Battery Control Device
Patent Information
- Application Number
- JP2021160382
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-09-30
- Publication Date
- 2025-02-17
- Estimated Expiration
- 2041-09-30
Smart Images

Figure 0007630401000001 
Figure 0007630401000002 
Figure 0007630401000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a battery control device. [Background technology]
[0002] Conventionally, there has been known a battery control device that controls a secondary battery composed of multiple battery cells. For example, the battery control device includes multiple battery monitoring circuits that repeatedly acquire status information such as the voltage and current of the multiple battery cells, and a control unit that acquires the status information from each battery monitoring circuit (for example, see Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2015-133823 A Summary of the Invention [Problem to be solved by the invention]
[0004] The battery monitoring circuit repeatedly acquires status information. When the battery monitoring circuit receives a command signal from the control unit, the battery monitoring circuit transmits the status information to the control unit. In order to receive more accurate status information, it is desirable for the control unit to receive the status information from the battery monitoring circuit as soon as possible after the battery monitoring circuit acquires the status information. However, there may be a large discrepancy between the timing at which the battery monitoring circuit acquires the status information and the timing at which the battery monitoring circuit receives the command signal from the control unit, leaving room for improvement in terms of acquiring more accurate status information.
[0005] The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a battery control device that can obtain more accurate state information. [Means for solving the problem]
[0006] (1) One aspect of the present invention is a battery control device comprising: a battery monitoring circuit that monitors status information of battery cells; and a control unit that communicates with the battery monitoring circuit and receives the status information from the battery monitoring circuit by sending an instruction signal to the battery monitoring circuit instructing it to send the status information, wherein the battery monitoring circuit comprises a first acquisition unit that repeatedly acquires the status information at a first timing, a second acquisition unit that repeatedly acquires the status information at a second timing different from the first timing, and a processing unit that, upon receiving the instruction signal, transmits to the control unit the latest status information of the status information acquired by the first acquisition unit and the status information acquired by the second acquisition unit.
[0007] (2) In the battery control device of (1) above, a period in which the first acquisition unit acquires the state information may be the same as a period in which the second acquisition unit acquires the state information.
[0008] (3) In the battery control device according to (1) or (2) above, a difference between the first timing and the second timing may be half the period.
[0009] (4) In a battery control device according to any one of (1) to (3) above, the first acquisition unit may acquire the status information, which is digital data of a physical quantity indicating a state of the battery cell, by repeatedly A / D converting the physical quantity at the first timing, and the second acquisition unit may acquire the status information, which is digital data of the physical quantity, by repeatedly A / D converting the physical quantity at the second timing.
[0010] (5) In the battery control device described above in (4), the physical quantity may be a value indicating a current value flowing through the battery cell.
[0011] (6) In the battery control device according to (5) above, the physical quantity may be a potential difference across a shunt resistor connected in series to the battery cell. Effect of the Invention
[0012] As described above, according to the present invention, it is possible to provide a battery control device that is capable of acquiring more accurate state information. [Brief description of the drawings]
[0013] [Figure 1] 1 is a diagram showing an example of a schematic configuration of a vehicle system including a battery control device according to an embodiment of the present invention. [Diagram 2] 1 is a diagram illustrating an example of a schematic configuration of a battery control device according to an embodiment of the present invention. [Diagram 3] 1 is a diagram showing an example of a schematic configuration of a battery monitoring circuit according to an embodiment of the present invention; [Figure 4] FIG. 4 is a flow diagram of the operation of the battery monitoring circuit according to the embodiment. [Diagram 5] 1 is a timing chart of a conventional battery monitoring circuit. [Figure 6] FIG. 2 is a diagram illustrating an example of a timing chart of the battery monitoring circuit of the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] The present invention will be described below through embodiments of the invention, but the following embodiments do not limit the invention according to the claims. In addition, not all of the combinations of features described in the embodiments are necessarily essential to the solution of the invention. In the drawings, the same or similar parts may be given the same reference numerals, and duplicated explanations may be omitted. In addition, the shapes and sizes of elements in the drawings may be exaggerated for clearer explanation.
[0015] The "connection" described below is an electrical connection. An electrical connection is a connection that allows an electrical signal to be transmitted directly or indirectly. The electrical connection may be a connection via a component such as a cable, a resistor, a capacitor, a diode, or a switch.
[0016] 1 is a diagram showing an example of a schematic configuration of a vehicle system 100 including a battery control device 300 according to this embodiment. The vehicle system 100 is mounted on a vehicle such as a hybrid vehicle or an electric vehicle. As an example, the vehicle system 100 is mounted on an electric vehicle that uses a motor as a driving power source.
[0017] As shown in FIG. 1, a vehicle system 100 includes a secondary battery 110, a motor 120, and a power conversion device .
[0018] The secondary battery 110 is mounted on a vehicle having the vehicle system 100, and is a nickel-metal hydride battery, a lithium-ion battery, or the like. For example, the secondary battery 110 is used as a battery in the vehicle having the vehicle system 100. For example, the power of the secondary battery 110 is used as driving power for the motor 120 and operating power for devices mounted on the vehicle having the vehicle system 100.
[0019] The secondary battery 110 includes a plurality of battery cell groups G (G-1 to Gn) connected in series. n is an integer equal to or greater than 2. A plurality of battery cells C are connected in series to each of the battery cell groups G-1 to Gn. The number of battery cells C in each of the battery cell groups G-1 to Gn (hereinafter also referred to as the "number of battery cells") depends on factors such as the body size of the vehicle in which the secondary battery 110 is mounted, and therefore the number of battery cells may differ depending on the vehicle having the vehicle system 100.
[0020] In each of the battery cell groups G-1 to Gn, the positive terminal of the uppermost battery cell (uppermost cell) C is the positive terminal P1 of the secondary battery 110, and the negative terminal of the lowermost battery cell (lowest cell) C is the negative terminal P2 of the secondary battery 110. The positive terminal P1 and negative terminal P2 of each battery cell C are each connected to the power conversion device 130. When there is no need to distinguish between the multiple battery cell groups G-1 to Gn, they will simply be referred to as "battery cell group G."
[0021] The motor 120 is an electric motor driven by power from the power conversion device 130. For example, the motor 120 is a driving motor of a vehicle having the vehicle system 100. For example, the motor 120 is a three-phase (U, V, W) brushless motor. The motor 120 may be a motor generator. That is, the motor 120 may be used as a generator driven by an engine of the vehicle having the vehicle system 100, and may also be used as an electric motor for starting the engine. The motor 120 of this embodiment mainly operates as an electric motor and drives the wheels of the vehicle having the vehicle system 100.
[0022] The power conversion device 130 manages the secondary battery 110 and controls the driving of the motor 120. The power conversion device 130 includes a power converter 200 and a battery control device 300.
[0023] The power converter 200 boosts the output voltage output from the secondary battery 110 and converts the boosted voltage into AC. The power converter 200 then outputs the converted AC voltage to the motor 120 to drive the motor 120. The power converter 200 may also have a function of stepping down the regenerative voltage from the motor 120 at a predetermined step-down ratio and outputting the voltage to the secondary battery 110.
[0024] The battery control device 300 controls the secondary battery 110, which is the object of control, and manages the state of the secondary battery 110. The control over the secondary battery 110 may be, for example, control to keep the voltage of the secondary battery 110 within a normal range (for example, cell balance control), control to keep the temperature of the secondary battery 110 within a normal range, or control to eliminate an abnormality in the secondary battery 110 if one occurs.
[0025] An example of a schematic configuration of the battery control device 300 will be described below with reference to Fig. 2. Fig. 2 is a schematic configuration diagram of the battery control device 300 according to this embodiment.
[0026] The battery control device 300 includes a battery state detection unit 10, a control unit 20, a power supply circuit 30, a communication circuit 40, and a voltage generation unit 50.
[0027] The battery state detection unit 10 includes a plurality of battery monitoring circuits 11 (11-1 to 11-n). For example, the battery monitoring circuits 11 are integrated circuits for battery monitoring. The battery monitoring circuits 11-1 to 11-n each have the same configuration, and when there is no need to distinguish between the plurality of battery monitoring circuits 11-1 to 11-n, they will simply be referred to as "battery monitoring circuits 11."
[0028] Each battery monitoring circuit 11 is electrically connected to one or more battery cells C. The battery monitoring circuit 11 monitors status information that is information indicating the status of the battery cells C. For example, there is a one-to-one correspondence between the multiple battery monitoring circuits 11 and the multiple battery cell groups G. The battery monitoring circuits 11 are connected to the battery cell groups G with which they correspond one-to-one. In other words, the battery monitoring circuits 11-k (k is an integer from 1 to n) are connected to each of the battery cells Ck included in the battery cell groups Gk with which they correspond one-to-one.
[0029] For example, the state information is at least one of a current value Ix flowing through a battery cell C, a voltage value of the battery cell C (hereinafter referred to as a "cell voltage value"), and a temperature of the battery cell C. The current value Ix flowing through each of the multiple battery cells C connected in series is the same. Therefore, it is sufficient that at least one battery monitoring circuit 11 among the multiple battery monitoring circuits 11-1 to 11-n detects the current value Ix.
[0030] 1 and 2, the battery monitoring circuit 11 acquires the current value Ix using a shunt resistor R. This shunt resistor R is connected in series to a battery cell C. The battery monitoring circuit 11 is connected to both ends of the shunt resistor R, and acquires the current value Ix by acquiring the potential difference of the shunt resistor R. The battery monitoring circuit 11 may acquire the current value Ix from the measurement result of a current sensor other than the shunt resistor R.
[0031] The battery monitoring circuit 11-k is provided corresponding to the battery cell group Gk, and has a plurality of input terminals corresponding to the output terminals (positive or negative terminals of the battery cell Ck) of each battery cell Ck in the battery cell group Gk. The output terminals (positive or negative terminals) of each battery cell Ck are connected one-to-one with the plurality of input terminals of the battery monitoring circuit 11-k, for example, by connection lines. This electrically connects both ends of each battery cell Ck with the battery monitoring circuit 11-k. The battery monitoring circuit 11-k may obtain the cell voltage value of the battery cell C by reading the potential difference between both ends of each battery cell C.
[0032] For example, the battery control device 300 has one or more temperature sensors (not shown) that measure the operating temperature of each battery cell group G. The battery monitoring circuit 11 is connected to the temperature sensor, and may obtain the temperature of the battery cell C based on the measurement result of the temperature sensor.
[0033] The battery monitoring circuit 11 communicates with the control unit 20 via the communication circuit 40 to send and receive information. When the battery monitoring circuit 11 receives an instruction signal from the control unit 20, it transmits the acquired status information to the control unit 20. The instruction signal is a signal that instructs the battery monitoring circuit 11 to transmit the status information to the control unit 20.
[0034] In this way, the battery monitoring circuit 11-k acquires the status information of the battery cell Ck, and transmits the acquired status information to the control unit 20 via the communication circuit 40 when an instruction signal is received.
[0035] 2, the battery monitoring circuits 11-1 to 11-n are daisy-chained and connected to each other by a communication line L1. This communication line L1 is a communication line capable of two-way communication. That is, each battery monitoring circuit 11 can communicate two-way with the adjacent battery monitoring circuit 11.
[0036] Further, among the plurality of battery monitoring circuits 11-1 to 11-n connected in a daisy chain, only the battery monitoring circuit 11-n on the lowest potential side (one end side) is connected to the communication circuit 40 via the communication line L2. The communication line L2 is a communication line capable of bidirectional communication. This allows the plurality of battery monitoring circuits 11-1 to 11-n connected in a daisy chain and the control unit 20 to communicate with each other via the communication circuit 40, and to transmit and receive information to each other. However, this is not limited, and the control unit 20 may be connected to each of the plurality of battery monitoring circuits 11-1 to 11-n via a connection line. In other words, the control unit 20 only needs to be able to communicate with each of the plurality of battery monitoring circuits 11-1 to 11-n, and there is no particular limitation on the connection form. The communication line L2 may include an insulating element such as a photocoupler or a pulse transformer, a communication IC, or the like.
[0037] The control unit 20 has a processor such as a CPU (Central Processing Unit) or an MPU (Micro Processing Unit). In addition to the processor, the control unit 20 may also include a non-volatile or volatile semiconductor memory (e.g., a RAM (Random Access Memory), a ROM (Read Only Memory), a flash memory, an EPROM (Erasable Programmable Read Only Memory), or an EEPROM (Electrically Erasable Programmable Read Only Memory)). For example, the control unit 20 may be a microcontroller such as an MCU.
[0038] The control unit 20 repeatedly transmits an instruction signal at regular intervals Ts to the battery monitoring circuit 11. As a result, the control unit 20 receives state information at regular intervals Ts from the battery monitoring circuit 11. The regular intervals Ts are the cycle at which the control unit 20 transmits the instruction signal.
[0039] The control unit 20 may determine an abnormality in the secondary battery 110 based on the received status information. When the control unit 20 detects an abnormality in the secondary battery 110, the control unit 20 may execute a process for turning on or blinking a warning light or a hazard light provided in the vehicle, for example. When the control unit 20 detects an abnormality in the secondary battery 110, the control unit 20 may execute a process to be taken in response to the abnormality, such as notifying the abnormality or executing a process to resolve the abnormality.
[0040] An example of the configuration of the battery monitoring circuit 11 according to this embodiment will be described below. Fig. 3 is a diagram showing an example of the configuration of the battery monitoring circuit 11 according to this embodiment. Fig. 3 shows a schematic configuration of the battery monitoring circuit 11 for acquiring a current value Ix as state information.
[0041] 3, the battery monitoring circuit 11 includes a first acquisition unit 31, a second acquisition unit 32, and a processing unit 33. The battery monitoring circuit 11 has a processor such as a CPU or an MPU. The control unit 20 may include a non-volatile or volatile semiconductor memory (e.g., RAM, ROM, flash memory, EPROM, EEPROM) in addition to the processor. For example, the control unit 20 may be a microcontroller such as an MCU.
[0042] The first acquisition unit 31 repeatedly acquires the status information X at a first timing. The status information acquired by the first acquisition unit 31 may be referred to as "status information X1."
[0043] In the example shown in FIG. 3, the first acquisition unit 31 has an AD converter. The first acquisition unit 31 is connected to both ends of the shunt resistor R. The first acquisition unit 31 reads the potential difference Vr (analog data) between both ends of the shunt resistor R, and repeatedly executes a first acquisition process at a first timing to acquire digital data of the potential difference Vr by A / D converting the read potential difference Vr. The period of the first acquisition process is referred to as an "acquisition period T1". The digital data of the potential difference Vr is an example of the state information X1. For example, the first acquisition unit 31 holds the digital data of the potential difference Vr as the state information X1, and updates the state information X1 every time the first acquisition unit 31 acquires the digital data of the potential difference Vr. In other words, the first acquisition unit 31 updates the state information X1 at the first timing by repeatedly executing the first acquisition process at the first timing. Acquisition of the state information X1 is an example of updating the state information X1. In this way, the first acquisition unit 31 acquires state information X1, which is digital data of a physical quantity (such as potential difference Vr) indicating the state of the battery cell C, by repeatedly A / D converting the physical quantity at a first timing.
[0044] The second acquisition unit 32 repeatedly acquires the state information at a second timing different from the first timing. The state information acquired by the second acquisition unit 32 may be referred to as "state information X2". In the example shown in FIG. 3, the second acquisition unit 32 has an AD converter. The second acquisition unit 32 is connected to both ends of the shunt resistor R. The second acquisition unit 32 repeatedly executes a second acquisition process at a second timing, in which the potential difference Vr (analog data) between both ends of the shunt resistor R is read and the read potential difference Vr is A / D converted to acquire digital data of the potential difference Vr. The period of the second acquisition process is referred to as an "acquisition period T2". For example, the acquisition period T2 is the same as the acquisition period T1. That is, in this embodiment, the first acquisition process and the second acquisition process are only different in the timing of execution and are the same in the period of execution. In addition, when the acquisition period T1 is the same as the acquisition period T2, the acquisition period T1 and the acquisition period T2 may be referred to as an acquisition period Tx.
[0045] The second timing may be different from the first timing. For example, the difference between the first timing and the second timing is half the acquisition period T1. As an example, if the acquisition period T1 is the same as the acquisition period T2 and the acquisition period T1=T2=10 ms, the difference between the first timing and the second timing is 5 ms.
[0046] For example, the second acquisition unit 32 holds digital data of the potential difference Vr as status information X2 separately from the first acquisition unit 31, and updates the status information X2 every time the digital data of the potential difference Vr is acquired. In other words, the second acquisition unit 32 updates the status information X2 at the second timing by repeatedly executing the second acquisition process at the second timing. Acquisition of the status information X2 is an example of updating the status information X2. In this way, the second acquisition unit 32 acquires the status information X2, which is digital data of a physical quantity (such as the potential difference Vr) indicating the state of the battery cell C, by repeatedly A / D converting the physical quantity at the second timing.
[0047] When the processing unit 33 receives an instruction signal from the control unit 20, it transmits the latest state information out of the state information X1 acquired by the first acquisition unit 31 and the state information X2 acquired by the second acquisition unit 32 to the control unit 20. For example, out of the state information X1 and the state information X2, the state information acquired by A / D conversion at a time closer to the current time is the latest state information.
[0048] When the processing unit 33 receives an instruction signal from the control unit 20, the processing unit 33 determines which of the status information X1 acquired by the first acquisition unit 31 and the status information X2 acquired by the second acquisition unit 32 is the latest status information. Then, the processing unit 33 transmits the latest status information of the status information X1 and the status information X2 to the control unit 20.
[0049] For example, the processing unit 33 has information on the time when the first acquisition process was executed (hereinafter referred to as "first time information") and information on the time when the second acquisition process was executed (hereinafter referred to as "second time information"). The processing unit 33 determines which of the first time information and the second time information is closer to the time when the instruction signal was received (hereinafter referred to as "instruction reception time"). If the processing unit 33 determines that the first time information is closer to the instruction reception time than the second time information, it determines that the latest information is status information X1. If the processing unit 33 determines that the second time information is closer to the instruction reception time than the first time information, it determines that the latest information is status information X2.
[0050] 4 is a flow diagram of the operation of the battery monitoring circuit 11 according to this embodiment. The battery monitoring circuit 11 executes a first acquisition process for acquiring status information X1 at a first timing, in an acquisition cycle T1. The battery monitoring circuit 11 executes a second acquisition process for acquiring status information X2 at a second timing different from the first timing, in an acquisition cycle T2. The battery monitoring circuit 11 receives an instruction signal from the control unit 20 at a constant interval Ts (step S101). When the battery monitoring circuit 11 receives an instruction signal from the control unit 20, it transmits to the control unit 20 the latest status information of the information X1 and status information X2 acquired at the time of receiving the instruction signal (step S102).
[0051] The effects of this embodiment will be described below with reference to Fig. 5 and Fig. 6. Fig. 5 is a timing chart of a conventional battery monitoring circuit. Fig. 6 is an example of a timing chart of the battery monitoring circuit 11 of this embodiment. In the example shown in Fig. 5 and Fig. 6, AD conversion performed by the battery monitoring circuit starts at the rising edge and ends at the falling edge.
[0052] As shown in FIG. 5, the conventional battery monitoring circuit updates the status information stored in the battery monitoring circuit at each acquisition period Tx by AD converting physical quantities, which are analog data such as the current value flowing through the battery cell C, at each acquisition period Tx. When the conventional battery monitoring circuit receives an instruction command at a fixed interval Ts, it transmits the status information to a control unit such as a microcomputer. Here, there is a difference ΔT between the timing of AD conversion (the timing of updating the status information) and the timing of receiving the instruction signal. This difference ΔT may gradually increase. For example, when the acquisition period Tx is 8 ms and the fixed interval Ts is 10 ms, the difference ΔT gradually increases as shown in FIG. 5, and the difference ΔT becomes 8 ms at the maximum. That is, when the conventional battery monitoring circuit receives an instruction command, it transmits to the control unit status information that is up to 8 ms old.
[0053] In the battery monitoring circuit 11 of this embodiment, two AD converters (a first acquisition unit 31 and a second acquisition unit 32) are assigned to one physical quantity. These two AD converters perform A / D conversion at the same acquisition period Tx, but the timings at which they perform A / D conversion are different from each other. When the battery monitoring circuit 11 receives a command signal, it determines which of the AD values (status information) converted by the two AD converters is the latest. Then, the battery monitoring circuit 11 notifies the control unit 20 of the latest AD value. This allows the battery monitoring circuit 11 to reduce the deviation ΔT more than in the past. For example, the timings at which the A / D conversion is performed between the first acquisition unit 31 and the second acquisition unit 32 differ by Tx×(1 / 2). With this configuration, the maximum deviation ΔT can be reduced by half compared to the past.
[0054] Thus, the battery control device 300 includes a battery monitoring circuit 11 that monitors status information of the battery cells C, and a control unit 20 that communicates with the battery monitoring circuit 11 and receives status information from the battery monitoring circuit 11 by transmitting an instruction signal to the battery monitoring circuit 11 instructing the battery monitoring circuit 11 to transmit the status information. The battery monitoring circuit 11 includes a first acquisition unit 31 that repeatedly acquires the status information at a first timing, and a second acquisition unit 32 that repeatedly acquires the status information at a second timing different from the first timing. The battery monitoring circuit 11 includes a processing unit 33 that, upon receiving the instruction signal, transmits the latest status information of the status information acquired by the first acquisition unit 31 and the status information acquired by the second acquisition unit 32 to the control unit 20.
[0055] With this configuration, the time lag ΔT between the timing at which the battery monitoring circuit 11 acquires status information and the timing at which it receives a command signal from the control unit 20 can be reduced more than in the past, making it possible to acquire status information that is more accurate than in the past.
[0056] The first acquisition unit 31 and the second acquisition unit 32 are each electrically connected to a current sensor that measures the current value of the battery cell C, and may each acquire digital data of the measurement result, which is an example of state information, by A / D converting the measurement result of this current sensor at different timings. This current sensor may be a shunt resistor. However, the current sensor is not limited to a shunt resistor, and may be a current transformer (CT) with a transformer or a sensor with a Hall element.
[0057] In the battery monitoring circuit 11 of the present embodiment, two AD converters are assigned to one physical quantity (analog data) indicating the state of the battery cell C. However, the present invention is not limited to this, and the battery monitoring circuit 11 may assign three or more AD converters to one physical quantity. That is, the battery monitoring circuit 11 assigns two or more AD converters to one physical quantity and acquires the physical quantity by A / D conversion at different timings. When the battery monitoring circuit 11 receives a command signal, it transmits the latest digital data among the digital data after AD conversion acquired at different timings. The A / D conversion cycles of the two or more AD converters may all be the same.
[0058] The term "unit" in the specification means a unit that processes at least one function or operation, which may be embodied as hardware or software, or a combination of hardware and software. [Explanation of symbols]
[0059] REFERENCE SIGNS LIST 100 vehicle system, 110 secondary battery, 120 motor, 130 power conversion device, 200 power converter, 300 battery control device, 10 battery state detection unit, 11 battery monitoring circuit, 20 control unit, 31 first acquisition unit, 32 second acquisition unit, 33 processing unit
Claims
1. a battery monitoring circuit that monitors state information of a battery cell; a control unit that communicates with the battery monitoring circuit and receives the status information from the battery monitoring circuit by transmitting an instruction signal to the battery monitoring circuit to instruct the battery monitoring circuit to transmit the status information; Equipped with The battery monitoring circuit includes: a first acquisition unit that repeatedly acquires the state information at a first timing; a second acquisition unit that repeatedly acquires the state information at a second timing different from the first timing; a processing unit that, when receiving the instruction signal, transmits to the control unit the latest of the status information acquired by the first acquisition unit and the status information acquired by the second acquisition unit; A battery control device comprising:
2. a period in which the first acquisition unit acquires the state information is the same as a period in which the second acquisition unit acquires the state information; The battery control device according to claim 1 .
3. a difference between the first timing and the second timing is half the time of the period; The battery control device according to claim 2 .
4. the first acquisition unit acquires the state information, which is digital data of a physical quantity indicating a state of the battery cell, by repeatedly performing A / D conversion of the physical quantity at the first timing; the second acquisition unit acquires the state information, which is digital data of the physical quantity, by repeatedly performing A / D conversion on the physical quantity at the second timing. The battery control device according to any one of claims 1 to 3.
5. The physical quantity is a value indicating a current value flowing through the battery cell. The battery control device according to claim 4.
6. The physical quantity is a potential difference across a shunt resistor connected in series to the battery cell. The battery control device according to claim 5.
Citation Information
Patent Citations
Current detection method and current detection device
JP2003227852A
Battery pack system
JP2015133823A
Current detector
JP2018173360A
Systems and methods for characterizing power quality events in an electrical system
US20200011909A1
Adaptive Power Measurement Accumulator with a Changing Sampling Frequency
US20200341039A1