CRANE EQUIPMENT FOR NUCLEAR FACILITY AND METHOD FOR CONTROLLING SPEED OF LOWERING LOAD IN CRANE EQUIPMENT FOR NUCLEAR FACILITY
The crane device for nuclear facilities addresses the challenge of safely and quickly lowering suspended loads by incorporating an emergency battery system and automatic brake release, enabling controlled speed adjustment during power loss.
Patent Information
- Application Number
- JP2021210231
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-12-24
- Publication Date
- 2024-12-05
- Estimated Expiration
- 2041-12-24
AI Technical Summary
Cranes in nuclear power facilities face challenges in safely and quickly lowering suspended loads such as spent fuel storage containers and new fuel when power is lost, as manual brake release is inefficient and speed control is difficult.
A crane device equipped with an emergency battery system and automatic brake release mechanism, coupled with an emergency lowering auxiliary brake, allows for quick and controlled descent of suspended loads by measuring and adjusting the lowering speed using an emergency centrifugal force limit switch.
Enables safe and rapid lowering of suspended loads even during power outages, ensuring controlled speed and efficient operation of the crane device.
Smart Images

Figure 0007594996000001 
Figure 0007594996000002 
Figure 0007594996000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a crane apparatus for nuclear facilities and a method for controlling the speed at which a load is lowered in a crane apparatus for nuclear facilities, and in particular to a crane apparatus for nuclear facilities that can also respond to a loss of power supply to a crane that lowers loads such as spent fuel storage containers and new fuel in the nuclear facilities, and a method for controlling the speed at which a load is lowered in a crane apparatus for nuclear facilities. [Background technology]
[0002] In a crane used in a nuclear facility, if the power supply to the crane is lost for some reason, there is a risk that the crane will stop with a load such as a spent fuel storage container or fresh fuel suspended, and stopping with the load suspended may cause the load to swing around. This is undesirable from the safety perspective in a nuclear facility.
[0003] Therefore, in the case of cranes used in nuclear facilities, when the power supply is lost, the brakes of the crane are manually released to prevent the crane from stopping with a load such as a spent fuel storage container or new fuel suspended.
[0004] However, the above-mentioned manual brake release method for the crane requires a lot of time and is therefore not an effective means of releasing the brake of the crane in an emergency. Therefore, it is necessary to make it possible to quickly lower the suspended load, such as the spent fuel storage container or fresh fuel, by means other than manual power.
[0005] On the other hand, when the crane brake is released, measures must be taken to ensure that the suspended loads, such as spent fuel storage containers and new fuel, can be lowered at a safe speed.
[0006] Patent Document 1 describes a fuel handling device for loading and unloading reactor core fuel in a nuclear power plant.
[0007] Patent Document 1 does not use a crane to load or unload core fuel, but in order to obtain a fuel handling device that can reduce cables without significantly affecting the workability around the fuel handling device, it describes a fuel handling device that includes a running rail installed on the floor, a bridge that runs on the running rail, a traverse rail having a first rail and a second rail that are installed as a pair on the bridge, and a trolley that runs on the traverse rail, a first battery provided movably along the first rail or the second rail and detachable from the trolley; a first charging device provided on the bridge and charging the first battery; a second battery provided movably along the first rail or the second rail and detachable from the trolley; and a second charging device provided on the bridge and charging the second battery; The second battery is described as being provided on one of the first and second rails on which the first battery is not provided, or on the same rail as the first battery, and on the opposite side of the bridge from the first battery, in a fuel handling device. [Prior art documents] [Patent documents]
[0008] [Patent Document 1] JP 2018-25447 A Summary of the Invention [Problem to be solved by the invention]
[0009] However, when the power supply to a crane used in the above-mentioned nuclear facility is lost and the brake of the crane is manually released, the reduction gear does not start, and there is a risk that the speed at which the load is lowered cannot be controlled depending on the weight of the object being suspended (e.g., spent fuel storage container, new fuel, etc.).
[0010] Therefore, in the prior art, when a crane loses power while hanging a load such as a spent fuel storage container or fresh fuel at a nuclear facility, it has been difficult to quickly and safely lower the load, and the above-mentioned Patent Document 1 does not disclose any solutions to the above-mentioned problems.
[0011] The present invention has been made in consideration of the above-mentioned points, and its first object is to provide a crane apparatus for a nuclear facility that can quickly and safely lower a suspended load, such as a spent fuel storage container or new fuel at a nuclear facility, even if the power supply to the crane is lost.
[0012] A second object of the present invention is to provide a method for controlling the speed at which a load is lowered in a crane apparatus for use in nuclear power facilities, the speed at which a load is lowered can be controlled. [Means for solving the problem]
[0013] In order to achieve the first object described above, the crane device for nuclear facilities of the present invention comprises a girder, a trolley installed on the upper part of the girder, and a normal power supply control device and an emergency battery device built into the inside of the girder, and is capable of traveling on a crane traveling rail by a girder traveling wheel installed on the girder, A crane apparatus for suspending and transporting equipment for a nuclear facility, the crane apparatus being configured such that during normal operation of the crane, power is supplied from the normal power supply control device to the entire crane via normal electrical wiring, and when power supply supplied to the crane is lost, power is supplied from the emergency battery device via emergency electrical wiring to a device used for emergency suspension of a load, The trolley is characterized by being equipped with at least a disc brake that operates during normal operation of the crane, an emergency brake release device that automatically releases the disc brake when power is lost to the crane, and an emergency lowering auxiliary brake that adjusts the hoisting speed of the load when power is lost to the crane.
[0014] In addition, in order to achieve the second object described above, the method for controlling the hoisting speed of a load in a crane apparatus for nuclear facilities of the present invention comprises a girder, a trolley installed on the upper part of the girder, and a normal power supply control device and an emergency battery device built into the inside of the girder, and is capable of traveling on a crane traveling rail by a girder traveling wheel installed on the girder, During normal operation of the crane, power is supplied from the normal power supply control device to the entire crane via the normal electrical wiring, and when the power supply supplied to the crane is lost, power is supplied from the emergency battery device via the emergency electrical wiring to a device used for emergency suspension of the load. The trolley is equipped with a disk brake that operates during normal operation of the crane, an emergency brake release device that automatically releases the disk brake when power to the crane is lost, an emergency lowering auxiliary brake that adjusts the hoisting speed of the load when power to the crane is lost, an emergency centrifugal limit switch, and a main hoist drum, The emergency centrifugal limit switch measures the rotation speed of the main hoist drum to detect the load lowering speed, and if the load lowering speed is faster than a preset speed, the emergency lowering auxiliary brake is activated to reduce the load lowering speed to the preset speed. Effect of the Invention
[0015] According to the present invention, when a crane is used to lower a suspended load such as a spent fuel storage container or new fuel at a nuclear facility, even if the power supply to the crane is lost, the load can be lowered quickly and safely, and the speed at which the load is lowered can be controlled. [Brief description of the drawings]
[0016] [Figure 1]1 is a schematic configuration diagram showing a first embodiment of a crane apparatus for a nuclear facility according to the present invention; [Diagram 2] FIG. 1 is a plan view showing a schematic configuration of a trolley in a first embodiment of a crane apparatus for a nuclear facility according to the present invention. [Diagram 3] FIG. 2 shows the schematic configuration of a disk brake, an emergency brake release device, and an emergency lowering auxiliary brake in the first embodiment of the crane equipment for a nuclear facility of the present invention, and is a diagram showing the state during braking. [Figure 4] FIG. 2 shows the schematic configuration of a disk brake, an emergency brake release device, and an emergency lowering auxiliary brake in the first embodiment of the crane equipment for a nuclear facility of the present invention, and is a diagram showing the state when the brakes are released. [Diagram 5] FIG. 2 is a diagram showing a detailed configuration of a portion of an emergency brake release device in the first embodiment of the crane equipment for a nuclear facility of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] Hereinafter, a crane apparatus for a nuclear facility and a method for controlling the hoisting speed of a load in the crane apparatus for a nuclear facility of the present invention will be described based on the illustrated embodiment. Note that the same reference numerals are used for the same components in each drawing. EXAMPLES
[0018] FIG. 1 shows a crane apparatus 100 for a nuclear facility according to a first embodiment of the present invention. The nuclear facility crane apparatus 100 of this embodiment shown in the figure has a structure in which a trolley 2 is installed on the upper part of a girder 1, and lighting 3 is installed inside the lower part of the girder 1. A normal power supply control device 4 and an emergency battery device 5 are also built into the girder 1, and this emergency battery device 5 can be charged at all times during normal operation of the nuclear facility crane apparatus 100, and can supply power to the crane's cab, lighting 3, and an emergency motor 30 described later. An auxiliary hoisting device 6, a main hoisting device 7, and a trolley traverse wheel 8 are installed on the trolley 2.
[0019] In addition, the nuclear facility crane device 100 is structured so as to be able to travel on the crane travel rails 10 by means of the girder travel wheels 9 installed on the girder 1.
[0020] During normal operation of the nuclear facility crane equipment 100, power is supplied to the entire crane from the normal power supply control device 4 via the normal electrical wiring 11, and further, the emergency battery equipment 5 can be constantly charged from the normal power supply control device 4 via the emergency electrical wiring 12.
[0021] In addition, in the event of a power loss, such as when the power supply to the nuclear facility crane equipment 100 is lost, it is possible to supply power from the emergency battery equipment 5 via the emergency electrical wiring 12 to the lighting 3 and the equipment used for emergency suspension of a load.
[0022] The trolley 2 shown in Figure 2 is equipped with an auxiliary hoisting drum 13, an auxiliary hoisting reduction gear 14, and an emergency brake release device 15.Furthermore, the trolley 2 is equipped with a service motor 16, a disc brake 17, a main hoisting drum 18, a main hoisting reduction gear 19, an emergency centrifugal limit switch 20, and an emergency lowering auxiliary brake 21.
[0023] The trolley 2 in this embodiment is structured so as to be capable of traversing on the trolley traversing rails 22 using the trolley traversing wheels 8.
[0024] During normal operation of the nuclear facility crane equipment 100, the auxiliary hoisting device 6 (consisting of an auxiliary hoisting drum 13 and an auxiliary hoisting reduction gear 14) is used for the purpose of transporting suspended loads such as tools used when transporting casks, etc., and the normal motor 16 is operated using power supplied from the normal power control device 4, and the disc brake 17, the main hoisting drum 18, and the main hoisting reduction gear 19 are operated, making it possible to hoist and lower suspended loads such as spent fuel storage containers and new fuel.
[0025] In addition, when power is lost to the nuclear facility crane equipment 100, the emergency brake release device 15 can be operated using power supplied by the emergency battery device 5, thereby enabling the applied disc brake 17 to be released.
[0026] In addition, a normal power supply control device 4 is installed inside the girder 1, and an emergency centrifugal limit switch 20 is installed on the side of the main hoisting drum 18. By using this emergency centrifugal limit switch 20, the rotation speed of the main hoisting drum 18 can be measured and the hoisting speed of the load can be detected.
[0027] If the detected lowering speed of the load is faster than a preset speed, the emergency lowering auxiliary brake 21 is applied to reduce the load lowering speed to the set speed, making it possible to lower the load at or below the set speed.
[0028] 3 and 4 show schematic configurations of the disc brake 17, emergency brake release device 15, and emergency lowering auxiliary brake 21 shown in FIG. 2, and FIG. 5 shows a detailed configuration of a portion of the emergency brake release device 15.
[0029] As shown in FIGS. 3 and 4 , the disc brake 17 is composed of a service disc 23 , a service thruster 24 , a service brake spring 25 , a service brake lever 26 , a service brake shoe 27 , a service brake shoe lever 28 and a service main spindle 29 .
[0030] In addition, the emergency brake release device 15 is composed of an emergency motor 30, a shaft 31, a spur gear 32 and a rack 33.
[0031] Furthermore, the emergency lowering auxiliary brake 21 is composed of an emergency disc 34, an emergency thruster 35, an emergency brake spring 36, an emergency brake lever 37, an emergency brake shoe 38, an emergency brake shoe lever 39 and an emergency main spindle 40. During normal operation of the crane equipment 100 for nuclear facilities, the emergency brake release device 15 and the emergency lowering auxiliary brake 21 are not activated, and are not intended to affect the operation of the crane equipment 100 for nuclear facilities.
[0032] To release the disc brake 17, when power is applied to the service thruster 24, the rod of the service thruster 24 rises, lifting the service brake lever 26. Then, the service main spindle 29 is pressed, and a force is applied in the direction in which the service brake shoe lever 28 opens (left and right direction in Fig. 3), causing the service brake shoe 27 to open and release the support of the service disc 23 (state from Fig. 3 to Fig. 4). The disc brake 17 is released by the service brake shoe 27, making it possible to hoist and lower the load.
[0033] On the other hand, when the power supply to the nuclear facility crane equipment 100 is lost, the rod of the service thruster 24 of the disk brake 17 is lowered, thereby applying the brake. At that time, the emergency motor 30 of the emergency brake release device 15 is started, and the shaft 31 and the spur gear 32 are rotated to pull the rack 33 (see FIG. 5), which takes the place of the lifting of the rod of the service thruster 24, thereby enabling the release of the applied disk brake 17.
[0034] Furthermore, when controlling the hoisting speed of the load when the nuclear facility crane equipment 100 loses power, the rod of the emergency thruster 35 of the emergency hoisting auxiliary brake 21 is lowered, and the emergency brake lever 37 is lowered by the emergency brake spring 36. As a result, the emergency main spindle 40 is pulled by the force of the lever, so that the emergency brake shoe lever 39 is pressed in the closing direction (left and right direction in FIG. 3), and the emergency brake shoe 38 pinches the emergency disc 34, thereby braking the disc brake 17 and making it possible to control the hoisting speed of the load.
[0035] According to this embodiment, when lowering a suspended load such as a spent fuel storage container or new fuel at a nuclear facility using the nuclear facility crane apparatus 100 of this embodiment described above, even if the power supply to the nuclear facility crane apparatus 100 is lost, the load can be lowered quickly and safely, and the lowering speed of the load can be controlled.
[0036] The present invention is not limited to the above-described embodiments, and includes various modified examples. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to those including all of the configurations described. In addition, it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is possible to add, delete, or replace a part of the configuration of each embodiment with another configuration. [Explanation of symbols]
[0037] 1... girder, 2... trolley, 3... lighting, 4... normal power supply control device, 5... emergency battery device, 6... auxiliary hoisting device, 7... main hoisting device, 8... trolley traverse wheel, 9... girder running wheel, 10... crane running rail, 11... normal electrical wiring, 12... emergency electrical wiring, 13... auxiliary hoisting drum, 14... auxiliary hoisting reduction gear, 15... emergency brake release device, 16... normal motor, 17... disc brake, 18... main hoisting drum, 19... main hoisting reduction gear, 20... emergency centrifugal limit switch, 21... emergency lowering auxiliary brake, 22... trolley lateral running rail, 23...service disc, 24...service thruster, 25...service brake spring, 26...service brake lever, 27...service brake shoe, 28...service brake shoe lever, 29...service main spindle, 30...emergency motor, 31...shaft, 32...spur gear, 33...rack, 34...emergency disc, 35...emergency thruster, 36...emergency brake spring, 37...emergency brake lever, 38...emergency brake shoe, 39...emergency brake shoe lever, 40...emergency main spindle, 100...crane equipment for nuclear equipment.
Claims
1. The crane is provided with a girder, a trolley installed on the upper part of the girder, and a normal power supply control device and an emergency battery device built into the inside of the girder. The girder running wheels installed on the girder can run on a crane running rail. A crane apparatus for suspending and transporting equipment for a nuclear facility, the crane apparatus being configured such that during normal operation of the crane, power is supplied from the normal power supply control device to the entire crane via normal electrical wiring, and when power supply supplied to the crane is lost, power is supplied from the emergency battery device via emergency electrical wiring to a device used for emergency suspension of a load, The trolley is equipped with at least a disc brake that operates during normal operation of the crane, an emergency brake release device that automatically releases the disc brake when power is lost to the crane, and an emergency lowering auxiliary brake that adjusts the hoisting speed of the load when power is lost to the crane.
2. The crane apparatus for a nuclear facility according to claim 1, The trolley further comprises an emergency centrifugal limit switch and a main hoist drum, and the emergency centrifugal limit switch measures the rotational speed of the main hoist drum to detect the hoisting speed of the load, and if the hoisting speed of the load is faster than a preset speed, the emergency hoisting auxiliary brake is activated, and the hoisting speed of the load is decelerated to the set speed.
3. The crane apparatus for a nuclear facility according to claim 1 or 2, When power to the crane is lost, the emergency brake release device is activated using power supplied by the emergency battery device, thereby releasing the disc brake.
4. The crane apparatus for a nuclear facility according to claim 3, A crane apparatus for a nuclear facility, characterized in that the emergency battery device is constantly charged from the normal power supply control device via emergency electrical wiring.
5. The crane apparatus for a nuclear facility according to claim 4, A crane apparatus for nuclear facilities, characterized in that, when power to the crane is lost, power is supplied from the emergency battery device via the emergency electrical wiring to the lighting installed on the trolley and to the device used for emergency suspension of the load.
6. A crane apparatus for a nuclear facility according to any one of claims 1 to 5, A crane apparatus for a nuclear facility, characterized in that the emergency battery device can be charged at all times during normal operation of the crane, and supplies power to the operator's cab, lighting, or emergency motor of the crane.
7. A crane apparatus for a nuclear facility according to any one of claims 1 to 6, During normal operation of the crane, an auxiliary hoisting device consisting of an auxiliary hoisting drum and an auxiliary hoisting reduction gear is used, and the electric power supplied from the normal power control device is used to operate the normal motor, thereby operating the disc brake, the main hoisting drum, and the main hoisting reduction gear, thereby enabling the hoisting and lowering of the load. This crane apparatus for nuclear facilities is characterized in that
8. The crane apparatus for a nuclear facility according to claim 1, The disc brake comprises a service disc, a service thruster, a service brake spring, a service brake lever, a service brake shoe, a service brake shoe lever and a service main spindle; The emergency brake release device comprises an emergency motor, a shaft, a spur gear and a rack; The emergency lowering auxiliary brake comprises an emergency disc, an emergency thruster, an emergency brake spring, an emergency brake lever, an emergency brake shoe, an emergency brake shoe lever and an emergency main spindle; During normal operation of the nuclear facility crane equipment, the emergency brake release device and the emergency lowering auxiliary brake are not activated, and the disc brake is released in such a manner that when power is applied to the service thruster, the rod of the service thruster rises, the service brake lever 26 is raised, and the service main spindle is pushed, and a force is applied in the direction in which the service brake shoe lever opens, causing the service brake shoe to open and releasing the support of the service disc, and the disc brake by the service brake shoe is released, thereby hoisting and lowering the load. On the other hand, when power to the crane equipment for nuclear facilities is lost, the rod of the service thruster of the disk brake is lowered to apply the brake, and at that time, the emergency motor of the emergency brake release device is started and the shaft and the spur gear are rotated to pull the rack, thereby releasing the braked disk brake.
9. The crane apparatus for a nuclear facility according to claim 8, When power is lost, the crane equipment for nuclear facilities is characterized in that the emergency brake lever is lowered by the emergency brake spring by lowering the rod of the emergency thruster of the emergency lowering auxiliary brake, the emergency main spindle is pulled by a lever force and pressed in the direction in which the emergency brake shoe lever is closed, and the emergency disc is clamped by the emergency brake shoe, thereby braking the disc brake and controlling the lowering speed of the load.
10. The crane is provided with a girder, a trolley installed on the upper part of the girder, and a normal power supply control device and an emergency battery device built into the inside of the girder. The girder running wheels installed on the girder can run on a crane running rail. During normal operation of the crane, power is supplied from the normal power supply control device to the entire crane via the normal electrical wiring, and when the power supply supplied to the crane is lost, power is supplied from the emergency battery device via the emergency electrical wiring to a device used for emergency suspension of the load. The trolley is equipped with a disk brake that operates during normal operation of the crane, an emergency brake release device that automatically releases the disk brake when power to the crane is lost, an emergency lowering auxiliary brake that adjusts the hoisting speed of the load when power to the crane is lost, an emergency centrifugal limit switch, and a main hoist drum, A method for controlling the hoisting speed of a load in a crane apparatus for nuclear facilities, characterized in that the emergency centrifugal limit switch measures the rotational speed of the main hoist drum to detect the hoisting speed of the load, and if the hoisting speed of the load is faster than a preset speed, the emergency hoisting auxiliary brake is activated to decelerate the hoisting speed of the load to the set speed.
11. A method for controlling a load hoisting speed in a crane apparatus for a nuclear facility according to claim 10, comprising: The emergency lowering auxiliary brake comprises an emergency disc, an emergency thruster, an emergency brake spring, an emergency brake lever, an emergency brake shoe, an emergency brake shoe lever and an emergency main spindle; A method for controlling the speed at which a load is lowered in a crane apparatus for a nuclear facility, characterized in that when power is lost, the rod of the emergency thruster of the emergency lowering auxiliary brake is lowered, thereby lowering the emergency brake lever by the emergency brake spring, and the emergency main spindle is pulled by a lever force and pressed in the direction in which the emergency brake shoe lever closes, and the emergency disc is clamped by the emergency brake shoe, thereby braking the disc brake and controlling the speed at which the load is lowered.
Citation Information
Patent Citations
JP1976073472U
Winding-down device for crane
JP1986037696A
JP1990007289U
Electric hoist with emergency brake releasing device
JP1995069582A
Electric hoist
JP1996324978A
