analysis result storage unit 150 stores the analysis results of the communication function software 111 transmitted from the communication function software analysis unit 120. Fig. 3 is a diagram showing the analysis results of the communication function software 111 that realizes the communication function A. As shown in Fig. 3, the analysis results of the communication function software 111 include at least information indicating the results of analysis, for each computing device 1, of the expected consumption of computing resources, power consumption, and delay time in each module.
[0055] The allocation control unit 160 determines a computing device 1 to which the deployment requested communication function software 111 is to be allocated. The allocation control unit 160 receives a deployment request for the communication function software 111 from the operator 10, as shown in Fig. 4. The allocation control unit 160 determines a computing device 1 to which each module is to be allocated, based on the analysis result of the communication function software 111, so as to reduce power consumption while satisfying the deployment conditions of the communication function software 111. The deployment conditions of the communication function software 111 include a request type, deployment date and time, traffic volume prediction, delay time, etc.
[0056] 5, the allocation control unit 160 checks whether each module can be deployed to the computing device 1 as allocated, and checks the surplus of computer resources in the commercial server 230. If the communication function software 111 can be deployed, the allocation control unit 160 determines the commercial server 230 to which the communication function software 111 is to be deployed. At this time, the allocation control unit 160 may take into consideration the maximum consumption of computer resources of each module, and may determine that deployment is possible if the surplus of computer resources in the commercial server 230 is greater than the maximum consumption of computer resources.
[0057] Furthermore, in order to reduce power consumption, the allocation control unit 160 may preferentially allocate the communication function software 111 to the commercial servers 230 that are currently executing the communication function software 111. By preferentially allocating the communication function software 111 to the commercial servers 230 that are already executing the communication function software 111 among the commercial servers 230 that constitute the computer resource pool 200, the number of commercial servers 230 that execute the communication function software 111 can be reduced. The commercial servers 230 that are not currently executing the communication function software 111 can be placed on cold standby, which leads to reduced power consumption.
[0058] The allocation control unit 160 may determine the computing device 1 to which the communication function software 111 is to be allocated based on the analysis result of the communication function software 111 and the surplus of computing resources in each commercial server 230. Furthermore, after calculating a combination of allocatable computing devices 1 based on the surplus of computing resources in each commercial server 230, the allocation control unit 160 may determine, from among the allocatable computing devices 1, a computing device 1 to which each module is to be allocated such that the deployment conditions of the communication function software 111 are satisfied and power consumption is reduced.
[0059] The remaining resource management unit 170 accumulates data on surplus computer resources of each commercial server 230 constituting the virtualization infrastructure, acquired by the server performance monitoring unit. The surplus computer resources are investigated, for example, in the order shown in Fig. 6. The commercial server 230 shown in Fig. 6 is composed of a CPU 5, a GPU 6, an FPGA 7, a NIC (Network Interface Card) 8, and a memory 9.
[0060] The communication function deploying unit 180 deploys the communication function software 111 on the commercial server 230 as allocated by the allocation control unit 160 .
[0061] The commercial servers 230 are servers that deploy the communication function software 111 in response to a deployment request from the operator 10, and each commercial server 230 has at least a CPU 5 and a memory 9. The two or more commercial servers 230 included in the computer resource pool 200 are easy to manage if the computing devices 1 have the same configuration, but may have different configurations. Furthermore, at least one of the multiple commercial servers 230 has a hardware accelerator.
[0062] The above describes a form in which the virtualization infrastructure system 100 is capable of executing processes from storing the communication function software described below to notifying the completion of construction. However, the virtualization infrastructure system 100 may be in a form in which it is capable of executing processes from storing the communication function software to notifying the availability of the communication function software, or it may be in a form in which it is capable of executing processes from requesting communication function construction to notifying the completion of construction.
[0063] In the case of a form capable of processing everything from storing communication function software to notifying users that the communication function software is available, the virtualization infrastructure system 100 includes at least a communication function software storage unit 110, a communication function software analysis unit 120, a test server 130, a server performance monitoring unit 140, and an analysis result accumulation unit 150.
[0064] In the case of a form capable of processing everything from a request for communication function construction to notification of completion of construction, the virtualization infrastructure system 100 includes at least a server performance monitoring unit 140, an analysis result storage unit 150, an allocation control unit 160, a remaining resource management unit 170, and a communication function deployment unit 180.
[0065] [How to control virtualization infrastructure] <From storing communication function software to notifying users that communication function software is available> The procedure of the process performed by the virtualization infrastructure system from storing the communication function software to notifying the availability of the communication function software will be described with reference to FIG.
[0066] 7, first, the operator 10 stores the communication function software 111 in the communication function software storage unit 110 (step S1). Next, the communication function software storage unit 110 requests the communication function software analysis unit 120 to analyze the computation characteristics of the stored communication function software 111 (step S2). At this time, the communication function software storage unit 110 transmits the binary data shown in FIG. 2 to the communication function software analysis unit 120.
[0067] The communication function software analysis unit 120, which has received the analysis request, deploys the received binary data in the test server 130 (step S3). Next, the communication function software analysis unit 120 applies a load pattern to the test server 130 (step S4), and receives data indicating the state of the test server 130 from the server performance monitoring unit 140 (step S5). After receiving sufficient data from the server performance monitoring unit 140 to analyze the computation characteristics of the communication function software 111, the communication function software storage unit 110 cancels the load pattern of the test server 130 (step S6).
[0068] The communication function software analysis unit 120 repeats the processes from S4 to S6 until all load patterns are completed. As shown in Fig. 3, when it is desired to obtain analysis results in which the call volume is varied to 10, 100, and 500 as the load pattern, the process from applying the load pattern (step S4) to canceling the load pattern (step S6) is repeated three times while varying the call volume.
[0069] After acquiring the analysis results for all load patterns, the communication function software analysis unit 120 transmits the results of analyzing the data received from the server performance monitoring unit 140 to the analysis result accumulation unit 150. The analysis result accumulation unit 150 stores the analysis results received from the communication function software analysis unit 120 (step S7).
[0070] After storing the analysis results in the analysis result accumulation unit 150, the communication function software analysis unit 120 transmits an analysis completion notification to the communication function software storage unit 110 (step S8). Upon receiving the analysis completion notification, the communication function software storage unit 110 transmits a communication function software availability notification to the operator 10 (step S9).
[0071] <From requesting communication function construction to notification of construction completion> The procedure of the process performed by the virtualization infrastructure system from storing the communication function software to notifying the availability of the communication function software will be described with reference to FIG.
[0072] 8, first, the operator 10 requests the allocation control unit 160 to build a communication function (step T1). Upon receiving the request to build a communication function, the allocation control unit 160 requests the analysis result accumulation unit 150 for the analysis result of the communication function software 111 requested to be built. The allocation control unit 160 receives the analysis result of the communication function software 111 from the analysis result accumulation unit 150, and thereby checks the calculation characteristics of the communication function software 111 (step T2). After checking the calculation characteristics, the allocation control unit 160 determines the computing device 1 to which the communication function software 111 is to be allocated for each module.
[0073] Next, the allocation control unit 160 requests data indicating surplus computer resources in each commercial server 230 from the remaining resource management unit 170. The allocation control unit 160 receives the data indicating surplus computer resources in each commercial server 230 from the remaining resource management unit 170, and checks whether each module can be allocated to the computing device 1 as specified (step T3). If the result of the check shows that a commercial server 230 is found that can be deployed as allocated, the commercial server 230 on which the communication function software 111 is to be deployed is determined.
[0074] At this time, by giving priority to the commercial servers 230 already executing the communication function software 111 when determining the commercial servers 230 to which the communication function software 111 is to be deployed, the number of commercial servers 230 executing the communication function software 111 can be reduced.
[0075] Next, the allocation control unit 160 requests the communication function deployment unit 180 to deploy the communication function software 111 to the available commercial servers 230 (step T4). Upon receiving the request, the communication function deployment unit 180 deploys the communication function software 111 to the commercial servers 230 so that each module is deployed on the allocated computing device 1 (step T5).
[0076] After completing the deployment, the communication function deployment unit 180 transmits a deployment completion notification to the allocation control unit 160 (step T6). The allocation control unit 160, which has received the deployment completion notification, transmits a construction completion notification to the operator 10 via the input / output interface (step T7).
[0077] <From requests for establishing communication functions to notifications of resource shortages> 9, a process procedure will be described for a case where a surplus of computer resources is confirmed in each commercial server 230 in step T3, and the result shows that the computer resources are insufficient. Note that steps T1 to T3 are the same, and therefore the description will be omitted.
[0078] If, as a result of checking the surplus computer resources of each commercial server 230, the allocation control unit 160 finds that the surplus resources of each commercial server 230 are insufficient and each module cannot be allocated to the computing device 1 as defined, it notifies the operator 10 that the communication function software 111 cannot be deployed due to a lack of computer resources (step T8). At this time, the allocation control unit 160 may notify the operator 10 together with information as to whether or not the current surplus computer resources allow deployment so as to satisfy the deployment conditions of the communication function software 111.
[0079] If the current surplus of computing resources allows deployment so as to satisfy the deployment conditions of the communication function software 111, the administrator 10 can reallocate them. At this time, the administrator 10 can, for example, calculate a combination of allocatable computing devices 1 based on the surplus of computing resources in each commercial server 230, and then instruct the allocation control unit 160 to reallocate the modules so as to determine, from among the allocatable computing devices 1, a computing device 1 to which each module is to be allocated so as to reduce power consumption while satisfying the deployment conditions of the communication function software 111.
[0080] If the communication function software 111 cannot be deployed so as to satisfy the deployment conditions due to a current surplus of computer resources, the administrator 10 instructs the communication function software 111 to be deployed since the deployment conditions of the communication function software 111 do not need to be satisfied, or instructs the deployment of the communication function software 111 to be cancelled.
[0081] In this way, the virtualization infrastructure system, the control program for the virtualization infrastructure system, and the control method for the virtualization infrastructure system of the present invention can allocate optimal computing devices while taking into account maintenance of service levels, computing resources, and power consumption. [Explanation of symbols]
[0082] 1. Computing Devices 5 CPU 6 GPU 7 FPGA 8 NIC 9. Memory 10 Operator 100 Virtualization Infrastructure Systems 110 Communication function software storage section 111 Communication function software 120 Communication Function Software Analysis Department 130 Test Server 140 Server Performance Monitoring Department 150 Analysis result storage section 160 Allocation control unit 170 Remaining Resource Management Unit 180 Communication Function Development Department 200 Computer Resource Pool 230 Commercial Server
Claims
1. A virtualization infrastructure system that deploys communication function software on a virtualization infrastructure, comprising: a server performance monitoring unit that grasps surplus computer resources of commercial servers that constitute the virtualization infrastructure; an allocation control unit that deploys the communication function software for each computing device of a test server including a CPU and one or more hardware accelerators, and determines a computing device of the commercial server to which the communication function software requested to be deployed is assigned based on a result of analyzing the computer resource consumption, power consumption, and delay time of the communication function software for each computing device, so that at least power consumption is reduced among the deployment conditions of the communication function software requested to be deployed, and determines the computing device to which the communication function software requested to be deployed is assigned by confirming whether the communication function software requested to be deployed can be deployed on the determined computing device based on the surplus of computing resources ascertained; a communication function deploying unit that deploys the communication function software requested to be deployed on the determined computing device; A virtualization infrastructure system comprising:
2. 2. The virtualization infrastructure system according to claim 1, wherein the allocation control unit determines the computing device to which the communication function software requested for deployment is assigned so as to provide a communication function during the requested period.
3. The communication function software includes a plurality of modules, 3. The virtualization infrastructure system according to claim 1, wherein the allocation control unit determines the computing device to be allocated to each of the plurality of modules.
4. A virtualization infrastructure system as described in any one of claims 1 to 3, characterized in that when determining the commercial servers to which the communication function software requested for deployment can be allocated, the allocation control unit prioritizes the commercial servers that are running the communication function software.
5. A control program that causes a computer to function as a virtualization infrastructure system described in any one of claims 1 to 4.
6. A method for controlling a virtualization infrastructure system that deploys communication function software in a virtualization infrastructure, comprising: grasping a surplus of computer resources of a commercial server constituting the virtualization infrastructure; deploying the communication function software for each computing device of a test server including a CPU and one or more hardware accelerators, determining a computing device of the commercial server to which the communication function software requested to be deployed is assigned so that at least power consumption is reduced among the deployment conditions of the communication function software requested to be deployed based on a result of analyzing the computer resource consumption, power consumption, and delay time of the communication function software for each computing device, and determining the computing device to which the communication function software requested to be deployed is assigned by confirming whether the communication function software requested to be deployed can be deployed on the determined computing device based on the surplus of computing resources ascertained; deploying the communication function software requested to be deployed on the determined computing device; A method for controlling a virtualization infrastructure system comprising:
Citation Information
Patent Citations
Virtualization base selection device and method thereof and program
JP2016143365A
Detecting and predicting bottlenecks in complex systems
JP2019525285A
Network system control method and control apparatus
JP2020102888A
Optimum arrangement method for software of off-road server, and program
JP2020137017A
Network system control method, control device, and server
JP6687106B2
