Power management device, power management system, and power management method
The power management system addresses the challenge of calculating accurate reference power values by managing facilities with distributed power sources and requesting operation plans when prediction errors exceed thresholds, enhancing estimation accuracy and reducing operational effort.
Patent Information
- Application Number
- JP2021106845
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-06-28
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-06-28
AI Technical Summary
Existing power management systems face challenges in accurately calculating reference power values due to the complexity of collecting detailed operation plans from facilities, leading to difficulties in estimating baseline power demand.
A power management system that includes a management unit to manage facilities with distributed power sources, identifies prediction errors in power demand, and requests operation plans from facilities when errors exceed a threshold, using a prediction model to improve accuracy.
The system enables appropriate collection of operation plans and accurate calculation of power demand reference values, reducing man-hours and improving prediction accuracy by selectively requesting operation plans based on error thresholds.
Smart Images

Figure 0007593891000001 
Figure 0007593891000002 
Figure 0007593891000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a power management apparatus, a power management system, and a power management method. [Background technology]
[0002] Conventionally, as a mechanism for adjusting the balance of power supply and demand in a power grid, a mechanism for requesting a facility to reduce power consumption from a power management device (hereinafter, DR; Demand Response) is also known (for example, Patent Document 1). DR is a mechanism for reducing power equivalent to the requested power from a reference power (hereinafter, reference value), and it is important to accurately estimate (calculate) the reference value. The reference value may be called a baseline power.
[0003] For example, the reference value may be calculated based on past information on the facility's power demand, meteorological information, calendar information (season, month, day of the week, etc.), and the like. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2013-169104 A Summary of the Invention [Problem to be solved by the invention]
[0005] Incidentally, when calculating the reference value, it is expected that the accuracy of calculation of the reference value can be improved by having the facility's terminal provide an operation plan for identifying the facility's power demand plan and calculating the reference value based on the operation plan.
[0006] However, it is expected that providing operation plans is cumbersome for the facility side, and it will be difficult to constantly collect detailed information about operation plans.
[0007] Therefore, the present invention has been made to solve the above-mentioned problems, and aims to provide a power management device, a power management system, and a power management method that are capable of properly collecting operation plans and properly calculating reference values for power demand. [Means for solving the problem]
[0008] The disclosed power management device includes a management unit that manages a facility including a distributed power source connected to a power grid, and a control unit that identifies a prediction error of the power demand of the facility referenced in a second period that follows a first period based on actual information of the power demand of the facility in the first period, and if the prediction error is greater than a threshold, requests the facility to submit an operation plan for identifying a plan for the power demand of the facility in the second period.
[0009] The disclosed power management system includes a management unit that manages a facility including a distributed power source connected to a power grid, and a control unit that identifies a prediction error of the power demand of the facility referenced in a second period that follows a first period based on actual information of the power demand of the facility in the first period, and if the prediction error is greater than a threshold, requests the facility to submit an operation plan for identifying a plan for the power demand of the facility in the second period.
[0010] The disclosed power management method includes steps of managing a facility including a distributed power source connected to a power grid, and identifying a prediction error of the power demand of the facility referenced in a second period that follows the first period based on actual information of the power demand of the facility in the first period, and if the prediction error is greater than a threshold, requesting an operation plan from the facility to identify a plan for the power demand of the facility in the second period. Effect of the Invention
[0011] According to the present invention, it is possible to provide a power management apparatus, a power management system, and a power management method that are capable of appropriately collecting operation plans and appropriately calculating a reference value related to power demand. [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 is a diagram showing a power management system 100 according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing a facility 300 according to the embodiment. [Diagram 3] FIG. 3 is a diagram showing a power management server 200 according to the embodiment. [Figure 4] FIG. 4 is a diagram illustrating a local control device 360 according to an embodiment. [Diagram 5] FIG. 5 is a diagram showing an example of a display image according to the embodiment. [Figure 6] FIG. 6 is a diagram illustrating a power management method according to an embodiment. [Figure 7] FIG. 7 is a diagram illustrating a power management method according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, the embodiments will be described with reference to the drawings. In the following description of the drawings, the same or similar parts are denoted by the same or similar reference numerals. However, the drawings are schematic.
[0014] [Embodiment] (Power Management System) In the following, the power management system will be described.
[0015] As shown in Fig. 1, the power management system 100 includes a power management server 200, a facility 300, and a power company 400. In Fig. 1, the facility 300 is exemplified by facilities 300A to 300C.
[0016] Each facility 300 is connected to the power system 110. In the following, the flow of power from the power system 110 to the facility 300 is referred to as a power flow, and the flow of power from the facility 300 to the power system 110 is referred to as a reverse power flow.
[0017] The power management server 200, the facility 300, and the power company 400 are connected to a network 120. The network 120 may provide lines between these entities. For example, the network 120 is the Internet. The network 120 may include a dedicated line such as a Virtual Private Network (VPN).
[0018] The power management server 200 is a server managed by a business operator such as a power generation business operator, a power transmission and distribution business operator, a retail business operator, or a resource aggregator. The resource aggregator may be a power business operator that adjusts the power supply and demand balance of the power system 110 in a VPP (Virtual Power Plant). The adjustment of the power supply and demand balance may include a transaction (hereinafter, negawatt trading) in which a reduction in the forward flow power (also referred to as the demand power of the facility 300) supplied from the power system 110 to the facility 300 is exchanged for value. The adjustment of the power supply and demand balance may include a transaction in which an increase in the reverse flow power supplied from the facility 300 to the power system 110 is exchanged for value. Hereinafter, a request for adjustment of the power supply and demand balance may be referred to as a power saving request. The resource aggregator may be a power business operator that provides reverse flow power to a power generation business operator, a power transmission and distribution business operator, a retail business operator, or the like in a VPP.
[0019] The power management server 200 transmits a control message to a local control device 360 provided in the facility 300, instructing control of a distributed power source (e.g., a solar cell device 310, a power storage device 320, or a fuel cell device 330) provided in the facility 300. For example, the power management server 200 may transmit a forward flow control message (e.g., DR; Demand Response) requesting control of forward flow power, or may transmit a reverse flow control message requesting control of reverse flow power. Furthermore, the power management server 200 may transmit a power source control message to control the operating state of the distributed power source. The control degree of the forward flow power or reverse flow power may be expressed as an absolute value (e.g., XX kW) or a relative value (e.g., XX%). Alternatively, the control degree of the forward flow power or reverse flow power may be expressed in two or more levels. The degree of control of forward flow power or reverse flow power may be represented by an electricity price determined based on the current electricity supply and demand balance (RTP: Real Time Pricing), or by an electricity price determined based on the past electricity supply and demand balance (TOU: Time Of Use).
[0020] As shown in FIG. 2, the facility 300 has a solar cell device 310, a power storage device 320, a fuel cell device 330, a load device 340, a local control device 360, a power meter 380, and a power meter 390.
[0021] The solar cell device 310 is a distributed power source that generates power in response to light such as sunlight. The solar cell device 310 may be an example of a distributed power source that allows reverse power flow. The solar cell device 310 may be an example of a distributed power source to which a feed-in tariff (FIT) may be applied. The solar cell device 310 may be a distributed power source for which the application period of the feed-in tariff has expired. For example, the solar cell device 310 is composed of a PCS (Power Conditioning System) and a solar panel.
[0022] Here, the power output from the solar cell device 310 may vary depending on the amount of light received, such as sunlight. Therefore, when the power generation efficiency of the solar cell device 310 is taken into consideration, the power output from the solar cell device 310 is variable power that may vary depending on the amount of light received by the solar panel.
[0023] The power storage device 320 is a distributed power source that charges and discharges power. The power storage device 320 may be an example of a distributed power source that does not allow reverse power flow. The power storage device 320 may be an example of a distributed power source to which a feed-in tariff cannot be applied. For example, the power storage device 320 is configured by a PCS and a power storage cell.
[0024] The fuel cell device 330 is a distributed power source that generates power using fuel. The fuel cell device 330 may be an example of a distributed power source that does not allow reverse power flow. The fuel cell device 330 may be an example of a distributed power source to which a feed-in tariff is not applied. For example, the fuel cell device 330 is composed of a PCS and a fuel cell.
[0025] For example, the fuel cell device 330 may be a solid oxide fuel cell (SOFC; Solid Oxide Fuel Cell), a polymer electrolyte fuel cell (PEFC; Polymer Electrolyte Fuel Cell), a phosphoric acid fuel cell (PAFC; Phosphoric Acid Fuel Cell), or a molten carbonate fuel cell (MCFC; Molten Carbonate Fuel Cell).
[0026] In an embodiment, the solar cell device 310, the power storage device 320, and the fuel cell device 330 may be regulated power sources used in the VPP. The regulated power sources are distributed power sources provided in the facility 300 that contribute to the VPP.
[0027] The load device 340 is a device that consumes power, for example, an air conditioner, a lighting device, an AV (Audio Visual) device, etc.
[0028] The local control device 360 is a device (EMS: Energy Management System) that manages the power of the facility 300. The local control device 360 may control the operation state of the solar cell device 310, may control the operation state of the power storage device 320 provided in the facility 300, or may control the operation state of the fuel cell device 330 provided in the facility 300. Details of the local control device 360 will be described later (see FIG. 4).
[0029] In the embodiment, communication between the power management server 200 and the local control device 360 is performed according to a first protocol. On the other hand, communication between the local control device 360 and the distributed power source is performed according to a second protocol different from the first protocol. For example, the first protocol may be a protocol conforming to Open ADR (Automated Demand Response) or a unique dedicated protocol. For example, the second protocol may be a protocol conforming to ECHONET Lite (registered trademark), SEP (Smart Energy Profile) 2.0, KNX, or a unique dedicated protocol. Note that the first protocol and the second protocol may be different from each other, and may be, for example, both of which may be unique dedicated protocols but are protocols created according to different rules. However, the first protocol and the second protocol may be protocols created according to the same rules.
[0030] The power meter 380 is an example of a core power meter that measures forward flow power from the power system 110 to the facility 300 and reverse flow power from the facility 300 to the power system 110. For example, the power meter 380 is a smart meter belonging to the power company 400.
[0031] Here, the power meter 380 transmits a message including an information element indicating an integrated value of forward flow power or reverse flow power in the unit time to the local control device 360 for each unit time (e.g., 30 minutes). The power meter 380 may transmit the message autonomously, or may transmit the message in response to a request from the local control device 360. The power meter 380 may transmit a message including an information element indicating the forward flow power or reverse flow power in the unit time to the power management server 200 for each unit time.
[0032] Power meter 390 is an example of an individual power meter that measures the power of each distributed power source. Power meter 390 may be provided at the output end of the PCS of the distributed power source, and may be considered to be a part of the distributed power source. In FIG. 2, power meter 391, power meter 392, and power meter 393 are provided as power meter 390. Power meter 391 measures the output power of solar cell device 310. Power meter 392 measures the discharge power of power storage device 320. Power meter 392 may measure the charging power of power storage device 320. Power meter 393 measures the individual output power of fuel cell device 330.
[0033] Here, the power meter 390 may transmit a message including an information element indicating the power of the distributed power source to the local control device 360 at intervals shorter than a unit time (for example, one minute). The individual output power of the distributed power source may be represented by an instantaneous value or an integrated value. The power meter 390 may transmit the message autonomously or in response to a request from the local control device 360.
[0034] Returning to Fig. 1, the electric power company 400 is an entity that provides infrastructure such as the electric power system 110, and is, for example, a power generation business operator or an electric power transmission and distribution business operator. The electric power company 400 may outsource various operations to the entity that manages the power management server 200. The electric power company 400 may transmit a request message to the power management server 200 to request adjustment of the power supply and demand balance of the electric power system 110.
[0035] (Power Management Server) The power management server will be described below. As shown in Fig. 3, the power management server 200 includes a management unit 210, a communication unit 220, and a control unit 230. The power management server 200 may be an example of a VTN (Virtual Top Node). In the embodiment, the power management server 200 is an example of a power management device.
[0036] The management unit 210 is configured with a storage medium such as a non-volatile memory and / or a HDD, and manages information related to the facility 300. For example, the information related to the facility 300 is the type of distributed power source provided in the facility 300, the specifications of the distributed power source provided in the facility 300, etc. The specifications may include the rated power generation of the solar cell device 310, the rated charging power of the power storage device 320, the rated charging power of the power storage device 320, and the rated output power of the fuel cell device 330. The specifications may include the rated capacity of the power storage device 320, the maximum charging and discharging power, etc.
[0037] In the embodiment, the management unit 210 constitutes a management unit that manages a facility 300 including distributed power sources connected to the power grid 110 .
[0038] The communication unit 220 is configured by a communication module, and communicates with the local control device 360 via the network 120. The communication module may be a wireless communication module conforming to standards such as IEEE802.11a / b / g / n, ZigBee, Wi-SUN, LTE, 5G, and 6G, or may be a wired communication module conforming to standards such as IEEE802.3.
[0039] As described above, the communication unit 220 performs communication according to the first protocol. For example, the communication unit 220 transmits a first message according to the first protocol to the local control device 360. The communication unit 220 receives a first message response from the local control device 360 according to the first protocol.
[0040] In the embodiment, the communication unit 220 may constitute a receiving unit that receives record information on the power demand of the facility 300 from the facility 300. The communication unit 220 may receive record information on the power generated by the solar cell device 310 from the facility 300. The communication unit 220 may receive record information on the charging / discharging power of the power storage device 320 from the facility 300. The communication unit 220 may receive record information on the output power of the fuel cell device 330 from the facility 300. The communication unit 220 may receive record information on the power consumption of the load device 340 from the facility 300.
[0041] The performance information of the demand power of the facility 300 may be performance information of the tidal flow power measured by the power meter 380. The performance information may be received from the power meter 380 or may be received from the local control device 360.
[0042] The control unit 230 may include at least one processor. The at least one processor may be configured by a single integrated circuit (IC), or may be configured by a plurality of circuits (such as integrated circuits and / or discrete circuits) communicatively connected to each other.
[0043] The control unit 230 controls each component provided in the power management server 200. For example, the control unit 230 instructs a local control device 360 provided in the facility 300 to control a distributed power source provided in the facility 300 by transmitting a control message. As described above, the control message may be a power flow control message, a reverse power flow control message, or a power source control message.
[0044] In an embodiment, the control unit 230 is configured to identify a prediction error of the power demand of the facility 300 referenced in a second period that follows the first period based on actual information of the power demand of the facility 300 in a first period, and if the prediction error is greater than a threshold value, to request the facility 300 to submit an operation plan for identifying a plan for the power demand of the facility 300 in the second period.
[0045] The second period is a period for adjusting the balance between power supply and demand in the power system 110. For example, the second period may be a DR period in which suppression of forward flow power (demand power) is requested, or may be an output suppression period in which suppression of reverse flow power (output power) is requested.
[0046] The demand power of the facility 300 referred to in the second period is used to calculate a reference power (hereinafter, a reference value) that is referred to when adjusting the power supply and demand balance of the power grid 110. Hereinafter, the demand power of the facility 300 referred to in the second period may be referred to as a reference value. The power management server 200 needs to reduce the power equivalent to the requested power requested in the request message from the reference value. The reference value may be referred to as a baseline power. The baseline power may be an average value of the demand power for a certain period before the DR period. The certain period may be determined according to the actual situation of the negawatt trading, or may be determined by the power company 400.
[0047] For example, the control unit 230 may use a prediction model generated by learning the power demand of the facility 300 in a first period to determine a prediction error of the power demand (reference value) of the facility 300 referenced in a second period.
[0048] The prediction model may be generated by learning actual information on power demand and learning parameters that affect the power demand. A predicted value and a prediction error of the power demand (reference value) may be output from the prediction model by inputting input parameters corresponding to the learning parameters into the prediction model. The learning parameters may include at least a parameter that specifies time. The learning parameters may include parameters that specify the day of the week, month, season, weather, temperature, humidity, etc.
[0049] The prediction model may be generated by learning historical information on the power generation of the solar cell device 310 and learning parameters that affect the power generation. The learning parameters may include parameters that specify weather, temperature, humidity, solar radiation, and the like that affect the power generation of the solar cell device 310.
[0050] The prediction model may be generated by learning historical information of power consumption of the facility 300 (e.g., the load devices 340) and learning parameters that affect the power consumption. The learning parameters may include at least a parameter that specifies time. The learning parameters may include parameters that specify the day of the week, month, season, weather, temperature, humidity, etc.
[0051] The prediction model may learn parameters related to the power storage device 320 as one of the learning parameters. The parameters related to the power storage device 320 may include parameters indicating the specifications (e.g., rated capacity, maximum charge / discharge power, etc.) of the power storage device 320. The parameters related to the power storage device 320 may include parameters indicating the remaining amount of power stored in the power storage device 320.
[0052] The operation plan requested of the facility 300 may include the plan for the power demand of the facility 300 itself. The operation plan may include an operation plan (charge and discharge plan) for the power storage device 320. The operation plan may include an operation plan for the fuel cell device 330. The operation plan may include an operation plan (power consumption) for the load device 340. In such a case, the operation plan may include an operation plan (power consumption) for the load device 340 whose power consumption is assumed to be greater than a threshold value.
[0053] Although not particularly limited, the operation plan may be input by a user of the facility 300. The operation plan may be input in a file format.
[0054] Under such a premise, the threshold value may be determined according to the power that can be adjusted by the distributed power source (hereinafter, the power storage device 320). The power that can be adjusted by the power storage device 320 may be specified based on at least one of the rated capacity of the power storage device 320 and the remaining amount of stored power of the power storage device 320. The threshold value may include a first threshold value and a second threshold value that is greater than the first threshold value.
[0055] Here, the control unit 230 may present the information element regarding the prediction error to the facility 300. The information element regarding the prediction error may be an information element indicating the prediction error itself, or may include a success probability of successfully adjusting the power supply and demand balance by controlling the power storage device 320 in the second period. The prediction error is a prediction error of a reference value referred to in the second period, and is highly correlated with the success probability, so that it is possible to specify the success probability based on the prediction error. The information element regarding the prediction error may be an information element indicating the level of the prediction error (e.g., large, medium, small, etc.), or may be an information element indicating the level of the success probability (e.g., low, medium, high, etc.).
[0056] The information elements regarding the prediction error may include at least one of information elements regarding a case in which a prediction error is identified without using an operation plan (hereinafter, information elements (without operation plan)) and information elements regarding a case in which a prediction error is identified using an operation plan (hereinafter, information elements (with operation plan)). The information elements regarding the prediction error may include both information elements (without operation plan) and information elements (with operation plan). With this configuration, the user of facility 300 can understand that providing an operation plan increases the probability of success, and the motivation to provide an operation plan can be improved.
[0057] The control unit 230 may request a first operation plan having a first level of data granularity when the prediction error is greater than a first threshold, and may request a second operation plan having a second level of data granularity finer than the first level when the prediction error is greater than a second threshold.
[0058] Here, the data granularity may be defined by the time unit of the operation plan. Although not particularly limited, the first level data granularity may be a data granularity of one day, and the second level data granularity may be a data granularity of one hour. The data granularity may be defined by the number of items in the operation plan. Although not particularly limited, the first level data granularity may be a data granularity including an item of the power demand of the facility 300, and the second level data granularity may be a data granularity including an item of the power demand of the facility 300 and the operation plan of the power storage device 320.
[0059] The information elements regarding the prediction error may include at least one of information elements regarding a case in which a prediction error is identified using a first operation plan (hereinafter, information element (first operation plan)) and information elements regarding a case in which a prediction error is identified using a second operation plan (hereinafter, information element (second operation plan)). The information elements regarding the prediction error may include both information elements (first operation plan) and information elements (second operation plan). The user of facility 300 can understand that the success rate increases by providing a second operation plan with finer data granularity, and the motivation to provide a second operation plan with finer data granularity can be improved.
[0060] The control unit 230 may generate display data (images) for requesting an operation plan from the facility 300 side, and control the communication unit 220 to transmit the display data (images) to a terminal (hereinafter, a user terminal) belonging to a user of the facility 300. The communication unit 220 may transmit the display data (images) directly to the user terminal, or may transmit the display data (images) directly to the user terminal via the local control device 360 or the like.
[0061] Similarly, the control unit 230 may generate display data (images) related to information elements related to prediction errors and control the communication unit 220 to transmit the display data (images) to the user terminal. The communication unit 220 may transmit the display data (images) directly to the user terminal, or may transmit the display data (images) directly to the user terminal via the local control device 360 or the like.
[0062] The display data (image) regarding the information element related to the prediction error may be transmitted together with the display data (image) for requesting the facility 300 side for the operation plan.
[0063] (Local Control Device) The local control device 360 will be described below. As shown in Fig. 4, the local control device 360 includes a first communication unit 361, a second communication unit 362, and a control unit 363. The local control device 360 may be an example of a VEN (Virtual End Node).
[0064] The first communication unit 361 is configured by a communication module, and communicates with the power management server 200 via the network 120. The communication module may be a wireless communication module conforming to standards such as IEEE802.11a / b / g / n, ZigBee, Wi-SUN, LTE, 5G, and 6G, or may be a wired communication module conforming to standards such as IEEE802.3.
[0065] As described above, the first communication unit 361 performs communication according to the first protocol. For example, the first communication unit 361 receives a first message from the power management server 200 according to the first protocol. The first communication unit 361 transmits a first message response to the power management server 200 according to the first protocol.
[0066] The second communication unit 362 is configured by a communication module and communicates with the distributed power sources. The communication module may be a wireless communication module conforming to standards such as IEEE802.11a / b / g / n, ZigBee, Wi-SUN, LTE, 5G, and 6G, or may be a wired communication module conforming to standards such as IEEE802.3 or a proprietary protocol.
[0067] As described above, the second communication unit 362 communicates according to the second protocol. For example, the second communication unit 362 transmits a second message to the distributed power source according to the second protocol. The second communication unit 362 receives a second message response from the distributed power source according to the second protocol.
[0068] The control unit 363 may include at least one processor. The at least one processor may be configured by a single integrated circuit (IC), or may be configured by a plurality of circuits (such as integrated circuits and / or discrete circuits) communicatively connected to each other.
[0069] The control unit 363 controls each component provided in the local control device 360. Specifically, the control unit 363 instructs devices to set the operating state of the distributed power source by transmitting a second message and receiving a second message response in order to control the power of the facility 300. The control unit 363 may instruct the distributed power source to report information about the distributed power source by transmitting a second message and receiving a second message response in order to manage the power of the facility 300.
[0070] (Image displayed) The display image will be described below. Here, a case will be illustrated in which the display image may include a display image related to an information element related to the prediction error and a display image for requesting the facility 300 side for an operation plan. Furthermore, a case will be illustrated in which the threshold includes a first threshold and a second threshold (>first threshold). The information element related to the prediction error is represented by the level of the success probability (in FIG. 5, the success expectation level).
[0071] First, a case where the prediction error is smaller than the first threshold will be described with reference to the upper part of Fig. 5. In such a case, the facility 300 does not need to be requested to prepare an operation plan.
[0072] As shown in the upper part of Fig. 5, the display image may include a display image related to an information element regarding a prediction error (demand response success expectation: high in the upper part of Fig. 5). The display image does not need to include a display image for requesting the facility 300 side to submit an operation plan.
[0073] Secondly, a case where the prediction error is larger than the first threshold will be described with reference to the middle part of Fig. 5. In such a case, a first operation plan having a first level of data granularity may be required.
[0074] As shown in the middle part of Fig. 5, the display image may include a display image regarding an information element regarding a prediction error (demand response success expectation: medium in the middle part of Fig. 5). The display image may include a display image for requesting the facility 300 side to submit a first operation plan (enter daily operation information in the middle part of Fig. 5).
[0075] Thirdly, a case where the prediction error is larger than the second threshold will be described with reference to the lower part of Fig. 5. In such a case, a second operation plan having a second level of data granularity that is finer than the first level may be required.
[0076] As shown in the lower part of Fig. 5, the display image may include a display image regarding an information element regarding a prediction error (demand response success expectation: low in the lower part of Fig. 5). The display image may include a display image for requesting the facility 300 side to submit a second operation plan (in the lower part of Fig. 5, please input operation information in hourly units).
[0077] Although not particularly limited, the display image may include an image that visualizes the remaining charge (SOC; State Of Charge [%]) and operation plan (Discharge [kW]) of the power storage device 320. Note that FIG. 5 illustrates a case in which Discharge is constant at 0 kW and SOC is also constant. Furthermore, when Discharge is a positive value, Discharge represents the discharged power of the power storage device 320, and when Discharge is a negative value, Discharge represents the charged power of the power storage device 320.
[0078] (Power management method) The power management method will be described below, taking as an example a case in which the second period is a DR period.
[0079] First, generation of a prediction model will be described with reference to Fig. 6. The generation of a prediction model is executed in a first period prior to a DR period.
[0080] 6, in step S10, the power management server 200 collects various types of information. Although not particularly limited, the power management server 200 may collect various types of information from an external server that manages weather, etc.
[0081] The collected information may include learning parameters that affect the power demand of the facility 300. The collected information may include learning parameters that affect the power generation of the solar cell device 310. The collected information may include learning parameters that affect the power consumption of the load device 340.
[0082] Furthermore, the collected information may include information about the facility 300. The information about the facility 300 includes the type of distributed power source provided in the facility 300, the specifications of the distributed power source provided in the facility 300, and the like.
[0083] In step S11, the power management server 200 receives record information from the facility 300. The record information may include record information on the power demand of the facility 300. The record information may include record information on the power generated by the solar cell device 310. The record information may include record information on the power consumption of the load device 340.
[0084] In step S12, the power management server 200 generates a prediction model based on the information collected in step S10 and the information received in step S11.
[0085] Secondly, a process relating to a prediction error of a reference value referred to in a DR period will be described with reference to FIG.
[0086] 7, in step S20, the power management server 200 collects various types of information. Although not particularly limited, the power management server 200 may collect various types of information from an external server that manages weather, etc.
[0087] The collected information is an input parameter input to the prediction model, and the input parameter is a parameter corresponding to the learning parameter. Therefore, the collected information may include a learning parameter that affects the demand power of the facility 300. The collected information may include a learning parameter that affects the power generation power of the solar cell device 310. The collected information may include a learning parameter that affects the power consumption of the load device 340.
[0088] In step S21, the power management server 200 inputs input parameters to the prediction model, and thereby acquires a prediction value and a prediction error of the power demand (reference value) from the prediction model.
[0089] In step S22, if the prediction error is greater than a threshold, the power management server 200 transmits a message (in FIG. 7, an input request) to the facility 300 requesting input of an operation plan for identifying a plan for the power demand of the facility 300 during the DR period.
[0090] In such a case, the power management server 200 may present information elements related to the prediction error along with the request for the operation plan to the facility 300. For example, the power management server 200 may transmit display data of a display image (see FIG. 5 ) that may include a display image related to the information elements related to the prediction error and a display image for requesting the facility 300 for the operation plan as an input request to the facility 300.
[0091] In step S23, each facility 300 displays a display image (see FIG. 5) based on the display data received from the power management server 200. For simplicity of explanation, a case is illustrated in which each facility 300 displays a display image, but as described above, the display image may be displayed by a user terminal.
[0092] In step S24, the power management server 200 receives a response message to the input request (input response in FIG. 7) from each facility 300. The input response may include an operation plan for identifying a plan for power demand of the facility 300 in the DR period.
[0093] In step S30, the power management server 200 receives a request message. The request message may be received from the power company 400.
[0094] In step S31, the power management server 200 determines the control content for the power storage device 320 based on the predicted value and prediction error of the power demand (reference value) from the prediction model, and transmits a control instruction corresponding to the control content to each facility 300. The power management server 200 may determine the control content for the power storage device 320 based on the rated capacity and remaining amount of stored power of the power storage device 320.
[0095] (Action and Effects) In the embodiment, the power management server 200 identifies a prediction error of the power demand of the facility 300 referenced in a second time period that is later than the first time period based on actual information of the power demand of the facility 300 in a first time period, and requests the facility 300 to provide an operation plan for identifying a plan for the power demand of the facility 300 in the second time period when the prediction error is equal to or greater than a threshold. With this configuration, an operation plan is requested when the prediction error is equal to or greater than a threshold, so that the operation plan can be appropriately collected while reducing the labor hours of the user of the facility 300 compared to a case in which the user of the facility 300 is always requested to input an operation plan. By appropriately collecting the operation plan, a reference value for the power demand can be appropriately calculated.
[0096] In an embodiment, the power management server 200 may present information elements related to the prediction error to the facility 300 when requesting an operation plan. This configuration can improve motivation to input an operation plan.
[0097] In an embodiment, the power management server 200 may request a first operation plan having a first level of data granularity when the prediction error is greater than a first threshold, and may request a second operation plan having a second level of data granularity that is finer than the first level when the prediction error is greater than a second threshold. With this configuration, it is possible to appropriately collect operation plans while suppressing an increase in the man-hours of users of the facility 300.
[0098] Furthermore, since the power management server 200 can easily collect operation plans, data that contributes to improving the prediction accuracy of the reference value can be identified by the operation plans, and the effort and time required for analyzing data used to predict the reference value can be reduced. Data that contributes to improving the prediction accuracy of the reference value includes the type of power demand of the facility 300, the type of distributed power source provided in the facility 300, the type of load device 340 provided in the facility 300, etc. Note that data that contributes to improving the prediction accuracy of the reference value can be used to predict the reference value of a new facility 300.
[0099] [Other embodiments] Although the present invention has been described by the above-mentioned embodiment, the description and drawings forming a part of this disclosure should not be understood as limiting the present invention. From this disclosure, various alternative embodiments, examples and operating techniques will become apparent to those skilled in the art.
[0100] In the above disclosure, the power management server 200 generates the prediction model, but the above disclosure is not limited to this. The prediction model may be generated by a third party other than the power management server 200.
[0101] In the above disclosure, the power management server 200 controls the power storage device 320, but the above disclosure is not limited to this. The power management server 200 only needs to have a function of requesting an operation plan for identifying a plan for the power demand of the facility 300 in the second time period based on a prediction error of the power demand (reference value) referred to in the second time period. Therefore, the power management server 200 does not need to have a function of actually controlling the power storage device 320. In such a case, the power management server 200 may be interpreted as a data providing device or a data requesting device.
[0102] In the above disclosure, the power storage device 320 has been mainly exemplified as a distributed power source (adjusted power source) controlled by the power management server 200. However, the above disclosure is not limited to this. The distributed power source controlled by the power management server 200 may include a fuel cell device 330.
[0103] In the above disclosure, the solar cell device 310 is exemplified as a distributed power source that allows reverse power flow. However, the above disclosure is not limited to this. The distributed power source that allows reverse power flow may include a distributed power source that outputs power by utilizing renewable energy. Such a distributed power source may include one or more distributed power sources selected from a wind power generation device, a hydroelectric power generation device, a geothermal power generation device, and a biomass power generation device. Note that reverse power flow of the discharge power of the power storage device 320 may be permitted, and reverse power flow of the output power of the fuel cell device 330 may be permitted.
[0104] Although not specifically mentioned in the above disclosure, the power storage device 320 may include a stationary power storage device, or may include a power storage device mounted on an electric vehicle.
[0105] In the above disclosure, the case where the local control device 360 is provided in the facility 300 has been exemplified. However, the above disclosure is not limited to this. The local control device 360 may be provided by a cloud service realized by a server or the like provided on the network 120.
[0106] Although not specifically mentioned in the above disclosure, the electric power may be an instantaneous value (kW) or an integrated value per unit time (kWh). [Explanation of symbols]
[0107] 100...power management system, 110...power system, 120...network, 200...power management server, 210...management unit, 220...communication unit, 230...control unit, 300...facility, 310...solar cell device, 320...power storage device, 330...fuel cell device, 340...load device, 360...local control device, 361...first communication unit, 362...second communication unit, 363...control unit, 380...power meter, 390...power meter, power meter, 392...power meter, 393...power meter, 400...power company
Claims
1. a management department that manages a facility including a distributed power source connected to a power grid; a control unit that identifies a predicted value of the power demand of the facility referred to in a second time period that is later than the first time period and an error level of the predicted value based on actual information of the power demand of the facility in the first time period, and when the error level of the predicted value is greater than a threshold value, requests the facility side to submit an operation plan for identifying a plan for the power demand of the facility in the second time period, The power management device, wherein the operation plan includes at least one of a plan for power demand at the facility, an operation plan for a power storage device installed at the facility, and an operation plan for a load device installed at the facility.
2. The power management apparatus of claim 1 , wherein the threshold is determined according to an adjustable power by the distributed power source.
3. The power management device according to claim 1 , wherein the second period is a period for adjusting a balance between power supply and demand in the power grid.
4. The control unit presents information elements relating to an error level of the predicted value to the facility side, 4. The power management device according to claim 1, wherein the information elements regarding the error level of the predicted value include at least one of information elements for a case in which the error level of the predicted value is determined without using the operation plan and information elements for a case in which the error level of the predicted value is determined using the operation plan.
5. The threshold values include a first threshold value and a second threshold value that is greater than the first threshold value. the control unit requests a first operation plan having a first level of data granularity when an error level of the forecasted value is greater than the first threshold, and requests a second operation plan having a second level of data granularity finer than the first level when an error level of the forecasted value is greater than the second threshold; The power management apparatus according to claim 1 , wherein the first level data granularity and the second level data granularity are defined by a time unit of the operation plan.
6. The control unit presents information elements relating to an error level of the predicted value to the facility side, 6. The power management device of claim 5, wherein the information elements regarding the error level of the predicted value include at least one of information elements for a case in which the error level of the predicted value is determined using the first operation plan and information elements for a case in which the error level of the predicted value is determined using the second operation plan.
7. The power management device according to claim 1 , wherein the operation plan includes a plan for power demand of the facility itself.
8. The power management device according to claim 1 , wherein the operation plan includes an operation plan for a load device of the facility.
9. The power management apparatus according to claim 1 , wherein the operation plan includes an operation plan for the distributed power source.
10. a management department that manages a facility including a distributed power source connected to a power grid; a control unit that identifies a predicted value of the power demand of the facility referred to in a second time period that is later than the first time period and an error level of the predicted value based on actual information of the power demand of the facility in the first time period, and when the error level of the predicted value is greater than a threshold value, requests the facility side to submit an operation plan for identifying a plan for the power demand of the facility in the second time period, The operation plan includes at least one of a plan for power demand at the facility, an operation plan for a power storage device installed at the facility, and an operation plan for a load device installed at the facility.
11. Managing a facility that includes a distributed generation system connected to an electric power grid; determining a predicted value of the power demand of the facility referred to in a second time period subsequent to the first time period and an error level of the predicted value based on actual information of the power demand of the facility in the first time period, and if the error level of the predicted value is greater than a threshold value, requesting the facility side to prepare an operation plan for determining a plan for the power demand of the facility in the second time period, The power management method, wherein the operation plan includes at least one of a plan for power demand at the facility, an operation plan for a power storage device installed at the facility, and an operation plan for a load device installed at the facility.
Citation Information
Patent Citations
Method of forecasting consumed electrical energy
JP2000217253A
Power purchase and sale support system
JP2004336890A
Communication equipment, household electric appliance, controller, communication system, household electric appliance control method, power consumption control method, and program
JP2013169104A
Factory energy management system, power management device, and factory energy management method
JP2014050256A
Electric power demand prediction system, learning device, and electric power demand prediction method
JP2019204458A