Curved beam sending device and method
The curved girder delivery device addresses the challenge of transferring curved girders by using a guide rail guide device with adjustable rollers and jacks, ensuring smooth and accurate transfer by aligning with the girder's curve, preventing damage and maintaining contact.
Patent Information
- Application Number
- JP2023130923
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-08-10
- Publication Date
- 2024-12-09
- Estimated Expiration
- 2043-08-10
AI Technical Summary
Existing methods for connecting a linear hand-stretching machine to a curved girder and transferring it to a bridge pier face challenges in controlling the lateral movement of guide rails, leading to potential damage and misalignment due to complex curvature changes, which complicates the transfer process.
A curved girder delivery device with a guide rail guide device that includes a guide rail position adjustment roller and horizontal jacks, allowing the guide rail to be adjusted according to the curve of the girder, ensuring smooth and accurate transfer by moving the roller in a direction intersecting the transport direction of the hand-stretching machine.
The device enables precise control of guide rail movement, preventing damage and ensuring smooth transfer of curved girders by maintaining contact with the guide rail position adjustment rollers, even as the curvature changes, thus avoiding device destruction.
Smart Images

Figure 0007595889000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a curved girder delivery device and method for connecting a hand stretching machine to the tip of a curved girder to safely and smoothly transport it to a bridge pier or the like. [Background technology]
[0002] As shown in Fig. 8, in order to span a long and heavy erection girder 10 from one point such as an abutment 11 to another point such as a pier 12, a hand stretching machine 13 is connected to the tip 30a of the erection girder 10. When the erection girder 10 is a curved girder 30, a linear hand stretching machine 13 is connected in the tangential direction of the tip 30a of the curved girder 30. This hand stretching machine 13 has a guide rail 19 with a square cross section provided on its underside, and when this guide rail 19 reaches the endless track type slide device 15 installed on the pier 12, it is placed on the endless track 23 of the endless track type slide device 15 and fed in sequentially.
[0003] In order to sequentially send out the guide rail 19 by the caterpillar belt type slide device 15, in the example of FIG. 8, since the erection girder 10 is a curved girder 30, the guide rail 19 tries to move laterally on the caterpillar belt 23 in a direction intersecting the conveying direction of the hand stretching machine 13. For this reason, the caterpillar belt type slide device 15 is used in which the caterpillar belt unit of the caterpillar belt moves laterally in a direction perpendicular to the moving direction as shown in Japanese Patent No. 4395557. More specifically, in FIG. 6(e) and FIG. 7, the caterpillar belt 23 is formed by connecting a plurality of caterpillar belt units 24 as an caterpillar belt by a chain (not shown). A slide receiving plate 25 that moves laterally is fitted into the recess 27 of the caterpillar belt unit 24, and the slide receiving plate 25 is held in the center by the left and right return springs 26. Incidentally, in Figure 8, if the curvature of the curved girder 30 is 1100R and the length of the hand stretching machine 13 is a = 40m, the lateral movement distance b of the hand stretching machine 13 on the endless track type slide device 15 from when the tip of the hand stretching machine 13 reaches the pier 12 to when the tip of the curved girder 30 reaches the pier 12 is approximately 30cm.
[0004] A conventional method in which a linear hand stretching machine 13 is connected to a curved beam 30 and the endless track type slide device 15 is used to sequentially feed the material will be described with reference to FIG. As mentioned above, if the length of the hand stretching machine 13 is a = 40 m and the lateral movement distance b = approximately 30 cm, the actual inclination angle of the guide rail 19 on the endless track belt 23 is extremely small, and when illustrated, it appears as a substantially straight line. Therefore, for the sake of convenience in FIG. 6, the inclination angle of the guide rail 19 is depicted as extremely large. In Fig. 6(a), the hand stretching machine 13 is moved from right to left in the drawing, and the guide rail 19 of the hand stretching machine 13 is assumed to ride up onto the three slide receiving plates 25 in the center of the caterpillar belt 23 (the actual number of slide receiving plates 25 is more, but in the drawing it is shown as three). The slide receiving plates 25 at the front and rear ends are rolled up and are not in contact with the guide rail 19. 6(b), the guide rail 19 is placed on the caterpillar belt 23 and moves in the X-axis direction as the curved girder 30 is transferred, and if the curved girder 30 is curved downward, it moves downward in the Y-axis direction according to the degree of the curve. The slide support plate 25 and the guide rail 19 move together in the X-axis direction, but in the Y-axis direction, only the guide rail 19 moves as shown, and the slide support plate 25 does not move in the Y-axis direction. 6(c), when the guide rail 19 is about to come off the slide receiving plate 25, the entire track-type slide device 15 is moved downward along the Y axis, and the center of the slide receiving plate 25 on both ends that does not have the guide rail 19 placed on it is aligned with the center of the track-type slide device 15. By moving the entire track-type slide device 15 downward along the Y axis, the three central slide receiving plates 25 on which the guide rails 19 are placed do not move downward along the Y axis, and only the track-type slide device 15 moves downward along the Y axis. In Fig. 6(d), the slide receiving plate 25 that has separated from the guide rail 19 on the left end is returned to the center by the return spring 26. The slide receiving plate 25 on the right end on which the guide rail 19 is not placed is returned to the center by the return spring 26, so when this slide receiving plate 25 goes under the guide rail 19, the guide rail 19 gets on this slide receiving plate 25. The guide rail 19 gets on the slide receiving plate 25 that is sent in succession, returning to the state of Fig. 6(a), and the same operation is repeated to move the guide rail 19 in parallel to the specified position.
[0005] In the above-described lateral movement of the guide rail 19 of the hand stretching machine 13 in the Y-axis direction, the guide rail 19 of the hand stretching machine 13 is straight, the curved beam 30 is curved, and the contact position of the guide rail 19 with the endless track belt type slide device 15 is not a constant value, but changes in a complex manner as the tip of the curved beam 30 approaches the endless track belt type slide device 15. Therefore, the movement distance of the guide rail 19 in the X-axis direction per unit time in the endless track belt type slide device 15 and the movement distance of the guide rail 19 in the Y-axis direction per unit time in the slide support plate 25 change in a complex manner depending on the curvature radius of the curved beam 30 and the change in the length of the hand stretching machine 13, making it difficult to appropriately control the lateral movement of the guide rail 19 in the endless track belt type slide device 15, and there was a risk that the guide rail 19 would be transferred to the slide support plate 25 or the endless track belt 23 would be destroyed if the guide rail 19 came off the slide support plate 25.
[0006] In this type of bridge construction, as shown in Figures 9(a) and (b), when a straight hand-stretching machine 13 is connected to the tip of a straight erection girder 10, even if the hand-stretching machine 13 is bent and precise straightness cannot be achieved, as shown in Figure 9(a), a method is known in which the guide rail 19 of the hand-stretching machine 13 is guided by rollers 14 on a base 16 installed on the pier 12, and the trajectory of the guide rail 19 is corrected while the bridge is erected to the land on the opposite bank (Patent Document 1). [Prior art documents] [Patent documents]
[0007] [Patent Document 1] Utility Model Registration No. 3140123. Summary of the Invention [Problem to be solved by the invention]
[0008] The conventional method of sending out a hand-stretching machine shown in Figures 9(a) and (b) is a method in which a straight hand-stretching machine 13 is connected to the tip of a straight erection girder 10, and if the hand-stretching machine 13 becomes bent, it is guided by rollers 14, and the trajectory of the guide rail 19 is corrected while the machine is erected successively to the land on the opposite bank. In contrast, the present invention connects a straight guide rail 19 in the tangential direction to the tip of the curved girder 30, and the conventional method in which the erection girder 10 and hand stretching machine 13 are straight cannot be used as is. In addition, in the present invention, the contact position of the guide rail 19 with the endless track belt type slide device 15 is such that, since the curved girder 30 has a bend, as the curved girder 30 approaches the endless track belt type slide device 15 on the pier 12, the ratio of the change in the Y-axis direction of the guide rail 19 to the change in the X-axis direction changes in a complex manner. Therefore, the movement distance of the guide rail 19 in the X-axis direction per unit time in the endless track belt type slide device 15 and the movement distance of the guide rail 19 in the Y-axis direction per unit time in the slide support plate 25 change in a complex manner according to the change in the radius of curvature of the curved girder 30 and the length of the hand stretching machine 13. Not only is it difficult to appropriately control the lateral movement of the guide rail 19 in the endless track belt type slide device 15, but when the guide rail 19 comes off the slide support plate 25, there is a risk that the guide rail 19 will be transferred to the slide support plate 25 or come off the slide support plate 25 and destroy the endless track belt 23.
[0009] The present invention aims to solve such conventional problems and to provide an apparatus and method capable of smoothly and precisely controlling the movement of a curved girder connected to a straight guide rail in the tangential direction of the tip of the curved girder. [Means for solving the problem]
[0010] The curved beam sending device of the present invention is A curved beam delivery device that transfers the curved beam 30 from one point to another point by connecting a linear hand stretching machine 13 to the tip of the curved beam 30, At the other point, a guide rail guide device 31 is installed to guide the guide rail 19 on the underside of the hand stretching machine 13, and this guide rail guide device 31 is characterized in that it comprises a guide rail position adjustment roller 40 on which the guide rail 19 is placed and the hand stretching machine 13 is transported, and a horizontal jack 38 that operates according to the curve of the curved beam 30 to move the guide rail position adjustment roller 40 in a direction intersecting the transport direction of the hand stretching machine 13.
[0011] The guide rail position adjustment roller 40 is characterized in that its vertical position can be freely adjusted by a vertical jack 39 provided on a vertical jack mounting frame 37, and its horizontal position can be freely adjusted by a horizontal jack 38 provided on a horizontal jack mounting frame 36 integrated with the vertical jack mounting frame 37.
[0012] The horizontal jack mounting frame 36 is characterized in that it is slidably mounted on a rail device 35 extending in the extension / contraction direction of the horizontal jack 38.
[0013] The horizontal jack 38 consists of a cylinder 38a and a piston 38b, and is characterized in that the piston 38b is attached to the end of the rail device 35, and the horizontal jack mounting frame 36 to which the cylinder 38a is attached is attached to the rail device 35 so as to be able to slide freely.
[0014] The guide rail position adjustment roller 40 is characterized in that it has roller flanges 48 on both sides for preventing the guide rail 19 from coming off, and MC nylon 49 is attached to the inside of the roller flanges 48.
[0015] The guide rail position adjustment roller 40 and the rotating shaft 50 of this guide rail position adjustment roller 40 are supported by roller support plates 44 on both sides, and the shaft 44a and bearings 44b at both ends of the roller support plate 44 are supported by the piston 39b of the vertical jack 39, the cylinder 39a of the vertical jack 39 is fixed to the vertical jack mounting frame 37 and connected to the horizontal jack mounting frames 36 on both sides of the vertical jack mounting frame 37, the cylinders 38a of the horizontal jacks 38 are fixed to each of these horizontal jack mounting frames 36, each of the horizontal jack mounting frames 36 is slidably mounted on the two rail devices 35, and each of the pistons 38b is attached to the end of each of the rail devices 35.
[0016] The piston 38b of each of the horizontal jacks 38 is removably attached to one end of a rail 42 constituting each of the rail devices 35, and a rotating plate 46a with a stopper 46b continuous with the rail 42 is rotatably provided on the other end of each of the rails 42 by a pivot pin 47. The piston 38b is removed from the rail device 35, the horizontal jack mounting frame 36 is slid until it reaches the stopper 46b, and then the guide rail guide device 31 is rotated by the pivot pin 47 so that the rail 42 functions as a temporary support base.
[0017] The method for launching a curved girder according to the present invention comprises the steps of: A curved beam delivery device that transfers the curved beam 30 from one point to another point by connecting a linear hand stretching machine 13 to the tip of the curved beam 30, A guide rail guide device 31 is installed at the other point to guide the guide rail 19 on the underside of the hand stretching machine 13, and the guide rail guide device 31 is equipped with a guide rail position adjustment roller 40 on which the guide rail 19 is placed and the hand stretching machine 13 is transported, and a horizontal jack 38 is used that operates according to the curve of the curved beam 30 to move the guide rail position adjustment roller 40 in a direction intersecting the transport direction of the hand stretching machine 13, A first step of transporting the curved beam 30 together with the hand stretcher 13 from one point to another; A second step of placing the guide rail 19 of the transported hand stretching machine 13 on a guide rail position adjustment roller 40 installed at the other point; A third step of placing the guide rail 19 on the guide rail position adjustment roller 40 and starting the transport of the hand stretching machine 13 together with the curved beam 30; A fourth step of operating the pump 53 for the vertical jack according to the curve of the curved beam 30 after the start of the transfer of the hand stretching machine 13 to move the guide rail position adjustment roller 40 in a direction intersecting the transfer direction of the hand stretching machine 13; A fifth step of transferring the curved girder 30 to another jack when the curved girder 30 reaches another point; A sixth step of removing the guide rail guide device 31 from the rail device 35 to allow the rail device 35 to function as a temporary support base; The present invention is characterized in that it comprises:
[0018] The method for launching a curved girder according to the present invention comprises the steps of: The piston 38b of each of the horizontal jacks 38 is detachably attached to one end of a rail 42 constituting each of the rail devices 35, and a rotating plate 46a with a stopper 46b continuous with the rail 42 is rotatably provided on the other end of each of the rails 42 by a pivot pin 47, and the piston 38b is removed from the rail device 35, the horizontal jack mounting frame 36 is slid until it reaches the stopper 46b, and then the guide rail guide device 31 is rotated by the pivot pin 47 so that the rail 42 functions as a temporary support. In the sixth step, in order to remove the guide rail guide device 31 from the rail device 35, the guide rail guide device 31 is moved by the horizontal jack 38 to the stopper 46b integral with the rotating plate 46a at the other end of the rail device 35, and the guide rail guide device 31 is rotated downward by the pivot pin 47. Effect of the Invention
[0019] According to the invention described in claim 1, A curved beam delivery device that connects a linear hand stretcher to the tip of a curved beam and transports the curved beam from one point to another point, A guide rail guide device is installed at the other point to guide the guide rail on the underside of the hand stretcher, and the guide rail guide device includes a guide rail position adjustment roller that places the guide rail on the hand stretcher and transports the hand stretcher, and a horizontal jack that operates according to the curve of the curved beam to move the guide rail position adjustment roller in a direction intersecting the transport direction of the hand stretcher, so that when a straight hand stretcher is connected to the tip of the curved beam and the curved beam is transported from one point to another, the horizontal jack is operated according to the curve of the curved beam to move the guide rail position adjustment roller in a direction intersecting the transport direction of the hand stretcher, thereby allowing the curved beam to be transported smoothly. Also, the hand stretcher can be prevented from coming off the guide rail position adjustment roller and destroying or damaging equipment such as an endless track.
[0020] According to the invention described in claim 2, The guide rail position adjustment roller is provided so that its vertical position can be adjusted by the vertical jack provided in the vertical jack mounting frame, and its horizontal position can be adjusted by the horizontal jack provided in the horizontal jack mounting frame integrated with the vertical jack mounting frame, so that the guide rail position adjustment roller position can be controlled by the horizontal jack. Also, the guide rail position adjustment roller and the guide rail can be brought into close contact with each other by the vertical jack, so that their positions can be controlled.
[0021] According to claim 3, The horizontal jack mounting frame is slidably mounted on the rail device extending in the extension / retraction direction of the horizontal jack, so that the position of the guide rail position adjustment roller can be controlled to always be horizontal.
[0022] According to the invention described in claim 4, The horizontal jack consists of a cylinder and a piston, and the piston is attached to the end of the rail device. The horizontal jack mounting frame to which the cylinder is attached is attached so that it can slide freely on the rail device. Therefore, the horizontal jack is always kept horizontal and can be correctly controlled in position.
[0023] According to the invention described in claim 5, The guide rail position adjustment roller has roller flanges on both sides to prevent the guide rail from coming off, so the guide rail will not come off the guide rail position adjustment roller and the curved girder can be guided. In addition, MC nylon is attached to the inside of the roller flange, which acts as a buffer for the guide rail and does not damage it.
[0024] According to the invention described in claim 6, The guide rail position adjusting roller and the rotating shaft of this guide rail position adjusting roller are supported by roller support plates on both sides, the shaft and bearings at both ends of the roller support plate are supported by the piston of the vertical jack, the cylinder of the vertical jack is fixed to the vertical jack mounting frame and the horizontal jack mounting frames are connected to both sides of the vertical jack mounting frame, the cylinder of the horizontal jack is fixed to each of these horizontal jack mounting frames, and each of the horizontal jack mounting frames is mounted so that it can slide freely on the two rail devices, and each of the pistons is attached to the end of each of the rail devices, so that the guide rail is always moved in close contact with the guide rail position adjusting roller even if the curvature of the curved girder changes.
[0025] According to the invention described in claim 7, The piston of each of the horizontal jacks is removably attached to one end of the rails that constitute each of the rail devices, and a rotating plate with a stopper that is continuous with the rail is provided at the other end of each of the rails so that it can be freely rotated by a pivot pin.The piston is removed from the rail device and the horizontal jack mounting frame is slid until it reaches the stopper, and then the guide rail guide device is rotated by the pivot pin so that the rail functions as a temporary support base.Therefore, by simply moving the guide rail guide device to the end of the rail device and rotating it, the rail device can function as a temporary support base when transporting the curved girder.
[0026] According to the invention described in claim 8, The device according to claim 1 is used, A first step of transporting the curved beam together with the hand stretcher from one point to another point; A second step of placing the guide rail of the transported hand stretcher on a guide rail position adjustment roller installed at the other point; A third step of placing the guide rail on the guide rail position adjustment roller and starting the transport of the hand stretcher together with the curved beam; A fourth step of operating the vertical jack pump according to the curve of the curved beam after the start of the transfer of the hand-stretching machine to move the guide rail position adjustment roller in a direction intersecting the transfer direction of the hand-stretching machine; A fifth step of transferring the curved girder to another jack when the curved girder reaches another point; a sixth step of removing the guide rail guide device from the rail device to allow the rail device to function as a temporary support; Therefore, when the curved girder reaches a pier or the like, the guide rail guide device can be removed from the rail device and the transfer operation to the next pier can be started immediately.
[0027] According to the invention described in claim 9, The device according to claim 7 is used, In the sixth step, in order to remove the guide rail guide device from the rail device, the guide rail guide device is moved by the horizontal jack to the stopper that is integral with the rotating plate at the other end of the rail device, and the guide rail guide device is rotated downward by the pivot pin. Therefore, when the curved girder reaches a pier or the like, the guide rail guide device does not need to be completely removed from the rail device, but can simply be rotated to become a temporary support base, and the transport control of the curved girder can be smoothly performed. [Brief description of the drawings]
[0028] [Figure 1] FIG. 1 is a perspective view showing a first embodiment of a guide rail guide device 31 in a curved girder delivery device and method thereof according to the present invention. [Diagram 2] 1(a) is a plan view of a straight-line hand-stretching machine 13 connected to the tip 30a of a curved girder 30, (b) is a plan view of the curved girder 30 moving together with the hand-stretching machine 13 until the tip of the hand-stretching machine 13 has reached the guide rail guide device 31 and the caterpillar-type slide device 15 above the pier 12, and (c) is a side view of the tip of the hand-stretching machine 13. [Diagram 3] 1A to 1C are explanatory diagrams for illustrating a state in which the guide rail guide device 31 of the present invention is normally fixed to the rail device 35, a state in which it has moved to the tip of the rail device 35, and a state in which it has rotated downward at the tip of the rail device 35. [Figure 4] 1A is a front view of the guide rail 19 of the hand stretching machine 13 in contact with the left roller flange 48 of the guide rail position adjustment roller 40, and FIG. 1B is a front view of the guide rail 19 in contact with the right roller flange 48. [Diagram 5] FIG. 1 is a hydraulic circuit diagram of a curved girder sending-out device and method according to a first embodiment of the present invention. [Figure 6]1A is a plan view of the guide rail 19 placed on the endless track belt 23, FIG. 1B is a plan view of the endless track belt 23 moving in the X-axis direction and the slide support plate 25 moving laterally in the Y-axis direction together with the guide rail 19, FIG. 1C is a plan view of the endless track belt type slide device 15 moving laterally in the Y-axis direction, FIG. 1D is a plan view of the slide support plate 25, which has returned to the center by the return spring 26, riding on the guide rail 19, and FIG. 1E is a side view of the guide rail 19 placed on the endless track belt 23. [Figure 7] 2 is a partially cutaway plan view of a track unit 24 in an endless track 23. FIG. [Figure 8] FIG. 1 is an explanatory diagram of a state in which a hand stretching machine 13 is connected to a curved girder 30 and transported in a conventional manner. [Figure 9] This shows a conventional method of connecting a straight-line hand-stretching machine to a straight-line erection girder for transportation, where (a) is a plan view of a straight-line erection girder 10 connected to a hand-stretching machine 13, and (b) is a side view of (a). [Figure 10] This is a front view of the hand stretching machine 13 being transported along the guide rail 19 by the bogie rollers 14. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0029] The weight position adjustment device of the present invention comprises: A curved beam delivery device that transfers the curved beam 30 from one point to another point by connecting a linear hand stretching machine 13 to the tip of the curved beam 30, At the other point, a guide rail guide device 31 is installed to guide the guide rail 19 on the underside of the hand stretching machine 13, and this guide rail guide device 31 comprises a guide rail position adjustment roller 40 that carries the guide rail 19 and transports the hand stretching machine 13, and a horizontal jack 38 that operates according to the curve of the curved beam 30 to move the guide rail position adjustment roller 40 in a direction intersecting the transport direction of the hand stretching machine 13.
[0030] The guide rail position adjustment roller 40 is arranged so that its vertical position can be freely adjusted by a vertical jack 39 provided on a vertical jack mounting frame 37, and its horizontal position can be freely adjusted by a horizontal jack 38 provided on a horizontal jack mounting frame 36 that is integral with the vertical jack mounting frame 37.
[0031] The horizontal jack mounting frame 36 is slidably mounted on a rail device 35 extending in the extension / retraction direction of the horizontal jack 38.
[0032] The horizontal jack 38 comprises a cylinder 38a and a piston 38b. The piston 38b is attached to the end of the rail device 35, and the horizontal jack mounting frame 36 to which the cylinder 38a is attached is attached to the rail device 35 so as to be freely slidable.
[0033] The guide rail position adjustment roller 40 is provided on both sides with roller flanges 48 for preventing the guide rail 19 from coming off, and MC nylon 49 is attached to the inside of the roller flanges 48.
[0034] The guide rail position adjustment roller 40 and the rotating shaft 50 of this guide rail position adjustment roller 40 are supported by roller support plates 44 on both sides, and the shaft 44a and bearings 44b at both ends of the roller support plate 44 are supported by the piston 39b of the vertical jack 39. The cylinder 39a of the vertical jack 39 is fixed to the vertical jack mounting frame 37 and connected to the horizontal jack mounting frames 36 on both sides of the vertical jack mounting frame 37. The cylinders 38a of the horizontal jacks 38 are fixed to each of these horizontal jack mounting frames 36. Each of the horizontal jack mounting frames 36 is mounted on the two rail devices 35 so that it can slide freely, and each of the pistons 38b is attached to the end of each of the rail devices 35.
[0035] The piston 38b of each of the horizontal jacks 38 is removably attached to one end of a rail 42 constituting each of the rail devices 35, and a rotating plate 46a with a stopper 46b continuous with the rail 42 is rotatably mounted on the other end of each of the rails 42 via a pivot pin 47. The piston 38b is removed from the rail device 35, and the horizontal jack mounting frame 36 is slid until it reaches the stopper 46b, and then the guide rail guide device 31 is rotated via the pivot pin 47 to cause the rail 42 to function as a temporary support base.
[0036] The device according to claim 1 is used, A first step of transporting the curved beam 30 together with the hand stretcher 13 from one point to another; A second step of placing the guide rail 19 of the transported hand stretching machine 13 on a guide rail position adjustment roller 40 installed at the other point; A third step of placing the guide rail 19 on the guide rail position adjustment roller 40 and starting the transport of the hand stretching machine 13 together with the curved beam 30; A fourth step of operating the pump 53 for the vertical jack according to the curve of the curved beam 30 after the start of the transfer of the hand stretching machine 13 to move the guide rail position adjustment roller 40 in a direction intersecting the transfer direction of the hand stretching machine 13; A fifth step of transferring the curved girder 30 to another jack when the curved girder 30 reaches another point; A sixth step of removing the guide rail guide device 31 from the rail device 35 to allow the rail device 35 to function as a temporary support base; It consists of:
[0037] The device according to claim 7 is used, In the sixth step, in order to remove the guide rail guide device 31 from the rail device 35, the guide rail guide device 31 is moved by the horizontal jack 38 to the stopper 46b integral with the rotating plate 46a at the other end of the rail device 35, and the guide rail guide device 31 is rotated downward by the pivot pin 47. EXAMPLES
[0038] A first embodiment of the present invention will be described with reference to the drawings. In Figure 2(a), 30 is a curved girder with a bend, and a straight hand stretching machine 13 is connected to the tip 30a of this curved girder 30 at the production yard or abutment 11, and as in Figure 9(a), it is transported to the tip of the abutment 11 by a cart 18 moving on rails 17 and a caterpillar-type slide device 15 on a base 16, etc. Here, if the curvature of the curved beam 30 is 1100R and the length of the hand stretching machine 13 is a = 40 m, when the tip of the curved beam 30 is transferred to the tip of the hand stretching machine 13 before transfer, the lateral movement distance b of the hand stretching machine 13 is approximately 30 cm. In Fig. 2(b), a caterpillar-type slide device 15 and a guide rail guide device 31 of the present invention are installed on a pier 12, for example, 40 m away from the abutment 11. When the tip of the sent-out hand stretching machine 13 reaches the guide rail guide device 31 via the caterpillar-type slide device 15, the guide rail 19 attached to the underside of the hand stretching machine 13 rides up on the guide rail position adjustment roller 40 (described later) of the caterpillar-type slide device 15. When the guide rail 19 is a double-unit unit, each guide rail 19 rides up on the guide rail position adjustment roller 40 of the caterpillar-type slide device 15 installed next to each other.
[0039] In Fig. 1, the guide rail guide device 31 of the present invention is provided with a guide rail position adjustment roller 40 in the center, and the guide rail guide device 31 is movably mounted on two parallel rail devices 35. The guide rail guide device 31 has a jack fixing body 34 consisting of two horizontal vertical jack mounting frames 37, one above the other in the center, and a horizontal jack mounting frame 36 consisting of a horizontal plate and a vertical plate integrally attached to both sides of the vertical jack mounting frame 37. The cylinders 39a of four vertical jacks 39 are attached to the vertical jack mounting frame 37, and the pistons 39b of the vertical jacks 39 protrude upward from the vertical jack mounting frame 37 so as to be vertically movable. The guide rail position adjustment roller 40, supported by two roller support plates 44, is attached to the upper part of the vertical jack mounting frame 37 so as to be freely rotatable on a rotating shaft 50, and this rotating shaft 50 is supported at both ends by roller shaft support plates 45, which fit the two vertical jack mounting frames 37 so as to be freely movable up and down. A shaft 44a is attached to both ends of the roller support plate 44, and a bearing 44b of this shaft 44a is attached to the tip of the piston 39b.
[0040] The horizontal jack mounting frames 36 on both sides are provided with horizontal jacks 38 for moving the guide rail position adjustment rollers 40 laterally in parallel with the rotation axis 50 of the guide rail position adjustment rollers 40. The length of the horizontal jacks 38 is determined by the curvature of the curved girder 30 and the length of the hand stretching machine 13. In the above example, the curved girder 30 has a curvature of 1100R and the hand stretching machine 13 has a length of 40m, so the horizontal movement distance is about 30cm, and is determined to be 30 to 50cm accordingly. The cylinder 38 a of the horizontal jack 38 is attached to the horizontal jack mounting frame 36 , and the piston 38 b is detachably attached to a piston support plate 41 at the end of the rail device 35 . The rail device 35 is a rail 42 with a flat upper surface, the piston support plate 41 is attached to one end of the upper surface of the rail 42, the piston 38b is detachably connected to the piston support plate 41, and a rail fitting groove member 43 integral with the horizontal jack mounting frame 36 is slidably fitted to the side of the rail 42. A rotating plate 46a, which is flush with the rail 42 and has the same width as the rail fitting groove member 43, is connected to the other end of the rail 42 by a rotating pin 47, and a stopper 46b is provided at the tip of the rotating plate 46a to prevent the rail fitting groove member 43 from slipping out.
[0041] 4(a) and (b), the guide rail position adjustment roller 40 has a width w of about 1.3 to 1.5 times the width of the guide rail 19, and the height h of the roller flanges 48 on both sides is about 1.5 times the height of the guide rail 19, so that the guide rail 19 does not come off during lateral movement. MC nylon 49 is attached to the inside of the roller flanges 48 so that the guide rail 19 can rotate smoothly even when it comes into contact with the roller flanges 48.
[0042] As shown in FIG. 5, the two horizontal jacks 38 are connected to a horizontal jack pump 52, and the horizontal jack pump 52 and an encoder 51 that measures the travel distance of the horizontal jacks 38 are connected to a horizontal jack control circuit 54. The four vertical jacks 39 are connected to vertical jack pumps 53 which are driven separately in pairs, and these vertical jack pumps 53 are connected to a vertical jack control circuit 55. The horizontal jack control circuit 54 and the vertical jack control circuit 55 are connected to an input terminal 56 which inputs the control amounts of the horizontal jacks 38 and the vertical jacks 39.
[0043] The operation of the guide rail guide device 31 configured as above will now be described. Prior to the transportation of the curved girder 30 connected to the hand stretching machine 13, the change in the trajectory that the curved girder 30 will move laterally from the time the guide rail 19 of the hand stretching machine 13 reaches the guide rail position adjustment roller 40 until the tip 30a of the curved girder 30 reaches the guide rail position adjustment roller 40 is calculated in advance based on the curvature of the curved girder 30 (assuming that the curvature is constant) and the length of the hand stretching machine 13, and this change is inputted into the horizontal jack control circuit 54 from the input terminal 56. When the curved beam 30 is sent out, the tip of the hand stretching machine 13 drops slightly, so it is preferable that the underside of the tip of the hand stretching machine 13 is curved as shown in Figure 2 (c) so that the guide rail 19 of the hand stretching machine 13 can easily ride up onto the guide rail position adjustment roller 40 when it reaches the guide rail position adjustment roller 40 of the guide rail guide device 31. When the guide rail 19 of the hand stretching machine 13 reaches the guide rail position adjustment rollers 40 of the guide rail guide device 31, the four vertical jacks 39 detect the load, and it is determined whether the guide rail 19 is approximately in the center of the guide rail position adjustment rollers 40 and whether the bottom of the guide rail 19 is in contact with the guide rail position adjustment rollers 40. The height and inclination of the vertical jacks 39 are adjusted by signals from the input terminal 56 so that they become correct. In the above example, it was assumed that the curved girder 30 had a constant curvature, but an appropriate control signal is input from the input terminal 56 based on how the curvature changes, the degree of curvature (e.g., whether the curve is winding or includes straight lines), and the length of the guide rail 19.
[0044] As the curved girder 30 is fed, the hand stretching machine 13 advances while the guide rail 19 is in contact with the guide rail position adjustment roller 40, and moves laterally in response to changes in the curvature of the curved girder 30. At this time, the rail fitting groove member 43 of the horizontal jack mounting frame 36 fits into the rail 42 of the rail device 35 and moves laterally along the rail 42. The amount of movement of the horizontal jack 38 corresponding to the amount of lateral movement per unit time at the contact point with the guide rail position adjustment roller 40 of the hand stretching machine 13 is input in advance from the input terminal 56 to the horizontal jack control circuit 54, and the lateral movement distance of the horizontal jack 38 is measured by the encoder 51, and the signal is sent to the horizontal jack control circuit 54. The guide rail position adjustment roller 40 moves laterally together with the guide rail 19 of the hand stretching machine 13 by the output signal calculated by this horizontal jack control circuit 54. The guide rail 19 moves laterally while always contacting the center position of the guide rail position adjustment roller 40, but even if it contacts the left roller flange 48 as in FIG. 4(a) or the right roller flange 48 as in FIG. 4(b), it rotates the guide rail position adjustment roller 40 within the range of the width of the guide rail position adjustment roller 40 and moves laterally.
[0045] When the curved girder 30 is transported and the contact position between the guide rail 19 and the guide rail position adjustment roller 40 reaches the tip 30a of the curved girder 30, the curved girder 30 is transferred to the caterpillar belt type slide device 15 provided adjacent to the guide rail guide device 31. When the caterpillar belt type slide device 15 is not provided, a transfer jack (not shown) is placed on the pier 12 to transfer the curved girder 30. After the curved girder 30 is placed on the caterpillar-type slide device 15 or on a separately installed jack, the guide rail position adjustment roller 40 of the guide rail guide device 31 lowers the vertical jack 39 to remove it from the guide rail 19.
[0046] At the point when the curved girder 30 is transferred to the endless track type slide device 15 or to a separately installed jack, the guide rail 19 of the hand stretching machine 13 reaches the guide rail position adjustment roller 40 of the guide rail guide device 31 installed on the next pier 12. If the curved girder 30 is transported in this state, the guide rail guide device 31 will get in the way of subsequent transport of the curved girder 30. Therefore, it is necessary to move the guide rail guide device 31 from above the rail device 35 at the point in time when the curved girder 30 is transferred to the caterpillar belt-type slide device 15 or a separately installed jack at the first pier 12. For this reason, in Fig. 3, the piston 38b of the horizontal jack 38, which was connected to the piston support plate 41 of the rail device 35 by the pin 57, is removed, and the piston 38b of the horizontal jack 38 is moved in a contracted state to the right in Fig. 3. Then, the rail fitting groove member 43 of the guide rail guide device 31 fits into the rail 42 and moves, and the rail fitting groove member 43 moves to the rotating plate 46a and stops at the stopper 46b.
[0047] When the rail fitting groove material 43 stops at the stopper 46b, the screw connecting the rail 42 and the rotating plate 46a is removed, and the plate is rotated to the right in FIG. 6 with the rotating pin 47 as the fulcrum. Then, the entire device including the guide rail position adjustment roller 40 of the guide rail guide device 31 is positioned below the extension line of the rail 42 of the rail device 35, and the horizontal jack 38 faces downward. In this state, the sandle material 33 and the like are placed on the rail 42 of the rail device 35 to make it a temporary support base, and the plate is transferred from the transfer jack to the temporary support base.
[0048] After the curved girder 30 is rearranged using the guide rail guide device 31 on the first pier 12 as a temporary support, the curved girder 30 with the hand stretching machine 13 is transported toward the guide rail guide device 31 on the next pier 12 in the same manner as described above. The curved girder 30 is then transported in the same manner to another location, such as land on the opposite shore. [Explanation of symbols]
[0049] 9...Curved girder delivery device and method thereof, 10...Erection girder, 11...Abutment, 12...Pier, 13...Hand stretching machine, 14...Bogie roller, 15...Crawler-type slide device, 16...Pedestal, 17...Rail, 18...Carriage, 19...Guide rail, 21...Support base, 22...Axle, 23...Crawler belt, 24...Crawler belt unit, 25...Slide support plate, 26...Return spring, 27...Recess, 30...Curved girder, 31...Guide rail guide device, 32...Temporary support base, 33...Sandle material, 35...Rail device, 36...Horizontal jack mounting frame, 37...Vertical jack mounting frame, 38...Horizontal jack, 38a...Cylinder, 38 b...piston, 39...vertical jack, 39a...cylinder, 39b...piston, 40...roller for adjusting guide rail position, 41...piston support plate, 42...rail, 43...rail fitting groove material, 44...roller support plate, 44a...shaft, 44b...bearing, 45...roller shaft support plate, 46a...rotating plate, 46b...stopper, 47...rotating pin, 48...roller flange, 49...MC nylon, 50...rotating shaft, 51...encoder, 52...pump for horizontal jack, 53...pump for vertical jack, 54...horizontal jack control circuit, 55...vertical jack control circuit, 56...input terminal, 57...pin.
Claims
1. A curved beam delivery device that connects a linear hand stretcher to the tip of a curved beam and transports the curved beam from one point to another point, A curved beam sending-out device is provided, which is installed at the other point and guides a guide rail on the underside of the hand-stretching machine, and this guide rail guide device comprises a guide rail position adjustment roller on which the guide rail is placed and which transports the hand-stretching machine, and a horizontal jack which operates in accordance with the curve of the curved beam to move the guide rail position adjustment roller in a direction intersecting the transport direction of the hand-stretching machine.
2. 2. The curved girder sending-out device according to claim 1, characterized in that the guide rail position adjustment rollers are arranged so that their vertical positions can be freely adjusted by a vertical jack provided in a vertical jack mounting frame, and their horizontal positions can be freely adjusted by a horizontal jack provided in a horizontal jack mounting frame integral with the vertical jack mounting frame.
3. 3. The curved girder sending-out device according to claim 2, wherein the horizontal jack mounting frame is slidably mounted on a rail device extending in the extension / retraction direction of the horizontal jack.
4. 4. The curved girder launching device according to claim 3, characterized in that the horizontal jack comprises a cylinder and a piston, the piston is attached to an end of the rail device, and the horizontal jack mounting frame to which the cylinder is attached is slidably attached to the rail device.
5. 2. The curved girder sending-out device according to claim 1, wherein the guide rail position adjustment roller has roller flanges on both sides to prevent the guide rail from coming off, and MC nylon is attached to the inside of the roller flanges.
6. 4. The curved girder launching device according to claim 3, characterized in that the guide rail position adjusting rollers and the rotating shafts of the guide rail position adjusting rollers are supported by roller support plates on both sides, the shafts and bearings at both ends of the roller support plate are supported by pistons of four vertical jacks positioned at both ends of the roller support plate, the cylinders of the four vertical jacks are fixed to the vertical jack mounting frame, the horizontal jack mounting frames are connected to both sides of the vertical jack mounting frame, the cylinders of two horizontal jacks are fixed to these horizontal jack mounting frames, each of the horizontal jack mounting frames is mounted on two of the rail devices so as to be able to slide freely, and each of the pistons of the two horizontal jacks is attached to the end of each of the rail devices.
7. The curved girder launching device as described in claim 6, characterized in that the pistons of each of the two horizontal jacks are removably attached to one end of each of the rails that constitute the two rail devices, and a rotating plate with a stopper that is continuous with the rails is rotatably provided on the other end of each of the rails with a pivot pin, and the pistons are removed from the rail device and the horizontal jack mounting frame is slid until it reaches the stopper, and then the guide rail guide device is rotated with the pivot pin so that the rail functions as a temporary support base.
8. The device according to claim 1 is used, The guide rail guide device is movably mounted on the rail device, A first step of transporting the curved beam together with the hand stretcher from one point to another point; A second step of placing the guide rail of the transported hand stretching machine on a guide rail position adjustment roller installed at the other point; A third step of placing the guide rail on the guide rail position adjustment roller and starting the transport of the hand stretcher together with the curved beam; A fourth step of operating a pump for a vertical jack according to the curve of the curved beam after the start of the transfer of the hand-stretching machine to move the guide rail position adjustment roller in a direction intersecting the transfer direction of the hand-stretching machine; A fifth step of transferring the curved girder to another jack when the curved girder reaches another point; a sixth step of removing the guide rail guide device from the rail device to allow the rail device to function as a temporary support; A method for sending out a curved girder comprising the steps of:
9. The device according to claim 7 is used, 9. The method for feeding out a curved girder according to claim 8, characterized in that in the sixth step, in order to remove the guide rail guide device from the rail device, the guide rail guide device is moved by the horizontal jack to the stopper integral with the rotating plate at the other end of the rail device, and the guide rail guide device is rotated downward by the pivot pin.
Citation Information
Patent Citations
Small-radius curve large-gradient narrow ramp bridge girder erection machine and construction method
CN115807387A
Method of send-out bridge girders, and device used for sending
JP2004346728A
Erection method of girder
JP2007138514A
Construction method for launching bridge girder
JP2011047117A
Sending-out method
JP2015169015A
