The traffic management system addresses power shortages in electric vehicles by monitoring battery capacity and re-planning operations to prevent outages, enhancing efficiency and reducing logistical burdens.
Patent Information
- Application Number
- PCT/JP2024/008843
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-28
- Filing Date
- 2024-03-07
- Publication Date
- 2024-10-03
AI Technical Summary
Conventional traffic management systems fail to consider power shortages in electric vehicles, leading to inefficiencies and potential disruptions in logistics operations, especially when unexpected power outages occur due to factors like temperature changes or increased electricity usage for heating.
A traffic management system that monitors the battery capacity of electric vehicles, compares actual and predicted values, and re-plans operations to address power shortages by identifying influencing factors and adjusting unexecuted plans before they become critical, thereby preventing power outages in other vehicles.
This approach enhances the operational efficiency of multiple electric vehicles by accurately predicting and mitigating power shortages, reducing the impact on logistics and customer operations, and ensuring uninterrupted delivery services.
Smart Images

Figure JP2024008843_03102024_PF_FP_ABST
Abstract
Description
Traffic management system and traffic management method
[0001] The present invention relates to a traffic management system and a traffic management method.
[0002] Japanese Patent Laid-Open Publication No. 2016-064752 (Patent Document 1) describes a conventional technology for appropriately correcting a driving plan based on the energy consumption of a vehicle. This publication states that "in a vehicle energy management device (100) that predicts future energy consumption (vehicle state information), creates a control plan, and controls a vehicle, the device determines whether or not a speed re-plan is necessary based on a comparison between an actual measurement value of energy consumption and a predicted value of energy consumption used in the control plan, and if it is determined that a speed re-plan is necessary, the device calculates an error between the actual measurement value of vehicle speed and the speed plan before updating, for at least one of a certain period from the past to the present and the current instant, and reduces the error to update the speed plan from the present onwards, and uses the updated speed plan to recalculate energy and re-plan the control vehicle."
[0003] JP 2016-064752 A
[0004] When planning a vehicle's journey, it is important to avoid situations where the vehicle runs out of energy and is unable to continue traveling. Running out of gas refers to a situation where the vehicle is unable to continue traveling due to a lack of gasoline, while running out of battery power refers to a situation where the vehicle is unable to continue traveling due to a lack of battery power. In recent years, the use of electric vehicles (EVs) that run on battery power has increased. However, because the power used for traveling by EVs is also used for other purposes, such as air conditioning, unexpected battery shortages are a concern. Furthermore, when EVs are used as delivery vehicles for delivering cargo in logistics, if a vehicle runs out of power during delivery, the cargo must be transferred to other vehicles, creating a major problem that cannot be solved simply by moving the vehicle that has run out of power. Furthermore, for example, if the temperature is lower than expected and one vehicle consumes a lot of power due to heating, causing a battery shortage, other vehicles may also run out of power. However, conventional technology does not consider reflecting the occurrence of battery shortages on other vehicles to improve the overall efficiency of vehicle operation.
[0005] Therefore, an object of the present invention is to improve the efficiency of operation of a plurality of electric vehicles.
[0006] In order to achieve the above object, a representative operation management system of the present invention is an operation management system that manages the operation of a plurality of electric vehicles, and includes: an operation planning unit that creates operation plans for the electric vehicles based on preconditions; a replanning necessity determination unit that compares, for electric vehicles traveling in accordance with the operation plan, an actual measured value of remaining battery capacity with a predicted value of remaining battery capacity in the operation plan to determine whether or not the operation plan needs to be replanned; and an influence range detection unit that, for operation plans that have been determined to require replanning, compares the values of the preconditions at the time the operation plan was created with the actual measured values of corresponding conditions, and identifies conditions with differences as factors for the replanning, and is characterized in that the operation planning unit replans unexecuted operation plans that are affected by the conditions identified as factors. Furthermore, one representative operation management method of the present invention is an operation management method for managing the operation of a plurality of electric vehicles, and is characterized by including: an operation planning step in which an operation management server creates an operation plan for the electric vehicles based on preconditions; a replanning necessity determination step in which, for electric vehicles traveling in accordance with the operation plan, an actual measured value of the remaining battery capacity with a predicted value of the remaining battery capacity in the operation plan are compared to determine whether the operation plan needs to be replanned; an influence range detection step in which, for an operation plan for which it has been determined that replanning is necessary, the value of the precondition at the time the operation plan was created is compared with the actual measured value of the corresponding condition, and conditions with differences are identified as factors for the replanning; and a replanning step in which replanning is carried out for unexecuted operation plans that are affected by the conditions identified as factors.
[0007] According to the present invention, it is possible to improve the efficiency of operation of a plurality of electric vehicles. Problems, configurations, and effects other than those described above will become apparent from the following description of the embodiments.
[0008] Configuration diagram of the fleet management server according to the first embodiment Flowchart explaining the processing of the fleet management server Flowchart showing details of determining whether replanning is necessary Flowchart showing details of detecting cause candidates Diagram of data string for detecting cause candidates Diagram of changing the same conditions Specific examples of data Diagram of setting the same conditions Diagram of replanning Flowchart when identifying vehicle conditions and driver conditions as factors
[0009] Hereinafter, an embodiment will be described with reference to the drawings.
[0010] In this first embodiment, an explanation will be given using an example of a fleet management server 20 having the functions of a fleet management system. FIG. 1 is a configuration diagram of the fleet management server 20 according to the first embodiment. The fleet management server 20 is connected to a logistics operation management system 10. The logistics operation management system 10 transmits information such as the origin and destination of cargo, deadlines, and the number of vehicles to the fleet management server 20. Here, the number of vehicles refers to the number of vehicles (delivery vehicles) that deliver cargo in logistics, and each vehicle is an electric vehicle. Furthermore, the fleet management server 20 can communicate with each vehicle and receives remaining battery power and location information from each vehicle.
[0011] The fleet management server 20 creates an operation plan for each vehicle using data received from the logistics operation management system 10 and each vehicle. The fleet management server 20 transmits the operation plan corresponding to each vehicle, and each vehicle runs according to the operation plan. The fleet management server 20 can also transmit the operation plan and the status of each vehicle to the logistics operation management system 10.
[0012] The fleet management server 20 includes an operation planning unit 21, a vehicle state acquisition unit 22, a replanning necessity determination unit 23, an affected area detection unit 24, a similar plan extraction unit 25, and an information acquisition unit 26. The fleet management server 20 may be a computer including a CPU (Central Processing Unit), a main storage device (memory), and an auxiliary storage device. When the fleet management server 20 is a computer, the CPU reads an operation management program from the auxiliary storage device, expands it into the main storage device, and sequentially executes the program to realize functions corresponding to the operation planning unit 21, the vehicle state acquisition unit 22, the replanning necessity determination unit 23, the affected area detection unit 24, the similar plan extraction unit 25, and the information acquisition unit 26.
[0013] The operation planning unit 21 creates an operation plan for an electric vehicle based on vehicle information, a map, driver / vehicle type information, and preconditions, and provides the plan to the vehicle. The vehicle information is information indicating the vehicle's type, etc. The map shows the roads on which the vehicle travels by connecting links and nodes. The driver / vehicle type information indicates the driver's attributes, the characteristics of each vehicle type, etc.
[0014] The preconditions are various conditions that affect the operation of the vehicle and are set by predicting them before the start of the operation. The conditions that affect the operation of the vehicle can include external conditions related to the outside of the vehicle, vehicle conditions related to the vehicle, and driver conditions related to the driver.
[0015] External conditions include weather, events, and traffic congestion. Weather includes rainfall, sunshine, temperature, etc. Events are events that temporarily affect traffic, such as local events, construction work, and accidents. Traffic congestion information is information on traffic congestion predicted based on the day of the week and time of day. Traffic congestion caused by accidents, etc. may be treated as an event. These conditions are also associated with links set on roads.
[0016] If a power shortage is predicted for a vehicle traveling according to an operation plan, the operation planning unit 21 re-plans the operation plan for the vehicle predicted to run out of power. Furthermore, if a power shortage is predicted for a vehicle traveling according to an operation plan and the cause of the power shortage is identified, the operation planning unit 21 re-plans the unexecuted operation plans that are affected by the cause. In other words, if the operation planning unit 21 determines that a re-planning is necessary for a delivery vehicle in the middle of a delivery, it re-plans the operation plan for the delivery vehicle before departure. As a result, an operation plan can be created for a vehicle before departure that takes into account the cause of a power shortage in other vehicles. Specifically, the operation planning unit 21 re-plans the unexecuted operation plans that include a link associated with a cause.
[0017] The vehicle state acquisition unit 22 acquires information on the remaining battery level and the current location from each vehicle, and outputs the information to the replanning necessity determination unit 23 .
[0018] The replanning necessity determination unit 23 compares the actual measured value of the remaining battery capacity of an electric vehicle traveling according to the operation plan with the predicted value of the remaining battery capacity in the operation plan to determine whether replanning of the operation plan is necessary. The actual measured value of the remaining battery capacity is the remaining battery capacity acquired by the vehicle state acquisition unit 22. The predicted value of the remaining battery capacity in the operation plan can be identified by the operation plan created by the operation planning unit 21 and the planning conditions (prediction conditions used in the plan).
[0019] For example, the re-planning necessity determination unit 23 determines whether the route indicated in the operation plan can be completed based on the actual measurement value of the remaining battery charge of the vehicle in motion and the operation plan, and determines that re-planning is necessary if the remaining battery charge is insufficient by the time the vehicle is completed. Alternatively, for example, the re-planning necessity determination unit 23 compares the remaining battery charge of the vehicle in motion with the remaining battery charge at the time of the operation plan, and determines that re-planning is necessary if the remaining battery charge of the vehicle in motion is lower than the remaining battery charge at the time of the operation plan. The re-planning necessity determination unit 23 outputs the conditions of the plan that require re-planning and the operation plan that requires re-planning to the affected range detection unit 24 as re-planning data.
[0020] The information acquisition unit 26 acquires predicted values and trends of various information (temperature information, weather information, event information, congestion information, etc.) and manages them in association with links set on roads. The information acquisition unit 26 outputs predicted values of various information (temperature information, weather information, event information, congestion information, etc.) to the operation planning unit 21. The information acquisition unit 26 compares actual trends with predictions for various information (temperature information, weather information, event information, congestion information, etc.) and outputs the difference to the influence range detection unit 24.
[0021] The influence range detection unit 24 identifies a factor that has made replanning necessary for an operation plan that has been determined to require replanning by the replanning necessity determination unit 23. Specifically, the influence range detection unit 24 compares the values of the preconditions at the time of creating the operation plan that requires replanning with the actual measured values of the corresponding conditions, and identifies a condition with a difference as a factor that requires replanning.
[0022] The affected range detection unit 24 outputs replanning data (conditions of the plan that requires replanning and the operation plan that requires replanning) and cause candidates (identified factors) to the similar plan extraction unit 25.
[0023] The similar plan extraction unit 25 extracts operation plans that include candidate causes as similar plans based on information on the replanning data, candidate causes, driver groups, and vehicle types. Similar plans may be extracted from unexecuted operation plans. For example, if a certain external condition is a candidate cause, operation plans that include a link associated with that external condition in the planned travel route are extracted as similar plans. At this time, the similar plans may be further narrowed down based on matching vehicle conditions and driver conditions.
[0024] The similar plan extraction unit 25 outputs similar plans that include the same conditions as the cause candidates to the operation planning unit 21. The operation planning unit 21 re-plans operation plans for the vehicle predicted to run out of power and the vehicles in the similar plans.
[0025] In this way, the fleet management server 20 estimates the predicted power consumption based on assumed conditions (predicted conditions) for electric vehicles during operation, and then performs a dispatch plan for electric vehicles. When a vehicle is detected that is predicted to run out of power while in operation due to a difference between the predicted conditions and the actual conditions, and rescheduling is required, the fleet management server 20 identifies vehicles among multiple other vehicles that have similar condition differences to the vehicle that requires rescheduling, and performs a dispatch plan for the identified vehicle. This avoids the need for rescheduling while the vehicle is in operation, minimizes the impact on logistics operations, and reduces the load on the customer business management system.
[0026] 2 is a flowchart illustrating the processing of the fleet management server 20. First, the operation planning unit 21 uses the information acquisition unit 26, driver and vehicle type information, vehicle information, and maps to create an operation plan including a buffer (step S101). The operation planning unit 21 transmits the created operation plan to the corresponding vehicles. Each vehicle starts traveling sequentially according to the operation plan it received.
[0027] The vehicle state acquisition unit 22 acquires the remaining battery power from the currently traveling vehicle (step S102). The re-planning necessity determination unit 23 determines whether re-planning is necessary for the currently traveling vehicle (step S103). If re-planning is unnecessary, the process ends. If re-planning is necessary, the influence range detection unit 24 determines as a cause candidate any difference between the predicted value used at the time of planning and the current predicted value (step S104). The similar plan extraction unit 25 sets the driver group (grouping by attributes) and vehicle type at the time of planning as the same conditions (step S105).
[0028] The operation planning unit 21 re-plans the cause candidates and subsequent plans (not yet departed) that meet the same conditions (step S106), and distributes the re-planned operation plans to each vehicle (step S107), thereby completing the process.
[0029] 3 is a flowchart showing the details of the process for determining whether replanning is necessary (step S103). The replanning necessity determination unit 23 first compares the remaining battery charge planned in the operation plan with the current remaining battery charge (step S201). This comparison determines whether the trip will be completed if the current remaining charge changes according to the predicted future trend.
[0030] If the comparison result shows that the current consumption is greater than the planned amount (even when the buffer is taken into consideration) (Step S202; Yes), the re-planning necessity determination unit 23 extracts the operation plan as a plan that will result in a power shortage (Step S203) and ends the processing. If the current consumption is not greater than the planned amount (Step S202; No), the processing ends as is.
[0031] 4 is a flowchart showing the details of the detection of possible causes (step S104). The affected area detection unit 24 first extracts the time until the power runs out during travel and the passing area (the series of links passed through) (step S301).
[0032] The influence range detection unit 24 extracts factors that cause a difference between the predicted time and actual progress at the extracted time and area (step S302).The influence range detection unit 24 compares the latest conditions in the plan for the undeparted train with the conditions at the time of planning using the extracted factors (step S303).
[0033] If the comparison reveals differences in the conditions (step S304; Yes), the influence extent detection unit 24 determines the differing conditions, time periods, and areas as possible causes (step S305) and terminates the process. If there are no differences in the conditions (step S304; No), the process terminates.
[0034] Fig. 5 is an explanatory diagram of a data string for detecting possible causes. In Fig. 5, a prediction that "a power shortage will occur at 11:00" for a certain vehicle is made at the time stage of 10:00. In addition, in this power shortage prediction, the areas through which the vehicle passes are associated as a link string.
[0035] Based on this time and the passed areas, the affected area detection unit 24 determines the difference between the actual progress and the plan. That is, it compares the predicted and actual progress of weather information, event information, and traffic congestion information in the areas passed through up to 10:00. As a result, there is no difference in the event information, there is a temporary difference in the traffic congestion information, and there is a difference in the weather information for all times and areas.
[0036] Therefore, the influence extent detection unit 24 compares the difference between the weather information forecast at the time of planning and the latest forecast. As a result, since there is a difference between the weather information forecast at the time of planning and the latest forecast, the influence extent detection unit 24 determines the weather information as a cause candidate. In FIG. 5, the influence extent detection unit 24 determines "Weather information 11:00-13:00, sunny, 25°C (conditions at the time of planning)" and "Area: D[ ], E[ ]" as cause candidates.
[0037] When there are multiple conditions (factors), each factor may be weighted. The weight of each factor is determined according to the magnitude of its influence and its duration over time. For example, differences in weather have a large influence and also have a duration over time, so a large value is set as the weight. By setting weights in this way, when looking at the differences between the planned value and the latest forecast value, items with a large influence can be prioritized. Differences in items with a small influence can be ignored as errors.
[0038] In the above explanation, the search results are narrowed down based on the condition that the vehicle model and driver group are the same, but it is also possible to set the condition that only either the vehicle model or the driver group is the same. Figure 6 is an explanatory diagram of changing the same condition.
[0039] In FIG. 6 , the replanning necessity determination unit 23 further outputs the replanned data to the similar plan extraction unit 25. The similar plan extraction unit 25 extracts operation plans including candidate causes as similar plans based on the replanned data, candidate causes, driver group, and vehicle type information. When a certain external condition is a candidate cause, the similar plan extraction unit 25 usually narrows down the candidates based on the conditions of the same vehicle type and the same driver group. However, if there is a plan for the same vehicle type that does not result in a battery shortage, it is possible to exclude the vehicle type from the same conditions, considering that the driver group has a large influence as a factor. In other words, in this case, similar plans are extracted by narrowing down the candidates based only on the driver group.
[0040] 7 shows specific examples of data. Weather information associates data such as "sunny, 25°C" with time and link ID. Event information associates time with a string of links affected by the event. Traffic congestion information associates time with the degree of traffic congestion with a link.
[0041] 8 is an explanatory diagram of the setting of the same condition (step S105). In FIG. 8, the search is narrowed down to the condition that the vehicle type and driver group are the same, so all of the unexecuted operation plans that are expected to run out of battery are of vehicle type "A" and of driver group "Group 1."
[0042] Here, the vehicle type is not limited to a broad classification such as a passenger car or a truck, but can be a specific vehicle type name such as a vehicle type A1 of a company A, a vehicle type B2 of a company B, etc. Furthermore, the driver group can be years of experience, carefulness of driving, gender, sensitivity to heat or cold, etc.
[0043] FIG. 9 is an explanatory diagram of replanning (step S106). In FIG. 9, the vehicle type and driver group are the same conditions. The candidate causes are "weather information 11:00-13:00, sunny, 25°C (conditions at the time of planning)" and "area: D[ ], E[ ]", and the same conditions are "vehicle type: A, driver group: Group 1". In FIG. 9, the operation plan that includes the candidate causes and satisfies the same conditions is operation plan ID 2. Therefore, the operation planning unit 21 selectively replans the operation plan with operation plan ID 2.
[0044] In the above description, the case where the external conditions are the factors has been described, but the vehicle conditions and the driver conditions may also be identified as factors. Fig. 10 is a flowchart for identifying the vehicle conditions and the driver conditions as factors.
[0045] The influence range detection unit 24 first selects the external conditions as the factors with priority (step S401). Next, the influence range detection unit 24 determines whether there are any vehicles that will not run out of power under the same external factors. This determination is to determine whether there are electric vehicles that require replanning under the same external conditions and electric vehicles that do not require replanning. If there are no vehicles that will not run out of power under the same external factors (step S402; No), the process ends with the external conditions being the factors.
[0046] If there is a vehicle that will not run out of power with the same external factors (step S402; Yes), the influence range detection unit 24 preferentially selects the vehicle conditions as the factors (step S403). Next, the influence range detection unit 24 determines whether there is a vehicle that will not run out of power with the same external factors and vehicle conditions. This determination is to determine whether there are electric vehicles that require replanning with the same vehicle conditions and electric vehicles that do not require replanning. If there is no vehicle that will not run out of power with the same external factors and vehicle conditions (step S404; No), the process ends with the vehicle conditions being the factors.
[0047] If there is a vehicle that has the same external factors and vehicle factors and does not run out of power (step S404; Yes), the influence range detection unit 24 selects the driver condition as the factor (step S405) and ends the process.
[0048] As described above, the fleet management server 20 is a fleet management system that manages the operation of multiple electric vehicles, and includes: a fleet planning unit 21 that creates a fleet plan for the electric vehicles based on preconditions; a replanning necessity determination unit 23 that compares the actual measured values of remaining battery power for electric vehicles traveling according to the fleet plan with the predicted values of remaining battery power in the fleet plan to determine whether the fleet plan needs to be replanned; and an influence range detection unit 24 that, for a fleet plan for which replanning is determined to be necessary, compares the values of the preconditions at the time of creation of the fleet plan with the actual measured values of corresponding conditions and identifies any conditions with differences as factors for the replanning. The fleet planning unit 21 replans unexecuted fleet plans that are affected by the conditions identified as factors. Therefore, if a vehicle is predicted to run out of battery after departure, this can be reflected in the fleet plan for the vehicle before departure, thereby avoiding running out of battery in other vehicles and improving the efficiency of the operation of multiple electric vehicles.
[0049] Furthermore, the replanning necessity determination unit 23 determines whether or not the route indicated in the operation plan can be completed based on the actual measurement value of the remaining battery charge and the operation plan, and determines that the replanning is necessary if the remaining battery charge is insufficient before the operation is completed. Therefore, it is possible to accurately determine whether the electric vehicle is running out of battery power and perform replanning.
[0050] Furthermore, the fleet management server 20 uses at least one of weather, an event, and traffic congestion as the pre-condition and the condition, so that it is possible to predict a power shortage based on various external conditions that affect the operation.
[0051] The operation management server 20 further includes an information acquisition unit 26 that acquires the preconditions and the conditions and manages them in association with links set on roads, and the operation planning unit 21 replans the operation plans that include the links associated with the factors among the unexecuted operation plans. In this way, by associating the conditions with the links, it is possible to selectively replan for vehicles that are scheduled to travel the same route.
[0052] The preconditions and the conditions include external conditions related to the outside of the vehicle, vehicle conditions related to the vehicle, and driver conditions related to the driver. Therefore, the causes of the power shortage can be accurately determined by taking into account the vehicle conditions and the driver conditions.
[0053] Furthermore, the influence range detection unit 24 preferentially identifies the external conditions as the cause, and when there are electric vehicles that require replanning and electric vehicles that do not require replanning under the same external conditions, it preferentially identifies the vehicle conditions as the cause, and when there are electric vehicles that require replanning and electric vehicles that do not require replanning under the same vehicle conditions, it identifies the driver conditions as the cause. Therefore, it is possible to predict and avoid power shortages caused by the vehicle or the driver.
[0054] Furthermore, the electric vehicles are delivery vehicles that deliver cargo in logistics, and when it is determined that replanning is necessary for a delivery vehicle that is currently delivering, the operation planning unit 21 replans the operation plan of the delivery vehicle before departure. This reduces the management burden of logistics and enables efficient delivery.
[0055] The present invention is not limited to the above-described embodiments, but includes various modifications. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to those including all of the described configurations. Furthermore, not only can the configurations be deleted, but also replacements and additions of configurations are possible.
[0056] 10: Logistics operation management system, 20: Operation management server, 21: Operation planning unit, 22: Vehicle state acquisition unit, 23: Replanning necessity determination unit, 24: Influence range detection unit, 25: Similar plan extraction unit, 26: Information acquisition unit
Claims
1. A traffic management system that manages the operation of a plurality of electric vehicles, comprising: an operation planning unit that creates operation plans for the electric vehicles based on pre-conditions; a replanning necessity determination unit that, for electric vehicles traveling in accordance with the operation plan, compares actual measured values of remaining battery power with predicted values of remaining battery power in the operation plan to determine whether or not replanning of the operation plan is necessary; and an influence range detection unit that, for an operation plan for which replanning is determined to be necessary, compares values of the pre-conditions at the time the operation plan was created with actual measured values of corresponding conditions and identifies conditions with differences as factors for the replanning, wherein the operation planning unit replans unexecuted operation plans that are affected by the conditions identified as factors.
2. An operation management system as described in claim 1, wherein the re-planning necessity determination unit determines whether or not it is possible to complete the route indicated in the operation plan based on the actual measured value of the remaining battery charge and the operation plan, and determines that re-planning is necessary if the remaining battery charge is insufficient before the operation can be completed.
3. A traffic management system according to claim 1, characterized in that at least one of weather, events, and traffic congestion is used as the pre-condition and the condition.
4. An operation management system as described in claim 1, further comprising an information acquisition unit that acquires the pre-conditions and the conditions and manages them in association with links set on a road, and the operation planning unit re-plans operation plans among the unexecuted operation plans that include links to which the factors are associated.
5. A traffic management system as described in claim 1, characterized in that the pre-conditions and the conditions include external conditions relating to the outside of the vehicle, vehicle conditions relating to the vehicle, and driver conditions relating to the driver.
6. A traffic management system as described in claim 5, wherein the influence range detection unit preferentially identifies the external conditions as the factor, and when there are electric vehicles that require re-planning and electric vehicles that do not require re-planning under the same external conditions, the unit preferentially identifies the vehicle conditions as the factor, and when there are electric vehicles that require re-planning and electric vehicles that do not require re-planning under the same vehicle conditions, the unit identifies the driver conditions as the factor.
7. An operation management system as described in claim 1, wherein the plurality of electric vehicles are delivery vehicles that deliver cargo in logistics, and the operation planning unit, when it is determined that replanning is necessary for a delivery vehicle that is currently making a delivery, replans the operation plan of the delivery vehicle before departure.
8. A traffic management method for managing the operations of a plurality of electric vehicles, comprising: an operation planning step in which an operation management server creates an operation plan for the electric vehicles based on pre-conditions; a replanning necessity determination step in which, for electric vehicles traveling according to the operation plan, an actual measured value of remaining battery power with a predicted value of remaining battery power in the operation plan to determine whether or not replanning of the operation plan is necessary; an influence range detection step in which, for the operation plans for which replanning is determined to be necessary, values of the pre-conditions at the time of creation of the operation plan are compared with actual measured values of corresponding conditions, and conditions with differences are identified as factors for the replanning; and a replanning step in which replanning is implemented for unexecuted operation plans that are affected by the conditions identified as factors.
Citation Information
Patent Citations
Vehicle energy management apparatus
JP2016064752A
Operation plan generation device and operation plan generation method
JP2015060570A
Operation management device and operation planning method for electric vehicle
JP2015092328A
Operation plan creation support apparatus, operation plan creation support method, and program
JP2018072897A
Power management system and power management method
JP2022089523A