server

The aggregator server addresses power loss disparities in non-contact charging by adjusting rewards, ensuring equitable participation and maintaining power balance in virtual power plants.

JP7601014B2Active Publication Date: 2024-12-17TOYOTA JIDOSHA KK
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2022001617
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-01-07
Publication Date
2024-12-17
Estimated Expiration
2042-01-07

AI Technical Summary

Technical Problem

In a virtual power plant, vehicles participating in demand response (DR) through non-contact charging face higher power losses, resulting in lower power storage and increased electricity costs, which can discourage participation and disrupt the power supply and demand balance.

Method used

An aggregator server adjusts rewards for vehicles participating in DR, providing higher rewards for non-contact charging to offset power losses and ensure equitable participation, using a processing device to calculate and distribute rewards based on transmitted power amounts and unit prices.

Benefits of technology

The solution enhances participation in DR by vehicles with non-contact charging, maintaining power supply and demand balance while reducing perceived unfairness and costs, thus stabilizing the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007601014000001
    Figure 0007601014000001
  • Figure 0007601014000002
    Figure 0007601014000002
  • Figure 0007601014000003
    Figure 0007601014000003
Patent Text Reader

Abstract

To contribute to adjustment of the electric power supply-demand balance by suppressing reduction of vehicles participating in DR with non-contact charging.SOLUTION: A server 600 comprises a communication device 630 and a processing device 605. The communication device 630 acquires the transmission electric power amount transmitted from an electric power facility during external charging of a vehicle 50 participating in DR. The processing device 605 calculates a standard reward being a standard of a reward given to each of the plurality of vehicles 50 from an aggregator according to the transmission electric power amount when each of the plurality of vehicles 50 participates in DR. The processing device 605 decides a first reward such that the first reward being the reward given to the first vehicle from the aggregator becomes the standard reward of the first vehicle when the first vehicle participates in DR, and decides a second reward such that the second reward being the reward given to the second vehicle from the aggregator becomes greater than the standard reward of the second vehicle when the second vehicle participates in DR.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a server. [Background technology]

[0002] JP 2015-95983 A (Patent Document 1) discloses an electric vehicle. This electric vehicle is configured so that the battery of the electric vehicle can be charged with power supplied from a power facility connected to a commercial power source via a power cable (contact charging). The electric vehicle is also configured so that the battery can be charged by receiving power supplied from a charging / discharging facility in a non-contact manner (non-contact charging). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2015-95983 A Summary of the Invention [Problem to be solved by the invention]

[0004] In a virtual power plant (VPP), an aggregator server uses demand response (DR) to adjust the balance between power supply and demand. DR is a mechanism that requests the power resource of a consumer to change (e.g., increase) the power demand.

[0005] A vehicle equipped with a power storage device may be used as the above-mentioned power resource. When multiple vehicles participate in DR, a situation is assumed in which one vehicle (first vehicle) participates in DR by performing contact charging, while another vehicle (second vehicle) participates in DR by performing non-contact charging.

[0006] The power loss occurring during non-contact charging is generally greater than the power loss occurring during contact charging. Therefore, the amount of power stored in the power storage device of the second vehicle due to DR may be less than the amount of power stored in the power storage device of the first vehicle. Therefore, the second vehicle may need to perform non-contact charging extra. In this case, the second vehicle will be charged extra electricity fees for this non-contact charging.

[0007] As a result, the second vehicle may be at a disadvantage compared to the first vehicle. If the number of second vehicles participating in DR decreases due to this disadvantage, this is undesirable from the viewpoint of adjusting the balance between power supply and demand.

[0008] The present disclosure has been made to solve the above problems, and its purpose is to provide a server that contributes to adjusting the balance of power supply and demand by preventing a decrease in the number of vehicles participating in DR through contactless charging. [Means for solving the problem]

[0009] The server of the present disclosure is an aggregator server that requests a plurality of vehicles, each of which is equipped with a power storage device and configured to be electrically connectable to a power grid, to participate in DR (Demand Response). Each of the plurality of vehicles is configured to be able to participate in DR by performing external charging to charge the power storage device using power from a power facility connected to the power grid. A first vehicle among the plurality of vehicles is configured to be able to perform contact charging, which is external charging using power received through a power cable of a first power facility as a power facility. A second vehicle among the plurality of vehicles is configured to be able to perform non-contact charging, which is external charging using power received in a non-contact manner from a second power facility as a power facility. The server includes an acquisition device and a processing device. The acquisition device acquires the amount of transmitted power transmitted from the power facility during external charging of the vehicle participating in DR. When each of the plurality of vehicles participates in DR, the processing device calculates a reference remuneration, which is a reference of a remuneration given to each of the plurality of vehicles by the aggregator, according to the amount of transmitted power. The processing device determines a first reward, which is a reward given to the first vehicle by the aggregator when the first vehicle participates in DR, so that the first reward becomes a base reward for the first vehicle, and determines a second reward, which is a reward given to the second vehicle by the aggregator when the second vehicle participates in DR, so that the second reward is greater than the base reward for the second vehicle.

[0010] The amount of power loss during non-contact charging is greater than the amount of power loss during contact charging. Therefore, the amount of power stored in the power storage device of the second vehicle due to DR is less than the amount of power stored in the power storage device of the first vehicle. Therefore, the second vehicle may be at a disadvantage compared to the first vehicle. With the above configuration, the remuneration (first remuneration) of the first vehicle is a base remuneration, whereas the remuneration (second remuneration) of the second vehicle is greater than the base remuneration, so that the second vehicle can benefit more from the remuneration than the first vehicle. Therefore, it is possible to suppress a decrease in the number of vehicles participating in DR by non-contact charging, thereby contributing to the adjustment of the balance between power supply and demand.

[0011] Preferably, the processing device determines a first remuneration according to a first transmission amount of power, which is the amount of power transmitted to the first vehicle, and a first unit price, which is the unit price of the first remuneration for the first transmission amount of power, and determines a second remuneration according to a second transmission amount of power, which is the amount of power transmitted to the second vehicle, and a second unit price, which is the unit price of the second remuneration for the second transmission amount of power, the second unit price being higher than the first unit price.

[0012] With the above configuration, the second unit price and the first unit price are determined so that the second unit price is higher than the first unit price, thereby improving a situation in which the second vehicle is at a disadvantage compared to the first vehicle.

[0013] Preferably, the processing device calculates a first electricity cost, which is the electricity cost of the first vehicle in DR, according to the electricity rate unit price of the power system and the first transmitted electricity amount, calculates a second electricity cost, which is the electricity cost of the second vehicle in DR, according to the electricity rate unit price and the second transmitted electricity amount, calculates a first profit, which is the profit the first vehicle obtains when participating in DR, by subtracting the first electricity cost from the first reward, calculates a second profit, which is the profit the second vehicle obtains when participating in DR, by subtracting the second electricity cost from the second reward, and determines the first reward and the second reward so that the difference between the first profit and the second profit is less than a threshold.

[0014] With the above configuration, it is possible to appropriately determine the first remuneration and the second remuneration while avoiding a situation in which the first profit and the second profit diverge.

[0015] Preferably, a total remuneration amount, which is a sum of the remunerations given to each of the plurality of vehicles by the aggregator, is an added value of a sum of the first remunerations of each of the at least one first vehicle and a sum of the second remunerations of each of the at least one second vehicle. The processing device determines the first remuneration and the second remuneration such that the total remuneration amount is maintained.

[0016] With the above configuration, the aggregator can appropriately distribute the total remuneration amount to the first vehicle and the second vehicle while avoiding a situation in which the power adjustment profit decreases as the total remuneration amount increases.

[0017] Preferably, when the first vehicle and the second vehicle use a toll infrastructure, the processing device determines the first remuneration and the second remuneration so that the second vehicle can use the toll infrastructure at a lower cost than the first vehicle.

[0018] With the above configuration, the second vehicle can benefit more than the first vehicle in terms of the usage fee for the paid infrastructure.

[0019] Preferably, the contactless charging includes on-the-go charging that is performed while the second vehicle is traveling in a power supply lane in which the second power facility is provided. When the second vehicle participates in DR by performing on-the-go charging, the processing device executes processing for notifying a user of the second vehicle when a start time of a period in which the second vehicle participates in DR arrives. The notification includes a notification that prompts the user of the second vehicle to drive the second vehicle in the power supply lane when the second vehicle is traveling in a travel lane different from the power supply lane at the start time.

[0020] With the above configuration, when the second vehicle performs charging while traveling, the aggregator can reliably allow the second vehicle to participate in DR.

[0021] Preferably, each of the multiple vehicles is configured to be able to participate in DR by performing external power feeding that supplies power stored in the power storage device to the power equipment. The first vehicle is configured to be able to perform contact power feeding, which is external power feeding that feeds power to the first power equipment through a power cable. The second vehicle is configured to be able to perform non-contact power feeding, which is external power feeding that feeds power to the second power equipment in a non-contact manner. The acquisition device acquires the amount of received power received by the power equipment during external power feeding of the vehicle participating in DR. The processing device calculates a base reward according to the amount of received power when each of the multiple vehicles participates in DR, determines a first reward such that the first reward is the base reward of the first vehicle calculated according to the amount of received power of the first power equipment when the first vehicle participates in DR, and determines a second reward such that the second reward is greater than the base reward of the second vehicle calculated according to the amount of received power of the second power equipment when the second vehicle participates in DR.

[0022] The amount of power loss during non-contact charging is greater than the amount of power loss during contact charging. Therefore, the amount of power received by the second power facility in DR may be less than the amount of power received by the first power facility. Therefore, the remuneration for the second vehicle may be less than the remuneration for the first vehicle, and the second vehicle may be at a disadvantage compared to the first vehicle. With the above configuration, even when the first vehicle and the second vehicle participate in DR by external power supply, the remuneration for the first vehicle (first remuneration) is the base remuneration, whereas the remuneration for the second vehicle (second remuneration) is greater than the base remuneration. Therefore, the second vehicle can benefit more from the remuneration than the first vehicle. Effect of the Invention

[0023] According to the present disclosure, it is possible to suppress a decrease in the number of vehicles participating in DR by using wireless charging, thereby contributing to adjusting the balance between power supply and demand. [Brief description of the drawings]

[0024] [Figure 1] 1 is a diagram showing a schematic configuration of a power management system according to an embodiment of the present invention; [Diagram 2] FIG. 1 is a diagram showing a configuration of a vehicle. [Diagram 3] 1A and 1B are diagrams illustrating a situation in which a vehicle is performing contact charging and a situation in which the vehicle is performing non-contact charging; [Figure 4] FIG. 13 is a diagram illustrating a difference in the amount of electric power stored in a battery when a vehicle participates in DR. [Diagram 5] FIG. 1 is a diagram for explaining the difference between contact charging and non-contact charging from the viewpoint of the benefit that a vehicle obtains when participating in DR. [Figure 6] FIG. 11 is a diagram for explaining that the DR remuneration is determined to be greater than the base remuneration in the first embodiment. [Figure 7] FIG. 4 is a diagram illustrating an example of data stored in a storage device of a server. [Figure 8] FIG. 4 is a functional block diagram illustrating functions of a server according to the first embodiment. [Figure 9] 11 is a flowchart showing an example of a process executed by a processing device of a server before a target DR period arrives in the first embodiment. [Figure 10] 5 is a flowchart showing an example of processing executed by a processing device after a target DR period ends in the first embodiment. [Figure 11] 11 is a flowchart for explaining details of the process for correcting unfairness (step S145 in FIG. 10). [Figure 12] 4 is a flowchart showing an example of a process executed by an ECU of a vehicle. [Figure 13] FIG. 13 is a diagram for explaining a method for determining a DR reward for a vehicle in the first modified example. [Figure 14] 13 is a flowchart showing an example of processing executed by the processing device after a target DR period ends in this modification 1. [Figure 15] FIG. 11 is a functional block diagram for explaining functions of a server according to the second modification. [Figure 16] 13 is a flowchart showing details of a process executed to correct unfairness among vehicles in this modification 2. FIG. [Figure 17]11 is a flowchart showing an example of a process executed by the processing device after a target DR period ends in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0025] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference characters and the description thereof will not be repeated.

[0026] [Embodiment 1] Fig. 1 is a diagram showing a schematic configuration of a power management system according to the present embodiment. Referring to Fig. 1, a power management system 10 includes a power system PG, a server 305, a power resource group 500, a server 600, and a server 700.

[0027] The power grid PG is constructed by the power transmission and distribution facilities. The power grid PG is maintained and managed by the electric power company that operates it.

[0028] The server 305 is operated by a business operator that manages a toll infrastructure 310 for vehicles. The toll infrastructure 310 for vehicles is, for example, a highway 312 or a parking lot 315. When a vehicle uses the toll infrastructure 310, the server 305 bills the user of the vehicle for payment of a usage fee for the toll infrastructure 310.

[0029] The power resource group 500 includes a plurality of vehicles 50 each equipped with a battery 130. Each vehicle 50 is configured to be electrically connectable to a power grid PG, and is a battery electric vehicle (BEV) that functions as a distributed power source.

[0030] Each vehicle 50 is configured to be capable of performing external charging, in which the battery 130 is charged using electric power from a power facility provided outside the vehicle.

[0031] When each vehicle 50 performs external charging, power is supplied to each vehicle 50 from the power grid PG, and the power load in the power grid PG increases. Therefore, each vehicle 50 can contribute to the adjustment of the power load (participate in DR) by performing external charging. When each vehicle 50 participates in DR, it can receive a reward from the aggregator according to its contribution to the power supply and demand balance in the power grid PG.

[0032] When the vehicle 50 participates in an "upward DR" that requests the vehicle 50 to increase the amount of charging power in external charging, the power demand in the power system PG can be increased by the increased amount of power. The upward DR is implemented when the power supply in the power system PG is greater than the power demand.

[0033] On the other hand, when the vehicle 50 participates in a "Downward DR" that requests the vehicle 50 to reduce (save) the amount of charging power in external charging, the power demand in the power grid PG is reduced by the reduced amount of charging power. The Downward DR is implemented when the power demand in the power grid PG is greater than the power supply. In this case, power may be supplied to the power grid PG through the power facility 45 by the external power supply (described later) of the vehicle 50.

[0034] The server 600 belongs to the aggregator and is configured to manage the power resource group 500. The aggregator is an electric utility that procures power for the power system PG using the power resource group 500 and increases or decreases the power load in the power system PG. This allows the aggregator to receive remuneration from the electric power company.

[0035] The server 600 includes a processing device 605, a storage device 620, and a communication device 630. The processing device 605 includes a processor such as a central processing unit (CPU) and memories such as a read only memory (ROM) and a random access memory (RAM). The storage device 620 stores, for example, programs executed by the processing device 605, as well as various information and data used by the processing device 605. The communication device 630 is a variety of communication interfaces.

[0036] The server 600 receives an adjustment request ARE for the balance between power supply and demand in the power system PG from the server 700 (described later). The adjustment request ARE includes a prediction result of whether power demand or power supply is greater in a target time period. When the server 600 receives the adjustment request ARE, the server 600 requests the vehicles 50 to participate in DR. Specifically, the server 600 transmits a DR signal S1 to each vehicle 50.

[0037] The DR signal S1 is a signal for requesting the vehicle 50 to participate in a down DR or an up DR. The DR signal S1 includes the type of DR (either up DR or down DR) and a period during which the vehicle 50 is requested to participate in the DR (DR period). The DR signal S1 further includes information indicating the amount of power exchanged between the vehicle 50 and the power system PG during the DR period (such as the amount of power transmitted from power equipment connected to the power system PG to the vehicle 50) and a reward (DR reward) paid by the aggregator to the user of the vehicle 50 for participating in the DR.

[0038] The server 600 is configured to receive an approval signal S11 from the vehicle 50. The approval signal S11 is transmitted from the vehicle 50 to the server 600 when the participation of the vehicle 50 in the DR is approved by the user of the vehicle 50.

[0039] When the server 600 receives the approval signal S11, a contract is established between the user of the vehicle 50 and the aggregator. This contract includes information indicating the DR period, the type of DR, the amount of power transferred during the DR period, and the DR remuneration. Contract information indicating the contents of this contract is included in the approval signal S11 and is stored in the storage device of the vehicle 50 and the storage device 620 of the server 600.

[0040] The server 700 is a computer belonging to a power company, and is configured to be able to communicate with the server 600. The server 700 predicts the power supply and demand balance in the power system PG for each period (time period), and outputs an adjustment request ARE for the power supply and demand balance to the server 600 according to the prediction result.

[0041] Fig. 2 is a diagram showing a configuration of a vehicle 50. Referring to Fig. 2, the vehicle 50 includes an inlet 110, voltage sensors 121, 131, and 141, and current sensors 122, 132, and 142. The vehicle 50 further includes a power receiving device 123, a battery 130, an HMI device 170, a communication device 180, a GPS (Global Positioning System) receiving device 181, and an ECU 150.

[0042] The inlet 110 is configured to receive power from a power stand 40 (described later). The voltage sensor 121 detects the voltage of the power received by the inlet 110. The current sensor 122 detects the current of the power received by the inlet 110.

[0043] The power receiving device 123 can wirelessly receive power from a power facility 45 (described later) and wirelessly transmit power to the power facility 45. The power receiving device 123 includes a coil .

[0044] The voltage sensor 141 detects the voltage of the power received by the power receiving device 123 or the power transmitted by the power receiving device 123. The current sensor 142 detects the current of the power received by the power receiving device 123 or the power transmitted by the power receiving device 123.

[0045] The battery 130 is a secondary battery such as a lithium ion battery or a nickel metal hydride battery. The battery 130 may be replaced by an electric double layer capacitor or other power storage device. The battery 130 is configured to store the power received by the inlet 110 or the power receiving device 123.

[0046] The voltage sensor 131 detects the voltage of the battery 130. The current sensor 132 detects the current input to and output from the battery 130.

[0047] The HMI device 170 includes an input device 172 and a display device 174. The input device 172 receives a user operation (for example, an operation for inputting a destination of the vehicle 50). The display device 174 displays various screens.

[0048] The communication device 180 is configured to wirelessly communicate with various devices (for example, the server 600 or the user terminal 300). The GPS receiver 181 acquires location information indicating the current location of the vehicle 50 from an artificial satellite. The location information may be transmitted to the server 600 through the communication device 180.

[0049] ECU 150 includes processor 151, RAM 152, and storage device 153. Processor 151 executes various types of arithmetic processing. RAM 152 functions as a working memory that temporarily stores data processed by processor 151. Storage device 153 stores programs executed by processor 151 and various types of information used by processor 151 (for example, the above-mentioned contract information).

[0050] The ECU 150 controls various devices such as the power receiving device 123, the HMI device 170, and the communication device 180. The ECU 150 controls external charging of the vehicle 50, for example, by outputting a charging start request or a charging stop request to the power station 40 or the power facility 45. When the destination of the vehicle 50 is set, the ECU 150 can also set a driving route for the vehicle 50.

[0051] External charging using power that the vehicle 50 receives from the power station 40 via a power cable 42 (described later) is contact charging. External charging using power that the vehicle 50 receives in a non-contact manner from a power facility 45 is non-contact charging. Non-contact charging includes charging while the vehicle 50 is traveling in a power supply lane (described later).

[0052] The power equipment 45 is configured to be operable as a power transmission equipment that transmits power to the vehicle 50. The power equipment 45 includes a coil 48, a voltage sensor 48A, a current sensor 48B, a communication device 46, and a control device 47. The coil 48 is connected to the commercial power supply PS through an inverter (not shown). The coil 48 is configured to supply power to the vehicle 50 in a non-contact manner (more specifically, through an electromagnetic field) using power supplied from the commercial power supply PS, and to receive power from the vehicle 50 in a non-contact manner.

[0053] The voltage sensor 48A detects the voltage of the power transmitted or received by the coil 48. The current sensor 48B detects the current of the power transmitted or received by the coil 48.

[0054] The control device 47 controls power transmission between the power equipment 45 and the vehicle 50 during the DR period. The control device 47 calculates the amount of transmitted power or the amount of received power by the coil 48 during the DR period according to the detection values ​​of the voltage sensor 48A and the current sensor 48B. The communication device 46 is configured to communicate with the server 600, and transmits the amount of transmitted power and the amount of received power calculated by the control device 47 to the server 600, for example.

[0055] The power equipment 45 may be installed on the ground (for example, a driving lane) or on a side wall. When the power equipment 45 is installed in a driving lane, the driving lane is also referred to as a power supply lane.

[0056] The power station 40 includes a power circuit 44 , a voltage sensor 44 A, a current sensor 44 B, a power cable 42 , a connector 43 , a communication device 48 , and a control device 41 .

[0057] The power supply circuit 44 converts the power supplied from the commercial power supply PS, and outputs the converted power to the power cable 42.

[0058] The voltage sensor 44A detects a voltage input to or output from the power supply circuit 44. The current sensor 44B detects a current input to or output from the power supply circuit 44.

[0059] The power cable 42 supplies power from the power station 40 to the vehicle 50. The power cable 42 can also supply power from the vehicle 50 to the power station 40.

[0060] The connector 43 is provided at the tip of the power cable 42 and is configured to be insertable into an inlet 110 of the vehicle 50 .

[0061] The communication device 48 is configured to communicate with an external device such as a server 600. The control device 41 controls the communication device 48 and the power supply circuit 44.

[0062] The control device 41 is configured to be capable of executing a power transmission process, which is a process of transmitting power from the power stand 40 to the vehicle 50 during the DR period. When the power transmission process is executed, external charging of the vehicle 50 is performed. After completing the power transmission process (external charging), the control device 41 transmits the amount of power transmitted by the power stand 40 during the DR period to the server 600 via the communication device 48.

[0063] The control device 41 is also configured to be capable of executing a power receiving process in which the power stand 40 receives power from the vehicle 50 during the DR period. After the power receiving process is completed, the control device 41 transmits the amount of power received by the power stand 40 to the server 600 via the communication device 48.

[0064] The control device 41 calculates the amount of received power or transmitted power of the power stand 40 during the DR period according to the detection values ​​of the voltage sensor 44A and the current sensor 44B during power transmission from the power stand 40 to the vehicle 50 or during power reception from the power stand 40 to the vehicle 50. The received power amount and transmitted power amount are transmitted to the server 600 by the communication device 48.

[0065] The user terminal 300 is operated by a user of the vehicle 50. The user terminal 300 includes an input device 311, a display device 316, and a communication device 318. The input device 311 receives user input. The display device 316 displays various screens. The communication device 318 is configured to communicate with a device different from the user terminal 300 (e.g., a server 600).

[0066] FIG. 3 is a diagram showing a situation in which the vehicle 50 is performing contact charging and a situation in which the vehicle 50 is performing non-contact charging.

[0067] 3, when the vehicle 50 participates in DR by performing contact charging using the power station 40 (case A), the vehicle 50 is also referred to as a vehicle 50A (first vehicle). The battery 130A is the battery 130 mounted on the vehicle 50A.

[0068] When the vehicle 50 participates in the DR by performing contactless charging using the power equipment 45 (case B), the vehicle 50 is also referred to as a vehicle 50B (second vehicle). The battery 130B is the battery 130 mounted on the vehicle 50B.

[0069] FIG. 4 is a diagram showing the difference between the amount of electric power stored in the battery 130A when the vehicle 50A participates in DR and the amount of electric power stored in the battery 130B when the vehicle 50B participates in DR.

[0070] 4, a case will be assumed in which the amount of power transmitted PT1 from the power station 40 to the vehicle 50A is equal to the amount of power transmitted PT2 from the power equipment 45 to the vehicle 50B. In the following description, when there is no particular distinction between the amounts of power transmitted PT1 and PT2, each of these amounts of power transmitted will also be referred to as the amount of power transmitted PT.

[0071] In vehicle 50A, the power amount of LA among the power transmission amounts PT is generated as a loss. As a result, the power amount charged to the battery 130A of vehicle 50A along with DR is PRA (<PT). The power transmission efficiency from the power stand 40 to vehicle 50A during contact charging in the DR period is also expressed as power transmission efficiency PTE1.

[0072] In vehicle 50B, the power amount of LB among the power transmission amounts PT is generated as a loss. The power transmission efficiency from the power facility 45 to vehicle 50B during non-contact charging is also expressed as power transmission efficiency PTE2. The power transmission efficiency PTE2 is generally lower than the power transmission efficiency PTE1. Therefore, the power loss occurring in non-contact charging is larger than the power loss occurring in contact charging (LB > LA). As a result, the power amount charged to the battery 130B of vehicle 50B along with DR is PRB, which is less than the charging power amount of battery 130A by the difference ΔPR (PRB = PRA - ΔPR).

[0073] When the power transmission amounts PT1 and PT2 are equal as described above, in both cases A and B, a power load corresponding to the power transmission amount PT occurs in the power grid PG. Therefore, vehicle 50B contributes to the power supply-demand balance of the power grid PG to the same extent as vehicle 50A. On the other hand, from the perspective of the charging power amount of the battery 130 accompanying participation in DR, vehicle 50B is disadvantaged compared to vehicle 50A.

[0074] FIG. 5 is a diagram for explaining the difference between contact charging and non-contact charging from the perspective of the benefits obtained when vehicle 50 participates in DR. This example shows a comparative example when the processing by the server 600 described later is not executed.

[0075] Referring to FIG. 5, the graph 220 shows the rewards given to vehicles 50A and 50B from the aggregator and the power charges incurred when vehicles 50A and 50B participate in DR in the comparative example.

[0076] The DR remuneration RWA of the vehicle 50A and the DR remuneration RWB of the vehicle 50B are determined according to the contribution of the vehicles 50A and 50B to the adjustment of the supply and demand balance in the power grid PG. For example, the more the amount of transmitted power PT increases, the more the power load in the power grid PG increases. Therefore, in this first embodiment, the DR remuneration of the vehicles 50A and 50B is determined according to the amount of transmitted power PT during the DR period (for example, the more the amount of transmitted power PT increases).

[0077] The unit price of DR reward RWA for the amount of transmitted power PT1 is also represented as the DR reward unit price UPRR1. The unit price of DR reward RWB for the amount of transmitted power PT2 is also represented as the DR reward unit price UPRR2. In this example, both the DR reward unit prices UPRR1 and UPRR2 are UPRR10. The power rate unit price of the power system PG is also represented as the power cost unit price UPRP.

[0078] The DR reward RWA is determined according to the amount of transmitted power PT1 (PT) and is RW0 (=UPRR10×PT1). The power cost PCA incurred by the vehicle 50A due to contact charging when the vehicle 50A participates in DR is determined according to the power cost unit price UPRP and the amount of transmitted power PT1 (PCA=UPRP×PT1). Therefore, the DR profit PA obtained when the vehicle 50A participates in DR is PA0 (=RW0-PCA).

[0079] Similarly, the DR reward RWB is determined according to the amount of transmitted power PT2 (PT) and is RW0 (=UPRR10×PT2=RWA). The power cost PCB0 incurred by the vehicle 50B in association with the contactless charging when the vehicle 50B participates in the DR is determined according to the amount of transmitted power PT2 and the unit power cost UPRP (PCB0=UPRP×PT2). In this example, the power cost PCB0 of the vehicle 50B during the DR period is equal to the power cost PCA of the vehicle 50A.

[0080] During the DR period, the amount of charge power in the battery 130B is less than the amount of charge power in the battery 130A (FIG. 4). BWhen the amount of stored power is insufficient (for example, when the user of vehicle 50B wants to fully charge battery 130B), vehicle 50B may need to perform extra contactless charging. In this example, it is assumed that an amount of power difference ΔPC needs to be extra transmitted from power equipment 45 to vehicle 50B to charge battery 130B with an amount of power difference ΔPR (FIG. 4). Difference ΔPC depends on difference ΔPR and power transmission efficiencies PTE1, PTE2 (FIG. 4).

[0081] When the amount of power difference ΔPC is transmitted from the power facility 45 to the vehicle 50B, an extra power cost ΔPAB (=UPRP×ΔPC) is incurred by the user of the vehicle 50B due to the contactless charging. As a result, the total power cost PCB of the vehicle 50B is greater than the power cost PCA of the vehicle 50A (PCB=PCA+ΔPAB).

[0082] Graph 230 shows the DR profits that vehicles 50A and 50B obtain when participating in DR in the comparative example. The DR profit PA is obtained by subtracting the power cost PCA from the DR reward RWA. The DR profit PB of vehicle 50B is obtained by subtracting the power cost PCB from the DR reward RWB. In this example, since the DR reward RWB is equal to the DR reward RWA (graph 220), the DR profit PB (PB0) of vehicle 50B is less than the DR profit PA (PA0) of vehicle 50A by the difference between these profits, ΔP (=ΔPAB).

[0083] From the above, the vehicle 50B may suffer a disadvantage compared to the vehicle 50A, and the user of the vehicle 50B may feel that it is unfair because the user of the vehicle 50B is at a loss compared to the user of the vehicle 50A. If the user of the vehicle 50B loses motivation to participate in DR due to a sense of unfairness, the power resources participating in DR by contactless charging may decrease. Alternatively, the vehicle 50B may not perform contactless charging during a period in which it is desired for the vehicle 50B to participate in DR by contactless charging (for example, charging while traveling). Then, after the period ends, a situation in which the vehicle 50B performs contact charging instead of contactless charging may even be assumed. Such a situation may cause a situation in which the balance between power supply and demand is not appropriately adjusted.

[0084] The server 600 according to the first embodiment has a configuration for dealing with the above-mentioned problems. Specifically, the communication device 630 acquires the amount of transmitted power PT transmitted from the power facility during external charging of the vehicle 50 participating in DR. When each vehicle 50 participates in DR, the processing device 605 sets a base reward according to the amount of transmitted power PT. The base reward is a standard of reward given to each vehicle 50 by the aggregator. Details of a method for setting the base reward will be described later.

[0085] When vehicle 50A participates in DR, the processing device 605 determines the DR reward RWA so that the DR reward RWA (first reward) given to vehicle 50A by the aggregator becomes the base reward of vehicle 50A. On the other hand, when vehicle 50B participates in DR, the processing device 605 determines the DR reward RWB so that the DR reward RWB (second reward) given to vehicle 50B by the aggregator becomes greater than the base reward of vehicle 50B.

[0086] With this configuration, the DR remuneration RWA is the base remuneration for the vehicle 50A, whereas the DR remuneration RWB is greater than the base remuneration for the vehicle 50B, so that the vehicle 50B can benefit more in terms of remuneration than the vehicle 50A. Therefore, it is possible to improve the situation in which the vehicle 50B is at a disadvantage compared to the vehicle 50A.

[0087] In this embodiment 1, the processing device 605 determines the DR remuneration RWA according to the amount of transmitted power PT1 and the DR remuneration unit price UPRR1 (first unit price). The processing device 605 determines the DR remuneration RWB according to the amount of transmitted power PT2 and the DR remuneration unit price UPRR2 (second unit price). The processing device 605 determines the DR remuneration unit price UPRR1 and the DR remuneration unit price UPRR2 so that the DR remuneration unit price UPRR2 is higher than the DR remuneration unit price UPRR1.

[0088] FIG. 6 is a diagram for explaining that the DR remuneration RWB is determined to be greater than the base remuneration in the first embodiment.

[0089] 6, graph 240 shows DR remuneration RWA, RWB in the first embodiment. Graph 240 differs from graph 220 in that the DR remuneration RWB is larger than that in the comparative example (FIG. 5) by the difference ΔRW. More specifically, graph 240 differs from graph 220 in that the DR remuneration unit price UPRR2 (=UPRR20) is higher than that in the comparative example (UPRR20>UPRR10). In other respects, graph 240 is basically similar to graph 220.

[0090] In this embodiment 1, a base remuneration RS is set for the vehicles 50A and 50B. The base remuneration RS of the vehicles 50A and 50B is set according to the amount of transmitted power PT (for example, the larger the amount of transmitted power PT, the higher the base remuneration RS), and in this example, both are RW0.

[0091] The DR remuneration RWA of the vehicle 50A is determined to be equal to the reference remuneration RS of the vehicle 50A (RWA=RS). In this example, the DR remuneration unit price UPRR1 (=UPRR10) of the vehicle 50A is equal to the comparative case.

[0092] On the other hand, the DR remuneration RWB of the vehicle 50B is determined to be greater than the base remuneration RS of the vehicle 50B by the difference ΔRW (=ΔPAB) (RWB=RWB0=RS+ΔRW). More specifically, the DR remuneration unit price UPRR2 is set to be higher than in the comparative example (UPRR20>UPRR10). From another perspective, determining the DR remuneration RWB to be greater than the base remuneration RS of the vehicle 50B as described above is equivalent to compensating the vehicle 50B for the amount of the difference ΔRW compared to the comparative example (paid as additional remuneration).

[0093] As a result, even if vehicle 50B incurs extra power cost ΔPAB due to power loss during contactless charging, the power cost ΔPAB and the additional remuneration of the difference ΔRW are offset.

[0094] Graph 250 shows DR profits PA, PB in the first embodiment. In the first embodiment, the DR profit PB of vehicle 50B is greater than that in the comparative example (PB0 in FIG. 5). As a result, the difference ΔP between the DR profits PA, PB is smaller than that in the comparative example (FIG. 5). In this example, DR remunerations RWA, RWB are determined so that the difference ΔP becomes 0. This eliminates the unfairness between vehicles 50A, 50B.

[0095] The DR remunerations RWA and RWB may be determined so that the difference ΔP is less than the threshold value TH. Even in this case, it is possible to avoid a situation in which the DR profits PA and PB diverge. As a result, it is possible to appropriately determine the DR remunerations RWA and RWB while reducing unfairness more than in the comparative example. The above threshold value TH is appropriately predetermined as a value equal to or greater than 0, but is preferably substantially 0.

[0096] From the above, in the first embodiment, it is possible to avoid a situation in which the user of the vehicle 50B loses motivation to participate in DR due to a sense of unfairness. As a result, it is possible to suppress a decrease in the number of the vehicles 50B participating in DR, thereby contributing to the adjustment of the balance between power supply and demand.

[0097] Fig. 7 is a diagram showing an example of data stored in the storage device 620 of the server 600. Referring to Fig. 7, the storage device 620 stores adjustment plan information 650, power cost unit price information 670, resource information 665, power transmission plan information 666, and DR remuneration unit price / DR remuneration information 668.

[0098] The adjustment plan information 650 indicates an adjustment plan for the power supply and demand balance determined according to a prior contract between the aggregator and the power company. The adjustment plan information 650 indicates the adjustment request power amount ARP, the adjustment remuneration AR, the adjustment remuneration unit price ARUP, the total remuneration amount TRA, and the adjustment profit APR for each DR period. The length of each DR period is, for example, 30 minutes, but is not limited to this.

[0099] The adjustment request power amount ARP indicates the amount of power that the power company requests the aggregator to adjust (procure or increase or decrease) in the power system PG. The adjustment remuneration AR indicates the remuneration that the aggregator receives from the power company when the aggregator successfully adjusts the adjustment request power amount ARP. The adjustment remuneration unit price ARUP indicates the unit price of the adjustment remuneration AR for the adjustment request power amount ARP.

[0100] The total remuneration amount (total distribution amount) TRA indicates the sum of the remuneration given (distributed) from the aggregator to each vehicle 50 from the adjusted profit APR. When at least one vehicle 50A and at least one vehicle 50B participate in DR, the total remuneration amount TRA is the sum of the DR remuneration RWA of each vehicle 50A and the sum of the remuneration DRB of each vehicle 50B. For the sake of simplicity, the following will representatively explain the case where the total remuneration amount TRA is the sum of the remuneration RWA of one vehicle 50A and the remuneration RWB of one vehicle 50B.

[0101] The adjustment profit APR indicates the profit that the aggregator obtains when it successfully achieves power adjustment. The adjustment profit APR is the difference between the adjustment remuneration AR and the total remuneration amount TRA (APR=AR-TRA). The power cost unit price information 670 indicates the power cost unit price UPRP of the power system PG.

[0102] The resource information 665 indicates the external charging method of each power resource (in this example, each vehicle 50) for each resource ID. The resource ID is a number for identifying a power resource. Furthermore, the resource information 665 indicates whether each power resource can participate in DR and the external charging method during the DR period for each period. The resource information 665 is determined according to the contents of a contract made between the aggregator and a user of each power resource.

[0103] A vehicle having a resource ID of R1 or R2 can perform both contact charging and contactless charging. In this example, the vehicle having an ID of R1 corresponds to vehicle 50A (FIG. 3), and the vehicle having an ID of R2 corresponds to vehicle 50B.

[0104] The power transmission plan information 666 indicates the amount of power transmission PT and the power transmission method from the power equipment to the vehicle for each resource ID and DR period. In this example, the power equipment having the ID of PE1 corresponds to the power stand 40, and the power equipment having the ID of PE2 corresponds to the power equipment 45.

[0105] The DR reward unit price / DR reward information 668 indicates the unit price of the DR reward and the DR reward of the power resource for each resource ID and DR period. The DR reward unit price / DR reward information 668 depends on the transmission power amount PT of the power transmission plan information 666. For example, for a vehicle 50A having a resource ID of R1, the DR reward RWA during the period P1 is prA1 (=uprA1×a1).

[0106] Fig. 8 is a functional block diagram for explaining functions of server 600 according to the first embodiment. In the following description, Figs. 4 to 7 will be referred to as appropriate.

[0107] 8, the server 600 includes a charging energy amount acquiring unit 400, an excess energy cost calculating unit 404, a transmission energy amount acquiring unit 406, a DR remuneration calculating unit 405, and an energy cost calculating unit 408. The server 600 further includes a DR profit calculating unit 410, a DR profit difference calculating unit 425, a judging unit 430, a base remuneration setting unit 435, a compensation amount setting unit 440, and a DR remuneration unit price setting unit 445. The server 600 further includes a DR remuneration determining unit 450, a total remuneration amount setting unit 460, a power transmission plan setting unit 470, a power transmission plan transmitting unit 475, a charging plan transmitting unit 476, and a DR period start notifying unit 488.

[0108] The functions of the charging energy amount acquiring unit 400, the power transmission energy amount acquiring unit 406, the power transmission plan transmitting unit 475, the charging plan transmitting unit 476, and the DR period start notifying unit 488 are achieved by the communication device 630 operating in accordance with commands from the processing device 605. The other functions are achieved by the processing device 605 operating.

[0109] After the DR period ends, the charging energy acquisition unit 400 acquires signals SA1 and SB1 from the vehicles 50A and 50B, respectively, by communication. The signal SA1 indicates the amount of charging energy of the battery 130A of the vehicle 50A during the DR period. The signal SB1 indicates the amount of charging energy of the battery 130B of the vehicle 50B during the DR period.

[0110] The excess power cost calculation unit 404 calculates the difference ΔPC by dividing the difference ΔPR (FIG. 4) in the amount of charged power of the batteries 130A, 130B by the power transmission efficiency PTE2 of the power equipment 45. The difference ΔPC is the amount of power that needs to be transmitted in excess from the power equipment 45 to the vehicle 50B. The excess power cost calculation unit 404 calculates the excess power cost ΔPAB (FIG. 5) of the vehicle 50B according to the power cost unit price UPRP and the difference ΔPC. The power transmission efficiencies PTE1, PTE2 are calculated by the processing device 605 upon the end of the DR period and stored in the storage device 620.

[0111] After the DR period ends, the transmitted power amount acquiring unit 406 acquires signals SA2 and SB2 from the power stand 40 and the power equipment 45, respectively, via communication. The signal SA2 indicates the transmitted power amount PT1 during the DR period. The transmitted power amount PT1 is calculated by the control device 41 according to the detection values ​​of the voltage sensor 44A and the current sensor 44B of the power stand 40. The signal SB2 indicates the transmitted power amount PT2 during the DR period. The transmitted power amount PT2 is calculated by the control device 47 according to the detection values ​​of the voltage sensor 48A and the current sensor 48B of the power equipment 45.

[0112] The DR remuneration calculation unit 405 calculates provisional values ​​of the DR remuneration RWA and RWB according to the acquisition result by the transmission power amount acquisition unit 406. Specifically, the DR remuneration calculation unit 405 calculates a provisional value of the DR remuneration RWA according to the DR remuneration unit price UPRR1 (in this example, it is assumed to be UPRR10 in FIG. 6) in the DR remuneration unit price / DR remuneration information 668 (FIG. 7) and the transmission power amount PT1. The provisional DR remuneration of the vehicle 50A calculated in this manner is also referred to as a provisional first remuneration. The provisional first remuneration is, for example, RW0. Then, the DR remuneration calculation unit 405 calculates a provisional value of the DR remuneration RWB according to the transmission power amount PT2 and the DR remuneration unit price UPRR2, assuming that the DR remuneration unit price UPRR2 in the DR remuneration unit price / DR remuneration information 668 is a default value equal to the DR remuneration unit price UPRR1. The provisional DR remuneration of the vehicle 50B calculated in this manner is also referred to as a provisional second remuneration. The provisional second remuneration is, for example, RW0 which is equal to the provisional first remuneration. The DR remuneration unit price UPRR2 in the DR remuneration unit price / DR remuneration information 668 may be changed from the default value later (described later).

[0113] The power cost calculation unit 408 calculates the power cost of the vehicles 50A, 50B during the DR period. Specifically, the power cost calculation unit 408 calculates the power cost PCA according to the amount of transmitted power PT1 and the power cost unit price information 670 (FIG. 8). Similarly, the power cost calculation unit 408 calculates the power cost PCB0 according to the amount of transmitted power PT2 and the power cost unit price information 670. Furthermore, the power cost calculation unit 408 calculates the power cost PCB according to the power cost PCB0 and the extra power cost ΔPAB of the vehicle 50B.

[0114] The DR profit calculation unit 410 calculates the provisional DR profit (provisional first profit) of the vehicle 50A and the provisional DR profit (provisional second profit) of the vehicle 50B. Specifically, the DR profit calculation unit 410 calculates the provisional first profit by subtracting the power cost PCA from the provisional first remuneration. Similarly, the DR profit calculation unit 410 calculates the provisional second profit by subtracting the power cost PCB from the provisional second remuneration.

[0115] The DR profit difference calculation unit 425 calculates a provisional profit difference which is the difference between the provisional first profit and the provisional second profit.

[0116] The determination unit 430 determines whether the DR remuneration unit price UPRR2 needs to be changed from the default value according to the provisional profit difference. Specifically, the determination unit 430 determines whether the provisional profit difference is equal to or greater than a threshold value TH.

[0117] If the provisional profit difference is less than the threshold value TH, there is no unfairness between the vehicle 50A and the vehicle 50B, or the difference is so small that it is not problematic from a practical point of view. In this case, the provisional first profit and the provisional second profit are determined as the profit RWA and the profit RWB, respectively.

[0118] On the other hand, if the provisional profit difference is equal to or greater than the threshold value TH, the provisional second profit is less than the provisional first profit to such an extent that the unfairness cannot be ignored. Therefore, it is not preferable to determine the provisional first profit and the provisional second profit as the profit RWA and the profit RWB, respectively (for example, the graph 230 in FIG. 5).

[0119] The determination unit 430 may determine whether the difference between the ratio of the tentative first profit to the amount of transmitted power PT1 (tentative first profit rate) and the ratio of the tentative second profit to the amount of transmitted power PT2 (tentative second profit rate) is equal to or greater than a threshold rate. It is preferable that the threshold rate is appropriately determined in advance so as to be substantially 0 (for example, equal to or greater than 0 and less than 0.1). This makes it possible to determine whether there is unfairness even when the amounts of transmitted power PT1 and PT2 are different.

[0120] When the provisional profit difference is equal to or greater than the threshold value TH, the base remuneration setting unit 435 sets the base remuneration RS of the vehicles 50A, 50B according to the amount of transmitted power PT. In the first embodiment, the base remuneration setting unit 435 calculates the base remuneration RS of the vehicles 50A, 50B as a multiplication value of the amount of transmitted power PT and the DR remuneration unit price UPRR1 (UPRR10 in FIG. 6). In this example, the base remuneration RS of the vehicles 50A, 50B is both RW0 in FIG. 6.

[0121] The compensation setting unit 440 sets the compensation to the vehicle 50B so that the difference ΔP between the profits PRA and PRB is less than the threshold value TH. In this example, the compensation setting unit 440 sets the compensation so that the extra power cost ΔPAB (FIG. 6) and the additional remuneration of the difference ΔRW are offset. This compensation is preferably equal to the power cost ΔPAB, but may be less than the power cost ΔPAB.

[0122] The DR remuneration unit price setting unit 445 sets the DR remuneration unit prices UPRR1 and UPRR2 so that these prices reflect the above compensation amount. In this example, the DR remuneration unit price setting unit 445 keeps the DR remuneration unit price UPRR1 at UPRR10 (FIG. 6). On the other hand, the DR remuneration unit price setting unit 445 sets the DR remuneration unit price UPRR2 to UPRR20, which is higher than the default value (UPRR10), by rewriting the DR remuneration unit price / DR remuneration information 668.

[0123] Thereafter, the DR remuneration calculation unit 405 calculates the DR remuneration RWA, RWB according to the DR remuneration unit price (rewritten DR remuneration unit price / DR remuneration information 668) set as described above. In this example, the DR remuneration RWA is maintained at RW0, which is equal to the provisional first remuneration. On the other hand, the DR remuneration RWB increases by the difference ΔRW from RW0, which is the provisional second remuneration.

[0124] The DR profit calculation unit 410 calculates the DR profit PA (FIG. 6) according to the DR remuneration RWA and the power cost PCA calculated in this way. Similarly, the DR profit calculation unit 410 calculates the DR profit PB according to the DR remuneration RWB and the power cost PCB calculated as above.

[0125] The DR profit difference calculation unit 425 calculates the difference ΔP between the DR profits PA and PB. In this example, the DR remuneration unit price / DR remuneration information 668 has already been rewritten so that the difference ΔP is less than the threshold value TH.

[0126] The determining unit 430 determines whether the difference ΔP is equal to or greater than the threshold value TH, and determines that the difference ΔP is less than the threshold value TH.

[0127] The DR remuneration determination unit 450 determines the DR remuneration RWA and RWB calculated according to the rewritten DR remuneration unit price / DR remuneration information 668 as the DR remuneration for the vehicles 50A and 50B, respectively. The determined DR remuneration RWA and RWB are transmitted to a server (not shown) that manages the bank accounts of the users of the vehicles 50A and 50B.

[0128] The total remuneration amount setting unit 460 sets the total remuneration amount TRA (FIG. 7) according to the determination results of the remuneration RWA and RWB. In this example, for simplicity of explanation, the total remuneration amount TRA is assumed to be the sum of the remuneration RWA and RWB. When the total remuneration amount setting unit 460 sets the total remuneration amount TRA as described above, the total remuneration amount TRA increases as the DR remuneration RWB increases. The total remuneration amount setting unit 460 rewrites the adjustment plan information 650 so that the total remuneration amount TRA increases. As a result, the adjusted profit APR (FIG. 6) decreases (is updated) compared to before the adjustment plan information 650 was rewritten.

[0129] The power transmission plan setting unit 470 sets the power transmission plans of the power stand 40 and the power facility 45 during the DR period according to the adjustment plan information 650 and the resource information 665. Specifically, the power transmission plan setting unit 470 selects, from among a plurality of power resources, a power resource (e.g., the vehicles 50A and 50B) that can participate in the DR during the target period according to the resource information 665. The power transmission plan setting unit 470 sets the power transmission plan information 666 according to the adjustment request power amount ARP determined by the adjustment plan information 650.

[0130] The power transmission plan transmission unit 475 transmits the power transmission plan information 666 to the power facilities (the power stand 40 and the power facility 45). In accordance with the transmitted power transmission plan information 666, the power stand 40 and the power facility 45 transmit the transmission power amount PT to the vehicles 50A and 50B, respectively, during the DR period.

[0131] The charging plan transmission unit 476 transmits a plan for external charging during the DR period to the vehicles 50A, 50B. This plan includes information indicating the start time and the end time of the DR period. This plan is created in accordance with the power transmission plan information 666.

[0132] The DR period start notification unit 488 executes a process for notifying the users of the vehicles 50A and 50B when the start time of the DR period of the vehicles 50A and 50B arrives. Specifically, the DR period start notification unit 488 transmits notification signals S31A and S31B notifying the arrival of the above-mentioned start time to the vehicles 50A and 50B, respectively.

[0133] For example, the vehicle 50B participates in the DR by performing charging while traveling. If the vehicle 50B is traveling in a driving lane different from the power supply lane (for example, a driving lane adjacent to the power supply lane and not having a power supply function) until the start time of the DR period arrives, the notification signal S31B prompts the user of the vehicle 50B to drive the vehicle 50B in the power supply lane.

[0134] Specifically, in response to receiving the notification signal S31B, the ECU 150 of the vehicle 50B displays a notification screen for notifying the user on the display device 174 of the HMI device 170. The ECU 150 may control the communication device 180 so that the notification screen is displayed on the display device 316 of the user terminal 300. When the notification is performed in this manner, the aggregator can reliably allow the vehicle 50B to participate in the DR.

[0135] 9 is a flowchart showing an example of processing executed by the processing device 605 of the server 600 before the arrival of a target DR period in the first embodiment. The processing of this flowchart is started when the server 600 receives an adjustment request ARE (FIG. 1) indicating that the power supply is greater than the power demand in the power system PG during the target DR period.

[0136] Referring to FIG. 9, the processing device 605 selects power resources (in this example, the vehicles 50A and 50B) that can participate in DR during a target period, according to the resource information 665 (step S20).

[0137] Next, the processing device 605 sets the power transmission plan information 666 according to the adjustment requested power amount ARP determined by the adjustment plan information 650 (step S25).

[0138] Next, the processing device 605 transmits the external charging plan to the vehicles 50A and 50B (step S30), and transmits the power transmission plan information 666 to the power facilities (the power station 40 and the power facility 45) (step S40).

[0139] FIG. 10 is a flowchart showing an example of processing executed by the processing device 605 after the target DR period ends in the first embodiment.

[0140] Referring to FIG. 10, the processing device 605 acquires the amount of charged energy of the battery 130A of the vehicle 50A that has executed contact charging for DR from the vehicle 50A via the communication device 630 (step S105).

[0141] Next, the processing device 605 acquires the amount of charged energy of the battery 130B of the vehicle 50B that has been contactlessly charged for DR from the vehicle 50B via the communication device 630 (step S110).

[0142] Next, the processing device 605 acquires the amount of transmitted power PT for each power facility (in this example, for the power stand 40 and the power facility 45) used for DR (step S115).

[0143] Next, the processing device 605 calculates the power cost for each vehicle participating in the DR (step S120). In this example, the processing device 605 calculates the power cost PCA, PCB (FIG. 6). The power cost PCB includes the power cost PCB0 associated with the DR and the extra power cost ΔPAB.

[0144] Next, the processing device 605 calculates the provisional DR remuneration for each vehicle (step S125). In this example, the processing device 605 calculates a provisional first remuneration for the vehicle 50A and a provisional second remuneration for the vehicle 50B.

[0145] Next, the processing device 605 calculates a tentative DR profit for each vehicle (step S130). In this example, the processing device 605 calculates a tentative first profit for the vehicle 50A and a tentative second profit for the vehicle 50B.

[0146] Next, the processing device 605 calculates the difference between the tentative first profit of the vehicle 50A and the tentative second profit of the vehicle 50B, thereby calculating the tentative profit difference between the vehicles 50A and 50B (step S135).

[0147] Next, the processing device 605 determines whether the tentative DR profit difference is equal to or greater than the threshold value TH (step S140). If the tentative DR profit difference is less than the threshold value TH (NO in step S140), the processing device 605 proceeds to step S150. On the other hand, if the tentative DR profit difference is equal to or greater than the threshold value TH (YES in step S140), the processing device 605 executes a process to correct the unfairness between the vehicle 50A and the vehicle 50B (step S145).

[0148] FIG. 11 is a flowchart for explaining details of the process for correcting unfairness (step S145 in FIG. 10).

[0149] 11, the processing device 605 calculates the base remuneration RS for the vehicles 50A and 50B according to the power transmission amount PT (step S1451). In this example, the power transmission amount PT1 and the power transmission amount PT2 are equal, and the base remuneration RS for both the vehicles 50A and 50B is RW0 (FIG. 6).

[0150] Next, the processing device 605 sets a reward (for example, an additional reward of the difference ΔRW in FIG. 6) to be given as a compensation amount to the vehicle 50B (step S1452).

[0151] Next, the processing device 605 sets the DR remuneration unit prices UPRR1 and UPRR2 so that these prices reflect the compensation amount (step S1455). Specifically, the processing device 605 sets these DR remuneration unit prices so that the difference ΔP in FIG. 6 is less than the threshold value TH.

[0152] Next, the processing device 605 determines the DR remuneration RWA (first remuneration) and the DR remuneration RWB (second remuneration) according to the DR remuneration unit prices UPRR1 and UPRR2 set in step S1455 (step S1457). In this example, the DR remuneration RWA is RW0 (FIG. 6), and the DR remuneration RWB is RW0+ΔRW. Then, the process proceeds to step S150 (FIG. 10).

[0153] 10 again, the processing device 605 determines the total remuneration amount TRA according to the determination results of the DR remunerations RWA and RWB (step S150). After that, the series of processes ends.

[0154] 12 is a flowchart showing an example of processing executed by the ECU 150 of the vehicle 50. The processing of this flowchart is started when the vehicle 50 transmits an approval signal S11 (FIG. 1) to the server 600 in a case where a travel route of the vehicle 50 has been set.

[0155] Next, ECU 150 determines whether the DR period has arrived (step S215). ECU 150 executes this determination process in accordance with the contract information stored in storage device 153. If the DR period has not arrived yet (NO in step S215), ECU 150 executes this determination process until the period arrives. On the other hand, if the DR period has arrived (YES in step S215), ECU 150 proceeds to step S217.

[0156] Next, the ECU 150 notifies the user of the vehicle 50 of the arrival of the DR period (step S217). For example, when the ECU 150 is mounted on the vehicle 50B and the vehicle 50B participates in the DR by performing charging while traveling, the ECU 150 displays the above-mentioned notification screen on the display device 174.

[0157] Next, ECU 150 determines whether or not an external chargeable condition for vehicle 50 is satisfied (step S215). When vehicle 50 is vehicle 50A, the external chargeable condition is that connector 43 is inserted into inlet 110. When vehicle 50 is vehicle 50B, the external chargeable condition is that the distance between vehicle 50 and power equipment 45 is less than a threshold distance at which vehicle 50 can receive power from power equipment 45 (for example, vehicle 50 is traveling in a power supply lane).

[0158] If the external chargeable condition is not satisfied (NO in step S215), ECU 150 executes the above determination process until this condition is satisfied. On the other hand, if the chargeable condition is satisfied (YES in step S215), ECU 150 proceeds to step S220.

[0159] Next, ECU 150 executes external charging (contact charging or non-contact charging) so that vehicle 50 can participate in DR (step S220). This external charging continues until the DR period ends. [First Modification of First Embodiment] In the above-described first embodiment, the processing device 605 determines the rewards RWA and RWB so that the reward RWB increases while the reward RWA is maintained (FIG. 6). As a result, the total reward amount TRA (FIG. 7) from the aggregator to each vehicle 50 increases.

[0160] In this first modification, the processing device 605 determines the remuneration RWA and the remuneration RWB so that the total remuneration amount TRA of the adjustment plan information 650 is kept constant.

[0161] As a result, a situation where the total reward amount TRA increases as described above is avoided. Therefore, the aggregator can appropriately distribute the total reward amount TRA to the vehicles 50A and 50B while avoiding a situation where the adjustment profit APR (Fig. 7) decreases as the total reward amount TRA increases. By avoiding a situation where the number of new entrants to the aggregator business decreases, it is possible to contribute to the adjustment of the power supply-demand balance.

[0162] Fig. 13 is a diagram for explaining a method for determining the DR rewards of the vehicles 50A and 50B in this Modification 1.

[0163] Referring to Fig. 13, the graph 260 shows the reference rewards RS of the vehicles 50A and 50B and the DR rewards RWA and RWB in this modification. In this example, the reference rewards RS of the vehicles 50A and 50B are both smaller than the reference reward (RW0 in Fig. 6) of the first embodiment.

[0164] The DR reward unit price UPRR1 is set lower than in the case of the first embodiment described above (UPRR15 < UPRR10). The DR reward RWA is equal to the reference reward RS (= UPRR15 × PT) of the vehicle 50A and is less than RW0 of the first embodiment.

[0165] The DR reward RWB is determined to be greater than the reference reward RS of the vehicle 50B by the difference ΔRW, while being lower than RWB0 in the case of the first embodiment (Fig. 6) by the difference ΔRWW. In this example, the DR reward unit price UPRR2 is set lower than in the case of the first embodiment described above, while being determined to be higher than the DR reward unit price UPRR1 (UPRR15 < UPRR2 = UPRR25 < UPRR20).

[0166] The graph 270 shows the DR profit that the vehicles 50A and 50B obtain when participating in the DR in this modified example 1. The DR profit RWA is determined to be ΔPA less than that in the first embodiment (PA0 in FIG. 6). On the other hand, the DR profit PB in this example is ΔPA more than the DR profit PB (PB0) in the comparative example. That is, a part (ΔPA) of the DR profit (PA0) of the vehicle 50A is compensated for in the DR profit PB.

[0167] 14 is a flowchart showing an example of a process executed by the processing device 605 after the target DR period ends in this modified example 1. In this example, the total remuneration amount (total distribution amount) TRA is kept constant.

[0168] 14, this flowchart differs from the flowchart of the first embodiment (FIG. 10) in that the process of determining the total remuneration amount (step S150) is not executed. The processes of steps S205 to S245 are similar to the processes of steps S105 to S145 in FIG. 6, respectively.

[0169] In step S245, the DR remuneration RWA, RWB (more specifically, the DR remuneration unit prices UPRR1, UPRR2) are determined so that the total remuneration amount TRA is maintained. Specifically, the DR remuneration RWA, RWB are determined so that a part of the DR profit of the vehicle 50A is compensated for to the DR profit PB (see FIG. 13). [Modification 2 of the First Embodiment] When the vehicles 50A and 50B use the toll infrastructure 310 for vehicles, the processing device 605 may determine the remuneration RWA and the remuneration RWB so that the vehicle 50B can use the toll infrastructure 310 more cheaply than the vehicle 50A.

[0170] For example, the processing device 605 outputs a request to the server 305 (FIG. 1) of the business operator managing the toll infrastructure 310 to discount the usage fee for vehicle 50B by the difference ΔRW (FIG. 6) from the usage fee for vehicle 50A. In this example, it is assumed that the server 305 permits vehicle 50B to use the toll infrastructure 310 at that discounted amount. Thereafter, the processing device 605 executes a settlement process so that the fee difference ΔRW is paid from the aggregator to the business operator managing the toll infrastructure.

[0171] As a result, the fee of the difference ΔRW of the DR remuneration RWB of the vehicle 50B is indirectly paid to the vehicle 50B as the above-mentioned discount amount from the aggregator through the above-mentioned management company. In this way, in this modified example 2, the DR remuneration RWB is composed of a remuneration (equal to the DR remuneration RWA of the vehicle 50A) paid directly from the aggregator to the vehicle 50B and a remuneration (discount amount) paid indirectly from the aggregator to the vehicle 50B as a discount amount. As a result, the vehicle 50B can benefit more than the vehicle 50A in terms of the usage fee of the toll infrastructure 310.

[0172] Fig. 15 is a functional block diagram for explaining the function of the server 600 according to the modified example 2. Referring to Fig. 15, the server 600 according to the modified example 2 differs from the server 600 (Fig. 8) of the first embodiment in that it includes a discount amount determination unit 447 and a discount information transmission unit 477 instead of the DR remuneration unit price setting unit 445. In other respects, the functional configuration of the server 600 according to the modified example 2 is basically similar to the functional configuration of the server 600 according to the first embodiment.

[0173] When the determination unit 430 determines that the provisional DR profit difference is equal to or greater than the threshold value TH, the DR remuneration determination unit 450 determines the provisional first remuneration and the provisional second remuneration equal to the remuneration as the DR remuneration to be paid directly from the aggregator to the vehicles 50A and 50B, respectively. Furthermore, the base remuneration setting unit 435 sets the base remuneration RS of the vehicles 50A and 50B to the provisional first remuneration and the provisional second remuneration, respectively. The compensation amount setting unit 440 sets the compensation amount to the vehicle 50B according to the provisional DR profit difference and the base remuneration RS of the vehicle 50B.

[0174] The discount amount determination unit 447 determines the discount amount when the vehicle 50B uses a toll infrastructure according to the compensation amount. The discount amount determination unit 447 determines the discount amount to, for example, the difference ΔRW (FIG. 6). The discount information transmission unit 477 transmits information indicating the determined discount amount to the server 305.

[0175] Fig. 16 is a flowchart showing details of the process executed to correct the unfairness between the vehicle 50A and the vehicle 50B in this modification 2. This process is executed when the tentative DR profit difference is equal to or greater than the threshold value TH in step S140 in Fig. 10 (NO in step S140).

[0176] 16, the processor 605 sets a compensation amount as a discount amount for the vehicle 50B (step S1453). Next, the processor 605 transmits information indicating the set discount amount to the server 305 that manages the paid infrastructure 310 (step S1458). Thereafter, the process proceeds to step S150 in FIG. 10. [Embodiment 2] Each vehicle 50 including the vehicles 50A and 50B may be configured to be capable of external power supply, supplying the power stored in the battery 130 to a power facility (for example, the power stand 40 or the power facility 45). In this case, the power facility 45 operates as a power receiving facility that receives power from the vehicle 50 in a wireless manner.

[0177] When each vehicle 50 executes external power feeding, power is supplied from each vehicle 50 to the power grid PG through power equipment, so that the power supply in the power grid PG can be increased. Therefore, when the power demand in the power grid PG is greater than the power supply, each vehicle 50 can participate in DR by executing external power feeding.

[0178] External power feeding in which vehicle 50A feeds the power stored in battery 130A to power station 40 through power cable 42 is also referred to as contact power feeding. External power feeding in which vehicle 50B feeds the power stored in battery 130B to power equipment 45 in a contactless manner is also referred to as non-contact power feeding. When contactless power feeding is performed, power receiving device 123 functions as a power feeding device that supplies power from vehicle 50 to power equipment 45 in a contactless manner. That is, vehicle 50B can perform contactless power feeding through this power feeding device.

[0179] In the following, for the sake of simplicity, it is assumed that the amount of power transmitted from vehicle 50A to power station 40 and the amount of power transmitted from vehicle 50B to power equipment 45 are equal.

[0180] When the vehicle 50B participates in DR by performing contactless power feeding, the amount of power loss in the amount of power transmitted from the vehicle 50 to the power equipment is generally larger than when the vehicle 50A participates in DR by performing contact power feeding. Therefore, the amount of power received by the power equipment 45 in DR may be less than the amount of power received by the power stand 40. Therefore, the amount of power supplied from the vehicle 50B to the power system PG through the power equipment 45 is less than the amount of power supplied from the vehicle 50A to the power system PG through the power stand 40.

[0181] This causes the vehicle 50B to contribute less to the power grid PG than the vehicle 50A. As a result, even though the amount of power loss of the battery 130 of the vehicles 50A and 50B is the same, the reward for the vehicle 50B may be less than the reward for the vehicle 50A. Alternatively, when the amount of power received by the power station 40 from the vehicle 50A is equal to the amount of power received by the power facility 45 from the vehicle 50B, the amount of power loss of the battery 130B due to DR is greater than the amount of power loss of the battery 130A due to the difference in the amount of power loss. This causes unfairness between the vehicles 50A and 50B.

[0182] The processor 605 of the server 600 according to the second embodiment has a configuration for dealing with such problems.

[0183] Specifically, the communication device 630 acquires the amount of received power that the power equipment receives from the vehicle 50 during external power feeding of the vehicle 50 participating in DR. The communication device 630 acquires, for example, the amount of power that the power stand 40 receives from the vehicle 50A during the DR period (first received power amount) and the amount of power that the power equipment 45 receives from the vehicle 50B during the DR period (second received power amount).

[0184] When each vehicle 50 participates in DR by performing external power feeding, the processing device 605 calculates the base remuneration RS according to the amount of received power of the power facility. For example, when the vehicle 50A participates in DR by performing contact power feeding, the processing device 605 calculates the base remuneration RS of the vehicle 50A according to the amount of received power of the power stand 40 during the DR period. Then, the processing device 605 determines the remuneration RWA so that the DR remuneration RWA becomes the base remuneration RS of the vehicle 50A.

[0185] Similarly, when the vehicle 50B participates in DR by performing contactless power feeding, the processing device 605 calculates the base remuneration RS of the vehicle 50B according to the amount of received power of the power facility 45 during the DR period. Then, the processing device 605 determines the remuneration RWB so that the DR remuneration RWB is greater than the base remuneration RS of the vehicle 50B.

[0186] 17 is a flowchart illustrating an example of a process executed by the processing device 605 after a target DR period ends in the second embodiment. This flowchart is executed when the power demand in the power system PG is greater than the power supply.

[0187] 17, the processing device 605 acquires the amount of power transmitted from the vehicle 50A that performed contact power feeding for DR to the power station 40 from the vehicle 50A via the communication device 630 (step S305). This amount of power is calculated by the ECU 150 of the vehicle 50A according to the voltage sensor 121 and the current sensor 122 of the vehicle 50A.

[0188] Next, the processing device 605 acquires the amount of power transmitted from the vehicle 50B that performed contactless charging for DR to the power equipment 45 from the vehicle 50B via the communication device 630 (step S310). This amount of power is calculated by the ECU 150 of the vehicle 50B according to the voltage sensor 141 and the current sensor 142 of the vehicle 50B.

[0189] Next, the processing device 605 acquires the amount of received power used for DR for each power facility (in this example, for the power stand 40 and the power facility 45) (step S315).

[0190] Next, the processing device 605 calculates a provisional DR remuneration for each vehicle 50 (step S325). In this example, the processing device 605 calculates a provisional first remuneration for the vehicle 50A, and calculates a provisional second remuneration for the vehicle 50B. The provisional first remuneration depends on the amount of received power of the power station 40 and the DR remuneration unit price UPRR1. The provisional second remuneration depends on the amount of received power of the power facility 45 and the DR remuneration unit price UPRR2 of the vehicle 50B. At this stage, it is assumed that the DR remuneration unit prices UPRR1 and UPRR2 are equal.

[0191] Next, the processing device 605 calculates a provisional DR profit for each vehicle 50 (step S330). In this example, the processing device 605 calculates a provisional DR profit (provisional first profit) for the vehicle 50A and a provisional DR profit (provisional second profit) for the vehicle 50B. The provisional first profit is a value obtained by subtracting the multiplication value of the amount of power reduction of the battery 130A and the unit power cost UPRP from the provisional first remuneration. The provisional second profit is a value obtained by subtracting the multiplication value of the amount of power reduction of the battery 130B and the unit power cost UPRP from the provisional second remuneration.

[0192] Next, the processor 605 calculates the tentative DR profit difference by calculating the difference between the tentative first profit and the tentative second profit (step S335).

[0193] Next, the processor 605 determines whether the tentative DR profit difference is equal to or greater than the threshold value TH (step S340). If the DR profit difference is less than the threshold value TH (NO in step S340), the processor 605 advances the process to step S350.

[0194] On the other hand, if the DR profit difference is equal to or greater than the threshold value TH (YES in step S340), the processing device 605 executes a process for correcting the unfairness between the vehicles 50A and 50B (step S345). This process is similar to the process in Fig. 11 or 16. For example, the DR rewards RWA and RWB are determined so that the difference ΔP (Fig. 6) between the DR profits PA and PB is less than the threshold value TH.

[0195] Next, the processing device 605 determines the total remuneration amount TRA according to the determination results of the DR remunerations RWA and RWB (step S350).

[0196] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not the above description, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0197] 10 Power management system, 40 Power stand, 42 Power cable, 45 Power equipment, 46, 48, 180, 318, 630 Communication equipment, 48, 124 Coil, 50, 50A, 50B Vehicle, 110 Inlet, 123 Power receiving device, 130, 130A, 130B Battery, 153, 620 Storage device, 305, 600, 700 Server, PG Power system.

Claims

1. a server of an aggregator that requests a plurality of vehicles, each of which is equipped with a power storage device and configured to be electrically connectable to an electric power grid, to participate in a demand response (DR), each of the plurality of vehicles is configured to be able to participate in the DR by performing external charging to charge the power storage device using electric power from power equipment connected to the power grid; A first vehicle among the plurality of vehicles is configured to be capable of performing contact charging, which is the external charging, using electric power received through a power cable of a first electric power facility serving as the electric power facility; A second vehicle among the plurality of vehicles is configured to be capable of performing wireless charging, which is the external charging, using electric power wirelessly received from a second electric power facility serving as the electric power facility, The server, an acquisition device that acquires an amount of transmitted power transmitted from the power facility during the external charging of the vehicle participating in the DR; a processing device that calculates a reference remuneration, which is a reference of a remuneration to be given to each of the plurality of vehicles by the aggregator when each of the plurality of vehicles participates in the DR, in accordance with the amount of transmitted power; When a first amount of transmitted power that is the amount of transmitted power to the first vehicle is equal to a second amount of transmitted power that is the amount of transmitted power to the second vehicle, the processing device: Calculating an additional power cost, which is a power cost during the wireless charging performed after the DR in which the second vehicle participates, in accordance with a power rate unit price of the power grid; determining a first reward, which is a reward given to the first vehicle by the aggregator when the first vehicle participates in the DR, so that the first reward becomes the base reward of the first vehicle; A server that determines a second reward, which is a reward given to the second vehicle by the aggregator when the second vehicle joins the DR, so that the second reward is more than the base reward of the second vehicle by the additional power cost.

2. The processing device includes: determining the first remuneration according to the first amount of transmitted power and a first unit price which is a unit price of the first remuneration for the first amount of transmitted power; determining the second remuneration according to the second amount of transmission power and a second unit price which is a unit price of the second remuneration for the second amount of transmission power; The server according to claim 1 , wherein the second unit price is higher than the first unit price.

3. The processing device includes: Calculating a first electricity cost, which is an electricity cost of the first vehicle in the DR, according to the electricity rate unit price and the first transmitted electricity amount; Calculating a second power cost, which is the power cost of the second vehicle in the DR, based on the power rate unit price and the second transmitted power amount; Calculating a first profit, which is a profit obtained when the first vehicle participates in the DR, by subtracting the first power cost from the first reward; Calculating a second profit, which is a profit obtained when the second vehicle participates in the DR, by subtracting the second power cost from the second reward; The server of claim 2 , further comprising: determining the first reward and the second reward such that a difference between the first reward and the second reward is less than a threshold value.

4. a total remuneration amount, which is a sum of the remunerations given to each of the plurality of vehicles by the aggregator, is a sum of the first remunerations of at least one of the first vehicles and the second remunerations of at least one of the second vehicles; The server according to claim 1 , wherein the processing device determines the first remuneration and the second remuneration such that the total remuneration amount is maintained.

5. A server according to any one of claims 1 to 4, wherein when the first vehicle and the second vehicle use a toll infrastructure, the processing device determines the first remuneration and the second remuneration so that the second vehicle can use the toll infrastructure more cheaply than the first vehicle.

6. the wireless charging includes in-travel charging that is performed while the second vehicle is traveling in a power supply lane in which the second power facility is provided, When the second vehicle participates in the DR by performing the on-travel charging, the processing device executes a process for notifying a user of the second vehicle when a start time of a period during which the second vehicle will participate in the DR arrives; 6. The server according to claim 1, wherein the notification includes a notification that prompts a user of the second vehicle to drive in the power supply lane when the second vehicle is driving in a driving lane different from the power supply lane at the start time.

7. each of the plurality of vehicles is configured to be able to participate in the DR by performing external power feeding to supply the power equipment with the power stored in the power storage device; the first vehicle is configured to be able to execute contact power feeding, which is the external power feeding, for feeding power to the first power equipment through the power cable; The second vehicle is configured to be able to execute contactless power supply, which is the external power supply that supplies power to the second power facility in a contactless manner, The acquisition device acquires an amount of received power received by the power equipment during the external power feeding of the vehicle participating in the DR, The processing device includes: When each of the plurality of vehicles participates in the dynamic range, the base remuneration is calculated according to the amount of received power; determining a first remuneration such that the first remuneration becomes the base remuneration of the first vehicle calculated according to the amount of received power of the first power facility when the first vehicle participates in the DR; 7. A server according to claim 1, further comprising: a server configured to determine, when the second vehicle participates in the DR, the second remuneration so that the second remuneration is greater than the base remuneration of the second vehicle calculated according to the amount of received power of the second power equipment.

Citation Information

Patent Citations

  • Charge / discharge management system

    JP2015095983A

  • Power transmission / reception management device and program

    JP2020115704A