The building design addresses the vulnerability of existing flood protection systems by incorporating a raisable building body with telescopic columns and floating bodies, effectively safeguarding against flood damage and maintaining essential services.

JP7594444B2Active Publication Date: 2024-12-04SEKISUI CHEMICAL CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021007828
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-02-12
Filing Date
2021-01-21
Publication Date
2024-12-04
Estimated Expiration
2041-01-21

AI Technical Summary

Technical Problem

Existing emergency evacuation capsules for buildings do not protect the building structure from flood damage, leaving it vulnerable during flooding events.

Method used

A building design that includes a foundation with a building body that can be raised and lowered using a lifting guide, featuring a telescopic column with a multilayer structure and roller guides, allowing the building to be elevated above floodwaters, while incorporating a floating body and adjustable piping systems to maintain functionality.

Benefits of technology

The design effectively protects both residents and the building structure from flood damage by raising the building body above floodwaters, ensuring continued functionality of essential systems and minimizing repair costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007594444000001
    Figure 0007594444000001
  • Figure 0007594444000002
    Figure 0007594444000002
  • Figure 0007594444000003
    Figure 0007594444000003
Patent Text Reader

Abstract

To protect residents and a building body from a flood damage simultaneously mainly by lifting the building body during a flood.SOLUTION: A building 1 has a foundation 2 and a building body 3. The building body 3 may be vertically movably installed relative to the foundation 2 by a lifting guide 31. The lifting guide 31 may be a column 7 of the building body 3 erected from the foundation 2. The column 7 may be an extension column 43 of multiple structure having an inner column 41 and an outer column 42. A protective member 51 for protecting one or both of a water supply pipe 25 and a sewerage pipe 26 when the building body 3 is lifted may be mounted to the building body 3. One or both of a feed water tank 61 and a waste water tank 62 may be installed at the building body 3. A floating body 4 for floating the building body 3 by a buoyant force may be installed between the foundation 2 and the building body 3. The floating body 4 may be a heat insulation material 22 installed at an underfloor 21 of the building body 3.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] This invention relates to buildings. [Background technology]

[0002] In recent years, the amount of rainfall has increased, causing flood damage to buildings. As a countermeasure, for example, in Patent Document 1, emergency evacuation capsules are installed in buildings. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-71346 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, when emergency evacuation capsules are installed in a building as in Patent Document 1, there are problems such as the fact that although the emergency evacuation capsules can protect the residents, they cannot protect the building from flood damage.

[0005] Therefore, a main object of the present invention is to contribute to improving the above-mentioned problems. [Means for solving the problem]

[0006] In response to the above problems, the present invention provides: A building structure having a foundation and a building body placed on the foundation, The building body is installed on the foundation by a lift guide so that it can be raised and lowered freely. 、 The lift guide is a pillar of the building body erected from the foundation, The lift guide is a telescopic column having a multi-layer structure including an inner column and an outer column, A roller guide is provided between the inner and outer columns. , The roller guides are provided in pairs or pairs so as to be positioned on the diagonal lines of the four corners of the inner column and the outer column when viewed in a plane. The building is characterized by its Effect of the Invention

[0007] According to the present invention, with the above-mentioned configuration, in the event of a flood, the main body of the building can be raised from the foundation using a lifting guide provided in the foundation, thereby simultaneously protecting both the residents and the main body of the building from flood damage. In addition, one or two pairs of roller guides are provided so as to be positioned diagonally at the four corners of the inner and outer columns when viewed in plan. As a result, the roller guides located at the corners simultaneously secure and form gaps for the two sides that form the corners, so simply by providing at least one pair of roller guides so as to be positioned diagonally at the corners, it becomes possible to simultaneously secure and form gaps for all four sides of the inner and outer columns. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a perspective view of a building according to the present embodiment. [Diagram 2] FIG. 2 is a perspective view showing a state in which the building main body of FIG. 1 has been raised. [Figure 2A] FIG. [Figure 2B] FIG. 2 is a vertical cross-sectional view of an expansion / contraction portion of the expansion pipe. [Diagram 3] FIG. 2 is a perspective view of a unit frame that constitutes a building unit. [Figure 4] (a) is a perspective view of the lower part of the telescopic column, and (b) is a cross-sectional view of the telescopic column. [Diagram 5] 4(a) is a cross-sectional view of the telescopic column taken along line AA in FIG. 4(b), and FIG. 4(b) is a cross-sectional view of the telescopic column taken along line BB in FIG. 4(b). [Figure 6] 1A is a cross-sectional view of a telescopic column, (b) is a longitudinal sectional view of the telescopic column in a contracted state, (c) is a longitudinal sectional view of the telescopic column in the middle of being extended, (d) is a partially enlarged view of the upper end of the telescopic column in (b), and (e) is a partially enlarged view of the lower end of the outer column in (c). [Figure 7] FIG. 11 is a perspective view showing a state in which the building body according to the second embodiment is raised. [Figure 8] FIG. 11 is a perspective view showing a state in which the building body according to the third embodiment is raised. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, the present embodiment will be described in detail with reference to the drawings. Fig. 1 to Fig. 8 are for explaining each example of this embodiment. Among them, Fig. 1 to Fig. 5 are for explaining Example 1, Fig. 6 is for explaining a modified example of Example 1, Fig. 7 is for explaining Example 2, and Fig. 8 is for explaining Example 3. EXAMPLES

[0010] <Configuration> The configuration of this embodiment will now be described.

[0011] As shown in FIG. 1 (FIG. 2), a building 1 in this embodiment has a foundation 2 and a building body 3 placed on top of the foundation 2.

[0012] Here, the building 1 may have any structure. In this embodiment, the building 1 is a unit building 5. The unit building 5 is a building 1 that can be constructed in a short period of time by transporting box-shaped building units 6 manufactured in advance in a factory to a construction site and assembling them at the construction site. For example, in the case of a steel-frame building unit 6, the building unit 6 has a unit frame 11 of a box-frame rigid frame structure as shown in FIG. 3 as its basic skeleton (or basic structure). The unit frame 11 is formed by connecting the upper ends of four metal columns 7 in a rectangular shape with four metal ceiling beams 8, and connecting the lower ends of the four columns 7 in a rectangular shape with four metal floor beams 9.

[0013] The foundation 2 is a fixed structure made of reinforced concrete for supporting the building body 3 on the ground of the site, and constitutes a part of the building 1 together with the building body 3. The foundation 2 has at least a rising portion 12 for installing the building body 3 at a position higher than the ground. The rising portion 12 is a wall-like portion extending upward from the ground at a required height. The rising portion 12 has at least a peripheral rising portion 12a provided with a substantially uniform height and width along the outer periphery of the building body 3. The rising portion 12 has another rising portion 12 (inner rising portion) that matches the layout of the building body 3, if necessary, provided inside the peripheral rising portion 12a. The inner rising portion is formed with a substantially uniform height and width equal to the peripheral rising portion 12a. The foundation 2 includes a mat foundation having a flat portion 14 (slab portion) that covers at least the ground inside the rising portion 12 under the rising portion 12, and a strip foundation that does not have a flat portion 14. In this embodiment, the foundation 2 is a mat foundation. Furthermore, when simply referring to the foundation 2 or the rising portion 12, this often refers to the outer periphery rising portion 12a, but is not necessarily limited to the outer periphery rising portion 12a.

[0014] Usually, ventilation holes or ventilation gaps are formed on the upper side of the rising portion 12 to allow ventilation to the underfloor 21. Due to the presence of these ventilation holes or ventilation gaps, water will enter the inside of the rising portion 12 of the foundation 2 during floods, etc. As a result, the water levels inside and outside the rising portion 12 will be the same. A flood is a disaster in which water overflows onto the ground. Floods occur, for example, due to the overflowing of rivers and sewers caused by heavy rainfall, or tsunamis caused by earthquakes.

[0015] Placing on top of the foundation 2 means that the building body 3 is placed on top of the foundation 2 (the rising part 12). In normal cases, the building body 3 is placed on the rising part 12 of the foundation 2. Furthermore, the building body 3 is directly and completely fixed to the foundation 2 so as not to move from the foundation 2 by anchor bolts 13 (FIG. 4) embedded so as to protrude upward from the upper end (top end) of the rising part 12 of the foundation 2. However, in the case of this embodiment, the building body 3 is not fixed to the foundation 2 in the same way as in the past so as to completely stop it from moving.

[0016] The building body 3 is a structure (above ground structure) that constitutes the main part or main body (such as the living space) of the building 1. In buildings 1 such as houses, the building body 3 may be one-story, two-story, or three or more story. In this embodiment, the building body 3 is two-story, but is not limited to this. In the case of a unit building 5, the building body 3 is composed of a plurality of building units 6. The plurality of building units 6 are connected to form an integrated unit.

[0017] In contrast to the above configuration, this embodiment has the following features.

[0018] (1) As shown in FIG. 5, a building body 3 may be installed on a foundation 2 so as to be movable up and down by means of a lift guide 31.

[0019] Here, the building main body 3 is installed on the rising portion 12 of the foundation 2 so that the vertical distance from the foundation 2 can be changed. This allows the building main body 3 to be lifted up and floated up (raising and lowering) as a whole relative to the foundation 2.

[0020] The lift guide 31 is a guide member that extends in the vertical direction and guides the lifting and lowering (up and down movement) of the building main body 3 relative to the foundation 2. The lift guide 31 performs a lifting and lowering guide function for the building main body 3, for example, when the building main body 3 floats up from the foundation 2 due to a flood, or when the building main body 3 is lifted up by the flood and moves upward away from the foundation 2.

[0021] The lift guide 31 may be anything, anywhere and in any way as long as it can guide the lifting and lowering of the building main body 3, for example by installing something like a guide pillar outdoors (on the site of) the building main body 3. In this embodiment, the lift guide 31 is installed on the foundation 2. The building main body 3 is installed on the rising part 12 of the foundation 2 fixed to the ground in a state where it can be moved upward, and the lift guide 31 installed on the foundation 2 guides the building main body 3 up and down, thereby assisting the lifting and lowering (up and down movement) of the building main body 3.

[0022] A single or multiple lift guides 31 can be attached to at least one of the rising portion 12 (peripheral rising portion 12a, inner rising portion) of the foundation 2 and the flat portion 14 (slab portion) on the inner side of the rising portion 12. In this embodiment, multiple lift guides 31 are installed mainly on the peripheral rising portion 12a.

[0023] (2) The lift guide 31 may be a pillar 7 of the building body 3 erected on the foundation 2.

[0024] Here, the columns 7 of the building body 3 refer to long structural members (structural columns) used as the basic framework of the building body 3. In the case of the building unit 6, the columns 7 of the building body 3 correspond to the four columns 7 that make up the unit frame 11. Note that, in the building unit 6, it is structurally possible to install an intermediate column 7 between the four columns 7 that make up the unit frame 11 and use the intermediate column 7 as the lift guide 31.

[0025] The building main body 3 also includes various vertical members, such as studs and vertical beams for mounting wall materials and heat insulating members, that do not form the basic framework of the building main body 3. However, such vertical members do not have to be included in the columns 7 (structural columns) of this embodiment.

[0026] In the case where the building main body 3 has columns 7 as its basic framework, by using the columns 7 as lift guides 31, the lift guides 31 can be incorporated into the basic framework of the building main body 3 without structural difficulties. Therefore, the building 1 can have the lift guides 31 installed between the building main body 3 and the foundation 2 without structural difficulties. By using the columns 7 as lift guides 31, the building main body 3 can be raised higher than the foundation 2. Furthermore, by using the columns 7 as lift guides 31, it is possible to eliminate the lift guides 31 that get in the way of daily life, such as guide columns installed outdoors of the building main body 3, and to eliminate problems such as poor appearance of the building 1 caused by outdoor guide columns.

[0027] In addition, it is difficult to stably install a large number of outdoor guide columns due to the fact that they can only be installed within the limits of the site. In addition to the above, there are other reasons why it is difficult to install outdoor guide columns, such as the fact that the guide columns must have a strong support structure so that they can stand on their own, and that they must always be able to maintain a precise vertical orientation so that they do not tilt or bend in the event of an earthquake or strong wind.

[0028] In contrast, if the columns 7 used in the basic framework of the building body 3 are used as lift guides 31 that guide the building body 3 as it ascends and descends, there will be no problems as with the guide columns installed outdoors. Also, the lift guides 31 can be installed freely within the range of the number of columns 7 to be installed on the building body 3, so more lift guides 31 can be secured. That is, since many columns 7 are used in the building body 3, if the columns 7 are used as lift guides 31, it is easy to secure the required number of lift guides 31 and provide the lift guides 31 with sufficient support strength, which is advantageous in terms of construction. If the lift guides 31 have sufficient support strength, the stability of the building body 3 increases when it is raised, and the sense of security also increases.

[0029] All the pillars 7 of the building body 3 may be lift-up guides 31, or only the necessary positions and the necessary number of pillars 7 may be lift-up guides 31. In this case, the pillars 7 that are not lift-up guides 31 are of normal pillar specifications, and their lower ends are not fixed to the foundation 2.

[0030] Specifically, it is preferable that all, most or part of the pillars 7 located along the outer periphery of the building main body 3 are made into lift-up guides 31. In particular, it is preferable that all or most of the pillars 7 located at or near the corners of the outer periphery of the building main body 3 are made into lift-up guides 31. In this case, the lift-up guides 31 are attached to the outer periphery rising portion 12a as described above. In addition to the above, all, most or part of the pillars 7 located on the inside of the building main body 3 may be made into lift-up guides 31 as appropriate. In this case, the lift-up guides 31 are attached to the inner rising portion (rising portion 12) as appropriate.

[0031] In the building main body 3, at least the columns 7 on the lower floors are used as lift guides 31. For example, in the case of a unit building 5 using steel-frame building units 6, all or some of the columns 7 constituting the unit frames 11 of a box rigid frame structure installed on the lower floors are used as lift guides 31. Each unit frame 11 has four columns 7, and a plurality of unit frames 11 are used in the building main body 3. As a result, the number of columns 7 used in the unit building 5 is significantly greater than in the case of a normal building 1, so the unit building 5 is a building 1 that is structurally advantageous for using the columns 7 as lift guides 31.

[0032] The pillars 7 of the building main body 3 usually extend vertically and have a length equivalent to the height of one floor. By using the pillars 7 as lifting guides 31, it becomes possible to raise the building main body 3 at least by a height equivalent to one floor. If the building main body 3 is a multi-story building, the pillars 7 may be continuous pillars with a length that spans the height of several floors. By using the continuous pillars as lifting guides 31, it becomes possible to raise the building main body 3 by a height equivalent to several floors that is approximately equal to the length of the continuous pillars.

[0033] To use the pillar 7 as the lifting guide 31, the pillar 7 is structured to have a portion (lifting portion) that moves up and down integrally with the building main body 3, and a portion (fixed portion) that moves vertically relative to the building main body 3. For example, the main body of the pillar 7 is fixed to the foundation 2 to form the fixed portion of the lifting guide 31. Also, a portion that moves up and down along the main body of the pillar 7 is provided on the main body (fixed portion) of the pillar 7, and this portion forms the lifting portion of the lifting guide 31. Then, the building main body 3 can be constructed using this lifting portion, or the lifting portion can be attached to the building main body 3, but preferably the lifting guide 31 is structured as follows.

[0034] (3) As shown in FIGS. 4 and 5, the lift guide 31 may be a telescopic column 43 having a multi-layer structure including an inner column 41 and an outer column 42.

[0035] Here, the inner column 41 is a columnar metal vertical member that is fitted (fitted) inside the outer column 42 in a manner that allows it to freely move in and out in the telescopic column 43. The inner column 41 serves as a fixed portion of the lift guide 31. The inner column 41 may be a hollow cylinder (inner cylinder) or a solid body. In this embodiment, the inner column 41 is a hollow cylinder.

[0036] The outer column 42 is a columnar metal vertical member that is fitted (externally fitted) to the outside of the inner column 41 in the telescopic column 43. The outer column 42 becomes the lifting portion of the lifting guide 31. The outer column 42 is a hollow cylinder (outer cylinder). It is preferable that the outer column 42 and the inner column 41 have approximately the same length, but they may have slightly different lengths.

[0037] The telescopic column 43 may be provided with, for example, a locking mechanism between the outer column 42 and the inner column 41. The locking mechanism is a mechanism that restricts the telescopic movement of the telescopic column 43 by locking so that the outer column 42 and the inner column 41 that are fitted together cannot temporarily move (move in and out) relative to each other in the longitudinal direction (up and down direction). The locking mechanism is also a mechanism that releases the telescopic movement of the telescopic column 43 by unlocking so that the outer column 42 and the inner column 41 can move relative to each other in the longitudinal direction.

[0038] The locking mechanism may, for example, have a structure in which a locking pin is inserted and removed between the outer column 42 and the inner column 41. In this way, by providing a locking mechanism between the outer column 42 and the inner column 41, for example, handling of the telescopic column 43 becomes easier. Furthermore, by providing a locking mechanism, it becomes possible to easily perform tasks such as manufacturing the building units 6 using the telescopic column 43 in a factory, transporting the building units 6 to a construction site, and attaching the telescopic column 43 to the foundation 2 at the construction site.

[0039] The telescopic column 43 is a columnar member that telescopically moves. The telescopic column 43 has a multiple structure (double structure) in which the outer column 42 and the inner column 41 are similar shapes with almost the same cross-sectional shape but different sizes, and the inner column 41 is inserted concentrically inside the outer column 42. The telescopic movement is, for example, a movement in which the overall length of the telescopic column 43 changes when the inner column 41 moves in and out of the outer column 42.

[0040] In this embodiment, the cross-sectional shape of the outer column 42 and the inner column 41 is a regular square, but the cross-sectional shape is not limited to this and may be a polygonal shape with more than one side, or a circular shape such as a perfect circle, an oval, or an ellipse. If the cross-sectional shape of the outer column 42 and the inner column 41 of the telescopic column 43 has corner parts, the corner parts may be appropriately subjected to R processing or C chamfering. If the outer column 42 and the inner column 41 are cylindrical members, R processing and C chamfering can be performed on one or both of the inner and outer circumference sides.

[0041] The telescopic column 43 is a member that can be used in various ways for a general building 1, a unit building 5, etc. It is most preferable to use the telescopic column 43 for a column 7 (structural column) of the building main body 3, and to make the column 7 the lift-up guide 31. However, the telescopic column 43 can also be used for a member (such as a beam member) other than the column 7 (structural column) of the building main body 3, and to make the other member the lift-up guide 31.

[0042] The bundle member is a vertical support member that supports the lower part of the building main body 3 against the ground (or the flat part 14 of the foundation 2). For example, when a telescopic column 43 is used as the bundle member, the telescopic column 43 is formed to the length required for the bundle member (approximately the same height as the rising part 12 of the foundation 2). Then, one or more telescopic columns 43 as the bundle member are installed vertically between the flat part 14 of the foundation 2 and the underfloor 21 of the building main body 3. When a bundle member formed of a telescopic column 43 is used as the lifting guide 31, the lifting guide 31 becomes able to lift the building main body 3 to a height approximately twice that of the rising part 12.

[0043] When the telescopic column 43 is used as a column 7 (structural column) of the building main body 3, the telescopic column 43 is formed to the length of the column 7. The telescopic column 43 is installed with its longitudinal direction facing the up-down direction. At this time, the telescopic column 43 is fitted into the outer column 42 so that the inner column 41 enters and exits in the longitudinal direction (downward) from the lower end of the outer column 42. The inner column 41 has its lower end abutted against the upper end of the rising part 12 of the foundation 2. Furthermore, the inner column 41 has its lower end fastened and fixed to the rising part 12 by the anchor bolt 13 described above. The outer column 42 is used as it is as a structural material (column main body) of the building main body 3, and the outer column 42 is integrated with the building main body 3.

[0044] By attaching the telescopic column 43 to the upper end of the rising portion 12 as the column 7 in this way, the telescopic column 43 functions as a part of the inner column 41 that moves up and down relative to the building main body 3 (or a fixed part that becomes one with the foundation 2). The telescopic column 43 also functions as a part of the outer column 42 that moves up and down integrally with the building main body 3 (lifting and lowering part or movable part). As a result, the building 1 has a structure in which the building main body 3 as a whole moves up and down integrally with the foundation 2 due to the telescopic movement of the telescopic column 43.

[0045] Moreover, the outer column 42 of the telescopic column 43 can be used in the same way as a normal column 7, and the inner column 41 is built into the outer column 42 so as to be freely movable without being exposed to the interior of the building main body 3 and without affecting the building main body 3. Therefore, the lifting guide 31 can be used with almost the same ease of use as a normal column 7. When the column 7 formed by the telescopic column 43 is used as the lifting guide 31, the lifting guide 31 can lift the building main body 3 to a height about twice that of the column 7.

[0046] A notch 45 (FIG. 4) for work is formed on the side surface of the lower end of the inner column 41 to attach the lower end surface of the inner column 41 to the anchor bolt 13 of the foundation 2. The notch 45 can be formed to a size required for the fixing work on any one to three sides of the lower end side of the inner column 41. In this embodiment, the notch 45 is provided on three sides of the side surface of the lower end of the inner column 41, but is not limited to this. A through hole is formed in the lower end surface of the inner column 41 in the vertical direction, and the inner column 41 is fastened and fixed to the rising part 12 by passing the anchor bolt 13 through this through hole and fastening a nut from above.

[0047] The outer columns 42 are not directly fixed to the foundation 2 and the anchor bolts 13, but the lower ends of the outer columns 42 may be grounded to the upper ends of the rising portion 12 under normal conditions. By grounding the lower ends of the outer columns 42 to the rising portion 12 in this way, the load of the building main body 3 is directly supported by the foundation 2 via the outer columns 42, so that the building main body 3 can be stably supported on the rising portion 12 of the foundation 2 and can be kept in a state where it can be raised and lowered freely at all times. However, the lower ends of the outer columns 42 may be installed so that they are slightly raised above the rising portion 12.

[0048] The telescopic column 43 can be installed with one or more intermediate columns (intermediate tubes) between the outer column 42 and the inner column 41. This gives the telescopic column 43 a triple or more layered structure. By making the telescopic column 43 a triple or more layered structure in this way, it becomes possible to raise or lift the building body 3 higher than the telescopic column 43 with a double structure.

[0049] (4) The telescopic column 43 may have a roller-type guide 46 between the outer column 42 and the inner column 41.

[0050] Here, the telescopic column 43 may be fitted in sliding contact with the outer column 42 and the inner column 41 so that they are in direct contact. In this embodiment, the telescopic column 43 forms a required gap (fitting gap) between the outer column 42 and the inner column 41. By interposing a roller-type guide 46 as shown in FIG. 5(a) in this gap, the outer column 42 and the inner column 41 are kept in a state where they are not in direct contact. This roller-type guide 46 keeps the gap between the outer column 42 and the inner column 41 constant, and allows the inner column 41 to move (or move in and out) smoothly relative to the outer column 42. The roller-type guide 46 has at least one guide roller.

[0051] The roller guide 46 is appropriately attached, for example, to at least one of the four corners between the outer post 42 and the inner post 41, or to at least one of the four sides, as viewed in a plan view.

[0052] It is preferable to provide one or two pairs of roller-type guides 46 so as to be positioned on the diagonal lines of the four corners of the outer column 42 and the inner column 41. In this way, by providing the roller-type guides 46 at the corners of the outer column 42 and the inner column 41, it is possible to simultaneously secure and form gaps between the outer column 42 and the inner column 41 for the two sides that form the corners. In addition, as described above, it is possible to install a larger roller-type guide 46 relative to the gap while reducing the above-mentioned gap. And, by simply providing a pair of roller-type guides 46 so as to be positioned on the diagonal lines of the four corners, it is possible to simultaneously secure and form gaps for all four sides of the outer column 42 and the inner column 41.

[0053] In this embodiment, the roller guides 46 are attached in a line at required intervals in the vertical direction in the gap between the outer column 42 and the inner column 41 when viewed from the side, for example, over almost the entire intermediate area in the longitudinal direction (vertical direction) of the outer column 42 and the inner column 41. This makes it possible to always stably move the outer column 42 in relation to the inner column 41.

[0054] The roller-type guides 46 may be attached outward on the outer surface of the inner column 41 so that multiple rollers are lined up in the vertical direction along the outer surface. In this case, the guide rollers roll along the inner surface of the outer column 42 in response to the relative movement in the vertical direction between the outer column 42 and the inner column 41. However, the above-mentioned roller-type guides 46 may be attached inward on the inner surface of the outer column 42 so that multiple rollers are lined up in the vertical direction along the inner surface in the same manner as above. In this case, the guide rollers roll along the outer surface of the inner column 41 in response to the relative movement in the vertical direction between the outer column 42 and the inner column 41.

[0055] 5(b), the telescopic column 43 may be provided with stoppers 47, 48 to prevent the outer column 42 from slipping out of the inner column 41. The stopper 47 is provided on the inner surface of the lower end (or its vicinity) of the outer column 42, and the stopper 48 is provided on the outer surface of the upper end (or its vicinity) of the inner column 41. The stoppers 47, 48 are provided so as to protrude into the gap at least one of the positions of the four corners of the outer column 42 and the inner column 41 or at least one of the positions of the four sides when viewed in a plan view.

[0056] The stoppers 47, 48 are installed at positions where they vertically engage with each other when the telescopic column 43 is fully extended, as viewed in a plan view. The stoppers 47, 48 are also installed at positions where they do not interfere with the roller-type guide 46. In this embodiment, a pair of roller-type guides 46 are provided so as to be positioned on one diagonal line at the four corners of the telescopic column 43, and a pair of stoppers 47, 48 are provided so as to be positioned on another diagonal line at the four corners of the telescopic column 43. However, the positional relationship between the roller-type guide 46 and the stoppers 47, 48 is not limited to this.

[0057] 6 shows a modified example of a roller-type guide 46 provided on a telescopic column 43. In this modified example, the telescopic column 43 has roller-type guides 46 attached to the inner surface of the lower end (or nearby) of the outer column 42 and to the outer surface of the upper end (or nearby) of the inner column 41. Each of these roller-type guides 46 has one guide roller, and is attached to all four corner positions of the telescopic column 43 when viewed from above. When viewed from the side, the telescopic column 43 does not have roller-type guides 46 attached to the middle positions in the longitudinal direction of the outer column 42 or the inner column 41.

[0058] The roller guide 46 at the lower end of the outer column 42 is attached facing inward toward (the corner portion of) the inner column 41. The roller guide 46 at the upper end of the inner column 41 is attached facing outward toward (the corner portion of) the outer column 42.

[0059] In this way, the configuration can be simplified by providing separate roller guides 46 at the bottom end of the outer column 42 and the top end of the inner column 41. Even in this way, the gap between the outer column 42 and the inner column 41 can be kept constant, and the inner column 41 can be moved (or moved in and out) smoothly relative to the outer column 42 when the telescopic column 43 telescopically moves.

[0060] In this case, the roller guide 46 at the lower end of the outer column 42 and the roller guide 46 at the upper end of the inner column 41 are installed in positions where they interfere with each other when the telescopic column 43 is fully extended. As a result, the upper and lower roller guides 46 also function as stoppers 47, 48, respectively, making dedicated stoppers 47, 48 unnecessary.

[0061] Note that the building 1 may be provided with one or more cable members such as mooring wires or mooring chains (mooring lines, hereinafter referred to as mooring wires for ease of understanding) instead of or in addition to the above-described lifting guide 31. The mooring wires moor the building main body 3 so that the building main body 3, which has been lifted from the foundation 2, does not move away from the foundation 2 in the lateral direction.

[0062] The mooring wires can be installed between the building body 3 and the foundation 2, between the building body 3 and the site, etc. The mooring wires to be used are at least approximately the same length as the expected amount of lifting and lowering movement of the building body 3 or longer.

[0063] It is preferable to attach a length adjustment mechanism such as a winder (winch) to the mooring wire so that the length and tension can be adjusted. The length adjustment mechanism, for example, makes the mooring wire stay at an optimal length or in a taut state with a required tension before the building main body 3 floats up during normal times. The length adjustment mechanism also functions to keep the mooring wire at an optimal length or in a taut state with a required tension when the building main body 3 is floating up during a flood, or when the floating building main body 3 returns to its original position after the water subsides after a flood, etc.

[0064] Also, for example, instead of or in addition to the mooring wire, the building body 3 may be moored in the same manner as the mooring wire by one or more pole-shaped or rod-shaped mooring members. In this case, it is preferable to attach a shock-absorbing length adjustment mechanism such as a damper to the pole-shaped mooring member.

[0065] However, the installation of mooring wires and mooring members on the premises is not as easy as that of the lifting guide 31. In addition, the mooring wires and mooring members require adjustment of their length and tension in a synchronized manner. For this reason, the mooring wires and mooring members are structurally disadvantageous compared to the lifting guide 31, which is easy to install on the building main body 3 and whose extension and contraction movements are naturally synchronized. In addition, the mooring wires and mooring members do not have a sufficient guiding function because their main function is mooring, and are therefore functionally disadvantageous compared to the lifting guide 31, which has a guiding function as its main function. Therefore, it is preferable to use the lifting guide 31, which can accurately guide the building main body 3 in the vertical direction and is easy to install.

[0066] The building main body 3 equipped with the lifting guides 31 (and mooring wires and mooring members) as described above can be forcibly raised or lifted from the foundation 2 by using a lifting device such as a jack or lifter. The lifting device can be operated by a resident or by height control using a water level detector or the like. However, in this embodiment, the building main body 3 is raised as follows.

[0067] (5) As shown in FIG. 2 (FIG. 1), a floating body 4 that floats the building body 3 by buoyancy may be installed between the foundation 2 and the building body 3.

[0068] Here, "between the foundation 2 and the main building body 3" means a position that is physically halfway between the foundation 2 and the main building body 3, or a relative position that relates to both the foundation 2 and the main building body 3.

[0069] The float 4 uses buoyancy to lift the building body 3 during floods. The float 4 is provided separately from the foundation 2 and the building body 3. The float 4 may be used alone, or in addition to the lifting device such as the above-mentioned jack or lifter. By using both the float 4 and the lifting device such as the jack or lifter, it is possible to reduce the burden on both the float 4 and the lifting device. In this embodiment, the float 4 is used alone.

[0070] The float 4 can also be installed outside the building body 3, but in this embodiment, as described below, the float 4 is installed inside the foundation 2 (the rising part 12 of the foundation 2) and below the building body 3, so that the float 4 is installed between the foundation 2 and the building body 3. In this way, the float 4 is housed inside the foundation 2 and covered from above by the building body 3, making it invisible from outside. Furthermore, by installing the float 4 inside the foundation 2, the float 4 is protected from damage by the foundation 2.

[0071] When the float 4 is installed inside the foundation 2, it is preferable to configure the structure so that water does not enter inside the foundation 2 during normal rainfall, and water reliably enters the underside of the float 4 through the foundation 2 during flooding. For this purpose, the building 1 is provided with the above-mentioned ventilation holes and ventilation gaps at a position above the foundation 2 or at a higher position. The ventilation holes and ventilation gaps are provided, for example, at the upper part or upper end of the rising part 12 of the foundation 2, or at a position between the foundation 2 and the building main body 3. In order to guide water that has passed through the ventilation holes or ventilation gaps to the underside of the float 4 during flooding, the building 1 may be provided with appropriate gaps or water channels in the foundation 2, the float 4, or between the foundation 2 and the float 4.

[0072] Moreover, by installing the float 4 inside the foundation 2, the foundation 2 (the rising part 12) can be used as (a part of) a guide body for raising and lowering the float 4, and the float 4 can be raised and lowered along the foundation 2. If the float 4 is designed to be able to rise higher than the foundation 2, an introduction taper part that narrows downward may be provided on the side of the float 4 or the peripheral part of the lower part of the float 4. This makes it easier for the float 4, which has risen higher than the foundation 2 and protrudes above the foundation 2, to be placed back inside the foundation 2 by the introduction taper part when the float 4 descends as the water subsides. In this case, it is preferable to attach a metal or resin guard to the introduction taper part to prevent damage to the float 4.

[0073] The floating body 4 may be anything that can be installed between the foundation 2 and the building body 3 (in this embodiment, inside the rising part 12 of the foundation 2 and below the building body 3) and that can generate enough buoyancy to float the building body 3. The floating body 4 may be, for example, a hollow sealed container or tank (such as an air tank) or a pontoon (cabinet ship).

[0074] Furthermore, the floating body 4 may be, for example, an airbag. An airbag is a bag that is normally folded and stored in a container, and is inflated by, for example, an inflator or compressor in the event of a flood. By inflating the airbag in the event of a flood, the building main body 3 can be floated up by buoyancy, and so the airbag serves as the floating body 4.

[0075] These various types of floats 4 may be used alone or in appropriate combination of a plurality of types. The floats 4 used in this embodiment will be described later.

[0076] A single or multiple floats 4 can be provided inside the foundation 2. In this embodiment, a single float 4 is provided, which has approximately the same shape as the lower part of the building body 3 and has an even thickness in the vertical direction.

[0077] As described above, when the inside of the foundation 2 is divided or partitioned into multiple sections by the rising parts 12 (inner rising parts) according to the floor plan, the floats 4 can be divided into multiple sections according to the partition shapes of the rising parts 12 inside the foundation 2. In this case, it is preferable to provide floats 4 in all partition sections, but depending on the situation, there may be partition sections where no floats 4 are provided.

[0078] (6) The floating body 4 may be a heat insulating material 22 installed under the floor 21 of the building body 3.

[0079] Here, underfloor 21 refers to the part or space below the underside of the floor that is located inside (the rising part 12 of) foundation 2 and that constitutes the first floor of building body 3. Note that it is preferable that the lower part (underside) of the first floor of building body 3 be made of a completely waterproof structure or a structure with higher waterproofness than usual so that it is not or is less susceptible to flood damage.

[0080] The insulating material 22 is a component for insulating. The insulating material 22 of the building 1 is provided inside the walls of the building main body 3, under the floor 21, etc. Various types of insulating material 22 are used for the building 1. The floating body 4 may be composed of a single type of insulating material 22, or may be composed of a combination of multiple types of insulating materials 22. The floating body 4 may be composed of a single structure of insulating material 22, or multiple (multiple pieces and / or multiple types) insulating materials 22. When the floating body 4 is composed of multiple insulating materials 22, the multiple insulating materials 22 are integrated together so that they do not come apart when the building main body 3 floats.

[0081] In the unit building 5, foam is usually used for the insulation material 22, which is a material that is light, does not absorb water, and does not lose buoyancy even if damaged, making it suitable for use as the floating body 4. In addition, foam is water repellent, so by installing it under the building body 3, it is possible to waterproof the lower part of the building body 3. This is expected to have the effect of eliminating or simplifying the waterproof structure for the lower part of the first floor of the building body 3. Any foam, such as urethane foam or polystyrene foam, may be used as the floating body 4, as long as it can float the building body 3 on water.

[0082] The heat insulating material 22 used as the floating body 4 is to be installed under the floor 21. The heat insulating material 22 under the floor 21 is preferably fixed to the lower part of the building body 3, but as long as the heat insulating material 22 is installed in a state where it will not come off from the lower part of the building body 3 when the building body 3 is lifted off the foundation 2, the heat insulating material 22 may or may not be fixed to the lower part of the building body 3. For example, as described above, when the columns 7 along the outer periphery of the building body 3 are used as the lift guides 31, these columns 7 (lift guides 31) surround and restrain the floating body 4 installed inside. Therefore, since the lift guides 31 function as a stopper for the floating body 4, it becomes possible to install the heat insulating material 22 without fixing it to the lower part of the building body 3.

[0083] Since the heat insulating material 22 does not become a floating body 4 relative to the building body 3 simply by being installed under the floor 21 in a normal manner, in order to enable the heat insulating material 22 to be used as a floating body 4, the heat insulating material 22 needs to be installed under the floor 21 in a manner different from the normal one. For this reason, a large amount of the heat insulating material 22 is installed under the floor 21 so that its volume becomes larger than normal.

[0084] For example, if the heat insulating material 22 is polystyrene foam with a foaming ratio of 40 times, the buoyancy of polystyrene foam per cubic meter is about 975 kg. For example, in the case of a two-story wooden building 1 with a floor area of ​​65.55 square meters (length 10 m, width 7.5 m, and width of the foundation 2 of about 10 cm to 15 cm), the statistical weight of the building body 3 is about 30 tons. In the case of a two-story steel-framed building 1, the statistical weight of the building body 3 is about 40 tons. Also, household goods are assumed to weigh about 1 ton. Therefore, it can be assumed, with a considerable margin of error, that the building body 3 has a total weight of 50 tons.

[0085] And, if we calculate that the floor area of ​​the 50-ton building body 3 is 65.55 square meters, the required polystyrene foam will have an area of ​​approximately 65.55 square meters (in reality, the area will be smaller by at least the width of the foundation 2) and a constant thickness of about 80 cm (vertical dimension). If polystyrene foam with such an area and thickness is used, it will be possible to obtain sufficient buoyancy to float the above-mentioned building body 3.

[0086] In addition, since there is a certain degree of correlation between the floor area and total weight of the building body 3, it is considered that basically similar calculation results will be obtained even if the floor area or total weight of the building body 3 changes. And since this value of 80 cm in thickness is a value with a sufficient margin, if polystyrene foam having an area approximately equal to the floor area of ​​the building body 3 is used with a constant thickness of at least about 80 cm, the building body 3 can be raised in most cases. It is realistically quite feasible to install the insulation material 22 with a thickness of about 80 cm. Therefore, this calculation result can be used as a standard value that is widely applicable to many buildings 1.

[0087] Furthermore, by using this 80 cm as the standard thickness of the insulation material 22 that will become the floating body 4, it is possible to facilitate the setting of the insulation material 22 (floating body 4) when actually installing the insulation material 22 as the floating body 4. In other words, it is only necessary to make numerical adjustments to increase or decrease the area and thickness of the insulation material 22 according to the specific floor area and total weight of the building body 3. Such numerical adjustments can be made more easily than determining the area and thickness of the insulation material 22 from scratch.

[0088] The rising portion 12 of the foundation 2 is formed so that its height is approximately the same as or higher than the thickness of the floating body 4 required to float the building main body 3. In this case, by making the rising portion 12 of the foundation 2 at least 80 cm above the ground, it becomes possible to fit polystyrene foam (insulation material 22) with a thickness of approximately 80 cm and an area approximately the same as the floor area of ​​the building main body 3 inside the foundation 2.

[0089] Furthermore, for example, if it is desired to make the floating body 4 slightly smaller than the floor area of ​​the building main body 3, the thickness of the floating body 4 and the height of the rising part 12 of the building 1 can be increased accordingly. Also, for example, if it is desired to make the floating body 4 a different size or a different planar shape from the floor shape of the building main body 3, the thickness of the floating body 4 and the height of the rising part 12 can be increased accordingly. By changing the shape in this way, a required gap or water channel can be formed between the foundation 2 and the floating body 4. Also, if the floating body 4 has sufficient buoyancy, it is possible to make the thickness of the floating body 4 not constant, but even in this case, the foundation 2 can be formed to match the thickness of each part of the floating body 4.

[0090] Furthermore, a foundation 2 that is 80 cm or more high will be higher than a normal foundation 2 (almost twice as high), and this alone will raise the position of the building 1 above the ground. Therefore, simply raising the foundation 2 by the required thickness of the float 4 is effective as a flood prevention measure. If you want to make the foundation 2 that houses the float 4, which is about 80 cm thick, the same height as a normal foundation 2, then all you have to do is dig down into the ground the inside of the foundation 2 by the amount that it is higher than normal, and house the lower half of the float 4 in that part.

[0091] Then, with the floating body 4 being installed under the floor 21 of the building main body 3, the equipment, components and other under-floor installations that had been installed under the floor 21 up until now can no longer be installed under the floor 21, and are therefore moved to the inside or roof of the building 1. In addition, equipment (air conditioning equipment) such as indoor and outdoor units of air conditioners are also changed to be installed inside or on the roof of the building 1. Furthermore, equipment (outdoor facilities) that is normally installed outdoors, such as EcoCute, ENE-FARM, home storage batteries, and electric vehicle charging equipment, are also installed inside or on the roof of the building 1.

[0092] If these devices (such as the above-mentioned underfloor installation items, air conditioning equipment, and outdoor equipment) cannot be installed indoors, the devices are integrated with the building body 3 so that they float together with the building body 3. Alternatively, the devices are attached to floats 4 individually or collectively so that they float together with the building body 3. For example, by integrating power supply devices such as home storage batteries and electric vehicle charging devices with the building body 3 and raising and lowering them together with the building body 3, the power supply devices are prevented from being submerged and their functions are preserved, making it possible to secure a power source in an emergency.

[0093] Furthermore, in this embodiment, as shown in Fig. 2, pipes such as water supply pipes 25 and sewerage pipes 26 connected to the building body 3 are configured as follows. The water supply pipes 25 and sewerage pipes 26 are pipes installed within the site so as to connect the building body 3 to a public water supply system and sewerage system. The water supply pipes 25 and sewerage pipes 26 are connected to the building body 3 at the portions routed inside the foundation 2.

[0094] That is, the water supply pipes 25 and the sewerage pipes 26 (their portions inside the foundation 2) may be normal fixed pipes. However, the water supply pipes 25 and the sewerage pipes 26 may be long pipes 27 having flexibility or changeability so as to prevent them from coming off the rising building body 3. The long pipes 27 have an extra length and flexibility or changeability assuming the height to which the building body 3 can be raised (the maximum height that can be raised, or the maximum extension amount of the telescopic column 43) or a higher height. Also, the water supply pipes 25 and the sewerage pipes 26 may be ones (telescopic pipes 28) having an extension structure that can extend and retract by the above-mentioned extra length, as shown in FIG. 2A, so as to prevent them from coming off the rising building body 3.

[0095] Structurally, the water supply pipe 25 is preferably a long pipe 27 that is flexible or changeable, and the sewer pipe 26 is preferably an expandable pipe 28, but is not limited to this. However, considering that at least the sewer pipe 26 will be contaminated by flood water, it is permissible to make it a normal fixed pipe and install it so that it comes off from the raised building body 3 (falls off when the building body 3 is raised).

[0096] The flexible or changeable long pipes 27 and the expandable pipes 28 are installed under the floor 21, avoiding the float 4 so as not to interfere with it. For example, the flexible or changeable long pipes 27 and the expandable pipes 28 are installed in the partition part of the foundation 2 where the float 4 is not installed as described above. By using such a piping structure or piping installation structure, the water supply pipes 25 and the sewerage pipes 26 deform in accordance with the floating or lifting of the building body 3, and do not come off or are difficult to come off. Thus, the building 1 is structured to be able to maintain a minimum standard of living for a short period of time until restoration in the event of a flood.

[0097] The flexible or variable long piping 27 preferably has a meandering shape or a loop-shaped bundled shape, for example, at the portion installed inside the foundation 2. At least the flexible or variable portion of the long piping 27 is formed by a flexible pipe or a rotary joint made of soft resin.

[0098] The portion of the expansion pipe 28 that is installed inside the foundation 2 is preferably formed, for example, in a serpentine shape or a stepped shape. The expansion and contraction movement of the expansion pipe 28 refers to a movement in which the overall length of the expansion pipe 28 changes. The expansion pipe 28 is suitably provided with, for example, an expansion section 281 having a double pipe structure, a rotary joint section 282, a bent section 283, and the like.

[0099] In the expansion pipe 28, in order to accommodate the maximum height to which the building main body 3 can be raised, one or more expansion sections 281, rotary joint sections 282, and bent sections 283 can be provided as appropriate. It is preferable to provide the expansion sections 281 in the straight portion of the expansion pipe 28 in a number corresponding to the maximum height to which the building main body 3 can be raised. The rotary joint sections 282 and bent sections 283 are provided so as to connect the multiple expansion sections 281. The expansion section 281 is capable of expanding and contracting in the X direction in the figure, and the rotary joint section 282 is capable of rotating in the Y direction in the figure. The rotary joint section 282 may be configured to absorb thermal expansion and contraction of the pipe by a slight insertion and removal movement in the Z direction in the figure.

[0100] 2B, the expansion / contraction section 281 has an inner tube 281a, an outer tube 281b, a seal section 281c, a stopper section 281d, etc. For example, the inner tube 281a is connected to the side of the expansion / contraction pipe 28 that faces the building main body 3. The outer tube 281b is formed in the part of the expansion / contraction pipe 28 that faces the public water supply or sewerage system.

[0101] The outer tube 281b is a large-diameter pipe with a long, socket-like shape, with the diameter of the end of the pipe larger than that of the inner tube 281a over the required length. The inner tube 281a is a spigot that is fitted into the inside of the outer tube 281b so as to be freely movable in and out in the longitudinal direction. The length of the outer tube 281b or the amount of fitting of the inner tube 281a into the outer tube 281b is approximately the length over which the extension and contraction section 281 can extend and contract.

[0102] The seal portion 281c is a flexible ring-shaped member made of an elastic material such as rubber. The seal portion 281c is provided on the inner periphery of the end (open end) of the outer tube 281b so as to close the gap between the outer tube 281b and the inner tube 281a. The outer tube 281b may be provided with a seal installation portion 281e for installing the seal portion 281c at its end so as to be continuous in the circumferential direction. The seal installation portion 281e may be a stepped portion or a circumferential groove that expands the end of the outer tube 281b toward the outer periphery by approximately the width and thickness of the seal portion 281c.

[0103] The stopper portion 281d is a circumferentially continuous flange or the like that protrudes outward from the outer periphery of the tip of the inner tube 281a inserted into the outer tube 281b by a protruding amount of about the gap between the inner tube 281a and the outer tube 281b or less. The stopper portion 281d is engaged in the longitudinal direction by a sealing lip portion 281f that is integrally formed on the inner periphery of the seal portion 281c, thereby sealing and preventing it from coming off at the maximum extension. The lip portion 281f is continuously protruded in the circumferential direction so as to protrude obliquely from the seal portion 281c toward the inside of the outer tube 281b, and is elastically contacted with the outer periphery surface of the inner tube 281a. The stopper portion 281d is restricted in position when it is reduced by hitting a portion (diameter changing portion 281g) at the inner part of the outer tube 281b, where the diameter changes to expand with respect to the piping.

[0104] <Function> The function of this embodiment will now be described.

[0105] A building 1 is constructed by pouring a foundation 2 into the ground at a construction site and constructing a building body 3 on the foundation 2. In a normal building 1, the building 1 is constructed according to a procedure such as placing a base on the foundation 2 and erecting columns 7 on the base. In a unit building 5, a building unit 6 manufactured in a factory is transported to the construction site, and the building unit 6 is placed on the foundation 2 at the construction site and fixed to the foundation 2, so that the unit building 5 is constructed in a short period of time.

[0106] In this embodiment, the building 1 uses telescopic columns 43 as lift guides 31 for the columns 7 (structural columns), which are structural materials. In the case of a modular building 5, the building units 6 are manufactured in a factory using telescopic columns 43 for the columns 7. In the factory, the building units 6 can be manufactured using the telescopic columns 43 in much the same way as normal columns 7.

[0107] At the construction site, the insulating material 22 that will become the floating body 4 is installed inside the foundation 2, and the building body 3 is constructed on top of it, so that the floating body 4 is installed between the foundation 2 and the building body 3. At this time, the floating body 4 may be fixed to the bottom of the building body 3 as necessary. In this way, a building 1 is completed in which the building body 3 floats on water in the event of a flood. Note that a lifting device such as a jack or lifter may be installed on the inside of the foundation 2 instead of or in addition to the floating body 4. In this way, a building 1 that can be lifted by the lifting device is completed.

[0108] In the case of the telescopic column 43 of this embodiment, the building main body 3 is attached to the foundation 2 by fixing the lower end of the inner column 41 to the anchor bolt 13 embedded in the foundation 2. As a result, the inner column 41 is fixed integrally to the foundation 2, and the outer column 42 is able to telescope up and down relative to the inner column 41. Therefore, the building main body 3 constructed with the outer column 42 as the column main body can rise (float up or be lifted up) together with the outer column 42 along the inner column 41 while attached to the foundation 2 (it can move up and down freely).

[0109] The building 1 constructed in this way has no difference from a normal building in terms of appearance and function as a residence. In addition, there is nothing outside the building body 3 that would be an obstacle to daily life (such as a structure for raising the building body 3). Therefore, the residents can live their daily lives without any particular hindrance. In addition, in the event of a flood, the entire building body 3 floats up along the lift guide 31 relative to the foundation 2 by an amount corresponding to the rise in the water level due to the buoyancy of the float 4, thereby preventing flooding damage to the building body 3. The building body 3 floats up naturally without any special operation while the residents are still inside. Note that if a lifting device such as a jack or lifter is provided inside the foundation 2 instead of or in addition to the float 4, the building body 3 is lifted by the lifting device. When the building body 3 is lifted by the lifting device, the lifting device is operated and the height is controlled using a water level detector or the like as appropriate.

[0110] <Effects> According to this embodiment, the following effects can be obtained.

[0111] (Effect 1) The building main body 3 may be installed in a state in which it can be raised and lowered freely relative to the foundation 2 by the lifting guide 31. In this way, the lifting guide 31 attached to the foundation 2 guides the rise (movement or displacement straight up) of the building main body 3 installed on the foundation 2. Therefore, for example, in the event of a flood, the building main body 3 can be floated or lifted up from the foundation 2 along the lifting guide 31 provided on the foundation 2.

[0112] At this time, the lifting guide 31 stably lifts the building body 3 straight up without tilting, and also functions to hold the building body 3 on the foundation 2 so that the building body 3 does not move sideways away from the foundation 2.

[0113] The lift guide 31 can be attached to the foundation 2 at the rising portion 12 (the outer peripheral rising portion 12a, the inner rising portion) or the flat portion 14, but it is preferable to attach it to at least the outer peripheral rising portion 12a, as this allows the building main body 3 to be stably supported over a wider area.

[0114] As described above, the building body 3 may be floated from the foundation 2 by the buoyancy of the floating body 4, or the building body 3 may be forcibly lifted from the foundation 2 using a lifting device such as a jack or a lifter. The building body 3 may be raised from the foundation 2 using both the floating body 4 and the lifting device.

[0115] After the water has subsided, the lifting guides 31 guide the building body 3 to descend (move or displace straight down) along the lifting guides 31, thereby ensuring that the building body 3 is returned to the top of the foundation 2 again. When a floating body 4 is used, the building body 3 is naturally lowered as the water level drops. When a lifting device is used, the building body 3 is lowered by operating the lifting device or by controlling the height as described above.

[0116] This makes it possible to protect both the residents and the main building 3 from flood damage. By protecting the main building 3, the economic burden of repair costs for the main building 3 is almost eliminated, and the residents do not lose their lives or property, so they can continue to live in the main building 3 without worry even after a flood.

[0117] Also, by attaching the lift guide 31 to the foundation 2, it is possible to install the lift guide 31 so that it is not noticeable or is not visible from the outside, preventing a deterioration in the appearance of the building 1. And, by attaching the lift guide 31 to the foundation 2, it is possible to eliminate the lift guide 31 (for example, a guide pillar installed outside the building main body 3) on the outside of the building main body 3, which would be a hindrance in daily life.

[0118] (Effect 2) The pillars 7 of the building main body 3 erected from the foundation 2 may be used as lift-up guides 31. As a result, in many buildings 1, the pillars 7 erected on the foundation 2 serve as the basic framework (structural pillars) of the building main body 3, so by using the pillars 7 of the building main body 3 as lift-up guides 31, the lift-up guides 31 can be easily and reliably installed in the building 1. Moreover, the lift-up guides 31 can be incorporated into the basic framework of the building main body 3. As a result, for example, it may be possible to eliminate the need to provide a lift-up guide 31 separate from the pillars 7 between the foundation 2 and the building main body 3.

[0119] Furthermore, because the pillars 7 themselves serve as the lift guides 31 for the building main body 3, the lift guides 31 can be installed on the building main body 3 so that they are not noticeable from both indoors and outdoors, preventing a deterioration in the appearance and living comfort of the building 1. Furthermore, by using the pillars 7 as the lift guides 31, it is possible to eliminate the need for lift guides 31 (such as guide pillars installed outdoors of the building main body 3) that get in the way of daily life on the outside of the building main body 3, and to raise the building main body 3 higher. Furthermore, the lift guides 31 can obtain a sufficiently high support strength compared to when a separate lift guide 31 (such as a guide pillar) is installed outdoors of the building main body 3.

[0120] (Effect 3) The lifting guide 31 may be configured as a multi-structured telescopic column 43 having an inner column 41 and an outer column 42. The multi-structured telescopic column 43 has a telescopic structure in which the inner column 41 fits (fits inwardly) into the outer column 42, allowing the inner column 41 to move in and out of the outer column 42 in the longitudinal direction (up and down direction), thereby changing the overall length. The telescopic column 43 has a large degree of telescopic movement possible due to the amount of fitting between the inner column 41 and the outer column 42, and therefore it is possible to lift or float the building main body 3 high (by approximately the length of the telescopic column 43).

[0121] Therefore, the telescopic column 43 is suitable for use as the lifting guide 31, and by using the telescopic column 43, the lifting guide 31 can be installed on the foundation 2 without structural difficulties and the building main body 3 can be raised high. The telescopic column 43 can be used as the lifting guide 31 for the columns 7 of the building main body 3 or for vertical members other than the columns 7 (for example, beam members).

[0122] For example, when a telescopic column 43 is used for the column 7 of the building main body 3, the column 7 itself becomes the lift-up guide 31, so that the lift-up guide 31 can be easily incorporated into the building main body 3 to guide the ascent of the building main body 3. Moreover, by using a telescopic column 43 for the column 7, the relationship between the building main body 3 and the column 7 (lift-up guide 31) of the column 7 as the lift-up guide 31 becomes substantially the same as that of the existing building 1. In this case, the column 7 using the lift-up guide 31 can be installed in the building main body 3 by fixing the lower end of the inner column 41 of the telescopic column 43 to the foundation 2 and constructing the building main body 3 using the outer column 42 (or by making the outer column 42 a fixed part relative to the building main body 3).

[0123] (Effect 4) The telescopic column 43 may be provided with a roller-type guide 46 between the inner column 41 and the outer column 42. This allows the gap (fitting gap) between the outer column 42 and the inner column 41 to be kept constant by the roller-type guide 46, and allows the inner column 41 to move smoothly (or move in and out) relative to the outer column 42. Therefore, in the event of a flood, the heavy building main body 3 can be smoothly guided in the vertical direction by the telescopic column 43 equipped with the roller-type guide 46, and can be reliably raised.

[0124] (Effect 5) The building 1 may have a floating body 4 installed between the foundation 2 and the building body 3, which floats the building body 3 by its buoyancy. In this way, in the event of a flood, the floating body 4 will float the building body 3 from the foundation 2 by its buoyancy, raising the building body 3 above the flood water level, thereby protecting the residents and the building body 3 from flood damage at the same time and preventing water from entering the building body 3. The entire building body 3 will naturally rise by the buoyancy of the floating body 4 by the amount of rise in the water level due to the flood, so no power, operation or control is required to float the building body 3, and the operation is reliable.

[0125] Furthermore, by installing the floating body 4 between the foundation 2 and the building body 3, it is possible to install the floating body 4 outside the building body 3 so as not to interfere with daily life. By installing the floating body 4 between the foundation 2 and the building body 3, the waterproofing properties of the floating body 4 can be used to waterproof the lower part of the building body 3, which is expected to prevent water from entering the inside of the building body 3.

[0126] (Effect 6) The float 4 may be composed of a heat insulating material 22 installed under the floor 21 of the building body 3. The heat insulating material 22 is formed to have a required thickness and volume based on the floor area and total weight of the building body 3 and installed under the floor 21, and becomes a float 4 to actually float the building body 3. As a result, the heat insulating material 22 used for insulating the building 1 can be effectively used as the float 4 simply by increasing its volume and installing it under the floor 21. The large-volume heat insulating material 22 installed under the floor 21 functions as the heat insulating material 22 of the building 1 under normal circumstances and also functions as the float 4 of the building body 3 during floods, so there is no waste in the structure. In addition, the heat insulating material 22 for the float 4 can be the same as the one already used under the floor 21 of the building body 3 for insulation, so the float 4 can be installed under the floor 21 of the building body 3 without any difficulty.

[0127] Furthermore, by installing the insulating material 22 as a floating body 4 under the floor 21 of the building main body 3, the floating body 4 can be installed outside the building main body 3 so as not to interfere with daily life. By installing the insulating material 22 as a floating body 4 under the floor 21 of the building main body 3, the water repellency of the insulating material 22 as a floating body 4 waterproofs the lower part of the building main body 3, and water intrusion into the inside of the building main body 3 can be more reliably prevented. EXAMPLES

[0128] <Configuration> The configuration of this embodiment will now be described.

[0129] In this embodiment, as shown in FIG. 7, a protective member 51 is attached to the building main body 3 to protect at least one or both of the water supply piping 25 and the sewerage piping 26 connected to the building main body 3 when the building main body 3 is raised.

[0130] Here, any protective member 51 may be used as long as it can protect the water supply pipe 25 and the sewerage pipe 26.

[0131] The protective member 51 may be installed, for example, so as to directly surround the water supply pipe 25 or the sewerage pipe 26 to be protected. When the protective member 51 is installed so as to directly surround the water supply pipe 25 or the sewerage pipe 26 to be protected, the protective member 51 may be directly wrapped around each of them individually so that the water supply pipe 25 or the sewerage pipe 26 is normally protected. When the protective member 51 is attached to the water supply pipe 25 or the sewerage pipe 26 individually, a waterproof sheet may be used for the protective member 51. When the water supply pipe 25 or the sewerage pipe 26 is a flexible or changeable long pipe 27 or an expandable pipe 28, the protective member 51 is installed with a slack so as to accommodate deformation of the pipe due to the floating or lifting of the building main body 3.

[0132] In this embodiment, the protective member 51 is installed so as to surround almost the entire outer periphery of the building main body 3 in a nearly continuous manner, thereby making it possible to protect the entire inner part of the outer periphery of the foundation 2 (the outer periphery rising portion 12a) together with the water supply piping 25 and the sewerage piping 26 at once.

[0133] In this case, the protective member 51 is preferably a flexible planar (cloth-like) or membrane-like member such as a net (protective net) or sheet (protective sheet). The net or sheet used may be one that does not prevent water from entering (passing through) the inside of the protective member 51 during a flood. The protective member 51 preferably has mesh or openings that are coarse enough to capture foreign matter or prevent the passage of foreign matter so that foreign matter does not enter the inside. The mesh or openings may be provided in a size or shape that assumes the size of the foreign matter to be captured, for example, about the same size as fallen leaves.

[0134] It is preferable that the protective member 51 is, for example, folded or rolled up under normal circumstances and installed inconspicuously along the lower part of the exterior wall of the building main body 3, the upper part of the rising part 12 of the foundation 2, or the outer periphery of the boundary between the exterior wall of the building main body 3 and the rising part 12 of the foundation 2. It is preferable that the protective member 51 is pulled out in its entirety during a flood, or pulled out by an amount corresponding to the amount of floating or lifting of the building main body 3, and deployed to cover the area between the lower part of the exterior wall of the building main body 3 and the rising part 12 of the foundation 2.

[0135] For this purpose, the protective member 51 may be in the form of a roll screen, for example. The roll screen-shaped protective member 51 may be installed, for example, by fixing the main body (the rolled-up portion) to the lower part of the exterior wall of the building main body 3, and attaching the edge (lower edge) of the screen (protective member 51) pulled out (downward) from the main body to the upper part of the rising part 12 of the foundation 2. Alternatively, the main body (the rolled-up portion) of the roll screen and the edge (upper edge) of the screen may be installed upside down to the above, at the rising part 12 of the foundation 2 and the lower part of the exterior wall of the building main body 3, respectively.

[0136] Also, for example, the upper edge of the protective member 51 may be fixed to the lower part of the exterior wall of the building main body 3, and the lower edge may be fixed to the upper part of the rising part 12 of the foundation 2. The protective member 51 may be housed in a horizontally long case with the middle excess part doubled and rolled horizontally, or with the middle part folded vertically like an accordion. The case may be attached along the lower part of the exterior wall of the building main body 3 or the upper part of the rising part 12 of the foundation 2. The case may be installed in a fixed state relative to the building main body 3 or the foundation 2, or may be attached so that a part or all of the case is detached from the building main body 3 or the foundation 2 when the building main body 3 is lifted up or raised.

[0137] It is preferable that the protective members 51 are attached so as to be continuous in the horizontal direction along each side constituting the exterior wall of the building main body 3. If it is not possible to cover each side constituting the exterior wall of the building main body 3 at once, it is preferable to divide the protective member 51 into a plurality of pieces and attach them in a continuous horizontal line.

[0138] <Effects> According to this embodiment, the following effects can be obtained.

[0139] A protective member 51 may be attached to the building body 3 for protecting at least one or both of the water supply pipes 25 and the sewerage pipes 26 connected to the building body 3 when the building body 3 rises. This allows the water supply pipes 25 and the sewerage pipes 26 to be protected by the protective member 51 during a flood, preventing damage to the water supply pipes 25 and the sewerage pipes 26 due to flooding, and preserving the functions of the water supply pipes 25 and the sewerage pipes 26. Therefore, the building 1 has a structure that allows a minimum standard of living to be maintained for a short period of time until the flood subsides and restoration is completed.

[0140] For example, when the protective member 51 is installed individually so as to directly surround the water supply pipe 25 and the sewerage pipe 26, the protective member 51 can directly protect the water supply pipe 25 and the sewerage pipe 26, respectively.

[0141] For example, if the protective member 51 is installed so as to continuously surround the entire outer periphery of the building main body 3, the entire inside of the foundation 2 can be protected, and the water supply piping 25 and sewerage piping 26 can also be indirectly protected.

[0142] In this case, the protective member 51 is, for example, in the form of a roll screen. As a result, the protective member 51 can be installed inconspicuously along the lower part of the outer wall of the building body 3, the upper part of the rising part 12 of the foundation 2, and the outer periphery of the boundary between the outer wall of the building body 3 and the rising part 12 of the foundation 2 during normal times. In addition, during flooding, the protective member 51 can be pulled out by an amount corresponding to the amount of lift or uplift of the building body 3, for example, and cover the space between the lower part of the outer wall of the building body 3 and the rising part 12 of the foundation 2. In addition, even when the protective member 51 is rolled up or folded like a bellows and stored in a case, it functions almost the same as a roll screen.

[0143] Incidentally, the configuration, operation, and effects other than those described above are similar to those of the above embodiment, and therefore the description of the above embodiment serves as a description of this embodiment. EXAMPLES

[0144] <Configuration> The configuration of this embodiment will now be described.

[0145] In this embodiment, as shown in FIG. 8, the building body 3 is provided with at least one or both of a water supply tank 61 and a drainage tank 62.

[0146] Here, the water supply tank 61 is a tank for storing water (tap water) such as drinking water. The water supply tank 61 is installed between the water supply piping 25 and various water faucets and the like installed in the building main body 3. The water supply tank 61 is installed so as to rise and fall integrally with the building main body 3.

[0147] The water supply tank 61 is preferably installed at a position higher than the water faucet of the building body 3 in order to obtain the water supply pressure necessary to supply water into the building body 3. For this purpose, the water supply tank 61 is preferably installed at a high position such as, for example, the upper part of the lower floor, between the ceiling of the lower floor and the floor of the upper floor, on the upper floor, between the ceiling of the upper floor and the roof, or on the roof. The water supply tank 61 can also be installed at a position lower than the water faucet of the building body 3, such as the lower part of the lower floor or under the floor 21 of the lower floor. In this case, a water supply pump for forcibly pumping water is attached to the water supply tank 61. In addition, the water supply tank 61 under the floor 21 of the lower floor can be installed so as to be buried in the floating body 4, for example, and floated by the floating body 4.

[0148] A single water supply tank 61 or multiple water supply tanks 61 may be installed in the building main body 3. When a single water supply tank 61 is installed, the water supply tank 61 may be installed in a position close to a main water faucet in the building main body 3, but may also be installed in the center of the building main body 3 in order to balance the building main body 3 in a floating state. When multiple water supply tanks 61 are installed, the water supply tanks 61 may be installed in separate locations close to the respective water faucets in the building main body 3. Alternatively, the water supply tanks 61 may be installed in separate locations so as to be approximately evenly balanced in each part of the building main body 3, taking into consideration the weight distribution of the building main body 3 and the water supply tanks 61, in order to balance the building main body 3 in a floating state.

[0149] When the water supply tank 61 is provided in the building body 3, the portion of the water supply piping 25 located inside the foundation 2 can be a normal fixed pipe, a flexible or changeable long pipe 27, an expandable pipe 28, or the like. The water supply piping 25 may be configured to come off from the connection with the water supply tank 61 when the building body 3 floats or is lifted up, or when the limit of flexibility, changeability, or expandability is exceeded.

[0150] When the water supply pipe 25 is detached from the water supply tank 61, the water supply tank 61 is provided with a valve device 63 such as a shutoff valve or a check valve at the connection portion with the water supply pipe 25. This valve device 63 prevents the water (water supply) stored inside the water supply tank 61 from flowing out and prevents flood water from entering the water supply tank 61 from the outside.

[0151] When multiple water supply tanks 61 are provided, the multiple water supply tanks 61 can be installed independently and connected to the water supply piping 25 individually. In this case, the valve device 63 is provided for each water supply tank 61. The multiple water supply tanks 61 may also be connected to each other. In this case, the valve device 63 may be provided only in the water supply tank 61 located most upstream and directly connected to the water supply piping 25.

[0152] In addition, it is also possible to provide an independent water supply system within the building main body 3, separate from the water supply piping 25, and install the water supply tank 61 in that water supply system.

[0153] On the other hand, the drainage tank 62 is a tank that temporarily stores wastewater generated in the building main body 3. The drainage tank 62 is installed between the drains of the kitchen, bath, toilet, washroom, etc. provided in the building main body 3 and the sewer pipes 26. The drainage tank 62 is installed so as to rise and fall integrally with the building main body 3. The drainage tank 62 is preferably installed at a position lower than the drainage outlet of the building main body 3, such as under the floor 21 of the lower floor, so that the wastewater flows out of the drainage outlet by gravity or the like. The drainage tank 62 under the floor 21 of the lower floor can be installed so as to be buried in the floating body 4, for example, and floated by the floating body 4.

[0154] A single drainage tank 62 or multiple drainage tanks 62 may be installed in the building body 3. When a single drainage tank 62 is installed, the drainage tank 62 may be installed in a position close to a main drainage outlet in the building body 3, but may also be installed in the center of the building body 3 in order to balance the building body 3 in a floating state. When multiple drainage tanks 62 are installed, each drainage tank 62 may be installed in a distributed manner in a position close to each drainage outlet in the building body 3. Also, each drainage tank 62 may be installed in a distributed manner so that it is approximately evenly balanced in each part of the building body 3, taking into consideration the weight distribution of the building body 3 and the drainage tanks 62, in order to balance the building body 3 in a floating state.

[0155] When the drainage tank 62 is provided in the building body 3, the portion of the sewerage pipe 26 inside the foundation 2 can be a normal fixed pipe, a flexible or changeable long pipe 27, an expandable pipe 28, or the like. The sewerage pipe 26 may be configured to come off from the connection portion with the drainage tank 62 when the building body 3 floats or is lifted up, or when the limit of flexibility, changeability, or expansion is exceeded.

[0156] When the sewer pipe 26 is detached from the drainage tank 62, the drainage tank 62 is provided with a valve device 64 such as a shutoff valve or a check valve at the connection portion with the sewer pipe 26. This valve device 64 prevents the wastewater accumulated inside the drainage tank 62 from leaking out to the outside, and prevents flood water from entering the inside of the drainage tank 62 from the outside.

[0157] When multiple drainage tanks 62 are provided, the multiple drainage tanks 62 can be installed independently and connected to the sewer piping 26 individually. In this case, a valve device 64 is provided for each drainage tank 62. The multiple drainage tanks 62 may also be connected to each other. In this case, the valve device 64 may be provided only in the drainage tank 62 furthest downstream that is directly connected to the sewer piping 26.

[0158] In addition, it is also possible to provide an independent drainage system within the building body 3, separate from the sewer piping 26, and install the drainage tank 62 in that system.

[0159] <Function> The function of this embodiment will now be described.

[0160] Under normal circumstances, the building body 3 is installed in a state in which it is placed on the foundation 2. In the event of a flood, the building body 3 is raised from the foundation 2.

[0161] Then, water (tap water) from the water supply piping 25 outside the building body 3 is normally sent to a water faucet inside the building body 3 via a water supply tank 61. At this time, water is stored in the water supply tank 61, and the water stored in the water supply tank 61 is constantly replaced by discharging water from the faucet.

[0162] In the event of a flood, the building body 3 together with the water supply tank 61 will rise (or be lifted) from the foundation 2, and the water supply piping 25 will come off the water supply tank 61 which has risen together with the building body 3, or will follow it, deforming by the amount that the building body 3 has risen. The water supply piping 25 will come off the water supply tank 61 if it exceeds its limit of deformation. When the water supply piping 25 comes off the water supply tank 61, the valve device 63, such as a shutoff valve or a check valve, will prevent the water stored inside from flowing out to the outside and prevent flood water from entering the tank from the outside.

[0163] If the water supply pipes 25 are not detached from the water supply tank 61, and there is no water outage, water from the water supply pipes 25 is sent to the water faucet in the main building 3 via the water supply tank 61, just as in normal times. If the water supply pipes 25 are detached from the water supply tank 61 or there is a water outage, the water stored in the water supply tank 61 can be sent to the water faucet in the main building 3. The water supply tank 61 can supply water until it is empty.

[0164] On the other hand, wastewater generated within the building body 3 is normally drained from the drain outlet through the drain tank 62 to the external sewer piping 26 by gravity flow, pressure pumping, vacuum suction, etc. At this time, the drain tank 62 is kept empty without wastewater accumulating.

[0165] In the event of a flood, the building body 3 together with the drainage tank 62 will rise (or be lifted) from the foundation 2, and the sewerage pipes 26 outside the building body 3 will either come off the drainage tank 62 which has risen together with the building body 3, or will follow it, deforming by the amount that the building body 3 has risen. If the sewerage pipes 26 exceed their limit of deformation, they will come off the drainage tank 62. When the sewerage pipes 26 come off, the drainage tank 62 will use valve devices 64 such as shutoff valves and check valves to prevent the drainage water stored inside from leaking out to the outside, and to prevent flood water from entering the tank from the outside.

[0166] If the sewer pipe 26 is not disconnected from the drain tank 62, the wastewater from the drain outlet of the building body 3 is drained to the external sewer pipe 26 via the drain tank 62, as in normal times. If the sewer pipe 26 is disconnected from the drain tank 62, the wastewater from the drain outlet is stored in the drain tank 62, which is closed by the valve device 64. The drain tank 62 can store the wastewater until it is full.

[0167] <Effects> According to this embodiment, the following effects can be obtained.

[0168] The building main body 3 may be provided with at least one or both of the water supply tank 61 and the drainage tank 62. In this way, by providing the building main body 3 with at least one or both of the water supply tank 61 and the drainage tank 62, water can be supplied or drained without hindrance even if the water supply pipes 25 and the sewerage pipes 26 become detached from the building main body 3 (its water supply tank 61 and drainage tank 62) during a flood. Water is supplied or drained within the capacity of the water supply tank 61 and the drainage tank 62. Therefore, the building 1 has a structure that allows a minimum standard of living to be maintained for a short period of time during a flood until recovery.

[0169] Incidentally, the configuration, operation, and effects other than those described above are similar to those of the above-mentioned embodiments, and therefore the description of the above-mentioned embodiments serves as a description of this embodiment. [Explanation of symbols]

[0170] 1. Building 2 Basics 3. Main building 4. Floating Body 7 Pillars 21 Under the floor 22 Insulation 25 Water Supply Piping 26 Sewer piping 31 Lifting guide 41 Inner Pillar 42 Outer pillar 43 Telescopic column 46 Roller guide 51 Protective materials 61 Water tank 62 Drainage tank 63 Valve gear 64 Valve gear

Claims

1. A building structure having a foundation and a building body placed on the foundation, The building body is installed on the foundation by a lift guide so as to be able to freely rise and fall, The lift guide is a pillar of the building body erected from the foundation, The lift guide is a telescopic column having a multi-layer structure including an inner column and an outer column, A roller guide is provided between the inner column and the outer column, A building characterized in that the roller-type guides are provided in one or two pairs so as to be located diagonally on the four corner portions of the inner column and the outer column when viewed in a plan view.

2. The building according to claim 1, A building characterized in that stoppers are provided on the outer surface of the upper end of the inner column and on the inner surface of the lower end of the outer column to prevent the outer column from slipping out of the inner column.

3. The building according to claim 1 or 2, At least, a protective member is attached to the building body to protect at least one or both of the water supply pipes and the sewerage pipes connected to the building body when the building body is raised, or Or, the building is characterized in that the building body is equipped with at least one or both of a water supply tank and a drainage tank.

4. A building according to any one of claims 1 to 3, A floating body that floats the building body by buoyancy is installed between the foundation and the building body, The floating body is a heat insulating material installed under the floor of the building body along the inside of the foundation to insulate the under floor and the foundation, A building characterized in that the insulation material acts as a guide when the building body is raised and lowered.

Citation Information

Patent Citations

  • Levitation type small compartment corresponding to tsunami (guide tower type)

    JP2014201303A

  • Building floating up in flood disaster, and construction method of the same

    JP2015148126A

  • Height freely-adjustable building

    JP2017053123A

  • Total disaster-coping isolated space

    JP2017072016A

  • Emergency evacuation equipment for disaster

    JP2018071346A