Method for quickly mounting curved keel in curved metal roof based on BIM

By using three positioning lines of BIM and circular pipes in curved metal roofs for keel processing and installation, the problems of low installation efficiency and low accuracy of traditional curved keels are solved, and efficient and accurate construction of curved metal roofs is achieved.

WO2025001338A1PCT designated stage expired Publication Date: 2025-01-02CHINA MCC5 GROUP CORP LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/082869
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-06-29
Filing Date
2024-03-21
Publication Date
2025-01-02

AI Technical Summary

Technical Problem

Traditional curved keels have low installation efficiency and low accuracy. Especially in the construction of complex free-curved metal honeycomb aluminum plate roofs, the bidirectional bending of the keels and different curvature radii lead to installation difficulties, affecting construction efficiency and accuracy.

Method used

Using a BIM-based method, a circular tube is used as a keel and three positioning lines are set up in its axial direction. The keel is processed and installed through these positioning lines. The position of the keel is determined using adjustable support and BIM modeling to achieve rapid installation.

Benefits of technology

Improve the efficiency and accuracy of keel installation, reduce construction costs, and complete the keel processing through three positioning lines. The positioning lines and adjustable support are used to quickly complete the installation of keel, solving the problem of difficulty in positioning of keels. Improve overall installation efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024082869_02012025_PF_FP_ABST
    Figure CN2024082869_02012025_PF_FP_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of roof engineering construction, and particularly disclosed is a method for quickly mounting a curved keel in a curved metal roof based on BIM. The method specifically comprises the following steps: step S1, using circular tubes as keels, and disposing three positioning lines on each section of keel along an axial direction thereof; step S2, conducting keel machining by using the three positioning lines; step S3, conducting spatial position positioning of a first section of keel on a construction site; step S4, mounting an adjustable keel support corresponding to the first section of keel, and fixing the first section of keel; step S5, connecting and mounting a second section of keel to the first section of keel; step S6, sequentially mounting the remaining keels until all the keels are mounted; and step S7, mounting a panel support on all the keels. According to the present invention, the installation efficiency and the installation precision are greatly improved, and then the construction cost is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

A method for rapid installation of curved keels in curved metal roofs based on BIM Technical Field

[0001] The present invention relates to the technical field of roof engineering construction, and more particularly to a method for quickly installing curved keels in a curved metal roof based on BIM. Background Art

[0002] Landmark large-scale venues not only fulfill their functions but also carry the responsibility of promoting regional culture. Complex free-form surface finishes with smooth and flowing curves are well-suited to expressing the venue's modern artistic character. However, for complex free-form metal honeycomb aluminum panel roofs, due to their complex and variable geometric curvature, the metal honeycomb aluminum panel keel follows the roof curvature, forming a spatial curve.

[0003] Traditional spatial curved keels use rectangular tubes for easy fixation, and the spatial curve is achieved by bending and pulling the rectangular tubes in two directions. The bidirectional bending and different curvature radii of the keel bring great difficulties to the determination of the keel baseline during the keel bending process and subsequent installation. In the existing technology, during installation, the points are usually measured first to determine the support installation position and top elevation, and the support is preliminarily installed; then the keel is installed. The rectangular keel is a spatial curve, and the bending direction of the rectangular keel needs to be found and determined. The keel installation efficiency using this method is low, and the positioning and installation accuracy is low.

[0004] Summary of the Invention

[0005] The technical problem to be solved by the present invention is to provide a method for quickly installing curved keels in curved metal roofs based on BIM, which greatly improves the installation efficiency and installation accuracy, thereby effectively reducing the construction cost.

[0006] The solution adopted by the present invention to solve the technical problem is:

[0007] A method for quickly installing curved keels in a curved metal roof based on BIM specifically comprises the following steps:

[0008] Step S1: using a circular tube as a keel, and setting three positioning lines along the axial direction of each keel;

[0009] Step S2: Process the keel using three positioning lines:

[0010] Step S3: The first section of keel is spatially positioned at the construction site;

[0011] Step S4: installing the adjustable keel support corresponding to the first keel section and fixing the first keel section;

[0012] Step S5: connecting and installing the second keel section to the first keel section;

[0013] Step S6: Install the remaining keels in sequence until all keels are installed;

[0014] Step S7: Install the panel supports on all keels.

[0015] In some possible implementations,

[0016] The three positioning lines include two curved positioning lines that are on the same horizontal plane as the longitudinal axis of the circular tube and arranged along the axial direction of the circular tube, and a positioning nail line that is arranged along the longitudinal direction of the circular tube and on the same vertical plane as the longitudinal axis of the circular tube;

[0017] The positioning nail line is located above the plane where the two curved positioning lines and the length direction of the circular tube are located.

[0018] In some possible implementations,

[0019] The two curved positioning lines are perpendicular to the horizontal plane where the longitudinal axis of the circular tube is located, and the positioning nail line is perpendicular to the vertical plane where the longitudinal axis of the circular tube is located.

[0020] In some possible implementations,

[0021] Step S3 specifically refers to:

[0022] Use BIM to model and derive the coordinates of three points on the first section of the keel positioning nail line;

[0023] The coordinates of the three points of the positioning nail line in the first section of the keel are set out at the construction site to locate the spatial position of the first section of the keel at the construction site.

[0024] In some possible implementations,

[0025] The step S4 specifically refers to:

[0026] Install the corresponding adjustable supports according to the spatial position of the first section of keel at the construction site;

[0027] Align the two curved positioning lines in the first section of the keel with the edge of the clamp in the middle of the adjustable support, and make the clamp be placed on the outside of the first section of the keel to complete the installation of the first section of the keel.

[0028] In some possible implementations,

[0029] The step S5 specifically includes the following steps:

[0030] Step S51: placing an insert at one end of the second keel section close to the first keel section, inserting the insert into the first keel section, and aligning the three positioning lines;

[0031] Step S52: Modeling is performed using BIM to derive the coordinates of two points on the positioning nail line of the second keel section, and positioning the second keel section at the construction site;

[0032] Step S53: According to the position of the second section of the keel at the construction site, the corresponding adjustable support is installed. The three positioning lines are used as the installation baseline. The two curved positioning lines are aligned with the upper edge of the middle clamp of the adjustable support, and the clamp is placed on the outside of the second section of the keel to complete the installation of the second section of the keel.

[0033] In some possible implementations,

[0034] The distance between the end faces of two adjacent groups of keels close to each other is 8-10mm.

[0035] In some possible implementations,

[0036] The step S7 specifically refers to:

[0037] Put the clamp at the bottom of the panel support onto the keel and align the edge of the clamp with the top line of the bend.

[0038] In some possible implementations,

[0039] The keel processing in step S2 is bending and pulling of the keel; specifically, it means: bending and pulling are performed using two sets of bending positioning lines and the axis of the long direction of the circular tube as the bending plane, and the positioning nail line as the bending normal.

[0040] In some possible implementations,

[0041] The three points of the positioning nail line in the first section of the keel are respectively set at the two ends and the middle of the first section of the keel;

[0042] The coordinates of the two points of the positioning nail line in the second section keel are respectively set at an end of the second section keel away from the first section keel and a middle part of the second section keel.

[0043] Compared with the prior art, the present invention has the following beneficial effects:

[0044] When the present invention is used to bend and draw a circular tube, the bending and drawing normal line is determined by three positioning lines, and the bending in each direction is controlled by the bending and drawing normal line to complete the processing of the keel;

[0045] When the present invention is used to install the keel, after the positioning point of the circular tube positioning nail line is determined by lofting, the established positioning line is used as the installation baseline. The keel installation can be quickly completed by simply aligning the curved positioning line of the circular tube with the upper edge of the middle clamp of the adjustable support that has been positioned.

[0046] The present invention utilizes the positioning nail line of the circular tube and the adjustment flexibility of the adjustable support to quickly complete the connection between the intermediate keel connection system and the keel, which has not yet been accurately measured and measured, effectively solving the problem of difficult keel installation and positioning, and greatly improving installation efficiency and installation accuracy.

[0047] The present invention also provides a baseline reference for the subsequent installation of the panel support by utilizing the three positioning lines on the circular tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] FIG1 is a schematic diagram of the connection between the first section keel and the second section keel in the present invention;

[0049] Among them: 1. The first section of the keel; 11. The bending positioning line; 12. The top nail line; 2. The second section of the keel. DETAILED DESCRIPTION

[0050] In this application, unless otherwise specified or limited, terms such as "mounted," "connected," "connect," and "fixed" should be interpreted broadly. For example, they can refer to fixed connections, removable connections, or integration; they can refer to direct connections or indirect connections through an intermediary; they can refer to internal communication between two components or interactions between two components. The terms "first," "second," and similar terms mentioned in this application do not denote any order, quantity, or importance; they are simply used to distinguish between different components. Similarly, terms such as "one" or "a" do not indicate a quantitative limitation; rather, they indicate the presence of at least one. In the implementation of this application, "and / or" describes an association relationship between associated objects, indicating that three possible relationships exist. For example, "A and / or B" can mean: A exists alone, A and B exist simultaneously, or B exists alone. In the description of the embodiments of this application, unless otherwise specified, "plurality" means two or more. For example, "plurality" refers to two or more positioning posts. Those skilled in the art will understand the specific meanings of these terms in this application based on the specific circumstances.

[0051] The present invention is described in detail below.

[0052] As shown in Figure 1:

[0053] A method for quickly installing curved keels in a curved metal roof based on BIM specifically comprises the following steps:

[0054] Step S1: using a circular tube as a keel, and setting three positioning lines along the axial direction of each keel;

[0055] Preferably, the circular tube is a metal tube, further made of aluminum alloy;

[0056] The three positioning lines include two curved positioning lines 11 arranged in the same horizontal plane as the longitudinal axis of the circular tube and along the axial direction of the circular tube, and a positioning nail line 12 arranged in the longitudinal direction of the circular tube and in the same vertical plane as the longitudinal axis of the circular tube;

[0057] The positioning nail line 12 is located above the plane where the two curved positioning lines 11 and the length direction of the circular tube are located;

[0058] The two curved positioning lines 11 and the horizontal plane where the longitudinal axis of the circular tube is located, and the positioning nail line 12 and the vertical plane where the longitudinal axis of the circular tube is located are perpendicular to each other.

[0059] Step S2: Process the keel using three positioning lines:

[0060] The keel processing in step S2 is bending and pulling of the keel; specifically, it means: bending and pulling are performed using two sets of bending positioning lines 11 and the axis of the long direction of the circular tube as the bending plane, and the positioning nail line 12 as the bending normal line.

[0061] Step S3: The first section of keel 1 is spatially positioned at the construction site; specifically,

[0062] Use BIM to model and derive the coordinates of three points on the positioning nail line 12 of the first section of keel 1;

[0063] Lofting the coordinates of the three points of the positioning nail line 12 in the first section of the keel 1 at the construction site, and positioning the spatial position of the first section of the keel 1 at the construction site;

[0064] Preferably, when the first section of the keel 1 is installed, the coordinates of three points are selected to realize the positioning of the first section of the keel 1; the three points are respectively selected at the two ends and the middle of the positioning nail line 12;

[0065] Step S4: Install the adjustable keel support corresponding to the first keel section 1 and fix the first keel section 1; specifically,

[0066] Install the corresponding adjustable supports according to the spatial position of the first section of keel 1 at the construction site;

[0067] Align the two curved positioning lines 11 in the first section of the keel 1 with the edge of the clamp in the middle of the adjustable support, and make the clamp be sleeved on the outside of the first section of the keel 1 to complete the installation of the first section of the keel 1.

[0068] Step S5: Connecting and installing the second keel section 2 to the first keel section 1; specifically comprising the following steps:

[0069] Step S51: placing an insert at one end of the second keel section 2 close to the first keel section 1, inserting the insert into the first keel section 1, and aligning the three positioning lines;

[0070] The distance between the end faces of two adjacent groups of keels close to each other is 8-10mm; that is, there will be a gap of 8-10mm between two adjacent groups of keels close to one end, so as to avoid deformation of the keels caused by thermal expansion;

[0071] After the insert of the second section keel 2 is plugged into the first section keel 1, the second section keel 2 is positioned close to one end of the first section keel 1;

[0072] Step S52: Modeling is performed using BIM to derive the coordinates of two points on the positioning nail line 12 of the second keel section 2, and positioning the second keel section 2 at the construction site;

[0073] Preferably, since the end of the second section keel 2 close to the first section keel 1 has been positioned by the first section keel 1, the multiple points on the second section keel 2 include a point located at the end of the second section keel 2 away from the first section keel 1 and a point located in the middle of the second section keel 2; the positioning of the second section keel 2 at the construction site can be achieved through the cooperation of these two points with the first section keel 1; this will reduce the measurement of the positioning points of the second section keel 2, thereby effectively speeding up construction efficiency and reducing construction costs.

[0074] Step S53: According to the position of the second section of keel 2 at the construction site, the corresponding adjustable support is installed, and the three positioning lines are used as the installation baseline. The two curved positioning lines 11 are aligned with the upper edge of the middle clamp of the adjustable support, and the clamp is installed on the outside of the second section of keel 2 to complete the installation of the second section of keel 2.

[0075] Step S6: Repeat step S5 to install the remaining keels in sequence until all keels are installed;

[0076] Step S7: Install the panel supports on all keels; specifically:

[0077] Put the clamp at the bottom of the panel support onto the keel and align the edge of the clamp with the top line of the bend.

[0078] The invention is used for curved roof construction. On the one hand, during the bending and drawing of the circular tube, the bending and drawing normal lines are determined by three positioning lines, and the bending in each direction is controlled by the bending and drawing normal lines to complete the processing of the keel.

[0079] When installing the keel using the present invention, after determining the positioning points of the circular tube positioning nail line 12 by laying out, the established positioning line is used as the installation baseline. The keel installation can be quickly completed by simply aligning the curved positioning line 11 of the circular tube with the upper edge of the middle clamp of the already positioned adjustable support. At the same time, by utilizing the adjustment flexibility of the circular tube positioning nail line 12 and the adjustable support, the connection between the intermediate keel connection system and the keel, which has not yet been accurately measured, can be quickly completed. This effectively solves the problem of difficult keel installation and positioning, greatly improving installation efficiency and accuracy. At the same time, the three positioning lines on the keel also provide a baseline reference for the subsequent installation of the panel support.

[0080] The present invention is not limited to the aforementioned specific embodiments, but extends to any new features or any new combination disclosed in this specification, as well as any new method or process steps or any new combination disclosed.

Claims

1. A method for rapid installation of curved keels in curved metal roofs based on BIM, characterized in that: The specific steps include: Step S1: using a circular tube as a keel, and setting three positioning lines along the axial direction of each keel; Step S2: Process the keel using three positioning lines: Step S3: The first section of keel is spatially positioned at the construction site; Step S4: installing the adjustable keel support corresponding to the first keel section, and fixing the first keel section; Step S5: connecting and installing the second section of keel to the first section of keel; Step S6: Install the remaining keels in sequence until all keels are installed; Step S7: Install the panel supports on all keels.

2. The method for rapid installation of curved keels in curved metal roofs based on BIM according to claim 1, characterized in that: The three positioning lines include two curved positioning lines which are on the same horizontal plane as the longitudinal axis of the circular tube and arranged along the axial direction of the circular tube, and a positioning nail line which is arranged along the longitudinal direction of the circular tube and on the same vertical plane as the longitudinal axis of the circular tube; The positioning nail line is located above the plane where the two curved positioning lines and the length direction of the circular tube are located.

3. The method for rapid installation of curved keels in curved metal roofs based on BIM according to claim 2, characterized in that: The two curved positioning lines are perpendicular to the horizontal plane where the long axis of the circular tube is located, and the positioning nail line is perpendicular to the vertical plane where the long axis of the circular tube is located.

4. The method for rapid installation of curved keels in curved metal roofs based on BIM according to claim 3 is characterized in that: Step S3 specifically refers to: Use BIM to model and derive the coordinates of three points on the first section of the keel positioning nail line; The coordinates of the three points of the positioning nail line in the first section of the keel are laid out at the construction site, and the spatial position of the first section of the keel is located at the construction site.

5. The method for rapid installation of curved keels in curved metal roofs based on BIM according to claim 4, characterized in that: The step S4 specifically refers to: Install the corresponding adjustable supports according to the spatial position of the first section of keel at the construction site; Align the two curved positioning lines in the first section of the keel with the edge of the clamp in the middle of the adjustable support, and make the clamp be mounted on the outside of the first section of the keel to complete the installation of the first section of the keel.

6. The method for rapid installation of curved keels in curved metal roofs based on BIM according to claim 5, characterized in that: The step S5 specifically comprises the following steps: Step S51: a core is arranged at one end of the second keel section close to the first keel section, the core is inserted into the first keel section, and the three positioning lines are aligned; Step S52: Modeling is performed using BIM, the coordinates of two points on the positioning nail line of the second section keel are derived, and the second section keel is positioned at the construction site; Step S53: According to the position of the second section of the keel at the construction site, the corresponding adjustable support is installed, and the three positioning lines are used as the installation baseline. The two curved positioning lines are aligned with the upper edge of the middle clamp of the adjustable support, and the clamp is installed on the outside of the second section of the keel to complete the installation of the second section of the keel.

7. The method for rapid installation of curved keels in curved metal roofs based on BIM according to claim 5, characterized in that: The distance between the end faces of two adjacent groups of keels close to each other is 8-10mm.

8. The method for rapid installation of curved keels in curved metal roofs based on BIM according to claim 6, characterized in that: The step S7 specifically refers to: Put the clamp at the bottom of the panel support on the keel and make sure the edge of the clamp is aligned with the top line of the bend. Colinear alignment.

9. A method for rapid installation of curved keels in curved metal roofs based on BIM according to any one of claims 3 to 8, characterized in that: The keel processing in step S2 is bending and pulling of the keel; specifically, it means: bending and pulling are performed using two sets of bending positioning lines and the axis of the long direction of the round tube as the bending plane and the positioning nail line as the bending normal line.

10. The method for rapid installation of curved keels in curved metal roofs based on BIM according to claim 6, characterized in that: The three points of the positioning nail line in the first section of the keel are respectively set at the two ends and the middle of the first section of the keel; The coordinates of two points of the positioning nail line in the second section keel are respectively set at an end of the second section keel away from the first section keel and the middle of the second section keel.

Citation Information

Patent Citations

  • Construction method of socket and spigot bolted keel for special-shaped metal roof

    CN110424642A

  • Three-dimensional adjustable system of complex multi-curve modeling veneer

    CN112227635A

  • Bamboo arch closure connecting structure and connecting method

    CN115627843A

  • BIM (Building Information Modeling)-based method for quickly installing curved keel in curved metal roof

    CN117005604A

  • Ball curtain frame construction