Method executed by user equipment, and user equipment
The user equipment determines the activated TCI state and the associated TAG information according to the activation command, calculates the downlink road loss reference signal, and solves the problem of determining the downlink road loss reference signal for PUCCH transmission under multiple TRPs, improving the accuracy of road loss compensation and accuracy of PUCCH transmission power.
Patent Information
- Application Number
- PCT/CN2024/091162
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-10
- Filing Date
- 2024-05-06
- Publication Date
- 2024-11-14
AI Technical Summary
In the case of multiple TRPs, the UE cannot effectively determine the downlink path loss reference signal transmitted by PUCCH, resulting in possible errors in the path loss compensation, which in turn affects the accuracy of the PUCCH transmission power.
The user equipment determines the activated uplink TCI state in multiple TCI states based on the most recent or most recently received activation command, and obtains the associated time advance packet TAG information through the TCI state, and then determines the control resource set for Calculate the reference signal for downlink loss.
When multiple TRPs correspond to different TAs, the downlink path loss reference signal transmitted by PUCCH can be effectively determined, the accuracy of path loss compensation can be improved, and the accuracy of PUCCH transmission power can be ensured.
Smart Images

Figure CN2024091162_14112024_PF_FP_ABST
Abstract
Description
Method performed by user equipment and user equipment Technical Field
[0001] The present invention relates to the field of wireless communication technology, and more particularly, to a method executed by a user equipment and corresponding user equipment. Background Art
[0002] To further enhance the uplink transmission and reception performance in NR technology, the Third Generation Partnership Project (3GPP) intends to study uplink transmission under multiple transmit and receive nodes (TRPs). In a serving cell, more than one transmit and receive node TRP can be deployed, with each TRP providing service to the same UE. A serving cell can be configured with one or more such TRPs.
[0003] According to existing technologies, if a serving cell is configured with multiple TRPs, the timing advance (TA) used by the UE for uplink transmissions remains the same regardless of the TRP configured for that serving cell. Furthermore, when performing uplink PUCCH transmissions, a downlink path loss reference signal (DCRS) is required to calculate the PUCCH transmit power. When multiple TRPs exist, the UE always determines the downlink path loss reference signal based on the first activated TCI state.
[0004] In actual applications, as shown in Figure 1, due to the different physical distances between different TRPs and UEs, the propagation delays are different, resulting in different values of the timing advance (Timing Advance) used by the UE when transmitting for different TRPs. If a serving cell is configured with multiple TRPs, and different TRPs correspond to different TA values, it means that the physical distances between different TRPs and UEs are different. If the UE continues to determine the downlink path loss reference signal based on the first activated TCI state, the path loss compensation may be wrong, causing the PUCCH transmission power to deviate from the actual demand. Therefore, how to determine the downlink path loss reference signal for PUCCH transmission in this case where multiple TRPs correspond to different TAs is a problem that needs to be solved.
[0005] Summary of the Invention
[0006] In order to solve the above problem, the present invention provides a method performed by a user equipment and the user equipment.
[0007] According to a first aspect of the present invention, a method performed by a user equipment (UE) is provided, comprising: the UE, configured with multiple uplink transmission configuration indication (TCI) states, determining, based on a most recent or most recently received activation command, at least one activated uplink TCI state among the multiple TCI states; the UE obtaining, based on the at least one activated uplink TCI state, timing advance group (TAG) information associated with the activated uplink TCI state; the UE determining, based on the TAG information, information of a control resource set associated with the TAG information; and the UE determining, based on the control resource set, a reference signal for calculating a downlink path loss.
[0008] In the method of the first aspect above, preferably, the UE may calculate the transmission power for PUCCH transmission according to the determined reference signal.
[0009] In the method of the first aspect above, preferably, the at least one activated uplink TCI state may be one uplink TCI state, and the UE obtains TAG information associated with the one activated uplink TCI state.
[0010] In the method of the first aspect above, preferably, the at least one activated uplink TCI state may be multiple uplink TCI states. When the TAG information associated with the multiple activated uplink TCI states is the same, the UE determines the control resource set associated with the same TAG information based on the same TAG information.
[0011] In the method of the first aspect above, preferably, the at least one activated uplink TCI state may be multiple uplink TCI states. When the TAG information associated with the multiple activated uplink TCI states is different, the UE selects the specified TAG information for determining the reference signal for calculating the downlink path loss.
[0012] In the method of the first aspect above, preferably, the at least one activated uplink TCI state may be multiple uplink TCI states. When the TAG information associated with the multiple activated uplink TCI states is different, the UE selects the TAG information associated with the first activated uplink TCI state among the multiple activated uplink TCI states to determine the reference signal for calculating the downlink path loss.
[0013] In the method of the first aspect above, preferably, the at least one activated uplink TCI state may be multiple uplink TCI states. When the TAG information associated with the multiple activated uplink TCI states is different, the UE selects the TAG associated with the last of the multiple activated uplink TCI states or the activated uplink TCI state closest in time to the PUCCH transmission to determine the reference signal for calculating the downlink path loss.
[0014] In the method of the above-mentioned first aspect, preferably, the UE can determine the information of the control resource set associated with the TAGID, that is, the number coresetPoolIndex of the control resource set, based on the TAGID of the TAG information, and the UE determines the reference signal for calculating the downlink path loss based on the control resource set pointed to by the number coresetPoolIndex of the control resource set.
[0015] In the method of the first aspect above, preferably, the UE can determine the resources of the reference signal for calculating the downlink path loss based on the first activated downlink TCI state or the most recently activated TCI state among the multiple downlink TCI states associated with the determined control resource set.
[0016] In addition, according to a second aspect of the present invention, a user equipment is provided, comprising: a processor; and a memory storing instructions, wherein the instructions execute the method described above when executed by the processor.
[0017] Effects of the Invention
[0018] According to the present disclosure, a method and user equipment executed by a user equipment for effectively determining a downlink path loss reference signal transmitted by a PUCCH when multiple TRPs correspond to different TAs can be provided. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] FIG1 is a schematic diagram for explaining a case where a user equipment is configured with multiple transmitting and receiving nodes.
[0020] FIG2 is a diagram for explaining the timing advance amount.
[0021] FIG3 is a flowchart showing a method executed by a user equipment as an example in the first embodiment.
[0022] FIG4 is a flowchart showing a method executed by a user equipment as a variation of the first embodiment.
[0023] FIG5 is a simplified structural block diagram of a user equipment involved in the present invention. DETAILED DESCRIPTION
[0024] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments. It should be noted that the present invention is not limited to the specific embodiments described below. In addition, for the sake of simplicity, detailed descriptions of known technologies that are not directly related to the present invention are omitted to prevent confusion in understanding the present invention.
[0025] Before the detailed description, the following explanations are given for several terms mentioned in the present invention. Unless otherwise specified, the terms involved in the present invention have the following meanings.
[0026] UE: User Equipment;
[0027] NR: New Radio, the next generation of wireless technology;
[0028] LTE: Long Term Evolution, long-term evolution technology;
[0029] eLTE: Enhanced Long Term Evolution, enhanced long-term evolution technology;
[0030] RRC: Radio Resource Control, radio resource control (layer);
[0031] MAC: Medium Access Control, media access control (layer);
[0032] MAC CE: MAC Control Element, MAC control element;
[0033] PHY: physical layer, physical layer;
[0034] RB: radio bearer, wireless bearer;
[0035] DRB: Data Radio Bearer, data radio bearer;
[0036] SRB: Signaling Radio Bearer, signaling radio bearer;
[0037] TCI: Transmission Configuration Indicator, transmission configuration indication;
[0038] RSRP: Reference Signal Received Power, reference signal received power;
[0039] PRACH: Physical Random Access Channel, physical random access channel;
[0040] RA: Random Access, random access;
[0041] RAR: Random Access Response, random access response;
[0042] TRP: Transmit / Receive Point, sending and receiving node;
[0043] SS: Synchronization Signal, synchronization signal;
[0044] PBCH: Physical Broadcast Channel, physical broadcast channel;
[0045] SSB: SS / PBCH block, synchronized broadcast block;
[0046] CSI-RS: Channel State Information-Reference Signal, channel state information reference signal;
[0047] HARQ: Hybrid Automatic Repeat Request, hybrid automatic request retransmission;
[0048] PUCCH: Physical Uplink Control Channel, physical uplink control channel;
[0049] SRS: Sounding Reference Signal, detection reference signal;
[0050] CSI: Channel-State Information, channel state information;
[0051] PDCCH: Physical Downlink Control Channel, physical downlink control channel.
[0052] PUSCH: Physical Uplink Shared Channel, physical uplink shared channel.
[0053] Hereinafter, a description is given of related technologies of the present invention.
[0054] Timing advance N TA
[0055] Timing advance N TA It can be used to calculate the timing advance between downlink and uplink.
[0056] As shown in Figure 2, in order to maintain uplink synchronization, the UE needs to start transmitting the i-th uplink frame (Uplink Frame i) some time before the start position of the i-th downlink frame (Downlink Frame i), as shown in the figure below. This period of time can be determined by the time advance value T TA Characterization, T TA =(N TA +N TA,offset )*T c , where T c It is a time parameter related to the carrier frequency.
[0057] The Timing advance command contains an index value, which is recorded as T A , used to calculate N TA When receiving the Timing Advance Command included in the random access response, the UE can calculate the value of NrA based on the TA. A Indirectly indicates N TA The specific calculation method can refer to the existing technology.
[0058] Timing Advance Group (TAG)
[0059] In the prior art, in order to maintain uplink time alignment, each serving cell is divided into a TAG, and serving cells with the same timing advance belong to the same TAG. TAGs are identified and distinguished by TAG IDs. In order to manage the validity of the TA value, each TAG can have its own timer, timeAlignmentTimer, which is used to control the effective time of uplink synchronization of the serving cells belonging to the TAG. During the operation of the timer timeAlignmentTimer, the TA value corresponding to the TAG can be considered valid, so that the timing advance value TTA calculated using the TA value is valid. When the TA value is updated, for example, when the UE receives a Timing advance command containing a TA, the timeAlignmentTimer of the corresponding TAG will be started or restarted; when the timeAlignmentTimer of a TAG times out, it means that the uplink of the serving cell belonging to the TAG is no longer synchronized. Usually, the UE will release the PUSCH and PUCCH of the serving cell and clear the HARQ buffer.
[0060] In the scenario of multiple TRPs, a serving cell may contain more than one TRP, and each TRP has its own corresponding time advance. Then one implementation method may be that a serving cell may belong to more than one TAG, for example, there may be two TAGs associated with the serving cell, each TAG corresponds to a TRP, or each TRP has its own associated TAG or TAGID. Similarly, each TAG may have its own timeAlignmentTimer.
[0061] In addition, the TAG to which the primary serving cell (PCell) belongs is called the primary TAG (PTAG).
[0062] Synchronous Broadcast Block SSB
[0063] When the NR system operates in the high frequency band, the base station often cannot simultaneously send multiple beams covering the entire cell. Therefore, beam scanning technology is introduced in the NR system to solve the problem of cell coverage.
[0064] Beam scanning means that a base station transmits only one or a few beam directions at a time, and then transmits different beams at multiple times to cover all directions required by the entire cell. The synchronized broadcast block set is designed for beam scanning and is used to transmit the primary synchronization signal, secondary synchronization signal, and physical broadcast channel required by UEs to search for cells in each beam direction. These signals constitute a synchronized broadcast block (SSB). A synchronized broadcast block set is a collection of multiple synchronized broadcast blocks within a specific time period. Each synchronized broadcast block corresponds to a beam direction within the same period, and the beam directions of each synchronized broadcast block in a synchronized broadcast block set cover the entire cell.
[0065] In a multiple TRP scenario, one TRP can be considered to correspond to some SSBs in the synchronized broadcast block set, while another TRP corresponds to some SSBs in the set. The SSBs corresponding to these two TRPs constitute the complete set of synchronized off-broadcast blocks, covering the entire cell. Therefore, during random access, when selecting random access resources, the UE must first determine the random access beam direction, that is, the SSB.
[0066] In the multiple TRP scenario, there can also be a primary TRP (primary TRP) corresponding to all SSBs in the synchronized broadcast block set, achieving coverage of the entire cell. At the same time, there are one or more secondary TRPs (Secondary TRPs), and their corresponding beam directions can be part of the SSB, or more subdivided, and can be represented by CSI-RS, that is, corresponding to the beam direction of CSI-RS.
[0067] Therefore, it can be considered that TRP and SSB or CSI-RS have a corresponding relationship, or are related to each other.
[0068] This correspondence can be directly reflected in the RRC configuration information. For example, if a group of SSB sequence numbers are configured for a TRP, then these SSBs are associated with the TRP; for example, if a group of CSI-RS is configured for a TRP, then these CSI-RS are associated with the TRP.
[0069] Such a correspondence may also be represented indirectly, for example, by TCI states.
[0070] The UE detects PDCCH in the configured search space. The configuration information of each search space contains the information of the control resource set (ControlResourceSet, CORESET) used by the search space. The control resource set provides resource blocks in the frequency domain and time domain. Each control resource set is associated with a series of TCI states. Each TCI state contains at least one SSB or CSI-RS information. The control resource set used for the same search space can be identified by its number coresetPoolIndex, where the number value 0 corresponds to the first TRP, the number value 1 corresponds to the second TRP, and so on. Therefore, one or more TCI states associated with the control resource set (or the control resource set number coresetPoolIndex) can correspond to the TRP corresponding to the control resource set (or the control resource set number coresetPoolIndex), thereby forming a corresponding relationship between TRP and SSB or CSI-RS.
[0071] In the present invention, network, base station and RAN can be used interchangeably. The network can be a Long Term Evolution (LTE) network, a New Radio Access Technology (New RAT, NR) network, an enhanced Long Term Evolution (eLTE) network, or other networks defined in subsequent evolution versions of 3GPP.
[0072] In addition, "associated with" and "corresponding to" can be used interchangeably herein.
[0073] Specific embodiments are listed below to illustrate the processing method of the present invention.
[0074] Example 1
[0075] In order to perform PUCCH transmission, the UE needs to determine the PUCCH transmission power. In the process of determining the transmission power, the UE needs to determine the reference signal for calculating the downlink path loss of the transmission power.
[0076] The specific formula for PUCCH transmission power can refer to the formula for PUSCH transmission power calculation in Chapter 7, Section 2 of the existing 3rd Generation Partnership Project (3GPP) Technical Specification (TS) 38.231 version v17.3.0, which is excerpted as follows:
[0077] For the meaning of each letter in the above formula, please refer to the above technical specifications.
[0078] Among them PLb,f,c (q d ) is the downlink path loss estimate, which is calculated by the UE based on the determined reference signal (RS).
[0079] FIG3 is a flowchart illustrating a method (a method for determining a reference signal for calculating downlink path loss of transmission power) performed by a user equipment as an example in Embodiment 1. The method for determining a reference signal for calculating downlink path loss of transmission power as an example in Embodiment 1 will be described based on FIG3 .
[0080] In one case, when the UE is configured with more than one uplink TCI state, preferably, these uplink TCI states are associated with different TAGs, then the UE may perform the following operations (steps) to determine the reference signal for downlink path loss estimation:
[0081] Step 101: The UE may determine an activated uplink TCI state among multiple TCI states according to the most recently or latest received activation command.
[0082] The activation command indicates the activated uplink TCI state to the UE.
[0083] Step 102: If only one uplink TCI state is activated by the activation command, the UE may obtain the tag information associated with the uplink TCI state, such as the tag ID of the tag associated with the activated uplink TCI state. Such association information (or mapping information) may be provided to the UE in an RRC configuration message.
[0084] Step 103: Based on the TAG information, such as TAGID, the UE can further determine the information of the control resource set associated with the TAG ID, such as the control resource set number coresetPoolIndex. Such association information (or mapping information) can also be provided to the UE in the RRC configuration message.
[0085] Step 104: Determine the reference signal for downlink path loss calculation based on the control resource set pointed to by coresetPoolIndex. The UE can determine the reference signal for downlink path loss calculation based on the TCI state associated with the determined control resource set:
[0086] For example, determining a resource of a reference signal for downlink path loss calculation according to a first activated downlink TCI state among multiple downlink TCI states associated with the determined control resource set;
[0087] For another example, the resources of the reference signal for downlink path loss calculation are determined according to the most recently activated downlink TCI state among the multiple downlink TCI states associated with the determined control resource set.
[0088] The method for determining the reference signal resource for downlink path loss calculation according to the downlink TCI state may be implemented according to the prior art.
[0089] FIG4 is a flowchart showing a method (a method of determining a reference signal for calculating a downlink path loss of transmission power) executed by a user equipment as a variation of the first embodiment.
[0090] As a variation of this embodiment, in one case, when the UE is configured with more than one uplink TCI state, and the coresetPoolIndex values of the control resource sets associated with these uplink TCI states are different, the UE may perform the following operations (steps) to determine the reference signal for downlink path loss estimation:
[0091] Step 201: The UE may determine an activated uplink TCI state among multiple TCI states according to the most recently or latest received activation command.
[0092] The activation command indicates the activated uplink TCI state to the UE.
[0093] Step 202: If only one uplink TCI state is activated by the activation command, the UE may obtain the value of Coresetpoolindex associated with the uplink TCI state according to the uplink TCI state.
[0094] Step 203: The UE determines a reference signal for downlink path loss calculation according to the control resource set pointed to by the coresetPoolIndex.
[0095] Example 2
[0096] Based on Example 1, there is also a situation where more than one uplink TCI state is activated by the activation command. This situation is described in Example 2.
[0097] In one case, the TAGs associated with these activated uplink TCI states are the same, and the UE can determine the downlink path loss reference signal according to the operation in embodiment 1.
[0098] In another case, the tags associated with these activated uplink TCI states are different. If these associated tags are called involved tags, then when there are more than one involved tags, how to determine which tag to use for subsequent reference signal calculation for downlink path loss is a problem that needs to be solved.
[0099] The UE may always select a designated / specific TAG for subsequent determination of the downlink path loss reference signal. For example, a TAG may be designated as a T-TAG. When a T-TAG exists in the TAGs involved, this T-TAG is always selected, and the downlink path loss reference signal is then determined according to the method in Example 1. Preferably, this T-TAG may be a PTAG. Alternatively, if the TCI state corresponding to this T-TAG includes a reference signal, the resource for calculating the downlink path loss reference signal may be determined based on the resource of this reference signal, for example, directly using it as the resource for calculating the downlink path loss reference signal.
[0100] Alternatively, if the activated uplink TCI states are activated by multiple activation commands, the UE selects the TAG associated with the first activated uplink TCI state among these activated uplink TCI states to determine the downlink path loss reference signal. Alternatively, if the first activated uplink TCI state among these activated uplink TCI states is selected, and if the TCI state contains a reference signal, the resource for calculating the downlink path loss reference signal can be determined based on the resource of this reference signal, for example, directly using it as the resource for calculating the downlink path loss reference signal.
[0101] Alternatively, in the activated uplink TCI state, each of which is activated by multiple activation commands, and each activation command can only activate one TCI state, the UE selects the last of these activated uplink TCI states, or the TAG associated with the last activated uplink TCI state that is closest in time to the PUCCH transmission, to determine the downlink path loss reference signal. Alternatively, the last of these activated uplink TCI states, or the activated uplink TCI state that is closest in time to the PUCCH transmission, is selected. If the TCI state contains a reference signal, the resource for calculating the downlink path loss reference signal can be determined based on the resource of this reference signal, for example, it can be directly used as the resource for calculating the downlink path loss reference signal. Preferably, if the UE is configured with two uplink TCI states, the second activated TCI state among these activated uplink TCI states can be selected.
[0102] In this embodiment, the value of Coresetpoolindex may also be associated with the uplink TCI state. In one case, when the UE is configured with more than one uplink TCI state, and the Coresetpoolindex values associated with these uplink TCI states are different, the UE may perform the following operations to determine the reference signal for downlink path loss estimation:
[0103] First, the UE may determine an activated uplink TCI state among multiple TCI states according to the most recently or latest received activation command.
[0104] The activation command indicates the activated uplink TCI state to the UE.
[0105] In particular, if activation commands are sent for different Coresetpoolindex values, then the most recently received activation command is for each of the different Coresetpoolindex values. That is, the first activation command activates at least one uplink TCI state associated with the uplink TCI state associated with the Coresetpoolindex value of 0; the second activation command activates at least one uplink TCI state associated with the uplink TCI state associated with the Coresetpoolindex value of 1. The UE then needs to consider the uplink TCI states activated in both the first and second activation commands.
[0106] Another situation is that an activation command simultaneously activates at least one TCI state in the uplink TCI state associated with the Coresetpoolindex value of 0 and at least one TCI state in the uplink TCI state associated with the Coresetpoolindex value of 1. In this case, the UE only needs to consider the most recently received such activation command.
[0107] If there are at least two uplink TCI states activated by the aforementioned activation command, and the values of their associated Coresetpoolindex are different, then the UE can always select a specific Coresetpoolindex value, such as a Coresetpoolindex value of 0 or a Coresetpoolindex value of 1, and then determine the reference signal for downlink path loss calculation based on the control resource set corresponding to or pointed to by the value.
[0108] Example 3
[0109] The uplink TCI state and downlink TCI state considered in Examples 1 and 2 may be unrelated, or decoupled. In another case, the uplink TCI state and the downlink TCI state are joint. That is, the UE can determine the uplink TCI state through the downlink TCI state. Then, when the base station activates the TCI state of the UE, it can determine the uplink TCI state by activating only the downlink TCI state. Or, the UE can determine the downlink TCI state through the uplink TCI state. Then, when the base station activates the TCI state of the UE, it can determine the downlink TCI state by activating only the uplink TCI state.
[0110] To distinguish it from the decoupled case, such a TCI state can be called a joint TCI state.
[0111] When the joint TCI state is configured, the aforementioned problem still exists and needs to be solved.
[0112] The UE may determine the activated joint TCI state among multiple joint TCI states based on the most recent or latest received activation command. If only one joint TCI state is activated by the activation command, the UE may determine the downlink path loss reference signal resource based on the joint TCI state.
[0113] If multiple joint TCI states are activated, the UE determines the downlink path loss reference signal resource based on the first activated joint TCI state among these joint TCI states.
[0114] Alternatively, if multiple joint TCI states are activated, the UE determines the resources of the downlink path loss reference signal according to the TCI states specified in these joint TCI states.
[0115] The specific determination method can refer to the content described in Example 2.
[0116] Example 4
[0117] Based on the above embodiment, since a TCI state can be associated with a TAG, if the timeAlignmentTimer timer of the TAG times out or stops running, then one or more TCI states associated with the TAG can be considered to be deactivated. Preferably, a TCI state that has been activated or is in an activated state is considered to be in a deactivated state (deactivated) when the timeAlignmentTimer timer of the TAG associated with it times out or stops running.
[0118] This embodiment may also be implemented independently to determine the status of the TCI state.
[0119] Example 5
[0120] Based on the aforementioned embodiment, when the MAC layer indicates to the lower layer that PUCCH resources are used for transmitting a signal scheduling request (Signal Scheduling Request), it may also indicate a tag ID. The tag corresponding to the indicated tag ID is characterized by its timeAlignmentTimer being running. Preferably, the indicated PUCCH resource can be associated with more than one TCI state or can be used for all configured TCI states. The indicated tag is a tag associated with one or more of the TCI states.
[0121] Based on the above indication, the lower layer of the MAC layer, such as the physical layer, when determining the transmission of the PUCCH, when judging whether the TCI state is in the activated state, in addition to the aforementioned received activation command, it can also consider whether its associated TAG ID is indicated.
[0122] If a TCI state is activated in an activation command or is instructed to be activated, but its associated TAG ID is not indicated by the upper layer, it indicates that the TCI state is still in the deactivated state;
[0123] If a TCI state is activated in an activation command, or is instructed to be activated, and its associated TAG ID is indicated, then it can be determined that the TCI state is in the active state.
[0124] This embodiment can also be implemented independently to determine the status of the TCI state.
[0125] Example 6
[0126] The "uplink TCI state" involved in the aforementioned embodiments can also be represented by PUCCH-SpatialRelationInfo. The PUCCH reference signal is configured in PUCCH-SpatialRelationInfo, and this reference signal can be associated with a tag. If the activation command indicates the identity of the activated PUCCH-SpatialRelationInfo, the UE can determine the associated tag and then determine the reference signal resources used for downlink path loss calculation as described in Example 1.
[0127] Example 7
[0128] The UE receives an RRC message containing scheduling request configuration information (e.g., SchedulingRequestConfig) sent from the network side. In the scheduling request configuration information, each scheduling request identifier can be associated with at least two PUCCH resources. Such an association operation can be to include a scheduling request identifier in the configuration related to the scheduling request resource, and at least two PUCCH resources at the same time. Each PUCCH resource is associated with a Coreset, specifically, the first PUCCH resource can be configured to be associated with a coresetPoolIndex with a value of 0, and the second PUCCH resource can be configured to be associated with a coresetPoolIndex with a value of 1. Such an association can be achieved by the following method: a coresetPoolIndex with a value of 0 can be included in the configuration information of the first PUCCH resource, or information corresponding to a coresetPoolIndex with a value of 0 can be included, so that the two are considered to be associated.
[0129] Since a coresetPoolIndex value of 0 can be associated with the first uplink TCI state, and a coresetPoolIndex value of 1 can be associated with the second uplink TCI state, it can be determined that the first uplink TCI state is applied when PUCCH is sent on the first PUCCH resource, and the second uplink TCI state is applied when PUCCH is sent on the second PUCCH resource. The first or second uplink TCI state can be a single TCI state or a TCI state group containing more than one TCI state.
[0130] When a scheduling request is triggered, it is considered pending. For each pending scheduling request, the UE's MAC layer can instruct lower layers to send a scheduling request (Signal Scheduling Request, Signal SR) on a PUCCH resource. Since a pending SR has a corresponding scheduling request configuration or scheduling request resource configuration and includes at least two PUCCH resources, the question of which PUCCH resource the UE should use to send the scheduling request becomes a problem.
[0131] In the first case, the uplink TCI state corresponding to the first PUCCH resource is in an activated state, and the uplink TCI state corresponding to the second PUCCH resource is in a deactivated state, or not activated, then the UE sends a PUCCH for a scheduling request on the first PUCCH resource.
[0132] Specifically, the MAC layer of the UE may determine that in this case, the first PUCCH resource is a valid PUCCH resource (valid PUCCH), and instruct a lower layer, such as a physical layer, to send a scheduling request on the valid PUCCH resource.
[0133] It is also possible that the MAC layer of the UE indicates both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE selects the PUCCH resource whose TCI state is in an activated state, that is, the first PUCCH resource, based on the states of the TCI states corresponding to the two resources, and then sends a scheduling request on the resource.
[0134] In the second case, the uplink TCI state corresponding to the first PUCCH resource is in a deactivated state, or is not activated, and the uplink TCI state corresponding to the second PUCCH resource is in an activated state, then the UE sends a PUCCH for a scheduling request on the second PUCCH resource.
[0135] Specifically, the MAC layer of the UE may determine that in this case, the second PUCCH resource is a valid PUCCH resource, and instruct a lower layer, such as a physical layer, to send a scheduling request on the valid PUCCH resource.
[0136] It is also possible that the MAC layer of the UE indicates both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE selects the PUCCH resource in which the TCI state is activated, that is, the second PUCCH resource, based on the status of the TCI states corresponding to the two resources, and then sends the PUCCH for the scheduling request on this resource.
[0137] In the third case, the uplink TCI states corresponding to the first PUCCH resource and the second PUCCH are both in the activated state.
[0138] In this case, the UE may arbitrarily select (or randomly select) one of the PUCCH resources and send a scheduling request on the resource.
[0139] Specifically, the MAC layer of the UE determines that in this case, the first and second PUCCH resources are valid PUCCH resources, and arbitrarily selects (or randomly selects) a PUCCH resource from them, and instructs the lower layer, such as the physical layer, to send a scheduling request on the selected PUCCH resource.
[0140] It is also possible that the MAC layer of the UE indicates both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE randomly selects a PUCCH resource based on the status of the TCI state corresponding to the two resources, and then sends the PUCCH for the scheduling request on the selected resource.
[0141] In this case, the network can also be configured or pre-set to specify whether to send the scheduling request on the first PUCCH resource or the second PUCCH resource. Alternatively, the scheduling request can be sent on the PUCCH resource associated with the first TCI state (or the coresetPoolIndex value is 0) or the PUCCH resource associated with the second TCI state (or the coresetPoolIndex value is 1).
[0142] Take "specify to send scheduling request on the first PUCCH resource" as an example:
[0143] Specifically, the MAC layer of the UE may determine that in this case, the first PUCCH resource is a valid PUCCH resource, and instruct a lower layer, such as a physical layer, to send a scheduling request on the PUCCH resource.
[0144] Alternatively, the MAC layer of the UE may indicate both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE sends a PUCCH for the scheduling request on the first PUCCH resource.
[0145] Let's take "sending a scheduling request on a PUCCH resource associated with the first TCI state (or a coresetPoolIndex with a value of 0)" as an example:
[0146] Specifically, the MAC layer of the UE determines that in this case, the PUCCH resource associated with the first TCI state (or the coresetPoolIndex with a value of 0), that is, the first PUCCH resource is a valid PUCCH resource, and instructs the lower layer, such as the physical layer, to send a scheduling request on the PUCCH resource.
[0147] It is also possible that the MAC layer of the UE indicates both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE selects the PUCCH resource associated with the first TCI state, that is, the first PUCCH resource, and then sends the PUCCH for the scheduling request on the PUCCH resource.
[0148] In the fourth case, the uplink TCI states corresponding to the first PUCCH resource and the second PUCCH are both in the deactivated state.
[0149] In this case, the MAC layer of the UE may determine that there are no valid PUCCH resources, thereby triggering and executing a random access procedure.
[0150] Another implementation of the above operation may be as follows.
[0151] When there is a pending scheduling request, the UE determines whether there are valid PUCCH resources:
[0152] Case 1: The uplink TCI state corresponding to the first PUCCH resource is in the activated state, while the uplink TCI state corresponding to the second PUCCH resource is in the deactivated state, or is not activated. The UE then determines that the first PUCCH resource is a valid PUCCH resource and can instruct the physical layer to send a scheduling request on this PUCCH resource.
[0153] Case 2: The uplink TCI state corresponding to the second PUCCH resource is in the activated state, while the uplink TCI state corresponding to the first PUCCH resource is in the deactivated state, or is not activated. The UE then determines that the second PUCCH resource is a valid PUCCH resource and can instruct the physical layer to send a scheduling request on this PUCCH resource.
[0154] Case 3: The uplink TCI state corresponding to the first PUCCH resource and the second PUCCH is both in the activated state. The UE can consider both resources to be valid PUCCH resources, and then randomly select a PUCCH resource to instruct the physical layer to send a scheduling request on the PUCCH resource; the UE can also always select a specified PUCCH resource to instruct the physical layer to send a scheduling request on the PUCCH resource. The specified PUCCH resource can be the first or second PUCCH resource that is pre-set or configured by the network, or the PUCCH resource associated with the first / second TCI state (or coresetPoolIndex with a value of 0 / 1);
[0155] Case 4: If the uplink TCI states corresponding to the first PUCCH resource and the second PUCCH are both in the deactivated state, it is considered that there are no valid PUCCH resources and the UE can trigger the random access process.
[0156] Example 8
[0157] On the basis of Example 7, a first counting variable COUNT-1 may be set for the first PUCCH resource, and a second counting variable COUNT-2 may be set for the second PUCCH resource.
[0158] After the MAC layer of the UE indicates to the lower layer that a scheduling request is to be transmitted on the first PUCCH resource, the value of COUNT-1 is incremented by one;
[0159] After the MAC layer of the UE indicates to the lower layer that a scheduling request is to be transmitted on the first PUCCH resource, the value of COUNT-2 is increased by one;
[0160] When it is determined that the value of COUNT-1 exceeds the maximum threshold value / threshold value set in advance or configured by the network, it can be determined that the first PUCCH resource is invalid. The UE can also further determine the value of COUNT-2 and whether the second PUCCH resource is valid:
[0161] -If the COUNT-2 value is not less than the maximum threshold value at this time, it can be considered that the second PUCCH resource is invalid, and the UE triggers and performs a random access procedure.
[0162] -If the COUNT-2 value is less than the maximum threshold value, but the TCI state associated with the second PUCCH resource is not in the activated state (or is in the deactivated state), then the second PUCCH resource can be considered invalid, and the UE can trigger and perform the random access procedure;
[0163] - As compensation, if the COUNT-2 value is less than the maximum threshold value at this time, the second PUCCH resource is still valid and there is no need to perform the random access procedure. In this case, the UE can wait for the next determination. Preferably, the TCI state associated with the second PUCCH resource is still in the active state;
[0164] When it is determined that the value of COUNT-2 exceeds the maximum threshold value / threshold, it can be determined that the second PUCCH resource is invalid. The UE can further determine the value of COUNT-1 and whether the second PUCCH resource is valid:
[0165] -If the value of COUNT-1 is not less than the maximum threshold value at this time, it can be considered that the first PUCCH resource is invalid, and the UE triggers and performs a random access procedure.
[0166] If the COUNT-1 value is less than the maximum threshold value, but the TCI state associated with the second PUCCH resource is not in the activated state (or is in the deactivated state), then the first PUCCH resource can be considered invalid, and the UE can trigger and perform the random access procedure;
[0167] - As a supplement, if the COUNT-1 value is less than the maximum threshold value at this time, the first PUCCH resource is still valid and there is no need to perform the random access procedure. In this case, the UE can wait for the next determination. Preferably, the TCI state associated with the second PUCCH resource is still in the active state;
[0168] Example 9
[0169] While the embodiments 1 to 8 of the present disclosure have been described above, the above embodiments may be combined for implementation.
[0170] Embodiments 1-6 are used to solve the power calculation problem during PUCCH transmission, while embodiments 7 and 8 are used to determine PUCCH resources. As embodiment 9, for example, embodiments 7 and 8 can be combined with the above embodiments 1-6 to determine PUCCH resources before transmitting PUCCH.
[0171] FIG5 is a simplified structural block diagram of a user equipment involved in the present invention.
[0172] As shown in Figure 5, the user equipment 500 includes at least a processor 501 and a memory 502. The processor 501 may include, for example, a microprocessor, a microcontroller, an embedded processor, etc. The memory 502 may include, for example, a volatile memory (such as a random access memory (RAM), a hard disk drive (HDD), a non-volatile memory (such as a flash memory), or other memory systems. The memory 502 stores program instructions. When executed by the processor 501, the instructions may perform one or more steps of the UE processing method disclosed herein.
[0173] The method and related apparatus of the present disclosure have been described above in conjunction with preferred embodiments. Those skilled in the art will appreciate that the methods described above are merely exemplary and that the various embodiments described above can be combined with one another unless conflicts arise. The method of the present disclosure is not limited to the steps and sequence described above.
[0174] The user equipment shown above may include more modules, for example, modules that can be developed or will be developed in the future and can be used for a base station, MME, or UE, etc. The various identifiers shown above are merely exemplary and not restrictive, and the present disclosure is not limited to the specific information elements used as examples of these identifiers. Those skilled in the art may make many changes and modifications based on the teachings of the illustrated embodiments.
[0175] It should be understood that the above embodiments of the present disclosure can be implemented through software, hardware, or a combination of software and hardware. For example, the various components within the base station and user equipment in the above embodiments can be implemented through a variety of devices, including but not limited to: analog circuit devices, digital circuit devices, digital signal processing (DSP) circuits, programmable processors, application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), programmable logic devices (CPLDs), and the like.
[0176] In addition, the program running on the device according to the present invention can be a program that controls the central processing unit (CPU) to enable the computer to implement the functions of the embodiments of the present invention. The program or the information processed by the program can be temporarily stored in a volatile memory (such as a random access memory RAM), a hard disk drive (HDD), a non-volatile memory (such as a flash memory), or other memory systems.
[0177] The program for realizing each embodiment of the present invention function can be recorded on a computer-readable recording medium. Can realize corresponding function by making a computer system read the program recorded on the recording medium and executing these programs. So-called "computer system" herein can be the computer system embedded in the device, can include operating system or hardware (such as peripheral device). "Computer-readable recording medium" can be a semiconductor recording medium, an optical recording medium, a magnetic recording medium, a short-term dynamic storage program recording medium or any other recording medium that is computer-readable.
[0178] The various features or functional modules of the devices used in the above embodiments can be implemented or executed by circuits (e.g., single-chip or multi-chip integrated circuits). The circuits designed to perform the functions described in this specification may include a general-purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, discrete gate or transistor logic, discrete hardware components, or any combination of the above devices. The general-purpose processor may be a microprocessor, or any existing processor, controller, microcontroller, or state machine. The above circuits may be digital circuits or analog circuits. In the event that new integrated circuit technologies have emerged to replace existing integrated circuits due to advances in semiconductor technology, one or more embodiments of the present invention may also be implemented using these new integrated circuit technologies.
[0179] Furthermore, the present invention is not limited to the above-described embodiments. Although various examples of the embodiments have been described, the present invention is not limited thereto. Fixed or non-mobile electronic devices installed indoors or outdoors can be used as terminal devices or communication devices, such as AV equipment, kitchen equipment, cleaning equipment, air conditioners, office equipment, vending machines, and other household appliances.
[0180] As described above, embodiments of the present invention have been described in detail with reference to the accompanying drawings. However, the specific structure is not limited to the above-described embodiments, and the present invention also includes any design changes that do not deviate from the main purpose of the present invention. In addition, various modifications can be made to the present invention within the scope of the claims, and embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention. In addition, components with the same effect described in the above embodiments can be replaced with each other.
Claims
1. A method performed by a user equipment UE, include: The UE configured with multiple uplink transmission configuration indication states TCI states determines at least one activated uplink TCI state among the multiple TCI states according to the most recently or most recently received activation command; The UE obtains, according to at least one activated uplink TCI state, timing advance group TAG information associated with the activated uplink TCI state; The UE determines, according to the TAG information, information of a control resource set associated with the TAG information; and The UE determines a reference signal for calculating a downlink path loss according to the control resource set.
2. The method according to claim 1, in, The UE calculates transmission power for PUCCH transmission according to the determined reference signal.
3. The method according to claim 1 or 2, in, The at least one activated uplink TCI state is an uplink TCI state, The UE obtains TAG information associated with the activated uplink TCI state.
4. The method according to claim 1 or 2, in, The at least one activated uplink TCI state is a plurality of uplink TCI states, In a case where the TAG information associated with multiple activated uplink TCI states is the same, the UE determines a control resource set associated with the same TAG information according to the same TAG information.
5. The method according to claim 1 or 2, in, The at least one activated uplink TCI state is a plurality of uplink TCI states, In the case where the TAG information associated with multiple activated uplink TCI states is different, the UE selects the specified TAG information to determine the reference signal for calculating the downlink path loss.
6. The method according to claim 1 or 2, in, The at least one activated uplink TCI state is a plurality of uplink TCI states, When the TAG information associated with multiple activated uplink TCI states is different, the UE selects the TAG information associated with the first activated uplink TCI state among the multiple activated uplink TCI states to determine the reference signal for calculating the downlink path loss.
7. The method according to claim 1 or 2, in, The at least one activated uplink TCI state is a plurality of uplink TCI states, When the TAG information associated with multiple activated uplink TCI states is different, the UE selects the TAG associated with the last of the multiple activated uplink TCI states, or the TAG associated with an activated uplink TCI state that is closest in time to the PUCCH transmission, to determine the reference signal for calculating the downlink path loss.
8. The method according to claim 1 or 2, in, The UE determines, according to the TAG ID of the TAG information, information of a control resource set associated with the TAG ID, that is, an index of the control resource set coresetPoolIndex, The UE determines a reference signal for calculating a downlink path loss according to the control resource set pointed to by the control resource set index coresetPoolIndex.
9. The method according to claim 1 or 2, in, The UE determines a resource of a reference signal for calculating a downlink path loss according to a first activated downlink TCI state or a most recently activated TCI state among multiple downlink TCI states associated with the determined control resource set.
10. A user device, include: processor; as well as Memory, which stores instructions, Wherein, the above instructions, when executed by the above processor, execute the method according to any one of claims 1 to 9.
Citation Information
Patent Citations
Method for determining transmission configuration indicator for terminal in wireless communication system and device using same method
CN110959304A
Timing advance in new radio
CN112640543A
Method and apparatus for obtaining time alignment with respect to multiple transmit-receive points
CN115696550A
Default pathloss reference signals for multi-panel uplink transmissions
WO2022067635A1
