Electrical energy scheduling method, vehicle controller, battery management system, system, device and medium

The VCU-based method for determining scheduling modes in bidirectional energy flow between a power grid and vehicle batteries addresses inefficiencies by allowing the BMS to adapt charging and discharging processes, ensuring efficient and flexible energy management.

JP7590573B2Active Publication Date: 2024-11-26CONTEMPORARY AMPEREX TECHNOLOGY (HONG KONG) LIMITED
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023533223
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-09-29
Publication Date
2024-11-26
Estimated Expiration
2041-09-29

AI Technical Summary

Technical Problem

Current technologies lack the ability to rationally control bidirectional electrical energy scheduling between a power grid and a vehicle, leading to inefficiencies in charging and discharging processes.

Method used

Implementing a method where a vehicle controller (VCU) determines the scheduling mode based on charging/discharging completion information, allowing the battery management system (BMS) to continue or terminate the electrical energy scheduling process as needed, ensuring flexible and rational control of bidirectional energy flow.

Benefits of technology

Enables efficient and flexible scheduling of electrical energy between the power grid and vehicle batteries, allowing vehicles to continue charging or discharging as required, improving the rationality and convenience of energy management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007590573000001
    Figure 0007590573000001
  • Figure 0007590573000002
    Figure 0007590573000002
  • Figure 0007590573000003
    Figure 0007590573000003
Patent Text Reader

Abstract

The present disclosure provides an electric energy scheduling method, device, system, apparatus, and medium. The method includes a power grid scheduling platform performing electric energy scheduling between a power grid and a vehicle battery via a charging / discharging device, the method including: receiving charging / discharging completion information sent by a BMS; determining whether the scheduling mode of the scheduling process is a target scheduling mode based on the charging / discharging completion information; and, if the scheduling mode is the target scheduling mode, allowing the BMS to accept the electric energy scheduling of the power grid scheduling platform. The present disclosure can rationally control the scheduling process of bidirectional electric energy scheduling between a power grid and a vehicle.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present application relates to the field of power technology, and in particular to an electric energy scheduling method, a vehicle controller, a battery management system, a system, an apparatus, and a medium. [Background technology]

[0002] With the development of new energy technology, the application field of batteries is becoming more and more widespread. For example, batteries are used as a power source to power power-consuming devices, thereby reducing the use of non-renewable resources. With the development of batteries, battery charging technology is also developing rapidly.

[0003] With the development of charging technology, the power grid scheduling platform can realize two-way flexible scheduling of electric energy between the power grid and the vehicle through the charging and discharging device supporting vehicle-to-grid (V2G) technology. For example, the power grid scheduling platform can schedule electric energy from the power grid to the vehicle's power battery according to demand, or can schedule electric energy from the vehicle's power battery to the power grid according to demand.

[0004] At present, there is a lack of means that can rationally control the scheduling process of bidirectional electric energy scheduling between the power grid and the vehicle. Summary of the Invention

[0005] Embodiments of the present application provide an electric energy scheduling method, a vehicle controller, a battery management system, a system, an apparatus, and a medium that can rationally control the scheduling process of bidirectional electric energy scheduling between a power grid and a vehicle.

[0006] According to a first aspect, an embodiment of the present application is applied to a VCU of a vehicle, In a scheduling process of the power grid scheduling platform performing electric energy scheduling between the power grid and the battery of the vehicle through the charging and discharging device, receiving charge / discharge completion information sent by the battery management system BMS, the charge / discharge completion information being sent by the BMS when a first electrical performance parameter of the battery satisfies a preset charge / discharge cut-off condition; According to the charging / discharging completion information, determine whether the scheduling mode of the scheduling process is a target scheduling mode, and the target scheduling mode is a bidirectional electric energy scheduling mode between the power grid and the battery; If the scheduling mode is a target scheduling mode, the BMS allows the power grid scheduling platform to accept the electric energy scheduling.

[0007] In the electric energy scheduling method of the embodiment of the present application, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging and discharging device, the BMS can send charging and discharging completion information to the VCU of the vehicle when the first electric performance parameter of the battery meets the preset charging and discharging cut-off condition, and the VCU can determine whether the scheduling mode of the scheduling process is a target scheduling mode for performing bidirectional scheduling for electric energy between the power grid and the vehicle according to the scheduling mode information in the charging and discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging and discharging process when the charging and discharging completion information is received, the scheduling process of bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging and discharging process of the vehicle.

[0008] In a preferred embodiment, the charge / discharge completion information includes scheduling mode information, and the step of determining whether the scheduling mode of the scheduling process is the target scheduling mode based on the charge / discharge completion information includes: The method includes determining whether the scheduling mode indicated by the scheduling mode information is the target scheduling mode.

[0009] According to this embodiment, the VCU can determine the electric energy scheduling mode based on the scheduling mode information in the charging / discharging completion information, and can select whether to control the BMS to terminate the electric energy scheduling based on the electric energy scheduling mode, so as to accurately identify whether the current electric energy scheduling process is a bidirectional electric energy scheduling process between the power grid and the battery, and further facilitate adopting different control policies according to different scheduling processes.

[0010] In a preferred embodiment, the step of determining whether the scheduling mode of the scheduling process is the target scheduling mode based on the charge / discharge completion information includes: The method includes a step of determining whether the charge / discharge completion information includes a target identifier, the target identifier being added to the charge / discharge completion information when the BMS determines that the scheduling mode is a scheduling mode other than the target scheduling mode, and the target identifier being a full charge identifier or a full discharge identifier.

[0011] According to this embodiment, the VCU can determine the electric energy scheduling mode based on whether the charging / discharging completion information includes a target identifier, and can select whether to control the BMS to terminate the electric energy scheduling based on the electric energy scheduling mode, so as to accurately identify whether the current electric energy scheduling process is a bidirectional electric energy scheduling process between the power grid and the battery, and further facilitate adopting different control policies according to different scheduling processes.

[0012] In a preferred embodiment, when the scheduling mode is a target scheduling mode, the step of allowing the BMS to accept the electric energy scheduling of the power grid scheduling platform specifically includes: If the scheduling mode is the target scheduling mode, the charging / discharging termination command is not sent to the BMS.

[0013] According to this embodiment, the VCU does not send a charge / discharge termination command, so that the two-way electrical energy scheduling process between the power grid and the battery can be rationally controlled by simply changing the communication policy on the VCU side, thereby improving the convenience of control.

[0014] According to a second aspect, the present invention is applied to a BMS, In a scheduling process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the battery of the vehicle through the charging and discharging device, the scheduling process includes obtaining a first electric performance parameter of the battery; When the first electrical performance parameter satisfies a preset charging / discharging cut-off condition, sending charging / discharging completion information to a vehicle controller VCU of the vehicle, the VCU determines whether a scheduling mode of the electrical energy scheduling is a target scheduling mode based on the charging / discharging completion information, and if the scheduling mode is the target scheduling mode, allowing the BMS to accept the electrical energy scheduling of the power grid scheduling platform.

[0015] In the electric energy scheduling method of the embodiment of the present application, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging and discharging device, the BMS can send charging and discharging completion information to the VCU of the vehicle when the first electric performance parameter of the battery meets the preset charging and discharging cut-off condition, and the VCU can determine whether the scheduling mode of the scheduling process is a target scheduling mode for performing bidirectional scheduling for electric energy between the power grid and the vehicle according to the charging and discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging and discharging process when the charging and discharging completion information is received, the scheduling process of bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging and discharging process of the vehicle.

[0016] In a preferred embodiment, after the step of transmitting charge / discharge completion information to the VCU of the vehicle, receiving charging / discharging end information sent by a power grid scheduling platform;

[0017] and terminating the electrical energy scheduling in response to the charging / discharging termination information sent by the VCU.

[0018] According to this embodiment, under the control of the power grid scheduling platform, the two-way scheduling mode between the power grid and the battery can be terminated, improving the rationality of the two-way scheduling.

[0019] In a preferred embodiment, the charging / discharging termination information is sent by the power grid scheduling platform to the BMS when the power grid scheduling platform determines that the electric energy scheduling parameters acquired in real time meet the target scheduling conditions.

[0020] the electrical energy scheduling parameters include a scheduling time parameter and / or a second electrical performance parameter of the battery; When the electrical energy scheduling parameter includes a scheduling time parameter, the target scheduling condition includes that the scheduling time parameter acquired in real time reaches the target scheduling time parameter; When the electrical energy scheduling parameters include a second electrical performance parameter, the target scheduling condition includes the second electrical performance parameter obtained in real time reaching the target electrical performance parameter.

[0021] In this embodiment, according to this embodiment, the power grid scheduling platform can obtain the electric energy scheduling parameters in real time, and when the electric energy scheduling parameters meet the target scheduling conditions, send charging / discharging end information to instruct the VCU to end the electric energy scheduling. The electric energy scheduling parameters can indicate the real-time electric energy scheduling state, so that the power grid scheduling platform can accurately control the electric energy scheduling process according to the electric energy scheduling state.

[0022] In a preferred embodiment, the VCU does not respond to the charge / discharge completion information when the scheduling mode is the target scheduling mode.

[0023] According to this embodiment, the VCU does not send a charge / discharge termination command, so that the two-way electrical energy scheduling process between the power grid and the battery can be rationally controlled by simply changing the communication policy on the VCU side, thereby improving the convenience of control.

[0024] In a third aspect, the present application provides an embodiment comprising: A first information receiving module is used for receiving charge / discharge completion information sent by a battery management system (BMS) in a scheduling process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the battery of the vehicle via a charging / discharging device, the charge / discharge completion information including scheduling mode information, and the charge / discharge completion information is sent by the BMS when a first electrical performance parameter of the battery satisfies a preset charge / discharge cutoff condition; A mode determination module is used to determine whether a scheduling mode of the scheduling process is a target scheduling mode according to the scheduling mode information, and the target scheduling mode is a bidirectional electric energy scheduling mode between the power grid and the battery; and a control module used for a step of allowing the BMS to accept the electric energy scheduling of the power grid scheduling platform when the scheduling mode is the target scheduling mode.

[0025] In the VCU of the embodiment of the present application, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging and discharging device, the BMS can send charging and discharging completion information to the VCU of the vehicle when the first electric performance parameter of the battery meets the preset charging and discharging cut-off condition, and the VCU can determine whether the scheduling mode of the scheduling process is a target scheduling mode for performing bidirectional scheduling for electric energy between the power grid and the vehicle according to the scheduling mode information in the charging and discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging and discharging process when the charging and discharging completion information is received, the scheduling process of bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging and discharging process of the vehicle.

[0026] According to a fourth aspect, the present embodiment comprises: A parameter acquisition module is used for acquiring a first electrical performance parameter of the battery in a process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the battery of the vehicle through the charging and discharging device; and an information sending module used in the steps of: sending charge / discharge completion information to a vehicle controller VCU of the vehicle when the first electrical performance parameter satisfies a preset charge / discharge cut-off condition, and the VCU determining whether the scheduling mode of the electrical energy scheduling is a target scheduling mode based on the scheduling mode information in the charge / discharge completion information; and allowing the BMS to accept the electrical energy scheduling of the power grid scheduling platform if the scheduling mode is the target scheduling mode.

[0027] In the embodiment of the present application, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging and discharging device, the BMS can send charging and discharging completion information to the VCU of the vehicle when the first electric performance parameter of the battery meets the preset charging and discharging cut-off condition, and the VCU can determine whether the scheduling mode of the scheduling process is a target scheduling mode for performing bidirectional scheduling for electric energy between the power grid and the vehicle according to the scheduling mode information in the charging and discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging and discharging process when the charging and discharging completion information is received, the scheduling process of bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging and discharging process of the vehicle.

[0028] According to the fifth aspect, A VCU as provided by the third aspect or any preferred embodiment of the third aspect; and a BMS provided by the fourth aspect or a preferred embodiment of any of the fourth aspect.

[0029] In the electric energy scheduling system of the embodiment of the present application, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging and discharging device, the BMS can send charging and discharging completion information to the VCU of the vehicle when the first electric performance parameter of the battery meets the preset charging and discharging cut-off condition, and the VCU can determine whether the scheduling mode of the scheduling process is a target scheduling mode for performing bidirectional scheduling for electric energy between the power grid and the vehicle according to the scheduling mode information in the charging and discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging and discharging process when the charging and discharging completion information is received, the scheduling process of bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging and discharging process of the vehicle.

[0030] According to a sixth aspect, a processor and a memory for storing computer program commands; The processor reads and executes the computer program commands to provide an electric energy scheduling apparatus for implementing the electric energy scheduling method provided by the first aspect or any preferred embodiment of the first aspect, or for implementing the electric energy scheduling method provided by the second aspect or any preferred embodiment of the second aspect.

[0031] In the electric energy scheduling device of the embodiment of the present application, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging and discharging device, the BMS can send charging and discharging completion information to the VCU of the vehicle when the first electric performance parameter of the battery meets the preset charging and discharging cut-off condition, and the VCU can determine whether the scheduling mode of the scheduling process is a target scheduling mode for performing bidirectional scheduling for electric energy between the power grid and the vehicle according to the scheduling mode information in the charging and discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging and discharging process when the charging and discharging completion information is received, the scheduling process of bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging and discharging process of the vehicle.

[0032] According to a seventh aspect, there is provided a computer storage medium having stored thereon computer program commands which, when executed by a processor, perform the electric energy scheduling method provided by the first aspect or any preferred embodiment of the first aspect, or, when executed by a processor, perform the electric energy scheduling method provided by the second aspect or any preferred embodiment of the second aspect.

[0033] In the computer storage medium of the embodiment of the present application, in a process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging and discharging device, the BMS can send charging and discharging completion information to the VCU of the vehicle when the first electric performance parameter of the battery meets the preset charging and discharging cut-off condition, and the VCU can determine whether the scheduling mode of the scheduling process is a target scheduling mode for performing bidirectional scheduling for electric energy between the power grid and the vehicle according to the scheduling mode information in the charging and discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging and discharging process when the charging and discharging completion information is received, the scheduling process of bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging and discharging process of the vehicle. [Brief description of the drawings]

[0034] In order to more clearly describe the technical solutions in the embodiments of the present application, the following provides a brief description of the drawings required for the embodiments of the present application. It should be understood that the drawings shown below are only some embodiments of the present application, and those skilled in the art can further obtain other drawings based on the drawings without creative efforts.

[0035] [Figure 1] FIG. 2 is a schematic diagram of an exemplary electrical energy scheduling scene according to an embodiment of the present application; [Diagram 2] 2 is a flowchart of an electric energy scheduling method according to an embodiment of the present application; [Diagram 3] 4 is a flowchart of another electric energy scheduling method according to an embodiment of the present application; [Figure 4]4 is a flowchart of another electric energy scheduling method according to an embodiment of the present application; [Diagram 5] 4 is a flowchart of another electric energy scheduling method according to an embodiment of the present application; [Figure 6] 4 is a flowchart of yet another electrical energy scheduling method according to an embodiment of the present application. [Figure 7] 1 is a schematic flow chart of an exemplary electrical energy scheduling method according to an embodiment of the present application; [Figure 8] FIG. 2 is a structural schematic diagram of a VCU according to an embodiment of the present application; [Figure 9] FIG. 1 is a structural schematic diagram of a BMS according to an embodiment of the present application. [Figure 10] FIG. 1 is a structural schematic diagram of a power grid scheduling system according to an embodiment of the present application; [Figure 11] 1 is a schematic diagram of the hardware structure of an electric energy scheduling device according to an embodiment of the present application; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0036] The embodiments of the present application will be described in more detail below with reference to the drawings and examples. The detailed description of the following examples and the drawings are used to exemplarily explain the principles of the present application, but are not intended to limit the scope of the present application, and the present application is not limited to the described examples.

[0037] It should be noted that, in this specification, relational terms such as first and second are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that any such actual relationship or order exists between those entities or operations. Furthermore, the terms "comprise", "include", and their variants are intended to be non-exclusive, and a process, method, article, or apparatus that includes a set of elements not only includes those elements, but also includes other elements not expressly listed, or further includes elements inherent to the process, method, article, or apparatus. In the absence of more limitations, an element qualified by the phrase "comprises" does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes the element.

[0038] Vehicle-to-grid (V2G) technology is a technology that allows electrical energy to flow bidirectionally between a battery of a vehicle and a power grid. The power grid can charge the battery of the vehicle through a charging / discharging device that supports the V2G technology, and the vehicle can transmit the electrical energy of the battery to the power grid through the charging / discharging device that supports the V2G technology. Here, the vehicle in the embodiment of the present application may be a vehicle that uses a power battery as a power source, such as a truck, a car, or a bus.

[0039] In the electric energy scheduling policy of the related art, a battery management system (BMS) of a vehicle can send charge / discharge completion information to a vehicle control unit (VCU) of the vehicle after determining that the battery of the vehicle is fully charged or fully discharged. After the VCU receives the charge / discharge completion information, it sends a charge / discharge end command to the BMS. The BMS responds to the charge / discharge end command and exits from the electric energy scheduling process. After the BMS exits from the electric energy scheduling flow, without manual intervention, the battery of the vehicle cannot continue charging / discharging, and correspondingly, the power grid scheduling platform cannot continue electric energy scheduling between the power grid and the vehicle battery.

[0040] However, in a practical electric energy scheduling scenario, when flexible two-way electric energy scheduling needs to be performed between the power grid and the vehicle battery, there may be a situation where the vehicle battery is first fully charged and then discharged, or the vehicle battery is first fully discharged and then recharged. In these situations, when the vehicle is fully charged or fully discharged, the VCU controls the BMS to end the scheduling process, so that the vehicle cannot continue to receive the electric energy scheduling of the power grid scheduling platform in the subsequent process.

[0041] In one exemplary scenario, in a certain area, the power usage low period is from 00:00 to 06:00 every day, and the power usage peak period is from 18:00 to 24:00 every day. A vehicle owner leaves a vehicle with a battery state of charge (SOC) of 40% at a charging station at 14:00 on the first day, chooses to use the vehicle at 8:00 a.m. on the second day, sets the target SOC to 100%, and selects the above target scheduling mode.

[0042] In this scenario, the power grid scheduling platform intends to transmit all the surplus electricity in the vehicle's battery with SOC 40% to the power grid during the peak power usage time period on the first day, i.e., 18:00-24:00 on the first day, and perform frequency modulation and peak regulation for the power grid. Then, during the low power usage time period on the next day, i.e., 00:00-06:00 on the next day, the power grid is used to charge the vehicle's battery to 100%, thereby satisfying the charging needs of the vehicle owner.

[0043] However, when using the above related technology, after the vehicle transmits all the surplus electricity of the battery with SOC 40% of the vehicle to the power grid from 18:00 to 24:00 on the first day, the BMS determines that the battery is fully discharged and sends charging / discharging completion information to the VCU, and then the VCU controls the BMS to exit the electric energy scheduling process, so that the vehicle cannot continue to be scheduled by the power grid scheduling platform. For example, the battery of the vehicle should be charged to SOC 100% from 00:00 to 06:00 the next day, but the vehicle has exited the electric energy scheduling process and cannot charge the battery. When the owner of the car uses the car at 8:00 a.m. the next day, the vehicle's battery SOC is 0%, that is, the battery electricity of the vehicle is empty. Therefore, the electric energy scheduling method in the related technology cannot reasonably control the two-way scheduling process of electric energy between the power grid and the vehicle.

[0044] Therefore, a solution applicable to bidirectional electric energy scheduling between the power grid and the vehicle is needed.

[0045] Based on this, the present application provides an electric energy scheduling method, device, system, apparatus and medium, which can be applied to the scenario of using a charging / discharging device to perform electric energy scheduling between a power grid and a vehicle. Specifically, after receiving the charging / discharging completion information of the BMS, if the VCU determines that the current electric energy scheduling mode is a bidirectional electric energy scheduling mode, it does not execute the flow of controlling the BMS to exit the charging / discharging mode, so that the battery of the vehicle can continue to be scheduled by the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging / discharging process when the charging / discharging completion information is received, the scheduling process of the bidirectional electric energy scheduling between the power grid and the vehicle can reasonably control the charging / discharging process of the vehicle.

[0046] In order to facilitate the description of the electric energy scheduling means provided by the embodiments of the present application, the following part of the embodiments of the present application first specifically describes an electric energy scheduling scenario.

[0047] Fig. 1 is a schematic diagram of an exemplary electric energy scheduling scene according to an embodiment of the present application. As shown in Fig. 1, the electric energy scheduling scene relates to a charging / discharging device 10, a vehicle 20, a power grid scheduling platform 30 and a power grid 40. The vehicle 20 includes a battery P1, a BMS 21 and a VCU 22. In Fig. 1, the hollow arrows indicate communication interactions, and the solid arrows indicate energy interactions.

[0048] Specifically, the power grid scheduling platform 30 can control the electric energy scheduling process between the power grid 40 and the battery P1 through the charging / discharging device 10. The charging / discharging device 10 can communicate with the power grid scheduling platform 30. The charging / discharging device 10 can communicate with the BMS 21, and the BMS 21 can communicate with the VCU 22. In some embodiments, the communication interaction between the above devices can be wired communication interaction based on a Controller Area Network (CAN) communication or the like, or wireless communication interaction can be performed by a method such as Bluetooth, WiFi, etc., which is not specifically limited herein.

[0049] In a specific scenario, the charging / discharging device 10 may be a charging station installed in a charging station. Correspondingly, after the vehicle arrives at the charging station, the electric energy scheduling between the power grid 40 and the battery P1 can be performed through the charging station in the charging station. The charging station may be a specific location or a location that can provide charging / discharging services to the vehicle, such as a mobile charging vehicle, and is not specifically limited here.

[0050] In another specific scenario, the charging / discharging device 10 may be a portable charging / discharging device such as an in-vehicle charging device, and correspondingly, the scheduling of electric energy between the battery P1 and the power grid 40 may be performed in a place where a commercial power source or the like is provided. For example, the scheduling of electric energy between the power grid 40 and the battery P1 may be performed in a place where a charging outlet is provided, such as a personal garage or parking lot.

[0051] After a basic understanding of the electric energy scheduling scene, in order to better understand the present application, the electric energy scheduling method, device, apparatus and medium according to the embodiments of the present application are described in detail below with reference to the drawings, but it should be noted that these embodiments do not limit the scope of the disclosure of the present application.

[0052] According to some embodiments of the present application, Fig. 2 is a flowchart of an electric energy scheduling method according to an embodiment of the present application. As shown in Fig. 2, the electric energy scheduling method 200 includes steps S210 to S230. The VCU 22 may be an entity that performs each step of the electric energy scheduling method.

[0053] In step S210, the power grid scheduling platform 30 receives the charge / discharge completion information sent by the BMS 21 in the scheduling process of performing electric energy scheduling between the power grid 40 and the battery P1 via the charge / discharge device 10.

[0054] In step S220, it is determined whether the scheduling mode of the scheduling process is the target scheduling mode based on the charge / discharge completion information.

[0055] In step S230, if the scheduling mode of the scheduling process is the target scheduling mode, the BMS 21 allows the power grid scheduling platform 10 to accept the electric energy scheduling.

[0056] Specific steps S210 to S230 of the electric energy scheduling method 200 will be introduced first, and then technical terms related to steps S210 to S230 will be described in detail.

[0057] The charging / discharging device 10 is a charging / discharging device 10 that supports a V2G function. In some embodiments, the charging / discharging device can be installed in a charging station or in a situation where it can be connected to a power grid, such as a parking lot. In some embodiments, the charging / discharging device 10 may include devices that support a V2G function and can charge and discharge the battery P1, such as a charging station, an AC-AC voltage conversion module, an AC-DC voltage conversion module, an on-board charger, etc., and the specific type is not limited. In some embodiments, when a charging connector of the charging / discharging device 10 is connected to a charging socket of the vehicle 20, electric energy interaction between the power grid 40 and the battery P1 of the vehicle 20 is realized through the charging / discharging device 10.

[0058] The battery P1 is a battery installed in the vehicle 20. The battery P1 can perform electrical energy interaction with the power grid 40 through the charging / discharging device 10. The battery P1 in the embodiment of the present application may be a lithium ion battery, a lithium metal battery, a lead acid battery, a nickel cadmium battery, a nickel hydrogen battery, a lithium sulfur battery, a lithium air battery, or a sodium ion battery, etc., and is not limited here. In terms of scale, the battery P1 in the embodiment of the present application may be a single cell, a battery module, or a battery pack, and is not limited here. In terms of application scenario, the battery P1 can be applied in the vehicle 20 to supply power to the motor of the vehicle 20 and be the power source of the vehicle 20. In terms of quantity, the number of the batteries P1 may be one or more, and is not limited here.

[0059] The BMS 21 can manage the battery P1. The BMS 21 is provided in the vehicle 20. Specifically, the BMS 21 can be used to monitor the voltage data of the battery P1 in the charging and discharging process of the battery P1 and communicate with the charging and discharging device 10 and the VCU 22, respectively. In some embodiments, the BMS 21 can also control the charging and discharging function of the battery P1. For example, the BMS 21 can control a relay provided on the electric energy transmission circuit of the battery P1. In a specific example, the BMS 21 can control the relay on the power transmission circuit of the battery P1 to close after entering the electric energy scheduling process, and the BMS 21 can control the relay on the power transmission circuit of the battery P1 to open after exiting from the electric energy scheduling process. The relay on the power transmission circuit of the battery P1 may include a main positive relay and / or a main negative relay, and is not specifically limited here.

[0060] The VCU 22 is installed in the vehicle 20, and when it determines that the electric energy scheduling needs to be terminated, it can control the BMS 21 to exit the charging / discharging process.

[0061] The power grid scheduling platform 30 may be a device or functional module that can control the electric energy scheduling process between the power grid 40 and the battery P1. In some embodiments, the power grid scheduling platform may be integrated into the charging / discharging device 10, or may be installed in a device having control and communication functions, such as a server outside the charging / discharging device 10. In some embodiments, the power grid scheduling platform 30 may charge for the electric energy transmission process. The functions of the power grid scheduling platform 30 may be set according to actual scenes and specific needs, and are not specifically limited here.

[0062] In the electric energy scheduling process between the power grid 40 and the battery P1, the executable scheduling modes may include a target scheduling mode. The target scheduling mode is a scheduling mode that performs bidirectional electric energy scheduling between the power grid 40 and the battery P1 via the charging / discharging device 10. Specifically, after the vehicle 20 is electrically connected to the charging / discharging device 10, the power grid scheduling platform 30 can flexibly control the battery P1 to discharge to the power grid 40 or control the power grid 40 to charge the battery P1 based on the status of the power grid load and / or the amount of electricity of the battery P1.

[0063] In some embodiments, the target scheduling mode may include at least one charging phase and one discharging phase. The charging phase is a phase of transmitting electrical energy from the power grid 40 to the battery P1, and the discharging phase is a phase of transmitting electrical energy from the battery P1 to the power grid 40. The target scheduling mode allows the electrical energy of the battery P1 to be replenished to the power grid 40 when the power grid 40 is in a high load state, for example, during a peak power usage period, thereby performing frequency modulation and peak regulation for the power grid 40. Also, when the power grid 40 is in a low load state, for example, during a low power usage period, the electrical energy of the power grid 40 is replenished to the battery P1 to meet the user's need for electrical energy in the battery P1, thereby realizing reasonable and flexible scheduling of electrical energy.

[0064] In some embodiments, the feasible scheduling mode may further include a first scheduling mode and / or a second scheduling mode. The first scheduling mode is a one-way scheduling mode in which the battery P1 is charged using the electric energy of the power grid 40 via the charging / discharging device 10. The second scheduling mode is a one-way scheduling mode in which the electric energy of the battery P1 is transmitted to the power grid 40 via the charging / discharging device 10. For example, when the vehicle 20 arrives at a charging station or charging area, it can transmit a part or all of the electric energy of the battery P1 to the power grid 40 via the charging / discharging device 10, or extract electric energy from the power grid 40 via the charging / discharging device 10 to charge the battery P1.

[0065] The charge / discharge completion information is used to indicate that the BMS 21 has determined that the charging or discharging of the battery P1 has been completed. The charge / discharge completion information is transmitted by the BMS 21 to the VCU when it has determined that the first electrical performance parameter of the battery P1 satisfies a preset charge / discharge cutoff condition.

[0066] The first electrical performance parameter of the battery P1 is a parameter that reflects the battery electric quantity. That is, the first electrical performance parameter is a parameter that can change according to the change in the electric quantity of the battery P1. Preferably, the first electrical performance parameter may be a state of charge (SOC), a battery electric quantity, a voltage value, etc.

[0067] The preset charge / discharge cut-off condition includes a preset charge cut-off condition and / or a preset discharge cut-off condition. In some embodiments, it can be determined that the first electrical performance parameter satisfies the preset charge cut-off condition under the condition that the first electrical performance parameter is equal to or greater than the first parameter threshold. For example, when the first electrical performance parameter is a voltage value of the battery P1, the first parameter threshold may be a charge cut-off voltage. The charge cut-off voltage may be a fully charged voltage or a first target voltage value. The fully charged voltage may be a voltage value when the battery P1 is fully charged. For example, the voltage value when the battery P1 is at SOC100%. The first target voltage value may be set according to an actual scene and specific needs, but is not limited thereto. In another embodiment, it can be determined that the first electrical performance parameter satisfies the preset discharge cut-off condition under the condition that the first electrical performance parameter is equal to or greater than the second parameter threshold. For example, when the first electrical performance parameter is a voltage value of the battery P1, the second parameter threshold may be a preset discharge cut-off voltage. The preset charge cut-off voltage may be a preset full charge voltage or a second target voltage value. The fully discharged voltage may be a voltage value when the electricity of the battery P1 is fully discharged, for example, a voltage value when the battery P1 has an SOC of 0%. The second target voltage value may be set according to, but is not limited to, an actual scene and specific needs.

[0068] In some embodiments, the charge / discharge completion information can be used to identify a scheduling mode of the current scheduling, so as to determine whether the current scheduling process is a bidirectional scheduling process between the power grid and the vehicle. For example, the charge / discharge completion information may include scheduling mode information and / or a target identifier.

[0069] Regarding step S210, in some embodiments, the BMS 21 can determine a scheduling mode of a current electric energy scheduling process through interaction with the charging / discharging device 10. When it is determined that the first electric performance parameter of the battery meets the preset charging / discharging cut-off condition, the charging / discharging completion information accompanied with the scheduling mode information of the current electric energy scheduling process is sent to the VCU 22. Note that, in the embodiments of the present application, the current electric energy scheduling process refers to the electric energy scheduling mode between the power grid 40 and the battery P1 when performing the electric energy scheduling method.

[0070] Regarding S230, it should be explained that before receiving the charge / discharge completion information, the VCU 11 allows the BMS 21 to accept the scheduling of the power grid scheduling platform 30; when receiving the charge / discharge completion information and the scheduling mode information in the charge / discharge completion information indicates that the current power grid scheduling mode is the target scheduling mode, the VCU 22 does not change the scheduled state of the BMS 21, that is, the VCU 22 can allow the BMS 21 to continue to receive the scheduling of the power grid scheduling platform 30. In some embodiments, when the scheduling mode of the scheduling process is not the target scheduling mode, for example, when the scheduling mode of the scheduling process is the above-mentioned first scheduling mode or the second scheduling mode, the VCU 22 can send a charge / discharge end command to the BMS 21 to control the BMS 21 to end the electric energy scheduling. Preferably, the charge / discharge end command can include a charge end command or a discharge end command, and when the scheduling mode is the above-mentioned first scheduling mode, the VCU 22 can send a charge end command to the BMS 21. When the scheduling mode is the second scheduling mode, the VCU 22 can send a discharge end command to the BMS 21.

[0071] According to the electric energy scheduling method 200 shown in the above steps S210 to S230, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging and discharging device, when the BMS determines that the battery of the vehicle transmits charging and discharging completion information to the VCU, the VCU can determine whether the scheduling mode of the electric energy scheduling is a target scheduling mode that performs bidirectional scheduling for the electric energy between the power grid and the vehicle through the charging and discharging device based on the charging and discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging and discharging process when the charging and discharging completion information is received, the scheduling process of the bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging and discharging process of the vehicle.

[0072] In addition, in the existing communication protocol, by changing the electric energy scheduling policy on the VCU side, the electric energy scheduling method 200 shown in the above steps S210 to S230 can be realized without replacing hardware, and the bidirectional electric energy scheduling process between the power grid and the vehicle can be easily realized.

[0073] According to some embodiments of the present application, preferably, step S230 specifically includes: When the scheduling mode is the target scheduling mode, the charging / discharging end command is not sent to the BMS 21. That is, after receiving the charging / discharging completion information, if it is determined that the current electric energy scheduling process is a two-way electric energy scheduling between the power grid 40 and the battery P1, the charging / discharging end command is not sent, so that the BMS 21 is still in the electric energy scheduling process.

[0074] By using a method in which the VCU 22 does not send a charge / discharge termination command, the two-way electrical energy scheduling process between the power grid 40 and P1 can be rationally controlled by simply changing the communication policy on the VCU 22 side, thereby improving the convenience of control.

[0075] According to some embodiments of the present application, preferably, FIG. 3 is a flowchart of another electric energy scheduling method according to an embodiment of the present application. The charging / discharging completion information includes scheduling mode information. As shown in FIG. 3, the electric energy scheduling method 300 includes steps S310 to S330. The VCU 22 may be an entity that performs each step of the electric energy scheduling method.

[0076] In step S310, the power grid scheduling platform 30 receives the charging / discharging completion information sent by the BMS 21 in the scheduling process of performing electric energy scheduling between the power grid 40 and the battery P1 via the charging / discharging device 10. Step S310 is similar to step S210, and the specific embodiment of step S310 may refer to the content related to step S210 in the above part of the examples of the present application, and the description thereof will be omitted here.

[0077] In step S320, it is determined whether the scheduling mode indicated by the scheduling mode information is the target scheduling mode.

[0078] The scheduling mode information is information indicating an electric energy scheduling mode between the power grid 40 and the battery P1. In some embodiments, the scheduling mode information can indicate one of the first scheduling mode, the second scheduling mode, or the target scheduling mode described in the above section. In a specific example, the content of a certain field in the charging / discharging completion information can indicate the scheduling mode information. Accordingly, the content of the field corresponding to different scheduling modes is different. For example, if the content of the field is 01, it indicates the target scheduling mode, if the content of the field is 10, it indicates the first scheduling mode, and if the content of the field is 11, it indicates the second scheduling mode.

[0079] In S320, by determining whether the scheduling mode information is the scheduling mode information of the target scheduling mode, it can be determined whether the scheduling mode of the scheduling process of the electric energy scheduling is the target scheduling mode. Specifically, if the scheduling mode information in the charging / discharging completion information is the scheduling mode information of the target scheduling mode, it is determined that the scheduling mode of the ongoing electric energy scheduling process is the target scheduling mode, that is, the mode of performing bidirectional electric energy scheduling between the power grid 40 and the battery P1.

[0080] In step S330, if the scheduling mode of the scheduling process is the target scheduling mode, the BMS 21 allows the power grid scheduling platform 10 to accept the electric energy scheduling. Step S330 is similar to step S230, and the specific embodiment of step S330 may refer to the content related to step S230 in the above part of the embodiment of the present application, and the description will be omitted here.

[0081] According to the electric energy scheduling method 300 shown in the above steps S310 to S330, the VCU 22 can determine the electric energy scheduling mode according to the scheduling mode information in the charge / discharge completion information, and can select whether to control the BMS 21 to terminate the electric energy scheduling based on the electric energy scheduling mode, so as to accurately identify whether the current electric energy scheduling process is a bidirectional electric energy scheduling process between the power grid 40 and the battery P1, and further easily adopt different control policies according to different scheduling processes.

[0082] According to some embodiments of the present application, preferably, FIG. 4 is a flowchart of another electric energy scheduling method according to an embodiment of the present application. As shown in FIG. 4, the electric energy scheduling method 400 includes steps S410 to S430. The VCU 22 may be an entity that performs each step of the electric energy scheduling method.

[0083] In step S410, the power grid scheduling platform 30 receives the charging / discharging completion information sent by the BMS 21 in the scheduling process of performing electric energy scheduling between the power grid 40 and the battery P1 via the charging / discharging device 10. Step S410 is similar to step S210, and the specific embodiment of step S410 may refer to the content related to step S210 in the above part of the examples of the present application, and the description thereof will be omitted here.

[0084] In step S420, it is determined whether the charge / discharge completion information includes a target identifier.

[0085] The target identifier is added to the charge / discharge completion information when the BMS determines that the scheduling mode is a scheduling mode other than the target scheduling mode. In some embodiments, the other scheduling mode may be the above-mentioned first scheduling mode and second scheduling mode. That is, when the BMS determines that the current scheduling mode is the first scheduling mode or the second scheduling mode, a target identifier is added to the charge / discharge completion information, i.e., a target identifier is attached to the generated charge / discharge completion information. When the BMS determines that the current scheduling mode is the target scheduling mode, a target identifier is not added to the charge / discharge completion information, i.e., a target identifier is not attached to the generated charge / discharge completion information.

[0086] The target identifier is a full charge identifier or a full discharge identifier. Specifically, when the first electrical performance parameter of the battery P1 satisfies a preset charge cut-off condition, the charge / discharge completion information may include a full charge identifier. When the first electrical performance parameter of the battery P1 satisfies a preset discharge cut-off condition, the charge / discharge completion information may include a full discharge identifier.

[0087] Preferably, two fields in the charge / discharge completion information can be a full charge identifier bit and a full discharge identifier bit, respectively. Correspondingly, when the assigned value of the full charge identifier bit is a preset value C1, the C1 of the full charge identifier bit is a full charge identifier. For example, when the assigned value of the full charge identifier bit is 1, the charge / discharge completion information includes a full charge identifier, and when the assigned value of the full charge identifier bit is 0, the charge / discharge completion information does not include a full charge identifier. Similarly, when the assigned value of the full discharge identifier bit is a preset value C2, the C2 of the full discharge bit is a full discharge identifier. In another embodiment, one field in the charge / discharge completion information can be an identifier bit indicating full charge or full discharge of the battery, correspondingly, when the assigned value of the identifier bit is a preset value D1, the D1 of the identifier bit is a full charge identifier. When the assigned value of the identifier bit is a preset value D2, the D2 on the identifier bit is a full discharge identifier. For example, if the assigned value of the identifier bit is 01, the charge / discharge completion information includes a full charge identifier, and if the assigned value of the identifier bit is 11, the charge / discharge completion information includes a full charge identifier.

[0088] In step S420, if the charging / discharging completion information includes a full charge identifier or a full discharge identifier, it indicates that the scheduling mode of the scheduling process is not the target scheduling mode.Similarly, if the charging / discharging completion information does not include a full charge identifier or a full discharge identifier, it indicates that the scheduling mode of the scheduling process is the target scheduling mode.

[0089] In step S430, if the scheduling mode of the scheduling process is the target scheduling mode, the BMS 21 allows the power grid scheduling platform 10 to accept the electric energy scheduling. Step S430 is similar to step S230, and the specific embodiment of step S430 may refer to the content related to step S230 in the above part of the examples of the present application, and the description will be omitted here.

[0090] According to the electric energy scheduling method 400 shown in the above steps S410 to S430, the VCU 22 can determine the electric energy scheduling mode according to whether the charging / discharging completion information includes a target identifier, and can select whether to control the BMS 21 to terminate the electric energy scheduling according to the electric energy scheduling mode, so as to accurately identify whether the current electric energy scheduling process is a bidirectional electric energy scheduling process between the power grid 40 and the battery P1, and further easily adopt different control policies according to different scheduling processes.

[0091] According to some embodiments of the present application, based on the same application spirit, Figure 5 is a flowchart of another electric energy scheduling method according to an embodiment of the present application. As shown in Figure 5, the electric energy scheduling method 500 includes step S510 and step S520. The execution subject of each step of the electric energy scheduling method may be the BMS 21.

[0092] In step S510, in the process of the power grid scheduling platform 30 performing electric energy scheduling between the power grid 40 and the battery P1 via the charging / discharging device 10, the power grid scheduling platform 30 obtains a first electric performance parameter of the battery P1.

[0093] In step S520, if the first electrical performance parameter meets the preset charging / discharging cut-off condition, send charging / discharging completion information to the vehicle controller VCU22 of the vehicle, so that the VCU determines whether the scheduling mode of the electrical energy scheduling is a target scheduling mode based on the charging / discharging completion information, and if the scheduling mode is the target scheduling mode, allow the BMS21 to accept the electrical energy scheduling of the power grid scheduling platform 30.

[0094] In addition, for the technical terms and specific embodiments of steps S510 and S520, reference may be made to the descriptions related to the electric energy scheduling methods 200 to 400 in the above parts of this application, and the descriptions thereof will be omitted here.

[0095] In S540, in some embodiments, the BMS 21 may generate charging / discharging completion information accompanied by the scheduling mode information, and send the generated charging / discharging completion information to the VCU 22. For specific embodiments, reference may be made to the description related to step S221 in the embodiments of the present application, and the description will be omitted here.

[0096] In another embodiment, the BMS 21 can determine whether the current scheduling mode is the target scheduling mode according to the interaction message between the BMS 21 and the charging / discharging device 10, and if the current scheduling mode is the target scheduling mode, generate charging / discharging completion information without a target identifier, and send the generated charging / discharging completion information to the VCU 22. For specific embodiments, please refer to the description related to step S222 in the embodiments of the present application, and the description will be omitted here.

[0097] According to the electric energy scheduling method 500 shown in the above steps S510 and S520, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging and discharging device, the BMS can send charging and discharging completion information to the VCU of the vehicle when the first electric performance parameter of the battery meets the preset charging and discharging cut-off condition, and the VCU can determine whether the scheduling mode of the scheduling process is a target scheduling mode for performing bidirectional scheduling for electric energy between the power grid and the vehicle according to the charging and discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging and discharging process when the charging and discharging completion information is received, the scheduling process of bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging and discharging process of the vehicle.

[0098] Other details of the electric energy scheduling method 500 according to the embodiment of the present application are similar to those of the electric energy scheduling methods 200 to 400 described with reference to the examples shown in Figures 2 to 4 above, and can achieve corresponding effects, and therefore will not be described here for the sake of brevity.

[0099] According to some embodiments of the present application, preferably, Fig. 6 is a flowchart of yet another electric energy scheduling method illustrated in the embodiments of the present application. The electric energy scheduling method 600 further includes steps S610 to S640.

[0100] In step S610, the power grid scheduling platform 30 obtains a first electrical performance parameter of the battery P1 in the process of performing electrical energy scheduling between the power grid 40 and the battery P1 via the charging / discharging device 10. Step S610 is similar to step S510, and the specific embodiment of step S610 may refer to the content related to step S510 in the above part of the examples of the present application, and the description thereof will be omitted here.

[0101] In step S620, when the first electrical performance parameter meets the preset charge / discharge cut-off condition, send charge / discharge completion information to the vehicle controller VCU22 of the vehicle, so that the VCU determines whether the scheduling mode of the electrical energy scheduling is the target scheduling mode according to the charge / discharge completion information, and if the scheduling mode is the target scheduling mode, allows the BMS21 to accept the electrical energy scheduling of the power grid scheduling platform 30. Step S620 is similar to step S520, and the specific embodiment of step S620 may refer to the content related to step S520 in the above part of the embodiment of the present application, and the description will be omitted here.

[0102] In step S630, the charging / discharging end information sent by the power grid scheduling platform 30 is received.

[0103] In step S640, in response to the charge / discharge end information transmitted by the VCU 22, the electric energy scheduling is ended.

[0104] The charging / discharging end information is used to instruct the BMS 21 to end the electric energy scheduling. Specifically, the charging / discharging end information can be sent after the power grid scheduling platform 30 determines that the current scheduling process may be ended. Specifically, the power grid scheduling platform 30 can send the charging / discharging end information to the charging / discharging device 10, and the charging / discharging device 10 can send the received charging / discharging end information to the BMS 21.

[0105] Regarding the specific transmission path of the charging / discharging information, in some embodiments, the power grid scheduling platform 30 can transmit the charging / discharging end information to the BMS 21 via the charging / discharging device 10. That is, the power grid scheduling platform 30 transmits the charging / discharging completion information to the charging / discharging device 10, and the charging / discharging device 10 transfers the charging / discharging completion information to the BMS 21. In other embodiments, the power grid scheduling platform 30 can transmit the charging / discharging end information to a vehicle Internet device such as a Telematics Box (TBOX) or an RDB (one of the vehicle Internet devices). It should be noted that the power grid scheduling platform 30 may also transmit the charging / discharging end information to the BMS 21 directly or indirectly in other ways, and the specific transmission path of the charging / discharging end information is not limited.

[0106] In S640, it should be noted that after the BMS 21 finishes the electric energy scheduling, the vehicle 20 can exit the electric energy scheduling flow.

[0107] The electric energy scheduling method 600 shown in steps S610-S650 can end the bidirectional scheduling mode between the power grid 40 and the battery P1 under the control of the power grid scheduling platform 30, thereby improving the rationality of the bidirectional scheduling.

[0108] According to some embodiments of the present application, the charging / discharging termination information is preferably sent to the BMS when the power grid scheduling platform determines that the electric energy scheduling parameters acquired in real time satisfy the target scheduling conditions.

[0109] The electrical energy scheduling parameters include a scheduling time parameter and / or a second electrical performance parameter of the battery P1. Specifically, when the electrical energy scheduling parameters include a scheduling time parameter, the target scheduling condition includes that the scheduling time parameter acquired in real time reaches the target scheduling time parameter.

[0110] When the electrical energy scheduling parameters include a second electrical performance parameter, the target scheduling condition includes the second electrical performance parameter obtained in real time reaching the target electrical performance parameter.

[0111] Regarding the target scheduling time parameter and the target electrical performance parameter, in terms of the acquisition manner, in some embodiments, the user can input them into a device having an information input function, such as a charging station, an in-vehicle terminal, etc. Correspondingly, when the device having the information input function receives the target scheduling time parameter and / or the target electrical performance parameter input by the user, it transmits the received target scheduling time parameter and / or the target electrical performance parameter to the power grid scheduling platform 30. Alternatively, the user can directly input the target scheduling time parameter and / or the target electrical performance parameter into a related application (APP), related program, or related operation webpage of the power grid scheduling platform 30. The related application (APP) and related program can be set in a device such as a mobile phone, a tablet PC, a computer, a charging station, etc. Preferably, the user can also input a selected electrical energy scheduling mode through the device having the information input function. For example, the user can select a target scheduling mode from a plurality of selectable scheduling modes. In another embodiment, the target scheduling time parameter and the target electrical performance parameter may be set by default. For example, if the target electrical performance parameter is SOC, it can be set to 100% by default. Alternatively, the default may be set to another value, and is not limited to this.

[0112] Specifically, the target scheduling time parameter may be a specific time value or a duration. In one embodiment, if the target scheduling time parameter is a time value, it may be a time value at which the user wants to end the electrical energy scheduling, for example, the user may set the electrical energy scheduling to end at 19:30:30 seconds. Or, it may be a time value at which the user wants to end the charging and discharging of the battery P1. In another embodiment, if the target scheduling time parameter is a duration, it may be a scheduling duration intended by the user, for example, 4h.

[0113] The target electrical performance parameter may be a target SOC, a target voltage value, a target amount of electricity, etc. In some embodiments, the target SOC may be a target value that the SOC of the battery needs to reach at the end of the electrical energy scheduling. Preferably, the target SOC may be a value input by the user, or may be a default value, or may be the sum of the battery SOC at the start of the electrical energy scheduling and the target SOC change amount input by the user. For example, if the SOC of the battery P1 before starting the electrical energy scheduling is 20% and the user wants to charge it to SOC 50% (i.e., the target SOC change amount input by the user is 50%), the target SOC may be 70%. As another example, if the SOC of the battery P1 before starting the electrical energy scheduling is 100% and the user wants to sell the amount of electricity to SOC 50% (i.e., the target SOC change amount input by the user is -50%), the target SOC may be 50%.

[0114] In some embodiments, the scheduling time parameter may be a specific time value or a duration of the scheduling process. In some embodiments, the power grid scheduling platform 30 may obtain the scheduling time parameter at every preset time interval, or may obtain the scheduling time parameter irregularly.

[0115] The second battery performance parameter of the battery P1 may be a parameter indicating the battery electric quantity. That is, the second electric performance parameter is a parameter that can change according to the electric quantity of the battery P1. Preferably, the second electric performance parameter may be an SOC, a battery electric quantity, a voltage value, or the like. Note that the second electric performance parameter and the first electric performance parameter may be the same parameter, for example, both are SOC. Or, they may be different types of parameters, for example, the first electric performance parameter may be a battery voltage and the second electric performance parameter may be an SOC, but are not limited thereto.

[0116] For example, when a vehicle arrives at a charging station, a user inputs a target time and a target SOC, and before the target time, the power grid scheduling platform 30 can flexibly schedule electric energy between the power grid and the vehicle battery based on parameters such as the status of the power grid and the battery charge, and can make the charge of the vehicle battery reach the target SOC before the target time. For example, if a user inputs the target time as 20:30 and the target SOC as 80%, when it approaches 20:30, the SOC of the vehicle battery can be made equal to 80% by a charging or discharging method.

[0117] According to this embodiment, the power grid scheduling platform 30 can obtain the electric energy scheduling parameters in real time, and when the electric energy scheduling parameters meet the target scheduling conditions, send charging / discharging end information to instruct the VCU 22 to end the electric energy scheduling. Because the electric energy scheduling parameters can reflect the real-time electric energy scheduling state, the power grid scheduling platform 30 can accurately control the electric energy scheduling process according to the electric energy scheduling state.

[0118] According to some embodiments of the present application, preferably, the VCU 22 does not respond to the charge / discharge completion information when the scheduling mode is the target scheduling mode.

[0119] By using a method in which the VCU 22 does not send a charge / discharge termination command, the two-way electrical energy scheduling process between the power grid 40 and the battery P1 can be rationally controlled by simply changing the communication policy on the VCU 22 side, thereby improving the convenience of control.

[0120] First, the electric energy scheduling method according to the embodiment of the present application is introduced using the electric energy scheduling methods 200 to 600 shown in Figures 2 to 6. In order to fully understand the electric energy scheduling means according to the embodiment of the present application, Figure 7 shows a schematic flowchart of an exemplary electric energy scheduling method according to the embodiment of the present application.

[0121] As shown in FIG. 7 , the electric energy scheduling method 700 relates to the charging / discharging device 10 , the BMS 21 of the vehicle 20 , the VCU 22 of the vehicle 20 , and the power grid scheduling platform 30 .

[0122] Specifically, the electric energy scheduling means includes steps S701 to S714.

[0123] In step S701, the charging / discharging device 10 receives target electric energy scheduling parameters input by a user.

[0124] In step S702, the charging / discharging device 10 sends the target electric energy scheduling parameters to the power grid scheduling platform 30.

[0125] In step S703, after the power grid scheduling platform 30 receives the target electric energy scheduling parameters, it sends a power grid scheduling command to the charging / discharging device 10.

[0126] In step S704, the charging / discharging device 10 responds to the power grid scheduling command and enters the current charging / discharging phase indicated by the power grid scheduling command.

[0127] In step S705, the charging / discharging device 10 sends an electric energy scheduling request for the current charging / discharging phase to the BMS 21.

[0128] In step S706, the BMS 21 controls the battery P1 to charge and discharge according to the electric energy scheduling request.

[0129] In step S707, in the electric energy scheduling process, the BMS 21 judges whether the second electric performance parameter acquired in real time reaches a preset charge / discharge cut-off condition. If the judgment result indicates that the preset charge / discharge cut-off condition has not been reached, the BMS 21 continues to acquire the second electric performance parameter in real time, and judges whether the preset charge / discharge cut-off condition has been reached. If the judgment result indicates that the preset charge / discharge cut-off condition has been reached, the BMS 21 then executes step S708.

[0130] In step S708, if the BMS 21 determines that the second electrical performance parameter acquired in real time reaches a preset charge / discharge cutoff condition, the BMS 21 transmits charge / discharge completion information to the VCU 22.

[0131] In step S709, the VCU 22 judges whether the scheduling mode of the scheduling process is the target scheduling mode based on the charge / discharge completion information. If the judgment result is "No", the VCU 22 subsequently executes step S710, and if the judgment result is "Yes", the VCU 22 subsequently executes step S711.

[0132] In step S710, if the scheduling mode of the scheduling process is not the target scheduling mode, the VCU 22 sends a charge / discharge end command to the BMS 21.

[0133] In step S711, if the scheduling mode of the scheduling process is the target scheduling mode, the VCU 22 allows the BMS 21 to continue accepting the electric energy scheduling of the power grid scheduling platform 30.

[0134] In step S712, the power grid scheduling platform 30 judges whether the electric energy scheduling parameters acquired in real time meet the target scheduling conditions. If the judgment result does not meet the target scheduling conditions, it continues to acquire the electric energy scheduling parameters, and judges whether the electric energy scheduling parameters acquired meet the target scheduling conditions. If the judgment result meets the target scheduling conditions, it continues to execute step S713.

[0135] In step S713, if the power grid scheduling platform 30 determines whether the electric energy scheduling parameters acquired in real time satisfy the target scheduling conditions, it sends charging / discharging end information to the BMS 21.

[0136] In step S714, the BMS 21 ends the electric energy scheduling in response to the charge / discharge end information.

[0137] Specific steps S701 to S714 of the electric energy scheduling method 700 will be introduced first, and then technical terms related to steps S701 to S714 will be described in detail.

[0138] The target electrical energy scheduling parameters may include a target scheduling mode input by a user. In some embodiments, the target electrical energy scheduling parameters may include a target scheduling time parameter and / or a target electrical performance parameter input by a user. For specific contents of the target scheduling mode, the target scheduling time parameter, and the target electrical performance parameter, reference may be made to the relevant descriptions in the above-mentioned embodiments of the present application, and the description thereof will be omitted here.

[0139] Regarding the power grid scheduling command, since the target scheduling mode can include at least one charging phase and at least one discharging phase, the power grid scheduling command is used to control the charging / discharging device 10 and the BMS 21 to enter the corresponding charging / discharging phase in the scheduling process corresponding to the target scheduling mode. Specifically, the power grid scheduling command includes a first power grid scheduling command for instructing the charging / discharging device 10 and the BMS 21 to enter the charging phase, and / or a second power grid scheduling command for instructing the charging / discharging device 10 and the BMS 21 to enter the discharging phase. In some embodiments, the power grid scheduling platform 30 can send the first power grid scheduling command or the second power grid scheduling command to the charging / discharging device 10 according to the power grid load and / or the amount of electricity of the battery P1.

[0140] Preferably, the power grid scheduling command may include a charge / discharge direction of a current charge / discharge phase and a power requirement for transmitting electric energy in the current charge / discharge phase. The charge / discharge direction is the transmission direction of electric energy, and if the calculated charge / discharge direction is the transmission direction of electric energy from the battery of the vehicle to the power grid, i.e., discharging the battery of the vehicle, the current charge / discharge phase is a discharging phase. Similarly, if the charge / discharge direction is the transmission direction of electric energy from the power grid to the battery of the vehicle, i.e., charging the battery of the vehicle, the current charge / discharge phase is a charging phase. In one embodiment, the power grid scheduling platform 30 may calculate the charge / discharge direction and the power requirement based on the power grid load and / or the battery electricity, etc.

[0141] Preferably, the power grid scheduling command may further include a charge / discharge depth of a current charge / discharge stage. The charge depth of a charge stage indicates a ratio of an amount of electricity to be charged in a current charge stage of the battery to a rated amount of electricity of the battery. The discharge depth of a discharge stage indicates a ratio of an amount of electricity to be discharged in a current discharge stage of the battery to a rated amount of electricity of the battery.

[0142] The power grid scheduling request may include a charge / discharge direction of the current charge / discharge phase and a power requirement of the electric energy to be transmitted in the current charge / discharge phase. Preferably, the power grid scheduling request may further include data for the BMS 21 to determine the charge / discharge parameters of the battery in this charge / discharge phase, such as a charge / discharge depth of the current charge / discharge phase.

[0143] In step S701 and step S702, in another embodiment, the target electric energy scheduling parameters can be further input into a related APP or a related webpage of the power grid scheduling platform.

[0144] For step S703, as a specific example, when the power grid is in a high-load state and the power grid scheduling platform 30 determines that the battery needs to be controlled to send power to the power grid, it can send an electric energy scheduling command to the charging / discharging device 10 at this time to instruct the charging / discharging device 10 to enter a discharging phase. After a certain period of time, when the power grid is in a low-load state, the power grid scheduling platform 30 can determine that power is to be sent from the power grid to the battery, and can send an electric energy scheduling command to the charging / discharging device 10 at this time to instruct the charging / discharging device 10 to enter a charging phase.

[0145] Regarding step S706, in some embodiments, the BMS 21 can monitor the voltage during the charging and discharging process of the battery P1. Furthermore, after determining that the stop condition of the target scheduling mode is reached, the BMS 21 exits from the electric energy scheduling process. In other embodiments, the BMS 21 can determine a charging and discharging mode and a charging and discharging request parameter according to the electric energy scheduling request, and send the charging and discharging mode and the charging and discharging parameters to the charging and discharging device 10, so that the charging and discharging device 10 adjusts the charging and discharging voltage and / or the charging and discharging current during the charging and discharging process according to the charging and discharging mode and the charging and discharging parameters to ensure the normal execution of the charging and discharging process. In one embodiment, the charging and discharging request parameter can include a voltage request value, a current request value, etc. The charging and discharging mode can include a constant current charging mode, a constant current discharging mode, a constant voltage charging mode, or a constant voltage discharging mode. Correspondingly, when the charging and discharging mode is a constant current charging mode, the charging and discharging device 10 controls the output current not to exceed a current request value. Furthermore, when the charging and discharging mode is a constant current discharging mode, the charging and discharging device 10 controls the input current not to exceed a current request value. When the charge / discharge mode is a constant voltage charge mode, the output voltage is controlled so as not to exceed a required voltage value, and when the charge / discharge mode is a constant voltage discharge mode, the input voltage is controlled so as not to exceed a required voltage value.

[0146] As an example, the BMS 21 can send the voltage requirement, the current requirement, and the charge / discharge mode via a battery charging request message (eg, a BCL message).

[0147] Based on the spirit of the same application, an embodiment of the present application provides the electric energy scheduling methods 200 to 400 described with reference to any of the preferred embodiments shown in Figures 2 to 4, as well as a corresponding VCU.

[0148] A VCU according to an embodiment of the present application will be described in detail below with reference to the drawings.

[0149] 8 is a structural schematic diagram of a VCU according to an embodiment of the present application. As shown in FIG. 8, the VCU 80 includes: a first information receiving module 810, a mode determining module 820, and a control module 830.

[0150] The first information receiving module 810 is used for receiving charge / discharge completion information sent by the battery management system BMS in a scheduling process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the battery of the vehicle through the charging / discharging device. The charge / discharge completion information is sent by the BMS when a first electrical performance parameter of the battery satisfies a preset charge / discharge cutoff condition.

[0151] The mode determination module 820 is used to determine whether the scheduling mode of the scheduling process is a target scheduling mode according to the charging / discharging completion information, which is a bidirectional electric energy scheduling mode between the power grid and the battery.

[0152] The control module 830 is used to allow the BMS to accept the electric energy scheduling of the power grid scheduling platform when the scheduling mode is the target scheduling mode.

[0153] By combining the VCU 80 shown in FIG. 8, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging / discharging device, when the BMS determines that the battery of the vehicle has sent charging / discharging completion information to the VCU, the VCU can determine whether the scheduling mode of the electric energy scheduling is a target scheduling mode that performs bidirectional scheduling for the electric energy between the power grid and the vehicle through the charging / discharging device based on the charging / discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging / discharging process when the charging / discharging completion information is received, the scheduling process of the bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging / discharging process of the vehicle.

[0154] In addition, by modifying the electric energy scheduling policy on the VCU side in the existing communication protocol, the above-mentioned VCU 80 can be realized without changing the hardware, and the bidirectional electric energy scheduling process between the power grid and the vehicle can be easily realized.

[0155] According to some embodiments of the present application, preferably, the mode determination module 820 is specifically used in the second information receiving module and the command sending module.

[0156] The second information receiving module is used for receiving the charging / discharging termination information sent by the power grid scheduling platform.

[0157] The command sending module responds to the charge / discharge end information, sends a charge / discharge end command to the BMS, and causes the BMS to end the electrical energy scheduling.

[0158] The VCU80 shown in this embodiment can exit the two-way scheduling mode between the power grid and the battery under the control of the power grid scheduling platform, improving the rationality of the two-way scheduling.

[0159] According to some embodiments of the present application, the charging / discharging termination information is preferably sent when the power grid scheduling platform determines that the electric energy scheduling parameters acquired in real time satisfy the target scheduling conditions.

[0160] The electrical energy scheduling parameters include a scheduling time parameter and / or a second electrical performance parameter of the battery. Specifically, when the electrical energy scheduling parameters include a scheduling time parameter, the target scheduling condition includes that the scheduling time parameter acquired in real time reaches the target scheduling time parameter.

[0161] When the electrical energy scheduling parameters include a second electrical performance parameter, the target scheduling condition includes the second electrical performance parameter obtained in real time reaching the target electrical performance parameter.

[0162] According to this embodiment, the power grid scheduling platform can obtain the electric energy scheduling parameters in real time, and when the electric energy scheduling parameters meet the target scheduling conditions, send charging / discharging end information to instruct the VCU 80 to end the electric energy scheduling. Because the electric energy scheduling parameters can indicate the real-time electric energy scheduling state, the power grid scheduling platform can accurately control the electric energy scheduling process according to the electric energy scheduling state.

[0163] According to some embodiments of the present application, the control module 830 is preferably configured to: When the scheduling mode is the target scheduling mode, the charging / discharging termination command is not sent to the BMS.

[0164] By using a method in which the VCU80 does not send a charge / discharge termination command, the two-way electrical energy scheduling process between the power grid and the battery can be rationally controlled by simply changing the communication policy on the VCU80 side, thereby improving the convenience of control.

[0165] Other details of the VCU 80 according to the embodiment of the present application are similar to those of the electric energy scheduling method 200 described with reference to the examples shown in Figures 2 to 4 above, and can achieve corresponding effects, and therefore will not be described here for the sake of brevity.

[0166] Based on the spirit of the same application, an embodiment of the present application provides an electric energy scheduling method 500-600 described with reference to any of the preferred embodiments shown in Figures 5 and 6, as well as a corresponding BMS.

[0167] Hereinafter, a BMS according to an embodiment of the present application will be described in detail with reference to the drawings.

[0168] FIG. 9 is a structural schematic diagram of a BMS according to an embodiment of the present application. As shown in FIG. 9, the BMS 90 includes: A parameter acquisition module 910 is used for acquiring a first electrical performance parameter of the battery in a process in which the power grid scheduling platform performs electrical energy scheduling between the power grid and the battery of the vehicle through the charging and discharging device; The information sending module 920 is used to send charge / discharge completion information to a vehicle controller VCU of the vehicle when the first electrical performance parameter satisfies a preset charge / discharge cut-off condition, and the VCU determines whether the scheduling mode of the electrical energy scheduling is a target scheduling mode based on the scheduling mode information in the charge / discharge completion information, and if the scheduling mode is the target scheduling mode, to allow the BMS to accept the electrical energy scheduling of the power grid scheduling platform.

[0169] By combining the BMS 90 shown in FIG. 9, in the process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the vehicle through the charging / discharging device, when the BMS determines that the battery of the vehicle has sent charging / discharging completion information to the VCU, the VCU can determine whether the scheduling mode of the electric energy scheduling is a target scheduling mode that performs bidirectional scheduling for the electric energy between the power grid and the vehicle through the charging / discharging device based on the charging / discharging completion information. If in the target scheduling mode, the VCU allows the BMS to continue to accept the electric energy scheduling of the power grid scheduling platform, so that the vehicle can continue to accept the flexible scheduling of the power grid scheduling platform. Compared with the method of controlling the BMS to end the charging / discharging process when the charging / discharging completion information is received, the scheduling process of the bidirectional electric energy scheduling between the power grid and the vehicle can rationally control the charging / discharging process of the vehicle.

[0170] According to some embodiments of the present application, preferably, the BMS further includes an information receiving module, an information sending module, and a control module.

[0171] The information receiving module is used for receiving the charging / discharging end information sent by the power grid scheduling platform.

[0172] The information transmitting module is used to transmit charge / discharge end information to the VCU, and the VCU transmits a charge / discharge end command to the BMS 90 in response to the charge / discharge end information.

[0173] The control module is used to respond to a charge / discharge termination command sent by the VCU and terminate the electrical energy scheduling.

[0174] According to this embodiment, under the control of the power grid scheduling platform, the two-way scheduling mode between the power grid and the battery can be terminated, and the rationality of the two-way scheduling can be improved.

[0175] According to some embodiments of the present application, preferably, the charging / discharging termination information is sent to the VCU via the BMS when the power grid scheduling platform determines in the electric energy scheduling process that the time parameter acquired in real time reaches the scheduling time parameter and / or the second electric performance parameter of the battery reaches the target electric performance parameter.

[0176] According to the embodiment, the power grid scheduling platform can obtain the electric energy scheduling parameters in real time, and when the electric energy scheduling parameters meet the target scheduling conditions, send the charge / discharge end information to instruct the VCU to end the electric energy scheduling. Because the electric energy scheduling parameters can indicate the real-time electric energy scheduling state, the power grid scheduling platform can accurately control the electric energy scheduling process according to the electric energy scheduling state.

[0177] According to some embodiments of the present application, preferably, the VCU does not respond to the charge / discharge completion information when the scheduling mode is the target scheduling mode.

[0178] By not having the VCU send a charge / discharge termination command, the two-way electrical energy scheduling process between the power grid and the battery can be rationally controlled by simply changing the communication policy on the VCU side, thereby improving control convenience.

[0179] Other details of the BMS 90 according to the embodiment of the present application are similar to those of the electric energy scheduling methods 500-600 described with reference to the examples shown in Figures 5 and 6, and can achieve corresponding effects, and therefore will not be described here for the sake of brevity.

[0180] Based on the same application, an embodiment of the present application provides a BMS 90 and a VCU 80 as well as a corresponding power grid scheduling system.

[0181] A power grid scheduling system according to an embodiment of the present invention will be described in detail below with reference to the drawings.

[0182] 10 is a structural schematic diagram of a power grid scheduling system according to an embodiment of the present application. As shown in FIG. 10, the power grid scheduling system 100 includes a BMS 120 and a VCU 110.

[0183] For specific details of the VCU 110, please refer to the description related to the VCU 80 in the above-mentioned embodiment of the present application, and for specific details of the BMS 120, please refer to the description related to the BMS 90 in the above-mentioned embodiment of the present application, and the description will be omitted here.

[0184] Preferably, the power grid scheduling system 100 may further include a charging / discharging device.

[0185] Preferably, the power grid scheduling system 100 may further include a power grid scheduling platform.

[0186] For the specific contents of each component module or device of the power grid scheduling system 100, reference may be made to the relevant contents in the above-mentioned embodiments of the present application, and the description thereof will be omitted here.

[0187] Other details of the power grid scheduling system according to the embodiment of the present application are similar to the BMS 90 and VCU 80 described with reference to the examples shown in Figures 8 and 9 above, and can achieve corresponding effects, and will not be described here for brevity.

[0188] FIG. 11 shows a schematic diagram of the hardware structure of an electric energy scheduling device according to an embodiment of the present application.

[0189] The electrical energy scheduling device may include a processor 1101 and a memory 1102 for storing computer program commands.

[0190] In particular, the processor 1101 may include a central processing unit (CPU), or an application specific integrated circuit (ASIC), or may be one or more integrated circuits configured to perform embodiments of the present application.

[0191] The memory 1102 may include mass memory for data or commands. By way of example and not limitation, the memory 1102 may include a hard disk drive (HDD), a floppy disk drive, a flash memory, an optical disk, a magneto-optical disk, a magnetic tape, or a Universal Serial Bus (USB) drive, or a combination of two or more of these. In some examples, the memory 1102 may include removable or non-removable (or fixed) media, or the memory 1102 is a non-volatile solid-state memory. In some implementations, the memory 1102 may be internal or external to the electrical energy scheduling device.

[0192] In some examples, memory 1102 may be a read only memory (ROM), in one example, the ROM may be a masked ROM, a programmable ROM (PROM), an erasable PROM (EPROM), an electrically erasable PROM (EEPROM), an electrically alterable programmable ROM (EAROM), or a flash memory, or a combination of two or more of these.

[0193] The memory 1102 may include read-only memory (ROM), random access memory (RAM), a magnetic disk storage media device, an optical storage media device, a flash memory device, an electrical, optical, or other physical / tangible memory storage device. Thus, in general, the memory includes one or more tangible (non-transitory) computer-readable storage media (e.g., memory devices) that include software encoded with computer-executable instructions, and that when executed (e.g., by one or more processors) operates to perform the operations described with reference to the method according to an aspect of the present disclosure.

[0194] The processor 1101 reads and executes the computer program commands stored in the memory 1102 to realize the electric energy scheduling methods 200-400 in the embodiments shown in Figures 2-4, and achieve the corresponding effects achieved by executing the methods in the examples shown in any of Figures 2-4, or realizes the electric energy scheduling methods 500-600 in the embodiments shown in Figures 5 and 6, and achieve the corresponding effects achieved by executing the methods in the examples shown in any of Figures 5 and 6, but for the sake of brevity, the description is omitted here.

[0195] In one example, the electrical energy scheduling device may further include a communication interface 1103 and a bus 1110. As shown in Fig. 11, the processor 1101, the memory 1102 and the communication interface 1103 are connected via the bus 1110 and complete communication with each other.

[0196] The communication interface 1103 is mainly used to realize communication between the modules, devices, units and / or apparatuses in the embodiments of the present application.

[0197] The bus 1110 includes hardware, software, or both that couples together the components of the electrical energy scheduling device. By way of example and not limitation, the bus may include an Accelerated Graphics Port (AGP) or other graphics bus, an Extended Industry Standard Architecture (EISA) bus, a Front Side Bus (FSB), a Hyper Transport (HT) interconnect, an Industry Standard Architecture (ISA) bus, an InfiniBand interconnect, a Low Pin Count (LPC) bus, a memory bus, a MicroChannel Architecture (MCA) bus, a Peripheral Component Interconnect (PCI) bus, a PCI-Express (PCI-X) bus, a Serial Advanced Technology Attachment (SATA) bus, a Video Electronics Standards Association Local (VLB) bus, or other suitable bus, or a combination of two or more of the foregoing. The bus 1110 may include one or more buses, where appropriate. Although embodiments of the present application describe and illustrate a particular bus, the present application contemplates any suitable bus or interconnect.

[0198] The electric energy scheduling apparatus can execute the electric energy scheduling method in the embodiment of the present application, thereby realizing the electric energy scheduling method and apparatus described with reference to Figs. 2 to 9 .

[0199] In addition, referring to the electric energy scheduling method in the above embodiments, the embodiments of the present application can be realized by providing a computer storage medium, which stores computer program commands, which, when executed by a processor, realize any of the electric energy scheduling methods in the above embodiments.

[0200] It should be noted that the present application is not limited to the specific configurations and processes described above and shown in the drawings. For clarity, detailed descriptions of known methods are omitted here. In the above embodiments, some specific steps are described and illustrated as examples. However, the method process of the present application is not limited to the specific steps described and illustrated, and those skilled in the art may make various changes, modifications, and additions, or change the order between steps after understanding the gist of the present application.

[0201] The functional blocks shown in the above block diagrams may be realized in hardware, software, firmware, or a combination thereof. When realized in hardware, it may be, for example, an electronic circuit, an Application Specific Integrated Circuit (ASIC), appropriate firmware, a plug-in, a function card, etc. When realized in software, the elements of the present application are programs or code segments used to perform the necessary tasks. The programs or code segments may be stored in a machine-readable medium or transmitted by a data signal carried by a carrier wave over a scheduling medium or a communication link. The "machine-readable medium" may include any medium capable of storing or scheduling information. Examples of machine-readable media include electronic circuits, semiconductor memory devices, ROMs, flash memories, erasable ROMs (EROMs), floppy disks, CD-ROMs, optical disks, hard disks, optical fiber media, radio frequency (RF) links, etc. The code segments may be downloaded over a computer network such as the Internet, an intranet, etc.

[0202] It should be noted that the exemplary embodiments mentioned in this application describe some methods or systems based on a sequence of steps or devices, however, this application is not limited to the order of steps mentioned above, i.e. steps may be performed according to the order mentioned in the embodiments, may be performed in a different order than the embodiments, or some steps may be performed simultaneously.

[0203] As mentioned above, each aspect of the present disclosure is described with reference to flowchart diagrams and / or block diagrams of methods, devices, apparatuses, and computer program products according to the embodiments of the present disclosure. It should be noted that each block in the flowchart diagrams and / or block diagrams, and combinations of blocks in the flowchart diagrams and / or block diagrams, can be realized by computer program commands. These computer program commands are provided to a processor of a general purpose computer, a special purpose computer, or other programmable data processing device, thereby generating a machine, and the commands executed by the processor of the computer or other programmable data processing device enable the implementation of the specified functions / operations in one or more blocks in the flowchart diagrams and / or block diagrams. Such a processor may be, but is not limited to, a general purpose processor, a special purpose processor, a special application processor, or a field programmable logic circuit. It should be noted that each block in the block diagrams and / or flowchart diagrams, and combinations of blocks in the block diagrams and / or flowchart diagrams, can also be realized by dedicated hardware that performs the specified functions or operations, or a combination of dedicated hardware and computer commands.

[0204] The above is only a specific embodiment of the present application, and those skilled in the art should understand that, in order to facilitate and simplify the description, the specific operation processes of the above-described systems, modules and units can refer to the corresponding processes in the method examples, and the description will be omitted here. However, the scope of protection of the present application is not limited thereto, and those skilled in the art can easily think of various equivalent modifications or replacements within the technical scope disclosed in the present application, and all such modifications or replacements should be included in the scope of protection of the present application.

Claims

1. It is applied to the vehicle controller VCU of the vehicle, In a scheduling process in which a power grid scheduling platform performs electric energy scheduling between a power grid and a battery of the vehicle through a charging / discharging device, receiving charge / discharge completion information sent by a battery management system (BMS), the charge / discharge completion information being sent by the BMS when a first electrical performance parameter of the battery satisfies a preset charge / discharge cut-off condition; According to the charging / discharging completion information, determine whether a scheduling mode of the scheduling process is a target scheduling mode, and the target scheduling mode is a bidirectional electric energy scheduling mode between the power grid and the battery; if the scheduling mode is the target scheduling mode, allowing the BMS to accept the power grid scheduling platform's electric energy scheduling.

2. The method of claim 1 , wherein the charging / discharging completion information includes scheduling mode information, and the step of determining whether a scheduling mode of the scheduling process is a target scheduling mode based on the charging / discharging completion information includes a step of determining whether a scheduling mode indicated by the scheduling mode information is a target scheduling mode.

3. The step of determining whether a scheduling mode of the scheduling process is a target scheduling mode based on the charging / discharging completion information includes:

2. The method of claim 1, comprising the steps of: determining whether the charging / discharging completion information includes a target identifier; the target identifier is added to the charging / discharging completion information when the BMS determines that the scheduling mode is a scheduling mode other than the target scheduling mode; and the target identifier is a full charge identifier or a fully discharge identifier.

4. When the scheduling mode is the target scheduling mode, the step of allowing the BMS to accept the electric energy scheduling of the power grid scheduling platform specifically includes: The method according to any one of claims 1 to 3, further comprising the step of not sending a charge / discharge termination command to the BMS if the scheduling mode is the target scheduling mode.

5. a first information receiving module, which is used for receiving charge / discharge completion information sent by a battery management system (BMS) in a scheduling process in which the power grid scheduling platform performs electric energy scheduling between the power grid and the battery of the vehicle through a charging / discharging device, the charge / discharge completion information including scheduling mode information, and the charge / discharge completion information is sent by the BMS when a first electrical performance parameter of the battery satisfies a preset charge / discharge cutoff condition; a mode determination module, which is used to determine whether a scheduling mode of the scheduling process is a target scheduling mode according to the scheduling mode information, and the target scheduling mode is a bidirectional electric energy scheduling mode between the power grid and the battery; A vehicle controller VCU including: a control module used for a step of allowing the BMS to accept the electric energy scheduling of the power grid scheduling platform when the scheduling mode is the target scheduling mode.

6. A vehicle controller VCU according to claim 5; and an information sending module for sending charge / discharge completion information to a vehicle controller VCU of the vehicle when the first electrical performance parameter satisfies a preset charge / discharge cut-off condition, and the VCU determines whether the scheduling mode of the electric energy scheduling is a target scheduling mode based on scheduling mode information in the charge / discharge completion information, and if the scheduling mode is the target scheduling mode, allows the BMS to accept the electric energy scheduling of the power grid scheduling platform.

7. a processor and a memory for storing computer program commands; The electrical energy scheduling device, wherein the processor implements the electrical energy scheduling method according to any one of claims 1 to 4 by reading and executing the computer program commands.

8. A computer storage medium having stored thereon computer program commands which, when executed by a processor, implement the method for electrical energy scheduling according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • Vehicle-mounted charging and discharging system and control method based on V2G technology

    CN104158259A

  • Orderly charging and discharging control method for electric automobile considering operation constraints of transmission network

    CN108631344A

  • Intelligent electric automobile charging and discharging system based on distributed energy application and operation control method thereof

    CN109398149A

  • Electric vehicle wireless charging and discharging and positioning function multiplexing device and mode switching control method thereof

    CN110696643A

  • Power system for residence

    JP2011172334A