Management device
The management device addresses the challenge of varying business customs in international real estate transactions by registering and notifying maintenance deadlines, ensuring timely management and reducing contractual issues in international real estate property transactions.
Patent Information
- Application Number
- PCT/JP2023/017863
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-12
- Publication Date
- 2024-11-21
AI Technical Summary
International real estate transactions face challenges in managing real estate properties due to differing business customs, particularly in maintaining equipment and fixtures, as existing technologies like Patent Document 1 are limited in supporting various types of real estate management across countries.
A management device that includes a deadline registration unit, timing calculation unit, and notification unit to register and notify deadlines for equipment and fixture maintenance, ensuring timely management even in unfamiliar business practices, thereby supporting international real estate property transactions.
Prevents managers from forgetting critical deadlines, enhancing the management of real estate properties across international borders by providing a standardized system for registering and notifying maintenance deadlines, thus facilitating smoother transactions and reducing contractual disputes.
Smart Images

Figure JP2023017863_21112024_PF_FP_ABST
Abstract
Description
management device
[0001] The present invention relates to a management device.
[0002] International real estate transactions involve renting, buying, and selling real estate properties in foreign countries. In international real estate transactions, parties involved in the transaction may encounter difficulties in managing the property due to business practices in the foreign country that differ from those in their own country. Examples of business practices related to real estate that may differ by country and / or region include business practices regarding whether the landlord, intermediary, or tenant is responsible for maintaining the facilities and / or fixtures of a rented property. Due to these circumstances, there is a need for tools to support the transaction and management of real estate properties in international real estate transactions.
[0003] With regard to supporting transactions and management of real estate properties, Patent Document 1 discloses a sublease real estate management system that relates to home appliance warranty that guarantees equipment repairs for real estate properties, in a management system including a management server and various terminals that is configured to have a real estate property information database in which real estate property information for real estate properties is stored, a contract condition evaluation setting means, a master lease pattern information database, and a master lease pattern setting means, and that the management system further has an equipment information database in which information on equipment contained in the real estate property information is stored, and a home appliance warranty setting means that sets home appliance warranty for the real estate property information, in which the equipment information of the real estate property information is read out within the equipment information database, the contract condition evaluation means examines the conditions for joining the home appliance warranty based on the equipment information, and the home appliance warranty setting means sets the premium for the home appliance warranty for the real estate property information based on the examination.
[0004] The technology of Patent Document 1 sets up a home appliance warranty so that immediate repairs can be made even when the equipment is severely damaged, and this warranty can be used to make immediate repairs even when the owner is away or does not have the financial means.
[0005] Japanese Patent Application Laid-Open No. 2004-062278
[0006] However, the technology of Patent Document 1 only enables immediate repairs of equipment related to rental properties in some countries and / or regions where home appliance warranty coverage is available. Therefore, the technology of Patent Document 1 has room for further improvement in terms of supporting various real estate management tasks, such as maintenance of equipment and / or fixtures of rental real estate properties, in international real estate transactions.
[0007] An object of the present invention is to support transactions and management of real estate properties in international real estate transactions and the like.
[0008] As a result of intensive research into solving the above-mentioned problems, the inventors have discovered that the above-mentioned object can be achieved by enabling the registration and notification of deadlines related to the management of maintenance, etc. of facilities and / or equipment of real estate properties. As a result, the inventors have completed the present invention. Specifically, the present invention provides the following.
[0009] The present invention provides a management device comprising a deadline registration unit capable of registering a deadline related to a real estate property, a timing calculation unit capable of calculating one or more notification timings for notifying the deadline, including at least a timing before the deadline, and a notification unit capable of notifying the deadline at the notification timing, wherein the deadline includes a management deadline related to the management of the real estate property, the management includes at least maintenance of facilities and / or equipment of the real estate property, and the notification unit is capable of notifying the management deadline.
[0010] The present invention allows a deadline for real estate property management, including maintenance of facilities and / or equipment of the real estate property, to be registered and notified in advance of the deadline. As a result, the present invention can prevent a manager from forgetting deadlines for international real estate property management, even if the manager does not have business practices for such management in his / her country.
[0011] The present invention can support transactions and management of real estate properties in international real estate transactions and the like.
[0012] FIG. 1 is a block diagram showing an example of the hardware configuration and software configuration of the system S of this embodiment. FIG. 2 is an example of a property information list 121. FIG. 3 is an example of a contractor list 122. FIG. 4 is an example of a contract list 123. FIG. 5 is an example of a construction deadline list 124. FIG. 6 is a main flowchart showing an example of a preferred flow of management processing executed by the management device 1 of this embodiment. FIG. 7 is a diagram continuing from FIG. 6. FIG. 8 is a diagram continuing from FIG. 7.
[0013] Hereinafter, an example of an embodiment of the present invention will be described in detail with reference to the drawings.
[0014] <System S> Fig. 1 is a block diagram showing an example of the hardware configuration and software configuration of a system S of this embodiment. An example of a preferred aspect of the system S of this embodiment will be described below with reference to Fig. 1.
[0015] The system S is configured to include at least a management device 1. The system S is preferably configured to include a terminal T that can communicate with the management device 1 via a network N.
[0016] [Management Device 1] The management device 1 includes at least a control unit 11, a storage unit 12, and a communication unit 13. There are no particular limitations on the type of the management device 1. Examples of the type include a server, a cloud server, and the like.
[0017] [Control Unit 11] The control unit 11 includes a CPU (Central Processing Unit), a RAM (Random Access Memory), a ROM (Read Only Memory), and the like.
[0018] The control unit 11 cooperates with the storage unit 12 and / or the communication unit 13 as necessary. The control unit 11 then realizes the software components of the program of this embodiment executed by the management device 1, such as a property information registration unit 111, an equipment information generation unit 112, an estimate unit 113, a presentation unit 114, a search unit 115, a deadline registration unit 116, a timing calculation unit 117, a notification unit 118, and a chatbot unit 119. The functions provided by each of the software components of the program of this embodiment will be described later in the description of a preferred flow of management processing.
[0019] [Storage Unit 12] The storage unit 12 is a device for storing data and / or files, and includes a data storage unit such as a hard disk, a semiconductor memory, a recording medium, and a memory card.
[0020] The storage unit 12 may have a mechanism that enables connection via the network N to a storage device or storage system such as a NAS, a SAN, cloud storage, a file server, and / or a distributed file system.
[0021] The memory unit 12 stores a program executed by a microcomputer, a property information list 121, a contractor list 122, a contract list 123, a construction deadline list 124, a neural network capable of recognizing the facilities and / or equipment of a real estate property from an image of the real estate property, and the like.
[0022] (Property Information List 121) Property information related to real estate properties is stored in the property information list 121. This allows the property information registration unit 111 to register property information related to real estate properties in the management device 1. This also allows the deadline registration unit 116, notification unit 118, chatbot unit 119, etc. to process deadline registration, notification, etc. related to real estate properties in association with the property information.
[0023] The property information is not particularly limited. For example, the property information stores one or more of the following information related to the property: property ID, property name, building information, website information, postal code, address, country name, unit system, property type, property layout, property size, special notes, additional property information, public transportation information, travel time from the station, owner information, rent information, etc. The property information may also include images that can be used to search for property information.
[0024] The building information stores, for example, one or more of the following information related to the building: building ID, building name, website information, postal code, address, country name, unit system, building type, building use, height, number of above-ground floors, number of underground floors, net rentable area, land use, area information, land ownership information, contract start date, contract expiration date, land area, public transportation information, travel time from the station, owner information, management company information, etc.
[0025] The additional property information may store, for example, one or more of the following information related to the property: ceiling and floor condition, ceiling height, floor load, air conditioning information, power consumption, exhaust capacity, water information, gas information, furniture information, bathroom information, garbage chute information, etc.
[0026] The owner information stores, for example, one or more of the following information related to the owner: name, image, phone number, email address. The management company information stores, for example, one or more of the following information related to the management company: name, image, phone number, email address.
[0027] 2 is an example of the property information list 121. In the example shown in Fig. 2, the property information list 121 stores information related to a property identified by a property ID "Room1," such as the property name "XX Street Shophouse," the address "XX Street," the country name "Singapore," the property type "Tenant," the required time from the station "5 minutes' walk," the owner information "ZZ Kosan," and the rent information "30,000 Singapore dollars per month."
[0028] In the example shown in Figure 2, the building information related to the property identified by the property ID "Room 1" includes the building ID "Building 1", building name "YY Building", address "XX Street", country name "Singapore", building type "Shophouse", number of above-ground floors "2", required time from the station "5 minutes' walk", owner information "ZZ Kosan", etc., which are stored in the property information list 121.
[0029] In addition, in the example shown in FIG. 2, information relating to an air conditioner, built-in dresser, etc. is stored in the property information list 121 as additional property information relating to the property identified by the property ID "Room1."
[0030] This allows the management device 1 to search for a property desired by a user based on the above-mentioned information related to the property identified by the property ID "Room 1." This also allows the management device 1 to mediate communication between the tenant and the landlord (ZZ Industries) related to the property identified by the property ID "Room 1."
[0031] (Contractor List 122) The contractor list 122 stores information about contractors related to real estate properties. This allows the property information registration unit 111 to associate property information related to real estate properties with contractors and register it in the management device 1. This also allows the deadline registration unit 116, notification unit 118, chatbot unit 119, etc. to process deadline registration, notification, etc. related to real estate properties in association with contractors.
[0032] The subscriber information is not particularly limited. For example, the subscriber information may include one or more of the following information related to the subscriber: subscriber ID, transaction type, corporate name, website information, registration number, personal name, corporate name, account information, email address, telephone number, country of location, postal code, address, date of birth, passport information, visa information, family information, qualification information, etc.
[0033] Fig. 3 is an example of the contractor list 122. In the example shown in Fig. 3, the contractor list 122 stores information (contractor information) related to the contractor identified by the contractor ID "Part 1," such as transaction type "borrower," personal name "John Smith," corporate name "AA Corporation," account information "JohnSmith," email address "johnsmith@...," telephone number "XXX-XXXX-XXXX," country of location "Japan," postal code "XXXX," address "BB City," date of birth, passport information, residence visa information, and family information "spouse 1, child 2."
[0034] This allows the management device 1 to notify the contractor of deadlines and the like based on the above-mentioned information relating to the contractor identified by the contractor ID "Part 1".
[0035] (Contract List 123) The contract list 123 stores information about contracts related to real estate properties. This allows the property information registration unit 111 to associate property information related to real estate properties with the contracts and register it in the management device 1. This also allows the deadline registration unit 116, notification unit 118, chatbot unit 119, etc. to process registration and notification of deadlines related to real estate properties in association with the contracts.
[0036] The contract information is not particularly limited. For example, the contract information may include one or more of the following information related to the contract: contract name, contract status, landlord information, tenant information, resident information, contract start date, contract expiration date, move-out date, rent information, security deposit information, repair cost information, rent payment due date information, contract renewal notice due date information, mid-term termination notice due date information, person in charge information, and approver information.
[0037] The contract information stored in the contract list 123 will be explained in more detail. Contracts overseas often contain numerous stipulations, and violations of these stipulations can result in penalties and confiscation of deposits. As a result, many disputes arise between tenants and landlords regarding contractual obligations. Contracts, incorporating the customs and practices of each country, vary from country to country. To consolidate these into a single standard format, the management device 1 divides the contract list 123 into (1) mandatory items and (2) variable and incidental items that vary depending on the contract and the customs of each country, and then digitizes all contracts into a unified format. This enables the management device 1 to manage real estate rental contracts from around the world.
[0038] (1) Absolutely required items include, for example, the target building (land or building), target section (section within the land or building), landlord, tenant, intermediary, manager, rent or consideration (fixed, variable), payment method and timing (annual, monthly, etc.), contract period (beginning and end of contract), renewal method (what happens after the term expires), termination method, etc.
[0039] (2) Variables and additional items that vary depending on the contract and national customs include, for example, maintenance, additional conditions such as subsidies that affect rent, rent-free conditions, and other provisions.
[0040] As a result, the management device 1 can provide a system that notifies and manages digitized tasks that need to be done, such as rent payments and maintenance, at the appropriate time, and automates document storage and sharing with all parties involved, thereby preventing problems that arise from neglecting contractual obligations and reducing or eliminating contractual problems and disputes.
[0041] 4 is an example of the contract list 123. In the example shown in FIG. 4 , information (contract information) related to the contract identified by the contract ID “Cont1” includes the contract name “Rental Contract”, contract status “Under Contract”, landlord information “ZZ Industries”, tenant information “John Smith”, resident information “John Smith and three others”, contract start date “April 1, 2023”, contract expiration date “April 1, 2025”, move-out date “None”, rent information “30,000 Singapore dollars per month”, security deposit information, repair burden amount information, rent payment due date information “Payment at the end of the month”, contract renewal notice due date information “6 months in advance”, deadline for mid-term termination notice information “1st of the previous month”, person in charge information “Jane Smith”, and approver information “John Smith . . . .”, which are stored in the contract list 123.
[0042] This allows the management device 1 to notify the contract deadline (for example, the rent payment date) based on the above-mentioned information related to the contract identified by the contractor ID "Cont1".
[0043] (Construction deadline list 124) The construction deadline list 124 stores deadlines (management deadlines) for construction work, etc., related to real estate properties. This allows the deadline registration unit 116, notification unit 118, chatbot unit 119, etc. to process registration and notification of management deadlines related to real estate properties.
[0044] The deadline is not particularly limited. For example, the deadline may include one or more of the following pieces of information related to the deadline: deadline ID, property information, acceptance date information, information on the equipment to be constructed, construction status, construction type, construction name, construction period information, warranty expiration date information, payment due date information, payment completion date information, construction application date information, regular maintenance date information, preview schedule, etc. In addition, various pieces of information related to a specific deadline may include notification timing related to the deadline.
[0045] 5 is an example of the construction deadline list 124. In the example shown in FIG. 5, the construction deadline list 124 stores information related to the deadline (construction deadline, management deadline) identified by the construction deadline ID "Rep1," such as property information "Room1," acceptance date information "June 1, 2023," equipment information to be constructed "air conditioner," construction status "in preparation," construction type "replacement work," construction name "air conditioner replacement," construction period information "July 1, 10:00-12:00, scheduled to be notified on June 24," warranty expiration date information "July 1, 2026, notified on June 1, 2026," payment due date information "July 31, 2023, scheduled to be notified on July 1," payment completion date information "unpaid," construction application date information "May 1, 2023," and regular maintenance date information "April 1, 2024, scheduled to be notified on March 1," among others.
[0046] This allows the management device 1 to notify of the deadline related to the contract (for example, the construction date for replacing an air conditioner) based on the above-mentioned information related to the contract identified by the construction deadline ID "Rep1".
[0047] [Communication Unit 13] The communication unit 13 is not particularly limited as long as it connects the management device 1 to the network N and enables communication with the terminal T, etc. Examples of the communication unit 13 include a wireless device compatible with a mobile phone network, a device connectable to a wireless LAN, and a network card compatible with the Ethernet standard.
[0048] [Network N] The type of the network N is not particularly limited as long as it allows the management device 1 and the terminals T to communicate with each other. The type of the network N is, for example, the Internet, a mobile phone network, a wireless LAN, or the like.
[0049] [Terminal T] The terminal T is, for example, a personal computer, a laptop computer, a smartphone, a tablet terminal, etc. The terminal T can execute a transmission process to transmit property information, images of facilities, etc., search conditions, deadlines related to management, user input related to the registration of any of these, natural language input related to dialogue with the chatbot unit 119, etc. to the management device 1. The terminal T can also execute a reception process to receive and display property information, facility information, images of facilities, etc., consideration, search results, deadline notifications, responses from the chatbot unit 119, etc. from the management device 1.
[0050] [Main Flowchart of Management Processing Executed by Management Device 1] Fig. 6 is a main flowchart showing an example of a preferred flow of management processing executed by the management device 1 of this embodiment. Fig. 7 is a diagram continuing from Fig. 6. Fig. 8 is a diagram continuing from Fig. 7. An example of a preferred flow of management processing executed by the management device 1 of this embodiment will be described below with reference to Figs. 6 to 8.
[0051] The management process preferably includes a property information registration step (steps S1 to S2) for registering property information, which enables the management device 1 to provide search services and the like based on the registered property information.
[0052] [Step S1: Determine whether to register property information] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the property information registration unit 111. The control unit 11 then executes processing related to the property information registration unit 111, which is processing for determining whether to register property information (step S1, property information registration determination step). If it is determined that the property information should be registered, the control unit 11 proceeds to step S2. If it is not determined that the property information should be registered, the control unit 11 proceeds to step S3.
[0053] The property information registration determination step is not particularly limited. For example, the property information registration determination step includes a procedure of determining that the property information is to be registered when property information is received from the terminal T via a web interface or the like related to the registration of the property information.
[0054] Although not an essential aspect, the property information registration determination step preferably includes a procedure for registering property information via a conversational interface in natural language provided by the chatbot unit 119 executed by the control unit 11. This allows the user to register property information through intuitive operations using natural language.
[0055] [Step S2: Registering Property Information] The control unit 11 executes a process related to the property information registration unit 111, which is a process of registering the property information determined to be registered in step S1 (step S2, property information registration execution step). The control unit 11 moves the process to step S3. The property information registration execution step includes, for example, a procedure of storing the property information determined to be registered in step S1 in the property information list 121.
[0056] The management process preferably includes an equipment information generation step (steps S3 to S6) for generating a plurality of pieces of equipment information related to the equipment and / or fixtures of the real estate property using image recognition of images of the real estate property, thereby enabling the management device 1 to register the generated equipment information.
[0057] [Step S3: Determine whether to generate facility information] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the facility information generation unit 112. The control unit 11 then executes a process related to the facility information generation unit 112, which is a process of determining whether to generate facility information (step S3, facility information generation determination step). If it is determined that facility information should be generated, the control unit 11 proceeds to step S4. If it is not determined that facility information should be generated, the control unit 11 proceeds to step S7.
[0058] The facility information generation determination step is not particularly limited and may include, for example, the following steps: a step of determining that facility information is to be generated when facility information is received from the terminal T via a web interface or the like related to the generation of facility information, and a step of determining that facility information is to be generated when an image of a real estate property is received from the terminal T via the web interface or the like.
[0059] [Step S4: Acquiring images of facilities, etc.] The control unit 11 executes a process related to the facility information generating unit 112, in which the control unit 11 acquires images of facilities, etc. related to the facility information determined to be generated in step S3 (step S4, facility image acquiring step). The control unit 11 then proceeds to step S5.
[0060] The image related to the facility image acquisition step is not particularly limited as long as it is an image of a real estate property. The image is preferably an image of the facility and / or fixtures of the real estate property. This allows the management device 1 to identify the facility and / or fixtures in the image using image recognition.
[0061] [Step S5: Generating facility information] The control unit 11 executes a process related to the facility information generation unit 112, in which a plurality of pieces of facility information related to the facilities and / or fixtures of the real estate property are generated using image recognition of the image acquired in step S4 (step S5, facility information generation execution step). The control unit 11 then proceeds to step S6.
[0062] The facility information generation execution step includes a procedure for performing image recognition using a neural network stored in the storage unit 12. The neural network is a neural network that can recognize the facilities and / or fixtures of a real estate property from an image of the real estate property.
[0063] [Step S6: Storing facility information] The control unit 11 executes a process related to the facility information generation unit 112, in which the facility information generated in step S5 is stored in the property information list 121 (step S6, facility information storage step). The control unit 11 moves the process to step S7. The facility information generated in step S5 is registered in the property information list 121 by the facility information storage step.
[0064] When the property information registration step is included, the management process preferably includes a consideration estimation step (steps S7 to S9) for estimating and presenting the consideration for a contract related to a real estate property. This allows the management device 1 to support the landlord and / or tenant in entering into a contract at the estimated consideration, i.e., an objective and fair consideration.
[0065] [Step S7: Determine whether to estimate the consideration] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the estimation unit 113. The control unit 11 then executes processing related to the estimation unit 113, which is processing for determining whether to estimate the consideration for a contract related to a real estate property (step S7, estimate presence / absence determination step). If it is determined that an estimate should be made, the control unit 11 proceeds to step S8. If it is not determined that an estimate should be made, the control unit 11 proceeds to step S10.
[0066] The step of determining whether or not an estimate is required is not particularly limited. For example, the step of determining whether or not an estimate is required includes a procedure of determining whether or not an estimate is required when a user's instruction to estimate the consideration for a contract related to a real estate property is received.
[0067] Although not an essential aspect, the estimate presence / absence determining step preferably includes a procedure for determining that a price should be estimated when an instruction to estimate a price is given via a conversational interface in natural language provided by the chatbot unit 119 executed by the control unit 11. This allows the user to instruct a price estimate through an intuitive operation using natural language.
[0068] [Step S8: Estimate the Consideration] The control unit 11 executes a process related to the estimation unit 113, which is a process of estimating the consideration determined to be estimated in step S7 (step S8, estimation step). The control unit 11 proceeds to step S9.
[0069] The estimation step is not particularly limited as long as it includes a procedure for estimating the consideration based on various information registered in the property information list 121. For example, the estimation step preferably includes a procedure for estimating the consideration using the consideration related to a past contract for the same property as the property being estimated. This allows the management device 1 to provide an objective estimate based on the consideration related to a past contract for the same property.
[0070] The estimation step preferably includes a procedure for estimating the price using the prices of past contracts for properties identical to and / or similar to the property being estimated in terms of, for example, location, floor plan, purpose, age, facilities, and equipment. This allows the management device 1 to provide an objective estimate based on the prices of past similar contracts. The estimation step preferably includes a procedure for calculating an effective rent based on the contents of the contract stored in the contract list 123, i.e., the contents of the contract as set forth in the contract, and estimating the price taking this effective rent into account. An example of a contract content that may be taken into account in this procedure is a rent-free contract, which provides rent-free accommodation for a certain period after occupancy. For example, in a three-year rental estimate, if a previous contract for the same or similar property had a contract rent of 900,000 yen with a one-year rent-free period, the appropriate price can be estimated as an effective rent of 600,000 yen, taking into account the one-year rent-free period, rather than 900,000 yen. In addition, the estimation step preferably includes a procedure for estimating the compensation taking into account various factors that affect the effective rent, such as subsidies and management fees. This allows the management device 1 to visualize the effective rent in a real estate market where the effective rent is opaque, thereby bringing transparency to the market. Such transparency is particularly important in international real estate transactions, where it is difficult to grasp local conditions. Therefore, the management device 1 can further support real estate property transactions and management in international real estate transactions.
[0071] In real estate rental contracts, other conditions besides the rent are also heavily involved, such as interior decoration period, rent-free period, subsidy support, etc., and this information is not made public. As a result, the rental contract market, where only the contract amount is made public, is too unfair to be called a real estate market.
[0072] The management device 1 of this embodiment, by having the contract list 123 and the estimation step, digitizes real estate contracts from all over the world and automatically calculates an appropriate effective rent from those contracts, comprehensively considering economic conditions other than the contract rent, including rent-free periods, free interior decoration periods, subsidies from the landlord, and other aspects that affect the rent, thereby visualizing and presenting a real estate market that is closer to the actual situation in an opaque market.In addition, this makes it possible for the management device 1 to uniformly compare real estate markets around the world, not just within a single country, but across borders.
[0073] Although not a required aspect, the estimation step preferably includes a procedure for estimating the price using a neural network that estimates the price based on past contracts for the same property and / or similar properties as the property being estimated. This allows the management device 1 to provide an objective estimate based on the output of the neural network. In this case, the management device 1 preferably performs machine learning of the price estimate based on the contents of the contracts stored in the contract list 123. This allows the management device 1 to improve the accuracy of the price estimate through machine learning and further visualize the market. This also allows the management device 1 to provide an estimate that takes into account changes in the market that have been learned by machine learning. In addition, this allows the management device 1 to evaluate the appropriateness of the contract contents, such as rent, based on the neural network that has undergone machine learning.
[0074] [Step S9: Presenting the Consideration] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the presentation unit 114. Then, the control unit 11 executes a process related to the presentation unit 114, which is a process of presenting the consideration estimated in step S8 (step S9, presentation step). The control unit 11 then proceeds to step S10.
[0075] If the property information registration step is included, the management process preferably further includes a search step (steps S10 to S12) for searching for property information on real estate properties. This allows the management device 1 to provide various searches related to property information. The search step is preferably a process using a neural network capable of machine learning. This allows the management device 1 to provide a property information search while improving it through machine learning. Such improvements include, for example, improvements that better reflect the searcher's preferences, improvements that provide search results that are closer to the content intended by the searcher in the search conditions, and improvements that make the effective rent displayed in the search results closer to the actual state of the real estate market.
[0076] [Step S10: Determining Whether to Search for Properties] The control unit 11 executes the search unit 115 in cooperation with the storage unit 12 and the communication unit 13. The control unit 11 then executes processing related to the search unit 115, which is processing for determining whether to search for properties related to property information stored in the property information list 121 (step S10, search determination step). If it is determined that a search should be performed, the control unit 11 proceeds to step S11. If it is not determined that a search should be performed, the control unit 11 proceeds to step S13.
[0077] The search determination step is not particularly limited, and may include, for example, a procedure for determining that property information is to be searched for based on search criteria and / or one or more images related to the search received from the terminal T via a web interface related to the search for property information.
[0078] Although not an essential aspect, the search determination step preferably includes a procedure for determining that property information is to be searched when a search for property information is instructed via a conversational interface in natural language provided by the chatbot unit 119 executed by the control unit 11. This allows the user to search for property information through intuitive operations using natural language.
[0079] [Step S11: Search for Property] The control unit 11 executes a process related to the search unit 115, which is a process of searching for a property that matches the search criteria provided by the user in step S10 from the property information stored in the property information list 121 (step S11, search execution step). The control unit 11 then proceeds to step S12.
[0080] If the search criteria provided by the user in step S10 include one or more images related to the search, the search execution step preferably includes a procedure for searching for property information related to the images using image recognition of the images. This allows the user to intuitively search for property information using images capturing the exterior, interior, facilities, etc., of the desired property. The search using image recognition is not particularly limited. For example, the search includes a procedure for searching the property information list 121 for property information containing images similar to the desired image using image recognition.
[0081] [Step S12: Command to Display Search Results] The control unit 11 executes a process related to the search unit 115, instructing the display of the search results obtained in step S11 (step S12, search result display step). The control unit 11 then proceeds to step S13.
[0082] The management process includes various processes that support post-occupancy support using an automated agent. The following is an example of post-occupancy support. The management process includes a construction deadline management step (steps S13 to S17) that registers deadlines for real estate property management, including maintenance of the property's facilities and / or equipment, and notifies the user of the deadlines before the deadline. This allows the management device 1 to prevent property managers and others who are not familiar with the business practices of managing international real estate properties from forgetting deadlines related to the management. It is preferable that the various processes that support post-occupancy support using an automated agent be processes that use a neural network capable of machine learning. This allows the management device 1 to provide post-occupancy support while improving it through machine learning. Such improvements include, for example, improved language recognition in support, improved language generation in support, and improved deadline management in support.
[0083] In real estate transactions conducted through intermediaries, the quality of intermediaries varies greatly from country to country, and the scope of responsibility varies greatly as the obligations of intermediaries vary according to law. As a result, the quality of service and response is highly personal and varies greatly from person to person, which leads to many problems occurring during transactions.
[0084] The management device 1 of this embodiment realizes a platform incorporating automatic responses, automatic learning AI, and image recognition AI through the management process described above. By incorporating automatic responses, automatic learning AI, and image recognition AI into the platform, the management device 1 of this embodiment completely automates real estate agents and management companies according to the following procedures (a) to (h), reducing personal aspects and enabling the provision of stable, high-quality services, thereby supporting a high quality of life wherever you live in the world.
[0085] (a) Confirm customer requirements through automated responses from the chatbot.
[0086] (b) An image recognition system is used to determine and analyze trends in customer preferences and intentions regarding properties from photos and images sent by the customer.
[0087] (c) Perform information analysis based on the data on real estate (land, building, data), landlord, tenant, management company, and intermediary stored in the memory unit 12.
[0088] (d) Based on the information analysis of (c), automatic communication regarding property proposals to customers is carried out.
[0089] (e) In addition, the chatbot automatically calculates an efficient route based on the property desired by the customer and the desired viewing time, and the viewing arrangement is finalized by automatically arranging viewing appointments with other real estate agents.
[0090] (f) Regarding car arrangements, we will support everything from transportation between properties to pick-up and drop-off by linking with a ride-hailing app.
[0091] (g) When the property to apply for has been decided, the tenant or tenant agent fills in the desired conditions according to the application template and sends it to the landlord or landlord agent. The conditions are exchanged online, and if an agreement is reached, the template becomes an official application form, which is linked to the contract app to make the document official, and the same is done for the contract.
[0092] (h) After occupancy, in addition to making notifications based on the contract, arrangements for equipment repairs and maintenance, and other communications will all be handled automatically by the chatbot. By sharing information with all parties involved on this system, each party will be able to grasp the situation in real time, and by automating responses, various issues can be addressed in a timely manner.
[0093] [Step S13: Determine whether to register a deadline] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the deadline registration unit 116. The control unit 11 then executes processing related to the deadline registration unit 116, which is processing for determining whether to register a deadline for a real estate property (step S13, deadline registration determination step). If it is determined that registration should be performed, the control unit 11 proceeds to step S14. If it is not determined that registration should be performed, the control unit 11 proceeds to step S16.
[0094] The deadline registration determination step is not particularly limited and may include, for example, a procedure in which, when an instruction for deadline registration is received from terminal T via a web interface or the like related to deadline registration, the step determines that the deadline should be registered based on the instruction.
[0095] Although not a required aspect, the deadline registration determination step preferably includes a procedure for determining that the deadline should be registered in accordance with an instruction when the instruction to register the deadline is given via a conversational interface in natural language provided by the chatbot unit 119 executed by the control unit 11. The chatbot unit 119 is a software component that can provide information related to the maintenance of real estate properties and can register procedures related to the maintenance of real estate properties based on input in natural language by the user.
[0096] The expiration date registration determination step includes the above-described determination procedure, so that the user can register the expiration date through an intuitive operation using natural language. The procedure includes, for example, a procedure for determining that the expiration date related to an input such as a repair request or an insurance application procedure should be registered when the input is received.
[0097] In this case, it is preferable that the chatbot unit 119 is capable of providing information related to the maintenance of the real estate property, so that the user can receive the information related to the maintenance and perform a series of operations to register the deadline based on the information via a conversational interface in natural language.
[0098] [Step S14: Registering the Expiry Date] The control unit 11 executes a process related to the expiry date registration unit 116, which is a process of registering the expiry date determined to be registered in step S13 (step S14, expiry date registration execution step). The control unit 11 then proceeds to step S15.
[0099] The deadline registration execution step preferably includes a procedure for registering the deadline in association with the facility information generated in the facility information generation step, thereby enabling the user to register the deadline with a relatively simple operation of registering the deadline based on the facility information generated from the image.
[0100] Incidentally, when it comes to support after moving in, it is difficult to determine which manufacturer's product is best for repairs and maintenance at the time of purchase. Some products have good functionality but are prone to breakdowns and require maintenance, so even if they are cheap at the time of purchase, they can end up costing more than others when maintenance costs are included, resulting in poor performance. However, all of this information is kept secret, and users are unaware of it.
[0101] The management process executed by the management device 1 of this embodiment preferably includes a procedure for determining the investment efficiency of buildings and equipment based on equipment repair data associated with buildings and sections accumulated during contract management and the impact on contract rent, and analyzing the data for each manufacturer and product. This allows the management device 1 and its users to analyze the repair status and maintenance costs of equipment and products from manufacturers in each country and determine the advantages and disadvantages for customers on a product / manufacturer basis.
[0102] [Step S15: Calculating Notification Timing] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the timing calculation unit 117. Then, the control unit 11 executes processing related to the timing calculation unit 117, which is processing for calculating the notification timing related to the deadline registered in step S14 (step S15, timing calculation step). The control unit 11 proceeds to step S16.
[0103] The timing calculation step is not particularly limited as long as it includes a procedure for calculating one or more notification timings including at least a timing before the deadline related to the calculation. The timing calculation step includes, for example, a procedure for calculating notification timings with a predetermined grace period depending on the type of deadline.
[0104] The management device 1 executes a notification step (steps S16 to S17) of notifying the deadline related to the notification timing calculated in step S15.
[0105] [Step S16: Determining Whether It is Notification Timing] The control unit 11 cooperates with the storage unit 12 and the communication unit 13 to execute the notification unit 118. Then, the control unit 11 executes a process related to the notification unit 118, which is a process for determining whether it is the notification timing calculated in step S15 (step S16, notification determination step). If it is determined that it is notification timing, the control unit 11 proceeds to step S17. If it is not determined that it is notification timing, the control unit 11 ends the management process and proceeds to step S1.
[0106] [Step S17: Notifying of Deadline] The control unit 11 executes a process related to the notification unit 118, which is a process of notifying of the deadline related to the timing registered in step S14 and determined to be the notification timing in step S16 (step S17, notification execution step). The control unit 11 ends the management process and proceeds to step S1.
[0107] The target to be notified of the deadline in the notification execution step is not particularly limited, and includes, for example, a party involved in the deadline, such as a borrower, a landlord, a construction worker, an agent, etc.
[0108] Business practices differ in international transactions, and there are hurdles to adapting to the regulations of each country. In addition, there are many cases where the landlord or related parties live outside the country where the property is located, or they travel between countries and their whereabouts are unknown. Even if a management company is involved, it is difficult to communicate quickly, share, and understand the situation, creating an environment where problems are likely to occur.
[0109] The management device 1 of this embodiment uses the contract list 123 and the above-mentioned management process to manage digitized contracts in a format that conforms to a single standard format, regardless of the customs and traditions of each country, and can manage contracts within this system, including within the framework of a country and virtual reality worlds such as the metaverse.Therefore, it is possible to provide a platform system that enables all people, including real estate contracts, tenants, landlords, management companies, and intermediaries, to centrally manage contracts defined as real estate around the world, regardless of which country they are from or where they live.
[0110] Furthermore, the management device 1 of this embodiment, like delivery systems such as Amazon (registered trademark), can efficiently request, quote, and share data with management companies, repair companies, and maintenance companies during repair and maintenance by using communication tools and status tracking tools incorporated in the above-mentioned management process, such as the deadline registration unit 116, timing calculation unit 117, notification unit 118, and chatbot unit 119. Even in situations where approval from the landlord is required (such as obtaining approval for repair costs), the management device 1 of this embodiment can share the status and obtain approval in a timely manner with the landlord. This allows the management device 1 of this embodiment to communicate in real time when a problem occurs, regardless of distance or time difference, enabling rapid response and arrangements.
[0111] [Contractor Registration Step] The management process preferably includes a contractor registration step of registering contractor information related to a contractor of a real estate property. This allows the management device 1 to perform various management operations based on the contractor information. More preferably, the contractor registration step allows the management device 1 to register information related to other parties involved in the contract, such as providers of real estate brokerage services and construction companies, using the management device 1.
[0112] [Contract Registration Step] The management process preferably includes a contract registration step of registering contract information related to a contract for a real estate property. The contract information preferably includes information related to past contracts. This allows the estimation unit 113 to estimate the price based on not only the contract information related to the current contract but also the past contract information.
[0113] [Preview Registration Step] The management process preferably includes a preview registration step of registering a preview date. The preview registration step is preferably executed using the chatbot unit 119. This allows the user to register the preview date through intuitive operations using natural language. Furthermore, this allows the management device 1 to notify the user of the date, thereby preventing the user from forgetting the preview date.
[0114] With regard to the preview registration step, it is preferable that the notification unit 118 can notify not only the contracting parties of the real estate property related to the preview, but also related parties such as the driver, etc. This allows the management device 1 to further reduce the labor required for previewing and support transactions and management of real estate properties.
[0115] [Effects of management processing] There are few people with the proper knowledge and experience when it comes to real estate investment, and it is difficult to handle the entire process of purchasing, managing, and selling in one place, and to do so across borders. Therefore, it is necessary to find trustworthy people in each region, but actually finding such people is a very high hurdle. Therefore, it is practically difficult to safely invest in real estate around the world.
[0116] By executing the above-mentioned management process, the management device 1 of this embodiment automates all real estate investment and management from acquisition to sale, and makes efficient investment decisions on real estate rent, selection of construction company, structure, equipment, location, room size, etc., and by completely automating construction and building management, it is possible to reduce the real estate management costs for individuals, companies, and funds and promote safe investments around the world.
[0117] <Example of Use of Management Device 1> An example of use of the management device 1 will be described below.
[0118] [Registration of Contractors] Providers and the like who provide services related to real estate brokerage using the management device 1 register contractor information about contractors of real estate properties and information about other parties in the management device 1 via terminals T and the like. The management device 1 stores the contractor information and the like in the memory unit 12.
[0119] [Registering a Contract] A provider or the like who provides a service related to real estate brokerage using the management device 1 registers contract information related to a real estate property in the management device 1 via a terminal T or the like. The management device 1 stores the contract information in the memory unit 12.
[0120] [Registration of Property Information] A provider or the like registers property information relating to a real estate property in the management device 1 via a terminal T or the like. The management device 1 stores the property information in the property information list 121.
[0121] [Registration of Equipment Information] The provider, etc., sends an image of the equipment, fixtures, etc. of the real estate property via a terminal T, etc., to the management device 1. The management device 1 performs image recognition on the image and stores equipment information related to the equipment, fixtures, etc. in the property information list 121.
[0122] [Estimating the Consideration] The provider or the like instructs the management device 1 to estimate the consideration for the real estate property via the terminal T or the like. The management device 1 estimates and presents the consideration using the registered contract information or the like.
[0123] [Searching for Properties] A tenant who wishes to rent a real estate property sends search criteria related to the desired property to the management device 1. The tenant also sends an image of the desired property taken by the tenant via a terminal T or the like to the management device 1. The management device 1 performs image recognition on the image, searches for properties based on the search criteria and the results of the image recognition, and displays the search results. The tenant selects a property they wish to view from the search results and registers a schedule for the viewing through a dialogue with the chatbot.
[0124] [Conclusion of contract] The management device 1 notifies the viewing schedule at the notification timing calculated based on the registered schedule. The management device 1 sends the notification to each of the parties involved in the viewing, such as the agent, the tenant, and the taxi company. The tenant travels to the property in a taxi that comes to pick them up based on the notification from the management device 1. The tenant views the property together with the agent and concludes a contract with the landlord regarding the rental of the property through the agent.
[0125] [Payment of rent] The management device 1 notifies the tenant of the schedule for paying rent at the notification timing calculated based on the registered schedule. The tenant pays rent based on the notified schedule.
[0126] [Response to repairs, etc.] The tenant notices that equipment or fixtures require repair. The tenant obtains information related to the repair from the management device 1 via the chatbot. The tenant registers various pieces of information related to the repair in the management device 1 via the chatbot. The management device 1 registers the various pieces of information along with the deadline for the repair. The management device 1 calculates the notification timing based on the deadline. Then, at the notification timing, the management device 1 notifies the deadline to construction personnel, the tenant, etc. After the repairs are performed, the tenant pays the fee by the payment date notified at the calculated notification timing.
[0127] The above describes one example of a preferred embodiment of the present invention. However, within the scope of the concept of the present invention, those skilled in the art may conceive of various modifications and alterations. Therefore, it is understood that these modifications and alterations fall within the scope of the present invention, just like the above-described example. For example, if a person skilled in the art appropriately adds, deletes, or modifies components of the above-described embodiment, or adds, omits, or modifies the conditions of a process, these modifications will also fall within the scope of the present invention, just like the above-described example, as long as they incorporate the gist of the present invention.
[0128] S System 1 Management device 11 Control unit 111 Property information registration unit 112 Equipment etc. information generation unit 113 Estimation unit 114 Presentation unit 115 Search unit 116 Deadline registration unit 117 Timing calculation unit 118 Notification unit 119 Chatbot unit 12 Storage unit 121 Property information list 122 Contractor list 123 Contract list 124 Construction etc. deadline list 13 Communication unit N Network T Terminal
Claims
1. A management device comprising: a deadline registration unit capable of registering a deadline related to a real estate property; a timing calculation unit capable of calculating one or more notification timings for notifying the deadline, the timing including at least a timing before the deadline; and a notification unit capable of notifying the deadline at the notification timing, wherein the deadline includes a management deadline related to the management of the real estate property, the management includes at least maintenance of facilities and / or equipment of the real estate property, and the notification unit is capable of notifying the management deadline.
2. The management device as described in claim 1, further comprising a chatbot unit capable of providing information related to the real estate property through a conversational interface in natural language, the chatbot unit capable of providing information related to the maintenance of the real estate property and capable of registering procedures related to the maintenance of the real estate property based on a user's input in natural language.
3. The management device of claim 1, further comprising an equipment information generation unit capable of generating multiple pieces of equipment information relating to the equipment and / or fixtures of the real estate property using image recognition of images taken of the real estate property, and the deadline registration unit is capable of registering the deadline in association with the equipment information.
4. The management device as described in claim 1, further comprising: a property information registration unit capable of registering property information relating to the real estate property; an estimation unit capable of estimating the consideration for a contract relating to the real estate property based on the property information; and a presentation unit capable of presenting the consideration estimated by the estimation unit.
5. The management device according to claim 4, further comprising a search unit capable of searching for the property information based on an image, the search unit capable of searching for the property information related to the image using image recognition of the image.
Citation Information
Patent Citations
System for providing residence maintenance information
JP2002041604A
Examination result management server, communication system, communication method and program
JP2021026330A
Drone digital locker builder
US10741087B1
Device installation assistance system
WO2018181780A1
