Charging plan creating system, information processing device, information processing method, and recording medium
The charging plan creation system uses machine-learned models to optimize charging timing and location for electric vehicles at airports, addressing inefficiencies and congestion by considering work schedules and battery capacities, thus enhancing operational efficiency and adapting to changing flight schedules.
Patent Information
- Application Number
- PCT/JP2024/010306
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-31
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-03
AI Technical Summary
Current systems struggle to determine optimal charging timing for a wide variety of electric vehicles at airports, especially considering sudden changes in aircraft departure and arrival times and varying charging capacities, leading to inefficiencies and congestion.
A charging plan creation system that uses machine-learned prediction models for each electric vehicle type, taking into account work schedules, battery capacity, and charging station locations to determine optimal charging start times and locations, providing real-time updates and recommendations to user terminals.
The system effectively manages charging operations by reducing waiting times, alleviating congestion at charging stations, and improving the operational efficiency of electric vehicles by adapting to current situations and changes in flight schedules.
Smart Images

Figure JP2024010306_03102024_PF_FP_ABST
Abstract
Description
Charging plan creation system, information processing device, information processing method, and recording medium
[0001] The present invention relates to a charging plan creation system, an information processing device, an information processing method, and a program.
[0002] Patent Document 1 describes an energy management device that, assuming that the electrification of business vehicles at airports will progress as a measure against global warming, includes an acquisition unit that acquires the remaining charge of storage batteries installed on aircraft, and a plan creation unit that uses the remaining charge of the storage batteries to create a power usage plan that is a power usage plan for airport facilities, which are airport equipment.
[0003] Furthermore, Patent Literature 2 describes an example of a charging management system that suppresses charging congestion for electric vehicles within an airport as a technology for managing the charging timing of multiple electric vehicles operating within the airport. The system described in Patent Literature 2 includes a collection unit that collects information on arrival and departure information and the amount of baggage on arriving and departing flights, a planning unit that creates a work plan for electric vehicles operating at the airport based on the information collected by the collection unit, and a determination unit that determines the charging timing for each electric vehicle based on the work plan created by the planning unit. The charging timing for each electric vehicle is determined taking into account the work period for each electric vehicle, the distance between the charging site and the work area where work will be performed during the work period, and the battery capacity of each electric vehicle.
[0004] JP 2022-45029 A JP 2021-12566 A
[0005] However, the technology described in the above-mentioned patent documents creates a work plan for electric vehicles working at an airport based on the amount of baggage for departing and arriving aircraft, and determines the charging timing for each electric vehicle based on the work plan. Therefore, the technology described in the above-mentioned patent documents has the problem of not being able to propose charging timing that is appropriate for the current situation, which differs from the plan, for example, by not taking into account sudden changes in aircraft arrival and departure times or cases where an electric vehicle cannot be charged at the instructed charging timing.
[0006] In view of the above-described problems, an example of an object of the present invention is to provide a charging plan creation system, an information processing device, an information processing method, and a program that solve the problem that it is difficult to appropriately determine charging timings for the wide variety of electric vehicles operating at airports in accordance with the current situation.
[0007] According to one aspect of the present invention, there is provided an information processing device comprising: a first model generated for each type of electric vehicle used at an airport, the first model receiving information including the work content of the electric vehicle as an input and the predicted power consumption of the electric vehicle as an output; an acquisition means for acquiring a current work schedule including the work content of each of the plurality of electric vehicles; and a plan creation means for inputting the work content identified based on the work schedules of the plurality of electric vehicles into the first model corresponding to each type of electric vehicle, and using the output of the first model, creating a charging plan for the plurality of electric vehicles including information regarding the charging start timing and power supply for each of the electric vehicles.
[0008] According to one aspect of the present invention, there is provided a charging plan creation system comprising: a user terminal of a user who uses a plurality of electric vehicles used at an airport; and an information processing device, wherein the information processing device has: a first model that, for each model of the plurality of electric vehicles, receives as input information including work content of the electric vehicle and outputs a predicted amount of power consumption of the electric vehicle; an acquisition means for acquiring a current work schedule including work content for each of the plurality of electric vehicles; a plan creation means that inputs the work content identified based on the work schedules of the plurality of electric vehicles into the first model corresponding to each model of the electric vehicle, and creates a charging plan for the plurality of electric vehicles including a charging start timing and a power supply for each of the electric vehicles using the output of the first model; and a provision means that provides information about the charging plan to the user terminal.
[0009] According to one aspect of the present invention, there is provided an information processing method, wherein one or more computers have a first model generated for each type of electric vehicle used at an airport, the first model having information including the work content of the electric vehicle as input and the predicted power consumption of the electric vehicle as output, the one or more computers obtain a current work schedule including the work content of each of the electric vehicles, input the work content identified based on the work schedules of the electric vehicles into the first model corresponding to each type of electric vehicle, and use the output of the first model to create a charging plan for the electric vehicles including information regarding the charging start timing and power supply for each of the electric vehicles.
[0010] According to one aspect of the present invention, a computer has a first model, which is generated for each type of electric vehicle used at an airport, and which receives information including the work content of the electric vehicle as an input and outputs the predicted power consumption of the electric vehicle; and a program is provided to cause the computer to execute: an acquisition process to acquire a current work schedule including the work content of each of the plurality of electric vehicles; and a plan creation process to input the work content identified based on the work schedules of the plurality of electric vehicles into the first model corresponding to each type of electric vehicle, and to create a charging plan for the plurality of electric vehicles using the output of the first model, which includes information regarding the charging start timing and power supply for each of the electric vehicles.
[0011] Another aspect of the present invention may be a program that causes at least one computer to execute the method of the above aspect, or a computer-readable recording medium on which such a program is recorded. This recording medium includes a non-transitory tangible medium. This computer program includes computer program code that, when executed by a computer, causes the computer to perform the information processing method on an information processing device.
[0012] Any combination of the above components, and any transformation of the present invention into a method, device, system, recording medium, computer program, etc., are also valid aspects of the present invention.
[0013] Furthermore, the various components of the present invention do not necessarily have to be independent entities, but may be formed as a single member by multiple components, one component may be formed from multiple components, one component may be part of another component, or part of one component may overlap with part of another component, etc.
[0014] Furthermore, although the method and computer program of the present invention describe a number of steps in a sequential order, the order in which the steps are described does not limit the order in which the steps are executed. Therefore, when implementing the method and computer program of the present invention, the order of the steps can be changed as long as it does not cause any problems in terms of the content.
[0015] Furthermore, the multiple steps of the method and computer program of the present invention are not limited to being executed at different times, and therefore, a step may occur while another step is being executed, or the execution timing of a step may partially or completely overlap with the execution timing of another step, etc.
[0016] According to one aspect of the present invention, there are provided a charging plan creation system, an information processing device, an information processing method, and a program that can appropriately determine charging timings for a wide variety of electric vehicles operating at an airport in accordance with the current situation.
[0017] 1 is a diagram illustrating an overview of an information processing device according to an embodiment. FIG. 2 is a flowchart illustrating an example of operation of an information processing device according to an embodiment. FIG. 3 is a diagram conceptually illustrating a system configuration of a charging plan creation system according to an embodiment. FIG. 4 is a diagram for explaining an overview of a charging plan creation system according to an embodiment. FIG. 5 is a block diagram illustrating an example of a hardware configuration of a computer that realizes an information processing device. FIG. 6 is a functional block diagram illustrating an example of a logical configuration of an information processing device according to an embodiment. FIG. 7 is a diagram illustrating an example of a data structure of work schedule information. FIG. 8 is a diagram illustrating an example of a data structure of user information. FIG. 9 is a diagram illustrating an example of a notification screen displayed on a display of a user terminal. FIG. 10 is a diagram illustrating an example of a data structure of flight information. FIG. 11 is a diagram illustrating an example of a data structure of aircraft information. FIG. 12 is a flowchart illustrating an example of operation of an information processing device according to an embodiment. FIG. 13 is a functional block diagram illustrating an example of a logical configuration of an information processing device according to an embodiment. FIG. 14 is a diagram illustrating an example of a data structure of vehicle information. FIG. 15 is a diagram illustrating an example of a data structure of vehicle-specific charging history information. FIG. 16 is a diagram illustrating an example of a data structure of power supply device information. FIG. 17 is a diagram illustrating an example of a data structure of power supply device-specific power supply history information. FIG. 18 is a diagram illustrating an example of a data structure of power consumption prediction information. FIG. 19 is a diagram illustrating an example of a data structure of power supply device usage prediction information. FIG. 19 is a flowchart illustrating an example of operation of an information processing device according to an embodiment. FIG. 19 is a diagram illustrating an example of a predicted usage status screen of a power supply device. FIG. 19 is a diagram illustrating an example of a detailed screen of a predicted usage status of a power supply device. FIG. 1 is a diagram showing an example of a predicted usage status screen in a map format. FIG. 2 is a diagram conceptually illustrating a system configuration of a charging plan creation system according to an embodiment. FIG. 3 is a functional block diagram showing an example of a logical configuration of an information processing device according to an embodiment. FIG. 4 is a diagram for explaining parameter information and an optimization model used for optimization. FIG. 5 is a diagram for explaining parameter information and an optimization model used for optimization. FIG. 6 is a diagram showing an example of a data structure of recommendation information. FIG. 7 is a diagram showing an example of a charging plan screen. FIG. 8 is a flowchart showing detailed procedures of a charging plan creation process. FIG. 9 is a diagram conceptually illustrating a system configuration of a charging plan creation system according to an embodiment. FIG. 10 is a diagram showing an example of a data structure of vehicle-specific work status information. FIG. 11 is a diagram showing an example of a data structure of work history information. FIG. 12 is a diagram showing an example of a reservation screen. FIG. 13 is a diagram showing an example of a data structure of power supply reservation information by power supply.
[0018] Hereinafter, embodiments of the present invention will be described with reference to the drawings. In all drawings, similar components are designated by similar reference numerals, and their description will be omitted as appropriate. In addition, in the following drawings, configurations of parts that are not related to the essence of the present invention are omitted and are not shown.
[0019] In the embodiments, "acquisition" includes at least one of the following: a device going to retrieve data or information stored in another device or storage medium (active acquisition); and inputting data or information output from another device into the device (passive acquisition). Examples of active acquisition include making a request or inquiry to another device and receiving a response, and accessing and reading information from another device or storage medium. Examples of passive acquisition include receiving information that is distributed (or transmitted, push notification, etc.). Furthermore, "acquisition" may also mean selecting and acquiring data or information from received data or information, or selecting and receiving distributed data or information.
[0020] <Minimum Configuration Example> Fig. 1 is a diagram illustrating an overview of an information processing device 100 according to an embodiment. The information processing device 100 includes an acquisition unit 102, a plan creation unit 104, and a prediction model 122. The prediction model 122 (first model) is a model generated for each type of electric vehicle 50 used at the airport. The prediction model 122 (first model) receives information including the work content of the electric vehicle 50 as input and outputs the predicted power consumption of the electric vehicle 50. The acquisition unit 102 acquires a current work schedule including the work content of each of the electric vehicles 50. The plan creation unit 104 inputs the work content identified based on the work schedules of the electric vehicles 50 into the prediction model 122 (first model) corresponding to the type of each electric vehicle 50, and uses the output of the prediction model 122 to create a charging plan for the multiple electric vehicles 50, including information regarding the charging start timing and the power supply device 20 for each electric vehicle 50.
[0021] 2 is a flowchart showing an example of operation of the information processing device 100 according to the embodiment. The acquisition unit 102 acquires a current work schedule including work details for each of the multiple electric vehicles 50 (step S101). The plan creation unit 104 inputs the work details identified based on the work schedules for the multiple electric vehicles 50 into a prediction model 122 (first model) corresponding to the vehicle type of each electric vehicle 50, and uses the output of the prediction model 122 to create a charging plan for the multiple electric vehicles 50 including information on the charging start timing and the power supply device 20 for each electric vehicle 50 (step S103).
[0022] This information processing device 100 can solve the problem of difficulty in appropriately determining the timing of charging electric vehicles operating at airports in accordance with the current situation.
[0023] A detailed example of the information processing device 100 will be described below.
[0024] (First embodiment) <System overview> Fig. 3 is a diagram conceptually showing a system configuration of a charging plan creation system 1 according to an embodiment. The charging plan creation system 1 includes an information processing device 100 and user terminals 200a, 200b, ... (hereinafter, referred to as user terminals 200 unless there is a need to particularly distinguish) used by users of a plurality of electric vehicles 50a, 50b, ... (the number of vehicles is not limited. hereinafter, referred to as electric vehicles 50 unless there is a need to particularly distinguish). The information processing device 100 is connected to the user terminals 200 via a communication network 3.
[0025] The information processing device 100 is a computer such as a server computer. The user terminal 200 is a computer such as a smartphone, a tablet terminal, or a personal computer. Alternatively, the user terminal 200 may be a computer that implements a navigation device or the like installed in the electric vehicle 50. The user terminal 200 is a terminal used by at least one of a worker who performs work using the electric vehicle 50, or their manager, and the driver of the electric vehicle 50. Hereinafter, the worker who uses the user terminal 200 or their manager will be referred to as a "user."
[0026] The information processing device 100 includes a storage device 120. The storage device 120 may be provided inside or outside the information processing device 100. In other words, the storage device 120 may be hardware that is integrated with the information processing device 100, or may be hardware that is separate from the information processing device 100.
[0027] The storage device 120 includes prediction models 122 (shown as prediction models 122a, 122b, ... in the figure, but the number is not limited. Furthermore, when there is no particular need to distinguish between them, they are referred to as prediction models 122) generated for each of the multiple electric vehicles 50.
[0028] At airports, various operations are performed to keep airplanes flying (for example, loading luggage, refueling, transporting and boarding / disembarking crew and passengers, simple inspection and maintenance, etc.). Commercial vehicles are used for these operations. The area where these operations are performed is called an apron. When the commercial vehicles are electric vehicles, the electric vehicles 50 can receive power from power feeders 20 (shown in the figure as power feeders 20a, 20b, ..., but the number is not limited; and when there is no need to distinguish between them, they are simply referred to as power feeders 20) installed in the apron.
[0029] The electric vehicle 50 uses electricity as at least a portion of its power source. The electric vehicle 50 of the embodiment is either an electric vehicle (EV) or a plug-in hybrid vehicle (PHV). However, the electric vehicle 50 may also be a fuel cell vehicle (FCV). In the case of a fuel cell vehicle, the electric vehicle 50 is refueled with fuel (hydrogen) at a hydrogen station instead of using a power supply device 20 described below.
[0030] The electric vehicle 50 has a storage battery (not shown) that stores electricity as a power source, and the storage battery can be charged using the power supply device 20. The location where the power supply device 20 is installed is also called a "station."
[0031] The electric vehicle 50 is a vehicle that performs various tasks at an airport. Examples of the electric vehicle 50 include at least one of a towing tractor that tows an aircraft, a tractor with a dolly attached that transports containers, a catering car that loads in-flight supplies onto an aircraft, a high-lift loader that loads cargo containers into the cargo hold, a belt loader that loads passenger baggage into the cargo hold, and a water tanker that supplies water to an aircraft. However, the electric vehicle 50 is not limited to these.
[0032] The power supply device 20 is electrically connected to the electric vehicle 50 and charges the storage battery of the electric vehicle 50. Although it depends on the amount of charge required by the storage battery of the electric vehicle 50, it takes, for example, several tens of minutes to several hours to supply power per electric vehicle 50. Therefore, if many electric vehicles 50 visit a station at the same time to charge, it will be crowded and the waiting time will be long, which is inefficient.
[0033] Work within the apron is performed by companies contracted for each task or by each airline. However, because information about each company's work is not shared, it is difficult to grasp all of each company's work schedules. Furthermore, workers working at airports work in shifts, and charging tends to occur during shifts when workers change positions. Furthermore, because work schedules are based around flight schedules, the work hours of the electric vehicle 50 overlap before and after aircraft takeoffs and landings, and the power supply demand for the electric vehicle 50 tends to be concentrated during the same times. Furthermore, flights are often delayed due to weather and various other factors, and flight schedules are often subject to sudden changes. Consequently, work schedules also change suddenly.
[0034] Therefore, without using the charging plan creation system 1, as shown in the left diagram of Fig. 4, when an electric vehicle 50 needs to be charged, it may stop at nearby charging stations AA, BB, and CC in that order, and finally be able to be charged at the last station D. Alternatively, if another electric vehicle 50 is already being charged at a station, the electric vehicle 50 may have to wait at that station until the charging of the other electric vehicle 50 is finished.
[0035] Meanwhile, the charging plan creation system 1 determines the optimal charging timing and charging location for each electric vehicle 50 using a prediction model 122 that has been machine-learned by the information processing device 100 for each electric vehicle 50, and provides the information to a user terminal 200 of the user of the electric vehicle 50. Therefore, as shown in the right diagram of Fig. 4 , the electric vehicle 50 can go directly to the recommended charging station DD without visiting other stations and charge without waiting.
[0036] <Hardware Configuration Example> Fig. 5 is a block diagram illustrating an example of the hardware configuration of a computer 1000 that realizes the information processing device 100. The user terminal 200 in Fig. 3 is also realized by the computer 1000. Alternatively, a control device (not shown) and a navigation device (not shown) mounted on the electric vehicle 50 in Fig. 3 are also realized by the computer 1000.
[0037] The computer 1000 has a bus 1010 , a processor 1020 , a memory 1030 , a storage device 1040 , an input / output interface 1050 , and a network interface 1060 .
[0038] The bus 1010 is a data transmission path for transmitting and receiving data among the processor 1020, memory 1030, storage device 1040, input / output interface 1050, and network interface 1060. However, the method of connecting the processor 1020 and the like to each other is not limited to bus connection.
[0039] The processor 1020 is implemented by a CPU (Central Processing Unit), a GPU (Graphics Processing Unit), or the like.
[0040] The memory 1030 is a main storage device realized by a RAM (Random Access Memory) or the like.
[0041] The storage device 1040 is an auxiliary storage device realized by a hard disk drive (HDD), a solid state drive (SSD), a memory card, a read only memory (ROM), or the like. The storage device 1040 stores program modules that realize each function of the information processing device 100 (e.g., the acquisition unit 102, the plan creation unit 104, the model generation unit 112 described below, the provision unit 106, etc.). The processor 1020 loads each of these program modules into the memory 1030 and executes them, thereby realizing each function corresponding to the program module. The storage device 1040 may also store each data of the storage device 120.
[0042] The program module may be recorded on a recording medium. The recording medium on which the program module is recorded may include a non-transitory, tangible medium usable by the computer 1000, and the program code readable by the computer 1000 (processor 1020) may be embedded in the medium.
[0043] The input / output interface 1050 is an interface for connecting the computer 1000 with various input / output devices. The input / output interface 1050 also functions as a communication interface for performing short-range wireless communication such as Bluetooth (registered trademark) and NFC (Near Field Communication).
[0044] The network interface 1060 is an interface for connecting the computer 1000 to the communication network 3. This communication network 3 is, for example, a local area network (LAN) or a wide area network (WAN). The network interface 1060 may be connected to the communication network 3 wirelessly or by wire.
[0045] The computer 1000 is connected to necessary devices (for example, operation keys, a keyboard, a mouse, an operation unit such as a touch panel, a display, a speaker, a microphone, a camera, etc.) via an input / output interface 1050 or a network interface 1060. The display is, for example, a liquid crystal display, an organic EL (Electro-Luminescence) display, etc., and is not particularly limited.
[0046] The components of the information processing device 100 of each embodiment shown in Figure 1 and Figure 7 (described later) are realized by any combination of hardware and software of the computer 1000 of Figure 5. Those skilled in the art will understand that there are various variations in the realization method and device. The functional block diagram showing the information processing device 100 of each embodiment shows logical functional blocks rather than a hardware-based configuration.
[0047] <Functional Configuration Example> Fig. 6 is a functional block diagram showing an example of the logical configuration of the information processing device 100 according to the embodiment. The information processing device 100 according to the embodiment further includes a providing unit 106 in addition to the configuration of the information processing device 100 in Fig. 1. However, the providing unit 106 may be realized by a computer other than the information processing device 100, such as a web server.
[0048] The prediction model 122 (first model) is a model generated for each type of electric vehicle 50 used at the airport, and takes information including the work content of the electric vehicle 50 as input and the predicted power consumption of the electric vehicle 50 as output.
[0049] The acquisition unit 102 acquires a current work schedule including work details of each of the multiple electric vehicles 50 and stores the work schedule information 140 in the storage device 120. Information related to the work schedule may be acquired in a predetermined format file (e.g., iCalendar (The Internet Calendaring and Scheduling Core Object Specification) format, CalDAV (Calendaring Extensions to WebDAV (Web-based Distributed Authoring and Versioning)) format, CSV (Comma Separated Values) format, etc.) from a schedule program of a computer of each outsourcing company. Alternatively, the work schedule of each worker (electric vehicle) may be input by an input operation of a person in charge or a worker performing the work on a work schedule input screen on a predetermined page of a website provided by the charging plan creation system 1. These input operations can be performed using, for example, a personal computer (not shown) of each outsourcing company or a computer such as a mobile terminal used by the worker. The information processing device 100 may acquire the work schedule input to the charging plan creation system 1 using these computers. Alternatively, the information processing device 100 may accept input of information regarding business schedules in a predetermined application installed on the user terminal 200 described below, or in a My Page displayed upon logging in on a predetermined website viewed on the user terminal 200.
[0050] FIG. 7 is a diagram showing an example data structure of work schedule information 140. For each electric vehicle 50, work schedule information 140 includes information indicating the vehicle model, information indicating the date, and, for each task, information indicating the task item, information indicating the work location, and information indicating the start and end times of the task. However, the end time of a task included in work schedule information 140 may instead be information indicating the duration of the task. In other words, the end time of a task may be calculated from the start time of the task and the time required to perform the task from the start time. Furthermore, if the task item is determined by the vehicle model, it does not need to be included in work schedule information 140.
[0051] The plan creation unit 104 inputs the work content identified based on the business schedules of the multiple electric vehicles 50 into a prediction model 122 (first model) corresponding to the vehicle type of each electric vehicle 50. Then, using the output of the prediction model 122, the plan creation unit 104 creates a charging plan for the multiple electric vehicles 50, including the charging start timing for each electric vehicle 50 and information on the power supply device 20 (for example, location information of the power supply device 20).
[0052] As described above, the work content includes a work start time and a work end time. The plan creation unit 104 creates a charging plan using information on at least one of the work start time and the work end time corresponding to the output of each electric vehicle 50 from the prediction model 122.
[0053] For example, the plan creation unit 104 estimates a fluctuation (decrease) in the charge amount based on a predicted value of power consumption based on the work content of each electric vehicle 50 on that day, which is output from the prediction model 122. Then, the plan creation unit 104 identifies a period other than work time from a predetermined time (e.g., one hour) before the time when the estimated remaining charge of the storage battery becomes less than a first threshold (e.g., 40% of the battery capacity) to the time when the estimated remaining charge of the storage battery becomes less than a second threshold (e.g., 30% of the battery capacity). Then, the plan creation unit 104 determines the charging start time so that the identified period other than work time includes a charging time (e.g., 40 minutes as the time required for charging).
[0054] As described above, the work content includes the work location for each electric vehicle 50. The plan creation unit 104 creates a charging plan by further using the work location corresponding to the output of each electric vehicle 50 in the prediction model 122.
[0055] For example, the plan creation unit 104 determines the power supply device 20 based on a time other than the specified work time, location information of the work location of the electric vehicle 50 before and after the time, and location information of the power supply device 20. In other words, the plan creation unit 104 preferentially determines, as the charging location, from among the multiple power supply devices 20, a power supply device 20 that is close to the work location where the electric vehicle 50 will be working before the charging start time or after the charging end time.
[0056] The providing unit 106 provides information related to the charging plan to the user terminal 200. In order to receive the information related to the charging plan via the user terminal 200, the user of the electric vehicle 50 and the user terminal 200 makes at least one of the following preparations in advance: (1) Installing and starting a predetermined application in the user terminal 200; (2) Accessing a predetermined website using a browser or the like on the user terminal 200; (3) If the navigation device of the electric vehicle 50 includes the user terminal 200, downloading and starting a predetermined application in the navigation device.
[0057] The predetermined application and the predetermined website are an application and a website for receiving services provided by the charging plan creation system 1. Therefore, after the above steps (1) to (3), the user of the electric vehicle 50 and the user terminal 200 further performs the following operations at least at the time of first use. (4) Using the user terminal 200, the user registers account information including the user's identification information and authentication information (for example, a password, biometric authentication information, etc.), thereby obtaining the account information. Then, the user enters the account information using the user terminal 200 and logs in to the charging plan creation system 1.
[0058] Furthermore, in the user registration, in order to link the account information to the electric vehicle 50 used by the user, the information processing device 100 accepts registration of identification information of the electric vehicle 50. That is, the information processing device 100 accepts identification information of the electric vehicle 50 that is the target for notifying the user terminal 200 of the timing of charging, and stores the identification information in the storage device 120 as user information 180 in association with the account information.
[0059] However, it is also possible that one user uses multiple electric vehicles 50 and the electric vehicle 50 they use changes depending on their work schedule. Therefore, linking the user to the electric vehicle 50 does not have to be performed at the time of user registration. For example, the acquisition unit 102 may link the user (user ID) and the electric vehicle 50 (vehicle ID) to information indicating the usage time in accordance with the acquired work schedule, and store this in the storage device 120 as second user information (not shown).
[0060] FIG. 8 is a diagram showing an example data structure of user information 180. The user information 180 associates, for each user, identification information capable of identifying the user (hereinafter referred to as a user ID), authentication information, identification information capable of identifying the user terminal 200 (hereinafter referred to as a terminal ID), and identification information capable of identifying the electric vehicle 50 (hereinafter referred to as a vehicle ID). The user information 180 is stored in the storage device 120, or the memory 1030 or storage device 1040 of the computer 1000. Note that various information described below may also be stored in the storage device 120, or the memory 1030 or storage device 1040 of the computer 1000. In the following description, the phrase "stored in the storage device 120" is used to mean "stored in the storage device 120, or the memory 1030 or storage device 1040 of the computer 1000."
[0061] The identification information of the user terminal 200 is not particularly limited as long as it can identify the user terminal 200, and may be, for example, a mobile phone number or an email address that can be received by the terminal. The identification information of the electric vehicle 50 is not particularly limited as long as it can identify the electric vehicle 50, and may be the vehicle registration number or uniquely assigned identification information.
[0062] 9 is a diagram showing an example of a notification screen 300 displayed on the display of the user terminal 200. In the case of an application, the notification screen 300 may be displayed as a pop-up on the display of the user terminal 200 in the form of a push notification, for example, or may be displayed on the top page of the application. In the case of a website, the notification screen 300 may be displayed on the top page that is displayed after logging in, for example. In both the case of an application and a website, a message indicating that there is a new notification may be displayed on the top page, and the notification screen 300 may be displayed on the page where the notification is viewed.
[0063] The notification screen 300 includes information indicating a recommended timing for charging that is generated based on the business schedule of the electric vehicle 50. The notification screen 300 includes a power supply device display field 302, a charging start time display field 303, a charging end time display field 304, a map display button 306, and a reservation button 308.
[0064] The power supply device display field 302 displays the name of the power supply device 20 at the recommended location. The charging start time display field 303 displays the recommended time to start charging. The charging end time display field 304 displays the estimated charging end time if charging starts at the recommended charging start time. The map display button 306 is a GUI (Graphical User Interface) that accepts a user operation to display a map showing the location of the recommended power supply device 20. The reservation button 308 is a GUI that accepts a user operation to instruct the execution of a reservation with the recommended charging schedule contents.
[0065] When the providing unit 106 receives a press of the map display button 306, in this example, the providing unit 106 causes the user terminal 200 to display a screen including a map indicating the location of station BB of the recommended power supply device 20. The map may include not only the location of station BB but also the location of the electric vehicle 50. Furthermore, the map may include information indicating a route from the location of the electric vehicle 50 to the location of the recommended power supply device 20. Furthermore, the map may provide navigation along the route from the location of the electric vehicle 50 to the location of the recommended power supply device 20.
[0066] Furthermore, after making a charging reservation, the providing unit 106 may notify the user that the charging start time is approaching a predetermined time (for example, 5 minutes) before the charging start time, and may display the notification screen 300 as information indicating the reserved charging schedule.
[0067] The work content acquired by the acquisition unit 102 and used by the plan creation unit 104 to create the charging plan further includes flight information 150 of the airplane that is the target of the work performed by the electric vehicle 50. The flight information 150 further includes information about the airline operating the airplane. The work content may also include aircraft information 152.
[0068] FIG. 10 is a diagram illustrating an example data structure of flight information 150. The flight information 150 can be obtained from each airline's server (not shown) and stored in the storage device 120. The flight information 150 includes information scheduled in advance and information that is updated as needed when changes to the flight occur. The flight information 150 includes information indicating the flight's scheduled date, and for each flight, the flight name, information indicating the departure or arrival point, information indicating stopover points, identification information for identifying the aircraft (hereinafter referred to as aircraft ID), the number of passengers, the departure time, and the amount of baggage. Furthermore, if a flight is delayed, the flight information 150 may also include information regarding the delay. The information regarding the delay may be stored separately from the flight information 150.
[0069] The plan creation unit 104 includes at least the arrival and departure points of the aircraft, the amount of luggage, and extreme information.
[0070] Furthermore, when a change occurs in the flight information 150, the acquisition unit 102 acquires the changed flight information 150, and the plan creation unit 104 performs processing to update the charging plan. There are various possible methods for detecting a change in the flight information 150, including, but not limited to, the following examples. (Example 1) Information indicating a change notification and the changed flight information 150 are received from an airline server (not shown). (Example 2) When flight delay information is received from the airline, the information processing device 100 displays a screen for accepting input of changes on the display of the information processing device 100, and accepts input of the changes through an operation by the operator.
[0071] 11 is a diagram showing an example of the data structure of the aircraft information 152. The aircraft information 152 is information that indicates basic information about the aircraft. The aircraft information 152 can be obtained from a server (not shown) of each airline and is stored in the storage device 120. The aircraft information 152 includes, for each aircraft, an aircraft ID, the number of passengers that can be accommodated, and a maintenance menu.
[0072] When creating the charging plan, the plan creation unit 104 may further use information related to the current remaining amount of power of the electric vehicle 50. Therefore, the acquisition unit 102 acquires information related to the current remaining amount of power of the storage battery of the electric vehicle 50.
[0073] The information relating to the current remaining amount of power in the storage battery of the electric vehicle 50 will be described in detail in an embodiment to be described later.
[0074] <Operation Example> An operation example of the information processing device 100 according to the embodiment will be described below. FIG. 12 is a flowchart illustrating an operation example of the information processing device 100 according to the embodiment. The acquisition unit 102 acquires a current work schedule including work details for each of the multiple electric vehicles 50 (step S101). The plan creation unit 104 inputs the work details identified based on the work schedules for the multiple electric vehicles 50 into a prediction model 122 corresponding to the vehicle type of each electric vehicle 50. Then, the plan creation unit 104 uses the output of the prediction model 122 to create a charging plan for the multiple electric vehicles 50 including information about the charging start timing and the power supply device 20 for each electric vehicle 50 (step S103). The provision unit 106 provides information about the charging plan to the user terminal 200 (step S105).
[0075] The providing unit 106 displays, for example, the notification screen 300 shown in FIG. 9 on the display of the user terminal 200 .
[0076] Furthermore, the acquisition unit 102 and the plan creation unit 104 repeatedly execute the processes of steps S101 and S103 (hereinafter also referred to as update processes). For example, by executing the update processes every hour in real time, for example, when a change occurs in the work content (for example, a delay in the flight arrival or departure time), the acquisition unit 102 and the plan creation unit 104 can update the charging plan in response to the change in real time. Alternatively, the acquisition unit 102 and the plan creation unit 104 may execute the update processes every day before the start of work.
[0077] As described above, according to the present embodiment, the information processing device 100 includes an acquisition unit 102, a plan creation unit 104, and a provision unit 106. The acquisition unit 102 acquires a current work schedule including work details for each of the multiple electric vehicles 50. The plan creation unit 104 inputs the work details identified based on the work schedules for the multiple electric vehicles 50 into a prediction model 122 corresponding to the vehicle type of each electric vehicle 50. Then, the plan creation unit 104 uses the output of the prediction model 122 to create a charging plan for the multiple electric vehicles 50 including information about the charging start timing for each electric vehicle 50 and about the power supply device 20 (for example, information indicating the location of the power supply device 20). The provision unit 106 provides information about the charging plan to the user terminal 200.
[0078] As described above, according to the present embodiment, a charging plan can be created for the charging timings of the wide variety of electric vehicles 50 working at the airport, taking into consideration the work schedules of each electric vehicle 50 and using the prediction model 122 that has been machine-learned for each vehicle type of the electric vehicle 50. Therefore, according to the present embodiment, it is possible to obtain a charging plan creation system, an information processing device, an information processing method, and a program that can make appropriate decisions in accordance with the current situation.
[0079] Furthermore, work at airports is generally performed by companies commissioned by each airline. Therefore, it has been difficult to update the charging timing taking into account the work content of multiple commissioned companies, sudden changes in the departure and arrival times of each airline's aircraft, and the actual charging status of each electric vehicle. According to this embodiment, it is possible to consolidate the work content of multiple different commissioned companies and update the charging timing taking into account sudden changes in the departure and arrival times of each airline's aircraft and the actual charging status of each electric vehicle.
[0080] Second Embodiment <Functional Configuration Example> Fig. 13 is a functional block diagram showing an example of the logical configuration of an information processing device 100 according to an embodiment. This embodiment differs from the above-described embodiments in that it has a configuration in which a prediction model 122 is machine-learned for each vehicle model. Although Fig. 13 does not show the plan creation unit 104 of the information processing device 100 of Fig. 1 or Fig. 6, the information processing device 100 of this embodiment may include the same configuration as the information processing device 100 of Fig. 1 or Fig. 6. Furthermore, the configuration of this embodiment may be combined with at least one of the configurations of the other embodiments to the extent that no contradiction occurs.
[0081] The information processing device 100 includes an acquisition unit 102, a model generation unit 112, and a provision unit 106. The acquisition unit 102 acquires various information necessary for machine learning, such as past performance data. The information for machine learning includes vehicle information 130 of the electric vehicle 50, vehicle battery information 132, and vehicle-specific charging history information 134.
[0082] The model generation unit 112 calculates a relational expression between the work content and power consumption, and generates prediction models 122a, 122b, ... of power consumption for each vehicle type. The model generation unit 112 trains the prediction model 122 for each vehicle type using the past charging records of each electric vehicle 50, the past usage records and business information of each power supply device 20, flight schedules, weather, etc.
[0083] 14 is a diagram showing an example of the data structure of the vehicle information 130. The vehicle information 130 includes basic information about each electric vehicle 50. For example, the vehicle information 130 includes identification information that can identify the electric vehicle 50, information indicating the model of the electric vehicle 50, information indicating the charging type of the storage battery of the electric vehicle 50 (information indicating whether the storage battery is compatible with normal charging or rapid charging), the capacity of the storage battery of the electric vehicle 50, and the mileage on a full charge as information indicating the deterioration status of the storage battery of the electric vehicle 50. The mileage on a full charge of the electric vehicle 50 is preferably calculated and updated periodically using information indicating the charging record of the storage battery of the electric vehicle 50 (vehicle-specific charging history information 134 and vehicle battery information 132), which will be described later.
[0084] FIG. 15 is a diagram showing an example of the data structure of the vehicle battery information 132. The vehicle battery information 132 is stored in the storage device 120 for each electric vehicle 50. The vehicle battery information 132 associates information indicating the remaining capacity of the storage battery of the electric vehicle 50, which is periodically collected from the electric vehicle 50, with time information at which the information was collected. Various methods for acquiring the information indicating the remaining capacity of the storage battery of the electric vehicle 50 are possible, and are not particularly limited. (Example 1) The acquisition unit 102 may receive information indicating the remaining capacity of the storage battery held by the computer 1000 controlling the electric vehicle 50 directly from the computer 1000 of the electric vehicle 50 using a wireless communication function. (Example 2) The computer 1000 of the electric vehicle 50 may periodically transmit the information indicating the remaining capacity of the storage battery to a server (not shown) that manages the electric vehicle 50 using a wireless communication function. The acquisition unit 102 may then acquire the information indicating the remaining capacity of the storage battery of the electric vehicle 50 from the server. (Example 3) The power supply history information 162 by power supply device, which will be described later, is received from a server (not shown) that manages information on the power supply device 20.
[0085] The information indicating the remaining capacity of the storage battery includes at least one of the remaining capacity (mAh) of the battery itself, information indicating the ratio of the charge amount to the capacity of the storage battery (%), and information indicating the driving record after full charge (km / full charge). The timing of information collection is not particularly limited, and may be in real time or at predetermined intervals.
[0086] 15 includes, for each electric vehicle 50, a vehicle ID, information indicating the date and time the information was acquired, the remaining charge (mAh) of the storage battery, and information indicating the driving record after full charge (km / full charge). The information indicating the date and time the information was acquired is not particularly limited to the time the information was received from the electric vehicle 50 or the time the information was stored in the storage device 120. Alternatively, when information indicating the remaining charge of the storage battery is accumulated in chronological order in the memory of the electric vehicle 50 and the chronological information is acquired, the time information recorded in the chronological information may be used.
[0087] The charge capacity of a storage battery decreases with age. Therefore, the vehicle battery information 132 may further include information indicating the date and time when the battery began to be used. The model generation unit 112 may train the prediction model 122 based on the vehicle battery information 132 and information regarding the period of use and the decrease in capacity of the storage battery of each electric vehicle 50.
[0088] 16 is a diagram showing an example of the data structure of the vehicle-specific charging history information 134. The vehicle-specific charging history information 134 indicates a history of charging results for each electric vehicle 50. The vehicle-specific charging history information 134 is obtained by storing power supply history information 162 for each power supply device 20 in the storage device 120 for each electric vehicle 50. The power supply history information 162 for each power supply device will be described later.
[0089] The vehicle-specific charging history information 134 includes, for each electric vehicle 50, a vehicle ID, and for each charge, information indicating the date on which the charge was performed, identification information (hereinafter referred to as station ID) that can identify the power supply device 20 that performed the charge, information indicating the type of charge (normal charge or rapid charge), information indicating the time at which the charge started, information indicating the remaining capacity of the storage battery of the electric vehicle 50 at the start of the charge (before the start), information indicating the time at which the charge ended, and information indicating the remaining capacity of the storage battery of the electric vehicle 50 at the end of the charge.
[0090] There are various conceivable methods for acquiring information about charging from the power supply device 20, and they are not particularly limited. (Example 1) The acquisition unit 102 may receive the power supply history information 162 for each power supply device held by the computer 1000 that controls the power supply device 20 directly from the computer 1000 of the power supply device 20 using a wireless communication function. (Example 2) The power supply history information 162 for each power supply device may be periodically transmitted by the computer 1000 of the electric vehicle 50 to a server (not shown) that manages the power supply device 20 using a wireless communication function. Then, the acquisition unit 102 may acquire the power supply history information 162 for each power supply device from the server.
[0091] Furthermore, the machine learning information includes the flight information 150 and aircraft information 152 described above, as well as weather information (not shown).
[0092] Information indicating the departure and arrival points of aircraft can be used, for example, to learn the characteristics of whether the amount of luggage per passenger increases or decreases depending on the region (country, etc.) of departure or arrival point.
[0093] Furthermore, the machine learning information may include power supply device information 160 and power supply device-specific power supply history information 162. Fig. 17 is a diagram showing an example data structure of the power supply device information 160. The power supply device information 160 includes, for each power supply device 20, basic information about the power supply device 20. For example, the power supply device information 160 includes, for each power supply device 20, a station ID, information indicating the installation location, information indicating the charging type, and information indicating the operation status. The information indicating the installation location can be expressed in latitude and longitude.
[0094] However, it is preferable that the information indicating the installation location is machine-learned in association with map information within the airport. The map information within the airport includes information indicating the location of each facility within the airport. Each facility within the airport includes, for example, a cafeteria, a shop, and a restroom for employees who use the electric vehicle 50, as well as an apron, a warehouse, and a maintenance area.
[0095] For example, since charging takes time, many users take a break or eat while waiting for charging to complete. Therefore, users tend to concentrate at power supply devices 20 that are close to cafeterias, shops, and restrooms. In this way, information indicating the installation locations of power supply devices 20 can be used to learn the relationship between user behavior and congestion at power supply devices 20 through machine learning.
[0096] When power supply devices 20 are installed in multiple locations, some of the power supply devices 20 may be closed depending on the season (summer vacation, Golden Week, etc.), the day of the week, or the time. Therefore, the information indicating the operating status includes an operating schedule for each power supply device 20.
[0097] 18 is a diagram showing an example of the data structure of the power supply device-specific power supply history information 162. The power supply device-specific power supply history information 162 accumulates information on power supply for each power supply device 20 and stores it in the storage device 120. The vehicle-specific charging history information 134 described above is obtained by acquiring information from the power supply device-specific power supply history information 162 and storing it in the storage device 120 for each electric vehicle 50.
[0098] The power supply history information 162 for each power supply device includes, for each day and for each power supply device 20, the vehicle ID of the electric vehicle 50 to which power was supplied, information indicating the charge type of the power supply, information indicating the start time of the power supply, and information indicating the end time of the power supply. There are various possible methods for acquiring the vehicle ID of the electric vehicle 50. For example, a reading device (not shown) that reads a recording medium (e.g., an IC card or a two-dimensional code displayed on the user terminal 200) on which the vehicle ID or user ID is recorded can be used to acquire the vehicle ID or user ID from the recording medium presented by the user at the time of power supply. Alternatively, the vehicle ID may be identified and acquired by analyzing an image of the license plate of the electric vehicle 50 captured by a camera installed on the power supply device 20.
[0099] The plan creation unit 104 inputs the work content of each electric vehicle 50 for that day into the prediction model 122 and outputs a predicted value of power consumption based on the work content of each electric vehicle 50 for that day. The plan creation unit 104, for example, calculates a predicted remaining battery level for each hour from the predicted power consumption amount corresponding to the work content for each day. Furthermore, the plan creation unit 104 identifies a recommended charging start time as a scheduled charging time using at least the time when the calculated remaining battery level will fall below a threshold and the start and end times of the work included in the work content. However, as described above, other information can also be used to identify the charging start time. The plan creation unit 104 stores this information as power consumption prediction information 144 for each electric vehicle 50 in the storage device 120.
[0100] 19 is a diagram showing an example of the data structure of the power consumption prediction information 144. The power consumption prediction information 144 includes, for each electric vehicle 50, a vehicle ID, information indicating the vehicle model, information indicating the date, information indicating the predicted remaining battery power for each time, and information indicating the scheduled charging time.
[0101] In addition, the plan creation unit 104 generates usage prediction information for each power supply device 20 according to the charging plan for each electric vehicle 50 generated using the prediction model 122, and stores the information in the storage device 120 as power supply device usage prediction information 164.
[0102] 20 is a diagram showing an example data structure of power supply device usage prediction information 164 for a power supply device 20 on that day. The power supply device usage prediction information 164 includes, for each power supply device 20, a station ID, and, for each predicted charging schedule, the vehicle ID of the electric vehicle 50 to be charged, the scheduled start time of the charging, and the scheduled end time of the charging, and may further include information indicating the congestion level. However, because the power supply device usage prediction information 164 indicates the predicted usage status for that day based on past performance information, the electric vehicle 50 does not need to be specified. In other words, the power supply device usage prediction information 164 does not need to include a vehicle ID. Furthermore, the information indicating the congestion level may be the congestion level by time period or the congestion level for a day.
[0103] The providing unit 106 uses the power consumption prediction information 144 or the power supply device usage prediction information 164 to generate a screen showing various information, which will be described later, and displays the screen on the user terminal 200 .
[0104] <Operation Example> The operation of the information processing device 100 will be described below with reference to Fig. 21 and Fig. 12. Fig. 21 is a flowchart showing an operation example of the information processing device 100 according to the embodiment. First, the generation of the prediction model 122 will be described with reference to Fig. 21. The acquisition unit 102 acquires past performance data as various information necessary for machine learning (step S201). The model generation unit 112 calculates a relational expression between the work content and power consumption (step S203). The model generation unit 112 generates prediction models 122a, 122b, ... of power consumption for each vehicle type (step S205). The generated prediction models 122a, 122b, ... are stored in the storage device 120.
[0105] Next, generation of a charging plan using the created prediction model 122 will be described according to the flow shown in FIG. 12 . The acquisition unit 102 acquires a current work schedule including work details for each of the multiple electric vehicles 50 (step S101). The plan creation unit 104 inputs the identified work details for the day based on the work schedules for the multiple electric vehicles 50 into the prediction model 122 corresponding to the vehicle type of each electric vehicle 50. Then, using the output of the prediction model 122, the plan creation unit 104 creates a charging plan for the multiple electric vehicles 50 including information on the charging start timing and the power supply device 20 for each electric vehicle 50 (step S103). The provision unit 106 generates various screens using the output of the prediction model 122 and displays them on the user terminal 200 (step S105).
[0106] 22 is a diagram showing an example of a predicted usage status screen 310 showing the predicted usage status of each power supply device 20 on the day. The providing unit 106 generates the predicted usage status screen 310 using the power supply device usage prediction information 164 and displays it on the display of the user terminal 200. The predicted usage status screen 310 includes information indicating, for each power supply device 20, the station name, charging type, usage status, occupancy rate, congestion level, and availability.
[0107] The charging type indicates normal charging (N) or quick charging (Q). The usage status is, for example, represented by a bar graph showing the time during which the power supply device 20 is used during business hours (e.g., midnight to midnight). The occupancy rate indicates the proportion of time during which the power supply device 20 is used relative to business hours. The congestion level is information indicating the congestion status of the power supply device 20. In this example, the congestion level is indicated by ranks A to C according to the waiting time. In this example, rank A indicates a waiting time of 60 minutes or more, rank B indicates a waiting time of 10 minutes or more but less than 60 minutes, and rank C indicates a waiting time of less than 10 minutes, but the ranking is merely an example and is not limited to this.
[0108] The availability is, for example, information indicating whether the power supply device 20 can be used on the day. Since the power supply device 20 may be open only on certain days, information indicating availability on the day is useful. However, the information indicating availability is not necessarily required, and for example, the predicted usage status screen 310 may include only the power supply devices 20 that are available on the day. Furthermore, in the embodiment described below, the information indicating availability further indicates whether each electric vehicle 50 can be used according to the charging plan. In other words, the information indicates not only whether the power supply device 20 itself is open, but also the result of determining whether the power supply device 20 can be used according to the business schedule of the electric vehicle 50. Details will be described later.
[0109] 23 is a diagram showing an example of a details screen that graphs the predicted usage status of each power supply device 20. The predicted usage status screen 320 for each power supply device 20 includes a graph that shows a time series change in the occupancy rate predicted for the day for each power supply device 20. Furthermore, the predicted usage status details screen 330 includes a graph that shows, for a specific electric vehicle 50, a detailed usage status of the power supply device 20 for which charging is recommended.
[0110] FIG. 24 is a diagram showing an example of a predicted usage status screen 340 in map format. The predicted usage status screen 340 is the same as the predicted usage status screen 320 for each power supply device in FIG. 22 described above, but in map format, and includes information indicating the location of the power supply device 20. The predicted usage status screen 340, for example, displays information (graphic elements such as icons) indicating the location of the power supply device 20 and information (graphic elements such as icons) indicating the current location of the electric vehicle 50 superimposed on a map. Furthermore, the predicted usage status screen 340 includes information indicating the current status of each power supply device 20, the same as the predicted usage status screen 310. The information on the power supply device 20 includes information indicating the name of the power supply device 20, information indicating the charging type, information indicating availability, information indicating the current waiting time, and information indicating the current congestion level, all of which are associated with the location of the power supply device 20. In this example, the corresponding information is included in a balloon image pointing to the location of each power supply device 20, but the method of associating the power supply device 20 with the information is not limited thereto. For example, when an operation such as touching, long pressing, clicking, or hovering the mouse over an icon representing each power supply device 20 is received, the providing unit 106 may display a window that displays information about the power supply device 20 .
[0111] As described above, the information processing device 100 of this embodiment includes the acquisition unit 102, the model generation unit 112, and the provision unit 106. The acquisition unit 102 acquires past performance data and the like as various information necessary for machine learning. The model generation unit 112 calculates a relational expression between the work content and power consumption, and generates prediction models 122a, 122b, ... of power consumption for each vehicle type. The model generation unit 112 trains the prediction model 122 for each vehicle type using the past charging performance of each electric vehicle 50, the past usage performance and business information of each power supply device 20, flight schedules, weather, and the like.
[0112] As described above, according to the present embodiment, the same effects as those of the above-described embodiment are achieved, and further, the prediction model 122 for each vehicle type is trained using the past charging records of each electric vehicle 50, the past usage records and business information of each power supply device 20, flight schedules, information on weather, etc., so that a charging plan with higher accuracy that is more in line with actual conditions can be generated. By efficiently charging according to the charging plan, it is possible to alleviate congestion at the power supply devices 20 and improve the efficiency (operating rate) of each operation of the electric vehicle 50.
[0113] (Third Embodiment) This embodiment is similar to the above-described embodiments except that it has a configuration in which a charging plan is generated using an optimization model 124 that receives the output of the prediction model 122 as input and outputs a charging plan. The charging plan creation system 1 of this embodiment further includes an optimization model 124 in addition to the configuration of the charging plan creation system 1 of the above-described embodiment shown in Fig. 3. Note that the configuration of this embodiment may be combined with at least one of the configurations of the other embodiments to the extent that no contradiction occurs.
[0114] <System Overview> Fig. 25 is a diagram conceptually showing a system configuration of the charging plan creation system 1 according to the embodiment. The charging plan creation system 1 has a configuration similar to that of the charging plan creation system 1 in Fig. 3 and further has an optimization model 124.
[0115] <Functional Configuration Example> Fig. 26 is a functional block diagram showing an example of a logical configuration of the information processing device 100 according to the embodiment. The information processing device 100 has the same configuration as the information processing device 100 in Fig. 6, and further has an optimization model 124. The plan creation unit 104 creates a charging plan using the optimization model 124 (second model) that receives the output of the prediction model 122 (first model) as input and outputs a charging plan.
[0116] Specifically, for each type of electric vehicle 50, the plan creation unit 104 inputs information including the work content of that electric vehicle 50 into the corresponding prediction model 122 for that vehicle type, and causes the prediction model 122 to output the predicted power consumption of that electric vehicle 50. Then, the plan creation unit 104 inputs the predicted power consumption of each electric vehicle 50 output from the prediction model 122 for that electric vehicle 50 into the optimization model 124, and causes the optimization model 124 to output a charging plan for each electric vehicle 50.
[0117] The parameters required for optimization using the optimization model 124 differ for each vehicle model. Figures 27 and 28 are diagrams for explaining the parameter information 142 used for optimization and the optimization model 124.
[0118] The parameter information 142 includes, for example, parameters related to baggage load, parameters related to passenger boarding, parameters related to equipment replenishment, parameters related to catering, and parameters related to aircraft. The parameters related to baggage load include the weight of baggage for each vehicle. The parameters related to passenger boarding include the number of passengers and total passenger weight for each vehicle. The parameters related to equipment replenishment include information indicating the type of equipment that needs to be replenished for each vehicle. The parameters related to catering include the type and quantity or weight of food and beverages to be loaded for each vehicle. The parameters related to aircraft include information indicating the type of aircraft to be worked on and maintenance menu items for each vehicle.
[0119] The optimization model 124 extracts and analyzes the parameters shown in the correspondence table in FIG. 28 for each vehicle type from each piece of information, optimizes the charging plan, and outputs the optimized charging plan. For example, since a dolly tractor is an electric vehicle 50 that transports containers, parameters related to the cargo load of the container are used in the analysis. Since a towing tractor (shown as "towing car" in the figure) is an electric vehicle 50 that tows aircraft, parameters related to the aircraft are used in the analysis. Since a high-lift loader is an electric vehicle 50 that loads cargo containers into the cargo hold, parameters related to the cargo load, parameters related to equipment replenishment, parameters related to catering, and parameters related to the aircraft are included. However, these are merely examples and are not limiting.
[0120] The charging plan for each electric vehicle 50 output from the plan creation unit 104 is stored in the storage device 120 as recommendation information 170. Fig. 29 is a diagram showing an example data structure of the recommendation information 170. The recommendation information 170 includes a daily charging plan for each electric vehicle 50. Specifically, the recommendation information 170 includes the vehicle ID of the electric vehicle 50 that is the target of the charging plan, information indicating the date of the charging plan, the station ID of the power supply device 20 that is the recommended charging location, information indicating the charging start time of the charging plan, and information indicating the scheduled charging end time.
[0121] The providing unit 106 may notify the user terminal 200 of a recommended charging plan in accordance with the charging plan created by the plan creation unit 104. For example, the providing unit 106 notifies the user terminal 200 of the recommended charging schedule before work starts, a predetermined time before the recommended charging start time (e.g., 30 minutes before, or a user setting may be accepted). Various notification contents are possible, and for example, a notification indicating that a charging plan has been created may be output to the user terminal 200. The notification may be presented in a manner according to the user's setting, and examples thereof include, but are not limited to, the following: (Example 1) A badge indicating that there is a new notification is displayed on an application icon of the user terminal 200. (Example 2) A notification indicating that a charging plan has been created is displayed on the lock screen or home screen of the user terminal 200. (Example 3) A sound or voice indicating that a notification has been received is output from a speaker (not shown) of the user terminal 200. (Example 4) A vibration unit (not shown) of the user terminal 200 is vibrated in response to the notification.
[0122] The providing unit 106 displays, on the display of the user terminal 200, a charging plan screen 350 (or the notification screen 300 in FIG. 9 ) including information indicating a charging location recommended in the charging plan, a charging start time, and a scheduled end time of the charging. FIG. 30 is a diagram showing an example of the charging plan screen 350. The charging plan screen 350 includes a charging plan display field 352 that displays the charging start time and the scheduled end time of the charging recommended in the charging plan, and a map display field 354 that indicates the charging location recommended in the charging plan. The map displayed in the map display field 354 includes an icon indicating the position of the power supply device 20 and an icon indicating the position of the electric vehicle 50. Furthermore, the map displayed in the map display field 354 includes a display field 356 that displays information about each power supply device 20. In this example, corresponding information is included in a balloon image that indicates the position of each power supply device 20, but the association method is not limited to this. For example, when an operation such as touching, long pressing, clicking, or hovering the mouse over an icon representing each power supply device 20 is received, the providing unit 106 may display a window that displays information about the power supply device 20 .
[0123] The display field 356 includes, for example, information indicating that charging using the power supply device 20 is recommended, the name of the power supply device 20, the charging type, information indicating availability, the waiting time, and the congestion level. On the other hand, for a power supply device 20 that is not recommended, the display field 356 includes the name of the power supply device 20 and the congestion level. That is, for a power supply device 20 that is not recommended, only the minimum necessary information is displayed in the display field 356. However, for a power supply device 20 that is not recommended, the display field 356 does not need to be displayed on the charging plan screen 350. Furthermore, whether or not to display these items, or the display items, may be set by a user operation in a setting menu or the like of the charging plan creation system 1. The providing unit 106 creates the charging plan screen 350 based on the set contents.
[0124] Furthermore, the providing unit 106 may highlight 358 the position on the map of the power supply device 20 that is recommended as a charging location on the charging plan screen 350. The highlighting 358 is preferably performed so that the user can immediately grasp the position of the recommended power supply device 20. The highlighting method is not particularly limited, and the icon of the power supply device 20 may be displayed in a flashing manner, in a 3D display, or as an animation, or a mark or text may be displayed near the icon to alert the user.
[0125] <Operation Example> Fig. 31 is a flowchart showing detailed steps of the charging plan creation process in step S103 of the flowchart in Fig. 2 or Fig. 12. An operation example of the information processing device 100 will be described below with reference to Figs. 12 and 31. First, the acquisition unit 102 acquires a current work schedule including the work content of each of the multiple electric vehicles 50 (step S101 in Fig. 12). Then, the plan creation unit 104 predicts the power consumption of each electric vehicle 50 using the vehicle-type prediction model 122 (step S301 in Fig. 31). In detail, the plan creation unit 104 inputs information including, for example, the work content of each electric vehicle 50 on the day into the corresponding vehicle-type prediction model 122 for each of the multiple electric vehicles 50, and causes the prediction model 122 to output the predicted power consumption of each electric vehicle 50.
[0126] Then, the plan creation unit 104 creates a charging plan using the optimization model 124 (step S303 in FIG. 31 ). In detail, the plan creation unit 104 inputs the predicted power consumption of each electric vehicle 50 output from the prediction model 122 for each vehicle type of electric vehicle 50 into the optimization model 124, and causes the optimization model 124 to output a charging plan for each electric vehicle 50. At this time, the optimization model 124 extracts parameters for each vehicle type from each piece of information and performs optimization processing.
[0127] Then, the providing unit 106 generates the charging plan screen 350 of FIG. 30 and displays it on the display of the user terminal 200. Specifically, the providing unit 106 first acquires a corresponding user ID by referring to the user information 180 based on the vehicle ID of the generated charging plan for the electric vehicle 50. Then, the providing unit 106 uploads the charging plan screen 350 to a web page that can be viewed by the user of the user ID, and outputs a notification indicating that the charging plan has been created. The notification output method is as described above. For example, in the case of using an application, the providing unit 106 displays a notification screen on the home screen or the like of the user terminal 200. In the case of using a website, the providing unit 106 displays the notification screen on a top page dedicated to the user.
[0128] Furthermore, the providing unit 106 may acquire a terminal ID corresponding to the vehicle ID and transmit the notification information to the telephone number or email address of the user terminal 200. In the case of a telephone number, the providing unit 106 transmits the notification information by SMS (Short Message Service).
[0129] As described above, the information processing device 100 of this embodiment further includes the optimization model 124. The plan creation unit 104 creates a charging plan using the optimization model 124, which receives the output of the prediction model 122 as input and outputs a charging plan. The optimization model 124 is associated with parameters required for optimization for each vehicle type. The optimization model 124 extracts vehicle-specific parameters from each piece of information and performs optimization processing.
[0130] As described above, according to this embodiment, the same effects as those of the above embodiment can be achieved, and further, since the charging plan is optimized according to the characteristics of each vehicle model, a more accurate charging plan can be created. Furthermore, since information on parameters required for each vehicle model is extracted and analyzed, the optimization process can be performed efficiently.
[0131] (Fourth embodiment) <System overview> Fig. 32 is a diagram conceptually illustrating a system configuration of a charging plan creation system 1 according to an embodiment. This embodiment differs from the above-described embodiments in that it has a configuration that identifies a work status of an electric vehicle 50 by processing a captured image. The charging plan creation system 1 in Fig. 32 further includes a plurality of cameras 5a, 5b, ... (hereinafter, referred to as cameras 5 unless a distinction is particularly required) in addition to the charging plan creation system 1 in Fig. 25 . However, this embodiment may be combined with the charging plan creation system 1 in Fig. 3 .
[0132] The camera 5 includes an imaging element such as a lens and a CCD (Charge Coupled Device) image sensor, and is, for example, a network camera such as an IP (Internet Protocol) camera. The network camera has, for example, a wireless LAN (Local Area Network) communication function and is connected to the information processing device 100 via the communication network 3, i.e., a relay device (not shown) such as a router. The camera 5 may also include a mechanism for controlling the orientation of the camera body and lens, zooming, focusing, etc., by tracking the movement of the electric vehicle 50 or a person.
[0133] The images generated by the camera 5 are preferably taken in real time and transmitted to the information processing device 100. However, the images transmitted to the information processing device 100 do not have to be transmitted directly from the camera 5, but may be images delayed by a predetermined time. The images taken by the camera 5 may be temporarily stored in another storage device 120, and the information processing device 100 may read them out from the storage device 120 sequentially or at predetermined intervals. Furthermore, the images transmitted to the information processing device 100 are preferably moving images, but may also be frame images taken at predetermined intervals or still images.
[0134] The cameras 5 are installed in multiple areas to generate images of electric vehicles 50 performing work within the airport apron. The images generated by each camera 5 are stored in the storage device 120 in association with identification information that can identify the camera 5. Furthermore, as information about each camera 5, the identification information of the camera 5 (hereinafter referred to as a camera ID) and information indicating the installation position of the camera 5 (for example, information that can identify the area to be imaged) are stored in association with each other.
[0135] The images generated by the camera 5 are transmitted to the information processing device 100 and processed. The image processing is performed by an image processing device that is not recommended. First, the image processing device identifies the electric vehicle 50 in the image. Then, the image processing device identifies the vehicle ID of the electric vehicle 50 from the area of the license plate of the electric vehicle 50. The image processing device then identifies the work status for each electric vehicle 50 through image analysis. The work status includes, for example, "approaching before work begins," "work begins," "work in progress," "work completed," and "leaving after work is completed." The information processing device 100 stores the time of change of each work status of the electric vehicle 50 identified by the image processing device in the storage device 120 as vehicle-specific work status information 146.
[0136] 33 is a diagram showing an example data structure of the vehicle-specific work status information 146. The vehicle-specific work status information 146 is associated with a camera ID for each camera 5, and includes, for each identified vehicle ID, information indicating the date and time each time a work status is identified and information indicating the identified work status. As described above, the camera ID is associated with information indicating the image capture area, so the information processing device 100 can identify the location where the electric vehicle 50 is performing work from the camera ID.
[0137] FIG. 34 is a diagram illustrating an example data structure of the work history information 148. The work history information 148 is the vehicle-specific work status information 146 obtained by analyzing the images captured by the camera 5, and is stored in the storage device 120 as history information for each task for each electric vehicle 50. For example, the work history information 148 includes, for each electric vehicle 50, for each date, and for each task, information indicating the camera ID, the image capture area, information indicating the task location identified from the image analysis results, the task start time, and the task end time. Furthermore, the work history information 148 may include information indicating the mileage for each electric vehicle 50, for each date. The mileage may be recorded for each task. The mileage may be information indicating the mileage stored in the computer 1000 of the electric vehicle 50, which may be received using a wireless communication function. The work history information 148 may also be used by the model generation unit 112 to train at least one of the prediction model 122 and the optimization model 124.
[0138] <Functional Configuration Example> The information processing device 100 of the embodiment has the same configuration as the information processing device 100 of any of the above-described embodiments. Here, it is assumed that the information processing device 100 has the same configuration as the information processing device 100 in Fig. 26, and the description will be given using Fig. 26. However, the configuration of this embodiment may be combined with at least one of the configurations of the other embodiments to the extent that no contradiction occurs.
[0139] The acquisition unit 102 further acquires the above-described vehicle-specific work status information 146. The vehicle-specific work status information 146 is further used by the plan creation unit 104 when creating a charging plan. For example, when detecting a discrepancy between the work schedule and the actual progress of work, the plan creation unit 104 updates the charging plan to match the current situation. Specifically, the plan creation unit 104 inputs information indicating the actual work status that differs from the work schedule (vehicle-specific work status information 146) into a prediction model 122 corresponding to the vehicle model of the electric vehicle 50, and acquires the predicted power consumption of the electric vehicle 50 as an output. Then, the plan creation unit 104 inputs the output of the prediction model 122 into an optimization model 124, and acquires a new charging plan as an output.
[0140] However, if it is assumed that a flight delay or the like will affect multiple electric vehicles 50 involved in work at the airport, it is preferable to successively update the charging plan by periodically repeating the processing of the acquisition unit 102 and the plan creation unit 104. However, if a situation arises in which the charging schedule for a specific electric vehicle 50 needs to be updated due to a delay in work for that specific electric vehicle 50 or the like, it is preferable to update the charging plan in a way that minimizes the impact on the other electric vehicles 50.
[0141] Therefore, it is preferable that the plan creation unit 104 performs the following process before updating the overall charging plan. For example, the plan creation unit 104 determines whether or not a difference from the business schedule will affect the original charging schedule. Then, the plan creation unit 104 further determines whether or not a delay in the start time of the charging schedule will affect the charging schedules of other electric vehicles 50.
[0142] For example, the charging plan update process is not performed if there is no impact on the original schedule or if there is no impact on the charging schedules of the other electric vehicles 50. Furthermore, if there is an impact on the charging schedules of the other electric vehicles 50, the plan creation unit 104 first selects a power supply device 20 that does not have a charging schedule for the other electric vehicles 50 entered, and updates the charging plan for that electric vehicle 50. If there is no power supply device 20 that does not have a charging schedule for the other electric vehicles 50 entered, the overall charging plan including the multiple electric vehicles 50 is updated.
[0143] Furthermore, the work status of each electric vehicle 50 can be used for machine learning of the optimization model 124. The model generation unit 112 trains the optimization model 124 using vehicle-specific work status information 146, which is the track record of the work status of each electric vehicle 50. For example, it is preferable that the charging time of each electric vehicle 50 is as short as possible and the number of times it is charged is small. In other words, it is preferable that the impact on work due to long charging times is minimized so that work does not get delayed. The model generation unit 112 trains the optimization model 124 using the vehicle-specific work status information 146, which is the actual work status, to generate an optimization model 124 that can be optimized to improve the work efficiency of the electric vehicle 50.
[0144] As described above, the charging plan creation system 1 of the present embodiment includes a plurality of cameras 5. The information processing device 100 processes images generated by the cameras 5 to identify the work status of each electric vehicle 50. Furthermore, the acquisition unit 102 acquires the identified work status. The plan creation unit 104 updates the charging plan using the work status.
[0145] As described above, according to this embodiment, the same effects as those of the above embodiment can be achieved, and furthermore, the charging plan can be updated according to the actual work situation, so that not only can a change in the work content of the electric vehicle 50 occur due to a change in the flight (for example, a delay in departure or arrival), but also delays in work or the advancement of work for a specific electric vehicle 50 can be dealt with in real time.
[0146] Although the embodiments of the present invention have been described above with reference to the drawings, these are merely examples of the present invention, and various other configurations can also be adopted.
[0147] (Other Embodiments) <Provision of Reservation Status Information> For example, the providing unit 106 may cause each user terminal 200 to display a reservation screen 400 indicating the reservation status of each power supply device 20. For example, when the providing unit 106 receives a press of the reservation button 308 on the notification screen 300 of FIG. 9 , the reservation screen 400 is displayed on the display of the user terminal 200.
[0148] 35 is a diagram showing an example of a reservation screen 400. The reservation screen 400 includes a reservation status display field 410, a reservation information display field 420, a reservation confirmation button 430, a reservation confirmation button 432, and a back button 434.
[0149] The reservation status display field 410 displays a list similar to that of the predicted usage status screen 310 in Fig. 22. Specifically, the reservation status display field 410 includes, for each power supply device 20, information indicating the station name, charging type, reservation status, occupancy rate, congestion level, and availability.
[0150] The charging type indicates whether it is normal charging (N) or quick charging (Q). The reservation status, for example, uses a bar graph to show the time during business hours (e.g., midnight to midnight) when the power supply device 20 is reserved for use. The occupancy rate indicates the proportion of time during business hours when the power supply device 20 is reserved for use. The congestion level is information indicating the congestion status of the power supply device 20. In this example, the congestion level is indicated by ranks A to C according to the waiting time. In this example, rank A indicates a waiting time of 60 minutes or more, rank B indicates a waiting time of 10 minutes or more but less than 60 minutes, and rank C indicates a waiting time of less than 10 minutes, but the ranking is merely an example and is not limited to this.
[0151] The availability of use is information indicating, for example, whether the power supply device 20 can be used on the day. Furthermore, the availability of use is information indicating whether the power supply device 20 can be used for each electric vehicle 50 according to the charging plan. In other words, the availability of use is not based on whether the power supply device 20 itself is open, but rather on the result of determining whether the power supply device 20 can be used according to the business schedule of the electric vehicle 50. For example, charging cannot be performed during a time when work is scheduled for the electric vehicle 50, even if there is no reservation for use of the power supply device 20.
[0152] Furthermore, the reservation status display field 410 includes information indicating the recommended charging location (station name) and the charging start time, as well as an arrow 412 indicating the start position of a bar graph. The bar graph includes an image element 416 indicating the time when charging reservations have already been made. Furthermore, the time required for charging of the electric vehicle 50 may be indicated on the bar graph using an image element 414 that is different from the image element 416.
[0153] The reservation information display field 420 is a display field showing the details of the charging reservation, and displays the vehicle ID of the electric vehicle 50, the charging type, the station name, and the charging start time. The reservation information display field 420 displays a recommended charging schedule as an initial value. However, each item displayed in the reservation information display field 420 may be a UI (User Interface) that accepts input or selection in a text box or the like. In this case, the information processing device 100 may accept changes to the user's reservation details by the user performing an input operation in the text box.
[0154] Alternatively, the user may move the position of the arrow 412 by dragging it on a touch panel. That is, the providing unit 106 may accept the user's operation to move the arrow 412 and accept the time at the destination station as the charging start time. Then, the providing unit 106 may display the changed reservation details in the reservation information display field 420.
[0155] When the reservation confirmation button 430 is pressed, the plan creation unit 104 determines whether the reservation is possible or not, for example, when the reservation details are changed in the reservation information display field 420. That is, it determines whether there is availability at the reservation time of the power supply device 20 for which the reservation is confirmed. If the reservation is possible, the providing unit 106 displays a message notifying the user of this, and also displays a message prompting the user to press the reservation confirmation button 432 if the user wishes to confirm the reservation. If there is no availability at the reservation time, the providing unit 106 displays a message indicating this. Furthermore, the providing unit 106 may display a message indicating whether or not the user wishes to be proposed another recommended charging schedule, and an operation button (not shown) for accepting the re-proposal. When the plan creation unit 104 accepts the pressing of the operation button for accepting the re-proposal, it may perform processing for updating the charging plan.
[0156] However, instead of performing the reservation confirmation process using the reservation confirmation button 430, the providing unit 106 may display a suggestion of a changeable charging schedule on the reservation screen 400. As described above, a change to the charging plan may affect other electric vehicles 50, so it is preferable to set a limit on the change. For example, the plan creation unit 104 may prepare multiple recommended charging schedule candidates for each electric vehicle 50 by prioritizing them, and suggest the recommended charging schedule in accordance with the priorities.
[0157] The method for updating the charging plan can be performed in the same way as in the fourth embodiment described above. That is, the plan creation unit 104 first selects a power supply device 20 that does not have a charging schedule for another electric vehicle 50, and updates the charging plan for that electric vehicle 50. If there is no power supply device 20 that does not have a charging schedule for another electric vehicle 50, the charging plan including multiple electric vehicles 50 is updated.
[0158] When the reservation confirmation button 432 is pressed, the reservation details displayed in the reservation information display field 420 are confirmed, and the plan creation unit 104 stores the reservation details as power supply reservation information 166 by power feeder in the storage device 120. When the return button 434 is pressed, the providing unit 106 closes the reservation screen 400.
[0159] 36 is a diagram showing an example data structure of the power supply unit-specific power supply reservation information 166. The power supply unit-specific power supply reservation information 166 includes, for each power supply 20, a station ID, and, for each reservation, a vehicle ID of the electric vehicle 50 for which charging has been reserved, a charging type, a scheduled charging start time, and a scheduled charging end time. Furthermore, the power supply unit-specific power supply reservation information 166 may include information indicating the congestion level of the power supply 20. Furthermore, the information indicating the congestion level may be the congestion level for each time period or the congestion level for a day.
[0160] According to this configuration, it is possible to reserve the power supply device 20 based on the charging schedule recommended based on the charging plan.
[0161] In addition, although the flowcharts used in the above description show multiple steps (processes) in a sequential order, the order of steps executed in each embodiment is not limited to the order shown. In each embodiment, the order of the steps shown in the drawings can be changed as long as it does not cause any problems in terms of content. Furthermore, the above-described embodiments can be combined as long as the content is not contradictory.
[0162] Although the present invention has been described above with reference to the embodiments, the present invention is not limited to the above embodiments. Various modifications that can be understood by those skilled in the art can be made to the configuration and details of the present invention within the scope of the present invention. Note that when information about users is acquired and used in the present invention, this must be done lawfully.
[0163] Some or all of the above embodiments may be described as, but are not limited to, the following supplementary notes. 1. An information processing device comprising: a first model generated for each type of electric vehicle used at an airport, the first model receiving information including the work content of the electric vehicle as an input and the predicted power consumption of the electric vehicle as an output; an acquisition means for acquiring a current work schedule including the work content for each of the plurality of electric vehicles; and a plan creation means for inputting work content identified based on the work schedules of the plurality of electric vehicles into the first model corresponding to each type of electric vehicle, and using the output of the first model, creating a charging plan for the plurality of electric vehicles including information regarding the charging start timing and power supply for each of the electric vehicles. 2. The information processing device described in 1., wherein the work content includes flight information of an airplane that will be the target of work performed by the electric vehicle. 3. The information processing device described in 2., wherein the flight information further includes information regarding the airline operating the airplane. 4. The information processing device described in 1. to 3. 5. The information processing device described in any one of items 1. to 4., wherein the work content further includes a work start time and a work end time, and the plan creation means creates the charging plan by further using at least one of the work start time and the work end time corresponding to the output from the first model for each of the electric vehicles. 5. The information processing device described in any one of items 1. to 4., wherein the acquisition means and the plan creation means execute iterative processing. 6. The information processing device described in any one of items 1. to 5., wherein the plan creation means creates the charging plan using a second model that uses the output of the first model as an input and the charging plan as an output. 7. The information processing device described in any one of items 1. to 6., wherein the plan creation means further uses information related to a current remaining power amount of the electric vehicle when creating the charging plan.8. The information processing device according to any one of 1. to 7., wherein the work content further includes a work location for each of the electric vehicles, and the plan creation means creates the charging plan by further using the work location corresponding to the output for each of the electric vehicles from the first model.
[0164] 9. A charging plan creation system comprising: a user terminal of a user who uses a plurality of electric vehicles used at an airport; and an information processing device, wherein the information processing device has: a first model that receives, for each model of the plurality of electric vehicles, information including work details for the electric vehicles as input and outputs a predicted amount of power consumption of the electric vehicles; an acquisition means for acquiring a current work schedule including the work details for each of the plurality of electric vehicles; a plan creation means that inputs the work details identified based on the work schedules of the plurality of electric vehicles into the first model corresponding to each model of each electric vehicle and uses the output of the first model to create a charging plan for the plurality of electric vehicles including a charging start timing and power supply for each of the electric vehicles; and a provision means that provides information about the charging plan to the user terminal. 10. The charging plan creation system described in 9., wherein the work details include flight information of an airplane that will be the target of work performed by the electric vehicles. 11. The charging plan creation system described in 10., wherein the flight information further includes information about the airline operating the airplane. 12. 9. 13. The charging plan creation system according to any one of 9. to 12., wherein the acquisition means and the plan creation means of the information processing device execute iterative processing. 14. The charging plan creation system according to any one of 9. to 13., wherein the plan creation means of the information processing device creates a charging plan using a second model that receives the output of the first model as an input and receives the charging plan as an output.15. The charging plan creation system according to any one of 9. to 14., wherein the plan creation means of the information processing device further uses information related to a current remaining amount of power of the electric vehicle when creating the charging plan. 16. The charging plan creation system according to any one of 9. to 15., wherein the work content further includes a work location for each of the electric vehicles, and the plan creation means of the information processing device creates the charging plan by further using the work location corresponding to the output for each of the electric vehicles from the first model.
[0165] 17. An information processing method in which one or more computers have a first model generated for each type of electric vehicle used at an airport, the first model receiving information including the work content of the electric vehicle as input and the predicted power consumption of the electric vehicle as output, and the one or more computers obtaining a current work schedule including the work content of each of the electric vehicles, inputting the work content identified based on the work schedules of the electric vehicles into the first model corresponding to each type of electric vehicle, and using the output of the first model to create a charging plan for the multiple electric vehicles including information regarding the charging start timing and power supply for each electric vehicle. 18. An information processing method according to 17, wherein the work content includes flight information of an airplane that will be the subject of work by the electric vehicle. 19. An information processing method according to 18, wherein the flight information further includes information regarding the airline operating the airplane. 20. An information processing method according to 17 to 19. 21. The information processing method described in any one of paragraphs 17. to 20., wherein the work content further includes a work start time and a work end time, and wherein the one or more computers create the charging plan by further using at least one of the work start time and the work end time corresponding to the output from the first model for each of the electric vehicles. 22. The information processing method described in any one of paragraphs 17. to 21., wherein the one or more computers repeatedly execute a process of obtaining the work schedule and creating the charging plan. 23. The information processing method described in any one of paragraphs 17. to 22., wherein the one or more computers create the charging plan by using a second model that uses the output of the first model as input and the charging plan as output. 24. The information processing method described in any one of paragraphs 17. to 22., wherein the one or more computers further use information related to the current remaining power of the electric vehicles when creating the charging plan.24. The information processing method according to any one of 17. to 23., wherein the work content further includes a work location for each of the electric vehicles, and the one or more computers create the charging plan by further using the work location corresponding to the output for each of the electric vehicles from the first model.
[0166] 25. A program for causing a computer to execute: an acquisition process for acquiring a current work schedule including the work content for each of the plurality of electric vehicles; and a plan creation process for inputting the work content identified based on the work schedules for the plurality of electric vehicles into the first model corresponding to each of the electric vehicle models, and using the output of the first model to create a charging plan for the plurality of electric vehicles including information about the charging start timing and power supply for each of the electric vehicles. 26. A program in accordance with 25., wherein the work content includes flight information of an airplane that will be the subject of work by the electric vehicle. 27. A program in accordance with 26., wherein the flight information further includes information about the airline operating the airplane. 28. A program in accordance with 25. to 27. 29. A program according to any one of claims 25. to 28., wherein the work content further includes a work start time and a work end time, and wherein, in the plan creation process, the charging plan is created by further using at least one of the work start time and the work end time corresponding to the output from the first model for each of the electric vehicles. 29. A program according to any one of claims 25. to 28., wherein the computer repeatedly executes the acquisition process and the plan creation process. 30. A program according to any one of claims 25. to 29., wherein, in the plan creation process, a charging plan is created using a second model that uses the output of the first model as an input and the charging plan as an output. 31. A program according to any one of claims 25. to 30., wherein, in the plan creation process, information related to a current remaining power amount of the electric vehicle is further used when creating the charging plan.32. The program according to any one of 25. to 31., wherein the work content further includes a work location for each of the electric vehicles, and in the plan creation process, the charging plan is created using the work location corresponding to the output for each of the electric vehicles from the first model.
[0167] 33. A computer has a first model, which is generated for each type of electric vehicle used at an airport, and which receives information including the work content of the electric vehicle as input and outputs the predicted power consumption of the electric vehicle; and a computer-readable recording medium having recorded thereon a program for causing the computer to execute: an acquisition process for acquiring a current work schedule including the work content for each of the multiple electric vehicles; and a plan creation process for inputting the work content identified based on the work schedules of the multiple electric vehicles into the first model corresponding to each type of electric vehicle, and using the output of the first model, creating a charging plan for the multiple electric vehicles including information about the charging start timing and power supply for each electric vehicle. 34. A computer-readable recording medium described in 33., wherein the work content includes flight information of an airplane that will be the target of work performed by the electric vehicle. 35. A computer-readable recording medium described in 34., wherein the flight information further includes information about the airline operating the airplane. 36. A computer-readable recording medium having recorded thereon a program for causing the computer to execute processes from 33. to 35. 37. A computer-readable recording medium having recorded thereon a program that causes the computer to repeatedly execute the acquisition process and the plan creation process. 38. A computer-readable recording medium having recorded thereon a program that causes the computer to repeatedly execute the acquisition process and the plan creation process. 39. A computer-readable recording medium having recorded thereon a program that causes the computer to repeatedly execute the acquisition process and the plan creation process. 40. A computer-readable recording medium having recorded thereon a program that causes the computer to repeatedly execute the acquisition process and the plan creation process. 41. A computer-readable recording medium having recorded thereon a program that causes the computer to repeatedly execute the acquisition process and the plan creation process. 42. A computer-readable recording medium having recorded thereon a program that causes the computer to repeatedly execute the acquisition process and the plan creation process. 43. A computer-readable recording medium having recorded thereon a program that causes the computer to repeatedly execute the acquisition process and the plan creation process. 44. A computer-readable recording medium having recorded thereon a program that causes the computer to repeatedly execute the acquisition process and the plan creation process.39. A computer-readable recording medium having a program recorded thereon, the recording medium being any one of 33. to 38., wherein, in the plan creation process, when creating the charging plan, information related to the current remaining power amount of the electric vehicle is further used. 40. A computer-readable recording medium being any one of 33. to 39., wherein the work content further includes a work location for each of the electric vehicles, and in the plan creation process, the charging plan is created by further using the work location corresponding to the output for each of the electric vehicles from the first model.
[0168] This application claims priority based on Japanese Patent Application No. 2023-059160, filed March 31, 2023, the disclosure of which is incorporated herein in its entirety.
[0169] REFERENCE SIGNS LIST 1 Charging plan creation system 3 Communication network 5, 5a, 5b Camera 20, 20a, 20b Power supply device 50, 50a, 50b Electric vehicle 100 Information processing device 102 Acquisition unit 104 Plan creation unit 106 Provision unit 112 Model generation unit 120 Storage device 122, 122a, 122b Prediction model 124 Optimization model 130 Vehicle information 132 Vehicle battery information 134 Charging history information for each vehicle 140 Work schedule information 142 Parameter information 144 Power consumption prediction information 146 Work status information for each vehicle 150 Flight information 152 Aircraft information 160 Power supply device information 162 Power supply history information for each power supply device 164 Power supply device usage prediction information 166 Power supply reservation information for each power supply device 170 Recommendation information 180 User information 200, 200a, 200b User terminal 300 Notification screen 310 Predicted usage status screen 320 Predicted usage status screen 330 Predicted usage status details screen 340 Predicted usage status screen 350 Charging plan screen 400 Reservation screen 1000 Computer 1010 Bus 1020 Processor 1030 Memory 1040 Storage device 1050 Input / output interface 1060 Network interface
Claims
1. An information processing device comprising: a first model generated for each type of electric vehicle used at an airport, the first model receiving information including the work content of the electric vehicle as an input and outputting a predicted power consumption of the electric vehicle; an acquisition means for acquiring a current work schedule including the work content of each of the electric vehicles; and a plan creation means for inputting work content identified based on the work schedules of the electric vehicles into the first model corresponding to each type of electric vehicle, and using the output of the first model, creating a charging plan for the electric vehicles including information regarding the charging start timing and power supply for each electric vehicle.
2. An information processing device according to claim 1, wherein the work content includes flight information of an airplane that is the subject of work performed by the electric vehicle.
3. An information processing device according to claim 1 or 2, wherein the work content further includes a work start time and a work end time, and the plan creation means creates the charging plan by further using at least one of the work start time and the work end time corresponding to the output of each of the electric vehicles from the first model.
4. An information processing device according to any one of claims 1 to 3, wherein the acquisition means and the plan creation means execute repeated processing.
5. An information processing device according to any one of claims 1 to 4, wherein the plan creation means creates a charging plan using a second model that receives the output of the first model as an input and receives the charging plan as an output.
6. An information processing device according to any one of claims 1 to 5, wherein the plan creation means, when creating the charging plan, further uses information related to a current remaining amount of power of the electric vehicle.
7. An information processing device according to any one of claims 1 to 6, wherein the work content further includes a work location for each of the electric vehicles, and the plan creation means creates the charging plan further using the work location corresponding to the output for each of the electric vehicles from the first model.
8. An information processing device according to claim 2, wherein the flight information further includes information about the airline operating the aircraft.
9. A charging plan creation system comprising: a user terminal of a user who utilizes a plurality of electric vehicles used at an airport; and an information processing device, wherein the information processing device has: a first model that, for each model of the plurality of electric vehicles, receives as input information including work content of the electric vehicle and outputs a predicted power consumption amount of the electric vehicle; an acquisition means for acquiring a current work schedule including work content for each of the plurality of electric vehicles; a plan creation means for inputting work content identified based on the work schedules of the plurality of electric vehicles into each of the first models corresponding to the model of each electric vehicle, and using the output of the first model, creates a charging plan for the plurality of electric vehicles including a charging start timing and a power supply for each of the electric vehicles; and a provision means for providing information regarding the charging plan to the user terminal.
10. An information processing method, comprising: one or more computers having a first model generated for each type of electric vehicle used at an airport, the first model having information including the work content of the electric vehicle as input and the predicted power consumption of the electric vehicle as output; the one or more computers obtaining a current work schedule including the work content of each of the electric vehicles, inputting the work content identified based on the work schedules of the electric vehicles into the first model corresponding to each type of electric vehicle, and using the output of the first model to create a charging plan for the electric vehicles including the charging start timing and power supply for each electric vehicle.
11. The information processing method according to claim 10, wherein the work content includes flight information of an airplane that is the subject of work performed by the electric vehicle.
12. An information processing method according to claim 10 or 11, wherein the work content further includes a work start time and a work end time, and the one or more computers create the charging plan by further using at least one of the work start time and the work end time corresponding to an output for each electric vehicle from the first model.
13. The information processing method according to any one of claims 10 to 12, wherein the one or more computers repeatedly execute a process of obtaining the business schedule and creating the charging plan.
14. An information processing method according to any one of claims 10 to 13, wherein the one or more computers create a charging plan using a second model that uses the output of the first model as an input and the charging plan as an output.
15. The information processing method according to any one of claims 10 to 14, wherein the one or more computers, when creating the charging plan, further use information related to a current remaining amount of power of the electric vehicle.
16. A computer-readable recording medium having recorded thereon a program for causing a computer having a first model, the first model being generated for each type of electric vehicle used at an airport, to execute: an acquisition process for acquiring a current work schedule including the work content of each of the multiple electric vehicles; and a plan creation process for inputting the work content identified based on the work schedules of the multiple electric vehicles into the first model corresponding to each type of electric vehicle, and using the output of the first model to create a charging plan for the multiple electric vehicles including information regarding the charging start timing and power supply for each electric vehicle.
17. A recording medium as claimed in claim 16, wherein the work content includes flight information of an airplane that is the subject of work performed by the electric vehicle. A computer-readable recording medium having a program recorded thereon.
18. A computer-readable recording medium having a program recorded thereon, the recording medium according to claim 16 or 17, wherein the work content further includes a work start time and a work end time, and in the plan creation process, the charging plan is created by further using at least one of the work start time and the work end time corresponding to the output of each of the electric vehicles from the first model.
19. A computer-readable recording medium having a program recorded thereon, the program causing the computer to repeatedly execute the acquisition process and the plan creation process, as set forth in any one of claims 16 to 18.
20. A computer-readable recording medium having a program recorded thereon, the computer being instructed in the recording medium according to any one of claims 16 to 19 to create a charging plan using a second model that uses the output of the first model as an input and the charging plan as an output in the plan creation process.
Citation Information
Patent Citations
Charging management system
JP2021012566A
Energy management device, energy management system, and energy management program
JP2022045029A
Operation management system
JP2022182803A
Cited By
Vehicle demand prediction method, device and equipment
CN120931012A
