The utility model relates to the field of
tellurium production of
tellurium-
zinc-
cadmium purification, in particular to a
distillation preposed preheating device for
tellurium purification of tellurium-
zinc-
cadmium, which comprises a box body and a heating device, the box body comprises a front side plate, a rear side plate, a bottom plate and a top plate, a feed port is arranged on the front side plate, a
discharge port is arranged on the rear side plate, and the heating device is arranged on the bottom plate. The bottom plate is provided with an S-shaped rail groove communicated with the feeding port and the discharging port, a first partition plate and a second partition plate are arranged in the box body and divide the interior of the box body into a first cavity, a second cavity and a third cavity, the heating device comprises a hot chamber, a burner, a draught fan and an air outlet
pipe, the burner is communicated with the interior of the hot chamber, and the draught fan is communicated with the interior of the hot chamber. The air outlet
pipe comprises a main
pipe, a first
branch pipe and a second
branch pipe, the first
branch pipe and the second branch pipe are communicated with the main pipe, the first branch pipe is communicated with the right side end of the first cavity, the second branch pipe is communicated with the left side end of the second cavity, the second branch pipe is connected with a third branch pipe, and the third branch pipe is communicated with the upper end of the third cavity. And the
discharge port is rotationally connected with a second baffle plate.