Inspection route planning proposal system
By introducing damage risk and inspection time calculation units into the inspection system, the inspection route is optimized, and the problems of insufficient resources and cost increase caused by the increase in equipment in the existing system are solved, and the key inspection of equipment at high risk of damage is achieved, which reduces the inspection cost and ensures the inspection reliability of equipment.
Patent Information
- Application Number
- JP2021146751
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-09-09
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2041-09-09
AI Technical Summary
When optimizing inspection routes, existing systems have increased the number of equipment that needs to be inspected, resulting in insufficient human resources and increased inspection costs. Reducing the number of inspection equipment to reduce costs may reduce the inspection reliability of equipment.
By introducing a damage risk calculation unit and an inspection time calculation unit in the system, a variety of different inspection route plans are proposed based on the inspection results and working hours of the equipment, the damage risk of the equipment and the time required for inspection, focusing on the inspection of high-risk equipment, and optimizing the inspection route without increasing the total inspection time.
It effectively reduces the number of equipment in the inspection route, concentrates on inspection of high-risk equipment, reduces inspection costs, and ensures the inspection reliability of equipment.
Smart Images

Figure 0007657128000001 
Figure 0007657128000002 
Figure 0007657128000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to an inspection route plan proposing system and an inspection route plan proposing method for proposing an inspection route plan for inspecting a plurality of devices installed in an inspection target area. [Background technology]
[0002] For example, patrol inspections of plants such as thermal power plants involve a variety of tasks, such as palpation, reading meters such as analog meters, detecting abnormal sounds, and checking for steam leaks. These tasks may need to be performed several times a day in shifts, and if they are performed by patrol personnel (people), there are issues such as increased inspection costs and a shortage of people. As a measure to reduce the inspection costs of patrol inspections, attempts have been made to digitize the measured values of analog meters and other instruments using wireless sensors and send them to mobile devices carried by patrol personnel via wireless communication using the wireless sensors.
[0003] Patent Document 1 discloses a system that optimizes inspection routes during on-site inspections of plants using mobile terminals, and when abnormalities or information requiring caution is obtained about equipment within a specified inspection route, the system refers to maintenance management history information, etc., and then performs additional inspections of equipment outside the inspection route. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2006-350604 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the system described in Patent Document 1, when an abnormality is detected in an equipment, the equipment to be inspected is added to the inspection route, which leads to improved plant reliability, but the workload increases and the human resource shortage problem may worsen. In this way, in recent plant patrol inspections, equipment to be inspected may be added to the inspection route, which may increase the inspection costs by the additional equipment to be inspected. If the number of equipment to be inspected in the patrol inspection is simply reduced in order to reduce inspection costs, the equipment may not be inspected appropriately, which may lead to a decrease in plant reliability.
[0006] In view of the above-mentioned circumstances, an object of at least one embodiment of the present disclosure is to provide an inspection route plan proposal system and an inspection route plan proposal method that can propose an inspection route plan that enables focused inspection of equipment with a high risk of damage and reduces excessive inspection costs. [Means for solving the problem]
[0007] An inspection route planning proposal system according to an embodiment of the present disclosure includes: An inspection route planning proposal system for proposing an inspection route plan for inspecting a plurality of devices installed in an inspection target area, comprising: an inspection result information storage unit that stores the inspection results of each of the plurality of devices and the inspection work time for each inspection item; A damage risk calculation unit configured to calculate a damage risk of each of the plurality of devices based on the inspection results stored in the inspection result information storage unit; an inspection time calculation unit configured to calculate an inspection time required for each of the inspection items of the plurality of devices based on the inspection work time stored in the inspection result information storage unit; the inspection route plan presentation unit presents an inspection route plan including at least one inspection target device among the plurality of devices that is to be inspected, inspection implementation items that are the inspection items to be performed on the inspection target device, and a total inspection time required to perform inspection of the inspection implementation items on the at least one inspection target device, the inspection route plan presentation unit being configured to be able to present a plurality of inspection route plans, each of which differs in at least one of the inspection target device or the inspection implementation items, taking into account the damage risk and the inspection time required.
[0008] A method for proposing an inspection route plan according to an embodiment of the present disclosure includes: An inspection route plan proposing method for proposing an inspection route plan for inspecting a plurality of devices installed in an inspection target area, comprising: An inspection result information acquisition step of acquiring inspection results of each of the plurality of devices and inspection work time for each inspection item; A damage risk calculation step of calculating a damage risk of each of the plurality of devices based on the inspection result acquired in the inspection result information acquisition step; an inspection required time calculation step of calculating an inspection required time for each of the inspection items of the plurality of devices based on the inspection work time acquired in the inspection result information acquisition step; an inspection route plan presenting step for presenting an inspection route plan including at least one inspection target device among the plurality of devices that is to be inspected, inspection implementation items that are the inspection items to be performed on the inspection target device, and a total inspection time required to perform inspection of the inspection implementation items on the at least one inspection target device, and an inspection route plan presenting step for presenting a plurality of inspection route plans each differing in at least one of the inspection target device or the inspection implementation items, taking into consideration the damage risk and the inspection time required. Effect of the Invention
[0009] According to at least one embodiment of the present disclosure, an inspection route plan proposing system and an inspection route plan proposing method are provided that can propose an inspection route plan that enables focused inspection of equipment with a high risk of damage and reduces excessive inspection costs. [Brief description of the drawings]
[0010] [Figure 1] FIG. 2 is a flow diagram of an inspection route planning method according to an embodiment of the present disclosure. [Diagram 2] FIG. 1 is a schematic configuration diagram illustrating a configuration of an inspection route plan proposal according to an embodiment of the present disclosure. [Diagram 3] FIG. 11 is an explanatory diagram for explaining an inspection route plan according to an embodiment of the present disclosure. [Figure 4] FIG. 1 is a flow diagram of a method for creating an inspection route plan. [Diagram 5] FIG. 11 is an explanatory diagram for explaining an example of a method for creating an inspection route plan. [Figure 6] FIG. 11 is an explanatory diagram for explaining an inspection route plan according to an embodiment of the present disclosure. [Figure 7] FIG. 11 is an explanatory diagram for explaining an example of a method for creating an inspection route plan. [Figure 8] FIG. 11 is an explanatory diagram for explaining information regarding inspectors. [Figure 9] FIG. 1 is a schematic configuration diagram illustrating a configuration of an inspection route plan proposal according to an embodiment of the present disclosure. [Figure 10] FIG. 2 is a flow diagram of an inspection route planning method according to an embodiment of the present disclosure. [Figure 11] FIG. 11 is an explanatory diagram for explaining updating of an inspection route plan when an abnormality is determined. [Figure 12] FIG. 11 is an explanatory diagram for explaining updating of an inspection route plan when an abnormality is determined. [Figure 13] FIG. 11 is an explanatory diagram for explaining updating of an inspection route plan when an abnormality is determined. [Figure 14] FIG. 2 is a flow diagram of an inspection route planning method according to an embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, some embodiments of the present disclosure will be described with reference to the accompanying drawings. However, the dimensions, materials, shapes, relative arrangements, etc. of components described as the embodiments or shown in the drawings are merely illustrative examples and are not intended to limit the scope of the present disclosure. For example, expressions expressing relative or absolute configuration, such as "in a certain direction," "along a certain direction," "parallel," "orthogonal," "center," "concentric," or "coaxial," not only strictly express such a configuration, but also express a state in which there is a relative displacement with a tolerance or an angle or distance to the extent that the same function is obtained. For example, expressions indicating that things are in an equal state, such as "identical," "equal," and "homogeneous," not only indicate a state of strict equality, but also indicate a state in which there is a tolerance or a difference to the extent that the same function is obtained. For example, expressions describing shapes such as a rectangular shape or a cylindrical shape do not only refer to rectangular shapes, cylindrical shapes, etc. in the strict geometric sense, but also refer to shapes that include uneven portions, chamfered portions, etc., to the extent that the same effect is obtained. On the other hand, the expressions "comprise", "include", or "have" a certain element are not exclusive expressions excluding the presence of other elements. In addition, the same components are denoted by the same reference numerals and the description thereof may be omitted.
[0012] Fig. 1 is a flow diagram of an inspection route plan proposing method according to an embodiment of the present disclosure. Fig. 2 is a schematic diagram showing a configuration of an inspection route plan proposing method according to an embodiment of the present disclosure. Fig. 3 is an explanatory diagram for explaining an inspection route plan in an embodiment of the present disclosure.
[0013] (Inspection route planning method) An inspection route plan proposing method 100 according to some embodiments is a method for proposing an inspection route plan RP for inspecting a plurality of devices 2 (see FIG. 2) installed in an inspection target area 1. As shown in FIG. 1, the inspection route plan proposing method 100 at least includes an inspection result information acquisition step S1, a damage risk calculation step S2, an inspection required time calculation step S3, and an inspection route plan presentation step S4. As shown in FIG. 1, the inspection route plan proposing method 100 may further include an inspection route plan determination step S5, an inspection step S6, and an inspection result information input step S7. Hereinafter, an example will be described in which each of the plurality of devices 2 includes plant devices constituting a plant (factory equipment), and the inspection target area 1 includes the site of the plant.
[0014] At least one step in the inspection route plan proposal method 100 may be performed by the inspection route plan proposal system 10 (see FIG. 2), by a device or equipment other than the inspection route plan proposal system 10, or manually.
[0015] 3, the inspection route plan RP includes at least one inspection target device 2T to be inspected among a plurality of devices 2 installed in the inspection target area 1, inspection implementation items AE which are inspection items E to be performed on the inspection target device 2T, and a total inspection required time TTR required to inspect the inspection implementation items AE on at least one inspection target device 2T. The total inspection required time TTR is the time required to inspect all inspection implementation items AE included in the inspection route plan RP, and is calculated by adding up the inspection required times TR of all inspection implementation items AE included in the inspection route plan RP.
[0016] As shown in FIG. 3, inspection item E includes sensing of device 2, taking a photograph of device 2, checking the operation of device 2, and the like.
[0017] In the inspection route plan determination step S5, the inspection route plan RP (the equipment to be inspected 2T and the inspection implementation items AE) is determined. In the inspection step S6, an inspection is performed according to the inspection route plan RP determined in the inspection route plan determination step S5. That is, in the inspection step S6, an inspection of the inspection implementation items AE is performed on the equipment to be inspected 2T included in the inspection route plan RP. The inspection in the inspection step S6 provides an inspection result R of the equipment to be inspected 2T. The inspection result R includes a determination result as to whether the equipment to be inspected 2T is normal or abnormal.
[0018] In the inspection result information input step S7, the inspection result R of at least one inspection target device 2T (device 2) obtained by the inspection in the inspection step S6 and the inspection work time WT for each inspection implementation item AE (inspection item E) are input. The inspection result R and the inspection work time WT may be input by the inspector who performed the inspection in the inspection step S6.
[0019] The inspection results R and the inspection work time WT input in the inspection result information input step S7 are stored in the inspection result information storage unit 11. By repeatedly performing steps ranging from the inspection route plan determination step S5 to the inspection result information input step S7, the inspection result information storage unit 11 accumulates the inspection results R of each of the multiple devices 2 installed in the inspection target area 1 and the inspection work time WT for each inspection item E. As a result, the inspection result information storage unit 11 stores the inspection results R of each of the multiple devices 2 and the inspection work time WT for each inspection item E.
[0020] In the inspection result information acquisition step S1, the inspection results R and the inspection work time WT for each inspection item are acquired for each of the multiple devices 2. The inspection results R and the inspection work time WT are acquired from the inspection result information storage unit 11.
[0021] In the damage risk calculation step S2, a damage risk RD (mean time between failures, MTBF in the illustrated example) of each of the multiple devices 2 is calculated based on the inspection results R acquired in the inspection result information acquisition step S1. In the illustrated embodiment, the damage risk calculation step S2 is performed by the damage risk calculation unit 12. The damage risk calculation unit 12 is configured to calculate a damage risk RD (mean time between failures, MTBF in the illustrated example) of each of the multiple devices 2 based on the inspection results R stored in the inspection result information storage unit 11.
[0022] The damage risk calculation unit 12 performs statistical processing on the inspection results R to calculate the damage risk RD (mean time between failures MTBF) of each of the multiple devices 2. Examples of the damage risk RD include the mean time between failures MTBF, which is the average interval between failures of the devices 2 and the next failure, and the failure frequency rate, which is the reciprocal of the mean time between failures MTBF, as shown in Fig. 3. A device 2 with a short mean time between failures MTBF has a high damage risk RD, and a device 2 with a long mean time between failures MTBF has a low damage risk RD.
[0023] In the inspection required time calculation step S3, based on the inspection work time WT acquired in the inspection result information acquisition step S1, the inspection required time TR for each inspection item E of each of the multiple devices 2 is calculated. In the illustrated embodiment, the inspection required time calculation step S3 is performed by the inspection required time calculation unit 13. The inspection required time calculation unit 13 is configured to calculate the inspection required time TR for each inspection item E of each of the multiple devices 2 based on the inspection work time WT stored in the inspection result information storage unit 11.
[0024] The inspection required time calculation unit 13 performs statistical processing on the inspection work time WT for each inspection item E of each of the multiple devices 2, thereby calculating the inspection required time TR for each inspection item E of each of the multiple devices 2. The inspection required time calculation unit 13 may take, for example, an average value or a median value of the inspection work times WT as the inspection required time TR.
[0025] In the inspection route plan presentation step S4, a plurality of inspection route plans RP each having different at least one of the inspection target equipment 2T or the inspection implementation items AE is presented in consideration of the damage risk RD and the required inspection time TR. That is, in the inspection route plan presentation step S4, a plurality of inspection route plans RP each having different at least one of the inspection target equipment 2T or the inspection implementation items AE is created in consideration of the damage risk RD and the required inspection time TR, and the created plurality of inspection route plans RP is presented.
[0026] In the illustrated embodiment, the inspection route plan presentation step S4 is performed by the inspection route plan presentation unit 14. The inspection route plan presentation unit 14 is configured to be able to present a plurality of inspection route plans RP in which at least one of the inspection target equipment 2T or the inspection implementation items AE is different, taking into consideration the damage risk RD and the inspection required time TR. The inspection route plan presentation unit 14 includes a creation unit 15 configured to create a plurality of inspection route plans RP in which at least one of the inspection target equipment 2T or the inspection implementation items AE is different, taking into consideration the damage risk RD calculated in the damage risk calculation unit 12 and the inspection required time TR calculated in the inspection required time calculation unit 13, and a presentation unit 16 configured to present the plurality of inspection route plans RP created in the creation unit 15. The presentation unit 16 includes a display screen 161 and is configured to display a plurality of inspection route plans RP on the display screen 161.
[0027] In the above-mentioned inspection route plan determination step S5, one inspection route plan RP selected from the multiple inspection route plans RP presented in the inspection route plan presentation step S4 may be determined as the inspection route plan RP to be used for inspection.
[0028] According to the above method, in the inspection route plan presentation step S4, a plurality of inspection route plans RP are presented, each of which differs in at least one of the equipment to be inspected 2T or the inspection implementation items AE. Each of the plurality of inspection route plans RP presented in the inspection route plan presentation step S4 takes into consideration the damage risk RD and the inspection time required TR of each of the plurality of equipment 2. Therefore, by performing an inspection according to one inspection route plan RP selected from the plurality of inspection route plans RP, it is possible to focus on inspecting equipment 2 with a high damage risk RD, and to reduce excessive inspection costs.
[0029] (Inspection route planning proposal system) An inspection route plan proposal system 10 according to some embodiments is for proposing the above-mentioned inspection route plan RP. As shown in Fig. 2, the inspection route plan proposal system 10 includes at least the above-mentioned inspection result information storage unit 11, the above-mentioned damage risk calculation unit 12, the above-mentioned inspection required time calculation unit 13, and the above-mentioned inspection route plan presentation unit 14.
[0030] According to the above configuration, the inspection route plan presentation unit 14 presents a plurality of inspection route plans RP, each of which differs in at least one of the equipment to be inspected 2T or the inspection implementation items AE. Each of the plurality of inspection route plans RP presented by the inspection route plan presentation unit 14 takes into consideration the damage risk RD and the inspection time required TR of each of the plurality of equipment 2. Therefore, by having an inspector carry out an inspection according to one inspection route plan RP selected from the plurality of inspection route plans RP, it is possible to focus on inspecting equipment 2 with a high damage risk RD, and to reduce excessive inspection costs.
[0031] (How to create an inspection route plan) As shown in Fig. 3, among the multiple devices 2 installed in the inspection area 1, devices that have been preset as inspection targets are defined as set devices 2S, and devices other than the set devices 2S whose damage risk is equal to or greater than a predetermined risk are defined as high-risk devices 2H. Among the multiple devices 2 installed in the inspection area 1, devices other than the set devices 2S whose damage risk is less than a predetermined risk are defined as low-risk devices 2L.
[0032] In the illustrated embodiment, the set devices 2S include devices 2 whose inspection intervals are preset by law or the like. The high-risk devices 2H are made up of devices 2 other than the set devices 2S whose mean time between failures (MTBF) is equal to or less than a predetermined mean time between failures (10,000 hr / time in the illustrated example). The low-risk devices 2L are made up of devices 2 other than the set devices 2S whose mean time between failures (MTBF) exceeds a predetermined mean time between failures (10,000 hr / time in the illustrated example).
[0033] Fig. 4 is a flow diagram of a method for creating an inspection route plan. Fig. 5 is an explanatory diagram for explaining an example of a method for creating an inspection route plan. In some embodiments, the above-mentioned creation unit 15 is configured to create each of a plurality of inspection route plans RP by a creation method 200 as shown in Fig. 4.
[0034] Specifically, the creation unit 15 adds all set devices 2S to the inspection targets in the inspection route plan RP (S41). Next, the creation unit 15 determines whether or not there is high-risk device 2H that is not included in the inspection route plan RP (S42), and if there is high-risk device 2H ("YES" in S42), determines whether or not it is possible to add high-risk device 2H to the inspection targets (S43). The creation unit 15 may randomly extract the high-risk device (high-risk device to be determined) 2H to be determined in S42 from among the multiple high-risk devices 2H, or may extract them in order of increasing risk.
[0035] Whether or not the high-risk equipment (high-risk equipment to be determined) 2H can be added to the inspection target can be determined based on whether or not the total time, which is the sum of the inspection required time TR of each of all the inspection implementation items AE included in the inspection route plan RP at the time of determination and the total of the inspection required time TR of each of the inspection implementation items AE of the high-risk equipment 2H, is equal to or less than the preset required time STR. If the total time is equal to or less than the set required time STR, the creation unit 15 determines that the high-risk equipment 2H can be added to the inspection target ("YES" in S43), and adds the high-risk equipment 2H to the inspection target (S44). If the total time exceeds the set required time STR, the creation unit 15 determines that the high-risk equipment 2H cannot be added to the inspection target ("NO" in S43), and does not add the high-risk equipment 2H to the inspection target.
[0036] The creation unit 15 determines whether or not there is any high-risk equipment 2H that is not included in the inspection route plan RP (S42), and if there is no high-risk equipment 2H ("NO" in S42), determines whether or not it is possible to add low-risk equipment 2L to the inspection target (S45). The creation unit 15 may randomly extract the low-risk equipment (determination target low-risk equipment) 2L to be determined in S45 from among the multiple low-risk equipment 2L, or may extract it in order of increasing risk.
[0037] Whether or not a low-risk device (determination target low-risk device) 2L can be added to the inspection target can be determined by whether or not the total time of the sum of the inspection required time TR of each of all the inspection implementation items AE included in the inspection route plan RP at the time of determination and the sum of the inspection required time TR of each of the inspection implementation items AE of the low-risk device 2L is equal to or less than the preset required time STR. If the total time is equal to or less than the set required time STR, the creation unit 15 determines that the low-risk device 2L can be added to the inspection target ("YES" in S45), and adds the low-risk device 2L to the inspection target (S46). If the total time exceeds the set required time STR, the creation unit 15 determines that the low-risk device 2L cannot be added to the inspection target ("NO" in S45), and does not add the low-risk device 2L to the inspection target.
[0038] In some embodiments, when, among the above-mentioned multiple devices 2, devices that have been preset as inspection targets are defined as set devices 2S, and devices other than the set devices 2S whose damage risk RD is a predetermined risk or higher are defined as high-risk devices 2H, the above-mentioned inspection route plan presentation unit 14 is configured to present, as at least one inspection route plan RP among the multiple inspection route plans RP, a short-term route plan RP in which the total inspection time TTR is equal to or less than the set time STR, and in which the set devices 2S and at least one high-risk device 2H are the inspection target devices 2T.
[0039] The creation unit 15 may be configured to create a plurality of inspection route plans RP (RP1, RP2) having different total inspection times TTR as shown in FIG. 5 by the above-mentioned creation method 200. The creation unit 15 may be configured to create a first inspection route plan RP1 in which the total inspection time TTR is equal to or less than a first set required time STR1 (STR), and a second inspection route plan RP2 in which the total inspection time TTR exceeds the first set required time STR1 and is equal to or less than a second set required time STR2 (STR) longer than the first set required time STR1. Each of the first inspection route plan RP1 and the second inspection route plan RP2 includes a set device 2S and at least one high-risk device 2H as the inspection target device 2T. The second set required time STR2 is set to be equal to or shorter than the inspection work available time, which is the time available for engaging in inspection work.
[0040] According to the above configuration, by inspectors carrying out inspections according to the short-time route plans RP1 and RP2, they can inspect not only the set devices 2S but also at least one high-risk device 2H having a high damage risk RD. In addition, since the total inspection required time TTR of the short-time route plans RP1 and RP2 is equal to or less than the set required time STR, it is possible to prevent the time spent by inspectors carrying out inspections according to the short-time route plans RP1 and RP2 on inspection work from becoming too long and exceeding the set required time STR.
[0041] In some embodiments, the above-mentioned inspection route plan presenting unit 14 may be configured to present an inspection route plan RP that includes the set device 2S and all high-risk devices 2H as the inspection target devices 2T and does not include the low-risk device 2L as one of the multiple inspection route plans RP. According to the above configuration, an inspector performs an inspection according to the inspection route plan RP that includes the set device 2S and all high-risk devices 2H as the inspection target devices 2T, and therefore appropriate inspection is performed on all high-risk devices 2H, thereby improving the reliability of the multiple devices 2.
[0042] In some embodiments, the above-mentioned inspection route plan presenting unit 14 may be configured to present a preset inspection route plan SRP (see FIG. 5) in addition to the multiple inspection route plans RP. The preset inspection route plan SRP is preset, for example, in a plant in which the equipment 2 to be inspected is installed, or in a plant of the same type as the plant. In FIG. 5, the total inspection time TTR of the set inspection route plan SRP is longer than the total inspection time TTR of the second inspection route plan RP2. According to the above configuration, since each of the multiple inspection route plans RP can be compared with the set inspection route plan SRP, it is useful when determining the inspection route plan RP to be used for inspection.
[0043] (Individual inspection route plan) Fig. 6 is an explanatory diagram for explaining an inspection route plan according to an embodiment of the present disclosure. Fig. 7 is an explanatory diagram for explaining an example of a method for creating an inspection route plan. Fig. 8 is an explanatory diagram for explaining information related to an inspector.
[0044] In some embodiments, the above-mentioned inspection route plan proposal system 10 further includes an inspector information storage unit 21 (see FIG. 2) that stores information II about an inspector who performs an inspection of an inspection action item AE on at least one inspection target device 2T. The above-mentioned inspection route plan presentation unit 14 is configured to present an individual inspection route plan IRP, which is an inspection route plan RP for each inspector, when there are multiple inspectors.
[0045] In the illustrated embodiment, the above-mentioned creation unit 15 is configured to create a plurality of individual inspection route plans IRP in consideration of the information II about the inspectors stored in the inspector information storage unit 21. The information II about the inspectors includes information about the number of inspectors engaged in inspection, as shown in FIG. 6. The above-mentioned creation unit 15 creates an inspection route plan RP3, as shown in FIG. 7, in which the total inspection time TTR is equal to or less than the sum of the inspection work times of the plurality of inspectors (in the illustrated example, WAT1+WAT2), by the above-mentioned creation method 200. Then, the creation unit 15 creates individual inspection route plans IRP (IRP1, IRP2) for each of the plurality of inspectors by allocating the inspection target devices 2T and the inspection implementation items AE included in the inspection route plan RP3 to each of the plurality of inspectors so as not to exceed the inspection work available time WAT (WAT1, WAT2) of each of the inspectors. The creation unit 15 may directly create individual inspection route plans IRP (IRP1, IRP2) in which the respective total required inspection times TTR (TTR1, TTR2) are equal to or less than the respective available inspection work times WAT (WAT1, WAT2).
[0046] According to the above configuration, the individual inspection route plan IRP presented by the inspection route plan presenting unit 14 is an inspection route plan RP in which an inspection item AE is assigned to each of the multiple inspectors. Each of the multiple inspectors performs an inspection according to the individual inspection route plan IRP, thereby inspecting multiple pieces of equipment 2 including equipment 2 with a high damage risk RD, and preventing the multiple inspectors from spending too much time on their inspection work.
[0047] 8, the above-mentioned information II regarding the inspector includes information indicating inspectable items PE, which are inspection items E of each of the plurality of devices 2 that can be inspected by each inspector. The above-mentioned inspection route plan presenting unit 14 is configured to present the individual inspection route plan IRP in consideration of the information indicating the inspectable items PE.
[0048] The inspection items E that an inspector can appropriately perform may differ depending on the inspector's capabilities and experience. According to the above configuration, the individual inspection route plan IRP presented in the inspection route plan presenting unit 14 is an inspection route plan RP in which the above-mentioned inspectable items PE are assigned to each of the multiple inspectors. In the individual inspection route plan IRP, an inspector with sufficient capabilities and experience is assigned an inspection implementation item AE that cannot be performed by an inspector with little capabilities and experience. Therefore, in the individual inspection route plan IRP, an appropriate inspection implementation item AE is assigned according to the inspector's capabilities and experience. By each of the multiple inspectors performing an inspection according to the individual inspection route plan IRP including appropriate inspection implementation items (inspectable items PE), appropriate inspection is performed on each of the multiple devices 2, and the reliability of the multiple devices 2 can be improved.
[0049] In some embodiments, the inspection result information storage unit 11 stores inspectors and inspection work times WT in association with each other, and the inspection required time calculation unit 13 is configured to be able to calculate the inspection required time TR (see FIG. 8) for each inspector based on the inspection work time WT stored in the inspection result information storage unit 11. The inspection route plan presentation unit 14 is configured to present an individual inspection route plan IRP in consideration of the inspection required time TR for each inspector.
[0050] The inspection work time WT for each inspection item E may differ depending on the inspector's ability and experience. According to the above configuration, the individual inspection route plan IRP presented by the inspection route plan presentation unit 14 is an inspection route plan RP in which an inspection implementation item AE is assigned to each of the multiple inspectors, taking into consideration the inspection time TR required for each inspector. In the individual inspection route plan IRP, an inspector with sufficient ability and experience is assigned many inspection implementation items AE because the inspection time TR required for each inspection item E tends to be shorter than that of an inspector with little ability and experience. Therefore, in the individual inspection route plan IRP, appropriate inspection implementation items AE are assigned according to the inspector's ability and experience. By each of the multiple inspectors performing an inspection according to the individual inspection route plan IRP including the appropriate inspection implementation items AE, it is possible to prevent the time that the inspector spends on the inspection work from being too long or too short.
[0051] In some embodiments, the above-mentioned information II on the inspectors includes information indicating an available inspection work time WAT (see FIG. 7), which is the time when each inspector can engage in inspection work. The above-mentioned inspection route plan presenting unit 14 is configured to present the individual inspection route plan IRP in consideration of the information indicating the available inspection work time WAT.
[0052] For example, the multiple inspectors may include non-full-time inspectors, and the available inspection work time WAT, which is the time that each inspector can engage in inspection work, may differ. According to the above configuration, the individual inspection route plan IRP presented by the inspection route plan presenting unit 14 takes into consideration the available inspection work time WAT of each of the multiple inspectors. An inspection item E is assigned to each of the multiple inspectors so that the total inspection time (TTR) falls within the available inspection work time WAT (WAT1, WAT2). By each of the multiple inspectors performing inspection according to the individual inspection route plan IRP including the inspection item E, it is possible to prevent the inspection work time WT of each of the multiple inspectors from becoming too long and exceeding the available inspection work time WAT.
[0053] (Changes in inspection route plan when abnormality is detected) FIG. 9 is a schematic diagram showing a configuration of an inspection route plan proposal according to an embodiment of the present disclosure. FIG. 10 is a flow diagram of an inspection route plan proposal method according to an embodiment of the present disclosure. Each of FIGS. 11 to 13 is an explanatory diagram for explaining the update of the inspection route plan when an abnormality is determined. As shown in FIG. 10, the above-mentioned inspection route plan proposal method 100 may further include an inspection target device addition step S8 in which, when an abnormality determination is input as the inspection result R in the inspection result information input step S7 ("YES" in S81), an inspection route plan RP is updated so that an individual inspection route plan IRP different from the individual inspection route plan IRP for the inspector who input the inspection result R includes an appliance 2 whose degree of association with the appliance 2 for which the abnormality determination is input is equal to or greater than a predetermined degree of association.
[0054] In the illustrated embodiment, the inspection target device addition step S8 is performed by the inspection result information input unit 32 (see FIG. 9). In some embodiments, as shown in FIG. 9, the above-described inspection route plan proposal system 10 further includes an equipment association storage unit 31, an inspection result information input unit 32, and an inspection route plan update unit 33.
[0055] The device association degree storage unit 31 stores an association degree indicating the degree of relationship between a plurality of devices 2. Among the plurality of devices 2, the association degree between devices 2 of the same or similar type is higher than the association degree between devices 2 of different types. Also, among the plurality of devices 2, the association degree between devices 2 of the same or similar use is higher than the association degree between devices 2 of different uses.
[0056] The inspection result information input unit 32 is configured to be able to input the inspection results R of each of the multiple devices 2 and the inspection work time WT for each inspection item E. The inspection results R and the inspection work time WT input by the inspection result information input unit 32 are stored in the inspection result information storage unit 11.
[0057] The inspection route plan update unit 33 is configured to, when an abnormality determination is input as the inspection result R to the inspection result information input unit 32, update the inspection route plan RP to include an equipment 2 (2R) whose degree of association with the equipment 2 (2E) for which the abnormality determination was input is equal to or greater than a predetermined degree of association in an individual inspection route plan IRP that is different from the individual inspection route plan IRP for the inspector who input the inspection result R.
[0058] When an abnormality determination is input as the inspection result R by the inspection result information input unit 32 ("YES" in S81), the inspection route plan update unit 33 determines whether or not there is any device 2R whose degree of association with the device 2E for which the abnormality determination was input is equal to or greater than a predetermined degree of association (S82). When there is any device 2R whose degree of association is equal to or greater than the predetermined degree of association in the above determination ("YES" in S82), the inspection route plan update unit 33 adds the device 2R as an inspection target to an individual inspection route plan IRP different from the individual inspection route plan IRP for which the device 2E is an inspection target (S83).
[0059] Hereinafter, a specific example will be described with reference to Figs. 11 to 13. Fig. 11 shows the device 2E in which an abnormality determination has been input as the inspection result R by the inspection result information input unit 32, and the equipment in which the device 2E is installed. The device 2E is installed in one section 61 when the equipment in which the device 2E is installed is divided into a plurality of sections. Figs. 12 and 13 show equipment of the same type as the equipment shown in Fig. 11 or similar equipment, and the device 2R installed in a section 62 corresponding to the section 61 when the equipment is divided into a plurality of sections. The device 2R is of the same type as the device 2E and has the same purpose as the device 2E, so that the degree of association with the device 2E is equal to or greater than a predetermined degree of association. Here, the same type of equipment includes equipment of the same model as the above equipment but installed in a different location. The similar equipment includes equipment of a different model from the above equipment.
[0060] Inspection routes IR1 and IR2 are shown according to the respective inspection route plans in Fig. 11 to Fig. 13. Equipment 2R is not included in the inspection targets before the update of the inspection route plan including the facilities shown in Fig. 12. When an abnormality is determined for equipment 2E shown in Fig. 11, equipment 2R, whose degree of association with equipment 2E is equal to or greater than a predetermined degree of association, is added to the inspection targets as shown in Fig. 13, and inspection route IR2 is changed to pass through equipment 2R.
[0061] During inspection, the equipment 2 (2R) that is highly related to the equipment 2 (2E) in which an abnormality has been detected is likely to have a similar abnormality. According to the above configuration, the inspection route plan update unit 33 can include the equipment 2 (2R) that is highly related to the equipment 2 (2E) in which an abnormality has been detected as an inspection target in the individual inspection route plan IRP of an inspector other than the inspector who detected the abnormality in the equipment 2 (2E). This makes it possible to have the inspector inspect the equipment 2 (2R) that is highly related. According to the above configuration, the inspection of the equipment 2 (2R) that is highly related to the equipment 2 (2E) in which an abnormality has been detected is promptly performed, so that the reliability of the multiple equipment 2 can be improved.
[0062] (Customize inspection route planning) Fig. 14 is a flow diagram of an inspection route plan proposing method according to an embodiment of the present disclosure. The above-mentioned inspection route plan proposing method 100 may further include an inspection route plan updating step S9 for adding or deleting at least one of the inspection target device 2T or the inspection implementation item AE to or from at least one inspection route plan RP (including an individual inspection route plan IRP) presented in the inspection route plan presenting step S4, as shown in Fig. 14. The inspection route plan updating step S9 is performed before the inspection route plan determining step S5.
[0063] In the illustrated embodiment, the inspection route plan updating step S9 is performed by an updated route plan input unit 34 (see FIG. 9). In some embodiments, the above-described inspection route plan proposal system 10 further includes an updated route plan input unit 34. The updated route plan input unit 34 is configured to be capable of adding or deleting at least one of the inspection target equipment 2T or the inspection implementation items AE to or from the inspection route plan RP presented by the inspection route plan presentation unit 14.
[0064] The inspection route plan presentation unit 14 presents the updated inspection route plan RP in which at least one of the inspection target equipment 2T or the inspection implementation item AE has been added or deleted by the updated route plan input unit 34. In the inspection route plan determination step S5, the updated inspection route plan RP (the inspection target equipment 2T and the inspection implementation item AE) may be determined as the inspection route plan RP to be used for inspection in the inspection route plan updating step S9 (updated route plan input unit 34).
[0065] According to the above configuration, the updated route plan input unit 34 can update the inspection route plan RP by adding or deleting inspection target equipment 2T and inspection action items AE as necessary to the inspection route plan RP presented by the inspection route plan presentation unit 14. By including the updated route plan input unit 34, the inspection route plan proposal system 10 can flexibly respond to cases where a change to the inspection route plan RP is desired.
[0066] In some embodiments, as shown in FIG. 2 and FIG. 9, the above-mentioned inspection route plan proposal system 10 further includes an information terminal 50. In the embodiment shown in FIG. 2 and FIG. 9, the information terminal (display device) 50 includes an inspection result information storage unit 11, a damage risk calculation unit 12, an inspection required time calculation unit 13, an inspection route plan presentation unit 14, and an inspector information storage unit 21. In the embodiment shown in FIG. 9, the information terminal 50 further includes an equipment relevance storage unit 31, an inspection route plan update unit 33, and an updated route plan input unit 34. Note that in some other embodiments, at least one of the inspection result information storage unit 11, the damage risk calculation unit 12, the inspection required time calculation unit 13, the inspection route plan presentation unit 14, the inspector information storage unit 21, the equipment relevance storage unit 31, the inspection route plan update unit 33, or the updated route plan input unit 34 may be mounted on a device other than the information terminal 50, such as a mobile terminal 40.
[0067] Each of the mobile terminal 40 and the information terminal 50 may be configured as a microcomputer including a CPU (processor) (not shown), memories such as ROM and RAM, storage devices such as external storage devices, an I / O interface, a communication interface, etc. Then, the CPU may operate (e.g., perform data calculations, etc.) according to instructions of a program loaded into the main storage device of the memory, for example, to realize each of the above-mentioned units.
[0068] In the illustrated embodiment, the display screen 161 for displaying the inspection route plan RP presented by the inspection route plan presentation unit 14 described above is provided on the information terminal 50.
[0069] 2 and 9, the above-described inspection route plan proposal system 10 further includes a mobile terminal 40. The mobile terminal 40 includes at least a display unit 41 configured to display the inspection route plan RP presented by the inspection route plan presentation unit 14, and an inspection result information input unit 32 configured to allow input of the inspection results R of each of the multiple devices 2 and the inspection work time WT for each inspection item E. The display unit 41 includes a display screen 411 provided on the mobile terminal 40, and is configured to display multiple inspection route plans RP on the display screen 411.
[0070] In the illustrated embodiment, the mobile terminal 40 is configured to be capable of wireless communication with the information terminal 50. The mobile terminal 40 includes a storage unit 42 that stores the inspection result R and the inspection work time WT input by the inspection result information input unit 32, and a communication unit 43 configured to be capable of wireless communication with the communication unit 51 of the information terminal 50. The information terminal 50 includes a communication unit 51 configured to be capable of wireless communication with the communication unit 43 of the mobile terminal 40. The inspection result R and the inspection work time WT input by the inspection result information input unit 32 are sent to the information terminal 50 via wireless communication between the communication unit 43 and the communication unit 51, and are stored in the inspection result information storage unit 11 of the information terminal 50. The information terminal 50 may be provided outside the range of the inspection target area 1.
[0071] According to the above configuration, by displaying the inspection route plan RP on the display unit 41 of the mobile terminal 40, an inspector can check the inspection route plan RP displayed on the display unit 41 during inspection, thereby preventing inspection omissions (omission of inspection items AE). Furthermore, by providing the inspection result information input unit 32 in the mobile terminal 40, an inspector can quickly input the inspection results R of each of the multiple devices 2 and the inspection work time WT for each inspection item E during inspection.
[0072] The present disclosure is not limited to the above-described embodiments, and includes modifications to the above-described embodiments and appropriate combinations of these modifications.
[0073] The contents described in the above-mentioned embodiments can be understood, for example, as follows.
[0074] 1) An inspection route planning proposal system (10) according to at least one embodiment of the present disclosure, An inspection route planning proposal system (10) for proposing an inspection route plan (RP) for inspecting a plurality of devices (2) installed in an inspection target area (1), comprising: an inspection result information storage unit (11) that stores the inspection results (R) of each of the plurality of devices (2) and the inspection work time (WT) for each inspection item (E); a damage risk calculation unit (12) configured to calculate a damage risk (RD) for each of the plurality of devices (2) based on the inspection results (R) stored in the inspection result information storage unit (11); an inspection required time calculation unit (13) configured to calculate an inspection required time (TR) for each of the inspection items (E) of the plurality of devices (2) based on the inspection work time (WT) stored in the inspection result information storage unit (11); The inspection route plan presentation unit (14) presents an inspection route plan (RP) including at least one inspection target equipment (2T) that is to be inspected among the plurality of equipment (2), inspection implementation items (AE) that are the inspection items (E) to be performed on the inspection target equipment (2T), and a total inspection time required (TTR) required to perform inspection of the inspection implementation items (AE) on the at least one inspection target equipment (2T), wherein the inspection route plan presentation unit (14) is configured to be capable of presenting a plurality of inspection route plans (RP) in which at least one of the inspection target equipment (2T) or the inspection implementation items (AE) is different, taking into account the damage risk (RD) and the inspection time required (TR).
[0075] According to the above configuration 1), the inspection route plan presentation unit (14) presents a plurality of inspection route plans (RP) each having different inspection target equipment (2T) or inspection implementation items (AE). Each of the plurality of inspection route plans (RP) presented by the inspection route plan presentation unit (14) takes into consideration the damage risk (RD) and inspection time required (TR) of each of the plurality of equipment (2). Therefore, by having an inspector perform an inspection according to one inspection route plan (RP) selected from the plurality of inspection route plans (RP), the inspector can focus on inspecting equipment (2) with a high damage risk (RD), and excessive inspection costs can be reduced.
[0076] 2) In some embodiments, the inspection route planning proposal system (10) described in 1) above, Among the plurality of devices (2), the device that is preset as the inspection target is defined as a set device (2S), and the device other than the set device (2S) whose damage risk (RD) is a predetermined risk or more is defined as a high-risk device (2H), The inspection route plan presentation unit (14) is configured to present, as at least one of the multiple inspection route plans (RP), a short-term route plan (RP1, RP2) in which the total inspection time (TTR) is equal to or less than a set time, and in which the set equipment (2S) and at least one of the high-risk equipment (2H) are the inspection target equipment (2T).
[0077] According to the configuration of 2) above, by inspectors carrying out inspections according to the short-term route plans (RP1, RP2), they can inspect not only the set equipment (2S) but also at least one high-risk equipment (2H) with a high damage risk (RD). In addition, since the total inspection time (TTR) of the short-term route plans (RP1, RP2) is equal to or less than the set required time, it is possible to prevent the time spent by inspectors carrying out inspections according to the short-term route plans (RP1, RP2) on inspection work from exceeding the set required time.
[0078] 3) In some embodiments, the inspection route planning proposal system (10) described in 1) or 2) above, Further comprising an inspector information storage unit (21) that stores information (II) regarding an inspector who performs inspection of the inspection implementation items (AE) on the at least one inspection target device (2T), The inspection route plan presentation unit (14) is configured to present, when there are a plurality of inspectors, an individual inspection route plan (IRP), which is the inspection route plan (RP) for each of the inspectors.
[0079] According to the above configuration 3), the individual inspection route plan (IRP) presented in the inspection route plan presentation unit (14) is an inspection route plan (RP) in which the inspection action items (AE) are assigned to each of the multiple inspectors. Each of the multiple inspectors performs an inspection according to the individual inspection route plan (IRP), thereby inspecting the multiple pieces of equipment (2) including the equipment (2) with a high damage risk (RD), and preventing the multiple inspectors from spending too much time on their inspection work.
[0080] 4) In some embodiments, the inspection route planning proposal system (10) described in 3) above, The information (II) regarding the inspector includes information indicating an inspectable item (PE) which is the inspection item (E) of each of the plurality of devices (2) that can be inspected by each inspector, The inspection route plan presentation unit (14) is configured to present the individual inspection route plan (IRP) taking into consideration the information indicating the inspectable items (PE).
[0081] The inspection items (E) that an inspector can appropriately inspect may differ depending on the inspector's ability and experience. According to the configuration of 4) above, the individual inspection route plan (IRP) presented in the inspection route plan presentation unit (14) is an inspection route plan (RP) in which the inspectable items (PE) are assigned to each of a plurality of inspectors. In the individual inspection route plan (IRP), an inspector with sufficient ability and experience is assigned the inspection items (PE) that cannot be performed by an inspector with less ability and experience. AE ) is assigned to each inspector. Therefore, in the Individual Inspection Route Plan (IRP), appropriate inspection items ( AE Each of the multiple inspectors performs an inspection according to an individual inspection route plan (IRP) that includes appropriate inspection items (inspectable items PE), and thus appropriate inspections are performed on each of the multiple pieces of equipment (2), thereby improving the reliability of the multiple pieces of equipment (2).
[0082] 5) In some embodiments, the inspection route planning proposal system (10) according to 3) or 4) above, The inspection result information storage unit (11) stores the inspector and the inspection work time (WT) in association with each other, the inspection required time calculation unit (13) is configured to be able to calculate the inspection required time (TR) for each inspector based on the inspection work time (WT) stored in the inspection result information storage unit (11); The inspection route plan presentation unit (14) is configured to present the individual inspection route plan (IRP) in consideration of the inspection time (TR) required for each inspector.
[0083] The inspection work time (WT) for each inspection item may vary depending on the inspector's capabilities and experience. According to the configuration of 5) above, the individual inspection route plan (IRP) presented in the inspection route plan presentation unit (14) is an inspection route plan (RP) in which the above inspection implementation items (AE) are assigned to each of the multiple inspectors, taking into account the inspection time (TR) for each inspector. In the individual inspection route plan (IRP), inspectors with sufficient capabilities and experience are assigned many of the above inspection implementation items (AE) because the inspection time (TR) for each inspection item (E) tends to be shorter than that of inspectors with less capabilities and experience. Therefore, in the individual inspection route plan (IRP), appropriate inspection implementation items (AE) are assigned according to the inspector's capabilities and experience. By having each of the multiple inspectors perform an inspection according to the individual inspection route plan (IRP) including appropriate inspection implementation items (AE), it is possible to prevent the time that the inspectors spend on inspection work from being too long or too short.
[0084] 6) In some embodiments, the inspection route plan proposal system (10) according to any one of 3) to 5) above, The information (II) regarding the inspector includes information indicating the inspection work available time (WAT), which is the time available for each inspector to engage in inspection work, The inspection route plan presentation unit (14) is configured to present the individual inspection route plan (IRP) taking into consideration the information indicating the available inspection time (WAT).
[0085] For example, the multiple inspectors may include non-full-time inspectors, and the available inspection time (WAT), which is the time that each inspector can engage in inspection work, may differ. According to the configuration of 6) above, the individual inspection route plan (IRP) presented in the inspection route plan presentation unit (14) takes into consideration the available inspection time (WAT) of each of the multiple inspectors. Inspection items (E) are assigned to each of the multiple inspectors so that the total inspection time (TTR) falls within the available inspection time (WAT). By each of the multiple inspectors performing inspections according to the individual inspection route plan (IRP) including the above inspection items (E), it is possible to prevent the inspection work time (WT) of each of the multiple inspectors from becoming too long and exceeding the available inspection time (WAT).
[0086] 7) In some embodiments, the inspection route plan proposal system (10) according to any one of 3) to 6) above, a device association degree storage unit (31) that stores an association degree indicating a degree of association between the plurality of devices (2); an inspection result information input unit (32) configured to be able to input the inspection results (R) of each of the plurality of devices (2) and the inspection work time (WT) for each inspection item (E); The inspection system further includes an inspection route plan update unit (33) configured, when an abnormality determination is input as the inspection result to the inspection result information input unit (32), to update the inspection route plan (RP) so as to include the equipment (2) whose degree of association with the equipment (2) for which the abnormality determination was input is equal to or greater than a predetermined degree of association in the individual inspection route plan (IRP) different from the individual inspection route plan (IRP) for the inspector who input the inspection result (R).
[0087] During inspection, the equipment (2) that is highly related to the equipment (2) in which an abnormality has been detected is highly likely to have a similar abnormality. According to the configuration of 7) above, in the inspection route plan update unit (33), the equipment (2) that is highly related to the equipment (2) in which an abnormality has been detected can be included as an inspection target in the individual inspection route plan (IRP) of an inspector other than the inspector who detected the abnormality in the equipment (2). This makes it possible to have the inspector inspect the equipment (2) that is highly related. According to the configuration of 7) above, inspection of the equipment (2) that is highly related to the equipment (2) in which an abnormality has been detected is promptly performed, thereby improving the reliability of the multiple equipment (2).
[0088] 8) In some embodiments, the inspection route plan proposal system (10) according to any one of 1) to 7) above, The inspection route plan presentation unit (14) further includes an updated route plan input unit (34) configured to be able to add or delete at least one of the inspection target equipment (2T) or the inspection implementation items (AE) to or from the inspection route plan (RP) presented by the inspection route plan presentation unit (14).
[0089] According to the configuration of 8) above, in the updated route plan input unit 34, the inspection route plan (RP) can be updated by adding or deleting the inspection target devices (2T) and the inspection action items (AE) as necessary to the inspection route plan (RP) presented by the inspection route plan presentation unit 14. By including the updated route plan input unit 34, the inspection route plan proposal system 10 can flexibly respond to cases where a change to the inspection route plan (RP) is desired.
[0090] 9) In some embodiments, the inspection route plan proposal system (10) according to any one of 1) to 8) above, The mobile terminal (40) further includes a display unit (41) configured to display the inspection route plan (RP) presented by the inspection route plan presentation unit (14), and an inspection result information input unit (32) configured to enable input of the inspection results (R) of each of the plurality of devices (2) and the inspection work time (WT) for each inspection item (E).
[0091] According to the above configuration 9), by displaying the inspection route plan (RP) on the display unit (41) of the mobile terminal (40), an inspector can check the inspection route plan (RP) displayed on the display unit (41) during inspection, thereby preventing inspection omissions (omission of inspection items AE). Furthermore, by providing the inspection result information input unit (32) on the mobile terminal (40), an inspector can quickly input the inspection results (R) of each of the multiple devices (2) and the inspection work time (WT) for each inspection item (E) during inspection.
[0092] 10) An inspection route planning suggestion method (100) according to at least one embodiment of the present disclosure, An inspection route plan proposing method (100) for proposing an inspection route plan (RP) for inspecting a plurality of devices (2) installed in an inspection target area (1), comprising: An inspection result information acquisition step (S1) of acquiring an inspection result (R) of each of the plurality of devices (2) and an inspection work time (WT) for each inspection item (E); A damage risk calculation step (S2) of calculating a damage risk (RD) for each of the plurality of devices (2) based on the inspection result (R) acquired in the inspection result information acquisition step (S1); an inspection time calculation step (S3) of calculating an inspection time (TR) for each of the inspection items (E) of the plurality of devices (2) based on the inspection work time (WT) acquired in the inspection result information acquisition step (S1); and an inspection route plan presenting step (S4) for presenting an inspection route plan (RP) including at least one inspection target equipment (2T) that is to be inspected among the plurality of equipment (2), inspection implementation items (AE) that are the inspection items (E) to be performed on the inspection target equipment (2T), and a total inspection time required (TTR) required to perform inspection of the inspection implementation items (AE) on the at least one inspection target equipment (2T), wherein a plurality of inspection route plans (RP) in which at least one of the inspection target equipment (2T) or the inspection implementation items (AE) is different is presented taking into account the damage risk (RD) and the inspection time required (TR).
[0093] According to the method of 10) above, in the inspection route plan presentation step (S4), a plurality of inspection route plans (RP) are presented, each of which differs in at least one of the equipment to be inspected (2T) or the inspection items (AE). Each of the plurality of inspection route plans (RP) presented in the inspection route plan presentation step (S4) takes into consideration the damage risk (RD) and inspection time required (TR) of each of the plurality of equipment (2). Therefore, by carrying out an inspection according to one inspection route plan (RP) selected from the plurality of inspection route plans (RP), it is possible to focus on inspecting the equipment (2) with a high damage risk (RD), and to reduce excessive inspection costs. [Explanation of symbols]
[0094] 1. Inspection area 2 equipment 2H High-risk equipment 2L Low-risk devices 2S setting equipment 2T Equipment to be inspected 10. Inspection route planning proposal system 11. Inspection result information storage unit 12 Damage Risk Calculation Section 13. Inspection time calculation section 14 Inspection route planning section 15 Creation Department 16 Presentation section 21 Inspector information storage unit 31 Device association memory section 32 Inspection result information input section 33 Inspection Route Planning Update Division 34 Updated route plan input section 40 Mobile Devices 41 Display section 100 Inspection route planning proposal method AE Inspection Items E. Inspection items II. Information about inspectors IRP Individual Inspection Route Planning MTBF Mean Time Between Failures PE Inspectable Items R Inspection results RD injury risk RP Inspection Route Planning S1 Inspection result information acquisition step S2 Damage risk calculation step S3 Inspection time calculation step S4 Inspection route plan presentation step S5 Inspection route planning decision step S6 Inspection step S7 Inspection result information input step TR inspection time required TTR Total inspection time WAT Inspection workable time WT Inspection Work Time
Claims
1. An inspection route planning proposal system for proposing an inspection route plan for inspecting a plurality of devices installed in an inspection target area, comprising: A storage unit configured to store whether or not the plurality of devices is a preset device set as an inspection target in association with each of the plurality of devices, to store the mean time between failures of each of the plurality of devices in association with each of the plurality of devices, and to store the inspection time required for each inspection item of each of the plurality of devices in association with the inspection item, An inspection route plan including at least one inspection target device to be inspected among the plurality of devices, an inspection implementation item which is the inspection item to be performed on the inspection target device, and a total inspection time required to perform the inspection of the inspection implementation item on the at least one inspection target device, wherein among the plurality of devices, devices other than the set devices whose mean time between failures is equal to or less than a predetermined mean time between failures are set as high risk devices, and devices other than the set devices whose mean time between failures exceeds the predetermined mean time between failures are set as low risk devices, after extracting the set devices as the inspection target devices, the devices are extracted as the inspection target devices at random or in order of shortest mean time between failures from among the high risk devices within a range in which the total inspection time does not exceed the set required time, and after all the high risk devices have been extracted as the inspection target devices, an inspection route plan is presented in which the devices are extracted as the inspection target devices at random or in order of shortest mean time between failures from among the low risk devices within a range in which the total inspection time does not exceed the set required time; The system is configured to present, as the inspection route plan, a first inspection route plan in which the set required time is a first set required time, and a second inspection route plan in which the set required time is a second set required time that is longer than the first set required time. Inspection route planning proposal system.
2. The second set required time is set to be equal to or shorter than an inspection work available time, which is the time during which an inspector can engage in inspection work. The inspection route planning system according to claim 1 .
3. The memory unit is configured to store the number of inspectors engaged in inspection and the inspection work available time, which is the time each inspector can engage in inspection work, When there are a plurality of inspectors, the inspection route plan is presented so as to avoid overlapping of the inspection items included in the inspection route plan and so that the total inspection time required does not exceed the available inspection time. The inspection route planning system according to claim 1 or 2.
4. The memory unit is configured to store inspectable items, which are the inspection items for each of the plurality of devices that can be inspected by the inspector, When the inspection items included in the inspection route plan are allocated to the individual inspection route plan, the inspection items that are not included in the inspectable items for the inspector are not included. The inspection route planning system according to claim 3 .
5. The memory unit is configured to store the inspection time required for inspecting the inspection items for each of the inspectors, When allocating the inspection items included in the inspection route plan to the individual inspection route plans, the inspection items are allocated so that the total inspection time required for each inspector does not exceed the available inspection work time. The inspection route planning system according to claim 3 or 4.
6. The storage unit is configured to store an association degree indicating a degree of a relationship between the plurality of devices, The inspection route planning proposal system comprises: An inspection result information input unit configured to be able to input the inspection results of each of the plurality of devices and the inspection work time for each inspection item, When an abnormality determination is input as the inspection result to the inspection result information input unit, the inspection route plan is updated so as to include, in the individual inspection route plan different from the individual inspection route plan for the inspector who input the inspection result, the equipment whose degree of association with the equipment for which the abnormality determination is input is equal to or greater than a predetermined degree of association, The inspection route planning system according to any one of claims 3 to 5.
7. An input unit capable of selecting at least one of the inspection target device or the inspection implementation items, The system is configured to present an updated route plan in which at least one of the inspection target device or the inspection implementation item selected in the input unit is added to or deleted from the inspection route plan. The inspection route planning system according to any one of claims 1 to 6.
8. A mobile terminal including a display configured to display the inspection route plan. The inspection route planning system according to any one of claims 1 to 7.
Citation Information
Patent Citations
Inspection system
JP1999264747A
Device and method for supporting maintenance inspection
JP2000315110A
Method, support device, and support system for patrol management of structure, recording medium with recorded data structure for patrol management, and recording medium with recorded patrol management support program
JP2002007600A
Job site maintenance supporting system and job site maintenance supporting method
JP2006350604A
Trouble support method for electric power supply facility
JP2010015206A