RECOMMENDED ACTION OUTPUT SYSTEM, RECOMMENDED ACTION OUTPUT METHOD, AND PROGRAM

The recommended behavior output system addresses the challenge of balancing electricity supply and demand in electric vehicle charging by using user action plans and charger information to optimize charging times and locations, ensuring user convenience.

JP7595310B2Active Publication Date: 2024-12-06PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2022503162
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-02-27
Filing Date
2021-01-22
Publication Date
2024-12-06
Estimated Expiration
2041-01-22

AI Technical Summary

Technical Problem

Existing systems for balancing electricity supply and demand in power systems, such as those for electric vehicle charging, do not consider user convenience, potentially impairing user experience.

Method used

A recommended behavior output system that includes a server device to acquire user action plans, battery storage information, and charger locations, predicting electricity demand trends to recommend optimal charging times and positions, thereby balancing supply and demand while maintaining user convenience.

Benefits of technology

The system effectively balances electricity supply and demand while minimizing inconvenience to users by recommending charging times and locations based on user schedules and charger availability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007595310000001
    Figure 0007595310000001
  • Figure 0007595310000002
    Figure 0007595310000002
  • Figure 0007595310000003
    Figure 0007595310000003
Patent Text Reader

Abstract

A recommended action output system (100) is provided with: a communication unit (121) for acquiring action plan information that includes the action plan of the user of a vehicle (110) having a storage cell mounted thereto and storage information that includes the storage capacity of the storage cell of the vehicle (110) and the storage amount of the storage cell at the present point of time; a control unit (122) for acquiring charger information that includes the location of a vehicle charger (141) installed in a specific region; a prediction unit (122a) for predicting the time transition of electric power demand in the specific region; a determination unit (122b) for determining, on the basis of the action plan information, storage information, and charger information, the charge timing of the storage cell recommended to the user and a charge location that indicates the location of the vehicle charger (141) that charges the storage cell, so that a peak demand in the predicted time transition of electric power demand is reduced; and a communication unit (121) for outputting recommended information that includes the determined charge timing and charge location.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a system for outputting recommended actions, a method for outputting recommended actions, and a program. [Background technology]

[0002] In recent years, electrification has progressed in various areas, such as the spread of all-electric homes and the introduction of electric vehicles, and it is expected that this trend will accelerate in the future. There are concerns that this progress in electrification will increase the load on the power supply system. For example, the increased load caused by charging electric vehicles could disrupt the balance between power supply and demand, and cause a deterioration in the power quality of the power grid.

[0003] Therefore, Patent Document 1 discloses a charging control method for guiding the required number of electric vehicles to charging stations at the required time and controlling the charging power to each electric vehicle at each charging station in order to balance the supply and demand of electricity in a power grid. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2012-48286 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, the technology of Patent Document 1 does not take into consideration user convenience, and therefore the technology of Patent Document 1 may impair user convenience.

[0006] Therefore, the present invention provides a recommended action output system, a recommended action output method, and a program that can maintain convenience for users and balance the supply and demand of electricity. [Means for solving the problem]

[0007] A recommended behavior output system according to one embodiment of the present invention includes a first acquisition unit that acquires behavior plan information including a behavior plan of a user of a vehicle equipped with a storage battery; a second acquisition unit that acquires power storage information including the power storage capacity of the storage battery of the vehicle and the current amount of power stored in the storage battery; a third acquisition unit that acquires charger information including locations of vehicle chargers installed within a specific area; a prediction unit that predicts the time trend of power demand in the specific area; a determination unit that determines a charging timing of the storage battery recommended to the user and a charging location indicating the location of a vehicle charger for charging the storage battery based on the behavior plan information, the power storage information, and the charger information so as to reduce peak demand in the time trend of the predicted power demand; and an output unit that outputs recommendation information including the determined charging timing and charging location.

[0008] A recommended behavior output method according to one embodiment of the present invention acquires action plan information including an action plan of a user of a vehicle equipped with a storage battery, acquires power storage information including the storage capacity of the vehicle's storage battery and the current amount of power stored in the storage battery, acquires charger information including the locations of a number of vehicle chargers installed within a specific area, predicts the time progression of electricity demand in the specific area, and based on the action plan information, the power storage information, and the charger information, determines a charging timing for the storage battery recommended to the user and a charging location indicating the location of a vehicle charger for charging the storage battery so as to reduce peak demand in the time progression of the predicted electricity demand, and outputs recommendation information including the determined charging timing and charging location.

[0009] A program according to one aspect of the present invention is a program for causing a computer to execute the above-mentioned recommended action output method. Effect of the Invention

[0010] According to the recommended behavior output system and the like according to one aspect of the present invention, it is possible to maintain convenience for users and to balance the supply and demand of electricity. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is a diagram showing an overview of the energy management system. [Diagram 2] FIG. 2 is a diagram showing an example of daily changes in electricity demand. [Diagram 3] FIG. 3 is a diagram showing an example of daily changes in real electricity demand. [Figure 4] FIG. 4 is a block diagram showing a functional configuration of a system for outputting recommended actions according to an embodiment. [Figure 5A] FIG. 5A is a diagram illustrating an example of action plan information according to the embodiment. [Figure 5B] FIG. 5B is a diagram illustrating an example of power accumulation information according to the embodiment. [Figure 5C] FIG. 5C is a diagram illustrating an example of charger information according to the embodiment. [Figure 6] FIG. 6 is a flowchart showing the operation of the system for outputting recommended actions according to the embodiment. [Figure 7] FIG. 7 is a flowchart showing a first example of the process of determining the charging timing and the charging position shown in FIG. [Figure 8] FIG. 8 is a flowchart showing a second example of the process of determining the charging timing and the charging position shown in FIG. [Figure 9] FIG. 9 is a flowchart showing a third example of the process of determining the charging timing and the charging position shown in FIG. [Figure 10] FIG. 10 is a flowchart showing a fourth example of the process of determining the charging timing and the charging position shown in FIG. [Figure 11] FIG. 11 is a flowchart illustrating an example of a process for generating the recommendation information illustrated in FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] (How the present invention was arrived at) In recent years, as problems with the conventional large-scale centralized energy system have become apparent and the introduction of renewable energy has expanded, there has been a shift to a distributed energy system that utilizes relatively small-scale energy resources that are distributed locally, and distributed energy resources introduced on the consumer side, such as cogeneration systems such as solar power generation or household fuel cells, stationary storage batteries, electric vehicles, private power generation equipment, negawatts (saving electricity), etc., are becoming more widespread. Examples of energy consumption on the consumer side include lighting equipment, air conditioning equipment, heat pump water heaters, etc. installed in homes, and production equipment installed in factories, etc.

[0013] Although each of these distributed energy resources owned by homes or factories is small, a mechanism and concept called a "virtual power plant (VPP)" has been proposed that uses advanced energy management technology that utilizes IoT (Internet of Things) to aggregate these resources and perform remote, integrated control to use them to adjust the balance of power supply and demand and function as if they were a single power plant (see Figure 1). Figure 1 is a diagram showing the overview of an energy management system 1.

[0014] As shown in Fig. 1, the energy management system 1 is a system that collectively manages the energy of multiple consumers, treating the multiple consumers as one group (community), for the purpose of reducing the amount of energy in the entire community and effectively utilizing renewable energy in the multiple consumers. The energy management system 1 also includes a community, a resource aggregator (power aggregator), and an aggregation coordinator. Note that the numbers of communities, resource aggregators, and aggregation coordinators included in the energy management system 1 are not limited to the numbers shown in Fig. 1.

[0015] Each community is composed of multiple consumers. The resource aggregator and aggregation coordinator are businesses that perform integrated control of consumer-side energy resources, distributed energy resources, etc., and provide energy services from a virtual power plant (VPP). In other words, the resource aggregator and aggregation coordinator are businesses that supply energy to multiple consumers. The resource aggregator is provided, for example, in each community and performs power control for multiple consumers in the community. Power and information are transmitted and received between the resource aggregator and the multiple consumers. Note that a VPP is a system that performs integrated control of power generation facilities, energy resources, etc. scattered on a power grid, and controls them as if they were one power plant (virtual power plant). The aggregation coordinator bundles the amount of power controlled by the resource aggregator, and performs power trading with so-called power companies, such as power transmission and distribution companies or retail electricity companies.

[0016] In recent years, electric vehicles, including electric cars equipped with storage batteries (on-board storage batteries) that can also be used as an energy resource in such an energy management system 1, have rapidly become popular. An electric vehicle refers to a vehicle that can run using electricity as its power source, and includes vehicles that are powered only by electricity (so-called electric vehicles: EVs), vehicles that are powered by electricity and other energy sources (for example, fuel such as gasoline) (so-called hybrid vehicles: HVs), and hybrid vehicles equipped with an external charging function (so-called plug-in hybrid vehicles: PHVs). A vehicle refers to a machine that can run on roads, and includes two-wheeled vehicles, three-wheeled vehicles, four-wheeled vehicles, and the like. It is predicted that EVs in particular will become more popular in the future.

[0017] Here, the change in electricity demand will be explained with reference to FIG. 2. FIG. 2 is a diagram showing an example of daily changes in electricity demand (Source: Federation of Electric Power Companies of Japan website, [searched on February 21, 2020], Internet<URL:https: / / www.fepc.or.jp / enterprise / jigyou / japan> ) Figure 2 shows an example of daily changes in electricity demand for a representative year from 1975 to 2016.

[0018] As shown in Figure 2, the demand for electricity increases during the day and reaches a daily peak demand. For example, the daily peak demand is reached around 3 p.m. (3 p.m.). The demand for electricity decreases from the evening and reaches a minimum in the morning. For example, the daily minimum demand is reached around 5 a.m.

[0019] In recent years, the number of consumers who own power generation facilities that utilize natural energy, such as solar power generation facilities, has been increasing, and this number is expected to continue to increase. For example, solar power generation is a power generation method that converts sunlight into electricity, and generates electricity mainly during the day. Solar power generation can hardly generate electricity at night, when there is almost no sunlight.

[0020] The real power demand in the energy management system 1 including such consumers will be described with reference to FIG. 3. FIG. 3 is a diagram showing an example of daily changes in real power demand (Source: Jonathan Coignard et al. 2018 Environmental Research Letters, California Independent System Operator). Note that real power demand is the net power demand obtained by subtracting the amount of power generated by consumers, such as solar power generation, from the actual power consumption, and is the amount of power that consumers of the energy management system 1 require to be supplied from the power company. FIG. 3 also shows an example of typical daily changes in real power demand from 2013 to 2020.

[0021] As shown in Figure 3, real electricity demand drops significantly during the day when solar power generation is high, but demand increases in the evening when solar power generation is low. This reversal of the supply and demand balance between daytime and evening is called the duck curve phenomenon. During the day, electricity is generated by consumers through solar power generation and other sources, so real electricity demand decreases. In the evening, the amount of electricity generated by consumers through solar power generation and other sources decreases, and electricity usage by consumers increases as office workers and others return home, so real electricity demand increases. The duck curve phenomenon is becoming more pronounced every year.

[0022] Such a duck curve phenomenon leads to a deterioration in the quality of power in the power grid. In addition, it is predicted that in the future, as the number of consumers who own solar power generation facilities increases, the actual power demand during the day will further decrease, and as the number of electric vehicles increases, the actual power demand in the evenings will further increase. For example, let us consider a case where dozens of houses in a complex of tens to hundreds of houses own EVs, the complex has multiple charging stations where EVs can be charged, and the residents of the dozens of houses return home from work or the like in the evenings. In this case, if the residents of the dozens of houses charge their EVs after returning home, the actual power demand in the complex in the evenings may suddenly increase.

[0023] If this phenomenon occurs in each power grid system, it is predicted that the evening ramp-up (the phenomenon in which supply output increases suddenly) will become even steeper. This means that the duck curve phenomenon will become even more pronounced, which will lead to a further deterioration of the power quality of the power grid. Furthermore, a pronounced duck curve phenomenon is undesirable from the perspective of energy costs.

[0024] Therefore, even in a situation where the amount of power generated by consumers increases and the number of electric vehicles increases, it is necessary to balance the supply and demand of electricity. In addition, a measure such as simply charging an electric vehicle during the day requires the user to go out of his / her way to charge the electric vehicle during the day, which is inconvenient. Therefore, the inventors of the present application have conducted extensive research into balancing the supply and demand of electricity while maintaining the convenience of the user, and have invented a recommended action output system and a recommended action output method described below. Note that balancing the supply and demand of electricity in this application means, for example, reducing the peak demand of real electricity demand. In the case of a daily change in real electricity demand as shown in FIG. 3, it is preferable to balance the supply and demand of electricity by reducing the peak demand of real electricity demand after the evening.

[0025] The charging station may be a charging / discharging station (e.g., EV Power Station (registered trademark)) that normally charges the secondary battery of an electric vehicle and discharges the secondary battery of the electric vehicle in an emergency when the power supply is stopped due to a power outage in the power grid, etc., to meet the power demand in an apartment building, etc.

[0026] Hereinafter, the embodiments will be described with reference to the drawings. Note that the embodiments described below are all comprehensive or specific examples. The numerical values, components, steps, and order of steps shown in the following embodiments are merely examples and are not intended to limit the present invention.

[0027] In addition, each drawing is a schematic diagram and is not necessarily a precise illustration. In addition, in each drawing, the same reference numerals are used for substantially the same configuration, and duplicated explanations may be omitted or simplified.

[0028] In addition, in this specification, terms indicating relationships between elements, such as coincidence, as well as numerical values ​​and numerical ranges, are not expressions that only indicate a strict meaning, but are expressions that include a substantially equivalent range, for example, a difference of about a few percent.

[0029] (Embodiment) [1. Configuration of the recommended action output system] First, the configuration of the system for outputting recommended actions will be described with reference to Fig. 4. Fig. 4 is a block diagram showing the functional configuration of the system for outputting recommended actions 100 according to this embodiment.

[0030] As shown in FIG. 4, the recommended action output system 100 includes a vehicle 110, a server device 120, an information terminal 130, and a charging station 140.

[0031] Vehicle 110 is an electric vehicle used by user U. Vehicle 110 is an automobile, but may be, for example, a taxi, a bus, or the like. Vehicle 110 is equipped with a battery. The battery is configured to include, for example, a plurality of secondary batteries. The secondary battery is, for example, a lithium ion secondary battery, but is not limited thereto, and may be any secondary battery used for electric vehicles, such as a nickel-metal hydride secondary battery. Hereinafter, the secondary battery will also be referred to as a storage battery. User U is an example of a user of vehicle 110.

[0032] Vehicle 110 is communicatively connected to server device 120. Vehicle 110 outputs to server device 120 power storage information (see FIG. 5B described later) including the power storage capacity of a battery mounted on vehicle 110 and the current amount of power stored in the battery.

[0033] The server device 120 executes a process for balancing the supply and demand of electricity while maintaining the convenience of the user U. The server device 120 determines the charging timing of the storage battery of the vehicle 110 and the charging position indicating the position of the vehicle charger 141 that charges the storage battery, for balancing the supply and demand of electricity while maintaining the convenience of the user U, based on the action plan information including the action plan of the user U of the vehicle 110 and the power storage information of the storage battery of the vehicle 110. Then, the server device 120 notifies the user U of the determined charging timing and information indicating the charging position via the information terminal 130. The server device 120 has a communication unit 121, a control unit 122, and a storage unit 123. In the following description, the "charging timing of the storage battery of the vehicle 110" may be simply referred to as the "charging timing of the vehicle 110".

[0034] The communication unit 121 is a communication circuit (communication module) for the server device 120 to communicate with the vehicle 110, the information terminal 130, the charging station 140, etc. The communication unit 121 transmits and receives various information under the control of the control unit 122.

[0035] The control unit 122 is a control device that controls each component of the server device 120. The control unit 122 acquires the action plan information of the user U, the power storage information of the vehicle 110, and the charger / discharger information of the vehicle charger 141 of the charging station 140, and stores them in the storage unit 123. The control unit 122 may acquire the action plan information from the information terminal 130, or may acquire the action plan information from another server device that manages a schedule. The action plan information may be acquired, for example, via a dedicated application. The control unit 122 may acquire, for example, from the information terminal 130, action plan information based on the action plan of the user U inputted via a dedicated application installed in the information terminal 130 of the user U. The control unit 122 may acquire the action plan information by predicting the action plan of the user U.

[0036] The control unit 122 may obtain the action plan information before executing the action shown in the action plan, for example. The control unit 122 may obtain the action plan information for the next day and after today, for example. This allows the server device 120 to determine the charging timing and charging location for tomorrow and after today and notify the user U.

[0037] Furthermore, the control unit 122 may acquire power storage information of a battery mounted on the vehicle 110 from the vehicle 110, or may acquire the power storage information from another server device that manages the power storage information. Furthermore, the control unit 122 may acquire charger information including the position of the vehicle charger 141 from a charging station 140 that has a vehicle charger 141 capable of charging the storage battery of the vehicle 110, or may acquire the charger information from another server device that manages the charger information.

[0038] Furthermore, the control unit 122 outputs the recommendation information generated by the generation unit 122c to the information terminal 130 via the communication unit 121.

[0039] Hereinafter, the action plan information, the power storage information, and the charger information will be described with reference to Figures 5A to 5C. Figure 5A is a diagram showing an example of the action plan information according to the present embodiment.

[0040] As shown in FIG. 5A, the action plan information is information indicating the schedule of the user U, and includes information regarding "time" and "place."

[0041] "Time" is information indicating a time period corresponding to "Place", such as 9:00AM to 10:00AM. "Place" is information indicating a location or destination (destination) where the user is staying during the corresponding time, such as home or supermarket A. In the example of FIG. 5A, the behavior plan information includes that the user U is at home from 9:00AM to 10:00AM, and goes shopping at supermarket A from 10:00AM to 11:00AM.

[0042] The action plan information may further include information such as the route to be taken when traveling in the vehicle 110, the duration of stay at the destination, and the number of passengers.

[0043] The information indicating the "location" may be inferred by the control unit 122. The control unit 122 may infer the "location" of the user U based on, for example, the past behavior history or schedule of the user U. For example, when the user U has a "meeting" scheduled for 10:00 AM to 11:00 AM, the control unit 122 may infer that the location of the user U is the office.

[0044] FIG. 5B is a diagram showing an example of power accumulation information according to the present embodiment.

[0045] As shown in FIG. 5B, the power storage information includes information relating to an "ID," an "energy storage capacity," and an "amount of stored power."

[0046] "ID" is identification information for identifying vehicle 110. "Storage capacity" indicates the storage capacity (maximum capacity) of the battery mounted on vehicle 110. The maximum capacity changes over time due to deterioration, etc. "Storage capacity" may be the fully charged capacity at that time. "Storage amount" indicates the current amount of storage in the battery mounted on vehicle 110. In the example of FIG. 5B, the storage information includes that the storage capacity is 30 kWh and the storage amount is 10 kWh. In other words, vehicle 110 currently has 20 kWh of free capacity and can charge 20 kWh.

[0047] The power storage information may further include information such as the amount of power stored after charging desired by the user U. This allows the generating unit 122c described later to determine at least one of the charging timing and charging position when charging the battery up to the power storage capacity and when charging up to the amount of power stored desired by the user U.

[0048] The control unit 122, for example, periodically acquires the power storage information from the vehicle 110.

[0049] FIG. 5C is a diagram showing an example of charger information according to the present embodiment.

[0050] As shown in FIG. 5C, the charger information includes information regarding the "location of the vehicle charger," "operation status," "time period when the charger can be used," and "whether or not discharge is possible."

[0051] "Vehicle charger location" is information indicating the location where the vehicle charger 141 is installed, for example, the latitude and longitude of the charging station 140 where the vehicle charger 141 is installed, but it may also be an address, etc. "Operation status" is information indicating the operation status of the vehicle charger 141, for example, the operation rate. For example, the operation rate is 40% from 9:00 AM to 11:00 AM. "Operation status" is included in the charger information of a vehicle charger 141 installed in a public space, for example. Note that information indicating "operation status" is an example of operation information.

[0052] The "available time period" indicates the time period during which the vehicle charger 141 can be used, for example, 9:00 AM to 5:00 PM. The "available time period" may also be the opening hours of the charging station 140 in which the vehicle charger 141 is installed. "Discharge capability" is information indicating whether the vehicle charger 141 can also discharge, for example, yes or no.

[0053] The charger information may further include "information indicating whether or not the charger is in a usable state." For example, the "information indicating whether or not the charger is in a usable state" may include information such as "Unavailable from 9:00 AM to 1:00 PM due to inspection." The "usable time period" and "information indicating whether or not the charger is in a usable state" are examples of usability information.

[0054] The control unit 122 acquires charger information for each of the vehicle chargers 141 included in a predetermined area. The predetermined area is set in advance, and may be, for example, an area on a map including each consumer in a community managed by a resource aggregator, an area on a map including all consumers in each community managed by an aggregation coordinator, or an administrative district such as a city, ward, town, or village.

[0055] Referring again to FIG. 4, the control unit 122 includes a prediction unit 122a, a determination unit 122b, and a generation unit 122c.

[0056] The prediction unit 122a predicts the time change of the power demand. The prediction unit 122a predicts, for example, the daily change of the power demand. The prediction unit 122a predicts, for example, the real power demand as shown in FIG. 3. The prediction unit 122a predicts the real power demand from the present time onward, for example, based on past data of the real power demand. The prediction method of the real power demand in the prediction unit 122a is not particularly limited, but for example, the real power demand in the time period or date and time when the real power demand is predicted is predicted based on past data of the real power demand when at least one of the location, temperature, season, weather, etc. in the time period or date and time when the real power demand is predicted is identical or similar. Note that similarity indicates that the difference between the at least one of the time period or date and time when the real power demand is predicted and the at least one of the time when the past real power demand data was acquired satisfies a predetermined condition. For example, in the case where at least one of the conditions is a location, the specified condition may be a difference of within a few kilometers, or a community that is adjacent on a map to the community in which the user U belongs, or an energy management system that is adjacent on a map to the energy management system 1 in which the user U belongs.

[0057] The determination unit 122b determines the charging timing and charging location of the vehicle 110 recommended to the user U, based on the action plan information, the power storage information, and the charger information, so as to reduce the peak demand in the time transition of the power demand predicted by the prediction unit 122a. It can also be said that the determination unit 122b determines the vehicle charger 141 that charges the storage battery of the vehicle 110 from among multiple vehicle chargers 141 included in a predetermined area, based on the action plan information, the power storage information, and the charger information.

[0058] The generating unit 122c generates recommendation information including the charging timing and charging location of the vehicle 110 determined by the determining unit 122b. The charging timing is, for example, a time period during which charging is recommended. The charging location indicates a location where a vehicle charger 141 that charges the storage battery of the vehicle 110 is installed.

[0059] For example, as shown on the display unit 131 in FIG. 4, the generation unit 122c generates recommendation information for displaying a charging timing (for example, 10:00 AM to 11:00 AM tomorrow) and a charging position where a vehicle charger 141 used for charging at the charging timing is installed. In FIG. 4, the charging position is displayed on the map with a black star mark. The current position of the user U may also be displayed on the map. In FIG. 4, the current position of the user U is displayed on the map with a black circle. Furthermore, a travel route from the current position of the user U to the charging position may also be displayed on the map. The charging position may also be displayed in text such as an address.

[0060] The storage unit 123 is a storage device that stores various information for processing by the control unit 122. The storage unit 123 may store, for example, action plan information, power storage information, charger information, and the like. The storage unit 123 may also store, for example, past data of actual power demand used by the prediction unit 122a to make predictions, a driving history of the vehicle 110, and the like. The storage unit 123 is realized, for example, by a semiconductor memory.

[0061] The server device 120 may be, for example, a server device managed by a resource aggregator or an aggregation coordinator, or may be a server device external to the energy management system 1 illustrated in FIG.

[0062] The information terminal 130 is a terminal device owned by the user U. The information terminal 130 is not particularly limited as long as it can communicate with the server device 120 and can present recommended information, and may be, for example, a smartphone, a tablet terminal, a personal computer, etc. Also, it may be a voice input / output device without a display unit (display).

[0063] The information terminal 130 has a display unit 131, and presents the recommended information to the user U by displaying the recommended information on the display unit 131. The information terminal 130 may present the recommended information to the user U by voice or the like. The display unit 131 is realized by a liquid crystal panel, but may be realized by other display panels such as an organic EL panel. The display unit 131 may also have a backlight.

[0064] Furthermore, the information terminal 130 may have a reception unit (not shown) that receives input from the user U, and may receive input related to the action plan of the user U via the reception unit. The information terminal 130 transmits information indicating the received input to the server device 120. For example, the information terminal 130 transmits action plan information indicating the action plan received via the input unit to the server device 120. The reception unit is, for example, a touch panel, a keyboard, a push button, or the like. The reception unit may also be, for example, a microphone that receives voice input.

[0065] The charging station 140 is a facility for charging the vehicle 110. The charging station 140 has one or more vehicle chargers 141. The vehicle charger 141 is a power supply device for supplying power from a power system to the vehicle 110. Furthermore, if the vehicle charger 141 has a discharging function, it supplies power from the vehicle 110 to a power consuming load (such as an electrical device installed in the facility) connected to the vehicle charger 141. In this way, the vehicle charger 141 may be a charger that only performs charging, or may be a charger / discharger that can perform charging and discharging. In other words, the charging station 140 may be a charging / discharging station.

[0066] The number of charging stations 140 included in the recommended behavior output system 100 is not particularly limited. For example, all charging stations 140 provided in a predetermined area are included in the recommended behavior output system 100. The number of vehicle chargers 141 installed in the charging stations 140 is not particularly limited, and may be one or two or more. The vehicle chargers 141 are installed in ordinary houses, apartment buildings, public spaces, etc.

[0067] [2. Operation of the recommended action output system] Next, the operation of the system 100 for outputting recommended actions will be described with reference to Figures 6 to 11. Figure 6 is a flow chart showing the operation of the system 100 for outputting recommended actions according to this embodiment.

[0068] 6, the control unit 122 of the server device 120 acquires action plan information (S11). The control unit 122 acquires, for example, action plan information as shown in Fig. 5A from the information terminal 130 via the communication unit 121. In this manner, the communication unit 121 functions as a first acquisition unit that acquires the action plan information.

[0069] Next, the control unit 122 acquires power storage information (S12). The control unit 122 acquires, for example, power storage information as shown in Fig. 5B from the vehicle 110 via the communication unit 121. In this manner, the communication unit 121 functions as a second acquisition unit that acquires the power storage information. The control unit 122 acquires the power storage information periodically, for example.

[0070] Next, the control unit 122 acquires charger information (S13). The control unit 122 reads, for example, charger information as shown in Fig. 5C from the storage unit 123. In this manner, the control unit 122 functions as a third acquisition unit that acquires the charger information.

[0071] The control unit 122 may execute steps S12 and S13, for example, with the acquisition of the action plan information in step S11 as a trigger.

[0072] Next, the prediction unit 122a predicts the time transition of the power demand (S14). For example, based on the power demand of each consumer and the power generation amount of each consumer, the prediction unit 122a predicts the time transition of the real power demand as shown in FIG. 3 at the time period or date and time to be predicted (for example, tomorrow, hereinafter also referred to as the target date and time). The prediction unit 122a predicts the time transition of the real power demand at the target date and time by averaging or weighting averaging a plurality of past data when at least one of the location, temperature, season, weather, etc. at the target date and time coincides or is similar. The target date and time is a date and time in the future from the time of prediction. For example, the prediction unit 122a may set the date and time when the user U is scheduled to move using the vehicle 110 in the action plan information as the target date and time. Note that hereinafter, it is assumed that the prediction unit 122a predicts the time transition of the real power demand shown in 2020 in FIG. 3.

[0073] Next, the prediction unit 122a determines whether or not there is a time period during which the power demand indicates a power demand (power demand amount) that is equal to or less than a threshold value in the time transition of the power demand (S15). The threshold value is not particularly limited as long as it is an amount of power that allows the power system to stably supply power. Note that, although 17000 MW is illustrated as an example of the threshold value in FIG. 3, the threshold value is not limited to this.

[0074] Next, if there is a time period in which the power demand is equal to or lower than the threshold (Yes in S15), the prediction unit 122a sets the time period as a first time period in which charging is recommended, and sets the time period in which the power demand is higher than the threshold as a second time period in which discharging is recommended (S16). Taking FIG. 3 as an example, the prediction unit 122a sets the time period from about 9:00 to 18:00, in which the power demand is equal to or lower than the threshold, as the first time period, and sets the remaining time periods as the second time period. That is, the prediction unit 122a sets the time period in which the actual power demand is low as the first time period, and sets the time period in which the actual power demand is high as the second time period. The second time period includes a time period that is a peak demand in the daily change of the actual power demand (a time period around 20:00 in the example of FIG. 3). Note that the prediction unit 122a may set at least the first time period at the target date and time in step S16.

[0075] Next, the prediction unit 122a and the determination unit 122b perform a process of determining the charging timing and charging position of the vehicle 110 recommended to the user U based on the action plan information, the power storage information, and the charger information (S17). Details of step S17 will be described later.

[0076] The determination unit 122b determines the charging timing and the charging location so as to reduce at least the peak demand of the predicted actual power demand. The determination unit 122b may determine one charging timing and one charging location, or may determine multiple charging timings and charging locations. Fig. 4 shows an example in which the charging timing and charging location determined by the determination unit 122b are displayed as recommended information.

[0077] Next, the generating unit 122c generates recommendation information for recommending the determined charging timing and charging position of the vehicle 110 to the user U (S18). In addition, for example, when the vehicle charger 141 at the user U's home also supports discharging, the generating unit 122c may generate recommendation information further including information for recommending the discharging timing of the vehicle 110 to the user U in step S18. The recommendation information includes information recommending discharging the storage battery of the vehicle 110 in the second time slot. The recommendation information may include information recommending discharging the vehicle 110 in a time slot including the time when the peak demand is reached in the second time slot. In addition, for example, in step S18, the generating unit 122c may generate recommendation information including not charging the vehicle 110 in the second time slot.

[0078] Next, the control unit 122 outputs the recommendation information generated by the generation unit 122c to the information terminal 130 via the communication unit 121 (S19). This allows the user U to know the recommended charging timing and charging position for the vehicle 110 by checking the recommendation information presented on the information terminal 130. In this way, the communication unit 121 also functions as an output unit that outputs the recommendation information.

[0079] Furthermore, if there is no time period in which the power demand is equal to or less than the threshold (No in S15), the prediction unit 122a ends the process. In this case, the control unit 122 may generate recommendation information that recommends not charging or recommends charging on a different day.

[0080] 6 may be performed, for example, before the user U gets into the vehicle 110. For example, when the server device 120 acquires the action plan information, the power storage information, and the charger information before the user U gets into the vehicle 110, the server device 120 can output the recommendation information to the information terminal 130 of the user U in advance.

[0081] 7 to 10, a process for determining the charging timing and charging position of the vehicle 110 recommended to the user U will be described. Fig. 7 is a flowchart showing a first example of the process (S17) for determining the charging timing and charging position shown in Fig. 6.

[0082] 7, the prediction unit 122a predicts the location and the amount of stored power of the vehicle 110 in the first time slot based on the action plan information (S21). In the example of FIG. 5A, the location of the user U is at home between 9:00 AM and 10:00 AM, so the prediction unit 122a predicts that the location of the vehicle 110 will be at home. Also, since the vehicle 110 is not traveling at this time, the amount of stored power in the battery does not decrease. For example, the amount of stored power of the vehicle 110 between 9:00 AM and 10:00 AM remains the amount of stored power included in the power storage information acquired in step S12.

[0083] In the example of FIG. 5A, the vehicle 110 goes to supermarket A between 10:00 AM and 11:00 AM, so the prediction unit 122a predicts the location of the vehicle 110 to be supermarket A. Note that the method of predicting the location of the vehicle 110 is not limited to this. At this time, the vehicle 110 travels, so the amount of stored power in the battery decreases. The amount of decrease in the amount of stored power is calculated based on, for example, the distance between the home and supermarket A (for example, the distance traveled), but is not limited to this. The prediction unit 122a predicts the amount of stored power of the vehicle 110 in the first time slot based on the amount of stored power of the vehicle 110 included in the power storage information and the amount of decrease in the amount of stored power described above.

[0084] Next, the determination unit 122b determines whether the predicted amount of stored power is equal to or less than a predetermined amount of stored power (S22). The predetermined amount of stored power is a stored power amount for determining whether the vehicle 110 needs to be charged, and may be determined based on the charge capacity of a battery mounted on the vehicle 110, for example. The predetermined amount of stored power may be acquired from the information terminal 130, for example. That is, the predetermined amount of stored power may be set by the user U.

[0085] In addition, in step S22, the decision unit 122b may determine whether or not to perform charging in the first time slot based on the difference between the stored power capacity of the battery included in the power storage information and the stored power amount in the first time slot predicted by the prediction unit 122a.

[0086] Next, when the predicted amount of stored power is equal to or less than the predetermined amount of stored power (Yes in S22), the determination unit 122b determines the charging timing and the charging position based on the position and amount of stored power of the vehicle 110 in the first time slot and the charger information (S23). The determination unit 122b determines the charging position based on the position of the vehicle 110 in the first time slot and the position of the vehicle charger 141. For example, the determination unit 122b identifies the vehicle charger 141 located close to the position of the vehicle 110 based on the position of the vehicle 110 (e.g., destination) in the first time slot and the position of the vehicle charger 141 included in the charger information, and determines the installation position where the identified vehicle charger 141 is installed as the charging position. In addition, the determination unit 122b determines the charging timing to be between 10:00 AM and 11:00 AM when the user U goes to supermarket A (for example, while the user U uses the vehicle 110). The charging timing is the timing in the first time slot.

[0087] Furthermore, the determination unit 122b may determine, for example, a timing at which the amount of stored power does not become equal to or less than a first amount of stored power as the charging timing for the vehicle 110. The first amount of stored power is an amount of stored power at which the amount of stored power in the battery decreases and requires immediate charging, and is determined appropriately depending on the travelable distance, etc.

[0088] In this way, the determination unit 122b determines the charging timing and the charging location according to the schedule of the user U in the first time slot in which charging is recommended. This allows the user U to stop by the charging location on the way out to charge the vehicle 110 without going to the charging location just to charge, so that the convenience of the user U is not likely to decrease.

[0089] As described above, the server device 120 determines the charging timing and charging location according to the location of the vehicle 110 in the first time slot (i.e., the location of the user U). Since it is determined that charging will be performed in the first time slot and this is notified to the user U, it is expected that charging of the vehicle 110 will be reduced during peak demand. In other words, it is possible to reduce peak demand.

[0090] In addition, for example, when there are multiple vehicles that need charging in a specified area, the server device 120 may determine the charging locations of each of the multiple vehicle chargers 141 so that the driving distance to the vehicle charger 141 for each of the multiple vehicles is short (e.g., the shortest) depending on the locations of each of the multiple vehicles that need charging and the locations of each of the multiple vehicle chargers 141 installed in the specified area.

[0091] If the predicted amount of stored power is greater than the predetermined amount of stored power (No in S22), the decision unit 122b decides to recommend not charging (S24). In this case, the recommendation information generated in step S18 includes information indicating that it is recommended not to charge in the first time slot.

[0092] Next, a process of determining the charging timing and charging position of the vehicle 110 recommended to the user U when the prediction unit 122a predicts the travel route of the vehicle 110 will be described with reference to Fig. 8. Fig. 8 is a flowchart showing a second example of the process (S17) of determining the charging timing and charging position shown in Fig. 6.

[0093] As shown in Fig. 8, the prediction unit 122a predicts the driving route of the vehicle 110 in the first time slot based on the action plan information (S31). For example, the prediction unit 122a predicts the driving route to the destination based on the destination included in the action plan information and the history of the past driving routes (driving history) of the vehicle 110. In the example of Fig. 5A, the prediction unit 122a travels from home to supermarket A, so predicts the driving route from home to supermarket A based on the past driving history from home to supermarket A. In this way, the prediction unit 122a predicts where the vehicle 110 is located or where the vehicle 110 is driving in the first time slot in which charging is recommended, based on the action plan information.

[0094] In addition, the prediction unit 122a may, for example, determine the driving route indicated by the most recent driving history among the multiple driving histories as the driving route for the first time zone at the target date and time, or may determine the driving route that has been driven the most number of times among the multiple driving histories as the driving route for the first time zone at the target date and time.

[0095] Next, the prediction unit 122a predicts the amount of stored power of the vehicle 110 in the first time zone (S32). The prediction unit 122a predicts the amount of stored power of the vehicle 110 based on the travel route predicted in step S31. This allows the prediction unit 122a to predict the amount of stored power of the vehicle 110 according to the travel route, thereby improving prediction accuracy of the amount of stored power.

[0096] The method of predicting the amount of stored power by the prediction unit 122a is not particularly limited. For example, the prediction unit 122a may predict the amount of stored power of the vehicle 110 in the first time slot based on a change in the amount of stored power (i.e., the amount of power used) of the battery when the vehicle 110 traveled in the past along the travel route predicted in step S31, or may predict the amount of stored power of the vehicle 110 in the first time slot based on information indicating a relationship between a travel distance along the travel route predicted in step S31 and a change in the amount of stored power (i.e., the amount of power used).

[0097] Next, the determination unit 122b determines whether or not the predicted amount of stored power is equal to or less than a predetermined amount of stored power (S33). Step S33 is similar to step S22 in FIG.

[0098] Next, when the predicted amount of stored power is equal to or less than the predetermined amount of stored power (Yes in S33), the determination unit 122b determines the charging timing and the charging position based on the travel route and the amount of stored power of the vehicle 110 in the first time slot, and the charger information (S34). The determination unit 122b determines the charging position based on the travel route of the vehicle 110 in the first time slot and the position of the vehicle charger 141. For example, the determination unit 122b identifies the vehicle charger 141 located close to the travel route of the vehicle 110 based on the travel route of the vehicle 110 in the first time slot and the charger information, and determines the installation position where the identified vehicle charger 141 is installed as the charging position. Furthermore, the determination unit 122b determines the charging timing to be when the vehicle 110 travels through the charging position or near the charging position. This allows the determination unit 122b to determine the charging timing in more detail.

[0099] If the predicted amount of stored power is greater than the predetermined amount of stored power (No in S33), the decision unit 122b decides to recommend not charging (S35). In this case, the recommendation information generated in step S18 includes information indicating that it is recommended not to charge in the first time slot.

[0100] In this way, the determination unit 122b predicts a travel route from the schedule of the user U in the first time slot in which charging is recommended, and determines the charging timing and charging position based on the predicted travel route. This allows the determination unit 122b to determine a charging timing and charging position that are more appropriate for the user U.

[0101] Next, a process of determining the charging timing and charging position of the vehicle 110 recommended to the user U when the prediction unit 122a predicts the action plan of the user U will be described with reference to Fig. 9. Fig. 9 is a flowchart showing a third example of the process (S17) of determining the charging timing and charging position shown in Fig. 6. In this case, step S11 shown in Fig. 6 does not have to be executed. In other words, the server device 120 does not have to acquire the action plan information of the user U from an external device.

[0102] 9, the prediction unit 122a acquires historical information on the position of the vehicle 110 (S41). The historical information on the position of the vehicle 110 may be information based on a past schedule of the user U, or may be information based on a driving history of the vehicle 110. The historical information on the position of the vehicle 110 is stored in the storage unit 123, and the prediction unit 122a acquires the historical information by reading the historical information from the storage unit 123. For example, in step S41, the prediction unit 122a acquires the driving history of the vehicle 110 in the past first time zone as historical information.

[0103] Next, the prediction unit 122a predicts the behavior plan of the user U based on the history information of the position of the vehicle 110 (S42). For example, the prediction unit 122a acquires a regularity of the behavior of the user U from the history information of the position of the vehicle 110, and predicts the behavior plan of the user U based on the acquired regularity. The regularity means that the correspondence between the date and time and the location is repeated periodically, for example, being in a specific location every week, on a specific day of the week, or during a specific time period. For example, when the prediction unit 122a acquires a regularity indicating that the user U goes to supermarket A between 10:00 AM and 11:00 AM every week on a specific day of the week, the prediction unit 122a predicts that the user U will also go to supermarket A between 10:00 AM and 11:00 AM on the next specific day of the week. It can also be said that the prediction unit 122a predicts the habitual behavior of the user U based on the history information of the position of the vehicle 110. The information indicating the behavior plan predicted by the prediction unit 122a is an example of behavior plan information. That is, the behavior plan information may be generated by the server device 120.

[0104] Next, the prediction unit 122a predicts the travel route of the vehicle 110 in the first time zone based on the predicted action plan (S43). Note that steps S43 to S47 are similar to steps S31 to S35 shown in Fig. 8, respectively, and therefore description thereof will be omitted.

[0105] In this way, the server device 120 predicts the action plan of the user U based on the historical information of the position of the vehicle 110, without acquiring the action plan information of the user U from an external device. This makes it possible to reduce the amount of communication between the server device 120 and the external device. Furthermore, even if the communication state between the server device 120 and the external device is not good, it is possible to determine the charging timing and the charging position.

[0106] Next, a process for determining the charging timing and charging position of the vehicle 110 recommended to the user U when the charger information includes information indicating the "usable time period" will be described with reference to Fig. 10. Fig. 10 is a flowchart showing a fourth example of the process (S17) for determining the charging timing and charging position shown in Fig. 6.

[0107] 10, the prediction unit 122a predicts the position and the amount of stored power of the vehicle 110 in the first time zone based on the action plan information (S51), and determines whether the predicted amount of stored power is equal to or less than a predetermined amount of stored power (S52). Steps S51 and S52 are similar to steps S21 and S22 in FIG. 7, respectively, and therefore will not be described.

[0108] Next, if the predicted amount of stored power is equal to or less than a predetermined amount of stored power (Yes in S52), the prediction unit 122a identifies one or more vehicle chargers 141 that can be used in the first time slot from among the multiple vehicle chargers 141 in the predetermined area based on the charger information (S53). The prediction unit 122a identifies one or more vehicle chargers 141 that can be used in the first time slot based on, for example, information indicating an "available time slot" included in the charger information. The prediction unit 122a may identify one or more vehicle chargers 141 based on whether the time slot indicated by the "available time slot" (for example, 9:00 AM to 5:00 PM in the example of FIG. 5C) is included in the first time slot.

[0109] The prediction unit 122a may identify one or more vehicle chargers 141 based on whether or not the time period indicated by the "available time period" includes a time period during which the vehicle 110 is likely to be traveling based on the action plan information (for example, 10:00 AM to 11:00 AM in the example of FIG. 5A). In other words, based on the action plan information, if the vehicle 110 is capable of charging using the vehicle charger 141 during the time period indicated by the "available time period", the prediction unit 122a may identify the vehicle charger 141 as one or more vehicle chargers 141 that can be used in the first time period.

[0110] Next, the determination unit 122b determines the charging timing and charging location based on the location of the vehicle 110 in the first time slot, the stored power amount, and information indicating the identified one or more vehicle chargers 141 (S54). This allows the determination unit 122b to determine the vehicle charger 141 that will charge the vehicle 110 from among the one or more vehicle chargers 141 that are available in the first time slot among the multiple vehicle chargers 141 installed within a specified area, thereby increasing the certainty that the vehicle 110 will be able to charge.

[0111] Furthermore, when the predicted amount of stored power is equal to or less than a predetermined amount of stored power (No in S52), the prediction unit 122a determines that it is recommended not to charge (S55).

[0112] Note that the prediction unit 122a performs the process of step S53 based on information indicating the "usable time period" included in the charger information, but is not limited to this. For example, the prediction unit 122a may perform the process of step S53 based on information indicating the "operation status" included in the charger information. For example, the prediction unit 122a may identify the vehicle charger 141 whose operation rate in the first time period is equal to or less than a predetermined value as one or more usable vehicle chargers 141. This allows the user U to smoothly charge the vehicle 110, so that the prediction unit 122a can reduce the impact of the charging operation of the vehicle 110 on the schedule of the user U. In other words, the prediction unit 122a can further suppress a decrease in the convenience of the user U.

[0113] Here, a process for generating recommended information to be recommended to the user U will be described with reference to Fig. 11. Fig. 11 is a flowchart showing an example of the process (S18) for generating the recommended information shown in Fig. 6. Specifically, the process when there are multiple pairs of charging timing and charging position will be described with reference to Fig. 11.

[0114] 11, the generation unit 122c determines whether there are multiple pairs of charging timing and charging location determined by the determination unit 122b (S61). When there are multiple pairs of charging timing and charging location determined by the determination unit 122b (Yes in S61), the generation unit 122c calculates the degree of reduction in peak demand for each of the multiple pairs (S62). For example, the generation unit 122c increases the degree of reduction in peak demand as the charging timing approaches the time period of peak demand. Note that the calculation of the degree of reduction in peak demand is not limited to this.

[0115] Next, the generating unit 122c determines a priority order for each of the plurality of groups based on the degree of reduction in peak demand for each of the plurality of groups (S63), and generates recommendation information according to the determined priority order (S64). The generating unit 122c sets a higher priority order as the degree of reduction in peak demand increases. The generating unit 122c may change the display mode of the charging timing and charging position according to the priority order, for example. The generating unit 122c may, for example, make the display larger as the priority order increases.

[0116] Furthermore, when there are not a plurality of pairs of the charging timing and the charging position determined by the determination unit 122b (No in S61), the generation unit 122c generates recommendation information including one pair of the charging timing and the charging position (S65).

[0117] In this way, when there are multiple pairs of charging timings and charging locations determined by the determination unit 122b, the server device 120 determines the priority order of the charging timings and charging locations recommended to the user U from the viewpoint of the degree of reduction in peak demand. This enables the server device 120 to effectively reduce peak demand.

[0118] Note that the generating unit 122c is not limited to determining the priority order based on the degree of reduction in peak demand. The generating unit 122c may determine the priority order according to the preference of the user U, for example, or may determine the priority order according to the operation rate. For example, if the user U tends to prefer charging at a nearby vehicle charger 141, the generating unit 122c may determine the priority order such that the shorter the distance between the installation position of the vehicle charger 141 and the driving route, the higher the priority order. Also, for example, the generating unit 122c may determine the priority order such that the lower the operation rate of the vehicle charger 141, the higher the priority order.

[0119] [3. Effects, etc.] As described above, the recommended behavior output system 100 includes a communication unit 121 that acquires behavior plan information including the behavior plan of the user U of the vehicle 110 equipped with a storage battery, and storage information including the storage capacity of the storage battery of the vehicle 110 and the current amount of storage in the storage battery, a control unit 122 that acquires charger information including the location of a vehicle charger 141 installed in a specific area, a prediction unit 122a that predicts the time trend of power demand in a specific area, a determination unit 122b that determines the charging timing of the storage battery of the vehicle 110 recommended to the user U and the charging location indicating the location of the vehicle charger 141 that charges the storage battery based on the behavior plan information, the storage information, and the charger information so as to reduce peak demand in the predicted time trend of power demand, and the communication unit 121 that outputs recommendation information including the determined charging timing and charging location.

[0120] The communication unit 121 functions as a first acquisition unit, a second acquisition unit, and an output unit. The control unit 122 is an example of a third acquisition unit, and the user U is an example of a user.

[0121] As a result, the charging timing and charging location of the vehicle 110 are determined based on the action plan of the user U, so the user U does not need to go to a charging location just to charge the vehicle 110, but can go to the charging location on the way out, which prevents a decrease in convenience for the user U. In addition, the charging timing and charging location are determined so as to reduce the predicted peak demand for electricity, so that the supply and demand of electricity can be balanced. Therefore, the recommended behavior output system 100 can maintain the convenience of the user while also balancing the supply and demand of electricity.

[0122] The prediction unit 122a sets a time period in which the power demand is equal to or less than a threshold in the time transition of the power demand as a first time period in which charging is recommended. The determination unit 122b determines the charging timing and charging position based on the position of the vehicle 110 in the first time period based on the action plan information, the amount of stored power in the storage battery of the vehicle 110 in the first time period based on the power storage information, and the charger information.

[0123] Thus, the determination unit 122b can effectively balance the supply and demand of power by determining the charging timing to be within the first time slot.

[0124] The action plan information also includes information indicating the destination of the user U. The prediction unit 122a predicts a travel route of the vehicle 110 based on the current position and the destination of the vehicle 110, and the determination unit 122b further determines a charging timing and a charging position based on the travel route.

[0125] This allows charging not only in the vicinity of the destination but also at charging positions in the vicinity of the travel route, increasing the degree of freedom for the determination unit 122b when determining the charging timing and charging position.

[0126] Furthermore, the communication unit 121 acquires history information of the position of the vehicle 110. The prediction unit 122a predicts an action plan of the user U based on the history information of the position of the vehicle 110, and the determination unit 122b determines a charging timing and a charging position based on the predicted action plan of the user U.

[0127] This allows the determination unit 122b to determine the charging timing and the charging position without acquiring the action plan of the user U from the user U. That is, the user U can acquire the recommended information without inputting the action plan to the information terminal 130 or the like. Thus, the server device 120 can further suppress the deterioration of convenience for the user U.

[0128] Furthermore, the charger information includes operation information that indicates the operation status of the vehicle charger 141. The decision unit 122b decides the charging timing and charging position based on the position of the vehicle 110 in the first time zone and the operation information.

[0129] As a result, the user U can charge the vehicle 110 with less waiting time when arriving at the charging location indicated in the recommended information, since the charging location with a low operation rate included in the operation information is determined. Thus, the server device 120 can further suppress the decrease in convenience for the user U.

[0130] The charger information also includes usability information indicating whether the vehicle charger 141 can be used. The determination unit 122b identifies one or more vehicle chargers 141 that can be used in the first time slot from among the multiple vehicle chargers 141 based on the usability information, and determines the charging timing and charging position based on the identified one or more vehicle chargers 141.

[0131] As a result, a charging location is determined from one or more vehicle chargers 141 that can be used during the first time slot. In other words, the certainty of being able to charge increases when the user U arrives at a charging location based on the recommended information. For example, the server device 120 can further suppress a decrease in convenience for the user U because the user U is prevented from having to go to a different charging location twice due to arriving at the charging location and finding that the vehicle charger 141 is out of order and unavailable.

[0132] The prediction unit 122a also identifies a time period in which the amount of power demand is greater than a threshold in the time transition of the power demand as a second time period in which discharging is recommended. The communication unit 121 further outputs recommendation information including a recommendation not to charge the vehicle 110 in the second time period.

[0133] This allows the server device 120 to restrict the user U from charging during the second time slot, making it easier to balance the supply and demand of electricity.

[0134] The vehicle charger 141 is a charger / discharger capable of charging and discharging. The prediction unit 122a identifies a time period in which the power demand is greater than a threshold value in the time transition of the power demand as a second time period in which discharging is recommended, and the communication unit 121 further outputs recommendation information including a recommendation to discharge the storage battery of the vehicle 110 in the second time period.

[0135] This allows the server device 120 to reduce the actual power demand in the second time slot, thereby further balancing the power supply and demand. Also, the server device 120 can effectively balance the power supply and demand by discharging during a time slot that includes peak demand in the second time slot, for example.

[0136] Furthermore, the determination unit 122b determines a plurality of pairs of charging timing and charging position, and the communication unit 121 outputs recommendation information including a plurality of pairs of charging timing and charging position.

[0137] This allows the determination unit 122b to propose a plurality of charging timings and charging positions to the user U. The user U can select a desired charging timing and charging position from a plurality of sets of charging timings and charging positions included in the recommendation information.

[0138] The recommendation information also includes information indicating a priority order for each of the plurality of pairs of charging timing and charging location based on the degree of reduction in peak demand for each of the plurality of pairs of charging timing and charging location.

[0139] As a result, the server device 120 can more effectively reduce peak demand by setting higher priorities for charging timings and charging locations that have a high degree of reduction in peak demand. In other words, the server device 120 can more easily balance the supply and demand of electricity.

[0140] As described above, the recommended behavior output method acquires behavior plan information including the behavior plan of the user U of the vehicle 110 equipped with a storage battery (S11), acquires power storage information including the power storage capacity of the storage battery of the vehicle 110 and the current power storage amount of the storage battery (S12), acquires charger information including the location of the vehicle charger 141 installed in a specific area (S13), predicts the time transition of the power demand in the specific area (S14), determines the charging timing of the storage battery of the vehicle 110 recommended to the user U and the charging location indicating the location of the vehicle charger 141 that charges the storage battery based on the behavior plan information, power storage information, and charger information so as to reduce the peak demand of the time transition of the predicted power demand (S17), and outputs recommended information including the determined charging timing and charging location (S19). As described above, the program is a program for causing a computer to execute the above-mentioned recommended behavior output method.

[0141] This provides the same effects as the above-mentioned recommended action output system 100.

[0142] (Other embodiments) Although the system for outputting recommended actions and the method for outputting recommended actions according to the present invention have been described based on the above-mentioned embodiment, the present invention is not limited to the above-mentioned embodiment.

[0143] For example, in the above embodiment, an example in which the presence or absence of charging is determined based on the predicted amount of stored power has been described, but the present invention is not limited to this. For example, the presence or absence of charging may be determined based on the amount of stored power included in the stored power information acquired in step S12 of FIG. 6 (the amount of stored power at the time when the vehicle transmits the vehicle information).

[0144] In the above embodiment, the server device is configured as one device, but may be configured as multiple devices. When the server device is configured as multiple devices, the functions of the server device may be distributed among the multiple devices in any manner. At least a part of the functions of the server device in the above embodiment may be provided by a device or information terminal owned by the recycling company.

[0145] In addition, the communication method between the devices included in the system for outputting recommended actions in the above embodiment is not particularly limited. Although an example in which wireless communication is performed between the devices has been described, wired communication may also be performed. Furthermore, wireless communication and wired communication may be combined between the devices.

[0146] The order of the processes described in the above embodiment is merely an example. The order of the processes may be changed, and at least some of the processes may be executed in parallel.

[0147] In addition, the division of functional blocks in the block diagram is one example, and multiple functional blocks may be realized as one functional block, one functional block may be divided into multiple blocks, some functions may be transferred to other functional blocks, and the functions of multiple functional blocks having similar functions may be processed in parallel or in a time-sharing manner by a single piece of hardware or software.

[0148] In the above embodiment, each component may be configured with dedicated hardware, or may be realized by executing a software program suitable for each component. Each component may be realized by a program execution unit such as a processor reading and executing a software program recorded on a recording medium such as a hard disk or a semiconductor memory. The processor is configured with one or more electronic circuits including a semiconductor integrated circuit (IC) or an LSI (Large scale integration). The multiple electronic circuits may be integrated on one chip, or may be provided on multiple chips. The multiple chips may be integrated on one device, or may be provided on multiple devices.

[0149] A system LSI is an ultra-multifunctional LSI manufactured by integrating multiple processing units on a single chip, and specifically, is a computer system that includes a microprocessor, a ROM (Read Only Memory), a RAM (Random Access Memory), etc. Computer programs are stored in the ROM. The system LSI achieves its functions by the microprocessor operating in accordance with the computer program.

[0150] Here, we refer to it as a system LSI, but it may also be called an IC, LSI, super LSI, or ultra LSI depending on the level of integration. Also, the method of integration is not limited to LSI, but may be realized by a dedicated circuit or a general-purpose processor. It is also possible to use an FPGA (Field Programmable Gate Array) that can be programmed after the LSI is manufactured, or a reconfigurable processor that can reconfigure the connections and settings of the circuit cells inside the LSI.

[0151] Furthermore, if a new integrated circuit technology that can replace LSI appears due to the progress of semiconductor technology or a derivative technology, it is possible to integrate the functional blocks using that technology. The application of biotechnology is also a possibility.

[0152] In addition, in the above-mentioned embodiments, these general or specific aspects may be realized by a system, a method, an integrated circuit, a computer program, or a non-transitory recording medium such as a computer-readable CD-ROM, or may be realized by any combination of the system, the method, the integrated circuit, the computer program, or the recording medium. The program may be a computer program that causes a computer to execute each of the characteristic steps included in the method for outputting recommended actions.

[0153] Another aspect of the present invention may be a non-transitory computer-readable recording medium on which such a program is recorded. For example, such a program may be recorded on a recording medium and distributed or circulated. For example, the distributed program may be installed in a device having another processor, and the program may be executed by the processor, thereby making the device perform each of the above processes. Note that the program may be stored in the recording medium in advance, or may be supplied to the recording medium via a wide area communication network including the Internet.

[0154] In addition, the present invention also includes forms obtained by applying various modifications to the embodiments that a person skilled in the art may conceive, or forms realized by arbitrarily combining the components and functions of each embodiment within the scope that does not deviate from the spirit of the present invention. [Explanation of symbols]

[0155] 100 Recommended Action Output System 110 vehicles 121 communication unit (first acquisition unit, second acquisition unit, output unit) 122 control unit (third acquisition unit) 122a Prediction Section 122b Decision section 122c generator 140 Charging Station 141 Vehicle Charger U User (User)

Claims

1. A first acquisition unit that acquires action plan information including an action plan of a user of a vehicle equipped with the storage battery; A second acquisition unit that acquires power storage information including a power storage capacity of the storage battery of the vehicle and a current amount of power stored in the storage battery; A third acquisition unit that acquires charger information including locations of vehicle chargers installed in a specific area; A prediction unit that predicts a time transition of the power demand in the specific area; a determination unit that determines a charging timing of the storage battery recommended to the user and a charging location indicating a location of a vehicle charger that charges the storage battery, so as to reduce a peak demand of the predicted time transition of the power demand based on the action plan information, the power storage information, and the charger information; an output unit that outputs recommendation information including the determined charging timing and the determined charging position, The action plan includes first information indicating a destination of the user and second information indicating a time to stay at the destination, The prediction unit is A time period during which the amount of power demand is equal to or less than a threshold in the time transition of the power demand is set as a first time period during which charging is recommended; predicting a position of the vehicle and a stored power amount of the storage battery of the vehicle during the first time period based on the first information of the action plan information and the stored power information; When the predicted amount of stored power in the storage battery during the first time period is equal to or less than a predetermined amount of stored power, determining the charging location based on a location of the vehicle during the first time period and a location of the vehicle charger included in the charger information; determining the charging timing based on the second information; The power demand in the specific area is the power demand obtained by subtracting the amount of power generated by consumers from the amount of power consumption. Recommended action output system.

2. The prediction unit predicts a driving route of the vehicle based on a current position of the vehicle and the destination, and further predicts a storage amount of the storage battery of the vehicle during the first time period based on the driving route. The system for outputting recommended actions according to claim 1 .

3. The first acquisition unit acquires history information of a position of the vehicle, The prediction unit predicts the action plan of the user based on the history information. The system for outputting recommended actions according to claim 1 or 2.

4. The charger information includes operation information indicating an operation status of the vehicle charger, The determination unit determines, as the charging position, a position of a vehicle charger having a low operation rate in the first time period based on the operation information. The system for outputting recommended actions according to claim 1 or 2.

5. the charger information includes availability information indicating whether the vehicle charger is available for use; The determination unit identifies one or more vehicle chargers that can be used during the first time period from among the plurality of vehicle chargers based on the availability information, and determines locations of the identified one or more vehicle chargers as the charging location. The system for outputting recommended actions according to claim 1 or 2.

6. The prediction unit identifies a time period in which an amount of power demand is greater than a threshold in the time transition of the power demand as a second time period; The output unit further outputs the recommendation information including a recommendation not to charge the vehicle during the second time period. The system for outputting recommended actions according to any one of claims 1 to 5.

7. The vehicle charger is a charger / discharger capable of charging and discharging, The prediction unit identifies a time period in which an amount of power demand is greater than a threshold in the time transition of the power demand as a second time period in which discharging is recommended; The output unit further outputs the recommendation information including a recommendation to discharge the storage battery of the vehicle during the second time period. The system for outputting recommended actions according to any one of claims 1 to 5.

8. The determination unit determines a plurality of pairs of the charging timing and the charging position, The output unit outputs recommendation information including a plurality of pairs of the charging timing and the charging position. The system for outputting recommended actions according to any one of claims 1 to 7.

9. The recommendation information includes information indicating a priority order of each of a plurality of sets of the charging timing and the charging location based on a degree of reduction in the peak demand in each of the plurality of sets, The degree of reduction is set higher as the charging timing in the group approaches the time period during which the peak demand occurs, The information indicating the priority is set higher as the degree of reduction is higher. The system for outputting recommended actions according to claim 8.

10. A method for outputting recommended actions executed by a processor, comprising: Acquire action plan information including an action plan of a user of a vehicle equipped with a storage battery; Acquire power storage information including a power storage capacity of the storage battery of the vehicle and a current power storage amount of the storage battery; Obtaining charger information including locations of multiple vehicle chargers installed within a particular area; Predicting the time trend of electricity demand in the specific area; determining a charging timing of the storage battery recommended to the user and a charging location indicating a location of a vehicle charger for charging the storage battery, so as to reduce a peak demand of the predicted time transition of the power demand based on the action plan information, the power storage information, and the charger information; outputting recommendation information including the determined charging timing and the determined charging location; The action plan includes first information indicating a destination of the user and second information indicating a time to stay at the destination, In the prediction of the time transition, A time period during which the amount of power demand is equal to or less than a threshold in the time transition of the power demand is set as a first time period during which charging is recommended; predicting a position of the vehicle and a stored power amount of the storage battery of the vehicle during the first time period based on the first information of the action plan information and the stored power information; In the determination of the charging position, if the predicted amount of stored power in the storage battery during the first time period is equal to or less than a predetermined amount of stored power, determining the charging location based on a location of the vehicle during the first time period and a location of the vehicle charger included in the charger information; determining the charging timing based on the second information; The power demand in the specific area is the power demand obtained by subtracting the amount of power generated by consumers from the amount of power consumption. Recommended action output method.

11. A program for causing a computer to execute the method for outputting recommended actions according to claim 10.

Citation Information

Patent Citations

  • Charge / discharge control apparatus

    JP2010081722A

  • Charge control method for electric vehicle, charge monitoring control center, on-vehicle navigation device, and power system stabilization system

    JP2012048286A

  • Battery charge and discharge system, energy management system, and electric vehicle

    JP2012191736A

  • System for supporting user of electrically driven vehicle

    JP2013085449A

  • Energy management system, energy management control device, and energy management method and program

    JP2013188031A