Information processing device, mobile body control method, and mobile body control program

WO2024202104A1PCT designated stage expired Publication Date: 2024-10-03MITSUBISHI HEAVY IND LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/031518
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2023-08-30
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing systems fail to efficiently and flexibly manage interference between manned and unmanned vehicles in work environments, leading to inefficiencies and potential collisions.

Method used

An information processing device that acquires and analyzes schedule information for both manned and unmanned vehicles, determining priorities and adjusting work schedules to prevent interference by setting non-overlapping work periods and routes.

Benefits of technology

Enables efficient and flexible operation by minimizing interference between manned and unmanned vehicles, ensuring safe and timely completion of tasks based on work priorities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023031518_03102024_PF_FP_ABST
    Figure JP2023031518_03102024_PF_FP_ABST
Patent Text Reader

Abstract

This information processing device comprises: an acquisition unit that acquires at least first schedule information including a target position and a schedule time zone of work of a first mobile body that is a manned vehicle; and a processing unit that analyzes interference of work between the first mobile body and a second mobile body that is an unmanned vehicle on the basis of the acquired first schedule information.
Need to check novelty before this filing date? Find Prior Art

Description

Information processing device, mobile body control method, and mobile body control program

[0001] The present disclosure relates to an information processing device, a method for controlling a moving object, and a program for controlling a moving object.

[0002] Controls that suppress interference between moving objects are known. For example, Patent Literature 1 discloses a configuration that prevents interference between an unmanned vehicle that autonomously travels within a mine and a manned vehicle that travels within the mine with a driver.

[0003] Patent No. 6368259

[0004] When performing work using manned and unmanned vehicles, a configuration is required that allows the work to be performed efficiently while flexibly suppressing interference between both manned and unmanned vehicles depending on the work situation.

[0005] The present disclosure has been made in consideration of the above, and aims to provide an information processing device, a method for controlling a mobile body, and a program for controlling a mobile body that can flexibly suppress interference between manned vehicles and unmanned vehicles depending on the work situation while performing work efficiently.

[0006] The information processing device according to the present disclosure includes an acquisition unit that acquires at least first scheduled information including a target location and scheduled time period for work by a first mobile body, which is a manned vehicle, and a processing unit that performs an analysis regarding interference between work between the first mobile body and a second mobile body, which is an unmanned vehicle, based on the acquired first scheduled information.

[0007] The method for controlling a moving body according to the present disclosure includes a step of acquiring at least first scheduled information including a target location and scheduled time period for work by a first moving body, which is a manned vehicle, and a step of analyzing interference between work between the first moving body and a second moving body, which is an unmanned vehicle, based on the acquired first scheduled information.

[0008] The control program for a mobile body according to the present disclosure causes a computer to execute a process of acquiring at least first scheduled information including a target location and scheduled time period for work by a first mobile body, which is a manned vehicle, and a process of analyzing interference between work between the first mobile body and a second mobile body, which is an unmanned vehicle, based on the acquired first scheduled information.

[0009] According to the present disclosure, it is possible to perform work efficiently while flexibly avoiding interference between manned vehicles and unmanned vehicles depending on the work situation.

[0010] FIG. 1 is a schematic diagram of a mobility control system according to this embodiment. FIG. 2 is a schematic diagram of the configuration of a first mobile body. FIG. 3 is a schematic diagram of the configuration of a second mobile body. FIG. 4 is a schematic block diagram of a control device for a second mobile body. FIG. 5 is a schematic block diagram of a management device. FIG. 6 is a schematic block diagram of an information processing device. FIG. 7 is a diagram showing an example of a work order. FIG. 8 is a diagram showing an example of an analysis result displayed on the display unit. FIG. 9 is a diagram showing an example of a workable area. FIG. 10 is a diagram showing another example of the operation of a mobile body. FIG. 11 is a diagram showing an example of candidates for first scheduled information displayed on the display unit. FIG. 12 is a flowchart showing an example of the operation of the information processing device according to this embodiment.

[0011] Preferred embodiments of the present disclosure will be described in detail below with reference to the accompanying drawings. Note that the present disclosure is not limited to these embodiments, and when there are multiple embodiments, the present disclosure also includes configurations in which the respective embodiments are combined.

[0012] (Movement Control System) FIG. 1 is a schematic diagram of a movement control system according to the present embodiment. As shown in FIG. 1, the movement control system 1 according to the present embodiment includes a moving object 10, a management device 12, and an information processing device 14. The movement control system 1 is a system that controls the movement of a moving object 10 belonging to a facility W. The facility W is, for example, a facility that is managed by logistics, such as a warehouse, but may be any facility that operates a moving object 10. In the movement control system 1, the moving object 10 picks up and transports an object P placed within a work area AR of the facility W. The work area AR is an area where an object is placed or where the moving object 10 moves, such as the floor of the facility W. In the present embodiment, the object P transported by the moving object 10 is a transport object in which cargo is loaded on a pallet. However, the object P is not limited to cargo loaded on a pallet and may be in any form, for example, it may be cargo only without a pallet. Furthermore, the moving body 10 is not limited to being one that transports the object P, but may be a device that moves within the facility W for any purpose.

[0013] 1, a work area AR is set in the facility W. The work area AR is an area where the mobile body 10 of this embodiment performs predetermined work such as loading and unloading work. The work area AR includes a first area AR1 and a second area AR2.

[0014] Hereinafter, the X direction refers to a direction along the floor surface of the work area, and the Y direction refers to a direction along the floor surface that intersects with the X direction. In this embodiment, the Y direction is a direction perpendicular to the X direction. The X and Y directions may also be referred to as directions along a horizontal plane. In the X and Y directions, the direction of the arrows is referred to as the + direction (or + side), and the direction opposite the + direction is referred to as the - direction (or - side). Furthermore, the direction perpendicular to the X and Y directions, more specifically, the direction pointing vertically upward, is referred to as the Z direction. Furthermore, in this embodiment, unless otherwise specified, "position" refers to a position (coordinate) in a coordinate system on a two-dimensional plane on the first area AR1 (the coordinate system of the first area AR1). Furthermore, unless otherwise specified, the "attitude (or orientation)" of the moving body 10, etc., refers to the orientation of the moving body 10, etc., in the coordinate system of the first area AR1, and refers to the yaw angle (rotation angle) of the moving body 10 when viewed from the Z direction, with the X direction being 0°.

[0015] The first area AR1 is an area where, for example, objects P to be loaded onto a transport vehicle V or objects P unloaded from a transport vehicle V are placed. The first area AR1 is provided with a plurality of placement areas A in which the objects P are placed. The placement areas A are areas set for placing the objects P and can also be considered areas where the objects P may be installed. The shape and size of the placement areas A are set in advance. In the example of FIG. 1 , the placement areas A are rectangular, but the shape and size may be arbitrary. Furthermore, the placement areas A are partitioned for each object P, and one object P is placed in each placement area A. Depending on the status of the equipment W, an object P may or may not be placed in each placement area A. In the example of FIG. 1 , the placement areas A are set in a row in the Y direction, but the arrangement and number of the placement areas A may be arbitrary.

[0016] The second area AR2 is provided at a position adjacent to the first area AR1. In the example of FIG. 1, the second area AR2 is located on the -Y side of the first area AR1. The second area AR2 has a storage area B. The storage area B stores the object P. The storage areas B are not limited to being arranged side by side in the X and Y directions, and may be arranged side by side in the Z direction, for example, like a shelf.

[0017] (Waypoints) Waypoints WP are set for each position (coordinate) in the working area AR. The movement route of the mobile body 10 is set to connect the waypoints WP. In other words, the route connecting the waypoints WP that the mobile body 10 is scheduled to pass through becomes the movement route of the mobile body 10. The waypoints WP are set according to the layout of the working area AR. For example, the waypoints WP may be set in a matrix pattern in the area in the working area AR where the mobile body 10 can move. Furthermore, the waypoints WP are set in advance according to the position where the object P will be placed within the parking area ARV. Furthermore, the waypoints WP can be set to correspond to the placement area A, etc., where the object P will be placed in the working area AR. For example, the waypoints WP can be set at positions (coordinates) corresponding to each placement area A.

[0018] (Mobile body) In this embodiment, the mobile body 10 includes a first mobile body 10A, which is a manned vehicle that moves by operation of a driver, and a second mobile body 10B that moves autonomously.

[0019] (First Moving Body) FIG. 2 is a schematic diagram of the configuration of the first moving body. The first moving body 10A as a manned vehicle is a device that moves by operation of a driver U. For example, the first moving body 10A moves by being operated by a driver U who is on board the first moving body 10A. However, this is not limited to this, and the first moving body 10A may also move by being remotely operated by a driver U who is not on board the first moving body 10A. Also, in this embodiment, the first moving body 10A is a device that can transport an object. Furthermore, in this embodiment, the first moving body 10A is a forklift. However, the first moving body 10A is not limited to being a forklift that transports an object, and may be any device that can move by being operated by a driver U.

[0020] 2, the first moving body 10A has an operation unit 70, a drive unit 72, an image capture unit 74, an input unit 76, a display unit 78, and a control device 80. The operation unit 70 is an interface mechanism that receives operations from the driver U and may include, for example, a steering wheel, an accelerator, a brake, etc. The drive unit 72 is a drive mechanism that moves the first moving body 10A. The drive unit 72 is driven by operations of the driver U received by the operation unit 70, causing the first moving body 10A to move.

[0021] The image capturing unit 74 is disposed, for example, on a head guard of the first moving body 10A. The image capturing unit 74 is installed facing the ceiling and captures an image of the ceiling. The image capturing unit 74 outputs captured image data to the control device 80.

[0022] The input unit 76 accepts information input by the driver U. Examples of the information input by the driver U include first scheduled information, which will be described later. The input unit 76 may be any of various input devices, such as a touch panel or a keyboard.

[0023] The display unit 78 displays information such as characters, images, etc. The display unit 78 may be, for example, a liquid crystal display or any of various other displays.

[0024] The control device 80 is a device that controls the first mobile body 10A. The control device 80 is a computer and includes a communication unit 82, a storage unit 84, and a control unit 86. The communication unit 82 is a module used by the control unit 86 to communicate with external devices such as the information processing device 14, and may include, for example, an antenna. In this embodiment, the communication method used by the communication unit 82 is wireless communication, but any communication method may be used. The storage unit 84 is a memory that stores various information such as the calculation contents and programs of the control unit 86, and includes, for example, at least one of a main storage device such as a RAM (Random Access Memory), a ROM (Read Only Memory), and an external storage device such as an HDD (Hard Disk Drive).

[0025] The control unit 86 is a computing device and includes an arithmetic circuit such as a CPU (Central Processing Unit). The control unit 86 includes a position estimation unit 88, an information transmission unit 90, and a movement control unit 92. The control unit 86 reads and executes a program (software) from the storage unit 84, thereby realizing the position estimation unit 88, the information transmission unit 90, and the movement control unit 92 and performing their processing. The control unit 86 may perform these processes using a single CPU, or may be equipped with multiple CPUs and perform the processes using the multiple CPUs. Furthermore, at least a portion of the position estimation unit 88, the information transmission unit 90, and the movement control unit 92 may be realized by hardware circuits. Furthermore, the program for the control unit 86 stored in the storage unit 84 may be stored in a recording medium readable by the control device 80.

[0026] The position estimation unit 88 analyzes the photographed data captured by the photographing unit 74 by image processing or the like. The position estimation unit 88 estimates the position of the first moving body 10A in real time based on the analysis result of the photographed data and the moving conditions of the first moving body 10A, such as the speed and steering angle.

[0027] The information transmission unit 90 transmits first moving body information indicating the position and speed of the first moving body 10A and first scheduled information of the first moving body to an external device such as the information processing device 14. The movement control unit 92 controls the movement of the first moving body 10A. Specific processing details of these will be described later. The movement control unit 92 automatically controls the first moving body 10A, for example, automatically stopping the first moving body 10A. However, since the first moving body 10A is a manned vehicle, it does not need to have a function to automatically control the first moving body 10A, in other words, it does not need to include the movement control unit 92.

[0028] (Second Moving Body) FIG. 3 is a schematic diagram of the configuration of the second moving body. The second moving body 10B as an unmanned vehicle is a device capable of moving automatically. In this embodiment, the second moving body 10B is a device capable of transporting an object. Furthermore, in this embodiment, the second moving body 10B is a forklift, more specifically, a so-called AGV (Automated Guided Vehicle) or AGF (Automated Guided Forklift). However, the second moving body 10B is not limited to being a forklift that transports an object, and may be any device capable of moving automatically.

[0029] As shown in FIG. 3 , the second movable body 10B includes a vehicle body 20, wheels 20A, straddle legs 21, a mast 22, a fork 24, a sensor 26A, and a control device 28. The straddle legs 21 are a pair of shaft-shaped members provided at one end of the vehicle body 20 in the longitudinal direction and protruding from the vehicle body 20. The mast 22 is movably attached to the straddle legs 21 and moves in the longitudinal direction of the vehicle body 20. The mast 22 extends in an up-down direction (direction Z in this case) perpendicular to the longitudinal direction. The fork 24 is attached to the mast 22 movably in direction Z. The fork 24 may also be movable laterally of the vehicle body 20 (a direction intersecting the up-down and longitudinal directions) relative to the mast 22. The fork 24 has a pair of claws 24A, 24B. The claws 24A, 24B extend from the mast 22 toward the rear of the vehicle body 20. The claws 24A and 24B are arranged apart from each other in the lateral direction of the mast 22. Hereinafter, in the front-to-rear direction, the direction on the side where the fork 24 is not provided on the second movable body 10B will be referred to as the front direction, and the direction on the side where the fork 24 is provided will be referred to as the rear direction.

[0030] The sensor 26A detects at least one of the position and posture of an object present around the vehicle body 20. It can also be said that the sensor 26A detects at least one of the position of the object relative to the second moving body 10B and the posture of the object relative to the second moving body 10B. In this embodiment, the sensors 26A are provided at the rearward tip of each straddle leg 21 and on the forward side of the vehicle body 20. However, the positions at which the sensors 26A are provided are not limited thereto, and the sensors 26A may be provided at any positions, and the number of sensors provided may also be arbitrary.

[0031] The sensor 26A is, for example, a sensor that emits laser light. The sensor 26A emits laser light while scanning in one direction (here, the horizontal direction), and detects the position and orientation of an object from the reflected light of the emitted laser light. In other words, the sensor 26A can also be said to be a so-called two-dimensional (2D)-LiDAR (Light Detection and Ranging). However, the sensor 26A is not limited to the above and may be a sensor that detects an object by any method. For example, the sensor 26A may be a so-called three-dimensional (3D)-LiDAR that scans in multiple directions, a so-called one-dimensional (1D)-LiDAR that does not scan, or a camera.

[0032] FIG. 4 is a schematic block diagram of a control device of the second moving body. The control device 28 is a device that controls the second moving body 10B. The control device 28 is a computer, and as shown in FIG. 4, includes a communication unit 100, a storage unit 102, and a control unit 104. The communication unit 100 is a module used by the control unit 104 to communicate with external devices such as the information processing device 14, and may include, for example, an antenna. In this embodiment, the communication method used by the communication unit 100 is wireless communication, but any communication method may be used. The storage unit 102 is a memory that stores various information such as the calculation contents and programs of the control unit 104, and includes, for example, at least one of a RAM, a main storage device such as a ROM, and an external storage device such as an HDD.

[0033] The control unit 104 is a computing device and includes a computing circuit such as a CPU. The control unit 104 includes a route acquisition unit 110, a movement control unit 112, and an information transmission unit 114. The control unit 104 reads and executes a program (software) from the storage unit 102, thereby realizing the route acquisition unit 110, the movement control unit 112, and the information transmission unit 114 and performing their processing. The control unit 104 may perform these processes using a single CPU, or may be equipped with multiple CPUs and perform the processes using the multiple CPUs. Furthermore, at least a portion of the route acquisition unit 110, the movement control unit 112, and the information transmission unit 114 may be realized by hardware circuits. Furthermore, the program for the control unit 104 stored in the storage unit 102 may be stored on a recording medium readable by the control device 28.

[0034] The route acquisition unit 110 acquires information about the route along which the second moving body 10B will move, the movement control unit 112 controls the movement mechanisms of the second moving body 10B, such as the drive unit and steering, to control the movement of the second moving body 10B, and the information transmission unit 114 transmits second moving body information indicating the position of the second moving body 10B to an external device such as the information processing device 14. Specific details of these processes will be described later.

[0035] (Management Device) FIG. 5 is a schematic block diagram of the management device. The management device 12 is a system that manages logistics in the facility W. In this embodiment, the management device 12 is a WCS (warehouse control system) or a WMS (warehouse management system). However, the management device 12 is not limited to a WCS or a WMS and may be any system, such as a back-end system such as a production management system. The management device 12 may be installed in any location, and may be installed within the facility W or at a location remote from the facility W to manage the facility W from that location. The management device 12 is a computer, and as shown in FIG. 5, includes a communication unit 30, a memory unit 32, and a control unit 34.

[0036] The communication unit 30 is a module used by the control unit 34 to communicate with external devices such as the information processing device 14, and may include, for example, an antenna. In this embodiment, the communication method used by the communication unit 30 is wireless communication, but any communication method may be used. The storage unit 32 is a memory that stores various information such as the calculation contents and programs of the control unit 34, and may include, for example, at least one of a RAM, a main storage device such as a ROM, and an external storage device such as an HDD.

[0037] The control unit 34 is a calculation device and includes a calculation circuit such as a CPU. The control unit 34 also includes a work order setting unit 40. The control unit 34 implements the work order setting unit 40 and executes its processing by reading and executing a program (software) from the storage unit 32. The control unit 34 may execute the processing using a single CPU, or may be equipped with multiple CPUs and execute the processing using these multiple CPUs. At least a portion of the work order setting unit 40 may also be implemented using a hardware circuit. The program for the control unit 34 stored in the storage unit 32 may also be stored on a recording medium readable by the management device 12.

[0038] The work order setting unit 40 sets a work order for the mobile body 10 for each object P. The work order setting unit 40 causes the set work order to be transmitted from the communication unit 30. The contents of the work order will be described later.

[0039] The management device 12 may also perform processes other than setting the destination position. For example, the management device 12 may also set information for controlling mechanisms (e.g., elevators, doors, etc.) other than the mobile object 10 provided in the facility W.

[0040] (Information Processing Device) FIG. 6 is a schematic block diagram of an information processing device. The information processing device 14 is a device that processes information related to the movement of the mobile object 10. The information processing device 14 is, for example, a Fleet Control System (FCS), but is not limited thereto and may be any device that processes information related to the movement of the mobile object 10. The information processing device 14 is a computer and, as shown in FIG. 6, includes a communication unit 50, a storage unit 52, and a control unit 54. The communication unit 50 is a module used by the control unit 54 to communicate with external devices such as the management device 12 and the mobile object 10, and may include, for example, an antenna. In this embodiment, the communication method used by the communication unit 50 is wireless communication, but any communication method may be used. The storage unit 52 is a memory that stores various information such as the calculation contents and programs of the control unit 54, and may include, for example, at least one of a RAM, a main storage device such as a ROM, and an external storage device such as an HDD.

[0041] The control unit 54 is a computing device and includes a computing circuit such as a CPU. The control unit 54 includes an acquisition unit 60, a setting unit 62, and a processing unit 64. The control unit 54 reads and executes a program (software) from the storage unit 52, thereby realizing the acquisition unit 60, the setting unit 62, and the processing unit 64 and performing their processing. The control unit 54 may perform these processes using a single CPU, or may be provided with multiple CPUs and perform the processes using the multiple CPUs. Furthermore, at least a portion of the acquisition unit 60, the setting unit 62, and the processing unit 64 may be realized by hardware circuits. Furthermore, the program for the control unit 54 stored in the storage unit 52 may be stored on a recording medium readable by the information processing device 14.

[0042] The acquisition unit 60 acquires a work order transmitted from the management device 12. The acquisition unit 60 acquires first work information transmitted from the first mobile body 10A. The acquisition unit 60 acquires second mobile body information transmitted from the second mobile body 10B. The setting unit 62 sets second schedule information for the second mobile body 10B based on the work order. The processing unit 64 analyzes interference between the first mobile body 10A and the second mobile body 10B. Specific processing details of these will be described later.

[0043] In the present embodiment, the management device 12 and the information processing device 14 are separate devices, but they may be integrated devices. That is, the management device 12 may have at least some of the functions of the information processing device 14, and the information processing device 14 may have at least some of the functions of the management device 12.

[0044] (Processing of the mobility control system) The processing content of the mobility control system 1 will be described below.

[0045] (Acquisition of First Schedule Information) When the driver U inputs first schedule information into the input unit 76 of the first moving body 10A, the information transmission unit 90 of the control unit 86 transmits the input first schedule information to the information processing device 14. The first schedule information includes information about the destination location (first destination location) of the work of the first moving body 10A, the scheduled time period for the work, and the priority of the work (first priority). The first schedule information may also include information about the movement route of the first moving body 10A. The first destination location may be any location within the facility W. The first destination location may be a location where the first moving body 10A will perform work, such as the location of an object to be received by the first moving body 10A or the destination location of an object to be transported by the first moving body 10A. The first scheduled time period may be the scheduled time period during which the driver U plans to perform work using the first moving body 10A. The first priority may be set appropriately depending on the work situation, for example, and the first priority may be set relatively high for urgent work and relatively low for ordinary work. In the information processing device 14, the communication unit 50 receives the first scheduled information transmitted from the first mobile object 10A. The acquisition unit 60 of the control unit 34 acquires the received first scheduled information.

[0046] (Acquisition of second scheduled information) The work order setting unit 40 of the management device 12 sets a work order for work to be performed by the second mobile body 10B, which is an unmanned vehicle. A work order is set for each object P. FIG. 7 is a diagram showing an example of a work order. As shown in FIG. 7, the work order includes an order ID, the ID of the object P corresponding to the order ID, source and destination information, the priority of the work, and the ID of the mobile body 10 to which the work is assigned. The work order setting unit 40 causes the communication unit 30 to transmit the set work order.

[0047] In the information processing device 14, the communication unit 50 receives a work order. The acquisition unit 60 acquires the received work order. The setting unit 62 generates second schedule information for the work of the second mobile body 10B based on the acquired work order. The second schedule information includes information on the destination location (second destination location) of the work of the second mobile body 10B, the scheduled time period (second scheduled time period) of the work, and the priority (second priority) of the work. The second schedule information may also include information on the movement path of the second mobile body 10B. The second destination location may be any location within the facility W. The second destination location may be a location where the second mobile body 10B will perform work, such as the location of an object to be received by the second mobile body 10B or the destination location of an object to be transported by the second mobile body 10B. The second scheduled time period may be the scheduled time period during which the work is scheduled to be performed by the second mobile body 10B. The second priority is a priority set in the work order. The acquisition unit 60 acquires the set second schedule information.

[0048] (Analysis 1 Regarding Interference) In the information processing device 14, the processing unit 64 performs an analysis regarding interference between the first moving body 10A and the second moving body 10B based on the acquired first scheduled information and second scheduled information. When the first moving body 10A performs work according to the first scheduled information and the second moving body 10B performs work according to the second scheduled information, the processing unit 64 analyzes whether there is a time period in which the travel paths or destination positions of the first moving body 10A and the second moving body 10B overlap.

[0049] The processing unit 64 determines which of the first moving body 10A and the second moving body 10B will perform the work with the higher priority based on the priorities included in the first schedule information and the second schedule information.

[0050] If the priority included in the second schedule information is higher than the priority included in the first schedule information, the processing unit 64 determines that the second mobile body 10B will perform a task with a higher priority than the first mobile body 10A. In this case, the processing unit 64 transmits the analysis result to the first mobile body 10A. At this time, the processing unit 64 can transmit information that associates the analysis result with the second schedule information by time to the first mobile body 10A.

[0051] The first moving body 10A receives the analysis results via the communication unit 82. The received analysis results are presented to the driver U, for example, by being displayed on the display unit 78. FIG. 8 is a diagram showing an example of the analysis results displayed on the display unit 78. FIG. 8 shows a state in which the number of vehicles passing by the second moving body 10B per predetermined time is superimposed on a map of the working area AR. Note that an indicator 78a may also be displayed on the display unit 78, and by sliding the indicator 78a, changes in the number of vehicles passing by the second moving body 10B per predetermined time may be indicated as the time changes. Furthermore, a portion representing the area in which the first moving body 10A can move and the movement route (the diagonal line portion surrounded by a dashed line in FIG. 8) may be superimposed on the map of the working area AR based on the analysis results.

[0052] The driver U can determine the work content to be performed by the first moving body 10A based on the analysis result. For example, if the analysis result indicates that there is a time period in which the travel routes or destination locations of the first moving body 10A and the second moving body 10B overlap, the driver U can change the first scheduled information so that the work will be performed in a time period in which the travel routes or destination locations of the first moving body 10A and the second moving body 10B do not overlap.

[0053] Furthermore, if the priority included in the second schedule information is higher than the priority included in the first schedule information, the processing unit 64 determines that the first mobile body 10A will perform work of higher priority than the second mobile body 10B. In this case, the processing unit 64 changes the second schedule information for the second mobile body 10B based on the analysis results so as not to interfere with the first mobile body 10A performing work according to the first schedule information. For example, the processing unit 64 can set a time period in which the first mobile body 10A will not perform work as a time period in the second schedule information. The processing unit 64 transmits the changed second schedule information to the second mobile body 10B. The second mobile body 10B receives the adjusted second schedule information and performs work based on the received adjusted second schedule information. Note that the processing unit 64 may notify the first mobile body 10A of a time period other than the time period set in the second schedule information as a time period during which work is available.

[0054] (Analysis 2 Regarding Interference) Note that, in the above example, a case where the second scheduled information is set by the setting unit 62 has been described as an example, but this is not limited to this case. For example, if the first scheduled information is acquired in the information processing device 14 in a state where the second scheduled information is not set, the processing unit 64 can analyze interference between the first moving body 10A and the second moving body 10B based on the acquired first scheduled information, and set the second scheduled information based on the results of the analysis.

[0055] In this case, for example, the processing unit 64 calculates, as an analysis result, a travel route, a destination location, and a scheduled time period that do not overlap with the first scheduled information based on the acquired first scheduled information. Based on the analysis result, the setting unit 62 sets second scheduled information for the second moving body 10B so as not to interfere with the first moving body 10A performing work in accordance with the first scheduled information. The setting unit 62 can set the second scheduled information every time first scheduled information is acquired.

[0056] When setting the second scheduled information, the processing unit 64 can calculate a workable area in which the first moving body 10A can work, for example, based on the analysis results. FIG. 9 is a diagram schematically illustrating an example of a workable area. As shown in FIG. 9, the workable area AR3 can be set to, for example, a range including the destination position and movement route of the first moving body 10A. In this case, the setting unit 62 can set the second scheduled information in accordance with the calculated workable area AR3. In other words, the setting unit 62 can set the second scheduled information so that work is performed outside the calculated workable area AR3. This can reliably prevent interference between the first moving body 10A and the second moving body 10B.

[0057] In addition, the processing unit 64 may change the second scheduled information depending on the manner of work of the first mobile body 10A when work is performed in a manner different from the first scheduled information, such as when the first mobile body 10A deviates from the predetermined route based on the first scheduled information, when work is performed beyond the scheduled time period based on the first scheduled information, or when work is completed earlier than the scheduled time.

[0058] FIG. 10 is a diagram schematically illustrating another example of the operation of the mobile body 10. As shown in FIG. 10 , for example, if the movement route R2 of the first mobile body 10A deviates from the predetermined route R1 based on the first schedule information, the processing unit 64 can change the second schedule information so that all work by the second mobile body 10B is stopped. Furthermore, if the work by the first mobile body 10A is performed beyond the scheduled time period based on the first schedule information, the processing unit 64 can change the scheduled time period for the work by the second mobile body 10B to be delayed. Furthermore, if the work by the second mobile body 10B is completed earlier than the scheduled time, the processing unit 64 can change the scheduled time period for the work by the second mobile body 10B to be advanced.

[0059] The processing unit 64 may also set multiple candidates for the first schedule information and transmit the multiple candidates to the first moving body 10A. FIG. 11 is a diagram schematically illustrating an example of candidates for the first schedule information displayed on the display unit 78. As shown in FIG. 11, the first moving body 10A displays multiple candidates on the display unit 78. Additionally, a configuration may be adopted in which a travel route, work area, etc. to be traveled using the first schedule information can be displayed on a map along with the multiple candidates for the first schedule information. The driver U can select the first schedule information from the multiple candidates displayed on the display unit 78. The driver U can input the selected first schedule information using the input unit 76. The input first schedule information is transmitted from the communication unit 82. The first schedule information is received by the communication unit 50 of the information processing device 14. The received first schedule information is acquired by the acquisition unit 60. In this manner, the acquisition unit 60 acquires a selection result in which the first moving body 10A selects one of the multiple candidates. The processing unit 64 sets the first schedule information based on the acquired selection result.

[0060] (Movement of First Moving Body) The first moving body 10A, which is a manned vehicle, moves by operation of the driver U. The driver U drives the first moving body 10A based on the first scheduled information set as described above, so that the first moving body 10A can perform work in accordance with the first scheduled information.

[0061] (Movement of the Second Moving Body) The second moving body 10B, which is an unmanned vehicle, performs work according to the set second scheduled information. That is, the movement control unit 112 of the second moving body 10B moves the second moving body 10B according to the route acquired by the route acquisition unit 110 during the scheduled time period based on the second scheduled information. More specifically, in this embodiment, the route acquisition unit 110 preferably sets the second route (global path) based on the first route (layout path), which is the movement route of the second scheduled information transmitted from the information processing device 14. In this case, the route acquisition unit 110 sets the second route based on the first route and vehicle specification information of the second moving body 10B. The vehicle specification information includes, for example, specifications that affect the route the second moving body 10B can travel, such as the size and minimum turning radius of the second moving body 10B. Like the first route, the second route is also a route toward a destination position. Furthermore, the second route is a route that the second moving body 10B can follow and that reaches the destination position.

[0062] The movement control unit 112 sequentially grasps the position information of the second moving body 10B, and moves the second moving body 10B so as to pass through a set route (the second route in the example of this embodiment). The method of acquiring the position information of the second moving body 10B is arbitrary. For example, in this embodiment, a detection body (not shown) is provided in the facility W, and the movement control unit 112 acquires information on the position and orientation of the second moving body 10B based on the detection of the detection body. Specifically, the second moving body 10B irradiates a laser beam toward the detection body and receives the laser beam reflected by the detection body to detect its own position and orientation in the facility W. The method of acquiring information on the position and orientation of the second moving body 10B is not limited to using a detection body, and for example, SLAM (Simultaneous Localization and Mapping) may be used.

[0063] The second scheduled information is set by the information processing device 14 so as not to interfere with the work of the first moving body 10A. Therefore, by having the second moving body 10B perform work in accordance with the second scheduled information, it is possible to appropriately avoid interference between the work of the first moving body 10A and the second moving body 10B.

[0064] FIG. 12 is a flowchart illustrating an example of the operation of the information processing device 14 according to this embodiment. As illustrated in FIG. 12 , the information processing device 14 acquires first scheduled information from the first moving body 10A using the acquisition unit 60 (step S10). The processing unit 64 determines whether second scheduled information has been set (step S20). If it is determined that second scheduled information has been set (Yes in step S20), the processing unit 64 acquires the second scheduled information (step S30). The processing unit 64 analyzes interference between the work of the first moving body 10A and the work of the second moving body 10B based on the acquired first scheduled information and second scheduled information (step S40). If, as a result of the analysis, it is determined that there is a time period in which the work of the first moving body 10A interferes with the work of the second moving body 10B (Yes in step S50), the processing unit 64 compares the priorities of the work of the first moving body 10A and the work of the second moving body 10B (step S60). If it is determined in step S60 that the work of the first moving body 10A has a higher priority (Yes in step S60), the analysis result is transmitted to the first moving body 10A (step S70). If it is determined in step S60 that the second moving body 10B has a higher priority (No in step S60), the second scheduled information is changed so as not to interfere with the work of the first moving body 10A (step S80).

[0065] If it is determined in step S20 that the second schedule information has not been set (No in step S20), the processing unit 64 performs an analysis process based on the first schedule information and calculates, as the analysis result, a travel route, a destination location, and a scheduled time period that do not overlap with the first schedule information (step S90).The processing unit 64 sets the second schedule information based on the analysis result (step S100).

[0066] As described above, according to the first aspect of the present disclosure, an information processing device 14 is provided that includes an acquisition unit 60 that acquires at least first scheduled information including the target location and scheduled time period for work by a first mobile body 10A, which is a manned vehicle, and a processing unit 64 that performs analysis regarding work interference between the first mobile body 10A and a second mobile body 10B, which is an unmanned vehicle, based on the acquired first scheduled information.

[0067] According to this configuration, by analyzing interference in work between the first moving body 10A and the second moving body 10B, information regarding interference in work between the first moving body 10A and the second moving body 10B can be acquired in the information processing device 14. By appropriately using this information in the information processing device 14, it is possible to suppress interference in work between the first moving body 10A and the second moving body 10B according to the status of the work while performing the work efficiently.

[0068] According to a second aspect of the present disclosure, in the information processing device 14 according to the first aspect, the acquisition unit 60 acquires second schedule information including a destination location and a scheduled time period for work by the second mobile body 10B, the first schedule information and the second schedule information each include information related to priority, and the processing unit 64 determines which of the first mobile body 10A and the second mobile body 10B is the mobile body 10 performing work with a higher priority. Therefore, by determining the priorities of the first mobile body 10A and the second mobile body 10B, work can be performed appropriately in accordance with the priorities.

[0069] According to the third aspect of the present disclosure, in the information processing device 14 according to the second aspect, when the processing unit 64 determines that the second moving body 10B will perform a task with a higher priority than the first moving body 10A, it transmits the analysis result to the first moving body 10A. Therefore, it is possible to prompt the driver U to reset the first schedule information of the first moving body 10A to match the second moving body 10B that will perform the task with a higher priority.

[0070] According to a fourth aspect of the present disclosure, in the information processing device 14 according to the third aspect, the processing unit 64 transmits information in which the analysis result and the second schedule information are associated by time to the first moving body 10A. Therefore, when prompting the driver U to reset the first schedule information, appropriate information can be presented to the driver U to make it easier for the driver U to avoid the second schedule information of the second moving body 10B.

[0071] According to the fifth aspect of the present disclosure, in the information processing device 14 according to the second aspect, when the processing unit 64 determines that the first moving body 10A will be performing a task with a higher priority than the second moving body 10B, the processing unit 64 changes the second scheduled information of the second moving body 10B based on the analysis result so as not to interfere with the first moving body 10A performing the task according to the first scheduled information. Thus, the second scheduled information of the second moving body 10B can be automatically changed to match the first moving body 10A performing the task with a higher priority.

[0072] According to a sixth aspect of the present disclosure, the information processing device 14 according to the first aspect further includes a setting unit 62 that sets second schedule information for the second moving body 10B based on the analysis result so as not to interfere with the first moving body 10A performing work in accordance with the first schedule information. Thus, the second schedule information can be set efficiently.

[0073] According to a seventh aspect of the present disclosure, in the information processing device 14 according to the sixth aspect, the processing unit 64 sets a plurality of candidates for the first scheduled information and presents the plurality of candidates to the first moving body 10A, the acquisition unit 60 acquires a selection result in which the first moving body 10A selects one of the plurality of candidates, and the processing unit 64 sets the first scheduled information based on the acquired selection result. This makes it possible to broaden the range of choices for the driver U's work schedule.

[0074] According to an eighth aspect of the present disclosure, in the information processing device 14 according to the sixth aspect, the processing unit 64 calculates a workable area in which the first moving body 10A can work based on the analysis results, and the setting unit 62 sets the second schedule information according to the calculated workable area. Therefore, interference between the first moving body 10A and the second moving body 10B can be appropriately avoided.

[0075] According to a ninth aspect of the present disclosure, in the information processing device 14 according to the sixth aspect, when the first moving body 10A performs work in a manner different from the first schedule information, the processing unit 64 changes the second schedule information according to the work manner of the first moving body 10A. Therefore, the work schedule of the second moving body 10B can be flexibly changed according to the work status of the first moving body 10A. Therefore, interference between the first moving body 10A and the second moving body 10B can be suppressed.

[0076] According to a tenth aspect of the present disclosure, in the information processing device 14 according to the sixth aspect, the setting unit 62 sets the second scheduled information each time the first scheduled information is acquired. Therefore, when the first moving body 10A performs a new task, the second moving body 10B performs the task based on the second scheduled information that has been appropriately set each time. This makes it possible to appropriately avoid interference between the first moving body 10A and the second moving body 10B.

[0077] According to an eleventh aspect of the present disclosure, there is provided a method for controlling a mobile body, which includes the steps of acquiring at least first scheduled information including a target location and scheduled time period for work by a first mobile body 10A, which is a manned vehicle, and analyzing work interference between the first mobile body 10A and a second mobile body 10B, which is an unmanned vehicle, based on the acquired first scheduled information.

[0078] According to this configuration, by analyzing interference between the first moving body 10A and the second moving body 10B, it is possible to obtain information regarding interference between the first moving body 10A and the second moving body 10B. By appropriately using this information, it is possible to suppress interference between the first moving body 10A and the second moving body 10B.

[0079] According to a twelfth aspect of the present disclosure, in an information processing device 14 relating to the first aspect, a control program for a mobile body is provided that causes a computer to execute a process of at least acquiring first scheduled information including a target location and scheduled time period for work by a first mobile body 10A, which is a manned vehicle, and a process of analyzing work interference between the first mobile body 10A and a second mobile body 10B, which is an unmanned vehicle, based on the acquired first scheduled information.

[0080] According to this configuration, by analyzing interference between the first moving body 10A and the second moving body 10B, it is possible to obtain information regarding interference between the first moving body 10A and the second moving body 10B. By appropriately using this information, it is possible to suppress interference between the first moving body 10A and the second moving body 10B.

[0081] Although the embodiments of the present disclosure have been described above, the embodiments are not limited to the contents of these embodiments. Furthermore, the above-described components include those that can be easily imagined by a person skilled in the art, those that are substantially the same, and those that are within the so-called equivalent range. Furthermore, the above-described components can be combined as appropriate. Furthermore, various omissions, substitutions, or modifications of the components can be made without departing from the spirit of the above-described embodiments.

[0082] 1 Movement control system 10 Mobile body 10A First mobile body 10B Second mobile body 12 Management device 14 Information processing device 20 Vehicle body 20A Wheel 21 Straddle leg 22 Mast 24 Fork 24A, 24B Claw 26A Sensor 28, 80 Control device 30, 50, 82, 100 Communication unit 32, 52, 84, 102 Memory unit 34, 54, 86, 104 Control unit 40 Work order setting unit 60 Acquisition unit 62 Setting unit 64 Processing unit 70 Operation unit 72 Drive unit 74 Photography unit 76 Input unit 78 Display unit 78a Indicator 88 Position estimation unit 90, 114 Information transmission unit 92, 112 Movement control unit 110 Path acquisition unit A Placement area B Storage area P Object P0 Fixed object R1 Route R2 Travel route U Driver V Transport vehicle ID Order W Equipment X, Z directions AR Work area AR1 First area AR2 Second area AR3 Workable area WP Waypoint

Claims

1. An information processing device comprising: an acquisition unit that acquires at least first scheduled information including a target location and scheduled time period for work of a first moving body, which is a manned vehicle; and a processing unit that performs an analysis regarding interference between work between the first moving body and a second moving body, which is an unmanned vehicle, based on the acquired first scheduled information.

2. The information processing device according to claim 1, wherein the acquisition unit acquires second schedule information including a destination location and a scheduled time period for the work of the second mobile body, the first schedule information and the second schedule information each include information regarding priority, and the processing unit determines which of the first mobile body and the second mobile body is the mobile body that will perform the work with the higher priority.

3. The information processing device according to claim 2, wherein the processing unit transmits the results of the analysis to the first mobile body when it determines that the second mobile body will perform the task with a higher priority than the first mobile body.

4. The information processing device according to claim 3, wherein the processing unit transmits information in which the result of the analysis and the second schedule information are associated with each other by time to the first moving body.

5. The information processing device according to claim 2, wherein when the processing unit determines that the first moving body is performing work of a higher priority than the second moving body, the processing unit changes the second scheduled information of the second moving body based on the results of the analysis so as not to interfere with the first moving body performing work in accordance with the first scheduled information.

6. The information processing device according to claim 2, further comprising a setting unit that sets the second scheduled information for the second moving body based on the results of the analysis so as not to interfere with the first moving body performing work in accordance with the first scheduled information.

7. The information processing device according to claim 6, wherein the processing unit sets multiple candidates for the first scheduled information and presents the multiple candidates to the first mobile body, the acquisition unit acquires a selection result in which the first mobile body selects one of the multiple candidates, and the processing unit sets the first scheduled information based on the acquired selection result.

8. The information processing device according to claim 6, wherein the processing unit calculates a workable area in which the first moving body can work based on the analysis results, and the setting unit sets the second scheduled information according to the calculated workable area.

9. The information processing device according to claim 6, wherein the processing unit changes the second scheduled information in accordance with the manner of work performed by the first moving body when the first moving body performs work in a manner different from the first scheduled information.

10. The information processing device according to claim 6, wherein the setting unit sets the second schedule information every time the first schedule information is acquired.

11. A method for controlling a moving body comprising: a step of acquiring at least first scheduled information including a target position and scheduled time period for a work operation of a first moving body which is a manned vehicle; and a step of analyzing interference between the work operation of the first moving body and a second moving body which is an unmanned vehicle based on the acquired first scheduled information.

12. A control program for a mobile body that causes a computer to execute at least a process of acquiring first schedule information including a target location and a scheduled time period for a task of a first mobile body, which is a manned vehicle, and a process of analyzing interference between tasks between the first mobile body and a second mobile body, which is an unmanned vehicle, based on the acquired first schedule information.

Citation Information

Patent Citations

  • Method and device for preparing carry plan in carrying process, method and device for controlling carry, computer program, and memory medium to be read by computer

    JP2002338052A

  • Cargo handling operation assignment system and method

    JP2018144967A

  • Cargo handling operation allocation system

    JP2018167991A