Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

429 results about "Resource assessment" patented technology

Service proxy method and system based on Dores front-end node

The invention provides a Dores front-end node-based service proxy method and system, and relates to the technical field of database access request processing, and the method comprises the steps: collecting front-end node performance indexes, extracting node performance characteristics through employing multi-head recursive attention and causal convolution solution, extracting inter-node correlation characteristics through combining graph attention convolution, and obtaining a database access request; the method comprises the following steps: constructing a node state vector, optimizing a multi-layer connection pool parameter by utilizing an online learning algorithm, establishing a node incidence matrix based on comparative learning, constructing a node performance probability graph evolution model through variational reasoning and Monte Carlo sampling, predicting a node performance change trend, and receiving a database access request; and generating a query plan by adopting an edge attention message passing mechanism, carrying out resource evaluation in combination with performance trend prediction, carrying out scheduling decision making by utilizing multi-agent reinforcement learning and Monte Carlo tree search, carrying out fault detection and migration according to node performance deviation, and updating a probability graph evolution model.
Owner:北京科杰科技有限公司

Method for improving power supply potential of emerging load based on dynamic prediction

The invention relates to the technical field of power system dispatching, in particular to an emerging load power supply potential improvement method based on dynamic prediction, which comprises the following steps of: acquiring emerging load power consumption, meteorological environment and power grid schedulable resource data in a target area through an Internet of Things sensing terminal, and performing two-channel modeling to obtain a new load power supply potential improvement model; a deep space-time network is used to predict a load curve, a model is established to quantify resource regulation potential, a scheduling priority list and a capacity allocation strategy are generated by means of a matching rule base according to load fluctuation and resource evaluation results, an actual scheduling effect is fed back to the prediction model, parameters are corrected through error back propagation, a closed-loop optimization link is formed, and the scheduling efficiency is improved. The method improves load prediction accuracy and resource scheduling adaptability, is suitable for emerging load power supply optimization in a novel power system, and guarantees stable and efficient operation of a power grid.
Owner:山东国研电力股份有限公司

Distributed heterogeneous computing power reasoning task dynamic scheduling method and system

The invention discloses a distributed heterogeneous computing power reasoning task dynamic scheduling method and system. The system comprises a computing power architecture adaptation module, a task scheduling module, a model updating module, a capability service module, a dynamic scheduling module, a resource evaluation module and a state sensing module. The computing power architecture adaptation module is used for identifying and matching a local heterogeneous computing power architecture and a remote heterogeneous computing power architecture; the task scheduling module is used for selecting a proper computing power terminal from a distributed heterogeneous computing power environment; the model updating module is used for updating the AI model in real time; the capability service module is used for providing a unified AI model service calling interface; the dynamic scheduling module is used for dynamically allocating computing power resources; the resource evaluation module is used for monitoring and evaluating the state of the computing power resource; the state sensing module is used for monitoring the health state of the computing power node in real time and responding to a fault in time; the scheduling efficiency of computing power resource scheduling is improved, and stable operation of the reasoning task is guaranteed.
Owner:BEIJING SILICON INTELLIGENCE TECH CO LTD

Heterogeneous computing cluster deployment method and collaborative scheduling system

The invention relates to the technical field of computers, provides a heterogeneous computing cluster deployment method and a collaborative scheduling system, realizes full-process automation and intelligent management from resource evaluation, task scheduling to dynamic optimization by accurately sensing the performance and task characteristics of computing units and the running state of a heterogeneous computing cluster, and improves the scheduling efficiency compared with a traditional scheduling scheme. According to the scheduling system, the heterogeneous computing cluster resource utilization rate, the task execution efficiency and the system stability are remarkably improved, the energy consumption cost is effectively reduced, the scheduling system adapts to the cluster environment with diversified task loads and dynamic changes, and an efficient and reliable collaborative scheduling solution is provided for a large-scale heterogeneous computing scene.
Owner:NEWLIXON TECH CO LTD +1

Task scheduling optimization method and device based on reinforcement learning, equipment and medium

The invention relates to a task scheduling optimization method and device based on reinforcement learning, equipment and a medium. The method comprises the steps that firstly, system resource state data are collected in real time, dynamic environment characteristics are determined through preprocessing and time sequence analysis, task characteristic data are analyzed at the same time, and a task priority sequence and a resource demand vector are generated through a priority ranking algorithm and a resource evaluation model; and then a state space and an action space are constructed by adopting a reinforcement learning algorithm, an optimal task allocation scheme is generated through strategy iteration and reward function optimization, and if the scheme meets a resource balance threshold, scheduling is executed, and performance indexes are collected. And finally, fusing real-time indexes with historical data, and updating parameters of the reinforcement learning model through experience playback and gradient descent to form a closed-loop optimized improved scheduling strategy. By adopting the method, the accurate mapping of the resource state and the task requirement can be realized, and the problem of insufficient adaptability of the traditional static scheduling to a complex scene is solved.
Owner:SHAOGUAN XINGCHENG NETWORK TECH CO LTD

Garden landscape plant health assessment method

The invention discloses a garden landscape plant health assessment method, and belongs to the technical field of resource assessment. Comprising the following steps: step 1, constructing a time sequence database of environmental factors and plant growth states; step 2, according to different plant species and growth stages thereof, dynamically calculating and generating a health reference value adapted to the current environmental condition; step 3, in the optimal evaluation time window, performing preliminary evaluation on the plant health condition, extracting original health indexes, and performing correction in combination with an environment disturbance compensation factor; step 4, performing double comparative analysis on the corrected health assessment result, eliminating false anomalies caused by environmental fluctuation, and calculating an anomaly confirmation credibility index; step 5, grading the plant health conditions, visually displaying the plant health conditions in a thermodynamic diagram form, and marking the environmental interference degree; and step 6, based on an evaluation result, automatically generating a targeted maintenance suggestion, and designing a corresponding maintenance effect verification scheme.
Owner:QINGDAO ZHIYONG CONSTR ENG CO LTD

Complex terrain wind resource assessment method based on correction of measured data of anemometer tower

The invention discloses a complex terrain wind resource assessment method based on measured data correction of an anemometer tower, and the method comprises the steps: simulating a complex terrain wind field based on a mesoscale WRF mode, and obtaining the mesoscale data of an innermost layer nested domain containing a wind power plant; according to the mesoscale data obtained in the step S1, microscale computational domain boundary inflow information is extracted, and initial prediction field information of the complex terrain wind field is obtained based on a mesoscale-microscale coupling mode; according to the anemometer tower position and the flow field characteristics, determining an anemometer tower reference height used for data correction and a corresponding observation wind speed and turbulence intensity; and S3, correcting the WRF-CFD numerical simulation result obtained in the step S2 by adopting the related data of the anemometer tower determined in the step S3 to obtain corrected wind speed and turbulence information of the wind field of the complex terrain. According to the method, the medium-micro scale coupling numerical simulation result can be improved, and the accuracy of wind resource evaluation is greatly improved.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Wind energy resource prediction method, system and device and storage medium

The invention discloses a wind energy resource prediction method, system and device and a storage medium, and relates to the field of renewable energy sources, and the method comprises the steps: obtaining the three-dimensional wind field observation data of a target region; performing space-time alignment processing operation on the three-dimensional wind field observation data to generate a space-time sequence; performing multi-source data fusion on the space-time sequence, and constructing a multi-dimensional wind field matrix; establishing a wind energy potential prediction model based on the multi-dimensional wind field matrix; and predicting to-be-predicted wind energy data based on the wind energy potential prediction model to obtain a wind energy resource prediction result. And efficient, accurate and reliable resource evaluation is provided for wind energy development of various terrain areas by constructing a machine learning model.
Owner:CHINA COMM CONSTR FIRST HARBOR CONSULTANTS

Optimal configuration method and device based on virtual power plant resources and computer equipment

The invention relates to an optimal configuration method, device and equipment based on virtual power plant resources. The method comprises the following steps: acquiring resource parameters of each virtual power plant resource, historical load data associated with each virtual power plant resource, external load data and user behavior data, and constructing a resource characteristic model for each virtual power plant resource according to the resource parameters, the historical load data, the external load data and the user behavior data, according to historical load data, external load data and user behavior data, load prediction is carried out according to the historical load data, the external load data and the user behavior data to obtain a load prediction result, adjustable capability indexes are determined according to the load prediction result and the resource characteristic model, and weighted fusion is carried out according to the adjustable capability indexes and the index weights of the adjustable capability indexes to obtain a resource evaluation result. And performing optimal configuration on each virtual power plant resource according to a preset configuration demand and the resource evaluation result corresponding to each virtual power plant resource. The method can improve the resource utilization rate and reduce the energy consumption.
Owner:CHINA SOUTHERN POWER GRID BIG DATA SERVICE CO LTD

Intelligent mineral resource exploration and evaluation system

The invention provides an intelligent mineral resource exploration and evaluation system, and relates to the technical field of data processing, and the system comprises a data preprocessing module which is used for preprocessing data to obtain preprocessed data; the stress analysis module is used for analyzing the rock physical property and the geological structure stress state of the exploration area according to the preprocessed data so as to obtain the relevance between the rock physical property and the geological structure stress state; calculating a dynamic adjustment coefficient according to the relevance between the rock physical property and the geological structure stress state; the resource reserve estimation module is used for estimating mineral resource reserves according to the dynamic adjustment coefficient; and the resource evaluation module is used for evaluating the mineral resource reserves to obtain a final evaluation result. According to the method, accurate analysis of the rock physical property and the geological structure stress state is realized, so that the accuracy and the reliability of exploration and evaluation of mineral resources are greatly improved.
Owner:SHANDONG INST OF GEOLOGICAL SCI

Smart fishery supervision method and system based on multi-source data fusion

The invention relates to the technical field of fishery management, in particular to an intelligent fishery supervision method and system based on multi-source data fusion, and the method comprises the steps: obtaining the multi-source trajectory data of a fishing boat, and carrying out the data fusion, and obtaining the precise trajectory data of the fishing boat; performing trajectory feature analysis, trajectory behavior pattern analysis and high-sensitivity point identification on the accurate trajectory data to obtain trajectory distribution of the fishing boat; obtaining multi-source fishery resource data and performing data fusion to obtain a fishery resource evaluation vector; the fishery resource prediction model processes the fishery resource evaluation vector to obtain fishery resource distribution; performing spatial coincidence analysis, time coincidence analysis and intensity coincidence analysis on the trajectory distribution of the fishing boats and the distribution of fishery resources to obtain analysis results; and an analysis result and management data are obtained and processed, and if abnormal behaviors exist, early warning is carried out.
Owner:JIANGSU TIANMAP GEOGRAPHIC INFORMATION ENG TECH CO LTD +1

Cross-scale wind power plant wind resource evaluation method based on numerical mode

The invention relates to the technical field of wind power generation, and discloses a cross-scale wind power plant wind resource evaluation method based on a numerical mode, comprising the following steps: step 1, acquiring multi-source observation data of a target area; step 2, screening a WRF optimal configuration scheme adaptive to the regional terrain; step 3, through a WRF power downscaling method, generating annual scale wind resource data as initial wind resource data; 4, performing partition correction on the initial wind resource data to obtain wind measurement data; step 5, constructing a WRF-WFP model coupling the WRF mode and the wind power plant parameterized model; step 6, optimizing WRF lower boundary conditions; 7, simulating the atmospheric flow of the target area, and quantifying the wake flow evolution characteristics of the wind power plant; 8, constructing a wake flow analysis model; and step 9, formulating a collaborative productivity plan of the wind power plant group. The power generation capacity of the wind power plant to be developed can be accurately predicted, and a reliable basis is provided for scientific decision-making of resource distribution development and planning of the million-kilowatt wind power plant.
Owner:SHANGHAI JIAOTONG UNIV

Wind resource assessment report generation method based on large model technology

The invention discloses a wind resource assessment report generation method based on a large model technology. The method comprises the following steps: processing multi-source data, and constructing a domain knowledge base and a fine tuning database; field adaptive RAG enhancement is carried out, professional literatures, historical cases and industry specifications in a field knowledge base are retrieved by adopting a retrieval enhancement generation technology, and wind resource assessment contents meeting technical standards are generated through a multi-modal fusion word vector technology; performing large model fine tuning, and optimizing the generative large model through a gradient-free optimization algorithm Wind-DFO on the basis of a fine tuning database by adopting a field self-adaptive fine tuning strategy; and automatically generating a report, arranging and matching multiple templates through an AI workflow, embedding a data visualization chart, executing verification of a grammar layer, a logic layer and a compliance layer, and outputting a standardized wind resource assessment report. The accuracy, specialty and efficiency of report generation are remarkably improved, and the problems that a traditional method depends on artificial experience, the data utilization efficiency is low, and standardization is insufficient are solved.
Owner:CHONGQING UNIV

Elastic management and optimal scheduling method and system for cloud computing resources

The invention discloses an elastic management and optimal scheduling method and system for cloud computing resources, and belongs to the technical field of cloud computing resource management.The method comprises the steps that a cluster composed of multiple types of intelligent agents is constructed, and the intelligent agents comprise a resource evaluation intelligent agent, an elastic telescopic intelligent agent, a load balancing intelligent agent and a fault recovery intelligent agent; the intelligent agents are distributed and deployed on different nodes of a cloud computing data center, and information interaction is realized through a communication interface based on RESTful API and a distributed message bus constructed by a gRPC protocol; a unified agent management platform is set up and is responsible for registration, monitoring, scheduling and dynamic adjustment of agents, and orderly operation and efficient cooperation of the whole multi-agent system are ensured. According to the method, the functions of efficient elastic allocation, intelligent load balancing, rapid fault recovery, continuous optimization evolution and the like of resources in the cloud computing data center can be realized, and the quality and competitiveness of cloud computing services are effectively improved.
Owner:SHANDONG INSPUR SCI RES INST CO LTD

Calculation power thermal evaluation method based on multi-dimensional data analysis and decision making system thereof

The invention provides a computing power thermal evaluation method based on multi-dimensional data analysis and a decision making system thereof, and relates to the technical field of computing power analysis, and the method comprises the steps: obtaining an original data set, and carrying out the preprocessing of the original data set to generate a standardized data set; performing vectorization processing and heterogeneous fusion on the standardized data set to generate a unified fusion data set; a hierarchical evaluation system is constructed, correlation analysis is performed based on evaluation index features, and a computing power evaluation feature set is formed; different initial index weights are configured for different types of regions; calculating an initial calculation force thermal value of each region; performing iterative optimization on the initial index weight by using an optimization algorithm; and recalculating the regional computing power thermal value based on the optimized index weight, generating a thermal time-space distribution map, and generating a computing power resource allocation scheme according to the thermal gradient difference. According to the method, the systematicness and objectivity of computing power resource assessment are improved, and a reliable decision basis is provided for regional computing power resource allocation.
Owner:HUBEI POST TELECOMM PLANNING DESIGN

Ecological product carbon sink value accounting method

The invention discloses an ecological product carbon sink value accounting method, belongs to the technical field of resource evaluation, and solves the problem that a regional carbon sink estimation result has deviation due to the fact that the existing method is insufficient in single remote sensing data coverage range and resolution and is difficult to adapt to spatial heterogeneity of a region to which a product belongs. The method comprises the following steps: acquiring multi-source heterogeneous carbon sink monitoring data associated with a sub-monitoring area in real time according to a preset acquisition period, preprocessing the multi-source heterogeneous carbon sink monitoring data, and performing data enhancement on a normalized data set based on a Mosaic-Mixup mixing method; executing the carbon sink value accounting model, wherein the carbon sink value accounting model outputs a carbon sink value accounting result; according to the method, a method of preprocessing the multi-source heterogeneous carbon sink monitoring data and performing data enhancement on the normalized data set is adopted, so that accurate and scientific data support can be provided for the carbon sink value accounting of the ecological product, and the carbon sink capacity of the regional ecological product can be accurately evaluated by the carbon sink value accounting model.
Owner:YUNNAN ACAD OF ENVIRONMENTAL SCI

Resource optimization scheduling method for high-performance parallel computing data center

The invention discloses a resource optimization scheduling method for a high-performance parallel computing data center, and relates to the technical field of resource optimization scheduling, and the method comprises the steps: collecting multi-dimensional parameters of the high-performance parallel computing data center, and carrying out the preprocessing; calculating a comprehensive scheduling target index according to the preprocessed parameters; calculating a comprehensive resource scheduling index according to the comprehensive scheduling target index, setting the comprehensive resource scheduling index as a target function, defining a constraint condition, and constructing a multi-target optimization model; and solving the multi-objective optimization model according to a multi-objective optimization algorithm, generating a resource allocation scheme, and allocating tasks to corresponding resource nodes to complete resource optimization scheduling. The comprehensive resource scheduling index is constructed, and the optimal solution is efficiently searched in the complex high-dimensional solution space by using the multi-objective optimization algorithm, so that the comprehensiveness of resource evaluation, the construction efficiency of the scheduling index and the optimization quality and practicability of the resource allocation scheme are remarkably improved.
Owner:BORNSALES SCI & TECH CO LTD

First-aid method and system based on 5G communication and edge device

The invention provides a first-aid method and system based on 5G communication and an edge device. The method comprises the following steps: determining a communication protocol target adaptation protocol with a 5G base station based on the edge device; obtaining multi-modal data according to the target adaptation protocol based on the edge device, and performing priority classification on the multi-modal data to obtain a priority classification result; evaluating the 5G network resources of the edge device, determining a resource evaluation result, and determining a cloud transmission strategy based on the resource evaluation result and the priority classification result; performing association analysis on the vital sign data, the medical image data and the voice record data to obtain a calculation task and task complexity, processing the calculation task based on the task complexity and a cloud transmission strategy, and determining a data processing result; and data processing results are transmitted to the first-aid smart center and the mobile terminal in a grading manner. According to the method and the device, the compatibility problem caused by non-uniformity of device interfaces is solved, and the edge device processing capability is improved.
Owner:GUANGDONG YITONG SOFTWARE CO LTD

Marine fishery resource survey station adaptive optimization method based on space-time coupling model

The invention discloses a marine fishery resource survey station adaptive optimization method based on a space-time coupling model. According to the method, a space-time continuous species distribution dynamic reference field is constructed by coupling a Bayesian hierarchical species distribution model and a regional ocean model system; performing ecological layering based on time, space and environment dimensions; and when the environment variables change significantly, a habitat suitability index is dynamically reconstructed, and the station layout is optimized again, so that the coverage of a key ecological hot spot area is ensured, and the in-gradient representativeness is maintained. The method has the advantages of fast environmental response, strong spatial representativeness, high adaptability and the like, and is suitable for scenes of resource assessment, ecological protection, biodiversity monitoring and the like.
Owner:EAST CHINA SEA FISHERIES RES INST CHINESE ACAD OF FISHERY SCI

HIVE grouping operation performance optimization and scheduling method based on key column partition

The invention provides an HIVE grouping operation performance optimization and scheduling method based on key column partitioning, which relates to the technical field of data processing, and comprises the following steps: preprocessing data by constructing a key column distribution histogram and determining a key column partitioning strategy; optimizing data partitions based on resource evaluation and a dynamic programming algorithm; and calculating an optimal data transmission path by adopting a minimum spanning tree algorithm, and dynamically adjusting an allocation scheme. According to the method, HIVE grouping operation performance can be improved, dynamic balance of calculation loads is achieved, the problem of data skew is effectively solved, and large-scale data processing efficiency is improved.
Owner:北京科杰科技有限公司

Deep reservoir physical property prediction and oil and gas resource evaluation system based on artificial intelligence

The invention provides a deep reservoir physical property prediction and oil and gas resource evaluation system based on artificial intelligence. And the problems of physical property prediction and resource evaluation of low-porosity and low-permeability reservoirs in oil-gas exploration are solved. The system fuses earthquake, well drilling and well logging data, and generates a high-quality reservoir database through data cleaning, normalization and interpolation processing. A deep learning model is constructed by adopting a convolutional neural network and a long-short-term memory network, a nonlinear relationship between reservoir physical properties and multi-source data is automatically captured, and high-precision prediction is realized. The system is integrated with a real-time economic evaluation module, and an economic evaluation result is dynamically adjusted through a gradient enhanced tree model in combination with real-time market data. In addition, an automatic feedback mechanism is introduced into the system, and a region with a large error is re-sampled and the model is updated. According to the scheme, the reservoir prediction precision and exploration efficiency are remarkably improved, dynamic economic analysis is supported, and reliable technical guarantee is provided for exploration and development decisions of deep oil and gas resources.
Owner:SHANGHAI BRANCH CHINA OILFIELD SERVICES

Metal resource evaluation method and system based on geological exploration

The invention discloses a metal resource assessment method and system based on geological exploration, relates to the technical field of mineral data processing, and effectively solves key problems in geological resource assessment through multi-module collaboration. A data fusion module integrates drilling data Zk, geophysical data Dw and remote sensing data Yg; the confidence Rx is calculated by using an adaptive weighting algorithm and probability filling is carried out, so that the data sparsity error is remarkably reduced; the boundary optimization module is used for calculating a mineralization continuity index Lx and generating a boundary optimization coefficient Ly in combination with the temperature dynamic factor Tx so as to realize intelligent correction of the boundary of the ore body; the depth correction module constructs a depth compensation model through the signal intensity M, the stability V and the noise level N, the deep data credibility Sx is improved, Monte Carlo simulation and dynamic parameter adjustment are matched, the system overcomes the defects of a traditional method in the aspects of data uncertainty, boundary ambiguity and deep precision, and the method has the advantages of being high in accuracy and high in reliability. And full-process automation and high-precision resource evaluation and early warning are realized.
Owner:甘肃省地质矿产勘查开发局第二地质矿产勘查院

Complex terrain wind resource assessment method and system based on CFD enhancement

The invention relates to the technical field of terrain wind resource assessment, in particular to a complex terrain wind resource assessment method and system based on CFD enhancement, and the method comprises the steps: processing terrain, weather and vegetation data, and generating a complex terrain feature vector; constructing bidirectional interaction between a mesoscale meteorological mode and computational fluid dynamics, and iteratively optimizing a flow field; fluid dynamic parameters are calculated through reinforcement learning automatic optimization; turbulence simulation is enhanced by combining the generative adversarial network with large eddy simulation; dynamically allocating resolution according to the grid priority of the multi-feature calculation; the lightweight model pre-judges errors, and after the errors reach the standard, evaluation indexes are calculated to complete wind resource evaluation; the system comprises a multi-source data fusion module, a dynamic coupling module, a parameter optimization module, a reinforced turbulence simulation module, an adaptive grid module and an error prediction and evaluation module, and all the modules cooperate to achieve full-process evaluation. The problems that in the prior art, one-way coupling precision is low, manual parameter selection is low in efficiency, turbulence simulation precision and efficiency are difficult to balance, and static grids are wasted are solved.
Owner:POWERCHINA BEIJING ENG CORP

Multi-dimensional standard-oriented talent resource information management platform and method

The invention provides a talent resource information management platform and method oriented to a multi-dimensional standard, and relates to the technical field of resource information management, and the method comprises the steps: receiving multi-source talent data through multiple data sources; performing talent resource evaluation on the multi-source talent data according to the evaluation dimension of the talent, and constructing a talent stereo map; performing intelligent feature analysis based on the talent stereo map to generate a comprehensive evaluation score; performing personalized talent recommendation according to the comprehensive evaluation score to obtain a comprehensive recommendation result; and carrying out dynamic visualization on the comprehensive recommendation result, and carrying out interactive management. According to the method and the device, the technical problem that effective integration of talents and team cooperation efficiency are further influenced due to lack of comprehensive consideration of multi-dimensional features in candidate evaluation in the prior art can be solved, and the technical goal of performing multi-dimensional feature comprehensive evaluation on candidates is achieved; the technical effect of improving the talent matching degree and the team cooperation efficiency is achieved.
Owner:GUIJU (ZHEJIANG) BIG DATA INFORMATION TECHNOLOGY CO LTD

Three-dimensional visualization expression method for multi-scale geological structure model

The invention provides a three-dimensional visualization expression method for a multi-scale geological structure model, including: collecting geological exploration data which includes geophysical information, drilling information, outcrop survey information, seismic information and geological age data; performing interpolation simulation on the geological exploration data to obtain an exploration sample set; preprocessing the exploration sample set to obtain preprocessed data, the preprocessing process including data cleaning, format unification and noise removal; constructing a multi-scale geological structure model according to the preprocessed data based on a three-dimensional modeling technology; performing scale decomposition on the geological structure model using a multi-scale analysis method to form model representations at different scale levels; and converting the model representations into 3D visualization images using a 3D graphics processing technology. The invention can effectively improve the expression ability of geological model and user experience, and has important practical application value for geological exploration and resource assessment.
Owner:INSTITUTE OF GEOLOGY AND GEOPHYSICS CHINESE ACADEMY OF SCIENCES

Collaborative planning method for regional integrated energy system

The invention discloses a collaborative planning method for a regional integrated energy system, and the method comprises the steps: firstly collecting regional historical energy consumption data and various external factor data, and predicting an energy demand through employing a gray prediction and multiple linear regression combined algorithm; exploring existing energy supply facilities in the region and evaluating renewable energy potential; determining a candidate type of the integrated energy system component according to the result, establishing an optimal configuration model, and solving through a particle swarm optimization algorithm; constructing an energy network layout planning model, and determining an optimal topological structure and parameters of the network; establishing a dynamic operation model, and formulating a collaborative operation strategy by using a model prediction control algorithm; and finally, comprehensively evaluating the planning scheme, and analyzing and adjusting the scheme by utilizing sensitivity according to an evaluation result. According to the method, multiple factors are comprehensively considered, and the problems that in existing regional integrated energy system planning, demand prediction is not accurate, resource evaluation is not comprehensive, component configuration and network layout lack optimization collaboration, and the operation strategy is single are effectively solved.
Owner:STATE GRID SIJI FEITIAN (LANZHOU) CLOUD TECH CO LTD

Emergency resource intelligent scheduling optimization method and system based on large model analysis

The invention provides an emergency resource intelligent scheduling optimization method and system based on large model analysis, and relates to the technical field of emergency resource scheduling. The method comprises the steps of collecting emergency event data and environment data; extracting emergency event features and environment features, constructing a prediction model based on a long short-term memory network, and obtaining a required emergency resource list; constructing an emergency resource evaluation model based on an analytic hierarchy process, and obtaining priority scores of the required emergency resources; constructing a multi-objective optimization model, and solving the multi-objective optimization model by using a particle swarm algorithm to generate a scheduling scheme; and constructing a decision function, and solving by using a genetic algorithm to obtain a scheduling decision. According to the method, through accurate prediction, scientific evaluation, multi-objective optimization and decision in combination with priority, the accuracy and efficiency of emergency resource scheduling and the resource utilization efficiency can be remarkably improved, powerful support is provided for emergency management work, and the method has important practical significance and application value.
Owner:WUHAN ZHONGDI YUNSHEN TECH CO LTD

Multi-dimensional fusion medical resource intelligent monitoring and early warning method

The invention discloses a multi-dimensional fusion medical resource intelligent monitoring and early warning method. According to the method and the device, the integrity and the accuracy of the medical resource data are improved through a multi-dimensional data fusion and dynamic calibration mechanism. Multi-source data of a medical institution system, a regional health platform, wearable equipment and the like are integrated, comprehensive data coverage and timely updating are ensured, and resource monitoring blind areas caused by information islands are reduced. Through the processing flows of noise filtering, missing value filling, abnormal value identification and the like, the influence of data errors on resource evaluation is reduced, quantitative analysis of key indexes such as medical resource supply and patient demands is closer to the actual situation, and the timeliness of medical resource risk early warning and the effectiveness of decision support are enhanced. The hierarchical early warning model constructed based on the multi-modal feature matrix can identify potential risks from multiple dimensions of resource exhaustion, service saturation, regional propagation and the like, and ensures reasonable distribution and efficient utilization of medical resources in different scenes.
Owner:HENGRUITONG FUJIAN INFORMATION TECH CO LTD

Power centralized control center data verification and backup method and device

The invention provides a power centralized control center data verification and backup method and device, and the method comprises the steps: obtaining hardware resource information corresponding to an operating system, and constructing a thread resource pool; the method comprises the following steps: connecting data sources of an electric power centralized control center, classifying and rating the data sources, and carrying out real-time demand analysis by adopting a parameterized mixed time algorithm to obtain a data task queue with a priority mark; monitoring the load state of an operating system and the length of a task queue, performing resource evaluation by applying an online distributed queue length estimation algorithm, dynamically creating a working thread and allocating resources; based on a thread resource allocation scheme, executing parallel data verification by adopting a sub-exponential algorithm on an independent set; and evaluating a backup demand according to the data verification result set, determining a backup strategy, and executing parallel data backup. According to the method, the characteristics of a domestic operating system are fully utilized, efficient verification and backup of the data of the electric power centralized control center are achieved, and the system resource utilization rate and the data safety are improved.
Owner:BEIJING IWHR TECH

Resource dynamic analysis and sample load scheduling optimization method oriented to edge distributed training

The invention discloses an edge distributed training-oriented resource dynamic analysis and sample load scheduling optimization method. The method comprises the following steps of: counting an operator proportion; operating a single resource intensive load of the computing power resource, and obtaining the total number of training samples of the load, the computing power resource utilization rate and the load completion time; obtaining a task execution strength value according to the total number of the training samples and the load completion time; obtaining a computing power resource evaluation value according to the computing power resource utilization rate and the task execution strength value; obtaining a distortion radar map according to the computing power resource and the operator proportion; and marking the calculation power resource evaluation value in the distortion radar map, obtaining the ratio of the calculation power resource to the task matching degree of the calculation nodes, establishing an optimization model by taking the time interval of completing iteration by minimizing the fastest node and the slowest node as an optimization target, and obtaining a sample load distribution optimization scheme. The problems of equipment isomerism and limited computing power resources in an edge environment are solved.
Owner:NANJING UNIV OF INFORMATION SCI & TECH