Drive control device
Patent Information
- Application Number
- JP2024554027
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2022-11-02
- Filing Date
- 2022-11-02
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-11-02
AI Technical Summary
Railway vehicles powered by internal combustion engines face challenges in starting the engine due to power storage device discharge during maintenance, requiring complex reattachment and ground charging, which complicates the charging process.
A drive control device with bidirectional conversion capabilities between AC and DC power, incorporating multiple first inverters and power storage devices connected to each converter, allowing for charging of the power storage device without removing it from the vehicle, using AC power from started engines to charge unstarted engines and storage devices.
Enables easy and efficient charging of power storage devices within the railway vehicle, eliminating the need for external charging facilities and simplifying the process of starting internal combustion engines by utilizing AC power conversion and storage.
Abstract
Description
Drive control device
[0001] The present disclosure relates to a drive control device.
[0002] Some railway vehicles are powered by an internal combustion engine. An example of this type of railway vehicle is disclosed in Patent Document 1. The railway vehicle disclosed in Patent Document 1 includes an engine, a generator driven by the engine to generate AC power, a converter that converts the AC power generated by the generator into DC power and outputs the DC power, an inverter that converts the DC power output by the converter into AC power and outputs the DC power, an electric motor that rotates by receiving AC power from the inverter, and a drive control device that controls the converter and the inverter.
[0003] International Publication No. 2019-73822
[0004] To start an engine, it is necessary to supply power to a generator, operate the generator as an electric motor, and transmit rotational force from the generator operating as an electric motor to the engine. To supply power to the generator, a power storage device capable of storing the power required to start the engine is provided. A converter converts DC power supplied from the power storage device into AC power, and supplies the converted AC power to the generator, causing the generator to operate and rotate as an electric motor. The rotation of the generator starts the engine.
[0005] When the engine is stopped, for example, due to an erroneous operation during maintenance work, the power storage device may be electrically connected to another electronic device, causing the power storage device to discharge. As a result, the engine cannot be started the next time the railway vehicle begins operation. In this case, in order to start the engine using power supplied from the power storage device, it is necessary to remove the power storage device from the railway vehicle, charge it using a charging facility on the ground to a level that allows the engine to be started, and then reattach it to the railway vehicle, which is a complicated process.
[0006] The present disclosure has been made in consideration of the above circumstances, and has an object to provide a drive control device that makes it easy to charge a power storage device.
[0007] To achieve the above object, a traction control device disclosed herein controls the traction of a railway vehicle powered by multiple internal combustion engines, and includes multiple converters capable of bidirectional conversion between AC power and DC power, multiple first inverters capable of bidirectional conversion between DC power and AC power, and multiple power storage devices. A converter is provided for each internal combustion engine and for each generator that generates AC power when driven by the internal combustion engine. A first inverter is provided for each converter and has a primary terminal connected to the converter and a secondary terminal connected to a load device that operates by receiving AC power. A power storage device is provided for each converter and connected to the converter and the primary terminal of the first inverter. The power storage device is charged with DC power output by the converter or the first inverter and stores power for starting the internal combustion engines. The secondary terminals of the multiple first inverters are connected to each other. When starting the multiple internal combustion engines, each converter converts DC power to AC power and supplies the converted AC power to the generator. When only some of the multiple internal combustion engines are started, a first inverter connected to an internal combustion engine that has not been started via a generator and a converter receives AC power from a first inverter connected via a converter to a generator driven by the started internal combustion engine, converts the supplied AC power into DC power, and supplies the converted DC power to at least one of the converter and the power storage device.
[0008] In the drive control device disclosed herein, when only some of the multiple internal combustion engines are started, a first inverter connected to the non-started internal combustion engines via a generator and a converter converts AC power supplied from the first inverter connected to the started internal combustion engines via the generator and converter into DC power and supplies the converted DC power to at least one of the converter and the power storage device. When DC power is supplied from the first inverter to the power storage device, the power storage device can be charged, and the converter converts the DC power supplied from the charged power storage device into AC power and supplies the converted AC power to the generator, thereby starting the internal combustion engines. When DC power is supplied from the first inverter to the converter, the converter converts the DC power supplied from the first inverter into AC power and supplies the converted AC power to the generator, thereby starting the internal combustion engines. When AC power generated by the generator driven by the started internal combustion engines is converted into DC power by the converter and supplied to the power storage device, the power storage device can be charged. In this way, according to the drive control device of the present disclosure, it is not necessary to remove the power storage device from the railway vehicle and charge it using charging equipment, and a drive control device that makes it easy to charge the power storage device can be obtained.
[0009] FIG. 1 is a block diagram showing a configuration of a drive control device according to a first embodiment; FIG. 2 is a block diagram showing a configuration of a first inverter according to a first embodiment; FIG. 3 is a block diagram showing a configuration of a control unit according to a first embodiment; FIG. 4 is a block diagram showing a hardware configuration of a control unit according to a first embodiment; FIG. 5 is a timing chart showing an example of an operation of starting an internal combustion engine and charging power storage devices performed by the drive control device according to a first embodiment when each power storage device is being charged; FIG. 6 is a timing chart showing an example of an operation of starting an internal combustion engine and charging power storage devices performed by the drive control device according to a first embodiment when some power storage devices are being discharged; FIG. 7 is a timing chart showing an example of an operation of starting an internal combustion engine and charging power storage devices performed by the drive control device according to a second embodiment when some charging devices are being discharged;
[0010] Hereinafter, a drive control device according to an embodiment of the present disclosure will be described in detail with reference to the drawings, in which the same or equivalent parts are designated by the same reference numerals.
[0011] (Embodiment 1) A drive control device for controlling the drive of a railway vehicle will be described using a railway vehicle powered by multiple internal combustion engines as an example. Fig. 1 shows a railway vehicle drive device 100 for driving a railway vehicle made up of multiple cars 100a, 100b.
[0012] The railway vehicle drive system 100 includes internal combustion engines 91a, 91b as power sources, generators 92a, 92b that generate AC power when driven by the internal combustion engines 91a, 91b, and a drive control device 1 that controls the drive of the railway vehicle by supplying the power generated by the generators 92a, 92b to traction motors 93a, 93b. The railway vehicle drive system 100 includes traction motors 93a, 93b that receive AC power from the drive control device 1 and rotate to generate propulsion force for the railway vehicle, and load devices 94a, 94b that operate by receiving power from the drive control device 1.
[0013] The drive control device 1 has a main conversion device 1a that converts AC power supplied from a generator 92a into AC power suitable for each of the main motor 93a and the load device 94a, and supplies the converted AC power to the main motor 93a and the load device 94a, and a main conversion device 1b that converts AC power supplied from a generator 92b into AC power suitable for each of the main motor 93b and the load device 94b, and supplies the converted AC power to the main motor 93b and the load device 94b.
[0014] The internal combustion engine 91a, the generator 92a, the main converter 1a, the traction motor 93a, and the load device 94a are mounted on a vehicle 100a. The internal combustion engine 91b, the generator 92b, the main converter 1b, the traction motor 93b, and the load device 94b are mounted on a vehicle 100b.
[0015] The internal combustion engines 91a, 91b are diesel engines, gasoline engines, or the like. The output shafts of the internal combustion engines 91a, 91b are fixed to the shafts of generators 92a, 92b, respectively. As a result, when the railway vehicle begins operation, the generators 92a, 92b are operated as electric motors to rotate, thereby starting the internal combustion engines 91a, 91b. After the internal combustion engines 91a, 91b start, the generators 92a, 92b rotate in conjunction with the rotation of the internal combustion engines 91a, 91b, generating AC power. The rotation speeds of the internal combustion engines 91a, 91b are controlled by an internal combustion engine control unit (not shown).
[0016] The internal combustion engine control unit acquires a start command signal that changes in response to operation of a start switch provided in the cab, an operation command signal that changes in response to operation of a master controller provided in the cab, and the rotation speeds of the internal combustion engines 91 a, 91 b measured by a speed sensor (not shown). The internal combustion engine control unit determines a target rotation speed based on the start command signal, the operation command signal, and the measured values of the rotation speeds of the internal combustion engines 91 a, 91 b, and performs control to bring the rotation speeds of the internal combustion engines 91 a, 91 b closer to the target rotation speed.
[0017] When the internal combustion engines 91a, 91b have not started, the generators 92a, 92b each operate as an electric motor and rotate when supplied with AC power from the drive control device 1. After the internal combustion engines 91a, 91b have started, the generators 92a, 92b are driven by the internal combustion engines 91a, 91b, respectively, to generate AC power and supply the generated AC power to the drive control device 1. The generators 92a, 92b are, for example, induction generators.
[0018] The traction motors 93a, 93b are each driven by AC power supplied from the drive control device 1, and generate propulsion force for the railway vehicle. To avoid complicating the diagram, FIG. 1 shows only one traction motor 93a, 93b, but each vehicle is equipped with multiple traction motors. Specifically, vehicle 100a is equipped with multiple traction motors 93a, for example, four traction motors 93a. Vehicle 100b is equipped with multiple traction motors 93b, for example, four traction motors 93b. The traction motors 93a, 93b are, for example, three-phase induction motors.
[0019] The load devices 94a and 94b each operate by receiving AC power supplied from the drive control device 1. The load devices 94a and 94b are, for example, in-vehicle devices such as lighting equipment and air conditioning equipment.
[0020] The drive control device 1 includes a plurality of converters 11a, 11b connected to generators 92a, 92b provided corresponding to the internal combustion engines 91a, 91b, respectively, capable of bidirectional conversion between AC power and DC power, and a plurality of first inverters 12a, 12b connected to the converters 11a, 11b, respectively, capable of bidirectional conversion between DC power and AC power. The drive control device 1 includes a plurality of power storage devices 13a, 13b connected to the converters 11a, 11b and the first inverters 12a, 12b, respectively. The drive control device 1 further includes second inverters 14a, 14b connected to the converters 11a, 11b, respectively. "Connected" means "electrically connected."
[0021] In detail, the main conversion device 1a provided in the drive control device 1 has a converter 11a that converts AC power supplied from the generator 92a into DC power and outputs the converted DC power, a first inverter 12a that converts the DC power supplied from the converter 11a into AC power and outputs the converted AC power to the load device 94a, a second inverter 14a that converts the DC power supplied from the converter 11a into AC power and supplies the converted AC power to the main motor 93a, and a storage device 13a connected to the converter 11a, the first inverter 12a, and the second inverter 14a.
[0022] The main conversion device 1a is equipped with a transformer 16a to which the first inverter 12a is connected at its primary terminals, which transforms the AC power output by the first inverter 12a, and an AC capacitor 17a connected to the secondary terminals of the transformer 16a, in order to convert the AC power output by the first inverter 12a into power suitable for the load device 94a.
[0023] The main converter 1a includes a storage device contactor 18a that switches the electrical connection between the storage device 13a and the converter 11a, the first inverter 12a, and the second inverter 14a, and an inverter contactor 19a whose one end is connected to the connection point between the AC capacitor 17a and the load device 94a.
[0024] The main conversion device 1a includes a control unit 15a that controls a converter 11a, a first inverter 12a, a second inverter 14a, a power storage device contactor 18a, and an inverter contactor 19a.
[0025] Similarly, the main conversion device 1b provided in the drive control device 1 has a converter 11b that converts AC power supplied from a generator 92b into DC power and outputs the converted DC power, a first inverter 12b that converts DC power supplied from the converter 11b into AC power and outputs the converted AC power to a load device 94b, a second inverter 14b that converts DC power supplied from the converter 11b into AC power and supplies the converted AC power to a main motor 93b, and a storage device 13b connected to the converter 11b, the first inverter 12b, and the second inverter 14b.
[0026] The main converter 1b is equipped with a transformer 16b to which the first inverter 12b is connected at its primary terminals, which transforms the AC power output by the first inverter 12b, and an AC capacitor 17b connected to the secondary terminals of the transformer 16b, in order to convert the AC power output by the first inverter 12b into power suitable for the load device 94b.
[0027] The main converter 1b includes a storage device contactor 18b that switches the electrical connection between the storage device 13b and the converter 11b, the first inverter 12b, and the second inverter 14b, and an inverter contactor 19b whose one end is connected to the connection point between the AC capacitor 17b and the load device 94b.
[0028] The main conversion device 1b includes a control unit 15b that controls a converter 11b, a first inverter 12b, a second inverter 14b, a power storage device contactor 18b, and an inverter contactor 19b.
[0029] For example, when a railway vehicle parked in a depot begins operation, the drive control device 1 having the above configuration starts the internal combustion engines 91 a, 91 b. Specifically, the drive control device 1 converts DC power stored in the power storage devices 13 a, 13 b into AC power using the converters 11 a, 11 b, supplies the converted AC power to the generators 92 a, 92 b, and operates the generators 92 a, 92 b as electric motors to rotate them. This causes the shafts of the generators 92 a, 92 b to rotate the internal combustion engines 91 a, 91 b, whose output shafts are fixed, to rotate and start the internal combustion engines 91 a, 91 b.
[0030] If one of the power storage devices 13a, 13b is discharging, AC power cannot be supplied to one of the generators 92a, 92b, and therefore one of the internal combustion engines 91a, 91b cannot be started. At this time, the drive control device 1 charges both of the power storage devices 13a, 13b with power generated by the generator 92a or the generator 92b, which is driven by the other of the started internal combustion engines 91a, 91b. This eliminates the need to remove one of the discharging power storage devices 13a, 13b from the railway vehicle and charge it using charging equipment, and provides a drive control device 1 that makes it easy to charge the power storage devices 13a, 13b.
[0031] The details of the configuration of the drive control device 1 having the above configuration will be described below. The converter 11a is connected to a generator 92a driven by an internal combustion engine 91a, and the converter 11b is connected to a generator 92b driven by an internal combustion engine 91b. Specifically, the AC side terminal of the converter 11a is connected to the output terminal of the generator 92a, and the DC side terminal of the converter 11a is connected to the first inverter 12a, the power storage device 13a, and the second inverter 14a. The AC side terminal of the converter 11b is connected to the output terminal of the generator 92b, and the DC side terminal of the converter 11b is connected to the first inverter 12b, the power storage device 13b, and the second inverter 14b.
[0032] The converters 11a and 11b each have a capacitor that is charged with DC power supplied from the power storage devices 13a and 13b when the internal combustion engines 91a and 91b are started, and a plurality of switching elements connected in parallel to the capacitor. The plurality of switching elements of the converters 11a and 11b are controlled by the control units 15a and 15b, respectively, so that the converters 11a and 11b convert AC power to DC power or convert DC power to AC power.
[0033] Specifically, when converters 11a and 11b receive AC power from connected generators 92a and 92b, they convert the AC power into DC power and output the converted DC power. Specifically, converter 11a converts AC power supplied from generator 92a into DC power and supplies the converted DC power to first inverter 12a, power storage device 13a, and second inverter 14a. Similarly, converter 11b converts AC power supplied from generator 92b into DC power and supplies the converted DC power to first inverter 12b, power storage device 13b, and second inverter 14b.
[0034] When the converters 11a and 11b receive DC power, they convert the DC power to AC power and supply the converted AC power to the connected generators 92a and 92b. For example, when starting the internal combustion engine 91a, the converter 11a converts the DC power supplied from the power storage device 13a into AC power and supplies the converted AC power to the generator 92a. This causes the generator 92a to operate as a motor and rotate, thereby starting the internal combustion engine 91a. Similarly, when starting the internal combustion engine 91b, the converter 11b converts the DC power supplied from the power storage device 13b into AC power and supplies the converted AC power to the generator 92b. This causes the generator 92b to operate as a motor and rotate, thereby starting the internal combustion engine 91b.
[0035] The first inverters 12a and 12b are static inverters that maintain constant output voltage and output frequency. The first inverter 12a has primary terminals 21a and 22a, which are DC side terminals connected to the converter 11a, and secondary terminals 23a, 24a, and 25a, which are AC side terminals connected to a load device 94a via a transformer 16a and an AC capacitor 17a. The first inverter 12b has primary terminals 21b and 22b, which are DC side terminals connected to the converter 11b, and secondary terminals 23b, 24b, and 25b, which are AC side terminals connected to a load device 94b via a transformer 16b and an AC capacitor 17b. The secondary terminals 23a, 24a, and 25b of the first inverter 12a are connected to the secondary terminals 23b, 24b, and 25b of the first inverter 12b via inverter contactors 19a and 19b, respectively.
[0036] When first inverter 12a receives DC power from converter 11a connected to primary terminals 21a and 22a, it converts the DC power to AC power and supplies the converted AC power to load device 94a connected to secondary terminals 23a, 24a, and 25a. Similarly, when first inverter 12b receives DC power from converter 11b connected to primary terminals 21b and 22b, it converts the DC power to AC power and supplies the converted AC power to load device 94b connected to secondary terminals 23b, 24b, and 25b.
[0037] When the internal combustion engine 91a is not started and the first inverter 12a receives AC power from the first inverter 12b connected to the started internal combustion engine 91b via the generator 92b and the converter 11b, the first inverter 12a converts the AC power into DC power and supplies the converted DC power to the converter 11a and the storage device 13a.
[0038] Similarly, when the internal combustion engine 91b is not started and the first inverter 12b receives AC power from the first inverter 12a connected to the started internal combustion engine 91a via the generator 92a and the converter 11a, the first inverter 12b converts the AC power into DC power and supplies the converted DC power to the converter 11b and the storage device 13b.
[0039] 2, the first inverter 12a includes a capacitor C1 having both terminals connected to the primary terminals 21a and 22a, switching elements SW1 and SW2 connected in series between the primary terminals 21a and 22a, switching elements SW3 and SW4 connected in series between the primary terminals 21a and 22a, and switching elements SW5 and SW6 connected in series between the primary terminals 21a and 22a.
[0040] Switching elements SW1 and SW2, switching elements SW3 and SW4, and switching elements SW5 and SW6 correspond to the U phase, V phase, and W phase, respectively. The connection point of switching elements SW1 and SW2 is connected to secondary terminal 23a. The connection point of switching elements SW3 and SW4 is connected to secondary terminal 24a. The connection point of switching elements SW5 and SW6 is connected to secondary terminal 25a.
[0041] The switching elements SW1, SW2, SW3, SW4, SW5, and SW6 are, for example, IGBTs (Insulated Gate Bipolar Transistors), GTOs (Gate Turn-Off Thyristors), MOSFETs (Metal-Oxide-Semiconductor Field-Effect Transistors), etc. In the first embodiment, IGBTs are used as the switching elements SW1, SW2, SW3, SW4, SW5, and SW6.
[0042] The first inverter 12a has freewheeling diodes D1, D2, D3, D4, D5, and D6 connected in parallel to the switching elements SW1, SW2, SW3, SW4, SW5, and SW6, respectively.
[0043] In the first embodiment, the anode of the freewheeling diode D1 is connected to the emitter terminal of the switching element SW1, and the cathode of the freewheeling diode D1 is connected to the collector terminal of the switching element SW1. Similarly, the anode of the freewheeling diode D2 is connected to the emitter terminal of the switching element SW2, and the cathode of the freewheeling diode D2 is connected to the collector terminal of the switching element SW2.
[0044] Similarly, the anode of the freewheeling diode D3 is connected to the emitter terminal of the switching element SW3, and the cathode of the freewheeling diode D3 is connected to the collector terminal of the switching element SW3. Similarly, the anode of the freewheeling diode D4 is connected to the emitter terminal of the switching element SW4, and the cathode of the freewheeling diode D4 is connected to the collector terminal of the switching element SW4.
[0045] Similarly, the anode of the freewheeling diode D5 is connected to the emitter terminal of the switching element SW5, and the cathode of the freewheeling diode D5 is connected to the collector terminal of the switching element SW5. Similarly, the anode of the freewheeling diode D6 is connected to the emitter terminal of the switching element SW6, and the cathode of the freewheeling diode D6 is connected to the collector terminal of the switching element SW6.
[0046] The anodes of the freewheeling diodes D1, D3, and D5 are connected to the secondary terminals 23a, 24a, and 25a of the first inverter 12a, respectively. The cathodes of the freewheeling diodes D1, D3, and D5 are connected to the primary terminal 21a, which corresponds to the positive electrode of the primary terminals 21a and 21b of the first inverter 12a. The anodes of the freewheeling diodes D2, D4, and D6 are connected to the primary terminal 22a, which corresponds to the negative electrode of the primary terminals 21a and 21b of the first inverter 12a. The cathodes of the freewheeling diodes D2, D4, and D6 are connected to the secondary terminals 23a, 24a, and 25a of the first inverter 12a, respectively. The freewheeling diodes D1-D6 rectify the AC current flowing in from the secondary terminals 23a, 24a, and 25a of the first inverter 12a and output it from the primary terminal 21a. In other words, the freewheel diodes D1-D6 function as a rectifier circuit that rectifies the AC power supplied from the first inverter 12b to convert it into DC power and supplies it to at least one of the converter 11a and the power storage device 13a.
[0047] The multiple switching elements SW1-SW6 of the first inverters 12a, 12b are controlled by the control units 15a, 15b, respectively, so that the first inverters 12a, 12b convert DC power to AC power or convert AC power to DC power.
[0048] As shown in Fig. 1, the power storage device 13a is connected to the converter 11a, the first inverter 12a, and the second inverter 14a. The power storage device 13a is charged with power output by the converter 11a or the first inverter 12a. Similarly, the power storage device 13b is connected to the converter 11b, the first inverter 12b, and the second inverter 14b. The power storage device 13b is charged with power output by the converter 11b or the first inverter 12b. Each of the power storage devices 13a and 13b has a given number of secondary batteries and a monitoring device that monitors the terminal voltages of the secondary batteries.
[0049] The DC side terminal of the second inverter 14a is connected to the converter 11a, the first inverter 12a, and the power storage device 13a, and the AC side terminal of the second inverter 14a is connected to the load device 94a. Similarly, the DC side terminal of the second inverter 14b is connected to the converter 11b, the first inverter 12b, and the power storage device 13b, and the AC side terminal of the second inverter 14b is connected to the load device 94b.
[0050] The second inverters 14a, 14b each include a capacitor that is charged with DC power output from the converters 11a, 11b, and multiple switching elements. The multiple switching elements of the second inverters 14a, 14b are controlled by control units 15a, 15b, respectively, so that the second inverters 14a, 14b convert DC power to AC power and supply the converted AC power to the main motors 93a, 93b. The second inverters 14a, 14b are formed, for example, by a power conversion circuit that is variable in output voltage and output frequency.
[0051] The transformers 16a, 16b are, for example, delta-star connected transformers that transform the AC power supplied from the first inverters 12a, 12b connected to the primary side to a voltage suitable for the load devices 94a, 94b and output the transformed AC power from the secondary side.
[0052] The AC capacitors 17a and 17b are connected to the secondary sides of the transformers 16a and 16b, respectively. The AC capacitors 17a and 17b form LC filters together with the coils of the transformers 16a and 16b, thereby reducing harmonic components generated by the switching operations of the first inverters 12a and 12b.
[0053] The power storage device contactors 18a and 18b electrically connect or disconnect the power storage devices 13a and 13b from other electronic devices, respectively. Specifically, the main converter 1a has a power storage device contactor 18a connected to each of the positive and negative terminals of the power storage device 13a. When each power storage device contactor 18a is closed, the power storage device 13a is connected to the converter 11a, the first inverter 12a, and the second inverter 14a. When each power storage device contactor 18a is opened, the power storage device 13a is electrically disconnected from the converter 11a, the first inverter 12a, and the second inverter 14a.
[0054] The main converter 1b has an electric storage device contactor 18b connected to the positive terminal of the electric storage device 13b and an electric storage device contactor 18b connected to the negative terminal of the electric storage device 13b. When each electric storage device contactor 18b is closed, the electric storage device 13b is connected to the converter 11b, the first inverter 12b, and the second inverter 14b. When each electric storage device contactor 18b is opened, the electric storage device 13b is electrically disconnected from the converter 11b, the first inverter 12b, and the second inverter 14b.
[0055] The inverter contactors 19a, 19b electrically connect or disconnect the first inverters 12a, 12b from each other. Specifically, the main converter 1a has three inverter contactors 19a corresponding to the U, V, and W phases, respectively. The main converter 1b has three inverter contactors 19b corresponding to the U, V, and W phases, respectively.
[0056] When the inverter contactors 19a and 19b are turned on, the secondary terminals 23a, 24a, and 25a of the first inverter 12a are electrically connected to the secondary terminals 23b, 24b, and 25b of the first inverter 12b. Specifically, when the inverter contactors 19a and 19b are turned on, the secondary terminals of the transformers 16a and 16b are electrically connected to each other, thereby establishing electrical continuity between the secondary terminals 23a, 24a, and 25a of the first inverter 12a and the secondary terminals 23b, 24b, and 25b of the first inverter 12b.
[0057] When the inverter contactors 19 a and 19 b are opened, the secondary terminals 23 a, 24 a, and 25 a of the first inverter 12 a are electrically disconnected from the secondary terminals 23 b, 24 b, and 25 b of the first inverter 12 b. Specifically, when the inverter contactors 19 a and 19 b are opened, the secondary terminals of the transformers 16 a and 16 b are electrically disconnected from each other, and the secondary terminals 23 a, 24 a, and 25 a of the first inverter 12 a and the secondary terminals 23 b, 24 b, and 25 b of the first inverter 12 b are brought into a non-conductive state.
[0058] The control unit 15a controls the switching elements of the converter 11a, the switching elements SW1-SW6 of the first inverter 12a, the switching elements of the second inverter 14a, the power storage device contactor 18a, and the inverter contactor 19a. Similarly, the control unit 15b controls the switching elements of the converter 11b, the switching elements SW1-SW6 of the first inverter 12b, the switching elements of the second inverter 14b, the power storage device contactor 18b, and the inverter contactor 19b.
[0059] Since the control units 15a and 15b have similar configurations, only the configuration of the control unit 15a will be described. As shown in Fig. 3, the control unit 15a includes a first contactor control unit 31 that closes or opens the inverter contactor 19a, a second contactor control unit 32 that closes or opens the power storage device contactor 18a, and a power conversion control unit 33 that controls the converter 11a, the first inverter 12a, and the second inverter 14a. The control unit 15a also includes a start determination unit 34 that determines whether a DC voltage V1 (hereinafter referred to as an intermediate link voltage) applied to an electric circuit between the converter 11a and the first inverter 12a is sufficient to start the internal combustion engine 91a, and a charge determination unit 35 that determines whether the power storage device 13a is charged based on the voltage of the power storage device 13a.
[0060] The first contactor control unit 31, the second contactor control unit 32, and the power conversion control unit 33 receive a start command signal S1 from the cab. The start command signal S1 is, for example, a signal that is at an L (low) level when the internal combustion engines 91 a, 91 b are stopped and is set to an H (high) level when the internal combustion engines 91 a, 91 b are started.
[0061] The power conversion control unit 33 receives a driving command signal S2 from the driver's cab. The driving command signal S2 is, for example, a signal indicating a powering notch that indicates the acceleration of the railway vehicle, a braking notch that indicates the deceleration of the railway vehicle, etc.
[0062] The control unit 15a having the above configuration acquires information from the control unit 15b. Specifically, the first contactor control unit 31 and the power conversion control unit 33 included in the control unit 15a acquire the determination result of the start determination unit 34 included in the control unit 15b, and the first contactor control unit 31 included in the control unit 15a acquires the determination result of the charge determination unit 35. The determination result of the start determination unit 34 included in the control unit 15b indicates whether the intermediate link voltage V2, which is a DC voltage applied to the electric circuit between the converter 11b and the first inverter 12b, is sufficient to start the internal combustion engine 91b. The determination result of the charge determination unit 35 indicates whether the power storage device 13b is being charged.
[0063] The details of each part of the control unit 15a will be described below. The first contactor control unit 31 closes the inverter contactor 19a when only some of the multiple internal combustion engines 91a, 91b are started. Specifically, the first contactor control unit 31 closes the inverter contactor 19a when the start command signal S1 is at H level and the determination result of the start determination unit 34 included in the control unit 15a indicates that the intermediate link voltage V1 is not sufficient to start the internal combustion engine 91a, or when the determination result of the start determination unit 34 included in the control unit 15b indicates that the intermediate link voltage V2 is not sufficient to start the internal combustion engine 91b.
[0064] After closing the inverter contactor 19a, the first contactor control unit 31 opens the inverter contactor 19a when the judgment results of the charge judgment unit 35 in the control unit 15a and the judgment results of the charge judgment unit 35 in the control unit 15b both indicate that the storage devices 13a, 13b are sufficiently charged.
[0065] When the start command signal S1 changes from L level to H level, the second contactor control unit 32 closes the power storage device contactor 18a. After the internal combustion engine 91a starts, when the determination result of the charge determination unit 35 indicates that the power storage device 13a is sufficiently charged, the second contactor control unit 32 opens the power storage device contactor 18a.
[0066] After the start command signal S1 changes from L level to H level, when the determination result of the start determination unit 34 indicates that the intermediate link voltage V1 is sufficient to start the internal combustion engine 91a, the power conversion control unit 33 controls the multiple switching elements of the converter 11a, causing the converter 11a to convert DC power into AC power. Specifically, the converter 11a converts the DC power supplied from the power storage device 13a into AC power and supplies the converted AC power to the generator 92a. As a result, the generator 92a operates as an electric motor and rotates, causing the internal combustion engine 91a, whose output shaft is fixed to the shaft of the generator 92a, to rotate and start up.
[0067] When the internal combustion engine 91a starts, the power conversion control unit 33 controls the multiple switching elements of the converter 11a, causing the converter 11a to convert AC power into DC power. Specifically, when the rotation speed of the internal combustion engine 91a obtained from the speed sensor reaches the starting rotation speed, the power conversion control unit 33 controls the multiple switching elements of the converter 11a. As a result, the converter 11a converts AC power supplied from the generator 92a, which is driven by the internal combustion engine 91a to generate electricity, into DC power and outputs the converted DC power. The starting rotation speed is the rotation speed at which the internal combustion engine 91a can be considered to have started, and may be determined depending on the use of the internal combustion engine 91a.
[0068] The power conversion control unit 33 controls the multiple switching elements of the converter 11a to increase the value of the DC voltage output by the converter 11a to a value suitable for supplying to the first inverter 12a and the second inverter 14a. The power conversion control unit 33 acquires the value of the intermediate link voltage V1 from a voltage sensor (not shown) and performs control to bring the value of the intermediate link voltage V1 closer to a value suitable for supplying to the first inverter 12a and the second inverter 14a. The power conversion control unit 33 controls the multiple switching elements of the converter 11a as described above, so that DC power is supplied from the converter 11a to the power storage device 13a, and the power storage device 13a is charged.
[0069] When the value of the intermediate link voltage V1 reaches a value suitable for supplying power to the first inverter 12a and the second inverter 14a, the power conversion control unit 33 controls the multiple switching elements SW1-SW6 of the first inverter 12a, causing the first inverter 12a to convert DC power into AC power. Specifically, the first inverter 12a converts the DC power supplied from the converter 11a into AC power and supplies the converted AC power to the load device 94a.
[0070] When the operation command signal S2 indicates a powering command, the power conversion control unit 33 controls the multiple switching elements of the second inverter 14a, causing the second inverter 14a to convert the DC power supplied from the converter 11a into AC power and supply the converted AC power to the main motor 93a.
[0071] The start determination unit 34 determines whether the intermediate link voltage V1 is sufficient to start the internal combustion engine 91a. Specifically, the start determination unit 34 acquires the value of the intermediate link voltage V1 from the voltage sensor and repeatedly determines whether the measured value of the intermediate link voltage V1 is equal to or greater than the starting voltage. For example, the start determination unit 34 repeats this determination at regular intervals. The start determination unit 34 outputs the determination result to the first contactor control unit 31, the power conversion control unit 33, and the control unit 15b. If the measured value of the intermediate link voltage V1 is equal to or greater than the starting voltage, it can be determined that the intermediate link voltage V1 is sufficient to start the internal combustion engine 91a. The starting voltage is a voltage value sufficient to start the internal combustion engine 91a and may be determined in advance according to the specifications of the internal combustion engine 91a and the generator 92a.
[0072] The charge determination unit 35 determines whether the power storage device 13a is sufficiently charged. Specifically, the charge determination unit 35 acquires a measured value of the terminal voltage of the secondary battery of the power storage device 13a from a monitoring device included in the power storage device 13a, and repeatedly determines whether the measured value of the terminal voltage of the secondary battery is equal to or greater than a charge threshold. For example, the charge determination unit 35 repeats the above determination at regular intervals. The charge determination unit 35 outputs the determination result to the first contactor control unit 31, the second contactor control unit 32, and the control unit 15b. If the measured value of the terminal voltage of the secondary battery is equal to or greater than the charge threshold, the power storage device 13a can be considered to be sufficiently charged. The charge threshold may be determined according to the specifications of the power storage device 13a.
[0073] The hardware configurations of the control units 15a and 15b having the above-described configuration are similar, so the hardware configuration of the control unit 15a will be described below. As shown in FIG. 4 , the control unit 15a includes a processor 81, a memory 82, and an interface 83. The processor 81, the memory 82, and the interface 83 are connected to one another via a bus 80. The functions of each unit in the control unit 15a are realized by software, firmware, or a combination of software and firmware. The software and firmware are written as programs and stored in the memory 82. The processor 81 reads and executes the programs stored in the memory 82, thereby realizing the functions of each unit described above. In other words, the memory 82 stores programs for executing the processing of each unit in the control unit 15a.
[0074] The memory 82 includes, for example, non-volatile or volatile semiconductor memory such as RAM (Random Access Memory), ROM (Read-Only Memory), flash memory, EPROM (Erasable Programmable Read Only Memory), EEPROM (Electrically Erasable and Programmable Read-Only Memory), magnetic disk, flexible disk, optical disk, compact disk, mini disk, DVD (Digital Versatile Disc), etc.
[0075] The control unit 15a is connected to the control unit 15b, the converter 11a, the first inverter 12a, the second inverter 14a, the power storage device contactor 18a, and the inverter contactor 19a via an interface 83. The interface 83 has an interface module that complies with one or more standards depending on the connection destination.
[0076] The starting of the internal combustion engines 91a, 91b and the charging of the power storage devices 13a, 13b performed by the drive control device 1 having the above configuration will be described with reference to FIGS. 5 and 6. An example of the operation of the drive control device 1 when both the power storage devices 13a, 13b are fully charged is shown in FIG. 5. As shown in graph A of FIG. 5, the timing at which the start command signal S1 changes from L level to H level is defined as time T1. Before time T1, the power storage device contactors 18a, 18b and the inverter contactors 19a, 19b are open, and the converters 11a, 11b, the first inverters 12a, 12b, and the second inverters 14a, 14b are stopped. Therefore, before time T1, the internal combustion engines 91a, 91b, the generators 92a, 92b, the traction motors 93a, 93b, and the load devices 94a, 94b are all stopped.
[0077] At time T1, when the start command signal S1 changes from L level to H level, the second contactor control unit 32 included in the control unit 15a included in the main conversion device 1a closes the storage device contactor 18a, as shown in graph B of FIG. 5 . When the storage device contactor 18a is closed, DC power is supplied from the storage device 13a to the converter 11a. As shown in graph C of FIG. 5 , at time T1, the voltage of the storage device 13a begins to decrease from a voltage value Va1. The voltage value Va1 is the voltage value of the storage device 13a when the storage device 13a is charged with sufficient power to start the internal combustion engine 91a. After time T1, the capacitor of the converter 11a is charged with DC power discharged from the storage device 13a. In other words, the intermediate link voltage V1 increases.
[0078] The capacitor of converter 11a is charged with DC power supplied from power storage device 13a to converter 11a, and the time when the value of intermediate link voltage V1 reaches the starting voltage is defined as time T2.
[0079] At time T2, the start determination unit 34 included in the control unit 15a determines that the measured value of the intermediate link voltage V1 is equal to or greater than the start-up voltage and sends the determination result to the first contactor control unit 31 and the power conversion control unit 33 included in each of the control units 15a and 15b. Because the determination result of the start determination unit 34 indicates that the measured value of the intermediate link voltage V1 is equal to or greater than the start-up voltage, the power conversion control unit 33 included in the control unit 15a controls the multiple switching elements of the converter 11a, causing the converter 11a to convert DC power to AC power. In detail, the converter 11a converts the DC power supplied from the power storage device 13a into AC power and supplies the converted AC power to the generator 92a.
[0080] When the generator 92a receives AC power from the converter 11a, it operates as an electric motor and rotates. Because the shaft of the generator 92a is fixed to the output shaft of the internal combustion engine 91a, the internal combustion engine 91a rotates as the generator 92a rotates, and the rotation speed of the internal combustion engine 91a increases, as shown in graph D of Figure 5. Thereafter, the rotation speed of the internal combustion engine 91a reaches the starting rotation speed R1, and the internal combustion engine 91a starts, at time T3. After time T3, the rotation speed of the internal combustion engine 91a increases, and it becomes possible for the generator 92a to generate electricity.
[0081] At time T3, after the internal combustion engine 91a starts, when the rotation speed of the internal combustion engine 91a reaches a rotation speed at which the generator 92a can generate electricity, the generator 92a driven by the internal combustion engine 91a starts generating electricity. The generator 92a supplies the generated AC power to the converter 11a.
[0082] After the internal combustion engine 91a starts at time T3, when AC power is supplied from the generator 92a to the converter 11a, the power conversion control unit 33 included in the control unit 15a controls the multiple switching elements of the converter 11a, causing the converter 11a to convert the AC power into DC power. In detail, the converter 11a converts the AC power supplied from the generator 92a, which is driven by the internal combustion engine 91a to generate power, into DC power and outputs the converted DC power.
[0083] After time T3, the power conversion control unit 33 of the control unit 15a controls the multiple switching elements of the converter 11a to increase the value of the DC voltage output by the converter 11a to a value suitable for supplying to the first inverter 12a and the second inverter 14a. The power conversion control unit 33 of the control unit 15a controls the multiple switching elements of the converter 11a as described above, thereby supplying DC power from the converter 11a to the power storage device 13a. As a result, the discharged power storage device 13a is charged, and as shown in graph C of FIG. 5 , the voltage of the power storage device 13a begins to increase from a voltage value Va2. The voltage value Va2 is lower than the voltage value Va1 and is a voltage value that allows the power storage device 13a to be recharged without over-discharging. The time when the voltage of the power storage device 13a subsequently reaches the voltage value Va1 and charging of the power storage device 13a is completed is defined as time T4. In other words, at time T4, the power storage device 13a is charged with enough power to start the internal combustion engine 91a next time.
[0084] At time T4, the charge determination unit 35 of the control unit 15a determines that the measured value of the terminal voltage of the secondary battery of the storage device 13a is greater than or equal to the charge threshold, and sends the determination result to the first contactor control unit 31 of the control units 15a and 15b and the second contactor control unit 32 of the control unit 15a.
[0085] When, at time T4, the determination result of the charge determination unit 35 of the control unit 15a indicates that the measured value of the terminal voltage of the secondary battery of the storage device 13a is equal to or greater than the charge threshold value, the second contactor control unit 32 of the control unit 15a opens the storage device contactor 18a, as shown in graph B of Figure 5.
[0086] After time T3 when the internal combustion engine 91a is started, the power conversion control unit 33 of the control unit 15a controls the multiple switching elements of the converter 11a as described above, so that the value of the intermediate link voltage V1 rises to a value suitable for supplying to the first inverter 12a and the second inverter 14a. In other words, the capacitor C1 of the first inverter 12a and the capacitor C2 of the second inverter 14a are sufficiently charged.
[0087] After time T3, when the measured value of the intermediate link voltage V1 acquired from the voltage sensor rises to a value suitable for operation of the first inverter 12a, the power conversion control unit 33 of the control unit 15a controls the multiple switching elements SW1-SW6 of the first inverter 12a, causing the first inverter 12a to convert DC power to AC power. Specifically, the first inverter 12a converts the DC power supplied from the converter 11a into AC power and supplies the converted AC power to the load device 94a. This enables operation of the load device 94a.
[0088] After time T3, when the measured value of the intermediate link voltage V1 acquired from the voltage sensor rises to a value suitable for operation of the second inverter 14a and the operation command signal S2 indicates a powering command, the power conversion control unit 33 of the control unit 15a controls the multiple switching elements of the second inverter 14a in accordance with the powering command, causing the second inverter 14a to convert DC power to AC power. More specifically, the second inverter 14a converts the DC power supplied from the converter 11a to AC power and supplies the converted AC power to the traction motor 93a. The rotation of the traction motor 93a supplied with AC power generates propulsion force for the railway vehicle.
[0089] The operation of the main converter 1b is the same as that of the main converter 1a described above. Specifically, when the start command signal S1 changes from L level to H level at time T1, the second contactor control unit 32 of the control unit 15b closes the storage device contactor 18b, as shown in graph F of FIG. 5 . When the storage device contactor 18b is closed, DC power is supplied from the storage device 13b to the converter 11b. As shown in graph G of FIG. 5 , the voltage of the storage device 13b begins to decrease from voltage value Vb1 at time T1. The voltage value Vb1 is the voltage value of the storage device 13b when the storage device 13b is charged with sufficient power to start the internal combustion engine 91b. After time T1, the capacitor of the converter 11b is charged with DC power discharged from the storage device 13b. In other words, the intermediate link voltage V2 increases.
[0090] At time T2, the capacitor of converter 11b is charged with DC power supplied from power storage device 13b to converter 11b, and the value of intermediate link voltage V2 reaches the threshold voltage.
[0091] At time T2, the start determination unit 34 included in the control unit 15b determines that the measured value of the intermediate link voltage V2 is equal to or greater than the start-up voltage and sends the determination result to the first contactor control unit 31 and the power conversion control unit 33 included in each of the control units 15a and 15b. Because the determination result of the start determination unit 34 indicates that the measured value of the intermediate link voltage V2 is equal to or greater than the start-up voltage, the power conversion control unit 33 included in the control unit 15b controls the multiple switching elements of the converter 11b, causing the converter 11b to convert DC power to AC power. In detail, the converter 11b converts the DC power supplied from the power storage device 13b to AC power and supplies the converted AC power to the generator 92b.
[0092] When the generator 92b receives AC power from the converter 11b, it operates as an electric motor and rotates. Because the shaft of the generator 92b is fixed to the output shaft of the internal combustion engine 91b, the internal combustion engine 91b rotates as the generator 92b rotates, and the rotation speed of the internal combustion engine 91b increases, as shown in graph H of Figure 5. Thereafter, at time T3, the rotation speed of the internal combustion engine 91b reaches the starting rotation speed R1, and the internal combustion engine 91b starts. After time T3, the rotation speed of the internal combustion engine 91b increases, and it becomes possible for the generator 92b to generate electricity.
[0093] At time T3, after the internal combustion engine 91b starts, when the rotation speed of the internal combustion engine 91b reaches a rotation speed at which the generator 92b can generate electricity, the generator 92b driven by the internal combustion engine 91b starts generating electricity. The generator 92b supplies the generated AC power to the converter 11b.
[0094] After the internal combustion engine 91b starts at time T3, when AC power is supplied from the generator 92b to the converter 11b, the power conversion control unit 33 included in the control unit 15b controls multiple switching elements of the converter 11b, causing the converter 11b to convert the AC power into DC power. In detail, the converter 11b converts the AC power supplied from the generator 92b, which is driven by the internal combustion engine 91b to generate power, into DC power and outputs the converted DC power.
[0095] After time T3, the power conversion control unit 33 of the control unit 15b controls the switching elements of the converter 11b to increase the DC voltage output by the converter 11b to a value suitable for supplying to the first inverter 12b and the second inverter 14b. The power conversion control unit 33 of the control unit 15b controls the switching elements of the converter 11b as described above, thereby supplying DC power from the converter 11b to the power storage device 13b. As a result, the discharged power storage device 13b is charged, and as shown in graph G of FIG. 5 , the voltage of the power storage device 13b begins to increase from a voltage value Vb2. The voltage value Vb2 is lower than the voltage value Vb1 and is a voltage value that allows the power storage device 13a to be recharged without over-discharging. Thereafter, at time T4, the voltage of the power storage device 13b reaches the voltage value Vb1, and charging of the power storage device 13b is completed. In other words, at time T4, the power storage device 13b is charged with enough power to start the internal combustion engine 91b next time.
[0096] At time T4, the charge determination unit 35 of the control unit 15b determines that the measured value of the terminal voltage of the secondary battery of the storage device 13b is greater than or equal to the charge threshold, and sends the determination result to the first contactor control unit 31 of the control units 15a and 15b and the second contactor control unit 32 of the control unit 15b.
[0097] When, at time T4, the determination result of the charge determination unit 35 of the control unit 15b indicates that the measured value of the terminal voltage of the secondary battery of the storage device 13b is equal to or greater than the charge threshold value, the second contactor control unit 32 of the control unit 15b opens the storage device contactor 18b, as shown in graph F of Figure 5.
[0098] After time T3 when the internal combustion engine 91b starts, the power conversion control unit 33 of the control unit 15b controls the multiple switching elements of the converter 11b as described above, so that the value of the intermediate link voltage V2 rises to a value suitable for supplying to the first inverter 12b and the second inverter 14b. In other words, the capacitor C1 of the first inverter 12b and the capacitor of the second inverter 14b are sufficiently charged.
[0099] After time T3, when the measured value of the intermediate link voltage V2 acquired from the voltage sensor rises to a value suitable for operation of the first inverter 12b, the power conversion control unit 33 of the control unit 15b controls the multiple switching elements SW1-SW6 of the first inverter 12b, causing the first inverter 12b to convert DC power to AC power. Specifically, the first inverter 12b converts the DC power supplied from the converter 11b into AC power and supplies the converted AC power to the load device 94b. This enables operation of the load device 94b.
[0100] After time T3, when the value of the intermediate link voltage V2 acquired from the voltage sensor rises to a value suitable for operation of the second inverter 14b and the operation command signal S2 indicates a powering command, the power conversion control unit 33 of the control unit 15b controls the multiple switching elements of the second inverter 14b in accordance with the powering command, causing the second inverter 14b to convert DC power to AC power. More specifically, the second inverter 14b converts the DC power supplied from the converter 11b to AC power and supplies the converted AC power to the traction motor 93b. The rotation of the traction motor 93b supplied with AC power generates propulsion force for the railway vehicle.
[0101] As described above, at time T2, the start determination units 34 included in the control units 15a and 15b determine that the intermediate link voltages V1 and V2 are equal to or greater than the starting voltages. In other words, the determination results obtained by the first contactor control unit 31 included in the control unit 15a indicate that the intermediate link voltage V1 is sufficient to start the internal combustion engine 91a and that the intermediate link voltage V2 is sufficient to start the internal combustion engine 91b, respectively. The same applies to the determination results obtained by the first contactor control unit 31 included in the control unit 15b. Therefore, the first contactor control units 31 included in the control units 15a and 15b keep the inverter contactors 19a and 19b open. Therefore, as shown in graphs E and I of FIG. 5 , the inverter contactors 19a and 19b remain open.
[0102] An example of the operation of the drive control device 1 when the power storage device 13a is fully charged and the power storage device 13b is discharged is shown in Figure 6. The way to interpret Figure 6 is the same as that of Figure 5. The operation of the main converter 1a of the drive control device 1 from time T1 to time T4 is the same as the example in Figure 5.
[0103] In the main converter 1b, because the power storage device 13b is in a discharged state, the terminal-to-terminal voltage of the secondary battery of the power storage device 13b is sufficiently small at time T1. For example, as shown in graph G of FIG. 6, the terminal-to-terminal voltage of the secondary battery of the power storage device 13b is a voltage value Vb2. When the start command signal S1 changes from L level to H level at time T1, the second contactor control unit 32 of the control unit 15b closes the power storage device contactor 18b, as shown in graph F of FIG. 6. Even when the power storage device contactor 18b is closed, because the power storage device 13b is in a discharged state, sufficient DC power is not supplied from the power storage device 13b to the converter 11b to start the internal combustion engine 91b.
[0104] Therefore, even at time T2, the intermediate link voltage V2 in the main converter 1b does not reach the starting voltage. At time T2, the start determination unit 34 in the control unit 15b determines that the intermediate link voltage V2 is less than the starting voltage, and sends the determination result to the first contactor control unit 31 and the power conversion control unit 33 in the control units 15a and 15b, respectively.
[0105] When the first contactor control unit 31 of the control unit 15b obtains a determination result indicating that the intermediate link voltage V2 is less than the starting voltage, it closes the inverter contactor 19b as shown in graph I of Figure 6.
[0106] When the power conversion control unit 33 of the control unit 15b obtains a determination result indicating that the intermediate link voltage V2 is lower than the starting voltage, the power conversion control unit 33 keeps the converter 11b, the first inverter 12b, and the second inverter 14b stopped, and therefore the internal combustion engine 91b cannot be started, as shown in graph H in FIG.
[0107] The operation of the drive control device 1 after time T4 will be described below. When charging of the power storage device 13a is completed at time T4 and the power storage device contactor 18a is opened, the power conversion control unit 33 of the control unit 15a controls the multiple switching elements of the converter 11a, as in the first embodiment, so that the value of the intermediate link voltage V1 rises to a value suitable for supplying to the first inverter 12a and the second inverter 14a.
[0108] After time T4, when the measured value of the intermediate link voltage V1 acquired from the voltage sensor reaches a value suitable for operating the first inverter 12a, the power conversion control unit 33 of the control unit 15a controls the multiple switching elements SW1-SW6 of the first inverter 12a, causing the first inverter 12a to convert DC power to AC power. Specifically, the first inverter 12a converts the DC power supplied from the converter 11a into AC power and supplies the converted AC power to the load device 94a. This enables operation of the load device 94a.
[0109] At time T2, the power conversion control unit 33 of the control unit 15a obtains a determination result indicating that the intermediate link voltage V2 is less than the starting voltage. Therefore, even if the measured value of the intermediate link voltage V1 obtained from the voltage sensor rises to a value suitable for operation of the second inverter 14a after time T4 and the operation command signal S2 indicates a powering command, the power conversion control unit 33 of the control unit 15a keeps the second inverter 14a stopped. This prevents the railway vehicle from starting to move while only some of the internal combustion engines 91a, 91b are running.
[0110] At time T2, the first contactor control unit 31 of the control unit 15a obtains a determination result indicating that the intermediate link voltage V2 is less than the starting voltage. The time at which the first contactor control unit 31 controls the inverter contactor 19a in accordance with this determination result is defined as time T5. In detail, as shown in graph E of FIG. 6 , the first contactor control unit 31 of the control unit 15a closes the inverter contactor 19a at time T5 after the internal combustion engine 91a starts and the power storage device 13a is charged based on the electric power generated by the generator 92a driven by the internal combustion engine 91a.
[0111] Because the inverter contactor 19b was already closed at time T2, when the inverter contactor 19a is closed at time T5, the secondary terminals 23b, 24b, and 25b of the first inverter 12b connected to the unstarted internal combustion engine 91b via the generator 92b and the converter 11b are electrically connected to the secondary terminals 23a, 24a, and 25a of the first inverter 12a connected to the started internal combustion engine 91a via the generator 92a and the converter 11a. In other words, by closing the inverter contactors 19a and 19b provided in the electrical circuit between the first inverter 12b connected to the unstarted internal combustion engine 91b via the generator 92b and the converter 11b and the first inverter 12a connected to the started internal combustion engine 91a via the generator 92a and the converter 11a, the secondary terminals 23b, 24b, and 25b of the first inverter 12b and the secondary terminals 23a, 24a, and 25a of the first inverter 12a are electrically connected. As a result, as shown by the solid arrows in Fig. 7, AC power output from the first inverter 12a is supplied to the first inverter 12b and the load device 94b via the inverter contactors 19a and 19b, thereby enabling the operation of the load device 94b.
[0112] When AC power is supplied to the secondary side from the first inverter 12a while the switching elements SW1-SW6 are in an off state, the first inverter 12b rectifies the AC power to convert it into DC power and outputs the converted DC power. Specifically, the AC power supplied to the secondary side of the first inverter 12a is rectified by the freewheeling diodes D1-D6 shown in Fig. 2. As indicated by the dotted arrows in Fig. 7, the first inverter 12b supplies DC power to the converter 11b and the power storage device 13b.
[0113] As a result, when the power storage device 13b is charged, the voltage of the power storage device 13b begins to rise, as shown in graph G in Fig. 6. The time when the charging of the power storage device 13b is completed thereafter is defined as time T6. In other words, at time T6, the power storage device 13b is charged with enough power to start the internal combustion engine 91b.
[0114] At time T6, the charge determination unit 35 of the control unit 15b determines that the measured value of the terminal voltage of the secondary battery of the storage device 13b is greater than or equal to the charge threshold, and sends the determination result to the first contactor control unit 31 of the control units 15a and 15b and the second contactor control unit 32 of the control unit 15b.
[0115] As shown in graphs E and I in Figure 6, at time T6, when the first contactor control units 31 of the control units 15a and 15b obtain a determination result indicating that the measured value of the terminal voltage of the secondary battery of the storage device 13b is equal to or greater than the charge threshold value with the inverter contactors 19a and 19b turned on, the first contactor control units 31 open the inverter contactors 19a and 19b.
[0116] As shown in graph F of Figure 6, at time T6, when the second contactor control unit 32 of the control unit 15b obtains a determination result indicating that the measured value of the terminal voltage of the secondary battery of the storage device 13b is equal to or greater than the charging threshold, the second contactor control unit 32 opens the storage device contactor 18b.
[0117] Between time T5 and time T6, the capacitor of converter 11b is charged with DC power supplied from first inverter 12b, and therefore, at time T6, intermediate link voltage V2 reaches the starting voltage.
[0118] At time T6, the start-up determination unit 34 of the control unit 15b determines that the measured value of the intermediate link voltage V2 is greater than or equal to the start-up voltage, and sends the determination result to the first contactor control unit 31 and the power conversion control unit 33 of each of the control units 15a and 15b.
[0119] Therefore, after time T6, the power conversion control unit 33 of the control unit 15b controls the multiple switching elements of the converter 11b to supply AC power from the converter 11b to the generator 92b, making it possible to start the internal combustion engine 91b, as shown by graph H in Fig. 6. The operation of the drive control device 1 when starting the internal combustion engine 91b is similar to the example in Fig. 5.
[0120] As described above, according to the drive control device 1 according to the first embodiment, when only a part of the internal combustion engines 91a, 91b is started because one of the power storage devices 13a, 13b is discharging, it is possible to charge both of the power storage devices 13a, 13b. Even when one of the power storage devices 13a, 13b is discharging, there is no need to remove the discharging power storage device 13a or 13b from the railway vehicle and charge it using a charging facility, and the drive control device 1 can be obtained that makes it easy to charge the power storage devices 13a, 13b.
[0121] (Embodiment 2) The method of charging the power storage devices 13a, 13b is not limited to the above example. In embodiment 2, a drive control device 1 that charges the power storage devices 13a, 13b using a method different from that of embodiment 1 will be described. The configuration of the drive control device 1 according to embodiment 2 is the same as that of embodiment 1. However, the second contactor control unit 32 included in the control units 15a, 15b acquires the determination result from the start determination unit 34 and acquires the rotation speed of the internal combustion engines 91a, 91b from the speed sensor.
[0122] The operation of the drive control device 1 when both the power storage devices 13a and 13b are fully charged is the same as in embodiment 1. An example of the operation of the drive control device 1 when the power storage device 13a is fully charged and the power storage device 13b is discharged is shown in Fig. 8. The way to interpret Fig. 8 is the same as that of Fig. 6. The operation of the main converter 1a included in the drive control device 1 from time T1 to time T4 is the same as the operation of the main converter 1a according to embodiment 1 shown in Fig. 6.
[0123] In the main converter 1b, because the power storage device 13b is in a discharged state, the terminal voltage of the secondary battery of the power storage device 13b is sufficiently small at time T1. For example, as shown in graph G of FIG. 8 , the terminal voltage of the secondary battery of the power storage device 13b is a voltage value Vb2. When the start command signal S1 changes from L level to H level at time T1, the second contactor control unit 32 of the control unit 15b closes the power storage device contactor 18b, as shown in graph F of FIG. 8 . Even when the power storage device contactor 18b is closed, because the power storage device 13b is in a discharged state, sufficient DC power is not supplied from the power storage device 13b to the converter 11b to start the internal combustion engine 91b.
[0124] Therefore, even at time T2, the intermediate link voltage V2 in the main converter 1b does not reach the starting voltage. At time T2, the start determination unit 34 of the control unit 15b determines that the intermediate link voltage V2 is less than the starting voltage, and sends the determination result to the first contactor control unit 31 and the power conversion control unit 33 of the control units 15a and 15b, respectively, and to the second contactor control unit 32 of the control unit 15b.
[0125] When the first contactor control unit 31 of the control unit 15b obtains a determination result indicating that the intermediate link voltage V2 is less than the starting voltage, it closes the inverter contactor 19b as shown in graph I of Figure 8.
[0126] When the second contactor control unit 32 of the control unit 15b obtains a determination result indicating that the intermediate link voltage V2 is less than the starting voltage, the second contactor control unit 32 opens the storage device contactor 18b as shown in graph F of Figure 8.
[0127] When the power conversion control unit 33 of the control unit 15b obtains a determination result indicating that the intermediate link voltage V2 is lower than the starting voltage, the power conversion control unit 33 keeps the converter 11b, the first inverter 12b, and the second inverter 14b stopped. Therefore, as shown in graph H in Figure 8, at time T2 when the rotation speed of the internal combustion engine 91a starts to increase, the rotation speed of the internal combustion engine 91b does not increase, and the internal combustion engine 91b cannot start.
[0128] The operation of the drive control device 1 after time T4 will be described below. When charging of the power storage device 13a is completed at time T4 and the power storage device contactor 18a is opened, the power conversion control unit 33 of the control unit 15a controls the multiple switching elements of the converter 11a, as in the first embodiment, so that the value of the intermediate link voltage V1 rises to a value suitable for supplying to the first inverter 12a and the second inverter 14a.
[0129] After time T4, when the measured value of the intermediate link voltage V1 acquired from the voltage sensor reaches a value suitable for operating the first inverter 12a, the power conversion control unit 33 of the control unit 15a controls the multiple switching elements SW1-SW6 of the first inverter 12a, causing the first inverter 12a to convert DC power to AC power. Specifically, the first inverter 12a converts the DC power supplied from the converter 11a into AC power and supplies the converted AC power to the load device 94a. This enables operation of the load device 94a.
[0130] At time T2, the power conversion control unit 33 of the control unit 15a obtains a determination result indicating that the intermediate link voltage V2 is less than the starting voltage. Therefore, even if the measured value of the intermediate link voltage V2 obtained from the voltage sensor increases to a value suitable for operation of the second inverter 14b after time T4 and the operation command signal S2 indicates a powering command, the power conversion control unit 33 of the control unit 15b keeps the second inverter 14a stopped. This prevents the railway vehicle from starting to move while only some of the internal combustion engines 91a, 91b are running.
[0131] At time T2, the first contactor control unit 31 of the control unit 15a obtains a determination result indicating that the intermediate link voltage V2 is less than the starting voltage. In response to this determination result, at time T5, the first contactor control unit 31 of the control unit 15a closes the inverter contactor 19a, as shown in graph E of FIG. 8 .
[0132] Because the inverter contactor 19b was already closed at time T2, when the inverter contactor 19a is closed at time T5, the secondary terminals 23b, 24b, and 25b of the first inverter 12b connected to the unstarted internal combustion engine 91b via the generator 92b and the converter 11b are electrically connected to the secondary terminals 23a, 24a, and 25a of the first inverter 12a connected to the started internal combustion engine 91a via the generator 92a and the converter 11a. In other words, by closing the inverter contactors 19a and 19b provided in the electrical circuit between the first inverter 12b connected to the unstarted internal combustion engine 91b via the generator 92b and the converter 11b and the first inverter 12a connected to the started internal combustion engine 91a via the generator 92a and the converter 11a, the secondary terminals 23b, 24b, and 25b of the first inverter 12b and the secondary terminals 23a, 24a, and 25a of the first inverter 12a are electrically connected. As a result, as shown by the solid arrows in Fig. 9, AC power output from the first inverter 12a is supplied to the first inverter 12b and the load device 94b via the inverter contactors 19a and 19b, thereby enabling the operation of the load device 94b.
[0133] As in the first embodiment, when AC power is supplied to the secondary side from the first inverter 12a while the switching elements SW1-SW6 are in the off state, the first inverter 12b rectifies the AC power to convert it into DC power and outputs the converted DC power. As indicated by the dotted arrow in Figure 9, the first inverter 12b supplies the DC power to the converter 11b. Because the power storage device contactor 18a is open at time T5, no DC power is supplied from the first inverter 12b to the power storage device 13a.
[0134] 8, when the capacitor of the converter 11b is charged with DC power supplied from the first inverter 12b, the voltage of the capacitor, in other words, the intermediate link voltage V2, increases. The time when the capacitor of the converter 11b is charged and the measured value of the intermediate link voltage V2 reaches the starting voltage is defined as time T7.
[0135] At time T7, the start-up determination unit 34 of the control unit 15b determines that the measured value of the intermediate link voltage V2 is equal to or greater than the start-up voltage, and outputs the determination result to the first contactor control unit 31 and the power conversion control unit 33 of each of the control units 15a and 15b, and the second contactor control unit 32 of the control unit 15b.
[0136] Because the determination result of the start determination unit 34 indicates that the measured value of the intermediate link voltage V1 is equal to or greater than the start voltage, the power conversion control unit 33 of the control unit 15b controls the multiple switching elements of the converter 11b, causing the converter 11b to convert DC power to AC power. More specifically, the converter 11b converts the DC power supplied from the first inverter 12b into AC power and supplies the converted AC power to the generator 92b.
[0137] When the generator 92b receives AC power from the converter 11b, it operates as an electric motor and rotates. Because the shaft of the generator 92b is fixed to the output shaft of the internal combustion engine 91b, the internal combustion engine 91b rotates as the generator 92b rotates, and the rotation speed of the internal combustion engine 91b increases, as shown in graph H of Figure 8. Thereafter, the rotation speed of the internal combustion engine 91b reaches the starting rotation speed R1, and the internal combustion engine 91b starts, at time T8. After time T8, the rotation speed of the internal combustion engine 91b increases, and it becomes possible for the generator 92a to generate power.
[0138] When the rotation speed of the internal combustion engine 91b reaches the starting rotation speed R1 at time T8, the second contactor control unit 32 of the control unit 15b closes the power storage device contactor 18b as shown in graph F of FIG.
[0139] At time T8, after the internal combustion engine 91b starts, when the rotation speed of the internal combustion engine 91b reaches a rotation speed at which the generator 92b can generate electricity, the generator 92b driven by the internal combustion engine 91b starts generating electricity. The generator 92b supplies the generated AC power to the converter 11b.
[0140] At time T8, the internal combustion engine 91b starts, and AC power is supplied from the generator 92b to the converter 11b. The power conversion control unit 33 of the control unit 15b controls the multiple switching elements of the converter 11b, causing the converter 11b to convert the AC power into DC power. In detail, the converter 11b converts the AC power supplied from the generator 92b, which is driven by the internal combustion engine 91b to generate power, into DC power, and outputs the converted DC power.
[0141] After time T8, the power conversion control unit 33 of the control unit 15b controls the multiple switching elements of the converter 11b to increase the value of the DC voltage output by the converter 11b to a value suitable for supplying to the first inverter 12b and the second inverter 14b. The power conversion control unit 33 of the control unit 15b controls the multiple switching elements of the converter 11b as described above, thereby supplying DC power from the converter 11b to the power storage device 13b. This charges the power storage device 13b, and as shown in graph G of FIG. 8 , the voltage of the power storage device 13b begins to increase from the voltage value Vb2. The time when the charging of the power storage device 13b is then completed is defined as time T9. In other words, at time T9, the power storage device 13b is charged with enough power to next start the internal combustion engine 91b.
[0142] At time T9, the charge determination unit 35 of the control unit 15b determines that the measured value of the terminal voltage of the secondary battery of the storage device 13b is greater than or equal to the charge threshold, and sends the determination result to the first contactor control unit 31 of the control units 15a and 15b and the second contactor control unit 32 of the control unit 15b.
[0143] As shown in graphs E and I in Figure 8, at time T9, when the first contactor control units 31 of the control units 15a and 15b obtain a determination result indicating that the measured value of the terminal voltage of the secondary battery of the storage device 13b is equal to or greater than the charging threshold value while the inverter contactors 19a and 19b are turned on, the first contactor control units 31 open the inverter contactors 19a and 19b.
[0144] As shown in graph F of Figure 8, at time T9, when the second contactor control unit 32 of the control unit 15b obtains a determination result indicating that the measured value of the terminal voltage of the secondary battery of the storage device 13b is equal to or greater than the charging threshold, the second contactor control unit 32 opens the storage device contactor 18b.
[0145] After time T8 when the internal combustion engine 91b is started, the power conversion control unit 33 of the control unit 15b controls the multiple switching elements of the converter 11b as described above, so that the value of the intermediate link voltage V2 rises to a value suitable for supplying to the first inverter 12b and the second inverter 14b. In other words, the capacitor C1 of the first inverter 12b and the capacitor of the second inverter 14b are sufficiently charged.
[0146] After time T8, when the measured value of the intermediate link voltage V2 acquired from the voltage sensor rises to a value suitable for operation of the first inverter 12b, the power conversion control unit 33 of the control unit 15b controls the multiple switching elements SW1-SW6 of the first inverter 12b, causing the first inverter 12b to convert DC power to AC power. Specifically, the first inverter 12b converts the DC power supplied from the converter 11b into AC power and supplies the converted AC power to the load device 94b. This enables operation of the load device 94b.
[0147] After time T8, when the measured value of the intermediate link voltage V1 acquired from the voltage sensor rises to a value suitable for operation of the second inverter 14a and the operation command signal S2 indicates a powering command, the power conversion control unit 33 of the control unit 15a controls the multiple switching elements of the second inverter 14a in accordance with the powering command, causing the second inverter 14a to convert DC power to AC power. More specifically, the second inverter 14a converts the DC power supplied from the converter 11a to AC power and supplies the converted AC power to the traction motor 93a. The traction motor 93a, supplied with AC power, rotates to generate propulsion force for the railway vehicle.
[0148] Similarly, after time T8, when the measured value of the intermediate link voltage V2 acquired from the voltage sensor rises to a value suitable for operation of the second inverter 14b and the operation command signal S2 indicates a powering command, the power conversion control unit 33 of the control unit 15b controls the multiple switching elements of the second inverter 14b in accordance with the powering command, causing the second inverter 14b to convert DC power to AC power. Specifically, the second inverter 14b converts the DC power supplied from the converter 11b to AC power and supplies the converted AC power to the traction motor 93b. The traction motor 93b, supplied with AC power, rotates, generating propulsion force for the railway vehicle.
[0149] As described above, according to the drive control device 1 of embodiment 2, even if one of the power storage devices 13a, 13b is discharging, it is possible to start both of the internal combustion engines 91a, 91b. Even when either of the power storage devices 13a, 13b is discharging, it is not necessary to remove the discharging power storage device 13a or 13b from the railway vehicle and charge it using a charging facility, and the drive control device 1 can be obtained that makes it easy to charge the power storage devices 13a, 13b.
[0150] The present disclosure is not limited to the above example. The above circuit configuration is an example and can be changed as desired. As an example, the circuit configuration of the first inverters 12a, 12b is not limited to the example of FIG. 2 and can be any circuit that can convert DC power supplied from the converters 11a, 11b into AC power and convert AC power supplied from the other first inverters 12a, 12b into DC power.
[0151] 10 , in addition to the configuration of the drive control device 1 described above, further includes step-down circuits 41 a and 41 b that step down the DC power supplied from the converters 11 a and 11 b and supply the power to the power storage devices 13 a and 13 b, respectively. Specifically, the main conversion device 2 a included in the drive control device 2 includes a step-down circuit 41 a that steps down the DC power supplied from the converter 11 a and supplies the stepped-down DC power to the power storage device 13 a. The main conversion device 2 b included in the drive control device 2 includes a step-down circuit 41 b that steps down the DC power supplied from the converter 11 b and supplies the stepped-down DC power to the power storage device 13 b.
[0152] As in the first embodiment, even if the output voltage of the converters 11a, 11b rises to a value suitable for the first inverters 12a, 12b and the second inverters 14a, 14b immediately after the start of the internal combustion engines 91a, 91b, the step-down circuits 41a, 41b supply the stepped-down DC power to the power storage devices 13a, 13b, so that the power storage devices 13a, 13b do not need to be large enough to withstand high voltages. This makes it possible to prevent the drive control device 2 from becoming larger.
[0153] In the drive control device 2, when one of the storage devices 13a, 13b is discharging and therefore only the internal combustion engine 91a or 91b is started, one of the first inverters 12a, 12b converts the AC power supplied from the other of the first inverters 12a, 12b into DC power, and supplies the converted DC power to the storage device 13a or 13b via the step-down circuit 41a or the step-down circuit 41b.
[0154] The operation of charging the power storage devices 13a, 13b by the drive control device 1 is not limited to the above example. As an example, when the start determination unit 34 determines that the intermediate link voltage V1 or the intermediate link voltage V2 is less than the start voltage after the charging period, which is the time required to charge the capacitors of the converters 11a, 11b, has elapsed since the start command signal S1 changed from L level to H level, the drive control device 1 may output the determination result of the start determination unit 34 to a display device provided in the driver's cab.
[0155] After outputting the above-mentioned judgment result to a display device provided in the driver's cab, the drive control device 1 may charge the discharging storage device 13a or 13b as shown in embodiment 1 when the driver operates a charging switch to instruct charging of the discharging storage device 13a or 13b.
[0156] When charging of the power storage device 13a or the power storage device 13b that was discharging at the time when the start command signal S1 changed from L level to H level is completed, the drive control device 1 may output a message to the effect that charging is completed to a display device provided in the driver's cab and prompt the driver to stop and restart the drive control device 1. Because the power storage device 13a or the power storage device 13b that was discharging is now charged, in other words, because both the power storage devices 13a, 13b are sufficiently charged, restarting the drive control device 1 will start both the internal combustion engines 91a, 91b.
[0157] As another example, immediately after the start of the internal combustion engines 91a, 91b, the output voltages of the converters 11a, 11b may be maintained at a value suitable for the power storage devices 13a, 13b, which is lower than the value suitable for the first inverters 12a, 12b and the second inverters 14a, 14b, and the power storage devices 13a, 13b may be charged. In this case, when the determination result of the charge determination unit 35 indicates that the charging of the power storage devices 13a, 13b is completed, the power conversion control units 33 included in the control units 15a, 15b each increase the output voltages of the converters 11a, 11b to a value suitable for the first inverters 12a, 12b and the second inverters 14a, 14b, and operate the first inverters 12a, 12b and the second inverters 14a, 14b.
[0158] The operation of the internal combustion engines 91a, 91b after startup is not limited to the above example. When the first inverters 12a, 12b are operating synchronously, the first contactor control units 31 included in the control units 15a, 15b may close the inverter contactors 19a, 19b immediately after startup of the internal combustion engines 91a, 91b.
[0159] The first contactor control unit 31 may close the inverter contactors 19a, 19b when the internal combustion engines 91a, 91b are started, and open the inverter contactors 19a, 19b when both the internal combustion engines 91a, 91b are started. In particular, the first contactor control unit 31 included in the control units 15a, 15b may close the inverter contactors 19a, 19b when the start command signal changes from L level to H level at time T1, as shown in Figure 11. The operation of the drive control device 1 thereafter is the same as the operation of the drive control device 1 according to the first embodiment shown in Figure 6.
[0160] When only the internal combustion engine 91a is started, the power conversion control unit 33 of the control unit 15a may control the multiple switching elements of the second inverter 14a, regardless of the determination result obtained from the start determination unit 34 of the control unit 15b, upon receiving the operation command signal S2 indicating a powering command. This causes the second inverter 14a to convert DC power to AC power and supply the converted AC power to the traction motor 93a. The traction motor 93a, supplied with AC power, generates propulsion power for the railway vehicle. As a result, it is possible to run the railway vehicle even when only the internal combustion engine 91a is started.
[0161] The number of internal combustion engines and main converters mounted on one railway vehicle is not limited to the above example and may be any number equal to or greater than two. Fig. 12 shows a railway vehicle drive system 200 that drives a railway vehicle consisting of cars 100a, 100b, and 100c. In addition to the configuration of railway vehicle drive system 100, railway vehicle drive system 200 includes an internal combustion engine 91c as a power source, a generator 92c that generates AC power when driven by the internal combustion engine 91c, a traction motor 93c that receives a supply of AC power to rotate and generate propulsive force for the railway vehicle, and a load device 94c that operates on a supply of AC power.
[0162] The traction control device 3 included in the railway vehicle traction device 200 includes three main conversion devices 1a, 1b, and 1c. The configurations of the main conversion devices 1a and 1b are the same as those in the first embodiment. The configuration of the main conversion device 1c is the same as that of the main conversion devices 1a and 1b, but with the addition of an inverter contactor 20c. In detail, the main conversion device 1c includes a converter 11c that converts AC power supplied from a generator 92c into DC power and outputs the converted DC power, a first inverter 12c that converts the DC power supplied from the converter 11c into AC power and outputs the converted AC power, a second inverter 14c that converts the DC power supplied from the converter 11c into AC power and supplies the converted AC power to a main electric motor 93c, and a power storage device 13c connected to the converter 11c, the first inverter 12c, and the second inverter 14c. The main conversion device 1c includes a power storage device contactor 18c that switches electrical connections between the power storage device 13c and the converter 11c, the first inverter 12c, and the second inverter 14c, and inverter contactors 19c and 20c. The main conversion device 1c also includes a control unit 15c that controls the converter 11c, the first inverter 12c, the second inverter 14c, the power storage device contactor 18c, and the inverter contactor 19c.
[0163] The main converter 1c is mounted on a vehicle 100c. In order to avoid complicating the drawing, primary terminals, which are DC side terminals, and secondary terminals, which are AC side terminals, of the first inverters 12a, 12b, and 12c, as well as transformers and AC capacitors connected to the secondary terminals of the first inverters 12a, 12b, and 12c are not shown in Fig. 12.
[0164] When the power storage device 13c is in a discharged state, for example, the first inverter 12a supplies AC power to the first inverter 12c via the inverter contactors 19a and 19c, as shown by the solid arrows in Fig. 13 . The first inverter 12c converts the AC power supplied from the first inverter 12a into DC power and outputs the converted DC power. As shown by the dotted arrows in Fig. 13 , the first inverter 12c supplies the DC power to the converter 11c and the power storage device 13c. As a result, when the power storage device 13c is charged, it becomes possible to store sufficient power in the power storage device 13c to next start the internal combustion engine 91c.
[0165] When the power storage device 13b is in a discharged state, for example, the first inverter 12c supplies AC power to the first inverter 12b via the inverter contactors 20c and 19b, as shown by the solid arrows in Fig. 14. The first inverter 12b converts the AC power supplied from the first inverter 12c into DC power and outputs the converted DC power. As shown by the dotted arrows in Fig. 14, the first inverter 12b supplies the DC power to the converter 11b and the power storage device 13b. As a result, when the power storage device 13b is charged, it becomes possible to store sufficient power in the power storage device 13b to next start the internal combustion engine 91b.
[0166] As in embodiment 2, the drive control device 1 may start the internal combustion engine 91a, internal combustion engine 91b, or internal combustion engine 91c that has not been started, and then charge the discharging storage device 13a, storage device 13b, or storage device 13c.
[0167] The hardware configuration of the control units 15a, 15b, and 15c is not limited to the above example. As an example, a modified example of the hardware configuration of the control unit 15a is shown in FIG. 15. As shown in FIG. 15, the control unit 15a may be realized by a processing circuit 84. The processing circuit 84 is connected to the control unit 15b, the converter 11a, the first inverter 12a, the second inverter 14a, the power storage device contactor 18a, and the inverter contactor 19a via an interface circuit 85.
[0168] When the processing circuitry 84 is dedicated hardware, the processing circuitry 84 includes, for example, a single circuit, a composite circuit, a processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array), or a combination thereof. Each unit of the control units 15 a, 15 b may be realized by an individual processing circuit 84 or may be realized by a common processing circuit 84.
[0169] Some of the functions of the control units 15a, 15b, and 15c may be implemented by dedicated hardware, and other functions may be implemented by software or firmware. For example, in the control unit 15a of the drive control device 1 according to the first embodiment, the first contactor control unit 31, the second contactor control unit 32, and the power conversion control unit 33 may be implemented by a processing circuit 84 shown in Fig. 15, and the start determination unit 34 and the charge determination unit 35 may be implemented by a processor 81 shown in Fig. 4 reading and executing a program stored in a memory 82.
[0170] At least a part of the control units 15a, 15b, and 15c may be realized as one function of a train information management system.
[0171] The drive control devices 1, 2, and 3 are not limited to being mounted on railway vehicles, but may also be mounted on any mobile object powered by multiple internal combustion engines, such as a trolleybus.
[0172] The present disclosure allows various embodiments and modifications without departing from the broad spirit and scope of the present disclosure. Furthermore, the above-described embodiments are intended to illustrate the present disclosure and do not limit the scope of the present disclosure. That is, the scope of the present disclosure is defined by the claims, not the embodiments. Various modifications made within the scope of the claims and the meaning of equivalent disclosures are considered to be within the scope of the present disclosure.
[0173] 1, 2, 3 Drive control device, 1a, 1b, 1c, 2a, 2b Main conversion device, 11a, 11b, 11c Converter, 12a, 12b, 12c First inverter, 13a, 13b, 13c Power storage device, 14a, 14b, 14c Second inverter, 15a, 15b, 15c Control unit, 16a, 16b Transformer, 17a, 17b AC capacitor, 18a, 18b, 18c Power storage device contactor, 19a, 19b, 19c, 20c Inverter contactor, 21a, 21b, 22a, 22b Primary terminal, 23a, 23b, 24a, 24b, 25a, 25b Secondary terminal, 31 First contactor control unit, 32 Second contactor control unit, 33 Power conversion control unit, 34 Start determination unit, 35 Charging determination unit, 41a, 41b: step-down circuit, 80: bus, 81: processor, 82: memory, 83: interface, 84: processing circuit, 85: interface circuit, 91a, 91b, 91c: internal combustion engine, 92a, 92b, 92c: generator, 93a, 93b, 93c: traction motor, 94a, 94b, 94c: load device, 100, 200: railway vehicle drive device, 100a, 100b, 100c: vehicle, C1: capacitor, D1, D2, D3, D4, D5, D6: freewheel diode, S1: start command signal, S2: operation command signal, SW1, SW2, SW3, SW4, SW5, SW6: switching element.
Claims
1. A drive control device that controls drive of a railway vehicle powered by a plurality of internal combustion engines, a plurality of converters each provided for one of the internal combustion engines and each provided for a generator that generates AC power by being driven by the internal combustion engine, the converters being capable of bidirectional conversion between AC power and DC power; a plurality of first inverters each provided for each of the converters, each having a primary terminal connected to the converter and a secondary terminal connected to a load device that operates by receiving a supply of AC power, and capable of bidirectional conversion between DC power and AC power; a plurality of power storage devices provided for each of the converters, connected to the converters and the primary terminals of the first inverter, and charged with DC power output by the converters or the first inverter to store power for starting the internal combustion engine; the secondary terminals of the first inverters are connected to each other; When starting up the internal combustion engines, each of the converters converts DC power into AC power and supplies the converted AC power to the generator; When only some of the multiple internal combustion engines are started, the first inverter connected to the internal combustion engines that are not started via the generator and the converter receives a supply of AC power from the first inverter connected to the generator driven by the internal combustion engines that are started via the converter, converts the supplied AC power into DC power, and supplies the converted DC power to at least one of the converter and the power storage device. Drive control device.
2. at least one inverter contactor that electrically connects or disconnects the secondary terminal of any one of the first inverters to or from the secondary terminal of another one of the first inverters; The drive control device according to claim 1 , further comprising: a first contactor control unit that closes or opens the inverter contactor.
3. The first contactor control unit closes each of the inverter contactors when the plurality of internal combustion engines are started. The drive control device according to claim 2.
4. the first contactor control unit, when only some of the multiple internal combustion engines are started, closes at least one of the inverter contactors to electrically connect the secondary terminal of the first inverter connected to the internal combustion engine that is not started via the generator and the converter to the secondary terminal of the first inverter connected to the generator driven by the internal combustion engine that is started via the converter; The drive control device according to claim 2.
5. When only some of the multiple internal combustion engines are started, if the inverter contactor is closed by the first contactor control unit, the first inverter connected to the internal combustion engine that is not started via the generator and the converter receives a supply of AC power from the first inverter connected via the converter to the generator driven by the internal combustion engine that is started, converts the supplied AC power into DC power, and supplies the converted DC power to the power storage device connected to the primary terminals, and the power storage device is charged with the DC power supplied from the first inverter. The drive control device according to claim 4.
6. When only some of the multiple internal combustion engines are started, if the inverter contactor is closed by the first contactor control unit, the first inverter connected to the internal combustion engine that is not started via the generator and the converter receives a supply of AC power from the first inverter connected via the converter to the generator driven by the internal combustion engine that is started, converts the supplied AC power into DC power, and supplies the converted DC power to the converter connected to the primary terminals, and the converter converts the DC power supplied from the first inverter into AC power and supplies the converted AC power to the connected generator. The drive control device according to claim 4.
7. a plurality of power storage device contactors provided for each of the power storage devices, electrically connecting the power storage device to the converter and the primary terminal of the first inverter, or electrically disconnecting the power storage device from the converter and the primary terminal of the first inverter; A second contactor control unit that closes or opens the contactor for the power storage device, the second contactor control unit closes each of the contactors for the power storage device when the multiple internal combustion engines are started, and when the internal combustion engines are started and the power storage device is charged by receiving a supply of DC power from the converter connected to the generator driven by the started internal combustion engines, opens the contactor for the power storage device connected to the charged power storage device. The drive control device according to any one of claims 4 to 6.
8. the second contactor control unit, when starting the plurality of internal combustion engines, opens the contactor for the power storage device connected to the power storage device if a voltage of DC power supplied from the power storage device to the converter is less than a starting voltage that is a voltage required to start the internal combustion engines after closing each of the contactors for the power storage device; The drive control device according to claim 7.
9. Each of the first inverters has a rectifier circuit that rectifies AC power supplied from another first inverter to convert it into DC power and supplies the converted DC power to at least one of the converter and the power storage device. The drive control device according to any one of claims 1 to 6.
10. a plurality of step-down circuits provided for each of the converters, connected to the converter and the primary terminal of the first inverter, stepping down the DC power supplied from the connected converter or the first inverter and supplying the DC power to the power storage device; When the internal combustion engine is started, the converter converts AC power output by the generator driven by the started internal combustion engine into DC power, supplies the converted DC power to the first inverter, and supplies the converted DC power to the power storage device via the step-down circuit. The drive control device according to any one of claims 1 to 6.
11. When only some of the multiple internal combustion engines are started, the first inverter connected to the internal combustion engines that are not started via the generator and the converter receives a supply of AC power from the first inverter connected via the converter to the generator driven by the internal combustion engine that is started, converts the supplied AC power into DC power, and supplies the converted DC power to the power storage device via the step-down circuit. The drive control device according to claim 10.
12. a power conversion control unit that controls the converter and the first inverter, When only a portion of the plurality of internal combustion engines is started, the power conversion control unit controls the converter that receives AC power from the generator driven by the internal combustion engine that is running, so that the converter converts the supplied AC power into DC power and supplies the converted DC power to the first inverter; The power conversion control unit controls the first inverter so that the first inverter converts the supplied DC power into AC power, converts the AC power to be supplied to the load device, and supplies the converted AC power to the load device and the internal combustion engine that is not started via the generator and the converter to a secondary side of the first inverter. The drive control device according to any one of claims 1 to 6.
13. a plurality of second inverters provided for each of the converters, which, when DC power is supplied from the converter, convert the supplied DC power into AC power to be supplied to a main motor, and supply the converted AC power to the main motor; the power conversion control unit controls the converter, the first inverter, and the second inverter; When only a portion of the plurality of internal combustion engines is started, The power conversion control unit controls the first inverter while keeping the second inverter stopped. The drive control device according to claim 12.
