Flood forecasting method based on flood season staging

Through the method of flood season staging and staging parameter calibration, the problem of uncertainty in parameter selection of existing flood forecast models in real-time forecasting is solved, and higher precision and accuracy of flood forecasting are achieved.

WO2024198531A1PCT designated stage expired Publication Date: 2024-10-03ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Patent Information

Application Number
PCT/CN2023/138885
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-30
Filing Date
2023-12-14
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

The uncertainty in simulation errors and parameter selection of existing flood forecast models, especially in real-time flood forecasting, is due to the inability to obtain a posteriori factors such as total sub-flood rainfall, maximum rain intensity during periods, and peak flow, resulting in simulation problems. Errors and uncertainty in parameter selection.

Method used

By studying the distribution pattern of heavy rain duration, floods are divided into flood seasons, and corresponding flood forecast models are established according to different flood seasons. Real-time flood forecasting is performed using staging parameters to accurately locate the current flood season and select a reasonable model.

Benefits of technology

It improves the precision and accuracy of flood forecast models, enables rapid selection of reasonable models in real-time forecasts, and significantly improves the accuracy and qualification rate of flood forecasts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023138885_03102024_PF_FP_ABST
    Figure CN2023138885_03102024_PF_FP_ABST
Patent Text Reader

Abstract

A flood forecasting method based on flood season staging, comprising the following steps: collecting and sorting rainfall data of a research area; obtaining an enveloping curve sequence of daily areal rainfall according to the daily areal rainfall of a river basin, and performing calculation according to an enveloping curve of daily rainfall to obtain flood season stages; performing staging sampling on rainstorm flood, selecting an optimization algorithm, and performing staging optimization on model parameters to obtain staging parameters; selecting a precision evaluation index, and performing model precision evaluation; according to a forecast operation time, selecting model parameters of a flood stage for forecasting; and constructing a stage-based forecast model reflecting rainstorm flood characteristics, thereby more accurately simulating the rainstorm flood characteristics. Additionally, flood stages can be accurately positioned according to current forecast times in actual forecast operations, and a reasonable flood forecast model is quickly and accurately selected. The flood forecasting method based on flood season staging further improves the flood forecasting precision, and has high operability and wide application prospects.
Need to check novelty before this filing date? Find Prior Art

Description

A flood forecasting method based on flood season division

[0001] This application claims priority to the Chinese patent application filed with the China Patent Office on March 30, 2023, with application number 202310333035.6 and invention name “A flood forecasting method based on flood season staging”, the entire contents of which are incorporated by reference into this application. Technical Field

[0002] The present invention relates to fields related to hydrology and water resources, water conservancy and hydropower engineering, and emergency disaster prevention, and in particular to a flood forecasting method based on flood season staging. Background Art

[0003] Flood forecasting is a technology that inputs rainfall into a hydrological model to simulate the outlet flow of a watershed. The effectiveness of the model simulation is crucial to the determination of the model parameters. In the humid areas of southern my country, flood forecasting models mainly use full-storage runoff models. This type of model is a method that combines empirical formulas with physical characteristics. The model is characterized by concentrated input and lumped parameters, and the hydrological elements are homogenized in space and time. This is inconsistent with the watershed object with dispersed input and distributed parameters. The simulated hydrological state cannot find a real correspondence in the watershed, which leads to simulation errors.

[0004] In fact, many scholars have classified floods in consideration of the spatiotemporal distribution characteristics of floods, and obtained corresponding model parameters for different types of floods. In these studies, the classification methods vary and the effects are relatively obvious, but without exception, the factors used to judge the classification are all some a posteriori factors such as the total rainfall of secondary floods, the maximum rainfall intensity during a period of time, the peak flow, the total amount of floods, the duration of secondary flood rainstorms, etc. In real-time flood forecasting operations, when a rainstorm is still in progress, these factors cannot be obtained, which is bound to bring uncertainty to the selection of model parameters.

[0005] Floods have obvious spatiotemporal distribution characteristics. For a specific river basin, the underlying natural geographical factors such as soil, vegetation and river systems in the basin are relatively stable. Therefore, the flood characteristics are mainly determined by the time distribution characteristics, and the time distribution characteristics of floods mainly depend on the time distribution characteristics of rainstorms. The present invention divides floods into stages in time through the study of the time distribution law of rainstorms, and establishes staged flood forecasting models based on this. The parameters of the stage model are calibrated according to the staged rainstorms and floods. In the actual forecasting process, the stage to which the flood belongs is judged according to the time when the flood occurs, and the corresponding parameters are called for flood forecasting. The flood forecasting model calibrated by the sampling method can not only simulate the characteristics of floods in different stages more accurately, but also can accurately find the stage according to the current forecast time during real-time forecasting, and select a reasonable flood forecasting model in time.

[0006] Summary of the Invention

[0007] The purpose of the present invention is to provide a flood forecasting method based on flood season stages to solve the problems raised in the above background technology.

[0008] To achieve the above object, the present invention provides the following technical solutions:

[0009] A flood forecasting method based on flood season stages includes the following steps:

[0010] Acquire historical rainfall data of the study area, and establish rainfall series for multiple stations in the study area based on the historical rainfall data, wherein the rainfall series includes daily rainfall series for the multiple stations;

[0011] Based on the daily rainfall in the study area, the corresponding outer line sequence is calculated, and the flood season stages are obtained according to the outer line of daily rainfall.

[0012] Sampling the rainstorm and flood data of each period to calibrate the flood forecast model in different periods and obtain the corresponding parameters;

[0013] Real-time flood forecasting based on periodized hydrological model parameters.

[0014] Compared with the existing technology, the beneficial effects of the present invention are: it fully considers the differences in seasonal causes of rainstorms and floods, divides rainstorms and floods into flood seasons, calibrates model parameters for rainstorms and floods of different causes, and constructs a stage-by-stage forecasting model that can reflect the characteristics of rainstorms and floods, thereby effectively improving the accuracy of the flood forecasting model; at the same time, in actual forecasting operations, the stage can be accurately located according to the current forecast time, and a reasonable flood forecasting model can be selected quickly and accurately. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 is a flowchart of a flood forecasting method based on flood season division.

[0016] FIG2 is an execution flow chart of a flood forecasting method based on flood season staging.

[0017] Figure 3 shows the temporal distribution of rainfall in the reservoir basin area in a flood forecasting method based on flood season division.

[0018] FIG4 is a schematic diagram of rainstorm floods in the period from April to July selected in a flood forecasting method based on flood season division.

[0019] FIG5 is a schematic diagram of heavy rain and floods in the period from August to October selected in a flood forecasting method based on flood season division. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0021] The specific implementation of the present invention is described in detail below with reference to specific embodiments.

[0022] As shown in FIG1 and FIG2 , a flood forecasting method based on flood season stages provided by an embodiment of the present invention includes the following steps:

[0023] S10, obtaining historical rainfall data of the study area, and establishing rainfall sequences for multiple stations in the study area based on the historical rainfall data, wherein the rainfall sequences include daily rainfall sequences for the multiple stations.

[0024] S20, based on the daily rainfall in the study area, calculate and obtain the corresponding outer line sequence, and calculate and obtain the flood season stages according to the outer line of the daily rainfall (that is, the outer line sequence).

[0025] S30, sampling the rainstorm and flood data of each period to calibrate the flood forecast model by period and obtain corresponding period parameters.

[0026] S40: Perform real-time flood forecasting based on the phased hydrological model parameters (ie, the phased parameters).

[0027] Furthermore, the rainfall sequence is expressed as: P = [P1, P2, ..., P N ].

[0028] Where N is the total number of stations, and the daily rainfall series at the nth station is expressed as: n =[p n1 ,p n2 ,...,p nM ].

[0029] Where M is the total number of time periods.

[0030] Furthermore, the steps of calculating and obtaining the corresponding outer envelope sequence based on the daily rainfall in the study area, and obtaining the flood season stages according to the outer envelope sequence of the daily rainfall specifically include:

[0031] The basin surface rainfall series is obtained based on the Thiessen polygon method:

[0032] Among them, X m is the surface rainfall in the basin on day m, p mi is the daily rainfall at station i during period m, f i is the area weight of site i.

[0033] Find the maximum value sequence of a certain day in the past years: Y t =max(X 1t ,X 2t ,...,X kt ,...,X Kt ).

[0034] Among them, Y t is the maximum daily rainfall on the tth day of the year, t = 1, 2, ..., 365, X kt is the surface rainfall on day t in year k, k = 1, 2, ..., K, K is the total number of years of daily rainfall series at each station, and max(.) is the maximum value.

[0035] The flood season stages are calculated based on the outer envelope of daily rainfall.

[0036] Furthermore, the step of calculating and obtaining the flood season stages based on the outer envelope of daily rainfall specifically includes:

[0037] Using fractal theory to study the flood season phases of daily rainfall series, the outer envelope series of daily rainfall Y t , according to the time span, determine the period length λ and sample Y λ , taking a certain period length ε as the time scale, calculate the capacity dimension D of the sample fractal with a period length λ c , execute the loop to obtain the capacity dimension D of different time periods λ c , if D c If the difference around λ in a certain period does not exceed a certain threshold, then this λ period is a period determined by the fractal method.

[0038] Furthermore, in the step of using fractal theory to study the flood season division of daily rainfall series, the capacity dimension D of two adjacent calculations is selected. c The relative error does not exceed 10%, that is, the threshold is 10%.

[0039] Furthermore, the step of sampling the rainstorm and flood data of each period to calibrate the flood forecast model by period and obtain the corresponding period parameters specifically includes:

[0040] Based on the flood season division, the flood season T is divided into T1, T2, ..., T D , that is, divided into D subsets, where D is the number of periods: T=[T1,T2,...,T D ].

[0041] According to the time span of the phases, select the measured rainstorm data P of the i-th flood in the d phases. di and measured flood data Q di : P=[P 1i ,P 2i ,...,P mi,...,P Mi ], m=1, 2,...,M, d=1, 2,...,D.

[0042] According to the combination of heavy rain and flood in the period [P di , Q di ] T , the constrained variable scaling method is used to optimize the model parameters and obtain T d Parameter C of flood forecast model within period d , the objective function is:

[0043] Among them, Q di,j T d The measured flow of the i-th flood process in the period, T d The forecast flow of the i-th flood process in the period, J is the number of the i-th flood period, I is T d The total number of flood events within the phase.

[0044] Conduct an accuracy assessment of flood forecasts, selecting peak flow error, coefficient of certainty, and pass rate as evaluation indicators;

[0045] The peak flow error: ΔQ m (%)=((Q mcal -Q mobs ) / Q mobs )×100%;

[0046] Coefficient of certainty:

[0047] Pass rate:

[0048] where Q mcal To calculate the peak flow, Q mobs is the measured peak flow; Q t-cal is the calculated flow at time t, Q t-obs is the measured flow rate at time t, is the measured average dry flow rate; A represents the number of qualified forecasts, and B represents the total number of forecasts.

[0049] Furthermore, the step of performing real-time flood forecasting based on the phased hydrological model parameters specifically includes:

[0050] Determine the date corresponding to the current time t.

[0051] According to the current date, it is classified into the flood season stage T d Inside.

[0052] From the calibrated hydrological model stage parameter combination, according to the flood season stage T d Select the corresponding staging parameter C d .

[0053] The pre-processed hydrological data is used as the model input, and the phase parameter C d As a model parameter, the model output is the predicted flow of the control section of the basin outlet, thereby realizing flood forecasting of the outlet sections of each basin in the region.

[0054] In this example, a reservoir basin in the eastern part of a certain place is selected for analysis. The climate of this reservoir basin is suitable and the rainfall is abundant. The average annual precipitation in the basin is 1236 mm. The flood season is from April 15 to October 15. The basin area above the reservoir dam site is 176 km. 2 There are 6 rain gauges in the basin. Rainfall observations have been carried out since 1961. The temporal distribution of surface rainfall in the reservoir basin is shown in Figure 3. The surface rainfall has two peaks in late June and late August to early September, respectively. The outer envelope of daily rainfall is calculated based on the observed rainfall, and the fractal dimension is calculated using the fractal method. With 5% as the control limit of the relative difference of the fractal dimension between two adjacent periods, the flood season can be divided into the following two parts, namely April 15 to July 31 and August 1 to October 15. The characteristics of rainstorm floods in the two flood season subsets are shown in Figures 4 and 5.

[0055] Based on the basic elements of hydrological rainfall and floods, four indicators, namely secondary rainfall amount, maximum rainfall intensity, average rainfall intensity, and peak flow, were selected to analyze a total of 25 floods sampled in different periods (see Table 1). From April 15 to July 31, the total amount of secondary flood rainfall and rainfall intensity were not large, the flood peak flattened significantly, and the flood peak and volume formed at the outlet section were relatively small; from August 1 to October 15, the total amount of secondary flood rainfall and rainfall intensity were large, the confluence time was short, and a flood process with high peak and large volume was formed at the outlet section.

[0056] Table 1 Rainstorm and flood characteristic index table

[0057] The model was calibrated according to the staged rainstorm and flood, and the hydrological model parameters C1 and C2 for different stages were obtained, as shown in Table 2. The relative error ΔQ of the peak flow of historical flood simulation in the period from April 15 to July 31 is shown in Table 2. m The flood qualified rate QR increased from 83% to 92%; the relative error ΔQ of the simulated flood peak flow during the period from August 1 to October 15 was m The flood simulation qualification rate QR was reduced from 11.1% to 9.30%, and the flood forecast model accuracy was significantly improved compared with the case without stage division.

[0058] Table 2 Simulation results of historical floods before and after the period

[0059] According to the system time t, if t is between April 15 and July 31, the C1 parameter set is selected to input the model; if t is between August 1 and October 15, the C2 parameter set is selected to input the model.

[0060] Those skilled in the art will appreciate that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program. The program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in various forms, such as static RAM (SRM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0061] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the disclosure in the specification and examples. This application is intended to cover any variations, uses, or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary techniques in the art not disclosed herein. The description and examples are to be considered merely as exemplary, and the true scope and spirit of the present disclosure are indicated by the claims.

[0062] It should be understood that the present disclosure is not limited to the exact structures that have been described above and shown in the drawings, and that various modifications and changes can be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.

Claims

1. A flood forecasting method based on flood season stages, characterized in that: The following steps are involved: Acquire historical rainfall data of the study area, and establish rainfall sequences of multiple stations in the study area based on the historical rainfall data, wherein the rainfall sequences include daily rainfall sequences of the multiple stations; Based on the daily rainfall in the study area, the corresponding outer line sequence is calculated, and the flood season stages are obtained according to the outer line of daily rainfall; Sampling the rainstorm and flood data of each period to calibrate the flood forecast model in stages and obtain the corresponding stage parameters; Real-time flood forecasting based on staged hydrological model parameters.

2. A flood forecasting method based on flood season division according to claim 1, characterized in that: The rainfall sequence is expressed as: P = [P1, P2, ..., P N ]; Where N is the total number of stations, and the daily rainfall series at the nth station is expressed as: P n =[p n1 ,p n2 ,...,p nM ]; Where M is the total number of time periods.

3. A flood forecasting method based on flood season division according to claim 2, characterized in that: The steps of calculating and obtaining the corresponding outer envelope sequence based on the daily rainfall in the study area, and obtaining the flood season stages according to the outer envelope of the daily rainfall specifically include: Based on the Thiessen polygon method, the basin surface rainfall series is obtained: Among them, X m is the surface rainfall in the basin on the mth day, p mi is the daily rainfall at station i during period m, f i is the area weight of site i; Find the maximum value sequence of a certain day in the past years: Y t =max(X 1t ,X 2t ,...,X kt ,...,X Kt ); Among them, Y t is the maximum daily rainfall on the tth day of each year, t = 1, 2, ..., 365, X kt is the surface rainfall on the tth day of the kth year, k = 1, 2, ..., K, K is the total number of years of the daily rainfall sequence at each station, and max(.) is the maximum value; The flood season stages are calculated based on the outer envelope of daily rainfall.

4. A flood forecasting method based on flood season division according to claim 3, characterized in that: The steps of calculating and obtaining the flood season stages according to the outer envelope of daily rainfall specifically include: Using fractal theory to study the flood season division of daily surface rainfall series, we take the outer envelope series Y of daily rainfall t , according to the time span, determine the period length λ and sample Y λ , taking a certain period length ε as the time scale, calculate the capacity dimension D of the sample fractal with a period length λ c , execute it repeatedly to obtain the capacity dimension D of different time periods λ c , if D c If the difference between the values ​​of λ in a certain period of time does not exceed a certain threshold, then this λ period is a period determined by the fractal method.

5. A flood forecasting method based on flood season division according to claim 4, characterized in that: In the step of using fractal theory to study the flood season division of daily rainfall series, the capacity dimension D of two adjacent calculations is selected. c The relative error does not exceed 10%, that is, the threshold is 10%.

6. A flood forecasting method based on flood season division according to claim 5, characterized in that: The step of sampling the rainstorm and flood data of each period to calibrate the flood forecast model by period and obtain the corresponding period parameters specifically includes: Based on the flood season division, the flood season T is divided into T1, T2, ..., T D , that is, divided into D subsets, where D is the number of installments: T=[T1,T2,...,T D ]; According to the time span of the phases, select the measured rainstorm data P of the ith flood in the d phases. di and measured flood data Q di : P=[P 1i ,P 2i ,...,P mi ,...,P Mi ],m=1、2、...、M,d=1、2、...、D; According to the combination of heavy rain and flood in the period [P di , Q di ] T , the constrained variable scaling method is used to optimize the model parameters and obtain T d Parameter C of flood forecast model within period d , the objective function is: Among them, Q di,j T d The measured flow of the i-th flood process in the period, T d The forecast flow of the i-th flood process in the period, J is the number of the i-th flood period, I is T d Total number of flood events during the period; Conduct flood forecast accuracy assessment, select peak flow error, certainty coefficient and pass rate As an evaluation indicator; The peak flow error: ΔQ m (%) = ((Q mcal -Q mobs ) / Q mobs )×100%; Coefficient of certainty: Pass rate: Where Q mcal To calculate the peak flow, Q mobs is the measured peak flow; Q t-cal is the calculated flow at time t, Q t-obs is the measured flow rate at time t, is the measured average dry flow; A represents the number of qualified forecasts, and B represents the total number of forecasts.

7. A flood forecasting method based on flood season division according to claim 6, characterized in that: The step of performing real-time flood forecasting based on the phased hydrological model parameters specifically includes: Determine the date corresponding to the current time t; According to the current date, it is classified into the flood season stages T d Inside; From the calibrated hydrological model stage parameter combination, according to the flood season stage T d Select the corresponding staging parameter C d ; The preprocessed hydrological data is used as the model input, and the phase parameter C d As a model parameter, the model output is the predicted flow of the control section of the basin outlet, thereby realizing flood forecasting of the outlet sections of each basin in the region.

Citation Information

Patent Citations

  • Pre-rainfall optimal parameter based flood forecasting method

    CN106845771A

  • Method of advanced flood early-warning and forecasting

    CN108416468A

  • Flood staging time determination method

    CN110738407A

  • Railway engineering facility rainstorm flood dynamic risk map analysis method

    CN113762796A

  • Flood forecasting method based on flood season staging

    CN116307233A

Cited By

  • Distributed flood forecasting and dispatching model construction method and system based on sub-basins

    CN119066891A

  • Flood season extreme rainfall sub-season prediction method based on air temperature sequence evolution characteristics

    CN119337613A

  • Method for rasterizing and designing rainstorm intensity based on time decomposition theory

    CN119623120A

  • Flood wave continuous self-correction extraction method and system and medium

    CN119807321A

  • Rainfall prediction method, system and device and storage medium

    CN120044641A