Power system, control device, and control method
The control device addresses the inefficiency in hydrogen production by directing surplus power from renewable sources to hydrogen production, enhancing operational stability and reducing costs by optimizing energy distribution and storage.
Patent Information
- Application Number
- PCT/JP2024/012725
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-30
- Filing Date
- 2024-03-28
- Publication Date
- 2024-10-03
AI Technical Summary
Renewable energy-derived power sources with similar output fluctuations limit the operating rate of hydrogen production equipment, as power supply decreases simultaneously, leading to inefficient energy utilization.
A control device that directs power from renewable energy sources with surplus output to hydrogen production devices, optimizing energy distribution and storage to stabilize hydrogen production rates.
Improves the operating rate of hydrogen production by effectively utilizing surplus power from diverse renewable sources, smoothing output fluctuations and reducing costs by using stored energy during low capacity times.
Smart Images

Figure JP2024012725_03102024_PF_FP_ABST
Abstract
Description
Power system, control device, and control method
[0001] The present disclosure relates to power systems and the like.
[0002] For example, a technology is known for producing hydrogen using power supplied from a plurality of renewable energy-derived power sources (see Patent Document 1).
[0003] Japanese Patent Application Laid-Open No. 2021-188096
[0004] However, for example, if multiple renewable energy power sources exhibit similar output fluctuations, the amount of power supplied from those power sources may decrease at similar times, which may result in limitations on the operating rate of the hydrogen production equipment.
[0005] In order to achieve the above object, one embodiment of the present disclosure provides a power system including: a hydrogen production device that produces hydrogen using power supplied from a plurality of renewable energy-derived power sources, including two or more power sources of different types; and a control device that causes power to be supplied to the hydrogen production device from a power source that has a surplus or margin in power output among the plurality of renewable energy-derived power sources.
[0006] In another embodiment of the present disclosure, there is provided a control device for a power system including a hydrogen production device that produces hydrogen using power supplied from a plurality of renewable energy-derived power sources, including two or more power sources of different types, wherein the control device supplies power to the hydrogen production device from a power source that has a surplus or margin in power output among the plurality of renewable energy-derived power sources.
[0007] Furthermore, in yet another embodiment of the present disclosure, there is provided a control method for a power system including a hydrogen production device that produces hydrogen using power supplied from a plurality of renewable energy-derived power sources, including two or more power sources of different types, in which a control device supplies power to the hydrogen production device from a power source that has a surplus or margin in power output among the plurality of renewable energy-derived power sources.
[0008] According to the above-described embodiment, it is possible to improve the availability of a hydrogen production device that produces hydrogen using power supplied from a plurality of power sources derived from renewable energy.
[0009] It is a diagram showing the configuration of a first example of a power system. It is a diagram showing an example of the hardware configuration of an information processing device. It is a flowchart showing an example of processing related to the operation of the power system. It is a diagram showing the configuration of a second example of a power system.
[0010] Hereinafter, an embodiment will be described with reference to the drawings.
[0011] [First Example of Power System] A first example of a power system 1 according to this embodiment will be described with reference to Figs. 1 and 2 .
[0012] Fig. 1 is a diagram showing a first example of the configuration of a power system 1. Fig. 2 is a diagram showing an example of the hardware configuration of an information processing device 71.
[0013] As shown in FIG. 1 , the power system 1 includes a power grid system 10, a renewable energy power plant 20, a renewable energy power plant 30, a hydrogen production system 40, a hydrogen tank 50, a wholesale power exchange 60, and a hydrogen EMS (Energy Management System) 70.
[0014] The power grid system 10 is a power transmission and distribution system that includes a power grid 11 that includes power lines and related facilities related to the generation, transmission, transformation, and distribution of power to consumers, and components related to the management and control of the power grid 11.
[0015] The renewable energy power plant 20 is a facility for generating power using renewable energy. The renewable energy power plant 20 includes a renewable energy generator 21 and a management device 22.
[0016] The renewable energy generator 21 is a power source derived from renewable energy and generates power using renewable energy. For example, the renewable energy generator 21 is a solar power generator.
[0017] The management device 22 performs processes related to the management of the renewable energy power plant 20 , including control related to the operation of the renewable energy generator 21 .
[0018] The functions of the management device 22 can be realized by any hardware or any combination of hardware and software. For example, the management device 22 is primarily configured as a computer including a central processing unit (CPU), a memory device, an auxiliary storage device, and an interface device. As a result, the management device 22 can realize various functions by loading programs installed in the auxiliary storage device into the memory device and executing them on the CPU. The memory device can be, for example, a static random access memory (SRAM) or a dynamic random access memory (DRAM). The auxiliary storage device can be, for example, a hard disk drive (HDD), a solid state drive (SSD), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The interface device can include, for example, a communication interface for communicating with other devices inside or outside the management device 22. The interface device may also include an external interface capable of inputting and outputting data to and from an external storage medium. As a result, the management device 22 can install programs and data that realize various functions from external devices or storage media through the communication interface or external interface.
[0019] The renewable energy generator 21 is connected to the power grid 11 of the power grid system 10 via the interconnection line IL21. This allows the renewable energy generator 21 to output generated power to the power grid 11 of the power grid system 10 via the interconnection line IL21.
[0020] The interconnection line IL21 is provided with a transformer (not shown).
[0021] Furthermore, the renewable energy generator 21 is connected to the hydrogen production system 40 via the interconnection line IL24. This allows the renewable energy generator 21 to supply generated power to the hydrogen production system 40 via the interconnection line IL24.
[0022] A back-to-back (BTB) AC / DC converter 25 is provided on the interconnection line IL24.
[0023] The BTB AC / DC converter 25 is a power converter for establishing a DC interconnection between the renewable energy generator 21 and the distribution line DL40 of the hydrogen production system 40. Specifically, the BTB AC / DC converter 25 converts AC on the renewable energy generator 21 side into DC, converts the DC into AC of the same frequency as before the conversion, and outputs it to the distribution line DL40 side of the hydrogen production system 40. This electrically disconnects the AC line between the renewable energy power plant 20 and the hydrogen production system 40. As a result, it is possible to prevent an AC loop from being formed between the power grid 11, the renewable energy generator 21, and the distribution line DL40 of the hydrogen production system 40 via the interconnection lines IL21, IL24, and IL14.
[0024] The renewable energy power plant 30 is a facility for generating power using renewable energy. The renewable energy power plant 30 includes a renewable energy generator 31 and a management device 32.
[0025] The renewable energy generator 31 is a power source derived from renewable energy, and generates power by utilizing a different type of renewable energy from that of the renewable energy generator 21. For example, the renewable energy generator 31 is a wind power generator.
[0026] The management device 32 performs processes related to the management of the renewable energy power plant 30 , including control related to the operation of the renewable energy generator 31 .
[0027] The functions of the management device 32 can be realized by any hardware or any combination of hardware and software. For example, the management device 32 is primarily configured as a computer including a CPU (Central Processing Unit), a memory device, an auxiliary storage device, and an interface device. As a result, the management device 32 can realize various functions by loading programs installed in the auxiliary storage device into the memory device and executing them on the CPU. The memory device is, for example, an SRAM or DRAM. The auxiliary storage device is, for example, an HDD, an SSD, an EEPROM, or a flash memory. The interface device includes, for example, a communication interface for communicating with other devices inside or outside the management device 32. The interface device may also include an external interface capable of inputting and outputting data to and from an external storage medium. As a result, the management device 32 can install programs and data that realize various functions from external devices or storage media through the communication interface or external interface.
[0028] The renewable energy generator 31 is connected to the power grid 11 of the power grid system 10 via an interconnection line IL31. This allows the renewable energy generator 31 to output generated power to the power grid 11 of the power grid system 10 via the interconnection line IL31.
[0029] The interconnection line IL31 is provided with a transformer (not shown).
[0030] Furthermore, the renewable energy generator 31 is connected to the hydrogen production system 40 via the interconnection line IL34. This allows the renewable energy generator 31 to supply generated power to the hydrogen production system 40 via the interconnection line IL34.
[0031] A BTB AC / DC converter 35 is provided on the interconnection line IL34.
[0032] The BTB AC / DC converter 35 is a power converter for establishing a DC interconnection between the renewable energy generator 31 and the distribution line DL40 of the hydrogen production system 40. Specifically, the BTB AC / DC converter 35 converts AC on the renewable energy generator 31 side into DC, converts the DC into AC of the same frequency as before the conversion, and outputs it to the distribution line DL40 side of the hydrogen production system 40. This electrically disconnects the AC line between the renewable energy power plant 30 and the hydrogen production system 40. As a result, it is possible to prevent an AC loop from being formed between the power grid 11, the renewable energy generator 31, and the distribution line DL40 of the hydrogen production system 40 via the interconnection lines IL31, IL34, and IL14.
[0033] The hydrogen production system 40 includes a power distribution line DL40, a hydrogen production device 41, a storage battery 42, a PCS 43, and a hydrogen generator 44.
[0034] The distribution line DL40 is connected to the power grid 11 of the power system 10 via an interconnection line IL14, and is also connected to the renewable energy generators 21 and 31 of the renewable energy power plants 20 and 30 via interconnection lines IL24 and IL34. As a result, the distribution line DL40 can distribute AC power to various devices of the hydrogen production system 40, such as the hydrogen production device 41, the PCS (Power Conditioning System) 43, and the hydrogen generator 44, using power supplied from the power grid 11 and the renewable energy generators 21 and 31.
[0035] The hydrogen production device 41 is connected to the power distribution line DL40 and produces hydrogen using power distributed from the power distribution line DL40. Specifically, the hydrogen production device 41 is a water electrolysis device that produces hydrogen by electrolyzing water supplied from a water tank (not shown) using power distributed from the power distribution line DL40. The water electrolysis device is, for example, an alkaline water electrolysis device, a polymer electrolyte membrane (PEM) water electrolysis device, or a solid oxide electrolysis cell (SOEC) water electrolysis device. The hydrogen produced by the hydrogen production device 41 is stored in a hydrogen tank 50.
[0036] The storage battery 42 stores the power distributed from the power distribution line DL40 through the PCS 43, and discharges the power to the power distribution line DL40 through the PCS 43. The storage battery 42 is, for example, a lithium ion battery.
[0037] The storage battery 42 is provided with a sensor that acquires information about the storage capacity (for example, the storage rate) of the storage battery 42, and the output of the sensor is taken into the hydrogen EMS 70 via a predetermined communication line.
[0038] The PCS 43 is connected to the distribution line DL40 and the storage battery 42, and performs power conversion related to the storage (charging) and discharging of the storage battery 42. Specifically, the PCS 43 converts AC power distributed from the distribution line DL40 into DC power and stores it in the storage battery 42, and converts DC power from the storage battery 42 into AC power and discharges it to the distribution line DL40.
[0039] The hydrogen generator 44 generates electricity by combusting hydrogen supplied from the hydrogen tank 50. The hydrogen generator 44 may be a mono-fuel type or a multi-fuel type in which other fuel is mixed with hydrogen and combusted. The hydrogen generator 44 is connected to the power distribution line DL40 and outputs the generated electric power to the power distribution line DL40.
[0040] The hydrogen tank 50 is connected to the hydrogen production device 41 by a pipeline or the like, and stores the hydrogen produced by the hydrogen production device 41. The hydrogen tank 50 is also connected to the hydrogen generator 44 by a pipeline or the like, and supplies hydrogen to the hydrogen generator 44.
[0041] The hydrogen tank 50 is provided with a sensor that acquires information about the amount of hydrogen stored inside the hydrogen tank 50, and the output of the sensor is taken into the hydrogen EMS 70 via a predetermined communication line.
[0042] The wholesale power exchange 60 is a trading market where electricity is bought and sold. The wholesale power exchange 60 is, for example, the Japan Electric Power Exchange (JPEX).
[0043] The hydrogen EMS 70 performs energy management related to the production of hydrogen by the hydrogen production system 40. The hydrogen EMS 70 includes an information processing device 71.
[0044] The information processing device 71 controls the operation of the hydrogen production device 41, the charging and discharging of the storage battery 42 by the PCS 43, and the operation of the hydrogen generator 44. The information processing device 71 can control the operation of the hydrogen production device 41, the charging and discharging of the storage battery 42 by the PCS 43, and the operation of the hydrogen generator 44 by outputting control commands to the hydrogen production system 40 via a predetermined communication line. In this case, the information processing device 71 controls each of the hydrogen production device 41, the PCS 43, and the hydrogen generator 44, for example, by sending commands directly to each of the hydrogen production device 41, the PCS 43, and the hydrogen generator 44. The information processing device 71 may also control each of the hydrogen production device 41, the PCS 43, and the hydrogen generator 44, for example, by sending commands to a lower-level control device installed in the hydrogen production system 40.
[0045] For example, the information processing device 71 controls the operation of the hydrogen production device 41 and the charging of the storage battery 42 by the PCS 43 depending on the surplus power and marginal power status of the renewable energy generators 21 and 31 .
[0046] The surplus power of the renewable energy generators 21, 31 may include, for example, surplus power relative to the power demand of the power grid 11. Specifically, when the power grid 11 is congested and the power grid system 10 issues an output curtailment command to the renewable energy generator 21, the renewable energy generator 21 is unable to output all of the power that it could originally generate to the power grid 11. Therefore, in this case, it can be said that the renewable energy generator 21 has surplus power relative to the power demand of the power grid 11. Similarly, when the power grid 11 is congested and the power grid system 10 issues an output curtailment command to the renewable energy generator 31, the renewable energy generator 31 is unable to output all of the power that it could originally generate to the power grid 11. Therefore, in this case, it can be said that the renewable energy generator 31 has surplus power relative to the power demand of the power grid 11. Based on information obtained from the power grid system 10, the hydrogen EMS 70 can grasp the congestion status of the power grid 11 and the output status of output suppression commands, and thereby grasp the surplus power status of the renewable energy generators 21, 31 in relation to the power demand of the power grid 11.
[0047] Furthermore, the surplus power of the renewable energy generators 21, 31 may include surplus power related to the interconnection requirements of the renewable energy generators 21, 31 with the power grid 11. Specifically, the interconnection requirements of the renewable energy generators 21, 31 with the power grid 11 impose an upper limit on the time rate of change (output fluctuation rate) of the output fluctuation of the renewable energy generators 21, 31. Therefore, if the increasing output fluctuation rate of the renewable energy generator 21 is relatively large compared to the upper limit, the renewable energy generator 21 cannot output a portion of the power that can be generated that is relatively large compared to the upper limit to the power grid 11. Therefore, in this case, it can be said that the renewable energy generator 21 has surplus power related to the interconnection requirements of the power grid 11. Similarly, if the increasing output fluctuation rate of the renewable energy generator 31 is relatively large compared to the upper limit, the renewable energy generator 31 cannot output a portion of the power that can be generated that is relatively large compared to the upper limit to the power grid 11. Therefore, in this case, it can be said that the renewable energy generator 31 has surplus power related to the interconnection requirements of the power grid 11. The case where the output fluctuation rate in the increasing direction is relatively large with respect to the upper limit may be a case where the output fluctuation rate in the increasing direction is equal to or greater than the upper limit, or may be a case where the output fluctuation rate in the increasing direction is greater than the upper limit. The hydrogen EMS 70 can grasp the status of surplus power regarding the grid connection of the renewable energy generators 21, 31 to the power grid 11 by grasping the status of output fluctuations of the renewable energy generators 21, 31 based on information acquired from the renewable energy power plants 20, 30.
[0048] The surplus power of the renewable energy generators 21, 31 includes the surplus power generated due to overloading of the solar generator when one of the renewable energy generators 21, 31 is a solar power generation device. Overloading of a solar generator refers to a state in which the maximum output capacity of the solar panels included in the solar generator is greater than the rated output capacity of the power conditioner included in the solar generator. When the solar generator is overloaded, peak shaving occurs due to the rated output capacity of the power conditioner during daytime hours when the solar panels can generate power at maximum output. However, in the morning and evening hours, the amount of power generated can be increased more than when the solar generator is not overloaded. As a result, by setting the increase in the amount of power generated by the solar generator in the morning and evening hours to exceed the loss in power generation due to peak shaving, a surplus in the power output of the solar generator can be generated, particularly in the morning and evening hours. Therefore, when the output (generated power) of one of the renewable energy generators 21, 31 is relatively large compared to a predetermined standard (surplus standard), it can be said that the solar generator has surplus power. The output of the solar power generator being relatively high with respect to the margin standard may be equal to or greater than the margin standard. The margin standard is defined to change depending on, for example, the time of day or the season. The hydrogen EMS 70 can grasp the status of the margin power of the solar power generator by grasping the power generation status of the solar power generator based on information acquired from the renewable energy power plant 20 or the renewable energy power plant 30.
[0049] Furthermore, the information processing device 71 may control the operation of the hydrogen production device 41, the charging and discharging of the storage battery 42 by the PCS 43, and the operation of the hydrogen generator 44, depending on the power supply and demand situation of the power grid 11. The situation of the power grid 11 includes the congestion situation of the power grid 11 and the power supply and demand situation of the power grid 11. Information regarding the situation of the power grid 11 is output from the power grid system 10 and is taken into the hydrogen EMS 70 via a predetermined communication line.
[0050] The information processing device 71 may also control the operation of the hydrogen production device 41 in accordance with the price of electricity in the power grid 11. Information regarding the price of electricity in the power grid 11 is output from the wholesale electricity exchange 60 and input into the hydrogen EMS 70 via a predetermined communication line.
[0051] The functions of the information processing device 71 can be realized by any hardware or a combination of any hardware and software, etc. For example, as shown in Fig. 2, the information processing device 71 includes an external interface 71A, an auxiliary storage device 71B, a memory device 71C, a CPU 71D, a high-speed calculation device 71E, a communication interface 71F, an input device 71G, a display device 71H, and a sound output device 71I.
[0052] The external interface 71A functions as an interface for reading data from and writing data to the recording medium 71Aa. Examples of the recording medium 71Aa include a flexible disk, a CD (Compact Disc), a DVD (Digital Versatile Disc), a BD (Blu-ray (registered trademark) Disc), an SD memory card, and a USB (Universal Serial Bus) memory. This allows the information processing device 71 to read various data used in processing through the recording medium 71Aa, store the data in the auxiliary storage device 71B, and install programs that realize various functions.
[0053] The information processing device 71 may acquire various data and programs used in the processing from an external device via the communication interface 71F.
[0054] The auxiliary storage device 71B stores various installed programs, as well as files and data necessary for various processes. The auxiliary storage device 71B includes, for example, an HDD, an SSD, a flash memory, or the like.
[0055] When an instruction to start a program is received, the memory device 71C reads out the program from the auxiliary storage device 71B and stores it in. The memory device 71C includes, for example, a DRAM or an SRAM.
[0056] The CPU 71D executes various programs loaded from the auxiliary storage device 71B to the memory device 71C, and realizes various functions related to the information processing device 71 in accordance with the programs.
[0057] The high-speed arithmetic unit 71E works in conjunction with the CPU 71D to perform arithmetic processing at a relatively high speed. The high-speed arithmetic unit 71E includes, for example, a graphics processing unit (GPU), an application specific integrated circuit (ASIC), or a field-programmable gate array (FPGA).
[0058] The high-speed calculation device 71E may be omitted depending on the required calculation processing speed.
[0059] The communication interface 71F is used as an interface for connecting to other devices other than the information processing device 71 so that they can communicate with each other. This allows the information processing device 71 to communicate with, for example, other devices inside the hydrogen EMS 70 or other devices outside the hydrogen EMS 70 through the communication interface 71F. The communication interface 71F may also have multiple types of communication interfaces depending on the communication method between the devices to be connected, etc.
[0060] The input device 71G accepts various inputs from the user.
[0061] The input device 71G includes, for example, an operation input device that accepts mechanical operation input from a user. The operation device for remote operation may be an operation input device. The operation input device includes, for example, a button, a toggle, a lever, a touch panel mounted on the display device 71H, a touch pad provided separately from the display device 71H, a keyboard, a mouse, etc.
[0062] The input device 71G also includes, for example, a voice input device capable of receiving voice input from the user, and a microphone capable of collecting the user's voice.
[0063] The input device 71G may include, for example, a gesture input device that can accept gesture input from the user, and a camera that can capture images of the user's gestures.
[0064] The input device 71G may include, for example, a biometric input device capable of receiving biometric input from a user, such as a camera capable of acquiring image data including information related to a user's fingerprint or iris.
[0065] The display device 71H displays information screens and operation screens to the user, and is, for example, a liquid crystal display or an organic EL (Electroluminescence) display.
[0066] The sound output device 71I conveys various pieces of information by sound to the user of the information processing device 71. The sound output device 71I is, for example, a buzzer, an alarm, a speaker, or the like.
[0067] [Control Process Related to Operation of Power System] Next, a control process related to the operation of the power system 1, which is executed by the information processing device 71 of the hydrogen EMS 70, will be described with reference to FIG. 3 .
[0068] 3 is a flowchart showing an example of a control process related to the operation of the power system 1. In this example, the process will be described as being performed in parallel with a process (hereinafter referred to as "main hydrogen production process") that operates the hydrogen production device 41 at a predetermined operating rate using power from the storage battery 42.
[0069] The main hydrogen production process may be performed by the information processing device 71 or by an information processing device included in the hydrogen EMS 70 that is separate from the information processing device 71 .
[0070] This flowchart is executed repeatedly, for example, when the hydrogen EMS 70 is in operation.
[0071] As shown in FIG. 3 , in step S102, the information processing device 71 determines whether or not the renewable energy generators 21, 31 have surplus power or marginal power based on information acquired from the power grid system 10 and the renewable energy power plants 20, 30.
[0072] If at least one of the renewable energy generators 21, 31 has at least one of surplus power and marginal power, the information processing device 71 proceeds to step S104, otherwise proceeds to step S114.
[0073] In step S104, the information processing device 71 determines whether the amount of hydrogen stored in the hydrogen tank 50 is relatively small (small) with respect to the threshold value V1_th1 based on the output of the sensor in the hydrogen tank 50. The amount of hydrogen stored in the hydrogen tank 50 being relatively small (small) with respect to the threshold value V1_th1 may mean that the amount of hydrogen stored in the hydrogen tank 50 is equal to or smaller than the threshold value V1_th1, or may mean that the amount of hydrogen stored in the hydrogen tank 50 is less than the threshold value V1_th1. The threshold value V1_th1 may be a fixed value or a variable value. If the amount of hydrogen stored in the hydrogen tank 50 is relatively small with respect to the threshold value V1_th1, the information processing device 71 determines that the hydrogen tank 50 has room to accommodate the hydrogen produced by the hydrogen production device 41, and proceeds to step S106. Otherwise, the information processing device 71 determines that the hydrogen tank 50 does not have room to accommodate the hydrogen produced by the hydrogen production device 41, and proceeds to step S108.
[0074] In step S106, the information processing device 71 controls one of the BTB AC / DC converters 25, 35 that corresponds to a generator that has at least one of surplus power and margin power, and causes the generator to output the generated power to the distribution line DL40. The BTB AC / DC converter that corresponds to the generator that has at least one of surplus power and margin power is the BTB AC / DC converter that is provided on one of the interconnection lines IL24, IL34 that connects the generator that has at least one of surplus power and margin power to the distribution line DL40. The information processing device 71 then controls the hydrogen production device 41 to produce hydrogen using the power of the distribution line DL40, i.e., the power supplied from the generator that has at least one of surplus power and margin power. As a result, the hydrogen EMS 70 can effectively utilize the surplus and spare power of the renewable energy generators 21, 31 to produce hydrogen, thereby adjusting supply and demand in the power system 1 and improving the operating rate of the hydrogen production device 41.
[0075] On the other hand, in step S108, the information processing device 71 determines whether the charge amount (i.e., remaining capacity) of the storage battery 42 is relatively small (low) with respect to the threshold value S_th1 based on the output of the sensor of the storage battery 42. The charge amount of the storage battery 42 being relatively small (low) with respect to the threshold value S_th1 may mean that the charge amount of the storage battery 42 is equal to or less than the threshold value S_th1, or may mean that the charge amount of the storage battery 42 is less than the threshold value S_th1. The threshold value S_th1 may be a fixed value or a variable value. If the charge amount of the storage battery 42 is relatively small with respect to the threshold value S_th1, the information processing device 71 determines that there is room for charging by accepting at least one of surplus power and margin power, and proceeds to step S110. On the other hand, otherwise, the information processing device 71 determines that there is no room for charging by accepting at least one of surplus power and margin power, and proceeds to step S112.
[0076] In step S110, the information processing device 71 controls one of the BTB AC / DC converters 25, 35 corresponding to a generator having at least one of surplus power and margin power, and causes the power generated by the generator to be subjected to output suppression to be output to the distribution line DL40. The information processing device 71 then controls the PCS 43 to store (charge) the power from the distribution line DL40, i.e., the power generated by the generator having at least one of surplus power and margin power, in the storage battery 42. This allows the hydrogen EMS 70 to store the surplus or margin power of the renewable energy generators 21, 31 in the storage battery 42 even when the hydrogen tank 50 does not have room to accept hydrogen produced by the hydrogen production device 41. Therefore, the hydrogen EMS 70 can use the storage battery 42 to adjust supply and demand in the power system 1 even when the hydrogen production device 41 cannot be operated.
[0077] Meanwhile, in step S112, the information processing device 71 outputs a command to adjust the surplus power or the surplus power to the management device of the renewable energy power plant corresponding to the generator having at least one of surplus power and surplus power. The adjustment of surplus power includes, for example, suppressing the output of the target generator in response to the surplus power relative to the power demand of the power grid 11. The adjustment of surplus power also includes, for example, absorbing the surplus power in response to the surplus power related to the interconnection requirements of the power grid 11. The absorption of surplus power is performed, for example, by charging a storage battery or the like installed in the renewable energy power plant 20, 30. The adjustment of surplus power also includes, for example, suppressing the output of the target generator or absorbing the surplus power. For example, if the renewable energy generator 21 is the target of output suppression, the information processing device 71 outputs a command to suppress the output of the renewable energy generator 21 to the management device 22. Then, the management device 22 controls the renewable energy generator 21 in response to the command from the information processing device 71 of the hydrogen EMS 70 and suppresses the output of the renewable energy generator 21. The same applies to the case where the renewable energy generator 31 is subject to output suppression.
[0078] When the process of step S106, step S110, or step S112 is completed, the information processing device 71 ends the process of this flowchart.
[0079] Meanwhile, in step S114, the information processing device 71 determines whether or not the power grid 11 is in a state of power shortage relative to demand. A state of power shortage relative to demand in the power grid 11 refers to a state in which the demand for power in the power grid 11 is greater than the power that the power grid 11 can supply. If the power grid 11 is in a state of power shortage relative to demand, the information processing device 71 proceeds to step S116, and otherwise proceeds to step S126.
[0080] In step S116, the information processing device 71 determines whether the amount of hydrogen stored in the hydrogen tank 50 is relatively large (large) compared to the threshold value V1_th2 based on the output of the sensor in the hydrogen tank 50. The amount of hydrogen stored in the hydrogen tank 50 being relatively large (large) compared to the threshold value V1_th2 may mean that the amount of hydrogen stored in the hydrogen tank 50 is equal to or greater than the threshold value V1_th2, or may be greater than the threshold value V1_th2. The threshold value V1_th2 may be the same as or different from the threshold value V1_th1. Furthermore, the threshold value V1_th2 may be a fixed value or a variable value. In the latter case, for example, the threshold value V1_th2 is varied based on information regarding the amount of hydrogen demand obtained from hydrogen consumers. If the amount of hydrogen stored in the hydrogen tank 50 is relatively large compared to the threshold value V1_th2, the information processing device 71 determines that there is room for generating electricity using the hydrogen in the hydrogen tank 50, and proceeds to step S118. On the other hand, in other cases, the information processing device 71 determines that there is no room to generate electricity using the hydrogen in the hydrogen tank 50, and proceeds to step S120.
[0081] In step S118, the information processing device 71 controls the hydrogen generator 44 to generate electricity using hydrogen in the hydrogen tank 50 and output the electricity to the distribution line DL40. This allows the information processing device 71 to supply the electricity generated by the hydrogen generator 44 to the power grid 11 via the interconnection line IL14. Therefore, the information processing device 71 can adjust supply and demand in the power system 1 when the power grid 11 is experiencing a power shortage relative to demand.
[0082] Meanwhile, in step S120, the information processing device 71 determines whether the charge amount (remaining capacity) of the storage battery 42 is relatively large (high) relative to the threshold value S_th2. The charge amount (remaining capacity) of the storage battery 42 being relatively large (high) relative to the threshold value S_th2 may mean that the charge amount of the storage battery 42 is equal to or greater than the threshold value S_th2, or that the charge amount of the storage battery 42 exceeds the threshold value S_th2. The threshold value S_th2 may be a fixed value or a variable value. If the charge amount of the storage battery 42 is relatively large (high) relative to the threshold value S_th2, the information processing device 71 determines that there is room to discharge the power of the storage battery 42 to the power grid 11, and proceeds to step S122. On the other hand, otherwise, the information processing device 71 determines that there is no room to discharge the power of the storage battery 42 to the power grid 11, and proceeds to step S124.
[0083] In step S122, the information processing device 71 controls the PCS 43 to discharge the power from the storage battery 42 to the distribution line DL40. This allows the information processing device 71 to supply power to the power grid 11 through the interconnection line IL14. Therefore, even when the power grid 11 is experiencing a power shortage relative to demand and the hydrogen tank 50 does not have any excess storage capacity, the hydrogen EMS 70 can adjust supply and demand in the power system 1 using the power from the storage battery 42.
[0084] In step S124, the information processing device 71 reduces the operating rate of the hydrogen production device 41 during the hydrogen production main process. As a result, when the amount of electricity stored in the storage battery 42 is relatively low, the information processing device 71 can suppress the amount of electricity taken out of the storage battery 42 and suppress the decrease in the amount of electricity stored in the storage battery 42.
[0085] When the process of step S118, step S122, or step S124 is completed, the information processing device 71 ends the process of this flowchart.
[0086] Meanwhile, in step S126, the information processing device 71 determines, based on information acquired from the wholesale electricity exchange 60, whether the unit price of electricity (electricity bill) of the power grid 11 is relatively cheap with respect to the threshold value EP_th1. The unit price of electricity of the power grid 11 is the electricity fee per unit amount of power (e.g., 1 kWh) of the power grid 11. The unit price of electricity of the power grid 11 being relatively cheap with respect to the threshold value EP_th1 may be equal to or less than the threshold value EP_th1, or may be less than the threshold value EP_th1. The threshold value EP_th1 may be a fixed value or a variable value. If the unit price of electricity of the power grid 11 is relatively cheap with respect to the threshold value EP_th1, the information processing device 71 proceeds to step S128; otherwise, the information processing device 71 ends the processing of this flowchart.
[0087] In step S128, the information processing device 71 determines whether the amount of hydrogen stored in the hydrogen tank 50 is relatively small compared to the threshold value V1_th3 based on the output of the sensor in the hydrogen tank 50. The amount of hydrogen stored in the hydrogen tank 50 being relatively small compared to the threshold value V1_th3 may mean that the amount of hydrogen stored in the hydrogen tank 50 is equal to or less than the threshold value V1_th3, or that the amount of hydrogen stored in the hydrogen tank 50 is less than the threshold value V1_th3. The threshold value V1_th3 may be a fixed value or a variable value. Furthermore, the threshold value V1_th3 may be the same as or different from the threshold value V1_th1 and the threshold value V1_th2. If the amount of hydrogen stored in the hydrogen tank 50 is relatively small (small) compared to the threshold value V1_th3, the information processing device 71 determines that the hydrogen tank 50 has room to accommodate the hydrogen produced by the hydrogen production device 41, and proceeds to step S130. On the other hand, in any other cases, the information processing device 71 determines that there is no room in the hydrogen tank 50 to accept the hydrogen produced by the hydrogen production device 41, and ends the processing of this flowchart.
[0088] In step S130, the information processing device 71 controls the hydrogen production device 41 to produce hydrogen using the power from the distribution line DL40, i.e., the power supplied from the power grid 11 via the interconnection line IL14. This allows the information processing device 71 to improve the availability of the hydrogen production device 41 by using the relatively inexpensive power supplied from the power grid 11.
[0089] When the process of step S130 is completed, the information processing device 71 ends the process of this flowchart.
[0090] In this way, in this example, the hydrogen EMS 70 can utilize the surplus power of the renewable energy generators 21, 31 to improve the operating rate of the hydrogen production device 41 and can also adjust supply and demand in the power system 1.
[0091] In particular, the renewable energy generators 21, 31 generate power using different types of renewable energy, resulting in different output fluctuations. Therefore, for example, in one day, the timing at which one of the renewable energy generators 21, 31 generates surplus or marginal power differs from the timing at which the other generator generates surplus or marginal power. As a result, the hydrogen EMS 70 can improve the overall average operating rate of the hydrogen production device 41 over a span of, for example, one day. This allows for a stable improvement in the operating rate of the hydrogen production device 41.
[0092] Furthermore, in this example, even in a situation where the hydrogen tank 50 does not have room to receive hydrogen, the hydrogen EMS 70 can store surplus or excess power from the renewable energy generators 21, 31 in the storage battery 42. This allows the hydrogen EMS 70 to use the power of the storage battery 42 to operate the hydrogen production device 41 after the fact.
[0093] In particular, as described above, when viewed over a certain time span, there is a difference between the timing at which one of the renewable energy generators 21, 31 generates surplus or marginal power and the timing at which the other generator generates surplus or marginal power. The hydrogen EMS 70 can then, for example, after shipping hydrogen from the hydrogen tank 50, have the hydrogen production device 41 produce hydrogen using the surplus or marginal power stored in the storage battery 42, thereby creating a margin for the storage battery 42 to again accept surplus or marginal power. Therefore, the storage battery 42 only needs to have a capacity that can accept the larger of the surplus or marginal power expected in both the renewable energy generators 21, 31. Therefore, the capacity of the storage battery 42 can be kept small, for example, compared to when a storage battery is provided for each of the renewable energy generators 21, 31.
[0094] Furthermore, in this example, when a power shortage occurs in the power grid 11, the hydrogen EMS 70 can supply the power grid 11 with discharged power from the storage battery 42 and power generated by the hydrogen generator 44 that uses hydrogen in the hydrogen tank 50. Therefore, the hydrogen EMS 70 can more appropriately adjust the supply and demand of power in the power system 1.
[0095] Furthermore, in this example, the hydrogen EMS 70 can operate the hydrogen production device 41 using the power supplied from the power grid 11 when the unit price of power from the power grid 11 is relatively low. This allows the hydrogen EMS 70 to improve the operating rate of the hydrogen production device 41 at a relatively low cost.
[0096] [Second Example of Power System] Next, a second example of the power system 1 will be described with reference to FIG.
[0097] In the following, the same symbols will be used for configurations that are the same as or correspond to those in the first example described above, and the explanation will focus on the parts that are different from the first example described above, and explanations of content that is the same as or corresponds to those in the first example described above may be omitted or simplified.
[0098] FIG. 3 is a diagram illustrating a configuration of a second example of the power system 1. In FIG.
[0099] As shown in FIG. 3 , in this example, the power system 1 differs from the first example described above in that it includes an MCH (methylcyclohexane) production device 45 and an MCH tank 55 as components of the hydrogen production system 40.
[0100] The MCH production apparatus 45 produces MCH as a hydrogen carrier using power from the power distribution line DL40. Specifically, like the hydrogen production apparatus 41, the MCH production apparatus 45 generates hydrogen ions on the anode side by electrolysis. The hydrogen ions then flow to the cathode side through an ion exchange membrane, and the MCH production apparatus 45 can produce MCH by reacting the hydrogen ions, electrons, and toluene supplied to the anode side on a catalyst at the cathode. The MCH produced by the MCH production apparatus 45 is stored in an MCH tank 55.
[0101] The MCH tank 55 is connected to the MCH manufacturing apparatus 45 via a pipeline or the like, and stores the MCH manufactured by the MCH manufacturing apparatus 45 .
[0102] The MCH tank 55 is provided with a sensor that acquires information about the amount of MCH stored inside the MCH tank 55. The output of the sensor is taken into the hydrogen EMS 70 via a predetermined communication line.
[0103] The information processing device 71 controls the operation of the hydrogen production device 41 and the MCH production device, the charging and discharging of the storage battery 42 by the PCS 43, and the operation of the hydrogen generator 44.
[0104] For example, the information processing device 71 may operate at least one of the hydrogen production device 41 and the MCH production device 45 to produce at least one of hydrogen and MCH under conditions similar to those in which the hydrogen production device 41 is operated in the first example described above. Specifically, when the amount of hydrogen stored in the hydrogen tank 50 is relatively small compared to the threshold value V1_th1, the information processing device 71 may cause the hydrogen production device 41 to produce hydrogen using the power of a generator that has at least one of surplus power and marginal power (see steps S104 and S106 in FIG. 3 of the first example described above). Similarly, when the amount of MCH stored in the MCH tank 55 is relatively small compared to the threshold value V2_th1, the information processing device 71 may cause the MCH 45 to produce hydrogen using the power of a generator that has at least one of surplus power and marginal power (using steps S104 and S106 in FIG. 3 of the first example described above).
[0105] For example, the information processing device 71 performs processing related to the operation of the hydrogen production device 41 and the MCH production device 45 based on information related to hydrogen consumers.
[0106] The information about hydrogen consumers includes, for example, information about the demand for each consumer. For example, under the assumption that hydrogen is transported to a consumer in a liquid state (liquid hydrogen), if the demand for a certain consumer is relatively large compared to a predetermined standard, the information processing device 71 may cause the hydrogen production device 41 to produce hydrogen for that consumer. This is because the amount of hydrogen that can be transported as liquid hydrogen per unit volume is significantly greater than the amount of hydrogen that can be transported by MCH, making it more suitable for meeting relatively large demands. On the other hand, under the assumption that hydrogen is transported to a consumer as liquid hydrogen, if the demand for a certain consumer is relatively small compared to a predetermined standard, the information processing device 71 may cause the MCH production device 45 to produce MCH for that consumer. This is because, if the demand for a relatively small amount of hydrogen is relatively small, it is possible to transport the demanded amount even if the amount of hydrogen per unit volume of MCH is relatively small, and storage and transportation costs can be prioritized.
[0107] Furthermore, the information about hydrogen consumers includes, for example, information about the geographical location of the consumer's hydrogen usage location or storage location (hereinafter, for convenience, "usage location, etc."). For example, under the assumption that hydrogen is transported to consumers as liquid hydrogen, if the distance between a consumer's hydrogen usage location, etc. and the location where the hydrogen tank 50 and MCH tank 55 are installed, or the time required for transportation, is relatively long compared to a predetermined standard, the information processing device 71 may cause the MCH production device 45 to produce MCH for that consumer. On the other hand, under the assumption that hydrogen is transported to consumers as liquid hydrogen, if the distance between a consumer's hydrogen usage location, etc. and the location where the hydrogen tank 50 and MCH tank 55 are installed, or the time required for transportation, is relatively short compared to a predetermined standard, the information processing device 71 may cause the hydrogen production device 41 to produce hydrogen for that consumer. This is because the longer the transportation distance and time, the higher the cost of transporting liquid hydrogen. Furthermore, the information processing device 71 may determine whether to produce hydrogen or MCH for a certain consumer, depending on whether a pipeline for transporting hydrogen from the hydrogen tank 50 is installed to the consumer's location where hydrogen is used. Specifically, if a pipeline for transporting hydrogen from the hydrogen tank 50 is installed to the consumer's location where hydrogen is used, the information processing device 71 may cause hydrogen to be produced for that consumer using the hydrogen production device 41. On the other hand, if a pipeline for transporting hydrogen from the hydrogen tank 50 is not installed to the consumer's location where hydrogen is used, the information processing device 71 may cause MCH to be produced for that consumer using the MCH production device 45.
[0108] Furthermore, the information processing device 71 may control the operation of the hydrogen production device 41 and the MCH production device 45 based on a comparison between the storage amount of the hydrogen tank 50 and the storage amount of the MCH tank 55 .
[0109] For example, when the information processing device 71 compares the storage volumes of the hydrogen tank 50 and the MCH tank 55 and determines that the hydrogen tank 50 can accommodate a larger production volume, it causes the hydrogen production device 41 to produce hydrogen, and when the MCH tank 55 can accommodate a larger production volume, it causes the MCH production device 45 to produce MCH.
[0110] Furthermore, one of the hydrogen production device 41 and the MCH production device 45 to be operated with priority may be specified in advance.
[0111] For example, when the amount of hydrogen stored in the hydrogen tank 50 is relatively small compared to the threshold value V1_th1, the information processing device 71 may cause the hydrogen production device 41 to produce hydrogen. In other cases, when the amount of MCH stored in the MCH tank 55 is relatively small compared to the threshold value V2_th1, the information processing device 71 may cause the MCH production device 45 to produce MCH. Conversely, the MCH production device 45 may be operated with priority.
[0112] As described above, in this example, the hydrogen EMS 70 can use surplus power from the renewable energy generators 21, 31 to cause the hydrogen production device 41 and the MCH production device 45 to produce hydrogen and MCH, respectively. This allows the hydrogen EMS 70 to produce MCH more cheaply. Furthermore, the hydrogen EMS 70 can adjust the supply and demand of power in the power system 1 using both the hydrogen production device 41 and the MCH production device 45. Therefore, the hydrogen EMS 70 can expand the adjustment range for adjusting the supply and demand of power, and as a result, can more appropriately adjust the supply and demand of power in the power system 1.
[0113] [Another Example of Power System] Next, another example of the power system 1 will be described.
[0114] The above-described embodiment may be modified or changed as appropriate.
[0115] For example, in the first and second examples of the power system 1 described above, one or more renewable energy generators may be connected to the power grid 11 and the distribution line DL40 of the hydrogen production system 40 in addition to the renewable energy generators 21 and 31. That is, in the first and second examples of the power system 1 described above, three or more generators that generate electricity using renewable energy may be connected to the distribution line DL40 of the hydrogen production system 40. In this case, all of the three or more generators that generate electricity using renewable energy may be different types, or at least two of the generators that generate electricity using renewable energy may be different types.
[0116] Furthermore, in the first and second examples and their variations of the power system 1 described above, the interconnection line between the generator that generates electricity using renewable energy and the distribution line DL40 may be replaced with another type of AC / DC converter, such as an HVDC (High Voltage Direct Current Transmission) AC / DC converter, instead of the BTB AC / DC converter.
[0117] Furthermore, in the first and second examples and their modifications of the power system 1 described above, the hydrogen production system 40 may be further simplified. For example, at least one of the storage battery 42, the PCS 43, and the hydrogen generator 44 may be omitted.
[0118] Furthermore, in the second example and its modified examples of the power system 1 described above, the hydrogen production device 41 may be omitted. In this case, the hydrogen production system 40 functions as a hydrogen carrier production system.
[0119] Furthermore, in the second example of the power system 1 described above and its modified example, instead of the MCH production device 45, a hydrogen carrier production device capable of producing other types of hydrogen carriers different from MCH using power from the distribution line DL40 may be provided.
[0120] Furthermore, in the first and second examples and their variations of the power system 1 described above, the renewable energy used by the generator may include other types of energy, such as geothermal energy, instead of or in addition to the solar energy and wind energy described above.
[0121] Furthermore, in the first and second examples and their variations of the power system 1 described above, the information processing device 71 may predict which of the multiple generators that use renewable energy are likely to generate surplus power or surplus power. The information processing device 71 may then operate the hydrogen production device 41 and the MCH production device 45 using the power of the generator predicted to be likely to generate surplus power or surplus power. In other words, the information processing device 71 may operate the hydrogen production device 41 and the MCH production device 45 using the power of the generator predicted to be likely to generate surplus power or surplus power among the multiple generators that use renewable energy. Similarly, the information processing device 71 may charge the storage battery 42 using the power of the generator predicted to be likely to generate surplus power or surplus power when the amount of hydrogen stored in the hydrogen tank 50 is not relatively small compared to the threshold value V1_th1 or when the amount of MCH stored in the MCH tank 55 is not relatively small compared to the threshold value V2_th1.
[0122] Furthermore, in the first and second examples and their modified examples of the power system 1 described above, a hydrogen carrier tank for storing hydrogen carriers may be provided instead of or in addition to the hydrogen tank 50, and a hydrogen carrier conversion device for converting hydrogen into hydrogen carriers may be provided between the hydrogen production device 41 and the hydrogen carrier tank. In this case, some or all of the hydrogen produced in the hydrogen production device 41 is sent to the hydrogen carrier conversion device, and the hydrogen carriers output from the hydrogen carrier conversion device are sent to the hydrogen carrier tank.
[0123] Furthermore, a larger power system may be constructed that includes a plurality of power systems 1 according to the first example, second example, or modified examples thereof, and the power systems 1 may adjust the supply and demand of power in cooperation with the other power systems 1. In this case, an interconnection line (hereinafter referred to as "power system interconnection line") is provided between the power systems 1, for example, connecting the distribution lines DL40 of the hydrogen production systems 40 of each other.
[0124] For example, if the information processing device 71 of the hydrogen EMS 70 determines that the hydrogen production system 40 of the power system 1 to which the information processing device 71 belongs does not have the capacity to utilize the surplus power of the renewable energy generators 21, 31, the information processing device 71 may cause the hydrogen production system 40 of the other power system 1 to utilize the surplus power. Specifically, if step S108 of FIG. 3 is NO, the information processing device 71 may perform processing to determine whether the other power system 1 can utilize the surplus power by inquiring of the hydrogen EMS 70 of the other power system 1 about whether the surplus power or surplus power is available. If the other power system 1 can utilize the surplus power or surplus power, the information processing device 71 may control the BTB AC / DC converters 25, 35 of the power system 1 to which the information processing device 71 belongs and the AC / DC converter of the power system interconnection line to output the surplus power or surplus power to the hydrogen production system 40 of the other power system 1. On the other hand, if the other power system 1 cannot utilize the surplus power or surplus power, the information processing device 71 may proceed to step S112.
[0125] Furthermore, if the information processing device 71 of the hydrogen EMS 70 determines that the hydrogen production system 40 of the power system 1 to which it belongs cannot supply power to the power grid 11 experiencing a power shortage, it may request a power supply from another power system 1. Specifically, if step S120 in FIG. 3 described above is NO, the information processing device 71 may perform processing to transmit a signal requesting a power supply via the power system interconnection to the other power system 1. Then, upon completion of this processing, the information processing device 71 may proceed to step S124. In this case, the information processing device 71 of the other power system 1 that is the request recipient can supply power to the requesting power system 1 via the power system interconnection by performing a processing flow similar to steps S116 to S122 in FIG. 3.
[0126] [Operation] Next, the operation of the power system, the control device, and the control method according to this embodiment will be described.
[0127] In this embodiment, the power system includes a hydrogen production device and a control device. The power system is, for example, the power system 1 described above. The hydrogen production device is, for example, the hydrogen production device 41. The control device is, for example, the information processing device 71. Specifically, the hydrogen production device produces hydrogen using power supplied from multiple renewable energy-derived power sources, including two or more different types of power sources. The two or more different types of power sources are, for example, the renewable energy power plant 20 and the renewable energy power plant 30 described above. The control device controls the supply of power to the hydrogen production device from one of the multiple renewable energy-derived power sources that has a surplus or margin in its power output. A "power source that has a surplus" refers to a power source that currently has a surplus or that may have a surplus in the future. Similarly, a "power source that has a surplus" refers to a power source that currently has a surplus or that may have a surplus in the future.
[0128] In this embodiment, the control device controls a power system including a hydrogen production device that produces hydrogen using power supplied from multiple renewable energy-derived power sources, including two or more different types of power sources. Specifically, the control device controls the supply of power to the hydrogen production device from a power source that has a surplus or margin in the power output of the multiple renewable energy-derived power sources.
[0129] In this embodiment, the control method controls a power system including a hydrogen production device that produces hydrogen using power supplied from multiple renewable energy-derived power sources, including two or more different types of power sources. Specifically, in the control method, the control device controls the hydrogen production device to supply power from one of the multiple renewable energy-derived power sources that has a surplus or margin in power output.
[0130] This allows the control device to have the hydrogen production device produce hydrogen using surplus or surplus power from renewable energy-derived power sources, thereby adjusting the supply and demand of electricity in the power system. The control device can also use the surplus or surplus power of the power sources at different times depending on the differences in output fluctuations between different types of renewable energy-derived power sources. Therefore, the control device can smooth out fluctuations in the operating status of the hydrogen production device due to output fluctuations from renewable energy-derived power sources, thereby improving the operating rate of the hydrogen production device. Furthermore, because the control device uses surplus or surplus power from renewable energy-derived power sources, it can have the hydrogen production device produce hydrogen more cheaply.
[0131] Furthermore, in this embodiment, a power source having a surplus in power output among a plurality of renewable energy-derived power sources may be a power source that is subject to power output suppression for the power grid, or a power source that increases in a manner that deviates from the power output fluctuation requirements for the power grid. "A power source that is subject to power output suppression for the power grid" refers to a power source that is currently subject to power output suppression for the power grid, or a power source that may become subject to power output suppression for the power grid in the future. Similarly, "a power source that increases in a manner that deviates from the power output fluctuation requirements for the power grid" refers to a power source that is currently increasing in a manner that deviates from the power output fluctuation requirements for the power grid, or a power source that may increase in a manner that deviates from the power output fluctuation requirements for the power grid in the future. The power grid is, for example, the above-mentioned power grid 11.
[0132] This allows the control device to improve the availability of the hydrogen production device by effectively utilizing the power of a power source derived from renewable energy that is subject to or may be subject to power output suppression to the power grid. Also, the control device can improve the availability of the hydrogen production device by effectively utilizing the power of a power source derived from renewable energy that is experiencing or may be experiencing increasing output fluctuations that deviate from the interconnection requirements for the power grid.
[0133] In this embodiment, the power source having a surplus in power output among the plurality of renewable energy-derived power sources may be a solar power generation device having a surplus in power output due to overloading. The solar power generation device having a surplus in power output due to overloading refers to a solar power generation device that currently has a surplus in power output due to overloading, or a solar power generation device that may have a surplus in power output due to overloading in the future.
[0134] This allows the control device to effectively utilize the power of a solar power generation device that has or may have excess power output due to overloading, thereby improving the operating rate of the hydrogen production device.
[0135] In the present embodiment, the power system may also include a power storage device. The power storage device is, for example, a storage battery 42. Specifically, the power storage device stores power supplied from a plurality of renewable energy-derived power sources. The control device may then control the power storage device to supply power from a power source that has a surplus or margin in the power output of one of the plurality of renewable energy-derived power sources.
[0136] This allows the control device to store surplus or excess power from the renewable energy source in the power storage device. Therefore, by using the power storage device in addition to the hydrogen production device, the control device can more appropriately adjust the supply and demand of power in the power system.
[0137] In this embodiment, the power system may also include a hydrogen tank. The hydrogen tank is, for example, the hydrogen tank 50 described above. Specifically, the hydrogen tank stores hydrogen produced by the hydrogen production device. The control device may then control the supply of power to each of the hydrogen production device and the power storage device from a power source that has a surplus or excess in power output among the multiple renewable energy-derived power sources, depending on the amount of hydrogen stored in the hydrogen tank and the amount of power stored in the power storage device.
[0138] This allows the control device to adjust the power supply to the hydrogen production device or the power storage device from a renewable energy power source that has or may have surplus or marginal power, taking into account the hydrogen capacity that the hydrogen tank can accommodate and the power capacity that the power storage device can accommodate. As a result, the control device can more appropriately adjust the supply and demand of power in the power system.
[0139] Furthermore, in this embodiment, when the amount of hydrogen stored in the hydrogen tank is relatively small compared to a first criterion, the control device may cause one of the plurality of renewable energy-derived power sources that has a surplus or margin in power output to supply power to the hydrogen production device. The first criterion is, for example, the threshold value V1_th1 described above. On the other hand, when the amount of hydrogen stored in the hydrogen tank is not relatively small compared to the first criterion and the amount of power stored in the power storage device is relatively small compared to a second criterion, the control device may cause one of the plurality of renewable energy-derived power sources that is subject to output suppression to supply power to the power storage device. The second criterion is, for example, the threshold value S_th1 described above.
[0140] This allows the control device to operate the hydrogen production device preferentially using electricity from renewable energy sources where there is or may be surplus or excess electricity, and in situations where the hydrogen tank cannot accommodate more hydrogen, the power can be stored in the storage device.
[0141] In addition, in this embodiment, the control device may control the discharge of power from the power storage device to the power grid, depending on the power supply and demand situation in the power grid and the amount of power stored in the power storage device.
[0142] This allows the control device to supply power to the power grid by discharging from the power storage device, taking into account the power supply and demand situation in the power grid and the amount of power stored in the power storage device. Therefore, the control device can more appropriately adjust the power supply and demand in the power system.
[0143] In the present embodiment, the control device may discharge power from the power storage device to the power grid when a power shortage occurs in the power grid and the amount of power stored in the power storage device is relatively large with respect to a third criterion, for example, the third criterion being a threshold value S_th2.
[0144] As a result, when the power supply from the power grid is tight, the control device can supply power from the power storage device that has a relatively large remaining capacity, thereby adjusting the power supply and demand of the power system.
[0145] In this embodiment, the power system may also include a hydrogen tank and a hydrogen power generation device. The hydrogen power generation device is, for example, the hydrogen generator 44 described above. Specifically, the hydrogen tank stores hydrogen produced by the hydrogen production device. The hydrogen power generation device generates electricity using the hydrogen stored in the hydrogen tank and supplies the electricity to the power grid. The control device may then control the operation of the hydrogen power generation device according to the power supply and demand situation in the power grid and the amount of hydrogen stored in the hydrogen tank.
[0146] This allows the control device to take into account the power supply and demand situation in the power grid and the amount of hydrogen stored in the hydrogen tank, have the hydrogen power generation device generate electricity using hydrogen from the hydrogen tank, and supply that electricity to the power grid, thereby enabling the control device to more appropriately adjust the power supply and demand in the power system.
[0147] In this embodiment, the hydrogen-powered power generator may generate electricity and supply it to the power grid when there is a power shortage in the power grid and the amount of hydrogen stored in the hydrogen tank is relatively large compared to a fourth criterion, which is, for example, the above-mentioned threshold value V1_th2.
[0148] As a result, when the power supply from the power grid is tight, the control device can use the hydrogen in the hydrogen tank, which has a relatively large remaining capacity, to generate electricity in the hydrogen power generation device and supply it to the power grid, thereby adjusting the supply and demand of electricity in the power system.
[0149] In this embodiment, the power system may include a power storage device in addition to the hydrogen power generation device, and the control device may control the operation of the hydrogen power generation device and the discharge of the power storage device according to the power supply and demand situation in the power grid, the amount of hydrogen stored in the hydrogen tank, and the amount of electricity stored in the power storage device.
[0150] This allows the control device to supply the power grid with the generated power from the hydrogen power generation device using hydrogen in the hydrogen tank and the discharged power from the power storage device, taking into account the power supply and demand situation in the power grid, the amount of hydrogen stored in the hydrogen tank, and the amount of power stored in the power storage device.As a result, the control device can more appropriately adjust the power supply and demand in the power system.
[0151] In addition, in this embodiment, when electricity is being generated in the power system, the control device may cause the hydrogen power generation device to generate electricity and supply it to the power system when the amount of hydrogen stored in the hydrogen tank is relatively large compared to the fourth standard, and may cause the storage device to discharge electricity to the power system when the amount of hydrogen stored in the hydrogen tank is not relatively large compared to the fourth standard and the amount of electricity stored in the storage device is relatively large compared to the third standard.
[0152] As a result, when the power supply from the power system is tight, the control device can prioritize supplying the generated power from the hydrogen power generation device to the power system, and when the remaining capacity of the hydrogen tank is low, supply the discharged power from the storage device to the power system, thereby adjusting the supply and demand of power in the power system.
[0153] In this embodiment, the hydrogen production device may produce hydrogen using power supplied from the power grid. The control device may then control the hydrogen production device to supply power from the power grid and produce hydrogen when the price of electricity from the power grid is relatively low compared to a predetermined (fifth) criterion. The predetermined (fifth) criterion is, for example, a threshold value EP_th1.
[0154] This allows the control device to more cheaply produce hydrogen using power supplied from the power grid, thereby improving the availability of the hydrogen production device while suppressing increases in costs.
[0155] In addition, in this embodiment, the control device may supply electricity from the power system to the hydrogen production device and cause the hydrogen production device to produce hydrogen when there is no congestion or power shortage in the power system and the price of electricity in the power system is relatively low compared to the fifth criterion.
[0156] This allows the control device to have the hydrogen production device produce hydrogen using inexpensive electricity from the power grid only when there is no congestion or power shortage in the power grid, thereby enabling the control device to more efficiently improve the operating rate of the hydrogen production device.
[0157] In this embodiment, the plurality of renewable energy-derived power sources may include a solar power generation device and a wind power generation device.
[0158] This allows the control device to use surplus or marginal power at different times from the two power sources, the solar power generation system and the wind power generation system, depending on the differences in the trends of output fluctuations between the two power sources.As a result, the control device can suppress fluctuations in the operating status of the hydrogen production device caused by output fluctuations from each of the two power sources so as to even them out, thereby improving the operating rate of the hydrogen production device.
[0159] In this embodiment, the power system may also include a hydrogen carrier production apparatus. The hydrogen carrier production apparatus is, for example, the MCH production apparatus 45 described above. Specifically, the hydrogen carrier production apparatus produces hydrogen carriers using power supplied from multiple renewable energy-derived power sources. The control device may then control the supply of power to the hydrogen carrier production apparatus from a power source that has a surplus or excess power output among the multiple renewable energy-derived power sources.
[0160] This allows the power system to utilize surplus or excess power from renewable energy-derived power sources to produce not only hydrogen but also hydrogen carriers.
[0161] In this embodiment, the hydrogen carrier may be methylcyclohexane.
[0162] This allows the power system to produce methylcyclohexane using surplus or excess power from a power source derived from renewable energy.
[0163] In addition, in this embodiment, the control device may control the operation of the hydrogen production device and the hydrogen carrier production device based on information about hydrogen consumers.
[0164] This allows the control device to adjust the operating conditions of the hydrogen production device and the hydrogen carrier production device, taking into account information about hydrogen consumers.
[0165] In addition, in this embodiment, the information about the consumer may include at least one of information about the consumer's demand for hydrogen and information about the geographical location of the consumer's hydrogen usage location or storage location.
[0166] This allows the control device to adjust the operating conditions of the hydrogen production device and the hydrogen carrier production device, taking into consideration the amount of hydrogen demanded by the consumer, the location where the consumer uses or stores the hydrogen, etc.
[0167] Although the embodiments have been described in detail above, the present disclosure is not limited to such specific embodiments, and various modifications and changes are possible within the scope of the gist described in the claims.
[0168] Finally, this application claims priority based on Japanese Patent Application No. 2023-054933, filed on March 30, 2023, the entire contents of which are incorporated herein by reference.
[0169] REFERENCE SIGNS LIST 1 Power system 10 Power grid system 11 Power grid 20 Renewable energy power plant 21 Renewable energy generator 25 BTB AC / DC converter 30 Renewable energy power plant 31 Renewable energy generator 35 BTB AC / DC converter 40 Hydrogen production system 41 Hydrogen production device 42 Storage battery 43 PCS 44 Hydrogen generator 45 MCH production device 50 Hydrogen tank 55 MCH tank 60 Wholesale electricity exchange 70 Hydrogen EMS 71 Information processing device DL40 Distribution line IL14, IL21, IL24, IL31, IL34 Interconnection line
Claims
1. A power system comprising: a hydrogen production device that produces hydrogen using power supplied from a plurality of renewable energy-derived power sources, including two or more different types of power sources; and a control device that controls the supply of power to the hydrogen production device from a power source that has a surplus or excess in power output among the plurality of renewable energy-derived power sources.
2. The power system according to claim 1, wherein the power source generating the surplus power output is a power source that is subject to power output suppression to the power grid, or a power source that increases in a manner that deviates from requirements for power output fluctuation to the power grid.
3. The power system according to claim 1, wherein the power source having a surplus in power output is a photovoltaic power generation device having a surplus in power output due to overloading.
4. The power system according to any one of claims 1 to 3, further comprising a power storage device that stores power supplied from the plurality of power sources derived from renewable energy, and wherein the control device controls the power storage device to supply power from a power source that has a surplus or margin in the power output.
5. The power system according to claim 4, further comprising a hydrogen tank for storing hydrogen produced by the hydrogen production device, and wherein the control device controls the supply of power to each of the hydrogen production device and the power storage device from a power source having a surplus or excess in the power output, depending on the amount of hydrogen stored in the hydrogen tank and the amount of power stored in the power storage device.
6. The power system according to claim 4, wherein the control device controls the discharge of power from the power storage device to the power grid in accordance with a power supply and demand situation in the power grid and an amount of power stored in the power storage device.
7. The power system according to any one of claims 1 to 3, comprising: a hydrogen tank for storing hydrogen produced by the hydrogen production device; and a hydrogen power generation device that generates electricity using the hydrogen stored in the hydrogen tank and supplies the electricity to an electric power grid, wherein the control device controls the operation of the hydrogen power generation device according to the supply and demand situation of electricity in the electric power grid and the amount of hydrogen stored in the hydrogen tank.
8. The power system according to claim 7, further comprising a power storage device that stores electricity supplied from the plurality of renewable energy-derived power sources, wherein the control device controls the operation of the hydrogen power generation equipment and the discharge of the power storage device according to the power supply and demand situation of the power grid, the amount of hydrogen stored in the hydrogen tank, and the amount of electricity stored in the power storage device.
9. The power system according to any one of claims 1 to 3, wherein the hydrogen production device produces hydrogen by power supply from a power grid, and the control device controls the hydrogen production device to receive power from the power grid and produce hydrogen when the price of electricity in the power grid is relatively low compared to a predetermined standard.
10. The power system according to any one of claims 1 to 3, wherein the plurality of renewable energy-derived power sources include a solar power generation device and a wind power generation device.
11. The power system according to any one of claims 1 to 3, comprising a hydrogen carrier production device that produces methylcyclohexane using power supplied from the plurality of renewable energy-derived power sources, wherein the control device controls the supply of power to the hydrogen carrier production device from a power source that has a surplus or margin in the power output of the plurality of renewable energy-derived power sources.
12. The power system according to claim 11, wherein the control device controls the operation of the hydrogen production device and the hydrogen carrier production device based on information relating to hydrogen consumers.
13. The power system according to claim 12, wherein the information about the consumer includes at least one of information about the consumer's demand for hydrogen and information about the geographical location of the consumer's hydrogen usage location or storage location.
14. A control device for a power system including a hydrogen production device that produces hydrogen using power supply from multiple renewable energy-derived power sources, including two or more power sources of different types, wherein the control device controls the supply of power to the hydrogen production device from a power source among the multiple renewable energy-derived power sources that has a surplus or excess in power output.
15. A control method for a power system including a hydrogen production device that produces hydrogen using power supply from multiple renewable energy-derived power sources, including two or more power sources of different types, wherein the control device causes the hydrogen production device to be supplied with power from one of the multiple renewable energy-derived power sources that has a surplus or excess in power output.
Citation Information
Patent Citations
Electric power energy system supported by underground space
CN113824153A
Wind power generation system, its control method, and wind power station using these system and method
JP2008278725A
Operation system of distributed type power supply and its operation method
JP2009077457A
Supply-and-demand control apparatus, power supply system, and supply-and-demand control method
JP2016093050A
Power supply system using power generation facility utilizing renewable energy
JP2016189691A
Cited By
Energy management device and energy management method
WO2026115792A1