Construction record management system, management system, construction record management method, and program

The construction record management system addresses the challenge of tracking material serial numbers and construction status by integrating data acquisition and storage units, enhancing material management and progress monitoring.

JP7821062B2Active Publication Date: 2026-02-26PANASONIC HOLDINGS CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2022124259
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-08-03
Publication Date
2026-02-26
Estimated Expiration
2042-08-03

Smart Images

  • Figure 0007821062000001
    Figure 0007821062000001
  • Figure 0007821062000002
    Figure 0007821062000002
Patent Text Reader

Abstract

To provide a construction record management system, a management system, a construction record management method, and a program that can manage construction status and production numbers of materials used for construction tasks at a construction site.SOLUTION: A construction record management system 30 includes a first acquisition unit 34, a second acquisition unit 35, and a storage unit. The material management system 10 manages inventory status of a plurality of types of materials used for a plurality of construction tasks at a construction site. The first acquisition unit 34 acquires, from the material management system 10, material information including at least production numbers of the materials shipped to the construction site. The second acquisition unit 35 acquires construction information relating to construction status at the construction site, of the materials having been shipped to the construction site. The storage unit stores the material information acquired by the first acquisition unit 34 and the construction information acquired by the second acquisition unit 35 in association with each other.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present disclosure relates to a construction record management system, a management system, a construction record management method, and a program. More specifically, the present disclosure relates to a system for managing construction information of construction work at a construction site. Facilities The present invention relates to a construction record management system, a management system, a construction record management method, and a program. [Background technology]

[0002] Patent Document 1 discloses a construction site management system. This construction site management system includes IC tags attached to each element present at the construction site, such as materials, tools, and workers; an IC tag reader that reads tag IDs from the IC tags; and a management server that can communicate with the IC tag reader. The IC tag readers are attached within each space at the construction site and at the entrances and exits to each space. The management server receives the tag ID and the space ID of the space in which the IC tag reader is installed from each IC tag reader, and manages the entry and exit dates and times of each element to and from each space based on the tag ID, space ID, and the time the tag ID was read. The management server manages the work status in each space based on the entry and exit dates and times of each element to and from each space. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Laid-Open No. 2005-326965 Summary of the Invention [Problem to be solved by the invention]

[0004] The construction site management system described above can manage the entry and exit of each element into a space equipped with an IC tag reader, but it is not possible to check the serial numbers of materials installed within the space (construction site) after construction has been completed.

[0005] An object of the present disclosure is to provide a construction record management system, management system, construction record management method, and program that can manage the serial numbers and construction status of materials used in construction work at a construction site. [Means for solving the problem]

[0006] A construction record management system according to one aspect of the present disclosure includes a first acquisition unit, a second acquisition unit, and a storage unit. The material management system manages the inventory status of multiple types of materials used for multiple construction tasks at a construction site. The first acquisition unit acquires material information from the material management system, the material information including at least the serial numbers of the materials to be shipped to the construction site. The second acquisition unit acquires construction information related to the construction status at the construction site of the materials shipped to the construction site. The storage unit stores the material information acquired by the first acquisition unit and the construction information acquired by the second acquisition unit in association with each other. The second acquisition unit receives tool usage information regarding the usage status of the power tool from the power tool used for construction work at the construction site, and acquires information regarding the construction work as the construction information based on the tool usage information.

[0007] The management system of one aspect of the present disclosure includes the construction record management system and a progress management system that manages the progress of multiple construction work tasks at the construction site. When construction work on the materials shipped to the construction site is completed, the construction record management system transmits the material information and construction information of the materials for which construction work has been completed to the progress management system. The progress management system records the material information and the construction information received from the construction record management system in association with each other.

[0008] A construction record management method according to one aspect of the present disclosure includes a first acquisition process, a second acquisition process, and a storage process. The material management system manages the inventory status of multiple types of materials used for multiple construction tasks at a construction site. In the first acquisition process, material information including at least the serial numbers of the materials to be shipped to the construction site is acquired from the material management system. In the second acquisition process, construction information related to the construction status of the materials shipped to the construction site is acquired. In the storage process, the material information acquired in the first acquisition process and the construction information acquired in the second acquisition process are stored in association with each other. In the second acquisition process, tool usage information regarding the usage status of the power tool used for construction work at the construction site is received from the power tool, and information regarding the construction work is acquired as the construction information based on the tool usage information.

[0009] A program according to one aspect of the present disclosure is a program for causing a computer system to execute the construction record management method. [Effects of the Invention]

[0010] According to the present disclosure, it is possible to provide a construction record management system, management system, construction record management method, and program that can manage the serial numbers and construction status of materials used in construction work at a construction site. [Brief explanation of the drawings]

[0011] [Figure 1] FIG. 1 is a schematic system configuration diagram of a management system including a construction record management system according to an embodiment of the present disclosure. [Figure 2] FIG. 2 is a sequence diagram illustrating the operation of the above embodiment. DETAILED DESCRIPTION OF THE INVENTION

[0012] (Embodiment) (1) Overview Hereinafter, a construction record management system 30 according to an embodiment of the present disclosure will be described in detail with reference to the drawings.

[0013] As shown in FIG. 1, the construction record management system 30 includes a first acquisition unit 34, a second acquisition unit 35, and a storage unit (third storage unit 33).

[0014] The first acquisition unit 34 acquires material information including at least the manufacturing number of materials to be shipped to the construction site from the material management system 10, which manages the inventory status of multiple types of materials used for multiple construction tasks at the construction site.

[0015] The second acquisition unit 35 acquires construction information relating to the construction status at the construction site of the materials shipped to the construction site.

[0016] The storage unit (third storage unit 33) stores the material information acquired by the first acquisition unit 34 and the construction information acquired by the second acquisition unit 35 in association with each other.

[0017] Here, a "construction site" refers to, for example, a site where new construction or renovation work for a residential or non-residential building is carried out. Work carried out at a construction site includes carpentry work, equipment work, piping work, wiring work, electrical work, painting work, interior construction work, etc., but in this embodiment, a case where the work carried out at the construction site is electrical work will be described as an example. When the work carried out at the construction site is electrical work, the multiple construction tasks carried out at the construction site may include work to install electrical equipment such as wiring fixtures, distribution boards, lighting fixtures, and ventilation fan equipment. Therefore, the multiple materials used in the multiple construction tasks may include electrical equipment such as wiring fixtures, distribution boards, lighting fixtures, and ventilation fan equipment that are installed at the construction site, as well as auxiliary materials such as electrical wires and mounting screws that are used to install this electrical equipment.

[0018] In this embodiment, a contractor performing construction work at a construction site orders materials to be used in the construction work from manufacturers or suppliers in accordance with the progress of the construction work at the construction site, has the materials delivered to a material storage area separate from the construction site, and accumulates the materials necessary for the construction work before the work begins.The contractor then ships the materials that have arrived in the material storage area to the construction site at the time when the construction work using those materials will be performed, and performs the construction work using those materials at the construction site.Note that a material storage area may be provided for each construction site, or one material storage area may be provided for multiple construction sites.Furthermore, multiple material storage areas may be provided for one construction site.

[0019] Here, the material management system 10 is a system that manages the inventory of multiple materials (such as the above-mentioned electrical equipment and auxiliary materials) used in multiple construction works. The material management system 10 manages, for example, at least the inventory status of materials in a material storage area and the shipping status of multiple materials from the material storage area to a construction site.

[0020] The material information acquired by the first acquisition unit 34 from the material management system 10 is information for identifying each of a plurality of materials. The material information may include at least the serial number of the material. The serial number of the material is an individual number assigned to the material by, for example, the manufacturer of the material. The first acquisition unit 34 may acquire the material information directly from the material management system 10, or may acquire it via another system (for example, the progress management system 20).

[0021] The construction information acquired by the second acquisition unit 35 is information relating to the construction status of materials at the construction site. The construction information may include, for example, information indicating whether construction work of materials has been performed at the construction site. The construction information may further include information relating to the work content of construction work of materials at the construction site.

[0022] The memory unit (third memory unit 33) stores material information, including the manufacturing number of the material, and construction information for materials used in construction work at the construction site, in association with each other. Therefore, if a manufacturing defect or the like is discovered in the material after the material has been installed, the installation status of the material in which the manufacturing defect occurred can be ascertained based on the material information and installation information stored in the memory unit (third memory unit 33) of the construction record management system 30. This has the advantage that the user of the construction record management system 30 can check the installation status at the construction site of the material in which a manufacturing defect or the like has been discovered, and if the material is being installed at the construction site, can take measures such as replacing the material.

[0023] (2)Details FIG. 1 is a schematic system configuration diagram of a management system 1 including a construction record management system 30. As shown in FIG.

[0024] The management system 1 comprises a construction record management system 30 and a progress management system 20 that manages the progress of multiple construction work tasks at a construction site. When construction work on materials shipped to the construction site is completed, the construction record management system 30 transmits material information and construction information for the materials for which construction work has been completed to the progress management system 20. The progress management system 20 records the material information and construction information received from the construction record management system 30 in association with each other. This allows the construction record management system 30 and the progress management system 20 to share material information and construction information for materials for which construction work has been completed.

[0025] The management system 1 also includes a material management system 10. The material management system 10 transmits material information about materials shipped to the construction site to the progress management system 20. The progress management system 20 transmits the material information received from the material management system 10 to the construction record management system 30. By the progress management system 20 transmitting the material information received from the material management system 10 to the construction record management system 30, the first acquisition unit 34 of the construction record management system 30 can acquire material information about materials for which construction work is performed at the construction site.

[0026] The material management system 10, the progress management system 20, and the construction record management system 30 that make up the management system 1 will be described in detail below.

[0027] (2.1) Materials Management System The material management system 10 manages the inventory status of materials in a material storage area.

[0028] The material management system 10 includes a first processing unit 11, a first communication unit 12, and a first storage unit 13.

[0029] The first processing unit 11 is mainly composed of a computer system having one or more processors and a memory. The functions of the first processing unit 11 are realized by the processor of the computer system executing a program recorded in the memory of the computer system. The program may be recorded in the memory, or may be provided via a telecommunications line such as the Internet, or may be recorded on a non-transitory recording medium such as a memory card and provided.

[0030] The first processing unit 11 has functions such as a shipment / receipt information acquisition unit 14, an inventory management unit 15, and a material information output unit 16. Note that the shipment / receipt information acquisition unit 14, the inventory management unit 15, and the material information output unit 16 merely indicate functions realized by the first processing unit 11, and do not necessarily indicate actual configurations.

[0031] The receipt / shipment information acquisition unit 14 acquires material information on materials received in the material storage area and material information on materials shipped from the material storage area. For example, a medium on which material information such as a barcode or an IC tag is recorded is attached to the material stored in the material storage area. The receipt / shipment information acquisition unit 14 has a reading device such as a barcode reader or an IC tag reader that reads material information from the medium. For example, when materials arrive at the material storage area, the receipt / shipment information acquisition unit 14 uses the reading device to read material information from the medium attached to the material, thereby acquiring material information on the material that has arrived at the material storage area as arrival information. In addition, the receipt / shipment information acquisition unit 14 also acquires, for example, information on the material stored in the material storage area. from When materials are shipped, the reading device reads the material information from the medium attached to the material, thereby obtaining the material information of the material shipped from the material storage area as shipping information. Note that the incoming / outgoing information obtaining unit 14 may obtain the material information of the material by performing image analysis on an image taken by a camera of the material received in the material storage area or the material to be shipped from the material storage area.

[0032] The inventory management unit 15 manages the storage status of multiple types of materials stored in the material storage area based on the arrival information and shipping information acquired by the receipt / shipment information acquisition unit 14. The inventory management unit 15 stores material storage information relating to the storage status of multiple types of materials stored in the material storage area in the first storage unit 13. The material storage information may include, for example, at least one of the item name, product number, serial number, manufacturing time information indicating the manufacturing time, lot information indicating the manufacturing lot, manufacturing location information indicating the manufacturing location, arrival date and time, shipping date and time, etc. of each of the multiple types of materials stored in the material storage area.

[0033] In addition, when the inventory management unit 15 receives order instruction information from the progress management system 20 instructing the ordering of materials required for construction work, it places an order for the necessary materials from the manufacturer or supplier based on the order instruction information and the inventory status of the materials.

[0034] Furthermore, when the inventory management unit 15 receives shipping instruction information from the progress management system 20, it instructs the worker to ship the materials instructed in the shipping instruction information.

[0035] For example, when the receipt / shipment information acquisition unit 14 acquires material arrival information or shipping information, the material information output unit 16 causes the first communication unit 12 to transmit material information including at least the serial number of the arrived material or the shipped material to the progress management system 20. The material information output by the material information output unit 16 may further include information regarding the material's product name and product number. The material information may further include at least one of manufacturing time information regarding the time of manufacturing the material, lot information regarding the manufacturing lot of the material, and manufacturing location information regarding the place of manufacturing the material. The manufacturing time information is information regarding the year, month, or date when the material was manufactured. The manufacturing location information may be information indicating the factory where the material was manufactured, or information indicating the manufacturing line within the factory.

[0036] The first communication unit 12 includes a communication interface for communicating with the progress management system 20. The first communication unit 12 communicates with the progress management system 20 via a network NT such as the Internet, for example.

[0037] The first storage unit 13 has at least one type of memory among, for example, a ROM (Read Only Memory), a RAM (Random Access Memory), and an EEPROM (Electrically Erasable Programmable Read Only Memory). Arrival Stores information, shipping information, etc.

[0038] (2.2) Progress Management System The progress management system 20 manages the progress of a plurality of construction works carried out at a construction site.

[0039] The progress management system 20 includes a second processing unit 21, a second communication unit 22, and a second storage unit 23.

[0040] The second processing unit 21 mainly comprises a computer system having one or more processors and a memory. The functions of the second processing unit 21 are realized by the processor of the computer system executing a program recorded in the memory of the computer system. The program may be recorded in the memory, or may be provided via a telecommunications line such as the Internet, or may be recorded on a non-transitory recording medium such as a memory card and provided.

[0041] The second processing unit 21 has functions such as a progress management unit 24. Note that the progress management unit 24 merely indicates the functions realized by the second processing unit 21, and does not necessarily indicate a substantial configuration.

[0042] The progress management unit 24 manages the progress of multiple construction works based on work information related to the multiple construction works to be performed at the construction site. The work information may include construction schedule information related to the planned construction date and time and the construction execution date and time of the multiple construction works, and work content information related to the materials used in each of the multiple construction works and the work content using the materials.

[0043] The progress management unit 24 manages the progress of a plurality of construction works based on the construction information input from the construction record management system 30. The progress management unit 24 outputs order instruction information to the material management system 10, which instructs the ordering of materials required for the construction works to be performed, based on the progress of a plurality of construction works. The progress management unit 24 also outputs order instruction information to the material management system 10, which instructs the ordering of materials required for the construction works to be performed. Arrival Show Arrival When the progress management unit 24 receives information from the material management system 10, it outputs shipping instruction information to instruct the shipping of the materials to the material management system 10 before the construction work is carried out. Furthermore, when the progress management unit 24 receives shipping information from the material management system 10 indicating that the materials required for the construction work to be carried out have been shipped, it outputs work instructions to instruct the implementation of the construction work to, for example, a mobile terminal carried by a worker who will be performing the construction work at the construction site.

[0044] The second communication unit 22 includes a communication interface for communicating with the material management system 10 and the construction record management system 30. The second communication unit 22 communicates with the material management system 10 and the construction record management system 30 via a network NT such as the Internet, for example.

[0045] The second storage unit 23 has at least one type of memory among, for example, ROM, RAM, and EEPROM. The second storage unit 23 stores work information related to a plurality of construction works performed at the construction site, material information on a plurality of materials used in the plurality of construction works, and construction information related to the construction status of the plurality of materials, etc.

[0046] (2.3) Construction Record Management System The construction record management system 30 manages construction records of multiple construction works carried out at a construction site.

[0047] The construction record management system 30 includes a third processing unit 31, a third communication unit 32, and a third storage unit 33.

[0048] The third processing unit 31 mainly comprises a computer system having one or more processors and a memory. The functions of the third processing unit 31 are realized by the processor of the computer system executing a program recorded in the memory of the computer system. The program may be recorded in the memory, or may be provided via a telecommunications line such as the Internet, or may be recorded on a non-transitory recording medium such as a memory card and provided.

[0049] The third processing unit 31 has functions such as a first acquisition unit 34, a second acquisition unit 35, and an output unit 36. Note that the first acquisition unit 34, the second acquisition unit 35, and the output unit 36 ​​merely indicate functions realized by the third processing unit 31, and do not necessarily indicate actual configurations.

[0050] The first acquisition unit 34 acquires material information including at least the serial numbers of materials to be shipped to a construction site from the material management system 10. In this embodiment, the first acquisition unit 34 acquires the material information from the material management system 10 via the progress management system 20.

[0051] The second acquisition unit 35 acquires construction information relating to the construction status at the construction site of materials shipped to the construction site. The second acquisition unit 35 includes, for example, a communication module that communicates with power tools used by workers to perform construction work at the construction site. The second acquisition unit 35 receives tool usage information relating to the usage status of the power tools from the power tools, and acquires construction information relating to the construction work based on this tool usage information.

[0052] Here, the construction information may include information on whether construction work using materials has been performed or may include information on the work content of the construction work performed using materials. If the construction work is, for example, screw tightening work, the second acquisition unit 35 may acquire tool usage information including the screw tightening torque from the power tool.

[0053] Furthermore, the information on the work content of the construction work may include, for example, location information on the location where the construction work of the material was performed. The power tool has a positioning function that uses a satellite positioning system such as a GPS (Global Positioning System), and when construction work is performed on the material, the power tool transmits information indicating the execution of the construction work and location information of the construction location. Records Management The construction information is transmitted to the construction record management system 30. In this way, it is preferable that the construction information further includes location information regarding the location where the construction work of the material was performed, and the user of the construction record management system 30 can understand the location where the construction work of the material was performed based on the location information included in the construction information.

[0054] The information about the work content of the construction work may further include at least one of construction time information about when the construction work was performed on the material and worker information about the worker who performed the work. The second acquisition unit 35 determines the construction time when the construction work was performed based on the time when the tool use information was received from the power tool, and generates construction time information about the construction time. The second acquisition unit 35 also acquires worker information, such as the worker's name or ID number, from a mobile terminal carried by the worker, for example, by communicating with the mobile terminal. In this way, it is preferable that the construction information further includes at least one of construction time information about when the construction work was performed on the material and worker information about the worker who performed the work. This allows the user of the construction record management system 30 to understand the construction time when the construction work was performed on the material or the worker who performed the work, based on the construction information.

[0055] The third communication unit 32 includes a communication interface for communicating with the progress management system 20. The third communication unit 32 communicates with the progress management system 20 via a network NT such as the Internet, for example.

[0056] The third storage unit 33 has at least one type of memory among, for example, ROM, RAM, and EEPROM. The third storage unit 33 stores construction information related to construction work performed at the construction site, material information on materials that are the targets of the construction work, etc.

[0057] (2.4) Operation explanation The operation of the management system 1 including the construction work management system 30 of this embodiment will be described with reference to Fig. 2 and other figures. In the sequence diagram shown in Fig. 2, steps S1 to S7 indicate events that take place in the material storage area A1 and the construction site A2. In addition, in the sequence diagram shown in Fig. 2, steps S11 to S24 indicate operations that are performed by the material management system 10, the progress management system 20, and the construction record management system 30. In addition, the sequence diagram shown in Fig. 2 is merely one example of the construction record management method according to this embodiment, and the order of the processes may be changed as appropriate, and processes may be added or omitted as appropriate.

[0058] The following describes the operation of the management system 1 when materials received in the material storage area A1 from the material manufacturer or supplier are shipped to the construction site A2 and construction work is carried out using the materials at the construction site A2.

[0059] Progress Management System 20 When the material management system 10 receives an order instruction from the manufacturer or supplier, it places an order for the materials necessary for construction work at the construction site A2, and the ordered materials arrive in the material storage area A1 (step S1).

[0060] When the receiving / shipping information acquisition unit 14 of the material management system 10 acquires the arrival information of the received materials, it updates the arrival information of the materials (step S11) and causes the first communication unit 12 to transmit the material information of the received materials to the progress management system 20. Here, the material information includes the manufacturing number of the material, manufacturing date information, etc.

[0061] When the progress management system 20 receives material information from the material management system 10, it updates the material information of the materials that have arrived in the material storage area A1 (step S12) and causes the second communication unit 22 to send the material information to the construction record management system 30.

[0062] When the construction record management system 30 receives the material information of the received materials from the progress management system 20, it updates the material information of the materials received in the material storage area A1 (step S13).

[0063] The progress management system 20 causes the second communication unit 22 to transmit shipping instruction information to the material management system 10, instructing the shipping of materials to be used in the construction work to be carried out in the future, depending on the progress of multiple construction work at the construction site.

[0064] When the material management system 10 receives the shipping instruction information from the progress management system 20, it ships the materials specified based on the shipping instruction information to the construction site A2 on the specified date and time (step S2). At this time, the inventory management unit 15 of the material management system 10 updates the inventory status of the materials (step S14), and the material information output unit 16 causes the first communication unit 12 to send the material shipping information to the progress management system 20.

[0065] The progress management unit 24 of the progress management system 20 updates the expected arrival information of the materials based on the shipping information received from the material management system 10 (step S15).

[0066] Furthermore, when materials arrive at the construction site A2 (step S3), the material management system 10 receives information indicating the arrival of the materials from the communication terminal that performs the material receiving process at the construction site A2, and updates the material arrival information (step S16). At this time, the material information output unit 16 of the material management system 10 causes the first communication unit 12 to transmit the material arrival information to the progress management system 20 (step S17).

[0067] When the progress management system 20 receives the arrival information of the materials, it causes the second communication unit 22 to transmit material information of the materials about which it received arrival information in step S17, and work implementation information instructing the implementation of the construction work, to the construction record management system 30. When the construction record management system 30 receives the material information and the work implementation information, it transmits work instruction information instructing the start of the construction work to the mobile terminal carried by the worker.

[0068] When the worker performs the work of installing the material using, for example, a power tool based on the work instruction information sent to the mobile terminal (step S4), the power tool sends information indicating the completion of the work to the construction record management system 30.

[0069] When the construction record management system 30 receives information indicating the performance of work from the power tool, the second acquisition unit 35 updates the construction information (step S18), and associates the material information of the materials with the construction information and stores them in the third storage unit 33. In addition, the construction record management system 30 causes the third communication unit 32 to transmit the material information of the materials used in the construction work and the construction information to the progress management system 20.

[0070] When the progress management system 20 receives the material information and construction information of the materials for which construction work has been performed from the construction record management system 30, it updates the construction schedule information at the construction site (step S19). Based on the construction schedule information, the progress management system 20 outputs shipping instruction information to the material management system 10 to instruct the shipping of materials required for the construction work to be performed.

[0071] Thereafter, each time a construction job for one material is performed, the management system 1 repeats the processing of steps S14 to S18 described above. Note that steps S5 to S7 are similar to the events of steps S2 to S4, and steps S20 to S24 are similar to the processing of steps S14 to S18, so their explanation will be omitted.

[0072] As a result, the material information and construction information of the materials for which construction work was performed at the construction site A2 are stored in the third storage unit of the construction record management system 30. 33and the second storage unit of the progress management system 20. 23 Therefore, in the event of a recall of materials used in construction work at the construction site A2, the user can easily ascertain the construction location of the recalled materials based on the information stored in the third storage unit 33 of the construction record management system 30. Note that the material information may include information on the manufacturing date, lot information, manufacturing location, etc. of the materials, and the user can easily ascertain the construction location of the recalled materials based on this information.

[0073] (3) Variations The above embodiment is merely one of various embodiments of the present disclosure. Various modifications to the above embodiment are possible depending on the design, etc., as long as the object of the present disclosure can be achieved. Furthermore, functions similar to those of the construction record management system 30 may be embodied in a construction record management method, a computer program, a non-transitory recording medium on which a program is recorded, or the like. A construction record management method according to one aspect includes a first acquisition process, a second acquisition process, and a storage process. The material management system 10 manages the inventory status of multiple types of materials used for multiple construction tasks at a construction site. The first acquisition process acquires, from the material management system 10, material information including at least the serial numbers of materials to be shipped to the construction site. The second acquisition process acquires construction information related to the construction status of the materials shipped to the construction site. The storage process associates and stores the material information acquired in the first acquisition process with the construction information acquired in the second acquisition process. A (computer) program according to one aspect is a program for causing a computer system to execute the above construction record management method.

[0074] Modifications of the above embodiment are listed below. The modifications described below can be applied in appropriate combinations.

[0075] The execution entity of the construction record management system 30 or construction record management method of the present disclosure includes a computer system. The computer system is primarily composed of a processor and memory as hardware. The processor executes a program stored in the computer system's memory to realize the functions of the execution entity of the construction record management system 30 or construction record management method of the present disclosure. The program may be pre-stored in the computer system's memory, provided via a telecommunications line, or provided on a non-transitory recording medium readable by the computer system, such as a memory card, optical disk, or hard disk drive. The processor of the computer system is composed of one or more electronic circuits, including a semiconductor integrated circuit (IC) or a large-scale integrated circuit (LSI). The integrated circuits, such as ICs and LSIs, are referred to by different names depending on the degree of integration, and include integrated circuits called system LSIs, very large-scale integrations (VLSIs), or ultra-large-scale integrations (ULSIs). Furthermore, field-programmable gate arrays (FPGAs), which are programmable after the LSI is manufactured, or logic devices capable of reconfiguring the connections within the LSI or the circuit partitions within the LSI, can also be used as processors. The electronic circuits may be integrated into one chip or distributed across multiple chips. The chips may be integrated into one device or distributed across multiple devices. The computer system referred to here includes a microcontroller having one or more processors and one or more memories. Therefore, the microcontroller is also composed of one or more electronic circuits including a semiconductor integrated circuit or a large-scale integrated circuit.

[0076] In the above embodiment, the management system 1 includes a material management system 10, a progress management system 20, and a construction record management system 30, but may also include components other than the material management system 10, the progress management system 20, and the construction record management system 30.

[0077] The management system 1 includes a material management system 10, a progress management system 20, and a construction record management system 30, but two or more of the material management system 10, the progress management system 20, and the construction record management system 30 may be realized by a single system. Also, all of the material management system 10, the progress management system 20, and the construction record management system 30 may be realized by a single system.

[0078] Furthermore, some of the functions of the material management system 10, the progress management system 20, and the construction record management system 30 may be realized by cloud computing or the like.

[0079] (summary) The above-described embodiments and the like disclose the following aspects.

[0080] The construction record management system (30) of the first aspect includes a first acquisition unit (34), a second acquisition unit (35), and a memory unit (33). The material management system (10) manages the inventory status of multiple types of materials used for multiple construction tasks at a construction site. The first acquisition unit (34) acquires material information including at least the serial numbers of materials shipped to the construction site from the material management system (10). The second acquisition unit (35) acquires construction information related to the construction status at the construction site of the materials shipped to the construction site. The memory unit (33) stores the material information acquired by the first acquisition unit (34) and the construction information acquired by the second acquisition unit (35) in association with each other.

[0081] According to this aspect, it is possible to manage the serial numbers and construction status of materials used in construction work at a construction site. For example, if a manufacturing defect or the like is discovered in a material after the material has been constructed, the construction status of the material with the manufacturing defect can be ascertained based on the material information and construction information stored in the storage unit (33) of the construction record management system (30). This has the advantage that a user of the construction record management system (30) can check the construction status at the construction site of a material with a manufacturing defect or the like, and, if the material is being constructed at the construction site, can take measures such as replacing the material.

[0082] In the construction record management system (30) of the second aspect, in the first aspect, the construction information further includes location information regarding the location where the construction work of the material was carried out.

[0083] According to this aspect, the user of the construction record management system (30) can know the location where the construction work of the material was carried out based on the location information.

[0084] In the third aspect of the construction record management system (30), in the first or second aspect, the construction information further includes at least one of construction time information relating to the construction time when the construction work of the material was performed, and worker information relating to the worker who performed the construction work of the material.

[0085] According to this aspect, the user of the construction record management system (30) can grasp the construction status of the materials in more detail based on the construction time information or the worker information.

[0086] In the fourth aspect of the construction record management system (30), in any of the first to third aspects, the material information further includes at least one of manufacturing time information relating to the manufacturing time of the material, lot information relating to the manufacturing lot of the material, and manufacturing location information relating to the manufacturing location of the material.

[0087] According to this aspect, the user of the construction record management system (30) can use the manufacturing date information, manufacturing lot information, or manufacturing location information to search for materials.

[0088] The management system (1) of the fifth aspect includes the construction record management system (30) of any one of the first to fourth aspects, and a progress management system (20) that manages the progress of multiple construction work operations at a construction site. When construction work on materials shipped to the construction site is completed, the construction record management system (30) transmits material information and construction information on the materials for which construction work has been completed to the progress management system (20). The progress management system (20) records the material information and construction information received from the construction record management system (30) in association with each other.

[0089] According to this aspect, the progress management system (20) shares material information and construction information with the construction record management system (30), so users of the progress management system (20) can also grasp material information and construction information of materials installed at the construction site.

[0090] The management system (1) of the sixth aspect is the same as that of the fifth aspect, and further includes a material management system (10). The material management system (10) transmits material information of materials shipped to the construction site to the progress management system (20). The progress management system (20) transmits the material information received from the material management system (10) to the construction record management system (30).

[0091] According to this aspect, the construction record management system (30) can receive material information on materials used in construction work from the progress management system (20) that manages the progress of construction work.

[0092] The construction record management method of the seventh aspect includes a first acquisition process, a second acquisition process, and a storage process. A material management system (10) manages the inventory status of multiple types of materials used for multiple construction tasks at a construction site. In the first acquisition process, material information including at least the serial numbers of materials to be shipped to the construction site is acquired from the material management system (10). In the second acquisition process, construction information related to the construction status of the materials shipped to the construction site is acquired. In the storage process, the material information acquired in the first acquisition process and the construction information acquired in the second acquisition process are stored in association with each other.

[0093] According to this aspect, it is possible to manage the serial numbers and construction status of materials used in construction work at a construction site.

[0094] The program of the eighth aspect is a program for causing a computer system to execute the construction record management method of the seventh aspect.

[0095] According to this aspect, it is possible to manage the serial numbers and construction status of materials used in construction work at a construction site.

[0096] Not limited to the above aspects, various configurations (including modified examples) of the construction record management system (30) according to the embodiment can be embodied as a construction record management method, a (computer) program, or a non-temporary recording medium on which a program is recorded, etc.

[0097] The configurations according to the second to fourth aspects are not essential for the construction record management system 30 and can be omitted as appropriate. The configuration according to the sixth aspect is not essential for the management system 1 and can be omitted as appropriate. [Explanation of symbols]

[0098] 1 Management System 10. Materials Management System 20 Progress Management System 30 Construction Record Management System 33 Storage section 34 First acquisition part 35 Second acquisition part

Claims

1. a first acquisition unit that acquires material information including at least a serial number of the material to be shipped to the construction site from a material management system that manages inventory statuses of multiple types of materials used in multiple construction work operations at the construction site; A second acquisition unit that acquires construction information regarding a construction status at the construction site of the materials shipped to the construction site; a storage unit that stores the material information acquired by the first acquisition unit and the construction information acquired by the second acquisition unit in association with each other, The second acquisition unit receives tool usage information relating to a usage status of the power tool used for construction work at the construction site from the power tool, and acquires information relating to the construction work as the construction information based on the tool usage information. Construction record management system.

2. The construction information further includes location information regarding a location where construction work of the material was performed. The construction record management system according to claim 1 .

3. The construction information further includes at least one of construction time information relating to the construction time when the construction work of the material was performed and worker information relating to the worker who performed the construction work of the material. The construction record management system according to claim 1 .

4. The material information further includes at least one of manufacturing time information relating to a manufacturing time of the material, lot information relating to a manufacturing lot of the material, and manufacturing location information relating to a manufacturing location of the material. The construction record management system according to claim 1 .

5. The construction record management system according to any one of claims 1 to 4, a progress management system for managing the progress of a plurality of construction works at the construction site, When the construction work of the materials shipped to the construction site is completed, the construction record management system transmits the material information and the construction information of the materials for which the construction work has been completed to the progress management system, The progress management system records the material information and the construction information received from the construction record management system in association with each other. Management system.

6. The material management system further includes: The material management system transmits the material information of the material shipped to the construction site to the progress management system, The progress management system transmits the material information received from the material management system to the construction record management system. The management system according to claim 5 .

7. a first acquisition process for acquiring material information including at least a serial number of the material to be shipped to the construction site from a material management system that manages inventory statuses of multiple types of materials used in multiple construction work operations at the construction site; A second acquisition process for acquiring construction information regarding the construction status of the materials shipped to the construction site; a storage process of storing the material information acquired in the first acquisition process and the construction information acquired in the second acquisition process in association with each other, In the second acquisition process, tool usage information relating to a usage status of a power tool used for construction work at the construction site is received from the power tool, and information relating to the construction work is acquired as the construction information based on the tool usage information. Construction record management methods.

8. In order to make a computer system execute the construction record management method according to claim 7, program.

Citation Information

Patent Citations

  • Housing material order delivery management method, IC tag, material, and IC tag management and issue server

    JP2004059249A

  • Construction site management system

    JP2005326965A

  • RFID tag and construction site management system and management method using it

    JP2008158569A

  • Method of managing building component

    JP2010055341A

  • Work result management apparatus and program

    JP2018169648A