ENERGY MANAGEMENT SYSTEM, ENERGY MANAGEMENT DEVICE, ENERGY MANAGEMENT METHOD, AND CONTROL PROGRAM

The energy management system addresses the integration of renewable energy into local grids by using a water electrolysis device with a monitoring and control system to manage power flow and consumption, enhancing grid efficiency and reducing emissions.

JP7590706B2Active Publication Date: 2024-11-27TOKYO ELECTRIC POWER CO HOLDINGS INC +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2020008999
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-01-23
Publication Date
2024-11-27
Estimated Expiration
2040-01-23

AI Technical Summary

Technical Problem

The integration of renewable energy into local grids is challenging due to unstable power generation caused by weather conditions and the difficulty in economically transporting hydrogen fuel, necessitating a system to manage and distribute renewable energy efficiently while reducing greenhouse gas emissions.

Method used

An energy management system that includes a water electrolysis device connected to a power distribution line, with a monitoring unit, calculation unit, and control system to manage power flow, set power consumption limits, and create control information for the electrolysis device, allowing efficient distribution of renewable energy.

Benefits of technology

The system effectively introduces renewable energy into local grids, improving grid utilization and load factors by managing power distribution and reducing carbon emissions through hydrogen production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007590706000001
    Figure 0007590706000001
  • Figure 0007590706000002
    Figure 0007590706000002
  • Figure 0007590706000003
    Figure 0007590706000003
Patent Text Reader

Abstract

To provide an energy management system, energy management device, energy management method, and program that can introduce renewable energy into a local grid (distribution line).SOLUTION: An energy management system 100, which includes a photovoltaic power generation system and a water electrolysis device connected to a power distribution line includes: a monitoring unit 120, which monitors distribution power, which is power supplied between a connection point of the photovoltaic power generation system in the power distribution line and a connection point of a water electrolysis device 300; a calculation unit 130, which calculates the power consumption of the water electrolysis device based on the distribution power and a threshold value of the power supplied to the power distribution line; and a creation unit 140, which derives a power consumption command value based on the power consumption calculated by the calculation unit, and creates control information for controlling the water electrolysis device including the derived power consumption command value.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] An embodiment of the present invention relates to an energy management system, an energy management device, an energy management method, and a control program. [Background technology]

[0002] The P2G (Power to Gas) system is well known. In a P2G system, hydrogen and methane are produced by electrolyzing water using electricity procured from renewable energy sources, and the hydrogen and methane produced are then stored and used. Taking advantage of the characteristics of hydrogen, which can be stored and transported for long periods of time, the P2G system is expected to be one of the technologies that will contribute to stabilizing the amount of power generated by renewable energy sources, which fluctuates with seasonal and weather changes. Regarding technology for producing hydrogen using electricity procured from a power plant using renewable energy, a technology that enables a highly efficient power supply by effectively utilizing solar power generation energy is known (see, for example, Patent Document 1). This technology comprises a solar power generation device, a power conversion controller that converts DC power from the solar power generation device into AC power and has an output control function for obtaining maximum power, hydrogen production means that produces hydrogen using the DC power from the solar power generation device, switching means that switches the electrical connection configuration of the solar power generation device, the power conversion controller, and the hydrogen production means, and a control unit that transmits a control signal to the switching means. The rated output power of the solar power generation device is greater than the rated output power of the power conversion controller, and the control unit controls the switching means according to a comparison result between the predicted power generation that can be generated by the solar power generation device and the output power or the output power, and the conversion efficiency characteristic of the power conversion controller. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2014-203274 A Summary of the Invention [Problem to be solved by the invention]

[0004] Consider expanding the use of renewable energy. As mentioned above, the power generation of renewable energy is subject to natural conditions such as weather and fluctuates unstably, so there are limited conditions under which the power generation facility can generate the rated power. If power generated from renewable energy is to be newly introduced into a local grid (distribution line), it is necessary to augment the power grid to match the rated power generated by the renewable energy. In addition, using hydrogen as fuel can eliminate greenhouse gas emissions, but the businesses that use hydrogen as fuel are scattered, making economical transportation difficult. In order to efficiently distribute hydrogen to scattered energy consumers, a hydrogen production system in the local grid mentioned above is necessary. The present invention has been made in consideration of the above-mentioned points, and its purpose is to provide a management system, an energy management device, an energy management method, and a control program that can introduce renewable energy into a local grid (distribution line). [Means for solving the problem]

[0005] One aspect of the present invention is an energy management system including a system for generating electricity using renewable energy connected to a power distribution line and a water electrolysis device, the power distribution line includes a first section connecting a first connection point where the system and the power distribution line are connected to a second connection point to which the water electrolysis apparatus is connected, the first connection point being located in a reverse power flow direction from the first connection point when power is supplied from the first connection point to the power distribution line while the system is generating power, causing a reverse power flow, and a second section being located further in a reverse power flow direction from the second connection point, A monitoring unit that monitors distributed power, which is power supplied to the The second section Supply to the distribution line Possible Electricity This is the upper limit Based on a threshold value and the distributed power, connected to the second connection point The water electrolysis device In the future consumption Should A calculation unit for calculating power, from now on consumption Should Based on power connected to the second connection point The water electrolysis device In the future consumption Should To set the power The regulation A creation department that creates control information El , an energy management system. In the energy management system according to one aspect of the present invention, the calculation unit calculates the power consumption of the water electrolysis device by subtracting the power threshold value from the distributed power. should be consumed in the future Calculate the power. In one aspect of the energy management system of the present invention, the monitoring unit is configured to monitor the water electrolysis system based on pairing of the identification information of the system that generates electricity using renewable energy and the identification information of the water electrolysis device, the pairing being obtained from a storage unit that stores the identification information of the system that generates electricity using renewable energy and the identification information of the water electrolysis device in association with each other. ,water A water electrolysis device corresponding to the identification information of the electrolysis device The second Connection point The second section is located further in the reverse power flow direction than the The generating unit generates control information addressed to a water electrolysis device corresponding to the identification information of the water electrolysis device included in the pairing. In one aspect of the present invention, the energy management system further includes an estimation unit that estimates the distributed power, and the monitoring unit monitors the distributed power estimated by the estimation unit. In the energy management system according to one aspect of the present invention, from now on consumption Should The water electrolysis device further includes a determination unit that determines whether the power exceeds the power that can be consumed by the water electrolysis device, and the creation unit derives a limit command value for limiting the output of the system that generates power from renewable energy based on the result of the determination by the determination unit, and creates control information for limiting the power supplied by the system that generates power from renewable energy, the control information including the derived limit command value. One aspect of the present invention is a system for generating electricity using renewable energy. and a second connection point to which a water electrolysis device is connected, the first connection point being located in a direction of reverse power flow from the first connection point when power is supplied from the first connection point while the system is generating power, causing a reverse power flow, and a second connection point to which a water electrolysis device is connected, and a second section being located further in the direction of reverse power flow from the second connection point. The above in distribution lines Second Section A monitoring unit that monitors distributed power, which is power supplied to the The second section Supply to the distribution line Possible Electricity This is the upper limit Based on a threshold value and the distributed power, connected to the second connection point The water electrolysis device In the future consumption Should A calculation unit for calculating power, from now on consumption Should The water electrolysis device is based on electric power. In the future consumption Should To set the power The regulation A creation department that creates control information El , an energy management device. One aspect of the present invention is Re A system that generates electricity from renewable energy and a water electrolysis device a distribution line including: a first section connecting a first connection point connected to the system and a second connection point to which the water electrolysis apparatus is connected, the first section being located in a reverse power flow direction from the first connection point when reverse power flow occurs as a result of power being supplied from the first connection point while the system is generating power; and a second section being located further in the reverse power flow direction from the second connection point; An energy management method executed by an energy management system comprising: Second Section monitoring distributed power, the power being delivered to The second section Supply to the distribution line Possible Electricity This is the upper limit Based on a threshold value and the distributed power, connected to the second connection point The water electrolysis device In the future consumption Should a step of calculating power; and setting power to be consumed in the future by the water electrolysis device connected to the second connection point based on the power to be consumed in the future calculated in the step of calculating power. The regulation and creating control information. R , an energy management method executed by an energy management system. One aspect of the present invention is Re A system that generates electricity from renewable energy and a water electrolysis device a distribution line including: a first section connecting a first connection point connected to the system and a second connection point to which the water electrolysis apparatus is connected, the first section being located in a reverse power flow direction from the first connection point when reverse power flow occurs as a result of power being supplied from the first connection point while the system is generating power; and a second section being located further in the reverse power flow direction from the second connection point; The energy management system includes a computer, Second Section monitoring distributed power, the power being delivered to The second section Supply to the distribution line Possible Electricity This is the upper limit Based on a threshold value and the distributed power, connected to the second connection point The water electrolysis device In the future consumption Should A step of calculating power; from now on consumption Should Based on power connected to the second connection point The water electrolysis device In the future consumption Should To set the power The regulation and creating the control information. Let , a control program. Effect of the Invention

[0006] According to an embodiment of the present invention, it is possible to provide an energy management system, an energy management device, an energy management method, and a control program that can introduce renewable energy into a local grid (power distribution line). [Brief description of the drawings]

[0007] [Figure 1A] FIG. 1 is a diagram illustrating an example 1 of an overview of an energy management system according to an embodiment. [Figure 1B] FIG. 11 is a diagram illustrating a second example of an overview of an energy management system according to an embodiment. [Diagram 2] 1 is a block diagram showing an example of an energy management device included in an energy management system according to an embodiment. [Diagram 3] FIG. 11 is a diagram illustrating an example of correspondence information. [Figure 4] FIG. 4 is a diagram illustrating an example of water electrolysis device information. [Diagram 5] FIG. 2 is a diagram for explaining an example of an operation of an energy management device included in the energy management system according to the embodiment. [Figure 6] 4 is a sequence chart showing an example of an operation of the energy management system according to the embodiment. [Figure 7] FIG. 11 is a block diagram showing an example of an energy management device included in an energy management system according to a first modified example of an embodiment. [Figure 8] FIG. 4 is a diagram illustrating an example of water electrolysis device information. [Figure 9] FIG. 4 is a diagram illustrating an example of photovoltaic power generation system information. [Figure 10] 10 is a sequence chart showing an example of an operation of an energy management system according to a first modified example of an embodiment. [Figure 11] FIG. 13 is a diagram showing an overview of an energy management system according to a second modified example of the embodiment. [Figure 12] FIG. 11 is a block diagram showing an example of an energy management device included in an energy management system according to a second modified example of the embodiment. [Figure 13]FIG. 11 is a diagram illustrating an example of correspondence information. [Figure 14] 13 is a sequence chart showing an example of an operation of an energy management system according to a second modified example of the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] Next, an energy management system, an energy management device, an energy management method, and a control program according to the present embodiment will be described with reference to the drawings. The embodiment described below is merely an example, and the embodiment to which the present invention is applied is not limited to the following embodiment. In addition, in all the drawings for explaining the embodiments, the same reference numerals are used for the parts having the same functions, and the repeated explanation is omitted. In addition, in this application, "based on XX" means "based on at least XX" and includes cases where it is based on other elements in addition to XX. Furthermore, "based on XX" is not limited to cases where XX is directly used, but also includes cases where it is based on XX that has been calculated or processed. "XX" is any element (for example, any information).

[0009] (Embodiment) (Energy Management System) FIG. 1A is a diagram illustrating an example 1 of an overview of an energy management system according to an embodiment. The energy management system 1 of the embodiment includes a power sensor 50-1, a power sensor 50-2, a power sensor 50-3, a smart meter 60-1, a smart meter 60-2, a smart meter 60-3, an energy management device 100, a solar power generation system 200-1, a solar power generation system 200-2, a solar power generation system 200-3, a water electrolysis device 300-1, a water electrolysis device 300-2, a water electrolysis device 300-3, an energy consumer CE-1, an energy consumer CE-2, and an energy consumer CE-3.

[0010] Power sensor 50-1, power sensor 50-2, power sensor 50-3, solar power generation system 200-1, solar power generation system 200-2, solar power generation system 200-3, water electrolysis device 300-1, water electrolysis device 300-2, water electrolysis device 300-3, consumer CE-1, consumer CE-2, and consumer CE-3 are connected to a local grid such as a distribution line DL. The power sensors 50-1, 50-2, 50-3, the energy management device 100, the water electrolysis devices 300-1, 300-2, and 300-3 are connected via a network NW and can communicate with each other. The network NW includes the Internet, a wide area network (WAN), a local area network (LAN), a public line, a provider device, a dedicated line, a wireless base station, etc.

[0011] Each of the power sensors 50-1, 50-2, and 50-3 detects power supplied to the distribution line DL. Specifically, the power sensor 50-1 detects power (hereinafter referred to as "first distributed power") supplied on the distribution line DL between a connection point of the photovoltaic power generation system 200-1 and a connection point of the water electrolysis device 300-1. The first distributed power is supplied between the connection point of the photovoltaic power generation system 200-1 and the connection point of the water electrolysis device 300-1 mainly by the photovoltaic power generation system 200-1. The power sensor 50-1 outputs a detection result of the first distributed power, including identification information of the power sensor 50-1, to the energy management device 100. The power sensor 50-2 detects power (hereinafter referred to as "second distributed power") supplied between the connection point of the photovoltaic power generation system 200-2 and the connection point of the water electrolysis device 300-2 on the power distribution line DL. The second distributed power is supplied between the connection point of the photovoltaic power generation system 200-2 and the connection point of the water electrolysis device 300-2 mainly by the photovoltaic power generation system 200-2. The power sensor 50-2 outputs a detection result of the second distributed power, including identification information of the power sensor 50-2, to the energy management device 100. The power sensor 50-3 detects power (hereinafter referred to as "third distributed power") applied on the distribution line DL between the connection point of the photovoltaic power generation system 200-3 and the connection point of the water electrolysis device 300-3. The second distributed power is supplied between the connection point of the photovoltaic power generation system 200-3 and the connection point of the water electrolysis device 300-3 mainly by the photovoltaic power generation system 200-3. The power sensor 50-3 outputs a detection result of the third distributed power, including identification information of the power sensor 50-3, to the energy management device 100.

[0012] Each of the photovoltaic power generation systems 200-1, 200-2, and 200-3 is a system that generates power by a power generation method that uses a solar cell to directly convert sunlight into electric power. One example of each of the photovoltaic power generation systems 200-1, 200-2, and 200-3 is a mega solar power plant. A mega solar power plant refers to a large-scale photovoltaic power station. Each of the photovoltaic power generation systems 200-1, 200-2, and 200-3 is included in a power grid, and converts DC power generated by the solar cell into AC power using a power conditioning subsystem (PCS), and supplies the power to loads such as consumers CE1 to CE3 via a grid connection.

[0013] Each of energy consumer CE-1, energy consumer CE-2, and energy consumer CE-3 uses power supplied from the distribution line DL. Specifically, energy consumer CE-1 mainly uses power generated by solar power generation system 200-1 and supplied from the distribution line DL. Energy consumer CE-2 mainly uses power generated by solar power generation system 200-2 and supplied from the distribution line DL. Energy consumer CE-3 mainly uses power generated by solar power generation system 200-3 and supplied from the distribution line DL. An example of each of energy consumer CE-1, energy consumer CE-2, and energy consumer CE-3 is a factory. A factory is a facility in the manufacturing industry that produces and manufactures actual products and performs maintenance such as inspection, servicing, and upkeep of the machinery of existing products. A boiler is installed in the factory. A boiler is equipped with a combustion chamber (firebox) that burns fuel, and a heat exchanger that transfers the heat obtained from the combustion to water and converts it into steam or hot water (= hot water). A boiler is a device that generates heat in the form of steam, hot water, or both. An example of a boiler is one that uses hydrogen as fuel. Below, as an example, the case where each of the energy consumers CE-1, CE-2, and CE-3 is a factory will be described. Water electrolysis devices 300-1, 300-2, and 300-3 are installed near the energy consumers CE-1, CE-2, and CE-3, which are factories. Smart meters 60-1, 60-2, and 60-3 are installed at the energy consumers CE-1, CE-2, and CE-3, respectively.

[0014] In this embodiment, the solar power generation system 200-1 and the water electrolysis device 300-1 are associated as a pairing (coupling), and this pairing is further associated with the power sensor 50-1. In this embodiment, the solar power generation system 200-2 and the water electrolysis device 300-2 are associated as a pairing, and this pairing is further associated with the power sensor 50-2. In this embodiment, the solar power generation system 200-3 and the water electrolysis device 300-3 are associated as a pairing, and this pairing is further associated with the power sensor 50-3. Each of the energy consumers CE-1 to CE-3 may be composed of a plurality of consumers. Each of the solar power generation systems 200-1 to 200-3 may be composed of a plurality of solar power generation systems. Each of the water electrolysis devices 300-1 to 300-3 may be composed of a plurality of water electrolysis devices. Fig. 1B is a diagram showing a second example of an outline of an energy management system according to an embodiment. In the energy management system 1' shown in Fig. 1B, a power sensor 50-1 detects power supplied between a connection point of the water electrolysis device 300-1 and a connection point of the photovoltaic power generation system 200-2 (hereinafter referred to as "section A") in the distribution line DL. A power sensor 50-2 detects power supplied between a connection point of the water electrolysis device 300-2 and a connection point of the photovoltaic power generation system 200-3 (hereinafter referred to as "section B") in the distribution line DL. The power sensor 50-2 detects power supplied between a connection point of the water electrolysis device 300-3 and a distribution substation SS (hereinafter referred to as "section C") in the distribution line DL. In this case, for sections A to C which are operated with power below a limited threshold, the solar power generation systems 200-1 to 200-3 and the water electrolysis devices 300-1 to 300-3 which are upstream of the respective assumed power flows are associated with each other by pairing them in a 1:N (N is an integer greater than 0) or M:N (M is an integer greater than 0) ratio. By establishing pairing, it becomes possible to associate the power supplied to the water electrolysis device 300-1, which is not a water electrolysis device that directly receives power from a renewable energy facility, and the power supplied to the energy consumer EC-1, making it possible to supply electricity and gas including the environmental value of energy, and thus realizing the system as an energy service provider (ESP). Returning to FIG. 1A, the explanation will be continued.

[0015] Each of the water electrolysis devices 300-1, 300-2, and 300-3 generates hydrogen by electrolyzing water using power supplied by each of the solar power generation systems 200-1, 200-2, and 200-3, respectively. An example of each of the water electrolysis devices 300-1, 300-2, and 300-3 is a PEM (Polymer Electrolyte Membrane) water electrolysis device. The PEM water electrolysis device produces hydrogen by electrolyzing water using a method called a solid polymer type. Each of the water electrolysis devices 300-1, 300-2, and 300-3 receives water electrolysis device control information transmitted by the energy management device 100, and acquires a power consumption command value included in the received water electrolysis device control information. Each of the water electrolysis devices 300-1, 300-2, and 300-3 generates hydrogen by consuming power supplied to the power distribution line DL based on the acquired power consumption command value. Since the allowable power demand of each of energy consumers CE-1, CE-2, and CE-3 is finite, the command values ​​to the water electrolysis devices 300-1, 300-2, and 300-3 are limited and transmitted by the energy management device 100 based on the measurement values ​​from smart meter 60-1, smart meter 60-2, and smart meter 60-3, respectively.

[0016] The energy management device 100 acquires the detection results of the power supplied to the distribution line DL, which are output by each of the power sensors 50-1, 50-2, and 50-3. Here, in the example shown in FIG. 1B, the energy management device 100 acquires the detection results of the power supplied to the section A of the distribution line DL, the section B of the distribution line DL, and the section C of the distribution line DL, which are measured by each of the power sensors 50-1, 50-2, and 50-3. The energy management device 100 monitors whether the detection results of the power exceed a power threshold based on the acquired power detection results. In this embodiment, the description will continue with the case where an upper limit value of the distribution power that can be supplied to the distribution line DL is applied as an example of the power threshold. The upper limit value of the distribution power that can be supplied to the distribution line DL is set in advance when the power system is introduced. Specifically, the energy management device 100 acquires a detection result of the first distributed power output by the power sensor 50-1, and monitors whether or not the first distributed power exceeds an upper limit of power that can be supplied to the distribution line DL based on the acquired detection result of the first distributed power. The energy management device 100 acquires a detection result of the second distributed power output by the power sensor 50-2, and monitors whether or not the second distributed power exceeds an upper limit of power that can be supplied to the distribution line DL based on the acquired detection result of the second distributed power. The energy management device 100 acquires a detection result of the third distributed power output by the power sensor 50-3, and monitors whether or not the third distributed power exceeds an upper limit of power that can be supplied to the distribution line DL based on the acquired detection result of the third distributed power.

[0017] The energy management device 100 calculates the power consumption of each of the water electrolysis devices 300-1, 300-2, and 300-3 based on the results of monitoring the detection results of the distributed power. Specifically, when the energy management device 100 determines that the first distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the energy management device 100 calculates the power consumption (hereinafter referred to as "first power consumption") of the water electrolysis device 300-1 associated with the solar power generation system 200-1 by subtracting the upper limit of power that can be supplied to the distribution line DL from the first distributed power. Here, in the example shown in Fig. 1B, when the energy management device 100 determines that the first distributed power exceeds the upper limit of power that can be supplied to section A of the distribution line DL, the energy management device 100 calculates the first power consumption of the water electrolysis device 300-1 associated with the solar power generation system 200-1 by subtracting the upper limit of power that can be supplied to section A of the distribution line DL from the first distributed power. When the energy management device 100 determines that the second distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the energy management device 100 calculates the power consumption of the water electrolysis device 300-2 associated with the solar power generation system 200-2 (hereinafter referred to as "second power consumption") by subtracting the upper limit of power that can be supplied to the distribution line DL from the second distributed power. Here, in the example shown in Fig. 1B, when the energy management device 100 determines that the second distributed power exceeds the upper limit of power that can be supplied to section B of the distribution line DL, the energy management device 100 calculates the second power consumption of the water electrolysis device 300-2 associated with the solar power generation system 200-2 by subtracting the upper limit of power that can be supplied to section B of the distribution line DL from the second distributed power. When the energy management device 100 determines that the third distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the energy management device 100 calculates the power consumption of the water electrolysis device 300-3 associated with the photovoltaic power generation system 200-3 (hereinafter referred to as "third power consumption") by subtracting the upper limit of power that can be supplied to the distribution line DL from the third distributed power. Here, in the example shown in Fig. 1B, when the energy management device 100 determines that the third distributed power exceeds the upper limit of power that can be supplied to the distribution line DL section C, the energy management device 100 calculates the third power consumption of the water electrolysis device 300-3 associated with the photovoltaic power generation system 200-3 by subtracting the upper limit of power that can be supplied to the distribution line DL section C from the third distributed power.

[0018] The energy management device 100 derives a power consumption command value (hereinafter referred to as the "first power consumption command value") for setting the power consumption of the water electrolysis device 300-1 based on the calculated first power consumption. The energy management device 100 acquires the address of the water electrolysis device 300-1 associated with the identification information of the water electrolysis device 300-1 from the water electrolysis device information. The energy management device 100 creates water electrolysis device control information including the first power consumption command value, and sends the acquired address of the water electrolysis device 300-1 as a destination. The energy management device 100 transmits the created water electrolysis device control information (hereinafter referred to as the "first water electrolysis device control information") to the water electrolysis device 300-1. The energy management device 100 derives a power consumption command value for setting the power consumption of the water electrolysis device 300-2 (hereinafter referred to as the "second power consumption command value") based on the calculated second power consumption. The energy management device 100 acquires the address of the water electrolysis device 300-2 associated with the identification information of the water electrolysis device 300-2 from the water electrolysis device information. The energy management device 100 creates water electrolysis device control information including the second power consumption command value and addressed to the acquired address of the water electrolysis device 300-2. The energy management device 100 transmits the created water electrolysis device control information (hereinafter referred to as the "second water electrolysis device control information") to the water electrolysis device 300-2. The energy management device 100 derives a power consumption command value (hereinafter referred to as the "third power consumption command value") for setting the power consumption of the water electrolysis device 300-3, based on the calculated third power consumption. The energy management device 100 acquires the address of the water electrolysis device 300-3 associated with the identification information of the water electrolysis device 300-3 from the water electrolysis device information. The energy management device 100 creates water electrolysis device control information including the third power consumption command value, and sends the acquired address of the water electrolysis device 300-3 as a destination. The energy management device 100 transmits the created water electrolysis device control information (hereinafter referred to as the "third water electrolysis device control information") to the water electrolysis device 300-3.

[0019] The water electrolysis device 300-1 receives the first water electrolysis device control information transmitted by the energy management device 100. The water electrolysis device 300-1 acquires a first power consumption command value included in the received first water electrolysis device control information. The water electrolysis device 300-1 controls the power consumption of the water electrolysis device 300-1 based on the acquired first power consumption command value. The water electrolysis device 300-2 receives the second water electrolysis device control information transmitted by the energy management device 100. The water electrolysis device 300-2 acquires a second power consumption command value included in the received second water electrolysis device control information. The water electrolysis device 300-2 controls the power consumption of the water electrolysis device 300-2 based on the acquired second power consumption command value. The water electrolysis device 300-3 receives the third water electrolysis device control information transmitted by the energy management device 100. The water electrolysis device 300-3 acquires a third power consumption command value included in the received third water electrolysis device control information. The water electrolysis device 300-3 controls the power consumption of the water electrolysis device 300-3 based on the acquired third power consumption command value. As a result, in the example shown in FIG. 1B, sections A to C of the distribution line DL are operated at the upper limit values ​​set for each section. In particular, by dynamically setting the threshold value for section C, it becomes possible to limit the reverse power flow of the bank of the distribution substation SS, and therefore the renewable energy utilization rate of the local grid can be controlled. In addition, in a conventional system using a storage battery, since the stored power needs to be discharged, it cannot be discharged when the utilization of the distribution line is high, and it is necessary to perform control taking into account the time axis, such as sliding to nighttime. In addition, in a conventional system using a storage battery, the utilization rate of the threshold setting section remains high due to the power discharged by the storage system itself, and the effect of promoting the spread of power generation by renewable energy is limited. On the other hand, according to the present embodiment in which the energy consumer CE, the photovoltaic power generation system 200, and the water electrolysis device 300 are associated with each other, it is possible to arbitrarily set the amount of power distributed in the threshold setting section, and since the system takes into account not only the heat demand but also the power demand within the pairing area, it is possible to flexibly respond to requests for the type and amount of energy. Therefore, in this embodiment, it is possible to dramatically increase the amount of renewable energy introduced into the power distribution network. Next, the operation mainly at night will be specifically described with reference to FIG. 1B. At night, there is no power generated by the solar power plants, which are connected to the power distribution network in large numbers, i.e., no power is generated by the solar power generation system 200. On the other hand, if a wind power plant is connected to a higher-level system, the wind power plant does not stop generating power even at night, and the power demand generally decreases, so that the supply of power from renewable energy increases relative to the power demand. Therefore, the market price of distributed power tends to drop at night. Therefore, it is clear that the power at night contains a large amount of renewable energy, and it is possible to procure power at a low cost. In such a case, the power measured by the power sensor 50-1 is the power flowing through the section A of the power distribution line DL, which has a limited threshold value, so that by absorbing the power in the water electrolysis device 300-1, it is possible to increase the utilization rate of the power distribution network DL and supply CO2-free fuel to energy consumers. Returning to FIG. 1A, the explanation will be continued.

[0020] Hereinafter, any one of the power sensors 50-1, 50-2, and 50-3 will be referred to as a power sensor 50. Of the first distributed power, the second distributed power, and the third distributed power, the distributed power detected by the power sensor 50 will be referred to as a distributed power. Hereinafter, any one of the photovoltaic power generation systems 200-1, 200-2, and 200-3 will be referred to as photovoltaic power generation system 200. Hereinafter, any one of the water electrolysis devices 300-1, 300-2, and 300-3 will be referred to as water electrolysis device 300. Hereinafter, the water electrolysis device control information transmitted by the water electrolysis device 300, among the first water electrolysis device control information, the second water electrolysis device control information, and the third water electrolysis device control information, will be referred to as water electrolysis device control information. Hereinafter, any one of the energy consumer CE-1, the energy consumer CE-2, and the energy consumer CE-3 will be referred to as energy consumer CE. The energy management system 1 shown in FIG. 1A will be described below, but the same can also be applied to the energy management system shown in FIG. 1B.

[0021] The energy management device 100 included in the energy management system 1 will be described in detail below. 2 is a block diagram showing an example of an energy management device included in the energy management system according to the embodiment. In addition to the energy management device 100, a power sensor 50 and a water electrolysis device 300 are also shown in FIG. [Energy management device 100] The energy management apparatus 100 is realized by a device such as a personal computer, a server, an industrial computer, etc. The energy management apparatus 100 includes, for example, a communication unit 110, a monitoring unit 120, a calculation unit 130, a creation unit 140, and a storage unit 150. The communication unit 110 is realized by a communication module. Specifically, the communication unit 110 is configured by a device that performs wired communication. The communication unit 110 may also be configured by a wireless device that performs wireless communication using a wireless communication technology such as LTE or wireless LAN. The communication unit 110 communicates between the power sensor 50 and the water electrolysis device 300 via the network NW. Specifically, the communication unit 110 receives the detection result of the distributed power output by the power sensor 50. Here, the distributed power is supplied by the solar power generation system 200. The communication unit 110 acquires the water electrolysis device control information output by the creation unit 140, and transmits the acquired water electrolysis device control information to the water electrolysis device 300 associated with the solar power generation system 200 that supplied the distributed power to the power distribution line.

[0022] The storage unit 150 is realized by a hard disk drive (HDD), a flash memory, a random access memory (RAM), a read only memory (ROM), etc. The storage unit 150 stores correspondence information 152 and water electrolysis device information 154. The correspondence information 152 and the water electrolysis device information 154 may be stored on a cloud. (Support information 152) The correspondence information 152 is information in the form of a table that associates identification information of a photovoltaic power generation system (photovoltaic power generation system identification information), identification information of a power sensor (power sensor identification information), and identification information of a water electrolysis device (water electrolysis device identification information). Here, the correspondence information 152 associates a pairing of a photovoltaic power generation system 200 and a water electrolysis device 300 installed near an energy consumer CE that mainly uses the power supplied by the photovoltaic power generation system 200 with a power sensor 50 that detects power applied between a connection point of the photovoltaic power generation system 200 included in the pairing and a connection point of the water electrolysis device 300 on the power distribution line DL. Fig. 3 is a diagram showing an example of the correspondence information. In the correspondence information 152 shown in Fig. 3, the photovoltaic power generation system identification information "PV0001", the power sensor identification information "VS0001", and the water electrolysis device identification information "WE0001" are associated with each other, the photovoltaic power generation system identification information "PV0002", the power sensor identification information "VS0002", and the water electrolysis device identification information "WE0002" are associated with each other, and the photovoltaic power generation system identification information "PV0003", the power sensor identification information "VS0003", and the water electrolysis device identification information "WE0003" are associated with each other and stored. This information is stored when the operation of the energy management system 1 is started.

[0023] (Water electrolysis device information 154) The water electrolysis device information 154 is information in the form of a table that associates water electrolysis device identification information with a water electrolysis device address. An example of the water electrolysis device address is an IP address. Fig. 4 is a diagram showing an example of water electrolysis device information. In the water electrolysis device information 154 shown in Fig. 4, water electrolysis device identification information "WE0001" is associated with a water electrolysis device address "AAAAA", water electrolysis device identification information "WE0002" is associated with a water electrolysis device address "BBBBB", and water electrolysis device identification information "WE0003" is associated with a water electrolysis device address "CCCCC". This information is stored when the energy management system 1 starts operating. Returning to Fig. 2, the explanation will be continued.

[0024] The monitoring unit 120, the calculation unit 130, and the creation unit 140 are realized by, for example, a hardware processor such as a CPU (Central Processing Unit) executing a program (software) stored in the storage unit 150. In addition, some or all of these functional units may be realized by hardware (including circuitry) such as an LSI (Large Scale Integration), an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a GPU (Graphics Processing Unit), or may be realized by cooperation between software and hardware. The program may be stored in advance in a storage device (a storage device having a non-transient storage medium) such as an HDD (Hard Disk Drive) or a flash memory, or may be stored in a removable storage medium (a non-transient storage medium) such as a DVD or a CD-ROM, and installed by mounting the storage medium in a drive device.

[0025] The monitoring unit 120, the calculation unit 130, and the creation unit 140 will now be described. The monitoring unit 120 acquires the detection result of the distributed power received by the communication unit 110. The monitoring unit 120 monitors the acquired detection result of the distributed power. Specifically, the monitoring unit 120 monitors whether the detection result of the distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, based on the detection result of the distributed power. When the monitoring unit 120 determines that the detection result of the distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the monitoring unit 120 identifies, from the correspondence information 152, the water electrolysis apparatus identification information that is stored in association with the power sensor identification information of the power sensor 50 that output the detection result of the distributed power. By identifying the water electrolysis apparatus identification information, it is possible to identify the water electrolysis apparatus 300 to be controlled. The monitoring unit 120 creates instruction information for calculating the power consumption of the water electrolysis apparatus 300 that corresponds to the identified water electrolysis apparatus identification information. The monitoring unit 120 outputs the water electrolysis apparatus identification information and the created instruction information to the calculation unit 130.

[0026] When the calculation unit 130 acquires the water electrolysis device identification information and instruction information output by the monitoring unit 120, the calculation unit 130 acquires the detection result of the distributed power received by the communication unit 110. The calculation unit 130 calculates the power consumption of the water electrolysis device 300 corresponding to the acquired water electrolysis device identification information, based on the upper limit of power that can be supplied to the distribution line DL and the acquired detection result of the distributed power. For example, the calculation unit 130 calculates the power consumption of the water electrolysis device 300 by subtracting the upper limit of power that can be supplied to the distribution line DL from the detection result of the distributed power. The calculation unit 130 outputs the water electrolysis device identification information and the calculation result of the power consumption of the water electrolysis device 300 to the creation unit 140. FIG. 5 is a diagram showing an example of the operation of the energy management device included in the energy management system according to the embodiment. FIG. 5 shows an example in which the power supplied to the distribution line DL is reduced from the power supplied to the energy consumer CE. In FIG. 5, the vertical axis represents output power, and the horizontal axis represents time. FIG. 5 shows the power generated by the photovoltaic power generation system 200, the power supplied to the distribution line DL, and the power supplied to the water electrolysis device 300. In the example shown in FIG. 5, the upper limit of the power that can be supplied to the distribution line DL is 2.0 [MW]. That is, of the power generated by the photovoltaic power generation system 200, the power of 2.0 [MW] or less is supplied to the energy consumer CE, but the power exceeding 2.0 [MW] is supplied to the water electrolysis device 300. The power supplied to the water electrolysis device 300 is consumed by the water electrolysis device 300. That is, the power supplied to the energy consumer CE from the power supplied to the distribution line DL by the photovoltaic power generation system 200 is reduced. Returning to FIG. 2, the description will be continued.

[0027] The creation unit 140 acquires the water electrolysis device identification information and the calculation result of the power consumption of the water electrolysis device 300 output by the calculation unit 130. The creation unit 140 derives a power consumption command value for instructing the power consumption of the water electrolysis device 300 based on the acquired calculation result of the power consumption of the water electrolysis device 300. For example, an arithmetic expression for deriving the power consumption command value is set from the calculation result of the power consumption of the water electrolysis device 300, and the creation unit 140 derives the power consumption command value based on the arithmetic expression. The creation unit 140 acquires the address of the water electrolysis device 300 stored in association with the acquired water electrolysis device identification information from the water electrolysis device information 154. The creation unit 140 creates water electrolysis device control information including the derived power consumption command value and addressed to the acquired address of the water electrolysis device 300. The creation unit 140 outputs the created water electrolysis device control information to the communication unit 110.

[0028] Next, the operation of the energy management system will be described. (Energy management system operation) FIG. 6 is a sequence chart showing an example of the operation of the energy management system according to the embodiment. (Step S1-1) The power sensor 50 detects the distributed power. (Step S2-1) The power sensor 50 transmits the detection result of the distributed power to the energy management device 100. (Step S3-1) In the energy management device 100 , the communication unit 110 receives the detection result of the distributed power transmitted by the power sensor 50 . (Step S4-1) In the energy management device 100, the monitoring unit 120 acquires the detection result of the distributed power received by the communication unit 110. The monitoring unit 120 monitors whether or not the distributed power exceeds the upper limit of power that can be supplied to the distribution line DL based on the acquired detection result of the distributed power. If the monitoring unit 120 determines that the distributed power does not exceed the upper limit of power that can be supplied to the distribution line DL, the process proceeds to step S1-1. In this case, no power consumption control is performed on the water electrolysis device 300. (Step S5-1) In the energy management device 100, when the monitoring unit 120 determines that the distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the monitoring unit 120 identifies, from the correspondence information 152, water electrolysis apparatus identification information that is stored in association with the power sensor identification information of the power sensor 50 that output the detection result of the distributed power. Here, the detection result of the distributed power includes the identification information of the power sensor 50 that detected the distributed power. The monitoring unit 120 creates instruction information for calculating the power consumption of the water electrolysis apparatus 300 that corresponds to the identified water electrolysis apparatus identification information. The monitoring unit 120 outputs the identified water electrolysis apparatus identification information and the created instruction information to the calculation unit 130.

[0029] (Step S6-1) In the energy management device 100, the calculation unit 130 acquires the water electrolysis device identification information and instruction information output by the monitoring unit 120. The calculation unit 130 acquires the detection result of the distributed power received by the communication unit 110. The calculation unit 130 calculates the power consumption of the water electrolysis device 300 based on the instruction information, the upper limit of power that can be supplied to the distribution line DL, and the acquired detection result of the distributed power, by subtracting the upper limit of power that can be supplied to the distribution line DL from the detection result of the distributed power. The calculation unit 130 outputs the water electrolysis device identification information and the calculation result of the power consumption of the water electrolysis device 300 to the creation unit 140. (Step S7-1) In the energy management device 100, the creation unit 140 acquires the water electrolysis device identification information and the calculation result of the power consumption of the water electrolysis device 300 output by the calculation unit 130. The creation unit 140 derives a power consumption command value for instructing the power consumption of the water electrolysis device 300 based on the acquired calculation result of the power consumption of the water electrolysis device 300. The creation unit 140 acquires the address of the water electrolysis device 300 stored in association with the acquired water electrolysis device identification information from the water electrolysis device information 154. The creation unit 140 creates water electrolysis device control information that includes the derived power consumption command value and is addressed to the acquired address of the water electrolysis device 300. The creation unit 140 outputs the created water electrolysis device control information to the communication unit 110.

[0030] (Step S8-1) In the energy management device 100, the communication unit 110 acquires the water electrolysis device control information output by the creation unit 140. The communication unit 110 transmits the acquired water electrolysis device control information to the water electrolysis device 300. (Step S9-1) The water electrolysis device 300 receives the water electrolysis device control information transmitted by the energy management device 100. (Step S10-1) The water electrolysis device 300 acquires a power consumption command value included in the received water electrolysis device control information. The water electrolysis device 300 controls power consumption based on the acquired power consumption command value. For example, the water electrolysis device 300 consumes power based on the power consumption command value from the power supplied by the solar power generation system 200 to the power distribution line DL. Specifically, the power generated by the solar power generation system 200 is supplied to a hydrogen generation device of the water electrolysis device 300 from a DC / DC converter of the power supply for the water electrolysis device 300. The hydrogen generation device produces hydrogen in accordance with the power consumption. The hydrogen produced by the hydrogen generator is supplied to the gas tanks and boilers installed at the energy consumer CE. The gas tanks and boilers obtain the hydrogen produced by the hydrogen generator. The boilers consume the obtained hydrogen. Hydrogen consumed by the boiler reduces the consumption of fossil fuels by other boilers. The gas tank stores the hydrogen obtained when the boiler is not consuming hydrogen. The hydrogen stored in the gas tank supplies hydrogen to the boiler when the hydrogen generator is not operating or when hydrogen production is insufficient.

[0031] In the above-described embodiment, the energy management system 1 includes a pairing between the solar power generation system 200-1 and the water electrolysis device 300-1, a pairing between the solar power generation system 200-2 and the water electrolysis device 300-2, and a pairing between the solar power generation system 200-3 and the water electrolysis device 300-3. However, the present invention is not limited to this example. For example, the energy management system 1 may include one or two pairings between the solar power generation system 200 and the water electrolysis device 300, or may include four or more pairings between the solar power generation system 200 and the water electrolysis device 300. In the above-described embodiment, the case where hydrogen produced by the water electrolysis apparatus 300 is consumed in a boiler installed in the energy consumer CE has been described. That is, the case where hydrogen is supplied to the energy consumer CE by the power supplied to the distribution line DL has been described. By consuming hydrogen in the energy consumer CE, it is possible to prevent the price of hydrogen from being involved in energy distribution. However, the present invention is not limited to this example, and for example, hydrogen produced by the water electrolysis apparatus 300 may be shipped to a city gas supply area or to an LP (liquefied petroleum) gas supply area. In addition, for example, hydrogen may be supplied to a supply destination using a cardle. In addition, for example, hydrogen produced by the water electrolysis apparatus 300 may be supplied to a supply destination using a gas cylinder, a cardle, and a semi-trailer loader. In other words, hydrogen produced by the power supplied to the distribution line DL may be supplied to a supply destination in a gas state. The hydrogen supplied to the supply destination may be mixed into a gas pipe. In the above embodiment, the case where the power generated by the photovoltaic power generation system is supplied to the power distribution line DL as an example of renewable energy has been described, but the present invention is not limited to this example. For example, the power generated from an energy resource that is constantly or repeatedly replenished by natural forces such as wind power, wave power, tidal power, running water, tides, geothermal power, and biomass may be supplied to the power distribution line DL. In the embodiment described above, the case has been described in which the energy management device 100 acquires the detection result of the power supplied to the distribution line DL for each solar power generation system 200, but this is not limiting. For example, the energy management device 100 may acquire the power flow of the distribution line DL. In the above-described embodiment, a case has been described in which the energy management device 100 acquires distributed power supplied between a connection point of the photovoltaic power generation system 200 and a connection point of the water electrolysis device 300 in the power distribution line DL, but this is not limited to the example. For example, the energy management device 100 may acquire a power flow between the energy consumer CE and the photovoltaic power generation system 200. For example, in the power distribution line DL, distributed power supplied between a connection point of the energy consumer CE-1 and a connection point of the photovoltaic power generation system 200-2, and distributed power supplied between a connection point of the energy consumer CE-2 and a connection point of the photovoltaic power generation system 200-3 may be acquired.

[0032] According to the energy management system of the present embodiment, the energy management system is an energy management system including a photovoltaic power generation system connected to a distribution line and a water electrolysis device, and is equipped with a monitoring unit 120 that monitors distributed power, which is power supplied between a connection point of the photovoltaic power generation system 200 on the distribution line DL and a connection point of the water electrolysis device 300, a calculation unit 130 that calculates the power consumption of the water electrolysis device 300 based on the distributed power and a threshold value of the power supplied to the distribution line DL, and a creation unit that derives a power consumption command value based on the power consumption calculated by the calculation unit 130, and creates water electrolysis device control information for controlling the water electrolysis device 300, the power consumption command value being included in the derived power consumption command value. With this configuration, the power consumption of the water electrolysis device 300 can be controlled based on the distributed power and a threshold value of the power supplied to the distribution line DL, and therefore the power supplied to the energy consumer CE from the photovoltaic power generation system 200 to the distribution line DL can be controlled. Renewable energy can be introduced to the local grid (distribution line) by reinforcing the distribution line DL between the connection point of the photovoltaic power generation system 200 and the connection point of the water electrolysis device 300. When introducing renewable energy to the local grid (distribution line), the points to be reinforced on the distribution line DL can be limited. Renewable energy that does not generate carbon dioxide can be introduced to the local grid (distribution line). This can improve the utilization rate of the power grid and the load factor of the energy consumer CE.

[0033] Furthermore, the calculation unit 130 calculates the power consumption of the water electrolysis device 300 by subtracting the power threshold from the distributed power. With this configuration, when the power generated by the photovoltaic power generation system 200 exceeds the power threshold to be supplied to the distribution line DL, the amount exceeding the power threshold can be supplied to the water electrolysis device 300. By reinforcing the distribution line DL between the connection point of the photovoltaic power generation system 200 and the connection point of the water electrolysis device 300, renewable energy can be introduced into the local grid (distribution line). When introducing renewable energy into the local grid (distribution line), the points of the distribution line DL to be reinforced can be limited. In addition, the monitoring unit 120 monitors the distributed power supplied between the connection point of the solar power generation system corresponding to the identification information of the solar power generation system and the connection point of the water electrolysis device corresponding to the identification information of the water electrolysis device, based on the pairing of the identification information of the solar power generation system and the identification information of the water electrolysis device obtained from the memory unit 150, which stores the identification information of the solar power generation system and the identification information of the water electrolysis device in association with each other, and the water electrolysis device control unit creates water electrolysis device control information, which includes the derived power consumption command value and is addressed to the water electrolysis device corresponding to the identification information of the water electrolysis device included in the pairing. In the distribution line DL, based on pairing of the identification information of the photovoltaic power generation system and the identification information of the water electrolysis device, renewable energy can be introduced into the local grid (distribution line) by reinforcing the connection point between the corresponding photovoltaic power generation system 200 and the connection point of the water electrolysis device 300. In other words, since the distribution line DL between the pairings does not need to be reinforced, it is possible to limit the points of reinforcement of the distribution line DL when introducing renewable energy into the local grid (distribution line).

[0034] (First Modification) 1A can be applied to an energy management system 1a according to a first modified example of the embodiment. However, an energy management device 100a is provided instead of the energy management device 100. Furthermore, a solar power generation system 200-1, a solar power generation system 200-2, and a solar power generation system 200-3 are connected to the energy management device 100a via a network NW. The energy management device 100a acquires detection results of the power supplied to the distribution line DL, which are output by each of the power sensors 50-1, 50-2, and 50-3. Based on the acquired power detection results, the energy management device 100a monitors whether the power detection results exceed a power threshold. In the first modification of this embodiment, the description will continue with a case where an upper limit value of the distributed power that can be supplied to the distribution line DL is applied as an example of the power threshold. The upper limit value of the distributed power that can be supplied to the distribution line DL is set in advance when the power system is introduced. Specifically, the energy management device 100a acquires a detection result of the first distributed power output by the power sensor 50-1, and monitors whether or not the first distributed power exceeds an upper limit of power that can be supplied to the distribution line DL based on the acquired detection result of the first distributed power. The energy management device 100a acquires a detection result of the second distributed power output by the power sensor 50-2, and monitors whether or not the second distributed power exceeds an upper limit of power that can be supplied to the distribution line DL based on the acquired detection result of the second distributed power. The energy management device 100a acquires a detection result of the third distributed power output by the power sensor 50-3, and monitors whether or not the third distributed power exceeds an upper limit of power that can be supplied to the distribution line DL based on the acquired detection result of the third distributed power.

[0035] The energy management device 100a calculates the power consumption of each of the water electrolysis devices 300-1, 300-2, and 300-3 based on the results of monitoring the detection results of the distributed power. Specifically, when the energy management device 100a determines that the first distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, it calculates the first power consumption of the water electrolysis device 300-1 associated with the solar power generation system 200-1 by subtracting the upper limit of power that can be supplied to the distribution line DL from the first distributed power. When the energy management device 100a determines that the second distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, it calculates the second power consumption of the water electrolysis device 300-2 associated with the solar power generation system 200-2 by subtracting the upper limit of power that can be supplied to the distribution line DL from the second distributed power. When the energy management device 100a determines that the third distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, it calculates the third power consumption of the water electrolysis device 300-3 associated with the solar power generation system 200-3 by subtracting the upper limit of power that can be supplied to the distribution line DL from the third distributed power.

[0036] The energy management device 100a determines whether or not all of the consumed power can be consumed by the water electrolysis device 300, based on the calculated consumed power and the power that can be consumed by the water electrolysis device 300 (hereinafter referred to as "consumable power"). Hereinafter, the result of determining whether all of the consumed power can be consumed by the water electrolysis device 300 is referred to as the power consumption determination result. Specifically, the energy management device 100a determines whether the entire first power consumption can be consumed by the water electrolysis device 300-1 based on the calculated first power consumption and the power consumable by the water electrolysis device 300-1 (hereinafter referred to as "first consumable power"). The energy management device 100a determines whether the entire second power consumption can be consumed by the water electrolysis device 300-2 based on the calculated second power consumption and the power consumable by the water electrolysis device 300-2 (hereinafter referred to as "second consumable power"). The energy management device 100a determines whether the entire third power consumption can be consumed by the water electrolysis device 300-3 based on the calculated third power consumption and the power consumable by the water electrolysis device 300-3 (hereinafter referred to as "third consumable power"). Specifically, the energy management apparatus 100a determines whether the first power consumption exceeds the first available power. The energy management apparatus 100a determines whether the second power consumption exceeds the second available power. The energy management apparatus 100a determines whether the third power consumption exceeds the third available power.

[0037] The energy management device 100a calculates the power consumption of the water electrolysis device 300 based on the results of monitoring the detection results of the distributed power and the power consumption determination result. Specifically, when the energy management device 100a determines that the first distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, it calculates the first power consumption of the water electrolysis device 300-1 associated with the solar power generation system 200-1 by subtracting the upper limit of power that can be supplied to the distribution line DL from the first distributed power. The energy management device 100a determines whether the calculated first power consumption exceeds the first consumable power. If the energy management device 100a determines that the first power consumption is equal to or less than the first consumable power, the energy management device 100a sets the first power consumption as the power consumption of the water electrolysis device 300-1. On the other hand, if the energy management device 100a determines that the first power consumption exceeds the first consumable power, the energy management device 100a sets the first consumable power as the power consumption of the water electrolysis device 300-1. If the energy management device 100a determines that the first power consumption exceeds the first consumable power, the energy management device 100a calculates the amount of power generated by the solar power generation system 200-1 that is to be limited in supply to the power distribution line DL (hereinafter referred to as the "first limited power")

[0038] When the energy management device 100a determines that the second distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, it calculates the second power consumption of the water electrolysis device 300-2 associated with the solar power generation system 200-2 by subtracting the upper limit of power that can be supplied to the distribution line DL from the second distributed power. The energy management device 100a determines whether the calculated second power consumption exceeds the second consumable power. If the energy management device 100a determines that the second power consumption is equal to or less than the second consumable power, the energy management device 100a sets the second power consumption as the power consumption of the water electrolysis device 300-2. On the other hand, if the energy management device 100a determines that the second power consumption exceeds the second consumable power, the energy management device 100a sets the second consumable power as the power consumption of the water electrolysis device 300-2. If the energy management device 100a determines that the second power consumption exceeds the second consumable power, the energy management device 100a calculates the power (hereinafter referred to as the "second limited power") generated by the photovoltaic power generation system 200-2 that is to be limited in supply to the power distribution line DL.

[0039] When the energy management device 100a determines that the third distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, it calculates the third power consumption of the water electrolysis device 300-3 associated with the solar power generation system 200-3 by subtracting the upper limit of power that can be supplied to the distribution line DL from the third distributed power. The energy management device 100a determines whether the calculated third power consumption exceeds the third consumable power. If the energy management device 100a determines that the third power consumption is equal to or less than the third consumable power, the energy management device 100a sets the third power consumption as the power consumption of the water electrolysis device 300-3. On the other hand, if the energy management device 100a determines that the third power consumption exceeds the third consumable power, the energy management device 100a sets the third consumable power as the power consumption of the water electrolysis device 300-3. If the energy management device 100a determines that the third power consumption exceeds the third consumable power, the energy management device 100a calculates the power (hereinafter referred to as the "third limit power") generated by the photovoltaic power generation system 200-3 that is to be limited in supply to the power distribution line DL.

[0040] The energy management device 100a derives a first power consumption command value based on the calculated first power consumption. The energy management device 100a acquires the address of the water electrolysis device 300-1 associated with the identification information of the water electrolysis device 300-1 from the water electrolysis device information. The energy management device 100a creates water electrolysis device control information including the first power consumption command value and addressed to the acquired address of the water electrolysis device 300-1. The energy management device 100a transmits the created first water electrolysis device control information to the water electrolysis device 300-1. When the energy management device 100a calculates the first limit power, it derives a first limit command value based on the calculated first limit power. The energy management device 100a acquires the address of the solar power generation system 200-1 associated with the identification information of the solar power generation system 200-1 from the solar power generation system information. The energy management device 100a creates control information (hereinafter referred to as "first solar power generation system control information") that includes the first limit command value and is addressed to the acquired address of the solar power generation system 200-1. The energy management device 100a transmits the created first solar power generation system control information to the solar power generation system 200-1.

[0041] The energy management device 100a derives a power consumption command value (hereinafter referred to as the "second power consumption command value") for setting the power consumption of the water electrolysis device 300-2 based on the calculated second power consumption. The energy management device 100a acquires the address of the water electrolysis device 300-2 associated with the identification information of the water electrolysis device 300-2 from the water electrolysis device information. The energy management device 100a creates control information (hereinafter referred to as the "second water electrolysis device control information") that is addressed to the acquired address of the water electrolysis device 300-2 and includes the second power consumption command value. The energy management device 100a transmits the created second water electrolysis device control information to the water electrolysis device 300-2. When the energy management device 100a calculates the second limit power, it derives a second limit command value based on the calculated second limit power. The energy management device 100a acquires the address of the solar power generation system 200-2 associated with the identification information of the solar power generation system 200-2 from the solar power generation system information. The energy management device 100a creates control information (hereinafter referred to as "second solar power generation system control information") that includes the second limit command value and is addressed to the acquired address of the solar power generation system 200-2. The energy management device 100a transmits the created second solar power generation system control information to the solar power generation system 200-2.

[0042] The energy management device 100a derives a power consumption command value (hereinafter referred to as the "third power consumption command value") for setting the power consumption of the water electrolysis device 300-3 based on the calculated third power consumption. The energy management device 100a acquires the address of the water electrolysis device 300-3 associated with the identification information of the water electrolysis device 300-3 from the water electrolysis device information. The energy management device 100a creates control information (hereinafter referred to as the "third water electrolysis device control information") that is addressed to the acquired address of the water electrolysis device 300-3 and includes the third power consumption command value. The energy management device 100a transmits the created third water electrolysis device control information to the water electrolysis device 300-3. When the energy management device 100a calculates the third limit power, it derives a third limit command value based on the calculated third limit power. The energy management device 100a acquires the address of the solar power generation system 200-3 associated with the identification information of the solar power generation system 200-3 from the solar power generation system information. The energy management device 100a creates control information (hereinafter referred to as "third solar power generation system control information") that is addressed to the acquired address of the solar power generation system 200-3 and includes the third limit command value. The energy management device 100a transmits the created third solar power generation system control information to the solar power generation system 200-3.

[0043] The solar power generation system 200-1 receives the first solar power generation system control information transmitted by the energy management device 100a. The solar power generation system 200-1 acquires a first limit command value included in the received first solar power generation system control information. The solar power generation system 200-1 limits the power that the solar power generation system 200-1 supplies to the distribution line DL based on the acquired first limit command value. The solar power generation system 200-2 receives the second solar power generation system control information transmitted by the energy management device 100a. The solar power generation system 200-2 acquires a second limit command value included in the received second solar power generation system control information. The solar power generation system 200-2 limits the power that the solar power generation system 200-2 supplies to the power distribution line DL based on the acquired second limit command value. The solar power generation system 200-3 receives the third solar power generation system control information transmitted by the energy management device 100a. The solar power generation system 200-3 acquires a third limit command value included in the received third solar power generation system control information. The solar power generation system 200-3 restricts the power that the solar power generation system 200-3 supplies to the power distribution line DL based on the acquired third limit command value.

[0044] The energy management device 100a included in the energy management system 1a will be described in detail below. Fig. 7 is a block diagram showing an example of an energy management device included in an energy management system according to a first modified example of an embodiment. In addition to the energy management device 100a, Fig. 7 shows a power sensor 50, a solar power generation system 200, and a water electrolysis device 300. [Energy management device 100a] The energy management apparatus 100a is realized by a device such as a personal computer, a server, an industrial computer, etc. The energy management apparatus 100a includes, for example, a communication unit 110, a monitoring unit 120, a calculation unit 130a, a determination unit 135, a creation unit 140a, and a storage unit 150. In addition to the functions described in the embodiment, the communication unit 110 acquires the photovoltaic power generation system control information output by the creation unit 140a, and transmits the acquired photovoltaic power generation system control information to the photovoltaic power generation system 200. The storage unit 150 stores correspondence information 152, water electrolysis device information 154a, and solar power generation system information 156. The correspondence information 152, water electrolysis device information 154a, and solar power generation system information 156 may be stored on a cloud.

[0045] (Water electrolysis device information 154a) The water electrolysis device information 154a is information in the form of a table that associates water electrolysis device identification information, water electrolysis device consumable power, and water electrolysis device address. The water electrolysis device consumable power is the power that can be consumed by the water electrolysis device. An example of the water electrolysis device address is an IP address. Fig. 8 is a diagram showing an example of the water electrolysis device information. In the water electrolysis device information 154a shown in Fig. 8, the water electrolysis device information 154a stores in association with the water electrolysis device identification information "WE0001", the water electrolysis device consumable power "***", and the water electrolysis device address "AAAAA", the water electrolysis device identification information "WE0002", the water electrolysis device consumable power "+++", and the water electrolysis device address "BBBBB", and the water electrolysis device identification information "WE0003", the water electrolysis device consumable power "*+*", and the water electrolysis device address "CCCCC". This information is stored when the operation of the energy management system 1a is started.

[0046] (Solar Power Generation System Information 156) The photovoltaic power generation system information 156 is information in a table format that associates photovoltaic power generation system identification information with a photovoltaic power generation system address. An example of the photovoltaic power generation system address is an IP address. Fig. 9 is a diagram showing an example of photovoltaic power generation system information. In the photovoltaic power generation system information 156 shown in Fig. 9, photovoltaic power generation system identification information "SPS0001" is associated with a photovoltaic power generation system address "XXXXX", photovoltaic power generation system identification information "SPS0002" is associated with a photovoltaic power generation system address "YYYYY", and photovoltaic power generation system identification information "SPS0003" is associated with a photovoltaic power generation system address "ZZZZZ". These pieces of information are stored when the operation of the energy management system 1a is started. Returning to Fig. 7, the description will be continued.

[0047] The monitoring unit 120, the calculation unit 130a, the determination unit 135, and the creation unit 140a are realized, for example, by a hardware processor such as a CPU executing a program stored in the storage unit 150. In addition, some or all of these functional units may be realized by hardware (including circuitry) such as an LSI, ASIC, FPGA, or GPU, or may be realized by cooperation between software and hardware. The program may be stored in advance in a storage device (a storage device having a non-transient storage medium) such as an HDD (Hard Disk Drive) or flash memory, or may be stored in a removable storage medium (a non-transient storage medium) such as a DVD or CD-ROM, and installed by mounting the storage medium in a drive device.

[0048] Of the monitoring unit 120, the calculation unit 130a, the determination unit 135, and the creation unit 140a, the calculation unit 130a, the determination unit 135, and the creation unit 140a that are different from those in the embodiment will be mainly described. The monitoring unit 120 outputs the water electrolysis apparatus identification information and the created instruction information to the calculation unit 130a. When the calculation unit 130a acquires the water electrolysis device identification information and instruction information output by the monitoring unit 120, the calculation unit 130a acquires the detection result of the distributed power received by the communication unit 110. The calculation unit 130a calculates the power consumption of the water electrolysis device 300 corresponding to the water electrolysis device identification information based on the instruction information. For example, the calculation unit 130a calculates the power consumption of the water electrolysis device 300 by subtracting the upper limit of power that can be supplied to the power distribution line DL from the detection result of the distributed power. The calculation unit 130a outputs the water electrolysis device identification information and the calculation result of the power consumption of the water electrolysis device 300 to the determination unit 135.

[0049] The determination unit 135 acquires the water electrolysis device identification information output by the calculation unit 130a and the calculation result of the power consumption of the water electrolysis device 300. The determination unit 135 acquires the water electrolysis device consumable power stored in association with the acquired water electrolysis device identification information from the water electrolysis device information 154a. The determination unit 135 determines whether the power consumption of the water electrolysis device 300 exceeds the consumable power of the water electrolysis device 300 based on the acquired water electrolysis device consumable power and the calculation result of the power consumption of the water electrolysis device 300. The determination unit 135 outputs the determination result of whether the power consumption of the water electrolysis device 300 exceeds the consumable power of the water electrolysis device 300, the water electrolysis device identification information, and the calculation result of the power consumption of the water electrolysis device 300 to the calculation unit 130a.

[0050] The calculation unit 130a acquires the determination result output by the determination unit 135, the water electrolysis device identification information, and the calculation result of the power consumption of the water electrolysis device 300. When the obtained determination result indicates that the calculation result of the power consumption of the water electrolysis device 300 is equal to or less than the consumable power of the water electrolysis device 300, the calculation unit 130a determines the calculation result of the power consumption of the water electrolysis device 300 as the power consumption of the water electrolysis device 300. The calculation unit 130a outputs the water electrolysis device identification information and information indicating the power consumption of the water electrolysis device 300 to the creation unit 140. When the calculation unit 130a determines that the power consumption of the water electrolysis device 300 exceeds the consumable power of the water electrolysis device 300 based on the obtained determination result, the calculation unit 130a determines the consumable power of the water electrolysis device 300 as the power consumption of the water electrolysis device 300. The calculation unit 130a outputs the water electrolysis device identification information and information indicating the power consumption of the water electrolysis device 300 to the creation unit 140a. The calculation unit 130a obtains the water electrolysis device consumable power and the water electrolysis device address stored in association with the water electrolysis device identification information from the water electrolysis device information 154a. The calculation unit 130a calculates the limit power, which is the power generated by the photovoltaic power generation system 200 and the power supply to the power distribution line DL is limited, by subtracting the water electrolysis device consumable power from the calculation result of the power consumption of the water electrolysis device 300. The calculation unit 130a identifies the photovoltaic power generation system identification information stored in association with the water electrolysis device identification information from the correspondence information 152. The calculation unit 130a outputs the identified photovoltaic power generation system identification information and information indicating the limit power to the creation unit 140.

[0051] Specifically, calculation unit 130a acquires the determination result output by determination unit 135 of whether the power consumption of water electrolysis device 300-1 exceeds the consumable power of water electrolysis device 300-1, water electrolysis device identification information of water electrolysis device 300-1, and the calculation result of the power consumption of water electrolysis device 300-1. When the obtained determination result indicates that the calculation result of the power consumption of the water electrolysis device 300-1 is equal to or less than the consumable power of the water electrolysis device 300-1, the calculation unit 130a determines the calculation result of the power consumption of the water electrolysis device 300-1 as the power consumption of the water electrolysis device 300-1. The calculation unit 130a outputs the water electrolysis device identification information of the water electrolysis device 300-1 and information indicating the power consumption of the water electrolysis device 300-1 to the creation unit 140. When the calculation unit 130a determines that the power consumption of the water electrolysis device 300-1 exceeds the consumable power of the water electrolysis device 300-1 based on the obtained determination result, the calculation unit 130a determines the consumable power of the water electrolysis device 300-1 as the power consumption of the water electrolysis device 300-1. The calculation unit 130a outputs the water electrolysis device identification information of the water electrolysis device 300-1 and information indicating the power consumption of the water electrolysis device 300-1 to the creation unit 140a. The calculation unit 130a acquires the water electrolysis device consumable power of the water electrolysis device 300-1 and the water electrolysis device address of the water electrolysis device 300-1, which are stored in association with the water electrolysis device identification information of the water electrolysis device 300-1, from the water electrolysis device information 154a. The calculation unit 130a calculates the first limited power by subtracting the water electrolysis device consumable power of the water electrolysis device 300-1 from the calculation result of the power consumption of the water electrolysis device 300-1. The calculation unit 130a identifies the photovoltaic power generation system identification information of the photovoltaic power generation system 200-1, which is stored in association with the water electrolysis device identification information of the water electrolysis device 300-1, from the correspondence information 152. The calculation unit 130a outputs the identified photovoltaic power generation system identification information of the photovoltaic power generation system 200-1 and information indicating the first limited power to the creation unit 140.

[0052] The calculation unit 130a acquires the determination result output by the determination unit 135 of whether the power consumption of the water electrolysis device 300-2 exceeds the consumable power of the water electrolysis device 300-2, the water electrolysis device identification information of the water electrolysis device 300-2, and the calculation result of the power consumption of the water electrolysis device 300-2. When the obtained determination result indicates that the calculation result of the power consumption of the water electrolysis device 300-2 is equal to or less than the consumable power of the water electrolysis device 300-2, the calculation unit 130a determines the calculation result of the power consumption of the water electrolysis device 300-2 as the power consumption of the water electrolysis device 300-2. The calculation unit 130a outputs the water electrolysis device identification information of the water electrolysis device 300-2 and information indicating the power consumption of the water electrolysis device 300-2 to the creation unit 140.

[0053] When the calculation unit 130a determines that the power consumption of the water electrolysis device 300-2 exceeds the consumable power of the water electrolysis device 300-2 from the obtained determination result, the calculation unit 130a determines the consumable power of the water electrolysis device 300-2 as the power consumption of the water electrolysis device 300-2. The calculation unit 130a outputs the water electrolysis device identification information of the water electrolysis device 300-2 and information indicating the power consumption of the water electrolysis device 300-2 to the creation unit 140a. The calculation unit 130a acquires the water electrolysis device consumable power of the water electrolysis device 300-2 and the water electrolysis device address of the water electrolysis device 300-2, which are stored in association with the water electrolysis device identification information of the water electrolysis device 300-2, from the water electrolysis device information 154a. The calculation unit 130a calculates the second limit power by subtracting the water electrolysis device consumable power of the water electrolysis device 300-2 from the calculation result of the power consumption of the water electrolysis device 300-1. The calculation unit 130a identifies the photovoltaic power generation system identification information of the photovoltaic power generation system 200-2, which is stored in association with the water electrolysis device identification information of the water electrolysis device 300-2, from the correspondence information 152. The calculation unit 130a outputs the identified photovoltaic power generation system identification information of the photovoltaic power generation system 200-2 and information indicating the second limit power to the creation unit 140.

[0054] The calculation unit 130a acquires the determination result output by the determination unit 135 of whether the power consumption of the water electrolysis device 300-3 exceeds the consumable power of the water electrolysis device 300-3, water electrolysis device identification information of the water electrolysis device 300-3, and the calculation result of the power consumption of the water electrolysis device 300-3. When the obtained determination result indicates that the calculation result of the power consumption of the water electrolysis device 300-3 is equal to or less than the consumable power of the water electrolysis device 300-3, the calculation unit 130a determines the calculation result of the power consumption of the water electrolysis device 300-3 as the power consumption of the water electrolysis device 300-3. The calculation unit 130a outputs the water electrolysis device identification information of the water electrolysis device 300-3 and information indicating the power consumption of the water electrolysis device 300-3 to the creation unit 140.

[0055] When the calculation unit 130a determines that the power consumption of the water electrolysis device 300-3 exceeds the consumable power of the water electrolysis device 300-3 based on the obtained determination result, the calculation unit 130a determines the consumable power of the water electrolysis device 300-3 as the power consumption of the water electrolysis device 300-3. The calculation unit 130a outputs the water electrolysis device identification information of the water electrolysis device 300-3 and information indicating the power consumption of the water electrolysis device 300-3 to the creation unit 140a. The calculation unit 130a acquires the water electrolysis device consumable power of the water electrolysis device 300-3 and the water electrolysis device address of the water electrolysis device 300-3, which are stored in association with the water electrolysis device identification information of the water electrolysis device 300-3, from the water electrolysis device information 154a. The calculation unit 130a calculates the third limit power by subtracting the water electrolysis device consumable power of the water electrolysis device 300-3 from the calculation result of the power consumption of the water electrolysis device 300-1. The calculation unit 130a identifies the photovoltaic power generation system identification information of the photovoltaic power generation system 200-3, which is stored in association with the water electrolysis device identification information of the water electrolysis device 300-3, from the correspondence information 152. The calculation unit 130a outputs the identified photovoltaic power generation system identification information of the photovoltaic power generation system 200-3 and information indicating the third limit power to the creation unit 140.

[0056] The creation unit 140a acquires the water electrolysis device identification information and information indicating the power consumption of the water electrolysis device 300 output by the calculation unit 130a. The creation unit 140a derives a power consumption command value for instructing the power consumption of the water electrolysis device 300 based on the acquired information indicating the power consumption of the water electrolysis device 300. The creation unit 140a acquires the address of the water electrolysis device 300 stored in association with the acquired water electrolysis device identification information from the water electrolysis device information 154a. The creation unit 140a creates water electrolysis device control information including the derived power consumption command value and addressed to the acquired address of the water electrolysis device 300. The creation unit 140a outputs the created water electrolysis device control information to the communication unit 110. The creation unit 140a acquires the photovoltaic power generation system identification information and the calculation result of the limit power output by the calculation unit 130a. The creation unit 140a derives a limit command value for instructing the limit power of the photovoltaic power generation system 200 based on the acquired calculation result of the limit power of the photovoltaic power generation system 200. For example, an arithmetic expression for deriving the limit command value is set from the calculation result of the limit power of the photovoltaic power generation system 200, and the creation unit 140a derives a sine command value based on the arithmetic expression. The creation unit 140a acquires the address of the photovoltaic power generation system 200 stored in association with the acquired photovoltaic power generation system identification information from the photovoltaic power generation system information 156. The creation unit 140a creates photovoltaic power generation system control information including the derived limit command value and addressed to the acquired address of the photovoltaic power generation system 200. The creation unit 140a outputs the created photovoltaic power generation system control information to the communication unit 110.

[0057] Specifically, the creation unit 140a acquires the water electrolysis device identification information of the water electrolysis device 300-1 and information indicating the power consumption of the water electrolysis device 300-1 output by the determination unit 135. The creation unit 140a derives a first power consumption command value based on the acquired information indicating the power consumption of the water electrolysis device 300-1. The creation unit 140a acquires the address of the water electrolysis device 300-1, which is stored in association with the acquired water electrolysis device identification information of the water electrolysis device 300-1, from the water electrolysis device information 154a. The creation unit 140a creates first water electrolysis device control information including the derived first power consumption command value and addressed to the acquired address of the water electrolysis device 300-1. The creation unit 140a outputs the created first water electrolysis device control information to the communication unit 110. The creation unit 140a acquires the photovoltaic power generation system identification information of the photovoltaic power generation system 200-1 and the calculation result of the first limit power output by the calculation unit 130a. The creation unit 140a derives a first limit command value based on the acquired calculation result of the first limit power. The creation unit 140a acquires the address of the photovoltaic power generation system 200-1 stored in association with the acquired photovoltaic power generation system identification information of the photovoltaic power generation system 200-1 from the photovoltaic power generation system information 156. The creation unit 140a creates first photovoltaic power generation system control information including the derived first limit command value and addressed to the acquired address of the photovoltaic power generation system 200-1. The creation unit 140a outputs the created first photovoltaic power generation system control information to the communication unit 110.

[0058] The creation unit 140a acquires the water electrolysis device identification information of the water electrolysis device 300-2 and information indicating the power consumption of the water electrolysis device 300-2 output by the determination unit 135. The creation unit 140a derives a second power consumption command value based on the acquired information indicating the power consumption of the water electrolysis device 300-2. The creation unit 140a acquires the address of the water electrolysis device 300-2, which is stored in association with the acquired water electrolysis device identification information of the water electrolysis device 300-2, from the water electrolysis device information 154a. The creation unit 140a creates second water electrolysis device control information including the derived second power consumption command value and addressed to the acquired address of the water electrolysis device 300-2. The creation unit 140a outputs the created second water electrolysis device control information to the communication unit 110. The creation unit 140a acquires the photovoltaic power generation system identification information of the photovoltaic power generation system 200-2 and the calculation result of the second limit power output by the calculation unit 130a. The creation unit 140a derives a second limit command value based on the acquired calculation result of the second limit power. The creation unit 140a acquires the address of the photovoltaic power generation system 200-2 stored in association with the acquired photovoltaic power generation system identification information of the photovoltaic power generation system 200-2 from the photovoltaic power generation system information 156. The creation unit 140a creates second photovoltaic power generation system control information including the derived second limit command value and addressed to the acquired address of the photovoltaic power generation system 200-2. The creation unit 140a outputs the created second photovoltaic power generation system control information to the communication unit 110.

[0059] The creation unit 140a acquires the water electrolysis device identification information of the water electrolysis device 300-3 and information indicating the power consumption of the water electrolysis device 300-3 output by the determination unit 135. The creation unit 140a derives a third power consumption command value based on the acquired information indicating the power consumption of the water electrolysis device 300-3. The creation unit 140a acquires the address of the water electrolysis device 300-3, which is stored in association with the acquired water electrolysis device identification information of the water electrolysis device 300-3, from the water electrolysis device information 154a. The creation unit 140a creates third water electrolysis device control information including the derived third power consumption command value and addressed to the acquired address of the water electrolysis device 300-3. The creation unit 140a outputs the created third water electrolysis device control information to the communication unit 110. The creation unit 140a acquires the photovoltaic power generation system identification information of the photovoltaic power generation system 200-3 and the calculation result of the third limit power output by the calculation unit 130a. The creation unit 140a derives a third limit command value based on the acquired calculation result of the third limit power. The creation unit 140a acquires the address of the photovoltaic power generation system 200-3 stored in association with the acquired photovoltaic power generation system identification information of the photovoltaic power generation system 200-3 from the photovoltaic power generation system information 156. The creation unit 140a creates third photovoltaic power generation system control information including the derived third limit command value and addressed to the acquired address of the photovoltaic power generation system 200-3. The creation unit 140a outputs the created third photovoltaic power generation system control information to the communication unit 110.

[0060] (Energy management system operation) FIG. 10 is a sequence chart illustrating an example of an operation of the energy management system according to the first modification of the embodiment. Steps S1-1 to S4-1 in FIG. 6 can be applied to steps S1-2 to S4-2. (Step S5-2) In the energy management device 100a, when the monitoring unit 120 determines that the distributed power exceeds the upper limit of power that can be supplied to the power distribution line DL, the monitoring unit 120 outputs the water electrolysis device identification information and the created instruction information to the calculation unit 130a. When the calculation unit 130a acquires the water electrolysis device identification information and instruction information output by the monitoring unit 120, it acquires the detection result of the distributed power received by the communication unit 110. The calculation unit 130a calculates the power consumption of the water electrolysis device 300 corresponding to the acquired water electrolysis device identification information, based on the upper limit of power that can be supplied to the power distribution line DL and the acquired detection result of the distributed power. The calculation unit 130a outputs the water electrolysis device identification information and the calculation result of the power consumption of the water electrolysis device 300 to the determination unit 135. The determination unit 135 acquires the water electrolysis device identification information output by the calculation unit 130a and the calculation result of the power consumption of the water electrolysis device 300. The determination unit 135 acquires the water electrolysis device consumable power stored in association with the acquired water electrolysis device identification information from the water electrolysis device information 154a. The determination unit 135 determines whether the power consumption of the water electrolysis device 300 exceeds the consumable power of the water electrolysis device 300 based on the acquired water electrolysis device consumable power and the calculation result of the power consumption of the water electrolysis device 300. In the energy management device 100a, the determination unit 135 outputs to the calculation unit 130a the determination result of whether the power consumption of the water electrolysis device 300 exceeds the consumable power of the water electrolysis device 300, the water electrolysis device identification information, and the calculation result of the power consumption of the water electrolysis device 300. The calculation unit 130a acquires the determination result output by the determination unit 135, the water electrolysis device identification information, and the calculation result of the power consumption of the water electrolysis device 300.

[0061] (Step S6-2) In the energy management device 100a, when the obtained determination result indicates that the calculation result of the power consumption of the water electrolysis device 300 is equal to or less than the consumable power of the water electrolysis device 300, the calculation unit 130a determines the calculation result of the power consumption of the water electrolysis device 300 as the power consumption of the water electrolysis device 300. (Step S7-2) In the energy management device 100a, the calculation unit 130a outputs the water electrolysis device identification information and information indicating the power consumption of the water electrolysis device 300 to the creation unit 140a. The creation unit 140a acquires the water electrolysis device identification information and information indicating the power consumption of the water electrolysis device 300 output by the calculation unit 130a. The creation unit 140a derives a power consumption command value based on the acquired information indicating the power consumption of the water electrolysis device 300. The creation unit 140a acquires the address of the water electrolysis device 300 stored in association with the acquired water electrolysis device identification information from the water electrolysis device information 154a. The creation unit 140a creates water electrolysis device control information including the derived power consumption command value and addressed to the acquired address of the water electrolysis device 300. The creation unit 140a outputs the created water electrolysis device control information to the communication unit 110.

[0062] (Step S8-2) In the energy management device 100a, when the calculation unit 130a determines that the power consumption of the water electrolysis device 300 exceeds the consumable power of the water electrolysis device 300 based on the acquired judgment result, the calculation unit 130a determines the consumable power of the water electrolysis device 300 as the power consumption of the water electrolysis device 300. (Step S9-2) In the energy management device 100a, the calculation unit 130a outputs the water electrolysis device identification information and information indicating the power consumption of the water electrolysis device 300 to the creation unit 140a. The creation unit 140a acquires the water electrolysis device identification information and information indicating the power consumption of the water electrolysis device 300 output by the calculation unit 130a. The creation unit 140a derives a power consumption command value based on the acquired information indicating the power consumption of the water electrolysis device 300. The creation unit 140a acquires the address of the water electrolysis device 300 stored in association with the acquired water electrolysis device identification information from the water electrolysis device information 154a. The creation unit 140a creates water electrolysis device control information including the derived power consumption command value and addressed to the acquired address of the water electrolysis device 300. The creation unit 140a outputs the created water electrolysis device control information to the communication unit 110. (Step S10-2) In the energy management device 100a, the communication unit 110 acquires the water electrolysis device control information output by the creation unit 140a, and transmits the acquired water electrolysis device control information to the water electrolysis device 300.

[0063] (Step S11-2) The water electrolysis device 300 receives the water electrolysis device control information transmitted by the energy management device 100a. (Step S12-2) The water electrolysis apparatus 300 acquires a power consumption command value included in the received water electrolysis apparatus control information. The water electrolysis apparatus 300 controls power consumption based on the acquired power consumption command value. For example, the water electrolysis apparatus 300 consumes power based on the power consumption command value from the power supplied by the solar power generation system 200 to the power distribution line DL. (Step S13-2) In the energy management device 100a, the calculation unit 130a obtains the water electrolysis device consumable power and the water electrolysis device address stored in association with the water electrolysis device identification information from the water electrolysis device information 154a. The calculation unit 130a calculates the limit power by subtracting the water electrolysis device consumable power from the calculation result of the power consumption of the water electrolysis device 300. The calculation unit 130a identifies the photovoltaic power generation system identification information stored in association with the water electrolysis device identification information from the correspondence information 152. The calculation unit 130a outputs the identified photovoltaic power generation system identification information and information indicating the limit power to the creation unit 140.

[0064] (Step S14-2) In the energy management device 100a, the creation unit 140a acquires the photovoltaic power generation system identification information and the calculation result of the limit power output by the calculation unit 130a. The creation unit 140a derives a limit command value based on the acquired calculation result of the limit power of the photovoltaic power generation system 200. The creation unit 140a acquires the address of the photovoltaic power generation system 200 stored in association with the acquired photovoltaic power generation system identification information from the photovoltaic power generation system information 156. The creation unit 140a creates photovoltaic power generation system control information including the derived limit command value and addressed to the acquired address of the photovoltaic power generation system 200. The creation unit 140a outputs the created photovoltaic power generation system control information to the communication unit 110.

[0065] (Step S15-2) In the energy management device 100a, the communication unit 110 acquires the photovoltaic power generation system control information output by the creation unit 140a, and transmits the acquired photovoltaic power generation system control information to the photovoltaic power generation system 200. (Step S16-2) The solar power generation system 200 receives the solar power generation system control information transmitted by the energy management device 100a. (Step S17-2) The photovoltaic power generation system 200 acquires a limit command value included in the received photovoltaic power generation system control information. The photovoltaic power generation system 200 limits the power that the photovoltaic power generation system 200 supplies to the power distribution line DL based on the acquired limit command value. In the sequence chart shown in FIG. 10, the order of steps S6-2 to S12-2 and steps S13-2 to S17-2 may be interchanged.

[0066] The features of the first variant of the embodiment described above may be applied to the energy management system 1' of the embodiment shown in FIG. 1B. According to the energy management system 1a of the first modified example of the present embodiment, the energy management system 1a is an energy management system including a solar power generation system 200 connected to a distribution line DL, and a water electrolysis device 300, and is equipped with a monitoring unit 120 that monitors distributed power, which is power supplied between a connection point of the solar power generation system 200 on the distribution line DL and a connection point of the water electrolysis device 300, a calculation unit 130a that calculates the power consumption of the water electrolysis device 300 based on the distributed power and a threshold value of the power supplied to the distribution line DL, and a creation unit 140a that derives a power consumption command value based on the power consumption calculated by the calculation unit 130a, and creates water electrolysis device control information for controlling the water electrolysis device 300, the power consumption command value being included in the derived power consumption command value. The water electrolysis device further includes a determination unit 135 that determines whether the power consumption calculated by the calculation unit 130a exceeds the power that can be consumed by the water electrolysis device 300. The creation unit 140a derives a limit command value for limiting the output of the solar power generation system 200 based on the result of the determination by the determination unit 135, and creates control information for limiting the power supplied by the solar power generation system 200, including the derived limit command value.

[0067] With this configuration, when the power consumption of the water electrolysis device 300 exceeds the power that can be consumed by the water electrolysis device 300, a limit command value for limiting the output of the photovoltaic power generation system 200 is derived, and control information for limiting the power supplied by the photovoltaic power generation system 200 including the derived limit command value can be created, so that the power supplied to the energy consumer CE from the photovoltaic power generation system 200 to the distribution line DL can be controlled. By reinforcing the distribution line DL between the connection point of the photovoltaic power generation system 200 and the connection point of the water electrolysis device 300, renewable energy can be introduced into the local grid (distribution line). When introducing renewable energy into the local grid (distribution line), the points of the distribution line DL to be reinforced can be limited. Renewable energy that does not generate carbon dioxide can be introduced into the local grid (distribution line). This can improve the utilization rate of the power grid and the load factor of the energy consumer CE.

[0068] (Second Modification) 11 is a diagram showing an overview of an energy management system according to a second modified example of the embodiment. Compared to the energy management system of the embodiment, the energy management system 1b of the second modified example of the embodiment omits the power sensor 50-1, the power sensor 50-2, and the power sensor 50-3. Compared to the energy management system of the embodiment, the energy management system 1b of the second modified example of the embodiment includes an energy management device 100b instead of the energy management device 100. The energy management device 100b estimates the distributed power. Based on the estimated result of the distributed power, the energy management device 100b monitors whether the estimated result of the distributed power exceeds a power threshold. In the second modified example of the present embodiment, the description will continue with a case where an upper limit value of the distributed power that can be supplied to the distribution line DL is applied as an example of the power threshold. The upper limit value of the distributed power that can be supplied to the distribution line DL is set in advance when the power system is introduced. Specifically, the energy management device 100b estimates the first distribution power and monitors, based on the estimation result of the first distribution power, whether or not the estimation result of the first distribution power exceeds the upper limit of power that can be supplied to the distribution line DL. The energy management device 100b estimates the second distribution power and monitors, based on the estimation result of the second distribution power, whether or not the estimation result of the second distribution power exceeds the upper limit of power that can be supplied to the distribution line DL. The energy management device 100b estimates the third distribution power and monitors, based on the estimation result of the third distribution power, whether or not the estimation value of the third distribution power exceeds the upper limit of power that can be supplied to the distribution line DL.

[0069] The energy management device 100b calculates the power consumption of each of the water electrolysis devices 300-1, 300-2, and 300-3 based on the estimation result of the distributed power. Specifically, When the energy management device 100b determines that the estimated result of the first distribution power exceeds the upper limit value of the power that can be supplied to the distribution line DL, it calculates the first power consumption of the water electrolysis device 300-1 associated with the solar power generation system 200-1 by subtracting the upper limit value of the power that can be supplied to the distribution line DL from the estimated result of the first distribution power. When the energy management device 100b determines that the estimated result of the second distribution power exceeds the upper limit of the power that can be supplied to the distribution line DL, it calculates the second power consumption of the water electrolysis device 300-2 associated with the solar power generation system 200-2 by subtracting the upper limit of the power that can be supplied to the distribution line DL from the estimated result of the second distribution power. When the energy management device 100b determines that the estimated result of the third distribution power exceeds the upper limit of power that can be supplied to the distribution line DL, it calculates the third power consumption of the water electrolysis device 300-3 associated with the solar power generation system 200-3 by subtracting the upper limit of power that can be supplied to the distribution line DL from the estimated result of the third distribution power.

[0070] The energy management device 100b derives a first power consumption command value based on the calculated first power consumption. The energy management device 100b acquires the address of the water electrolysis device 300-1 associated with the identification information of the water electrolysis device 300-1 from the water electrolysis device information. The energy management device 100b creates water electrolysis device control information including the first power consumption command value and addressed to the acquired address of the water electrolysis device 300-1. The energy management device 100b transmits the created first water electrolysis device control information to the water electrolysis device 300-1. The energy management device 100b derives a second power consumption command value based on the calculated second power consumption. The energy management device 100b acquires the address of the water electrolysis device 300-2 associated with the identification information of the water electrolysis device 300-2 from the water electrolysis device information. The energy management device 100b creates water electrolysis device control information including the second power consumption command value and addressed to the acquired address of the water electrolysis device 300-2. The energy management device 100b transmits the created second water electrolysis device control information to the water electrolysis device 300-2. The energy management device 100b derives a third power consumption command value based on the calculated third power consumption. The energy management device 100b acquires the address of the water electrolysis device 300-3 associated with the identification information of the water electrolysis device 300-3 from the water electrolysis device information. The energy management device 100b creates water electrolysis device control information including the third power consumption command value and addressed to the acquired address of the water electrolysis device 300-3. The energy management device 100b transmits the created third water electrolysis device control information to the water electrolysis device 300-3.

[0071] The energy management device 100b included in the energy management system 1b will be described in detail below. Fig. 12 is a block diagram showing an example of an energy management device included in an energy management system according to a second modified example of the embodiment. In Fig. 12, a water electrolysis device 300 is shown in addition to an energy management device 100b. [Energy management device 100b] The energy management device 100b is realized by a device such as a personal computer, a server, an industrial computer, etc. The energy management device 100b includes, for example, a communication unit 110, an estimation unit 115, a monitoring unit 120, a calculation unit 130, a creation unit 140, and a storage unit 150. The storage unit 150 stores correspondence information 152b and water electrolysis device information 154. The correspondence information 152b and water electrolysis device information 154 may be stored on a cloud.

[0072] (Correspondence information 152b) The correspondence information 152b is information in the form of a table that associates photovoltaic power generation system identification information with water electrolysis apparatus identification information. Here, the correspondence information 152b associates a photovoltaic power generation system 200 with a water electrolysis apparatus 300 installed near an energy consumer CE that mainly uses the power supplied by the photovoltaic power generation system 200. Fig. 13 is a diagram showing an example of the correspondence information. In the correspondence information 152b shown in Fig. 13, the photovoltaic power generation system identification information "PV0001" is associated with the water electrolysis apparatus identification information "WE0001", the photovoltaic power generation system identification information "PV0002" is associated with the water electrolysis apparatus identification information "WE0002", and the photovoltaic power generation system identification information "PV0003" is associated with the water electrolysis apparatus identification information "WE0003". This information is stored when the operation of the energy management system 1b is started. Returning to Fig. 12, the explanation will be continued.

[0073] The estimation unit 115, the monitoring unit 120, the calculation unit 130, and the creation unit 140 are realized, for example, by a hardware processor such as a CPU executing a program stored in the storage unit 150. In addition, some or all of these functional units may be realized by hardware (including circuitry) such as an LSI, ASIC, FPGA, or GPU, or may be realized by cooperation between software and hardware. The program may be stored in advance in a storage device (storage device having a non-transient storage medium) such as an HDD (Hard Disk Drive) or flash memory, or may be stored in a removable storage medium (non-transient storage medium) such as a DVD or CD-ROM, and installed by mounting the storage medium in a drive device.

[0074] Of the estimation unit 115, the monitoring unit 120b, the calculation unit 130, and the creation unit 140a, the estimation unit 115 and the monitoring unit 120 which are different from the embodiment will be mainly described. The estimation unit 115 estimates the distributed power. For example, the estimation unit 115 holds weather condition-generated power correspondence information, which is information that associates information indicating a weather condition with information indicating power generated by the solar power generation system 200. Image information captured by an imaging unit (not shown) of the environment in which the solar power generation system 200 is installed is input to the estimation unit 115. The estimation unit 115 estimates the weather condition based on the image information input by the imaging unit. The estimation unit 115 acquires the power generated by the solar power generation system 200, which is associated with the estimated result of the weather condition, from the weather condition-generated power correspondence information, and sets the acquired power generated by the solar power generation system 200 as the estimated result of the distributed power. The estimation unit 115 outputs the estimated result of the distributed power to the monitoring unit 120b.

[0075] Specifically, the estimation unit 115 holds first weather condition-generated power correspondence information, which is information that associates information indicating a weather condition with information indicating power generated by the photovoltaic power generation system 200-1. Image information of an environment in which the photovoltaic power generation system 200-1 is installed is input to the estimation unit 115 by the imaging unit. The estimation unit 115 estimates the weather condition based on the image information input by the imaging unit. The estimation unit 115 acquires the power generated by the photovoltaic power generation system 200-1, which is associated with the estimation result of the weather condition, from the first weather condition-generated power correspondence information, and sets the acquired power generated by the photovoltaic power generation system 200-1 as an estimation result of the first distributed power. The estimation unit 115 outputs the estimation result of the first distributed power to the monitoring unit 120b.

[0076] The estimation unit 115 holds second weather condition-generated power correspondence information, which is information that associates information indicating a weather state with information indicating power generated by the photovoltaic power generation system 200-2. Image information of the environment in which the photovoltaic power generation system 200-2 is installed is input to the estimation unit 115 by the imaging unit. The estimation unit 115 estimates the weather state based on the image information input by the imaging unit. The estimation unit 115 acquires the power generated by the photovoltaic power generation system 200-2, which is associated with the estimation result of the weather state, from the second weather condition-generated power correspondence information, and sets the acquired power generated by the photovoltaic power generation system 200-2 as the estimation result of the second distributed power. The estimation unit 115 outputs the estimation result of the second distributed power to the monitoring unit 120b. The estimation unit 115 holds third weather condition-generated power correspondence information, which is information that associates information indicating a weather state with information indicating power generated by the photovoltaic power generation system 200-3. Image information of the environment in which the photovoltaic power generation system 200-3 is installed is input to the estimation unit 115 by the imaging unit. The estimation unit 115 estimates the weather state based on the image information input by the imaging unit. The estimation unit 115 acquires the power generated by the photovoltaic power generation system 200-3, which is associated with the estimation result of the weather state, from the third weather condition-generated power correspondence information, and sets the acquired power generated by the photovoltaic power generation system 200-3 as the estimation result of the third distributed power. The estimation unit 115 outputs the estimation result of the third distributed power to the monitoring unit 120b.

[0077] The monitoring unit 120b acquires the estimation result of the distributed power output by the estimation unit 115. Based on the acquired estimation result of the distributed power, the monitoring unit 120b monitors whether or not the estimation result of the distributed power exceeds the upper limit of power that can be supplied to the distribution line DL. When the monitoring unit 120b determines that the estimation result of the distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the monitoring unit 120b identifies, from the correspondence information 152b, water electrolysis apparatus identification information that is stored in association with the photovoltaic power generation system identification information of the photovoltaic power generation system 200 that supplies the distributed power. By identifying the water electrolysis apparatus identification information, it is possible to identify the water electrolysis apparatus 300 to be controlled. The monitoring unit 120b creates instruction information for calculating the power consumption of the water electrolysis apparatus 300 that corresponds to the identified water electrolysis apparatus identification information. The monitoring unit 120b outputs the water electrolysis apparatus identification information and the created instruction information to the calculation unit 130. Specifically, the monitoring unit 120b monitors whether the estimation result of the first distribution power exceeds the upper limit of power that can be supplied to the distribution line DL based on the obtained estimation result of the first distribution power. When the monitoring unit 120b determines that the estimation result of the first distribution power exceeds the upper limit of power that can be supplied to the distribution line DL, the monitoring unit 120b identifies, from the correspondence information 152b, water electrolysis apparatus identification information that is stored in association with the photovoltaic power generation system identification information of the photovoltaic power generation system 200-1 that supplies the first distribution power. By identifying the water electrolysis apparatus identification information, the water electrolysis apparatus 300-1 to be controlled can be identified. The monitoring unit 120b creates instruction information for calculating the power consumption of the water electrolysis apparatus 300-1 that corresponds to the identified water electrolysis apparatus identification information. The monitoring unit 120b outputs the water electrolysis apparatus identification information and the created instruction information to the calculation unit 130.

[0078] Based on the acquired estimation result of the second distribution power, the monitoring unit 120b monitors whether the estimation result of the second distribution power exceeds the upper limit of power that can be supplied to the distribution line DL. When the monitoring unit 120b determines that the estimation result of the second distribution power exceeds the upper limit of power that can be supplied to the distribution line DL, the monitoring unit 120b identifies, from the correspondence information 152b, water electrolysis apparatus identification information that is stored in association with the photovoltaic power generation system identification information of the photovoltaic power generation system 200-2 that supplies the second distribution power. By identifying the water electrolysis apparatus identification information, it is possible to identify the water electrolysis apparatus 300-2 to be controlled. The monitoring unit 120b creates instruction information for calculating the power consumption of the water electrolysis apparatus 300-2 that corresponds to the identified water electrolysis apparatus identification information. The monitoring unit 120b outputs the water electrolysis apparatus identification information and the created instruction information to the calculation unit 130. Based on the obtained estimation result of the third distribution power, the monitoring unit 120b monitors whether the estimated value of the third distribution power exceeds the upper limit of power that can be supplied to the distribution line DL. When the monitoring unit 120b determines that the estimation result of the third distribution power exceeds the upper limit of power that can be supplied to the distribution line DL, the monitoring unit 120b identifies, from the correspondence information 152b, water electrolysis apparatus identification information that is stored in association with the photovoltaic power generation system identification information of the photovoltaic power generation system 200-3 that supplies the third distribution power. By identifying the water electrolysis apparatus identification information, it is possible to identify the water electrolysis apparatus 300-3 to be controlled. The monitoring unit 120b creates instruction information for calculating the power consumption of the water electrolysis apparatus 300-3 that corresponds to the identified water electrolysis apparatus identification information. The monitoring unit 120b outputs the water electrolysis apparatus identification information and the created instruction information to the calculation unit 130.

[0079] Next, the operation of the energy management system will be described. (Energy management system operation) FIG. 14 is a sequence chart illustrating an example of an operation of the energy management system according to the second modification of the embodiment. (Step S1-3) In the energy management device 100b, the estimation unit 115 estimates the distributed power. The estimation unit 115 outputs the estimation result of the distributed power to the monitoring unit 120b. (Step S2-3) In the energy management device 100b, the monitoring unit 120b acquires the estimation result of the distributed power output by the estimation unit 115. Based on the acquired estimation result of the distributed power, the monitoring unit 120b monitors whether or not the estimation result of the distributed power exceeds the upper limit of power that can be supplied to the distribution line DL. If the monitoring unit 120b determines that the estimation result of the distributed power does not exceed the upper limit of power that can be supplied to the distribution line DL, the process proceeds to step S1-3. In this case, no power consumption control is performed on the water electrolysis device 300. (Step S3-3) In the energy management device 100b, when the monitoring unit 120b determines that the estimated result of the distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the monitoring unit 120b identifies, from the correspondence information 152b, water electrolysis apparatus identification information that is stored in association with the photovoltaic power generation system identification information of the photovoltaic power generation system 200 that supplies the distributed power. By identifying the water electrolysis apparatus identification information, it is possible to identify the water electrolysis apparatus 300 to be controlled. The monitoring unit 120b creates instruction information for calculating the power consumption of the water electrolysis apparatus 300 corresponding to the identified water electrolysis apparatus identification information. The monitoring unit 120b outputs the water electrolysis apparatus identification information and the created instruction information to the calculation unit 130. Steps S6-1 to S10-1 described with reference to FIG. 6 can be applied to steps S4-3 to S8-3.

[0080] In the energy management system 1b of the second modified example of this embodiment, the case has been described in which the estimation unit 115 in the energy management device 100b estimates the weather state based on the image information input by the imaging unit, and acquires the amount of power generated by the photovoltaic power generation system 200 associated with the estimated result of the weather state from the weather state-generated power correspondence information, but this is not limiting. For example, the estimation unit 115 may acquire weather information from outside, and acquire the amount of power generated by the photovoltaic power generation system 200 associated with the weather state based on the acquired weather information from the weather state-generated power correspondence information. The features of the energy management system 1b of the second modified example of the present embodiment may be applied to the energy management system 1a of the second modified example of the present embodiment. That is, the energy management device 100a described with reference to FIG. 7 is provided with the estimation unit 115, and the monitoring unit 120b is provided instead of the monitoring unit 120. In this case, the energy management device 100a estimates the distributed power. The energy management device 100a monitors whether or not the estimated result of the distributed power exceeds a power threshold based on the estimated result of the distributed power. Specifically, the energy management device 100a estimates the first distributed power, and monitors whether or not the estimated result of the first distributed power exceeds an upper limit value of power that can be supplied to the distribution line DL based on the estimated result of the first distributed power. The energy management device 100a estimates the second distributed power, and monitors whether or not the estimated result of the second distributed power exceeds an upper limit value of power that can be supplied to the distribution line DL based on the estimated result of the second distributed power. The energy management device 100a estimates the third distributed power and monitors, based on the estimation result of the third distributed power, whether or not the estimated value of the third distributed power exceeds the upper limit of power that can be supplied to the distribution line DL.

[0081] The energy management device 100a calculates the power consumption of each of the water electrolysis devices 300-1, 300-2, and 300-3 based on the estimation result of the distributed power. Specifically, when the energy management device 100a determines that the estimation result of the first distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the energy management device 100a calculates the first power consumption of the water electrolysis device 300-1 associated with the photovoltaic power generation system 200-1 by subtracting the upper limit of power that can be supplied to the distribution line DL from the estimation result of the first distributed power. When the energy management device 100a determines that the estimation result of the second distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the energy management device 100a calculates the second power consumption of the water electrolysis device 300-2 associated with the photovoltaic power generation system 200-2 by subtracting the upper limit of power that can be supplied to the distribution line DL from the estimation result of the second distributed power. When the energy management device 100a determines that the estimated result of the third distribution power exceeds the upper limit of the power that can be supplied to the distribution line DL, it calculates the third power consumption of the water electrolysis device 300-3 associated with the solar power generation system 200-3 by subtracting the upper limit of the power that can be supplied to the distribution line DL from the estimated result of the third distribution power.

[0082] The energy management device 100a determines whether the entire consumed power can be consumed by the water electrolysis device 300 based on the calculated power consumption and the consumable power of the water electrolysis device 300. Specifically, the energy management device 100a determines whether the entire first consumed power can be consumed by the water electrolysis device 300-1 based on the calculated first power consumption and first consumable power. The energy management device 100a determines whether the entire second consumed power can be consumed by the water electrolysis device 300-2 based on the calculated second power consumption and second consumable power. The energy management device 100a determines whether the entire third consumed power can be consumed by the water electrolysis device 300-3 based on the calculated third power consumption and third consumable power. Specifically, the energy management apparatus 100a determines whether the first power consumption exceeds the first available power. The energy management apparatus 100a determines whether the second power consumption exceeds the second available power. The energy management apparatus 100a determines whether the third power consumption exceeds the third available power.

[0083] The energy management device 100a calculates the power consumption of the water electrolysis device 300 based on the results of monitoring the detection results of the distributed power and the power consumption determination result. Specifically, when the energy management device 100a determines that the first distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, it calculates the first power consumption of the water electrolysis device 300-1 associated with the solar power generation system 200-1 by subtracting the upper limit of power that can be supplied to the distribution line DL from the first distributed power. The energy management device 100a determines whether the calculated first power consumption exceeds the first consumable power. If the energy management device 100a determines that the first power consumption is equal to or less than the first consumable power, the energy management device 100a sets the first power consumption as the power consumption of the water electrolysis device 300-1. On the other hand, if the energy management device 100a determines that the first power consumption exceeds the first consumable power, the energy management device 100a sets the first consumable power as the power consumption of the water electrolysis device 300-1. If the energy management device 100a determines that the first power consumption exceeds the first consumable power, the energy management device 100a calculates a first limit power from the power generated by the photovoltaic power generation system 200-1.

[0084] When the energy management device 100a determines that the second distributed power exceeds the upper limit of power that can be supplied to the distribution line DL, the energy management device 100a calculates a second power consumption of the water electrolysis device 300-2 associated with the photovoltaic power generation system 200-2 by subtracting the upper limit of power that can be supplied to the distribution line DL from the second distributed power. The energy management device 100a determines whether the calculated second power consumption exceeds the second consumable power. When the energy management device 100a determines that the second power consumption is equal to or less than the second consumable power, the second power consumption is set as the power consumption of the water electrolysis device 300-2. On the other hand, when the energy management device 100a determines that the second power consumption exceeds the second consumable power, the energy management device 100a sets the second consumable power as the power consumption of the water electrolysis device 300-2. When the energy management device 100a determines that the second power consumption exceeds the second consumable power, the energy management device 100a calculates a second limit power from the power generated by the photovoltaic power generation system 200-2.

[0085] When the energy management device 100a determines that the third distribution power exceeds the upper limit of power that can be supplied to the distribution line DL, the energy management device 100a calculates a third power consumption of the water electrolysis device 300-3 associated with the photovoltaic power generation system 200-3 by subtracting the upper limit of power that can be supplied to the distribution line DL from the third distribution power. The energy management device 100a determines whether the calculated third power consumption exceeds the third consumable power. When the energy management device 100a determines that the third power consumption is equal to or less than the third consumable power, the third power consumption is set as the power consumption of the water electrolysis device 300-3. On the other hand, when the energy management device 100a determines that the third power consumption exceeds the third consumable power, the energy management device 100a sets the third consumable power as the power consumption of the water electrolysis device 300-3. When the energy management device 100a determines that the third power consumption exceeds the third consumable power, the energy management device 100a calculates a third limit power from the power generated by the photovoltaic power generation system 200-3.

[0086] The energy management device 100a derives a first power consumption command value based on the calculated first power consumption. The energy management device 100a acquires the address of the water electrolysis device 300-1 associated with the identification information of the water electrolysis device 300-1 from the water electrolysis device information. The energy management device 100a creates water electrolysis device control information including the first power consumption command value and addressed to the acquired address of the water electrolysis device 300-1. The energy management device 100a transmits the created first water electrolysis device control information to the water electrolysis device 300-1. When the energy management device 100a calculates the first limit power, the energy management device 100a derives a first limit command value based on the calculated first limit power. The energy management device 100a acquires the address of the solar power generation system 200-1 associated with the identification information of the solar power generation system 200-1 from the solar power generation system information. The energy management device 100a creates first solar power generation system control information including the first limit command value, with the acquired address of the solar power generation system 200-1 as the destination. The energy management device 100a transmits the created first solar power generation system control information to the solar power generation system 200-1.

[0087] The energy management device 100a derives a second power consumption command value for setting the power consumption of the water electrolysis device 300-2 based on the calculated second power consumption. The energy management device 100a acquires the address of the water electrolysis device 300-2 associated with the identification information of the water electrolysis device 300-2 from the water electrolysis device information. The energy management device 100a creates second water electrolysis device control information including the second power consumption command value and addressed to the acquired address of the water electrolysis device 300-2. The energy management device 100a transmits the created second water electrolysis device control information to the water electrolysis device 300-2. When the energy management device 100a calculates the second limit power, the energy management device 100a derives a second limit command value based on the calculated second limit power. The energy management device 100a acquires the address of the solar power generation system 200-2 associated with the identification information of the solar power generation system 200-2 from the solar power generation system information. The energy management device 100a creates second solar power generation system control information including the second limit command value, with the acquired address of the solar power generation system 200-2 as the destination. The energy management device 100a transmits the created second solar power generation system control information to the solar power generation system 200-2.

[0088] The energy management device 100a derives a third power consumption command value for setting the power consumption of the water electrolysis device 300-3 based on the calculated third power consumption. The energy management device 100a acquires the address of the water electrolysis device 300-3 associated with the identification information of the water electrolysis device 300-3 from the water electrolysis device information. The energy management device 100a creates control information (hereinafter referred to as "third water electrolysis device control information") that is addressed to the acquired address of the water electrolysis device 300-3 and includes the third power consumption command value. The energy management device 100a transmits the created third water electrolysis device control information to the water electrolysis device 300-3. When the energy management device 100a calculates the third limit power, it derives a third limit command value based on the calculated third limit power. The energy management device 100a acquires the address of the solar power generation system 200-3 associated with the identification information of the solar power generation system 200-3 from the solar power generation system information. The energy management device 100a creates third solar power generation system control information including the third limit command value, with the acquired address of the solar power generation system 200-3 as the destination. The energy management device 100a transmits the created third solar power generation system control information to the solar power generation system 200-3.

[0089] According to an energy management system 1b of a second modified example of the present embodiment, the energy management system 1b is an energy management system including a solar power generation system 200 connected to a distribution line DL and a water electrolysis device 300, and is equipped with a monitoring unit 120b that monitors distributed power, which is power supplied between a connection point of the solar power generation system 200 on the distribution line DL and a connection point of the water electrolysis device 300, a calculation unit 130 that calculates the power consumption of the water electrolysis device 300 based on the distributed power and a threshold value of the power supplied to the distribution line DL, and a creation unit 140 that derives a power consumption command value based on the power consumption calculated by the calculation unit 130, and creates water electrolysis device control information for controlling the water electrolysis device 300, the power consumption command value being included in the derived power consumption command value. Furthermore, the power distribution system further includes an estimation unit 115 that estimates the distributed power, and the monitoring unit 120b monitors the distributed power estimated by the estimation unit 115.

[0090] With this configuration, the energy management device 100b can estimate the distributed power. Even without providing the power sensor 50 in the energy management system 1b, the power consumption of the water electrolysis device 300 can be controlled based on the estimated value of the distributed power and the threshold value of the power supplied to the distribution line DL, and therefore the power supplied to the energy consumer CE from the photovoltaic power generation system 200 to the distribution line DL can be controlled. By reinforcing the distribution line DL between the connection point of the photovoltaic power generation system 200 and the connection point of the water electrolysis device 300, renewable energy can be introduced into the local grid (distribution line). When introducing renewable energy into the local grid (distribution line), the reinforcement points of the distribution line DL can be limited. Renewable energy that does not generate carbon dioxide can be introduced into the local grid (distribution line). This can improve the utilization rate of the power grid and the load factor of the energy consumer CE.

[0091] The energy management apparatus 100, the energy management apparatus 100a, and the energy management apparatus 100b described above include a computer system. The energy management apparatus 100, the energy management apparatus 100a, and the energy management apparatus 100b may perform the various processes described above by recording a program for implementing the above processes in a computer-readable recording medium, and reading and executing the program recorded in the recording medium into a computer system. The "computer system" here may include hardware such as an OS and peripheral devices. The "computer-readable recording medium" refers to a storage device such as a flexible disk, a magneto-optical disk, a ROM, a writable non-volatile memory such as a flash memory, a portable medium such as a CD-ROM, and a hard disk built into a computer system.

[0092] Furthermore, the term "computer-readable recording medium" includes a memory that holds a program for a certain period of time, such as a volatile memory (e.g., DRAM (Dynamic Random Access Memory)) inside a computer system that becomes a server or a client when a program is transmitted via a network such as the Internet or a communication line such as a telephone line. The above-mentioned program may be transmitted from a computer system that stores the program in a storage device or the like to another computer system via a transmission medium, or by a transmission wave in the transmission medium. Here, the "transmission medium" that transmits the program refers to a medium that has a function of transmitting information, such as a network (communication network) such as the Internet or a communication line (communication line) such as a telephone line. The above-mentioned program may also be a program for realizing part of the above-mentioned functions. Furthermore, the above-mentioned functions may be realized in combination with a program already recorded in the computer system, that is, a so-called difference file (difference program).

[0093] Although the embodiment has been described above as a form for carrying out the present invention, the present invention is not limited to such an embodiment, and various modifications and substitutions can be made without departing from the scope of the present invention. For example, the modifications shown in the embodiment can be applied to other embodiments. In addition, the first modification of the embodiment and the second modification of the embodiment can be combined. [Explanation of symbols]

[0094] 1, 1a, 1b...Energy management system, 50, 50-1, 50-2, 50-3...Power sensor, 60-1, 60-2, 60-3...Smart meter, 100, 100a, 100b...Energy management device, 110...Communication unit, 120, 120b...Monitoring unit, 130, 130a...Calculation unit, 135...Determination unit, 140, 140a...Creation unit, 150...Memory unit, 152, 152b...Correspondence information, 154, 154a...Water electrolysis device information, 156...Photovoltaic power generation system information, 200, 200-1, 200-2, 200-3...Photovoltaic power generation system, 300, 300-1, 300-2, 300-3...Water electrolysis device

Claims

1. An energy management system including a system for generating electricity from renewable energy connected to a power distribution line and a water electrolysis device, the power distribution line includes a first section connecting a first connection point where the system and the power distribution line are connected to a second connection point to which the water electrolysis apparatus is connected, the first section being located in a reverse power flow direction from the first connection point when power is supplied from the first connection point to the power distribution line while the system is generating power, and the second section being located further in the reverse power flow direction from the second connection point; A monitoring unit that monitors distributed power, which is power supplied to the second section; a calculation unit that calculates the power to be consumed in the future by the water electrolysis apparatus connected to the second connection point, based on a threshold that is an upper limit value of power that can be supplied to the power distribution line in the second section and the distributed power; a creation unit that creates control information for setting the power to be consumed in the future by the water electrolysis apparatus connected to the second connection point, based on the power to be consumed in the future calculated by the calculation unit; An energy management system comprising:

2. The energy management system according to claim 1 , wherein the calculation unit calculates the amount of power to be consumed by the water electrolysis device in the future by subtracting the threshold value of power from the distributed power.

3. the monitoring unit monitors the distributed power supplied to a second section located further in a reverse power flow direction than a second connection point to which a water electrolysis device corresponding to the identification information of the water electrolysis device is connected, based on pairing of the identification information of the system that generates electricity using renewable energy and the identification information of the water electrolysis device, the pairing being obtained from a storage unit that stores the identification information of the system that generates electricity using renewable energy and the identification information of the water electrolysis device in association with each other; The energy management system according to claim 1 , wherein the creation unit creates control information addressed to a water electrolysis device corresponding to the identification information of the water electrolysis device included in the pairing.

4. An estimation unit for estimating the distributed power Further equipped with The energy management system according to claim 1 , wherein the monitoring unit monitors the distributed power estimated by the estimation unit.

5. a determination unit that determines whether the power to be consumed in the future calculated by the calculation unit exceeds the power that can be consumed by the water electrolysis device; Further equipped with 5. The energy management system according to claim 1, wherein the creation unit derives a limit command value for limiting the output of the system that generates power using renewable energy based on the result of the judgment made by the judgment unit, and creates control information for limiting the power supplied by the system that generates power using renewable energy, the control information including the derived limit command value.

6. a monitoring unit that monitors distributed power, which is power supplied to a second section of a power distribution line including a first connection point connected to a system that generates power using renewable energy, a first section connecting a second connection point to a water electrolysis apparatus and located in a reverse power flow direction from the first connection point when power is supplied from the first connection point while the system is generating power, and a second section located further in the reverse power flow direction from the second connection point; a calculation unit that calculates the power to be consumed in the future by the water electrolysis apparatus connected to the second connection point, based on a threshold that is an upper limit value of power that can be supplied to the power distribution line in the second section and the distributed power; a creation unit that creates control information for setting the power to be consumed in the future by the water electrolysis apparatus, based on the power to be consumed in the future calculated by the calculation unit; An energy management device comprising:

7. An energy management method implemented by an energy management system including a system that generates electricity using renewable energy, a water electrolysis device, a first connection point connected to the system, and a distribution line including a first section that is located in a reverse flow direction from the first connection point and connects between the system and a second connection point to which the water electrolysis device is connected when power is supplied from the first connection point while the system is generating electricity and a reverse flow occurs, and a second section that is located further in the reverse flow direction from the second connection point, monitoring distributed power, which is power supplied to the second section; calculating power to be consumed in the future by the water electrolysis apparatus connected to the second connection point, based on a threshold that is an upper limit value of power that can be supplied to the power distribution line in the second section and the distributed power; creating control information for setting the power to be consumed in the future by the water electrolysis apparatus connected to the second connection point, based on the power to be consumed in the future calculated in the calculating step; The energy management method is executed by an energy management system.

8. A computer for an energy management system including a system that generates electricity using renewable energy, a water electrolysis device, a first connection point connected to the system, and a distribution line including a first section that is located in a reverse flow direction from the first connection point and connects between the first connection point and a second connection point to which the water electrolysis device is connected when power is supplied from the first connection point while the system is generating electricity, and a second section that is located further in the reverse flow direction from the second connection point, monitoring distributed power, which is power supplied to the second section; calculating power to be consumed in the future by the water electrolysis apparatus connected to the second connection point, based on a threshold that is an upper limit value of power that can be supplied to the power distribution line in the second section and the distributed power; creating control information for setting the power to be consumed in the future by the water electrolysis apparatus connected to the second connection point, based on the power to be consumed in the future calculated in the calculating step; A control program that executes the above.

Citation Information

Patent Citations

  • Photovoltaic power generation system equipped with hydrogen producing means

    JP2014203274A

  • Tidal current control method for power distribution system and power distribution system

    JP2018107981A

  • Power system

    JP2019193557A