Information determination method, terminal, network device, communication device, and storage medium

By determining the size of the first information domain in the first downlink control information between the terminal and the network device, the problem of unclear information domain size when scheduling multiple cells is solved, and accurate analysis and consistency understanding are achieved.

WO2025035326A1PCT designated stage expired Publication Date: 2025-02-20BEIJING XIAOMI MOBILE SOFTWARE CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/112758
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-08-11
Publication Date
2025-02-20

AI Technical Summary

Technical Problem

In the prior art, the size determination of the information domain in the downlink control information (DCI) that schedules multiple cells is unclear, resulting in parsing errors.

Method used

By determining the size of the first information domain in the first downlink control information between the terminal and the network device, the maximum value of the information domain size corresponding to each cell in the cell set, or the size is indicated according to the configuration signaling.

Benefits of technology

It ensures that when multiple cells are scheduled, the size of the information domain is determined clearly, avoiding analysis errors, and ensuring that the terminal and base station understand the size of the information domain consistently.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023112758_20022025_PF_FP_ABST
    Figure CN2023112758_20022025_PF_FP_ABST
Patent Text Reader

Abstract

The present disclosure relates to the technical field of communications, and in particular to an information determination method, a terminal, a network device, a communication device, and a storage medium. The information determination method comprises: on the basis of at least one of the following first sizes, determining a second size of a first information domain in first downlink control information for scheduling multiple cells: a first size of a first information domain corresponding to each cell in a cell set to which the cell corresponding to the first downlink control information belongs, or a first size of a first information domain corresponding to a first reference cell in a cell combination corresponding to the first downlink control information. The present disclosure facilitates avoiding the problem in the process of scheduling multiple cells using first downlink control information, caused by not determining that a first size of a first information domain corresponding to which cell among the multiple cells is used as a basis for determining a second cell of a first information domain in first control information.
Need to check novelty before this filing date? Find Prior Art

Description

Information determination method, terminal, network device, communication device and storage medium Technical Field

[0001] The present disclosure relates to the field of communication technology, and in particular to an information determination method, a terminal, a network device, a communication device, and a storage medium. Background Art

[0002] In related technologies, a Downlink Control Information (DCI) within a scheduling cell is only allowed to schedule data for one cell, such as the Physical Uplink Shared Channel (PUSCH) and the Physical Downlink Shared Channel (PDSCH). However, with the gradual fragmentation of frequency resources, the demand for simultaneously scheduling data from multiple cells is gradually increasing.

[0003] Summary of the Invention

[0004] The embodiments of the present disclosure provide an information determination method, a terminal, a network device, a communication device, and a storage medium to solve technical problems in related technologies.

[0005] According to a first aspect of an embodiment of the present disclosure, an information determination method is proposed, which is executed by a terminal, and the method includes: determining a second size of a first information field in first downlink control information for scheduling multiple cells based on at least one of the following first sizes: a first size of the first information field corresponding to each cell in a cell set to which the cell corresponding to the first downlink control information belongs, or a first size of the first information field corresponding to the first reference cell in a cell combination corresponding to the first downlink control information.

[0006] According to a second aspect of an embodiment of the present disclosure, an information determination method is proposed, which is executed by a terminal. The method includes: determining the size of a first information field in first downlink control information for scheduling multiple cells according to first configuration signaling.

[0007] According to a third aspect of an embodiment of the present disclosure, an information determination method is proposed, which is executed by a network device, and the method includes: determining a second size of a first information field in first downlink control information for scheduling multiple cells based on at least one of the following first sizes: a first size of the first information field corresponding to each cell in a cell set to which the cell corresponding to the first downlink control information belongs, or a first size of the first information field corresponding to the first reference cell in a cell combination corresponding to the first downlink control information.

[0008] According to a fourth aspect of an embodiment of the present disclosure, an information determination method is proposed, which is executed by a network device. The method includes: sending configuration signaling to a terminal, wherein the configuration signaling is used by the terminal to determine the size of a first information field in a first downlink control information used to schedule multiple cells.

[0009] According to a fifth aspect of an embodiment of the present disclosure, a terminal is proposed, comprising: one or more processors; wherein the terminal is used to execute the information determination method described in any one of the first aspect and the second aspect.

[0010] According to a sixth aspect of an embodiment of the present disclosure, a network device is proposed, comprising: one or more processors; wherein the network device is used to execute the information determination method described in any one of the second aspect and the third aspect.

[0011] According to the seventh aspect of an embodiment of the present disclosure, a communication device is proposed, comprising: one or more processors; wherein the processor is used to call instructions so that the communication device executes the information determination method described in any one of the first aspect, the second aspect, the third aspect, and the fourth aspect.

[0012] According to an eighth aspect of an embodiment of the present disclosure, a communication system is proposed, comprising a terminal and a network device, wherein the terminal is configured to implement the information determination method described in any one of the first and second aspects, and the network device is configured to implement the information determination method described in any one of the second and third aspects.

[0013] According to the ninth aspect of an embodiment of the present disclosure, a storage medium is proposed, which stores instructions. When the instructions are executed on a communication device, the communication device executes the information determination method described in any one of the first, second, third, and fourth aspects.

[0014] According to an embodiment of the present disclosure, a terminal can determine the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs. Accordingly, for the first information field in the first downlink control information, the second size of the information field can be clearly determined based on the maximum value of the first size of the first information field corresponding to each cell in the cell set, so as to accurately parse the first information field based on the second size. This helps avoid problems caused by not determining the second size of the first information field in the first control information based on which cell among the multiple cells corresponds to the first size of the first information field when the first downlink control information schedules multiple cells.

[0015] According to an embodiment of the present disclosure, a network device may send a first configuration signaling to a terminal. The first configuration signaling includes but is not limited to RRC signaling. The first configuration signaling may indicate the size of the first information field in the first downlink control information of the terminal. The terminal may receive the first configuration signaling sent by the network device, and then determine the size of the first information field in the first downlink control information based on the first configuration signaling, so that after receiving the first downlink control information, the first information field in the first downlink control information may be parsed according to the determined size. This is beneficial for avoiding problems caused by determining the size of the first information field in the first control information based on the size of the first information field corresponding to a cell in the first downlink control information when the first downlink control information schedules multiple cells. It can also ensure that the terminal and the base station have a consistent understanding of the size of the first information field. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present disclosure, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.

[0017] FIG1 is a schematic diagram showing the architecture of a communication system according to an embodiment of the present disclosure.

[0018] FIG2A is an interactive schematic diagram illustrating an information determination method according to an embodiment of the present disclosure.

[0019] FIG2B is an interactive schematic diagram illustrating an information determination method according to an embodiment of the present disclosure.

[0020] FIG3 shows a schematic diagram of cells that can be scheduled by first downlink control information and cells that are actually scheduled according to an embodiment of the present disclosure.

[0021] Figure 4 is a schematic flow chart of a method for determining information according to an embodiment of the present disclosure. The method for determining information shown in this embodiment can be executed by a terminal.

[0022] FIG5 is a schematic flowchart showing an information determination method according to an embodiment of the present disclosure.

[0023] Figure 6 is a schematic flow chart of a method for determining information according to an embodiment of the present disclosure. The method for determining information shown in this embodiment can be executed by a network device.

[0024] FIG7 is a schematic flowchart showing an information determination method according to an embodiment of the present disclosure.

[0025] FIG8 is a schematic block diagram of a terminal according to an embodiment of the present disclosure.

[0026] FIG9 is a schematic block diagram of a terminal according to an embodiment of the present disclosure.

[0027] FIG10 is a schematic block diagram showing a network device according to an embodiment of the present disclosure.

[0028] FIG11 is a schematic block diagram showing a network device according to an embodiment of the present disclosure.

[0029] FIG12 is a schematic structural diagram of a communication device proposed in an embodiment of the present disclosure.

[0030] FIG13 is a schematic diagram of the structure of a chip proposed in an embodiment of the present disclosure. DETAILED DESCRIPTION

[0031] Embodiments of the present disclosure provide an information determination method, a terminal, a network device, a communication device, and a storage medium.

[0032] In a first aspect, an embodiment of the present disclosure proposes an information determination method, which is executed by a terminal, and the method includes: determining the second size of the first information field in the first downlink control information used to schedule multiple cells based on at least one of the following first sizes: the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, or the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information.

[0033] In the above embodiment, the terminal can determine the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs. Accordingly, for the first information field in the first downlink control information, the second size of the information field can be determined based on the maximum value of the first size of the first information field corresponding to each cell in the cell set, so as to accurately parse the first information field based on the second size. This helps avoid problems caused by the failure to determine the second size of the first information field in the first control information based on which cell in the multiple cells corresponds to the first information field when the first downlink control information schedules multiple cells.

[0034] In combination with some embodiments of the first aspect. In some embodiments, determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs includes: determining the second size of the first information field in the first downlink control information according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0035] In combination with some embodiments of the first aspect, in some embodiments, the second size of the first information field in the first downlink control information is equal to the maximum value.

[0036] In conjunction with some embodiments of the first aspect, in some embodiments, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0037] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0038] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0039] In combination with some embodiments of the first aspect. In some embodiments, determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information includes: the terminal is configured with first signaling, and determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information; wherein the first signaling is used to indicate the cell combination corresponding to the first downlink control information.

[0040] In combination with some embodiments of the first aspect. In some embodiments, the information determination method further includes: when the terminal is not configured with the first signaling, determining the second size of the first information field in the first downlink control information according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0041] In conjunction with some embodiments of the first aspect, in some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0042] a cell combination that can be scheduled by the first downlink control information;

[0043] The cell combination actually scheduled by the first downlink control information.

[0044] In conjunction with some embodiments of the first aspect, in some embodiments, the first reference cell includes at least one of the following:

[0045] The cell with the smallest cell index in the cell combination;

[0046] The cell with the largest cell index in the cell combination;

[0047] The first information field corresponding to each cell in the cell combination has the largest size.

[0048] In combination with some embodiments of the first aspect, in some embodiments, the first information field is applied to some cells among the cells actually scheduled by the first downlink control information.

[0049] In combination with some embodiments of the first aspect, in some embodiments, the part of cells to which the first information field applies includes: the cell with the smallest index among the cells actually scheduled by the first downlink control information.

[0050] In combination with some embodiments of the first aspect. In some embodiments, the information determination method further includes: when the second size of the first information field is larger than the third size of the first information field corresponding to the first cell actually used by the first information field, parsing the first information field according to a first number of bits in a proportion of the first information field to determine the information indicated by the first information field for the first cell.

[0051] In combination with some embodiments of the first aspect, in some embodiments, the first number of bits in the proportion of the first information field includes at least one of the following:

[0052] a first number of most significant bits in the proportion of the first information field;

[0053] The first information field accounts for a first number of least significant bits in the bit.

[0054] In combination with some embodiments of the first aspect, in some embodiments, the first number is equal to the third size.

[0055] In combination with some embodiments of the first aspect. In some embodiments, the information determination method further includes: when the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, parsing the first information field by adding a second number of zero bits to the first information field to determine the information indicated by the first information field for the first cell.

[0056] In combination with some embodiments of the first aspect, in some embodiments, adding a second number of zero bits to the first information field includes at least one of the following:

[0057] adding a second number of bits having a value of zero before the most significant bit of the first information field;

[0058] A second number of bits having a value of zero are added after the least significant bit of the first information field.

[0059] In combination with some embodiments of the first aspect, in some embodiments, the second number is equal to a difference between the third size and the second size.

[0060] In a second aspect, an embodiment of the present disclosure proposes an information determination method, which is executed by a terminal. The method includes: determining the size of a first information field in first downlink control information for scheduling multiple cells according to first configuration signaling.

[0061] In the above embodiment, the network device may send first configuration signaling to the terminal. The first configuration signaling includes but is not limited to RRC signaling. The first configuration signaling may indicate the size of the first information field in the first downlink control information of the terminal. The terminal may receive the first configuration signaling sent by the network device and, based on the first configuration signaling, determine the size of the first information field in the first downlink control information. After receiving the first downlink control information, the terminal may parse the first information field in the first downlink control information based on the determined size. This helps avoid problems caused by determining the size of the first information field in the first control information based on the size of the first information field corresponding to a cell in the first downlink control information when the first downlink control information schedules multiple cells. It also ensures that the terminal and the base station have a consistent understanding of the size of the first information field.

[0062] In conjunction with some embodiments of the second aspect, in some embodiments, the first configuration signaling is determined based on a reference cell.

[0063] In conjunction with some embodiments of the second aspect, in some embodiments, the reference cell includes at least one of the following:

[0064] Dispatching cells;

[0065] a cell with the largest cell index in the cell combination corresponding to the first downlink control information;

[0066] the cell with the smallest cell index in the cell combination corresponding to the first downlink control information;

[0067] a cell with the largest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0068] a cell with the smallest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0069] a cell having the largest size of the first information field in the cell set to which the cell corresponding to the first downlink control information belongs;

[0070] a cell used to calculate the size of the first downlink control information;

[0071] A cell used to calculate blind detection resources for the first downlink control information.

[0072] In conjunction with some embodiments of the second aspect, in some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0073] a cell combination that can be scheduled by the first downlink control information;

[0074] a cell combination actually scheduled by the first downlink control information;

[0075] And / or, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0076] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0077] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0078] In combination with some embodiments of the second aspect, in some embodiments, the information determination method further includes: ignoring traditional configuration signaling, wherein the traditional configuration signaling is used to indicate the size of the first information field in traditional downlink control information.

[0079] In a third aspect, an embodiment of the present disclosure proposes an information determination method, which is executed by a network device, and the method includes: determining the second size of the first information field in the first downlink control information used to schedule multiple cells based on at least one of the following first sizes: the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, or the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information.

[0080] In the above embodiment, the network device can determine the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs. Accordingly, for the first information field in the first downlink control information, the second size of the information field can be determined based on the maximum value of the first size of the first information field corresponding to each cell in the cell set, so that the first information field can be accurately parsed based on the second size. This helps avoid problems caused by the first downlink control information scheduling multiple cells, which may arise from not determining which cell in the multiple cells corresponds to the first size of the first information field to determine the second size of the first information field.

[0081] In combination with some embodiments of the third aspect. In some embodiments, determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs includes: determining the second size of the first information field in the first downlink control information according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0082] In combination with some embodiments of the third aspect, in some embodiments, the second size of the first information field in the first downlink control information is equal to the maximum value.

[0083] In conjunction with some embodiments of the third aspect, in some embodiments, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0084] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0085] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0086] In combination with some embodiments of the third aspect. In some embodiments, determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information includes: configuring first signaling for the terminal, and determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information; wherein the first signaling is used to indicate the cell combination corresponding to the first downlink control information.

[0087] In combination with some embodiments of the third aspect. In some embodiments, the information determination method further includes: when the first signaling is not configured for the terminal, determining the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0088] In conjunction with some embodiments of the third aspect, in some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0089] a cell combination that can be scheduled by the first downlink control information;

[0090] The cell combination actually scheduled by the first downlink control information.

[0091] In conjunction with some embodiments of the third aspect, in some embodiments, the first reference cell includes at least one of the following:

[0092] The cell with the smallest cell index in the cell combination;

[0093] The cell with the largest cell index in the cell combination;

[0094] The first information field corresponding to each cell in the cell combination has the largest size.

[0095] In conjunction with some embodiments of the third aspect, in some embodiments, the first information field is applied to some cells among the cells actually scheduled by the first downlink control information.

[0096] In combination with some embodiments of the third aspect, in some embodiments, the part of cells to which the first information field is applied includes: the cell with the smallest index among the cells actually scheduled by the first downlink control information.

[0097] In combination with some embodiments of the third aspect. In some embodiments, the information determination method further includes: when the second size of the first information field is larger than the third size of the first information field corresponding to the first cell actually used by the first information field, determining the information indicated by the first information field for the first cell based on a first number of bits in a proportion of the first information field.

[0098] In conjunction with some embodiments of the third aspect, in some embodiments, the first number of bits in the proportion of the first information field includes at least one of the following:

[0099] a first number of most significant bits in the proportion of the first information field;

[0100] The first information field accounts for a first number of least significant bits in the bit.

[0101] In combination with some embodiments of the third aspect, in some embodiments, the first number is equal to the third size.

[0102] In combination with some embodiments of the third aspect. In some embodiments, the information determination method further includes: when the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell actually used by the first information field, determining the information indicated by the first information field for the first cell by adding a second number of zero bits to the first information field.

[0103] In combination with some embodiments of the third aspect, in some embodiments, adding a second number of zero bits to the first information field includes at least one of the following:

[0104] adding a second number of bits having a value of zero before the most significant bit of the first information field;

[0105] A second number of bits having a value of zero are added after the least significant bit of the first information field.

[0106] In combination with some embodiments of the third aspect, in some embodiments, the second number is equal to the difference between the third size and the second size.

[0107] In a fourth aspect, an embodiment of the present disclosure proposes an information determination method, which is executed by a network device, and the method includes: sending configuration signaling to a terminal, wherein the configuration signaling is used by the terminal to determine the size of the first information field in the first downlink control information used to schedule multiple cells.

[0108] In some embodiments, a network device may send first configuration signaling to a terminal. The first configuration signaling includes, but is not limited to, RRC signaling. The first configuration signaling may indicate the size of the first information field in the first downlink control information of the terminal. The terminal may receive the first configuration signaling sent by the network device and, based on the first configuration signaling, determine the size of the first information field in the first downlink control information. After receiving the first downlink control information, the terminal may parse the first information field in the first downlink control information based on the determined size. This helps avoid problems caused by determining the size of the first information field in the first control information based on the size of the first information field corresponding to a cell in the first downlink control information when the first downlink control information schedules multiple cells. It also ensures that the terminal and the base station have a consistent understanding of the size of the first information field.

[0109] In conjunction with some embodiments of the fourth aspect, in some embodiments, the configuration signaling is sent to the terminal in a reference cell.

[0110] In conjunction with some embodiments of the fourth aspect, in some embodiments, the reference cell includes at least one of the following:

[0111] Dispatching cells;

[0112] a cell with the largest cell index in the cell combination corresponding to the first downlink control information;

[0113] the cell with the smallest cell index in the cell combination corresponding to the first downlink control information;

[0114] a cell with the largest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0115] a cell with the smallest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0116] a cell having the largest size of the first information field in the cell set to which the cell corresponding to the first downlink control information belongs;

[0117] a cell used to calculate the size of the first downlink control information;

[0118] A cell used to calculate blind detection resources for the first downlink control information.

[0119] In conjunction with some embodiments of the fourth aspect, in some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0120] a cell combination that can be scheduled by the first downlink control information;

[0121] a cell combination actually scheduled by the first downlink control information;

[0122] And / or, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0123] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0124] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0125] In a fifth aspect, an embodiment of the present disclosure proposes a terminal comprising: one or more processors; wherein the terminal is used to execute the information determination method described in any one of the first aspect, the second aspect, the optional embodiment of the first aspect, and the optional embodiment of the second aspect.

[0126] In the sixth aspect, an embodiment of the present disclosure proposes a network device, comprising: one or more processors; wherein, the network device is used to execute the information determination method described in any one of the third aspect, the fourth aspect, the optional embodiment of the third aspect, and the optional embodiment of the fourth aspect.

[0127] In the seventh aspect, an embodiment of the present disclosure proposes a communication device, which includes: one or more processors; one or more memories for storing instructions; wherein the processor is used to call the instructions so that the communication device executes the xx method described in the first and second aspects, and the optional implementation methods of the first and second aspects.

[0128] In the eighth aspect, an embodiment of the present disclosure proposes a communication system, which includes: a terminal and a network device; wherein the terminal is configured to execute the method described in the first and second aspects, and the optional implementation methods of the first and second aspects, and the network device is configured to execute the method described in the third aspect, the fourth aspect, the optional embodiment of the third aspect, and the optional embodiment of the fourth aspect.

[0129] In the ninth aspect, an embodiment of the present disclosure proposes a storage medium, which stores instructions. When the instructions are executed on a communication device, the communication device executes the method described in the first aspect, the second aspect, the third aspect, the fourth aspect, the optional embodiment of the first aspect, the optional embodiment of the second aspect, the optional embodiment of the third aspect, and the optional embodiment of the fourth aspect.

[0130] In the tenth aspect, an embodiment of the present disclosure proposes a program product. When the program product is executed by a communication device, the communication device executes the method described in the first aspect, the second aspect, the third aspect, the fourth aspect, the optional embodiment of the first aspect, the optional embodiment of the second aspect, the optional embodiment of the third aspect, and the optional embodiment of the fourth aspect.

[0131] In the eleventh aspect, an embodiment of the present disclosure proposes a computer program, which, when running on a computer, enables the computer to execute the method described in the first aspect, the second aspect, the third aspect, the fourth aspect, the optional embodiment of the first aspect, the optional embodiment of the second aspect, the optional embodiment of the third aspect, and the optional embodiment of the fourth aspect.

[0132] It is understandable that the above-mentioned terminals, network devices, communication devices, communication systems, storage media, program products, and computer programs are all used to execute the methods proposed in the embodiments of the present disclosure. Therefore, the beneficial effects that can be achieved can refer to the beneficial effects of the corresponding methods and will not be repeated here.

[0133] The present disclosure provides an information determination method, a terminal, a network device, a communication device, and a storage medium. In some embodiments, the terms information determination method, information processing method, and communication method are interchangeable; the terms terminal, network device, information processing device, and communication device are interchangeable; and the terms information processing system and communication system are interchangeable.

[0134] The embodiments of the present disclosure are not exhaustive and are merely illustrative of some embodiments, and are not intended to be a specific limitation on the scope of protection of the present disclosure. In the absence of contradiction, each step in a certain embodiment can be implemented as an independent embodiment, and the steps can be arbitrarily combined. For example, a solution after removing some steps in a certain embodiment can also be implemented as an independent embodiment, and the order of the steps in a certain embodiment can be arbitrarily exchanged. In addition, the optional implementation methods in a certain embodiment can be arbitrarily combined; in addition, the embodiments can be arbitrarily combined. For example, some or all steps of different embodiments can be arbitrarily combined, and a certain embodiment can be arbitrarily combined with the optional implementation methods of other embodiments.

[0135] In each embodiment of the present disclosure, unless otherwise specified or provided for by logic, the terms and / or descriptions between the embodiments are consistent and can be referenced by each other. The technical features in different embodiments can be combined to form a new embodiment based on their inherent logical relationships.

[0136] The terms used in the embodiments of the present disclosure are only for the purpose of describing specific embodiments and are not intended to limit the present disclosure.

[0137] In the embodiments of the present disclosure, unless otherwise specified, elements expressed in the singular form, such as "a", "an", "the", "above", "said", "aforementioned", "this", etc., may mean "one and only one", or "one or more", "at least one", etc.

[0138] For example, when using articles such as “a”, “an”, and “the” in English in translation, the noun following the article can be understood as a singular expression or a plural expression.

[0139] In the embodiments of the present disclosure, “plurality” refers to two or more.

[0140] In some embodiments, the terms "at least one," "one or more," "a plurality of," "multiple," etc. may be used interchangeably.

[0141] In some embodiments, descriptions such as "at least one of A and B," "A and / or B," "A in one case, B in another case," or "in response to one case A, in response to another case B" may include the following technical solutions depending on the situation: in some embodiments, A (A is executed independently of B); in some embodiments, B (B is executed independently of A); in some embodiments, execution is selected from A and B (A and B are selectively executed); and in some embodiments, A and B (both A and B are executed). The above is also applicable when there are more branches such as A, B, and C.

[0142] In some embodiments, "A or B" and other descriptions may include the following technical solutions depending on the situation: in some embodiments, A (A is executed independently of B); in some embodiments, B (B is executed independently of A); in some embodiments, execution is selected from A and B (A and B are selectively executed). The above is also applicable when there are more branches such as A, B, C, etc.

[0143] The prefixes such as "first" and "second" in the embodiments of the present disclosure are only used to distinguish different description objects and do not constitute any restrictions on the position, order, priority, quantity or content of the description objects. For the statement of the description objects, please refer to the description in the context of the claims or embodiments, and no unnecessary restrictions should be constituted due to the use of prefixes.

[0144] For example, if the description object is "field," the ordinal number preceding "field" in "first field" and "second field" does not restrict the position or order of the "fields." "First" and "second" do not restrict whether the modified "fields" are in the same message, nor do they restrict the order of the "first field" and "second field." For another example, if the description object is "level," the ordinal number preceding "level" in "first level" and "second level" does not restrict the priority of the "levels." For another example, the number of description objects is not restricted by the ordinal number and can be one or more. For example, in the case of "first device," the number of "devices" can be one or more. Furthermore, the objects modified by different prefixes can be the same or different. For example, if the description object is "device," "first device" and "second device" can be the same or different devices, and their types can be the same or different. For another example, if the description object is "information," "first information" and "second information" can be the same or different information, and their content can be the same or different.

[0145] In some embodiments, “including A,” “comprising A,” “used to indicate A,” and “carrying A” can be interpreted as directly carrying A or indirectly indicating A.

[0146] In some embodiments, terms such as "in response to...", "in response to determining...", "in the case of...", "at the time of...", "when...", "if...", "if...", etc. can be used interchangeably.

[0147] In some embodiments, terms such as "greater than", "greater than or equal to", "not less than", "more than", "more than or equal to", "not less than", "higher than", "higher than or equal to", "not less than", and "above" can be replaced with each other, and terms such as "less than", "less than or equal to", "not greater than", "less than", "less than or equal to", "not more than", "lower than", "lower than or equal to", "not higher than", and "below" can be replaced with each other.

[0148] In some embodiments, devices and the like can be interpreted as physical or virtual, and their names are not limited to those in the embodiments.

[0149] The recorded names, "device", "equipment", "device", "circuit", "network element", "node", "function", "unit", "section", "system", "network", "chip", "chip system", "entity", "subject" and other terms can be used interchangeably.

[0150] In some embodiments, "network" can be interpreted as devices included in the network (eg, access network equipment, core network equipment, etc.).

[0151] In some embodiments, the terms "access network device (AN device)", "radio access network device (RAN device)", "base station (BS)", "radio base station" "fixed station", "node", "access point", "transmission point (TP)", "reception point (RP)", "transmission / reception point (TRP)", "panel", "antenna panel", "antenna array", "cell", "macro cell", "small cell", "femto cell", "pico cell", "sector", "cell group", "serving cell", "carrier", "component carrier", "bandwidth part (BWP)" and the like may be used interchangeably.

[0152] In some embodiments, the terms "terminal", "terminal device", "user equipment (UE)", "user terminal", "mobile station (MS)", "mobile terminal (MT)", subscriber station, mobile unit, subscriber unit, wireless unit, remote unit, mobile device, wireless device, wireless communication device, remote device, mobile subscriber station, access terminal, mobile terminal, wireless terminal, remote terminal, handset, user agent, mobile client, client, etc. can be used interchangeably.

[0153] In some embodiments, the access network device, the core network device, or the network device can be replaced by a terminal. For example, the various embodiments of the present disclosure can also be applied to a structure in which the communication between the access network device, the core network device, or the network device and the terminal is replaced by communication between multiple terminals (for example, device-to-device (D2D), vehicle-to-everything (V2X), etc.). In this case, it is also possible to set the structure in which the terminal has all or part of the functions of the access network device. In addition, terms such as "uplink" and "downlink" can also be replaced by terms corresponding to communication between terminals (for example, "side"). For example, uplink channels, downlink channels, etc. can be replaced by side channels, and uplinks, downlinks, etc. can be replaced by side links.

[0154] In some embodiments, the terminal may be replaced by an access network device, a core network device, or a network device. In this case, the access network device, the core network device, or the network device may have a structure that has all or part of the functions of the terminal.

[0155] In some embodiments, obtaining data, information, etc. may comply with the laws and regulations of the country where the data is obtained.

[0156] In some embodiments, data, information, etc. may be obtained with the user's consent.

[0157] In addition, each element, each row, or each column in the table of the embodiment of the present disclosure can be implemented as an independent embodiment, and the combination of any elements, any rows, and any columns can also be implemented as an independent embodiment.

[0158] FIG1 is a schematic diagram showing the architecture of a communication system according to an embodiment of the present disclosure.

[0159] As shown in FIG1 , a communication system 100 includes a terminal 101 and a network device 102 , wherein the network device includes at least one of the following: an access network device and a core network device.

[0160] In some embodiments, the terminal 101 includes, for example, a mobile phone, a wearable device, an Internet of Things device, a car with communication function, a smart car, a tablet computer, a computer with wireless transceiver function, a virtual reality (VR) terminal device, an augmented reality (AR) terminal device, a wireless terminal device in industrial control, a wireless terminal device in self-driving, a wireless terminal device in remote medical surgery, a wireless terminal device in a smart grid, a wireless terminal device in transportation safety, a wireless terminal device in a smart city, and at least one of a wireless terminal device in a smart home, but is not limited thereto.

[0161] In some embodiments, the access network device is, for example, a node or device that accesses a terminal to a wireless network. The access network device may include an evolved NodeB (eNB), a next generation evolved NodeB (ng-eNB), a next generation NodeB (gNB), a node B (NB), a home node B (HNB), a home evolved nodeB (HeNB), a wireless backhaul device, a radio network controller (RNC), a base station controller (BSC), a base transceiver station (BTS), a base band unit (BBU), a mobile switching center, a base station in a 6G communication system, an open base station (Open RAN), a cloud base station (Cloud RAN), a base station in other communication systems, and at least one of an access node in a Wi-Fi system, but is not limited thereto.

[0162] In some embodiments, a core network device may be a device including one or more network elements, or may be multiple devices or device groups, each including all or part of the one or more network elements. The network element may be virtual or physical. The core network may include, for example, at least one of an Evolved Packet Core (EPC), a 5G Core Network (5GCN), and a Next Generation Core (NGC).

[0163] In some embodiments, the technical solution of the present disclosure can be applied to the Open RAN architecture. In this case, the interfaces between or within the access network devices involved in the embodiments of the present disclosure can be transformed into internal interfaces of the Open RAN, and the processes and information interactions between these internal interfaces can be implemented through software or programs.

[0164] In some embodiments, the access network device can be composed of a centralized unit (CU) and a distributed unit (DU), where the CU can also be called a control unit. The CU-DU structure can be used to split the protocol layer of the access network device, with the functions of some protocol layers centrally controlled by the CU, and the functions of the remaining part or all of the protocol layers distributed in the DU, which is centrally controlled by the CU, but is not limited to this.

[0165] It can be understood that the communication system described in the embodiment of the present disclosure is for the purpose of more clearly illustrating the technical solution of the embodiment of the present disclosure, and does not constitute a limitation on the technical solution proposed in the embodiment of the present disclosure. Ordinary technicians in this field can know that with the evolution of the system architecture and the emergence of new business scenarios, the technical solution proposed in the embodiment of the present disclosure is also applicable to similar technical problems.

[0166] The following embodiments of the present disclosure may schedule the communication system 100 shown in Figure 1, or part of the entities, but are not limited thereto. The entities shown in Figure 1 are illustrative only. The communication system may include all or part of the entities shown in Figure 1, or may include other entities outside of Figure 1. The number and form of the entities are arbitrary, and the entities may be physical or virtual. The connection relationship between the entities is illustrative only. The entities may be connected or disconnected, and the connection may be in any manner, directly or indirectly, and wired or wireless.

[0167] The embodiments of the present disclosure may schedule Long Term Evolution (LTE), LTE-Advanced (LTE-A), LTE-Beyond (LTE-B), SUPER 3G, IMT-Advanced, 4th generation mobile communication system (4G), 5th generation mobile communication system (5G), 5G new radio (NR), future radio access (FRA), new radio access technology (RAT), new radio (NR), new radio access (NX), future generation radio access (FX), Global System for Mobile communications (GSM (registered trademark)), CDMA2000, Ultra Mobile Broadband (UMB), IEEE 802.11 (Wi-Fi (registered trademark)), IEEE 802.16 (WiMAX (registered trademark)), IEEE 802.20, Ultra-WideBand (UWB), Bluetooth (registered trademark), Public Land Mobile Network (PLMN) networks, Device-to-Device (D2D) systems, Machine-to-Machine (M2M) systems, Internet of Things (IoT) systems, Vehicle-to-Everything (V2X), systems utilizing other communication methods, and next-generation systems based on and extending these methods. Furthermore, multiple systems may be combined (for example, a combination of LTE or LTE-A with 5G).

[0168] FIG2A is an interactive schematic diagram illustrating an information determination method according to an embodiment of the present disclosure.

[0169] As shown in FIG2A , the information determination method includes:

[0170] Step S201: The terminal determines the size of the information field according to the first information.

[0171] In some embodiments, the first information field includes a first information field in downlink control information used to schedule multiple cells.

[0172] It should be noted that, in some embodiments, the network device may send the first downlink control information to the terminal before the terminal determines support for the first information field. Alternatively, in some embodiments, the network device may send the first downlink control information to the terminal after the terminal determines support for the first information field.

[0173] In some embodiments, the first information includes a first size of a first information field corresponding to each cell in a cell set to which the cell corresponding to the first downlink control information belongs.

[0174] In some embodiments, the first information includes a first size of a first information field corresponding to a first reference cell in a cell combination corresponding to the first downlink control information.

[0175] In some embodiments, the terminal determines the second size of the first information field in the first downlink control information according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0176] In some embodiments, the second size of the first information field in the first downlink control information is equal to the maximum value.

[0177] In some embodiments, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0178] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0179] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0180] In some embodiments, when the terminal is configured with the first signaling, it can determine the second size of the first information field in the first downlink control information based on the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information.

[0181] In some embodiments, when the terminal is not configured with the first signaling, it can determine the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0182] In some embodiments, the first signaling is used to indicate a cell combination corresponding to the first downlink control information.

[0183] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0184] a cell combination that can be scheduled by the first downlink control information;

[0185] The cell combination actually scheduled by the first downlink control information.

[0186] In some embodiments, the first reference cell includes at least one of the following:

[0187] The cell with the smallest cell index in the cell combination;

[0188] The cell with the largest cell index in the cell combination;

[0189] The first information field corresponding to each cell in the cell combination has the largest size.

[0190] In some embodiments, the first information field is applied to some cells among the cells actually scheduled by the first downlink control information.

[0191] In some embodiments, the part of cells to which the first information field is applied includes: the cell with the smallest index among the cells actually scheduled by the first downlink control information.

[0192] In some embodiments, when the second size of the first information field is larger than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, the terminal parses the first information field based on a first number of bits in a proportion of the first information field. In some embodiments, the terminal may determine, based on the parsing result, the information indicated by the first information field for the first cell.

[0193] In some embodiments, the first number of bits in the proportion of the first information field includes at least one of the following:

[0194] a first number of most significant bits in the proportion of the first information field;

[0195] The first information field accounts for a first number of least significant bits in the bit.

[0196] In some embodiments, the first number is equal to the third size.

[0197] In some embodiments, when the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, the terminal may parse the first information field by adding a second number of zero bits to the first information field. In some embodiments, the terminal may determine, based on the parsing result, the information indicated by the first information field for the first cell.

[0198] In some embodiments, adding a second number of zero bits to the first information field comprises at least one of the following:

[0199] adding a second number of bits having a value of zero before the most significant bit of the first information field;

[0200] A second number of bits having a value of zero are added after the least significant bit of the first information field.

[0201] In some embodiments, the second number is equal to the difference between the third size and the second size.

[0202] Step S202: The network device determines the size of the information field according to the first information.

[0203] In some embodiments, when the network device determines that the first signaling is configured for the terminal, it can determine the second size of the first information field in the first downlink control information based on the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information.

[0204] In some embodiments, when the network device determines that the first signaling is not configured for the terminal, the network device determines the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0205] In some embodiments, when the second size of the first information field is larger than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, the network device can determine the information indicated by the first information field to the first cell based on the first number of bits in the proportion of the first information field.

[0206] In some embodiments, when the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, the network device may determine the information indicated by the first information field to the first cell by adding a second number of bits with a value of zero to the first information field.

[0207] The communication method involved in the embodiments of the present disclosure may include at least one of steps S201 to S202. For example, step S201 may be implemented as an independent embodiment, step S202 may be implemented as an independent embodiment, and steps S201+S202 may be implemented as independent embodiments, but are not limited thereto.

[0208] In some embodiments, steps S201 and S202 may be performed in an interchangeable order or simultaneously.

[0209] In some embodiments, step S201 is optional, and one or more of these steps may be omitted or replaced in different embodiments.

[0210] In some embodiments, step S202 is optional, and one or more of these steps may be omitted or replaced in different embodiments.

[0211] FIG2B is an interactive schematic diagram illustrating an information determination method according to an embodiment of the present disclosure.

[0212] As shown in FIG2B , the information determination method includes:

[0213] Step S203: The network device sends first information to the terminal.

[0214] In some embodiments, the first information includes first configuration signaling.

[0215] In some embodiments, the first configuration signaling is used by the terminal to determine the size of the first information field.

[0216] In some embodiments, the first information field is the first information field in first downlink control information used to schedule multiple cells.

[0217] In some embodiments, the first configuration signaling is sent to the terminal in a reference cell.

[0218] Step S204: The terminal determines the size of the first information field according to the first information.

[0219] In some embodiments, the first configuration signaling is determined based on a reference cell.

[0220] In some embodiments, the reference cell includes at least one of the following:

[0221] Dispatching cells;

[0222] a cell with the largest cell index in the cell combination corresponding to the first downlink control information;

[0223] the cell with the smallest cell index in the cell combination corresponding to the first downlink control information;

[0224] a cell with the largest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0225] a cell with the smallest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0226] a cell having the largest size of the first information field in the cell set to which the cell corresponding to the first downlink control information belongs;

[0227] a cell used to calculate the size of the first downlink control information;

[0228] A cell used to calculate blind detection resources for the first downlink control information.

[0229] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0230] a cell combination that can be scheduled by the first downlink control information;

[0231] a cell combination actually scheduled by the first downlink control information;

[0232] And / or, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0233] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0234] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0235] In some embodiments, the terminal ignores legacy configuration signaling.

[0236] In some embodiments, the conventional configuration signaling is used to indicate the size of the first information field in conventional downlink control information.

[0237] The communication method involved in the embodiment of the present disclosure may include at least one of steps S203 to S204. For example, step S203 may be implemented as an independent embodiment, step S204 may be implemented as an independent embodiment, and steps S203+S204 may be implemented as independent embodiments, but are not limited thereto.

[0238] In some embodiments, steps S203 and S204 may be executed in an interchanged order or simultaneously.

[0239] In some embodiments, step S203 is optional, and one or more of these steps may be omitted or replaced in different embodiments.

[0240] In some embodiments, step S204 is optional, and one or more of these steps may be omitted or replaced in different embodiments.

[0241] In some embodiments, reference may be made to other optional implementations described before or after the description corresponding to FIG. 2A and FIG. 2B .

[0242] In some embodiments, the network device may send first downlink control information for scheduling multiple cells to the terminal. The first downlink control information may be called MC-DCI, for example, and its full name may be Multi-cell Downlink Control Information or Multi-cell scheduling Downlink Control Information.

[0243] In some embodiments, the first downlink control information is used to schedule multiple cells, and may refer to data used for the first downlink control information to schedule multiple cells, such as scheduling the physical uplink shared channel (PUSCH) and physical downlink shared channel (PDSCH) of one or more cells in the multiple cells, thereby realizing scheduling of multiple cells through one downlink control information.

[0244] In one embodiment, the terminal may receive the first downlink control information in a scheduling cell. The cell scheduled by the first downlink control information may be referred to as an actually scheduled cell. The actually scheduled cell is all or part of the cells that can be scheduled by the first downlink control information.

[0245] The following uses several embodiments to illustrate the cells that can be scheduled by the first downlink control information and the cells that are actually scheduled in this application.

[0246] FIG3 shows a schematic diagram of cells that can be scheduled by first downlink control information and cells that are actually scheduled according to an embodiment of the present disclosure.

[0247] In some embodiments, as shown in FIG3 , the network device may send Radio Resource Control (RRC) signaling to the terminal, and configure, through the RRC signaling, for the terminal a first list of cell sets to which cells that can be scheduled by the first downlink control information belong, for example, by indicating the first list through the Information Element (IE) MC-DCI-SetofCellsToAddModList in the RRC signaling. The first list may include multiple cell sets, and different sets do not include the same cell.

[0248] In some embodiments, different cell sets in the first list may include different cells. For example, if cell set #1 in the first list includes cell #1, then other cell sets in the first list will not include cell #1.

[0249] In some embodiments, as shown in Figure 3, the network device may indicate the set of cells to which the cell actually scheduled by the first downlink control information belongs in the first list. For example, the network device may indicate a set in the first list through the information element DCI field Scheduled cell set indicator in the RRC signaling. For example, the first list contains 4 sets, and for example, the 4 sets are represented by the following 4 information elements: MC-DCI-setofCells0, MC-DCI-setofCells1, MC-DCI-setofCells2, and MC-DCI-setofCells3. For example, if the set indicated by the network device in the first list is MC-DCI-setofCells2, then the terminal may determine that the set is the set of cells to which the cell actually scheduled by the first downlink control information belongs.

[0250] In some embodiments, the first downlink control information can be further divided into first downlink control information for scheduling PUSCH, for example, MC-DCI 0_3, and first downlink control information for scheduling PDSCH, for example, MC-DCI 1_3. MC-DCI 0_3 and MC-DCI 0_3 refer to MC-DCI formats, which can be downlink control information formats newly added based on legacy downlink control information formats. Legacy downlink control information can refer to downlink control information used to schedule a single cell.

[0251] In some embodiments, for example, as shown in FIG3 , for MC-DCI 0_3, the network device may indicate to the terminal the cell set to which the cell actually scheduled by MC-DCI 0_3 belongs through the information element ScheduledCell-ListDCI-0-3 in the RRC signaling. The cell set to which the cell actually scheduled by MC-DCI 0_3 belongs corresponds to the cell set to which the cell actually scheduled by the first downlink control information belongs. For example, when the cell set to which the cell actually scheduled by the first downlink control information belongs, as indicated by the network device, is MC-DCI-setofCells2, the terminal may determine the cell set to which the cell actually scheduled by MC-DCI 0_3 belongs based on ScheduledCell-ListDCI-0-3.

[0252] In some embodiments, for example, as shown in FIG3 , for MC-DCI 1_3, the network device may indicate to the terminal the cell set to which the cell actually scheduled by MC-DCI 1_3 belongs through the information element ScheduledCell-ListDCI-1-3 in the RRC signaling. The cell set to which the cell actually scheduled by MC-DCI 1_3 belongs corresponds to the cell set to which the cell actually scheduled by the first downlink control information belongs. For example, when the cell set to which the cell actually scheduled by the first downlink control information belongs, as indicated by the network device, is MC-DCI-setofCells2, the terminal may determine the cell set to which the cell actually scheduled by MC-DCI 1_3 belongs based on ScheduledCell-ListDCI-1-3.

[0253] In some embodiments, the network device may indicate to the terminal the cell combinations that can be scheduled by the first downlink control information. For example, for MC-DCI 0_3, as shown in FIG3 , the network device may indicate the cell combinations that can be scheduled by MC-DCI 0_3 through the information element ScheduledCellComboListDCI-0-3 under ScheduledCell-ListDCI-0-3, for example, a cell combination list may be indicated. For example, in FIG3 , the cell combinations that can be scheduled by MC-DCI 0_3 include ScheduledCellCombo0 to ScheduledCellComb15, a total of 16 cell combinations, and the corresponding combination indexes are 0 to 15, respectively.

[0254] In some embodiments, the network device may indicate to the terminal the cell combination actually scheduled by MC-DCI 0_3, where the cell combination may include at least one cell. For example, the network device may indicate to the terminal the cell combination actually scheduled by MC-DCI 0_3 through an information field in the first downlink control information. For example, the network device may indicate to the terminal the cell combination actually scheduled by MC-DCI 0_3 through a scheduled cells indicator information field in the first downlink control information. The cell combination actually scheduled by MC-DCI 0_3 belongs to the list of cell combinations that can be scheduled by MC-DCI 0_3 indicated by ScheduledCellComboListDCI-0-3. For example, in FIG3 , the cell combination actually scheduled by MC-DCI 0_3 indicated to the terminal by the Scheduled cells indicator is the cell combination ScheduledCellCombo1 corresponding to index 1.

[0255] Among them, when the network device does not indicate the list of cell combinations that can be scheduled by the first downlink control information, for example, ScheduledCellComboListDCI-0-3 is not configured, the cell combination actually scheduled by the first downlink control information can be indicated through the frequency domain resource assignment (FDRA) field.

[0256] In some embodiments, the network device may indicate to the terminal the cell combinations that can be scheduled by the first downlink control information. For example, for MC-DCI 1_3, as shown in FIG3 , the network device may indicate the cell combinations that can be scheduled by MC-DCI 1_3 through the information element ScheduledCellComboListDCI-1-3 under ScheduledCell-ListDCI-1-3, for example, a cell combination list may be indicated. For example, in FIG3 , the cell combinations that can be scheduled by MC-DCI 1_3 include ScheduledCellCombo0 to ScheduledCellComb15, a total of 16 cell combinations, and the corresponding indexes are 0 to 15, respectively.

[0257] In some embodiments, the network device may indicate to the terminal the cell combination actually scheduled by MC-DCI 1_3, where the cell combination may include at least one cell. For example, the network device may indicate to the terminal the cell combination actually scheduled by MC-DCI 1_3 through an information field in the first downlink control information. For example, the network device may indicate to the terminal the cell combination actually scheduled by MC-DCI 1_3 through a scheduled cells indicator information field in the first downlink control information. The cell combination actually scheduled by MC-DCI 1_3 belongs to the list of cell combinations that can be scheduled by MC-DCI 1_3 indicated by ScheduledCellComboListDCI-1-3. For example, in FIG3 , the cell combination actually scheduled by MC-DCI 1_3 indicated to the terminal by the Scheduled cells indicator is the cell combination ScheduledCellCombo1 corresponding to index 1.

[0258] Among them, when the network device does not indicate the list of cell combinations that can be scheduled by the first downlink control information, for example, ScheduledCellComboListDCI-1-3 is not configured, it can indicate the cell combination actually scheduled by the first downlink control information through the frequency domain resource allocation (FDRA) field.

[0259] In some embodiments, the cells that can be scheduled by the first downlink control information can be determined based on the configuration information of the network device or based on predefined rules, which is not limited in this disclosure. The cells that can be scheduled by the first downlink control information are used to represent the capability range of the first downlink control information, and the cells actually scheduled belong to the cells that can be scheduled by the first downlink control information.

[0260] In some embodiments, the first downlink control information includes at least one information field, which may also be referred to as a field. Since the first downlink control information can be used to schedule multiple cells, the information field in the first downlink control information can schedule at least one of the multiple cells. Therefore, it is necessary to determine the size of the information field, that is, the number of bits of information used, in order to accurately parse the information field.

[0261] In some embodiments, the information field scheduling cell means that the information indicated by the information field can be used to schedule the terminal in the applicable cell. For example, taking the information field of the Channel State Information (CSI) request (e.g., called CSI Request) as an example, the CSI Request can indicate to the terminal in the applicable cell whether the network device requests the terminal to report channel state information. In other words, the CSI Request is used to schedule whether the terminal reports channel state information in the applicable cell.

[0262] In a first aspect, embodiments of the present disclosure provide an information determination method. In some embodiments, the information determination method may be executed by a terminal, and the information determination method may include the following steps:

[0263] The second size of the first information field in the first downlink control information for scheduling multiple cells is determined according to at least one of the following first sizes:

[0264] a first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, or

[0265] a first size of a first information field corresponding to a first reference cell in a cell combination corresponding to the first downlink control information;

[0266] In some embodiments, the first downlink control information may include one or more information fields, wherein some information fields do not need to be applied to all cells among the cells actually scheduled by the first downlink control information, but only need to be applied to some cells among the cells actually scheduled by the first downlink control information. Such information fields may be referred to as first information, and the first information fields may be applied to some cells among the cells actually scheduled by the first downlink control information. That is, the first information field may be an information field included in the first downlink control information that is applied to some cells among the cells actually scheduled by the first downlink control information. For example, the type of the first information field may be referred to as type 1C.

[0267] It should be noted that, in some embodiments, the information field applied to a cell may mean that the information indicated by the information field can be applied to the cell. For example, taking the channel state information request (e.g., CSI Request) information field as an example, the information indicated by the CSI Request field is 00011, which indicates a value of 3, meaning that the report trigger state corresponding to the value 3 is triggered. Then, the CSI Request field applied to cell #1 means that the report trigger state corresponding to the value 3 for cell #1 is triggered. The terminal can perform corresponding CSI measurement reporting in cell #1 based on the triggered trigger state configuration according to the CSI Request field.

[0268] For example, the cells actually scheduled by the first downlink control information include three cells, namely cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3. The first information domain is applied to some of these three cells, for example, it can be applied to cell #1 and cell #2, for example, it can be applied to cell #2 and cell #3, for example, it can be applied to cell #1 and cell #3, for example, it can be applied to cell #1, for example, it can be applied to cell #2, for example, it can be applied to cell #3.

[0269] In some embodiments, the portion of cells to which the first information field applies includes: the cell with the smallest index among the cells actually scheduled by the first downlink control information. That is, the first information field may be the information field within the information field included in the first downlink control information that applies to the cell with the smallest index among the cells actually scheduled by the first downlink control information. For example, taking the example where the cells actually scheduled by the first downlink control information include cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3, the first information field may be the information field within the information field included in the first downlink control information that applies to cell #1.

[0270] Figure 4 is a schematic flow chart of a method for determining information according to an embodiment of the present disclosure. The method for determining information shown in this embodiment can be executed by a terminal.

[0271] As shown in FIG4 , determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs includes:

[0272] In step S401, the second size of the first information field in the first downlink control information is determined according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0273] It should be noted that the embodiment shown in FIG. 4 can be implemented independently or in combination with at least one other embodiment in the present disclosure. The specific selection can be made as needed and the present disclosure does not limit it.

[0274] In some embodiments, the first information field includes at least one of the following: a channel state information request (eg, CSI Request) information field, and an uplink shared channel indication (eg, UL-SCH indicator) information field.

[0275] In some embodiments, for each cell in the cell set to which the cell corresponding to the first downlink control information belongs, the terminal can determine the first size of the first information field corresponding to the cell. For example, the first size of the first information field corresponding to each cell can be determined according to the method of determining the size of the information field in the traditional downlink control information. For example, the network device can send a report trigger size (e.g., reportTriggerSize) signaling to the terminal on cell #1 to indicate the first size of the CSI Request field corresponding to cell #1.

[0276] Taking the first information field including the CSI Request field as an example, the network device can indicate the first size of the CSI request field for each cell through report trigger size (e.g., reportTriggerSize) signaling. The terminal can determine the first size of the CSI request field corresponding to each cell based on the report trigger size signaling sent by the network device.

[0277] Because the first downlink control information is used to schedule multiple cells, and the network device indicates the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, and the first size of the first information field corresponding to different cells can be different, it is necessary to clearly determine how to determine the size of the first information field in the first downlink control information in order to accurately parse the first information field.

[0278] According to an embodiment of the present disclosure, a terminal can determine the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs. Accordingly, for the first information field in the first downlink control information, the second size of the information field can be clearly determined based on the maximum value of the first size of the first information field corresponding to each cell in the cell set, so as to accurately parse the first information field based on the second size. This is conducive to avoiding problems caused by not clearly determining the first size of the first information field of the first information field in the first control information based on which cell in the multiple cells corresponds to the first size of the first information field when the first downlink control information schedules multiple cells.

[0279] In some embodiments, the second size of the first information field in the first downlink control information is equal to a maximum value.

[0280] In some embodiments, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0281] The cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0282] The cell set to which the cell actually scheduled by the first downlink control information belongs may also be referred to as the cell set to which the cell scheduled by the first downlink control information belongs.

[0283] For example, taking the cell set to which the cell corresponding to the first downlink control information belongs as an example, including the cell set to which the cell that can be scheduled by the first downlink control information belongs, for example, the cell set to which the cell that can be scheduled by the first downlink control information belongs is {1, 2, 3, 4}, that is, including cell #1 with an index of 1, cell #2 with an index of 2, cell #3 with an index of 3, and cell #4 with an index of 4.

[0284] For example, the first size of the first information field corresponding to cell #1 is 2, i.e., 2 bits; the first size of the first information field corresponding to cell #2 is 3, i.e., 3 bits; the first size of the first information field corresponding to cell #3 is 4, i.e., 4 bits; and the first size of the first information field corresponding to cell #4 is 5, i.e., 5 bits. The maximum value of the first size of the first information field corresponding to each cell in the cell set is 5, so the terminal can determine that the first information field in the first downlink control information occupies 5 bits.

[0285] For example, taking the example that the cell set to which the cell corresponding to the first downlink control information belongs includes the cell set to which the cell actually scheduled by the first downlink control information belongs, for example, the cell set to which the cell actually scheduled by the first downlink control information belongs is {1, 2, 3}, that is, including cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3.

[0286] For example, the first size of the first information field corresponding to cell #1 is 2, i.e., 2 bits; the first size of the first information field corresponding to cell #2 is 3, i.e., 3 bits; and the first size of the first information field corresponding to cell #3 is 4, i.e., 4 bits. The maximum value of the first size of the first information field corresponding to each cell in the cell set is 4, so the terminal can determine that the second size of the first information field in the first downlink control information is 4.

[0287] The following describes, through several embodiments, a method for determining the second size of the first information field in the first downlink control information.

[0288] Taking the first information field including the CSI Request information field as an example, the second size of the CSI Request information field in the first downlink control information is equal to in, It refers to the number of cells in the cell set to which the cell actually scheduled by the first downlink control information belongs. r is mapped one by one based on the order of cell index from small to large, where r=1 corresponds to the cell with the smallest index in the cell set. M c (r) represents the first size of the first information field corresponding to the rth cell in the cell set. c (r) It can be determined based on high-level parameters, for example, based on the report trigger size (for example, reportTriggerSize). For example, the first size can range from 0 to 6.

[0289] Taking the first information field including the UL-SCH indicator information field as an example, the second size of the UL-SCH indicator information field in the first downlink control information is equal to in, It refers to the number of cells in the cell set to which the cell actually scheduled by the first downlink control information belongs. r is mapped one by one based on the order of cell index from small to large, where r=1 corresponds to the cell with the smallest index in the cell set. M c (r) represents the first size of the first information field corresponding to the rth cell in the cell set. When the number of scheduled PUSCHs indicated by the Time Domain Resource Assignment (TDRA) field is 1, M c The first dimension of (r) is 0, otherwise, M c The first dimension of (r) is 1. c When the first size of (r) is 1, if the value of this bit is 1, the corresponding UL-SCH is transmitted on the PUSCH; if the value of this bit is 0, the corresponding UL-SCH is not transmitted on the PUSCH.

[0290] In some embodiments, the value of the CSI Request information field in the first downlink control information is 0, and the value of the UL-SCH indicator information field is 0. The terminal may not expect to receive such first downlink control information, that is, the terminal does not expect to receive the first downlink control information in which the value of the CSI Request information field is 0 and the value of the UL-SCH indicator information field is 0.

[0291] In some embodiments, determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information includes:

[0292] The terminal is configured with a first signaling, and determines the second size of the first information field in the first downlink control information based on the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information; wherein the first signaling is used to indicate the cell combination corresponding to the first downlink control information.

[0293] In some embodiments, the information determination method also includes: when the terminal is not configured with the first signaling, determining the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0294] In some embodiments, the network device may configure first signaling for the terminal, where the first signaling is used to indicate a cell combination corresponding to the first downlink control information.

[0295] When the terminal is configured with the first signaling, the terminal can determine the cell combination corresponding to the first downlink control information, and then the terminal can determine the first reference cell in the cell combination; determine the second size of the first information field in the first downlink control information based on the first reference cell, for example, it can be determined that the second size is equal to the size of the first information field corresponding to the first reference cell.

[0296] When the terminal is not configured with the first signaling, the terminal cannot determine the cell combination corresponding to the first downlink control information. Then the terminal can determine the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, and determine the second size of the first information field in the first downlink control information based on the maximum value.

[0297] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0298] A cell combination that can be scheduled by the first downlink control information;

[0299] The cell combination actually scheduled by the first downlink control information.

[0300] For example, the first signaling includes at least one of the following:

[0301] ScheduledCellCombo-ListDCI-0-3;

[0302] ScheduledCellCombo-ListDCI-1-3.

[0303] In some embodiments, the first reference cell includes at least one of the following:

[0304] The cell with the smallest cell index in the cell combination;

[0305] The cell with the largest cell index in the cell combination;

[0306] The cell with the largest corresponding first information field in the cell combination.

[0307] In some embodiments, the terminal may determine a cell combination corresponding to the first downlink control information, and then the terminal may determine a first reference cell in the cell combination; and determine the second size of the first information field in the first downlink control information according to the first reference cell.

[0308] In some embodiments, determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information includes:

[0309] The first reference cell is a cell with the smallest cell index in the cell combination.

[0310] In one possible implementation, the terminal determines the cell actually scheduled by the first downlink control information based on a specific information field of the first downlink control information, such as indication information in a scheduled cells indicator field or a frequency domain resource assignment field. The terminal also determines that the second size of the first information field in the first downlink control information is equal to the first size of the first information field corresponding to the cell with the smallest cell index value among the actually scheduled cells.

[0311] In some embodiments, for example, the first information field includes a CSI request field. The actual scheduled cell may be indicated by the Scheduled cells indicator field or the Frequency domain resource assignment field, and the size of the CSI request field may be determined based on the reportTriggerSize of the cell with the smallest index (e.g., serving cell index) among the actual scheduled cells. For example, the size of the CSI request field may be 0, 1, 2, 3, 4, 5, or 6 bits. The CSI request field is applied to the cell with the smallest index.

[0312] In some embodiments, the first information field includes a UL-SCH indicator field. The size of the UL-SCH indicator field accounts for the number of bits M. U (r), where r refers to the cell with the smallest index (e.g., serving cell index) among the cells actually scheduled indicated by the Scheduled cells indicator field or the Frequency domain resource assignment field. U (r) can be determined by:

[0313] When the number of actually scheduled PUSCHs indicated by the Time domain resource assignment field is greater than 1, M U (r) is 0 bit.

[0314] Otherwise, M U(r) is 1 bit. When the value is 1, it is used to indicate that UL-SCH should be transmitted on PUSCH, and when the value is 0, it is used to indicate that UL-SCH should not be transmitted on PUSCH. When the terminal does not support triggering SRS (Sounding Reference Signal) only on DCI, the terminal does not expect to receive DCI format 0_1 ​​when the UL-SCH indicator field indicates 0 and the CSI request field is all 0, unless the CRC (Cyclic Redundancy Check) of DCI format 0_1 ​​is preempted by SP-CSI-RNTI (Semi-Persistent Channel State Information Radio Network Temporary Identifier). When the terminal supports triggering SRS only on DCI, the terminal does not expect to receive DCI format 0_1 ​​when the UL-SCH indicator field indicates 0 and the CSI request field is all 0 and the SRS request field is all 0, unless the CRC of DCI format 0_1 ​​is preempted by SP-CSI-RNTI.

[0315] RNTI stands for Radio Network Temporary Indentifier, and SP stands for Semi-Persistent.

[0316] For example, the cell combination corresponding to the first downlink control information may include one or more cell combinations. For example, the cells included in the cell combination corresponding to the first downlink control information are shown in Table 1:

[0317] Table 1

[0318] As shown in Table 1, take the example where the cell combination corresponding to the first downlink control information includes two small combinations, namely cell combination #1 and cell combination #2, where cell combination #1 includes cell #1 and cell #2, and cell combination #2 includes cell #2 and cell #4.

[0319] When the first reference cell includes the cell with the smallest cell index in the cell combination, the cell with the smallest cell index in the two cell combinations can be determined to be cell #1. Furthermore, the second size of the first information field in the first downlink control information can be determined to be the size of the first information field corresponding to cell #1, for example, the second size is 2.

[0320] When the first reference cell includes the cell with the largest cell index in the cell combination, it can be determined that the cell with the largest cell index in the two cell combinations is cell #4. Furthermore, the second size of the first information field in the first downlink control information can be determined to be the size of the first information field corresponding to cell #4, for example, the second size is 5.

[0321] When the first reference cell includes the cell with the largest first information field size in the cell combination, based on the above example, the size of the first information field corresponding to cell #1 is 2, the size of the first information field corresponding to cell #2 is 3, and the size of the first information field corresponding to cell #4 is 5. Therefore, it can be determined that the size of the first information field corresponding to cell #4 is the largest, and thus the first reference cell is determined to be cell #4. Furthermore, the second size of the first information field in the first downlink control information can be determined to be the size of the first information field corresponding to cell #4, for example, the second size is 5.

[0322] In some embodiments, the information determination method also includes: when the second size of the first information field is larger than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, parsing the first information field according to the first number of bits in the proportion of the first information field to determine the information indicated by the first information field to the first cell.

[0323] In some embodiments, the first size of the first information field in the first downlink control information may be larger than the third size of the first information field corresponding to the first cell to which the first information field is actually applied. In this case, the terminal may parse the first information field based on the first number of bits in the proportion of the first information field to ensure that the parsed information can be successfully applied to the first cell, thereby realizing the indication function of the first information field for the first cell.

[0324] In some embodiments, the first number is equal to the third size.

[0325] For example, the first size of the first information field in the first downlink control information is 5, and the third size of the first information field corresponding to the first cell actually used by the first information field is 4. The first size is greater than the third size, then 4 bits can be determined from the 5 bits of the first information field, and then these 4 bits can be parsed to obtain the information indicated by the first information field to the first cell.

[0326] In some embodiments, the first number of bits in the proportion of the first information field includes at least one of the following:

[0327] The first number of most significant bits in the ratio of the first information field, that is, the first number of bits starting from the most significant bit in the ratio of the first information field;

[0328] The first number of least significant bits in the ratio of the first information field is, that is, the first number of bits in the ratio of the first information field, starting from the least significant bit.

[0329] For example, the first size of the first information field in the first downlink control information is 5, the indication value is 10011, and the third size of the first information field corresponding to the first cell actually used by the first information field is 4. The first size is larger than the third size. Then, the 4-bit values ​​corresponding to the most significant bits can be determined in the 5 bits of the first information field, that is, 1001 can be parsed, and the parsing result can be used as the information indicated by the first information field to the first cell.

[0330] For example, the first size of the first information field in the first downlink control information is 5, the indication value is 10011, and the third size of the first information field corresponding to the first cell actually used by the first information field is 4. The first size is larger than the third size. Then, the 4-bit value corresponding to the least significant bit can be determined in the 5 bits of the first information field, that is, 0011 can be parsed, and the parsing result can be used as the information indicated by the first information field to the first cell.

[0331] In some embodiments, the information determination method also includes: when the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, parsing the first information field by adding a second number of bits with a value of zero to the first information field to determine the information indicated by the first information field to the first cell.

[0332] In some embodiments, the first size of the first information field in the first downlink control information may be smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied. In this case, the terminal may parse the first information field by adding a second number of zero bits to the first information field to ensure that the parsed information can be successfully applied to the first cell, thereby realizing the indication function of the first information field for the first cell.

[0333] In some embodiments, the second number is equal to the difference between the third size and the second size.

[0334] For example, the first size of the first information field in the first downlink control information is 5, the third size of the first information field corresponding to the first cell actually used by the first information field is 6, the first size is smaller than the third size, and the difference between the third size and the first size is 1. Then, the first information field can be parsed by adding one bit with a value of 0 to the five bits of the first information field to obtain the information indicated by the first information field to the first cell.

[0335] In some embodiments, adding a second number of zero bits to the first information field comprises at least one of the following:

[0336] Adding a bit with a value of zero before the most significant bit of the first information field;

[0337] A bit with a value of zero is added after the least significant bit of the first information field.

[0338] For example, if the first size of the first information field in the first downlink control information is 5, specifically 10011, and the third size of the first information field corresponding to the first cell actually used by the first information field is 6, and the first size is smaller than the third size, then a bit with a value of 0 may be added before the most significant bit of the 5 bits of the first information field. For example, after adding the bit with a value of 0 to the first information field, 010011 is obtained, and 010011 may be parsed, and the parsed result is used as the information indicated by the first information field for the first cell.

[0339] For example, the first size of the first information field in the first downlink control information is 5, specifically 10011, and the third size of the first information field corresponding to the first cell actually used by the first information field is 6. If the first size is smaller than the third size, a bit with a value of 0 may be added after the least significant bit of the 5 bits of the first information field. For example, after adding the bit with a value of 0 to the first information field, 100110 is obtained. 100110 may be parsed, and the parsed result may be used as the information indicated by the first information field for the first cell.

[0340] In a second aspect, embodiments of the present disclosure provide an information determination method. Figure 5 is a schematic flow chart illustrating an information determination method according to an embodiment of the present disclosure. The information determination method illustrated in this embodiment can be executed by a terminal.

[0341] As shown in FIG5 , the information sending method may include the following steps:

[0342] In step S501, the size of a first information field in first downlink control information for scheduling multiple cells is determined according to first configuration signaling.

[0343] It should be noted that the embodiment shown in FIG. 5 can be implemented independently or in combination with at least one other embodiment in the present disclosure. The specific selection can be made as needed and the present disclosure does not limit it.

[0344] In some embodiments, the first downlink control information may include one or more information fields, wherein some information fields do not need to be applied to all cells among the cells actually scheduled by the first downlink control information, but only need to be applied to some cells among the cells actually scheduled by the first downlink control information. Such information fields may be referred to as first information, and the first information fields may be applied to some cells among the cells actually scheduled by the first downlink control information. That is, the first information field may be an information field included in the first downlink control information that is applied to some cells among the cells actually scheduled by the first downlink control information. For example, the type of the first information field may be referred to as type 1C.

[0345] For example, the cells actually scheduled by the first downlink control information include three cells, namely cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3. The first information domain is applied to some of these three cells, for example, it can be applied to cell #1 and cell #2, for example, it can be applied to cell #2 and cell #3, for example, it can be applied to cell #1 and cell #3, for example, it can be applied to cell #1, for example, it can be applied to cell #2, for example, it can be applied to cell #3.

[0346] In some embodiments, the portion of cells to which the first information field applies includes: the cell with the smallest index among the cells actually scheduled by the first downlink control information. That is, the first information field may be the information field within the information field included in the first downlink control information that applies to the cell with the smallest index among the cells actually scheduled by the first downlink control information. For example, taking the example where the cells actually scheduled by the first downlink control information include cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3, the first information field may be the information field within the information field included in the first downlink control information that applies to cell #1.

[0347] In some embodiments, for each cell in the cell set to which the cell corresponding to the first downlink control information belongs, the terminal can determine the first size of the first information field corresponding to the cell. For example, the first size of the first information field corresponding to each cell can be determined based on the method of determining the size of the information field in the traditional downlink control information.

[0348] In some embodiments, the first information field includes at least one of the following: a channel state information request (eg, CSI Request) information field, and an uplink shared channel indication (eg, UL-SCH indicator) information field.

[0349] Taking the first information field including the CSI Request field as an example, the network device can indicate the first size of the CSI request field for each cell through report trigger size (e.g., reportTriggerSize) signaling. The terminal can determine the first size of the CSI request field corresponding to each cell based on the report trigger size signaling sent by the network device.

[0350] Because the first downlink control information is used to schedule multiple cells, and the network device indicates the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, and the first size of the first information field corresponding to different cells can be different, it is necessary to clearly determine how to determine the size of the first information field in the first downlink control information in order to accurately parse the first information field.

[0351] According to an embodiment of the present disclosure, a network device may send a first configuration signaling to a terminal. The first configuration signaling includes but is not limited to RRC signaling. The first configuration signaling may indicate the size of the first information field in the first downlink control information of the terminal. The terminal may receive the first configuration signaling sent by the network device, and then determine the size of the first information field in the first downlink control information based on the first configuration signaling, so that after receiving the first downlink control information, the first information field in the first downlink control information may be parsed according to the determined size. This is beneficial for avoiding problems caused by determining the size of the first information field in the first control information based on the size of the first information field corresponding to a cell in the first downlink control information when the first downlink control information schedules multiple cells. It can also ensure that the terminal and the base station have a consistent understanding of the size of the first information field.

[0352] In some embodiments, the first configuration signaling is determined based on a reference cell.

[0353] For example, the first configuration signaling may be determined based on a reference cell. For example, the first size of the first information field in the first downlink control information indicated by the first configuration signaling may be determined based on the size of the first information field corresponding to the reference cell.

[0354] Take the example where the first downlink control information includes DCI 0_3 and the first information field includes the CSI Request information field.

[0355] In some embodiments, the size of the CSI Request information field may be determined based on higher layer parameters in the reference cell, such as the report trigger size (e.g., reportTriggerSizeDCI-0-3). For example, the size of the CSI Request information field may range from 0 to 6.

[0356] Take the example where the first downlink control information includes DCI 0_3 and the first information field includes the UL-SCH indicator information field.

[0357] In some embodiments, the size of the UL-SCH indicator information field may be determined based on higher-layer parameters in a reference cell. For example, the size may be determined based on uplink shared channel downlink control information (e.g., UL-SCHDCI-0-3). If UL-SCHDCI-0-3 is not enabled or disabled, or the indication value is 0 / 1, the size of the UL-SCH indicator information field is 0. If UL-SCHDCI-0-3 is enabled or the indication value is 1 / 0, the size of the UL-SCH indicator information field is 1.

[0358] In some embodiments, the reference cell includes at least one of the following:

[0359] Scheduling cell (the cell where the terminal receives the first downlink control information);

[0360] a cell with the largest cell index in the cell combination corresponding to the first downlink control information;

[0361] the cell with the smallest cell index in the cell combination corresponding to the first downlink control information;

[0362] a cell with the largest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0363] a cell with the smallest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0364] a cell with the largest size of the first information field in the cell set to which the cell corresponding to the first downlink control information belongs;

[0365] a cell for calculating a size of the first downlink control information;

[0366] A cell used to calculate blind detection resources of the first downlink control information, for example, the blind detection resources include at least one of the following: BD, CCE, where BD represents blind detection (Blind Detection) and CCE represents control channel element (Control Channel Element)).

[0367] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0368] A cell combination that can be scheduled by the first downlink control information;

[0369] A cell combination actually scheduled by the first downlink control information;

[0370] and / or

[0371] The cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0372] The cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0373] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0374] In some embodiments, the information determination method further includes: ignoring traditional configuration signaling, wherein the traditional configuration signaling is used to indicate the size of the first information field in the traditional downlink control information.

[0375] When the first configuration signaling for the first downlink control information (eg, reportTriggerSizeDCI-0-3, but not limited to reportTriggerSizeDCI-0-3) is configured for the terminal, the terminal may ignore the traditional configuration signaling, eg, reportTriggerSize.

[0376] For example, configuration signaling of legacy downlink control information (legacy DCI, DCI used only for scheduling one cell) in each cell in the cell set to which the cell corresponding to the first downlink control information belongs may be ignored.

[0377] Taking the first information field including the CSI request information field as an example, the size of the CSI request information field is determined based on the first configuration signaling reportTriggerSize-MC-DCI. Then, the size of the CSI request corresponding to a cell in the actual scheduling cell can be determined based on the first configuration signaling reportTriggerSize-MC-DCI.

[0378] It is not necessary to determine the size of the CSI request corresponding to each cell based on the configuration signaling reportTriggerSize for legacy DCI in each cell in the cell set to which the cell corresponding to the first downlink control information belongs. For example, the network device does not configure the configuration signaling reportTriggerSize for legacy DCI in each cell, or, for example, the network device configures the configuration signaling reportTriggerSize for legacy DCI in cell #1, but the terminal does not parse the signaling, or, for example, the network device configures the configuration signaling reportTriggerSize for legacy DCI in cell #1, the terminal can parse the signaling, but does not determine the size of the CSI request corresponding to cell #1 based on the parsing result.

[0379] In some embodiments, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following: the cell set to which the cell that can be scheduled by the first downlink control information belongs; and the cell set to which the cell actually scheduled by the first downlink control information belongs.

[0380] In some embodiments, the first configuration signaling is configured based on a cell set. That is, the terminal can determine the size of the corresponding first information field in the first downlink information based on the first configuration signaling. And / or, the terminal can determine the parsing information of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs based on the first configuration signaling. For example, the terminal determines the first size of the first information field corresponding to each cell based on the first configuration signaling, thereby determining the indication value of the first information field in the first downlink control information, that is, the indication value of each cell in the actually scheduled cell. For example, the cell set to which the cell corresponding to the first downlink control information belongs includes cell #1, cell #2, cell #3, and cell #4, and the terminal receives the first configuration signaling reportTriggerSizeDCI-0-3. For example, based on receiving the first configuration signaling for a cell in the cell set, the terminal can determine the size of the CSI request information field corresponding to each of the above four cells based on reportTriggerSizeDCI-0-3, thereby determining the parsing method of the CSI request information field corresponding to each cell. Therefore, according to this embodiment, the terminal ignores the configuration signaling for legacy DCI in each cell in the cell set to which the cell corresponding to the first downlink control information belongs, and can still determine the size of the information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs based on the first configuration signaling.

[0381] In a third aspect, embodiments of the present disclosure provide an information determination method. In some embodiments, the information determination method may be performed by a network device, and the information determination method may include the following steps:

[0382] The second size of the first information field in the first downlink control information for scheduling multiple cells is determined according to at least one of the following first sizes:

[0383] a first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, or

[0384] a first size of a first information field corresponding to a first reference cell in a cell combination corresponding to the first downlink control information;

[0385] In some embodiments, the first downlink control information may include one or more information fields, wherein some information fields do not need to be applied to all cells among the cells actually scheduled by the first downlink control information, but only need to be applied to some cells among the cells actually scheduled by the first downlink control information. Such information fields may be referred to as first information, and the first information fields may be applied to some cells among the cells actually scheduled by the first downlink control information. That is, the first information field may be an information field included in the first downlink control information that is applied to some cells among the cells actually scheduled by the first downlink control information. For example, the type of the first information field may be referred to as type 1C.

[0386] It should be noted that, in some embodiments, "the information field applies to a cell" may mean that the information indicated by the information field applies to that cell. For example, in the case of a channel state information request (e.g., CSI Request) information field, the information indicated by the CSI Request field is 00011, which indicates a value of 3, indicating a request to report three CSIs. Therefore, if the CSI Request field applies to cell #1, it means a request to report three CSIs for cell #1. Based on the CSI Request field, the terminal can determine the three CSIs by measuring the reference signal in cell #1 and send the three CSIs to the network device.

[0387] For example, the cells actually scheduled by the first downlink control information include three cells, namely cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3. The first information domain is applied to some of these three cells, for example, it can be applied to cell #1 and cell #2, for example, it can be applied to cell #2 and cell #3, for example, it can be applied to cell #1 and cell #3, for example, it can be applied to cell #1, for example, it can be applied to cell #2, for example, it can be applied to cell #3.

[0388] In some embodiments, the portion of cells to which the first information field applies includes: the cell with the smallest index among the cells actually scheduled by the first downlink control information. That is, the first information field may be the information field within the information field included in the first downlink control information that applies to the cell with the smallest index among the cells actually scheduled by the first downlink control information. For example, taking the example where the cells actually scheduled by the first downlink control information include cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3, the first information field may be the information field within the information field included in the first downlink control information that applies to cell #1.

[0389] In some embodiments, determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs includes:

[0390] The second size of the first information field in the first downlink control information is determined according to the first size of the first information field corresponding to the application cell in the cell set to which the cell corresponding to the first downlink control information belongs, wherein the application cell is the cell with the smallest index among the cells actually scheduled by the first downlink control information.

[0391] Figure 6 is a schematic flow chart of a method for determining information according to an embodiment of the present disclosure. The method for determining information shown in this embodiment can be executed by a network device.

[0392] As shown in FIG6 , determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs includes:

[0393] In step S601, the second size of the first information field in the first downlink control information is determined according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0394] In some embodiments, the first information field includes at least one of the following: a channel state information request (eg, CSI Request) information field, and an uplink shared channel indication (eg, UL-SCH indicator) information field.

[0395] In some embodiments, for each cell in the cell set to which the cell corresponding to the first downlink control information belongs, the network device can determine the first size of the first information field corresponding to the cell. For example, the first size of the first information field corresponding to each cell can be determined according to the method of determining the size of the information field in the traditional downlink control information. For example, the network device can send a report trigger size (e.g., reportTriggerSize) signaling to the terminal on cell #1 to indicate the first size of the CSI Request field corresponding to cell #1.

[0396] Taking the first information field including the CSI Request field as an example, the network device can indicate the first size of the CSI request field for each cell through report trigger size (e.g., reportTriggerSize) signaling. The terminal can determine the first size of the CSI request field corresponding to each cell based on the report trigger size signaling sent by the network device.

[0397] Because the first downlink control information is used to schedule multiple cells, and the network device indicates the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, and the first size of the first information field corresponding to different cells can be different, it is necessary to clearly determine how to determine the size of the first information field in the first downlink control information in order to accurately parse the first information field.

[0398] According to an embodiment of the present disclosure, a network device can determine the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs. Accordingly, for the first information field in the first downlink control information, the second size of the information field can be clearly determined based on the maximum value of the first size of the first information field corresponding to each cell in the cell set, so as to accurately parse the first information field based on the second size. This is conducive to avoiding problems caused by not determining the second size of the first information field in the first control information based on which cell among the multiple cells corresponds to the first size of the first information field when the first downlink control information schedules multiple cells.

[0399] In some embodiments, the second size of the first information field in the first downlink control information is equal to a maximum value.

[0400] In some embodiments, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0401] The cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0402] The cell set to which the cell actually scheduled by the first downlink control information belongs may also be referred to as the cell set to which the cell scheduled by the first downlink control information belongs.

[0403] For example, taking the cell set to which the cell corresponding to the first downlink control information belongs as an example, including the cell set to which the cell that can be scheduled by the first downlink control information belongs, for example, the cell set to which the cell that can be scheduled by the first downlink control information belongs is {1, 2, 3, 4}, that is, including cell #1 with an index of 1, cell #2 with an index of 2, cell #3 with an index of 3, and cell #4 with an index of 4.

[0404] For example, the first size of the first information field corresponding to cell #1 is 2, i.e., 2 bits; the first size of the first information field corresponding to cell #2 is 3, i.e., 3 bits; the first size of the first information field corresponding to cell #3 is 4, i.e., 4 bits; and the first size of the first information field corresponding to cell #4 is 5, i.e., 5 bits. The maximum value of the first size of the first information field corresponding to each cell in the cell set is 5, so the network device can determine that the first information field in the first downlink control information occupies 5 bits.

[0405] For example, taking the example that the cell set to which the cell corresponding to the first downlink control information belongs includes the cell set to which the cell actually scheduled by the first downlink control information belongs, for example, the cell set to which the cell actually scheduled by the first downlink control information belongs is {1, 2, 3}, that is, including cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3.

[0406] For example, the first size of the first information field corresponding to cell #1 is 2, i.e., 2 bits; the first size of the first information field corresponding to cell #2 is 3, i.e., 3 bits; and the first size of the first information field corresponding to cell #3 is 4, i.e., 4 bits. The maximum value of the first size of the first information field corresponding to each cell in the cell set is 4, so the network device can determine that the second size of the first information field in the first downlink control information is 4.

[0407] The following describes, through several embodiments, a method for determining the second size of the first information field in the first downlink control information.

[0408] Taking the first information field including the CSI Request information field as an example, the second size of the CSI Request information field in the first downlink control information is equal to in, It refers to the number of cells in the cell set to which the cell actually scheduled by the first downlink control information belongs. r is mapped one by one based on the order of cell index from small to large, where r=1 corresponds to the cell with the smallest index in the cell set. M c (r) represents the first size of the first information field corresponding to the rth cell in the cell set. c (r) It can be determined based on high-level parameters, for example, based on the report trigger size (for example, reportTriggerSize). For example, the first size can range from 0 to 6.

[0409] Taking the first information field including the UL-SCH indicator information field as an example, the second size of the UL-SCH indicator information field in the first downlink control information is equal to in, It refers to the number of cells in the cell set to which the cell actually scheduled by the first downlink control information belongs. r is mapped one by one based on the order of cell index from small to large, where r=1 corresponds to the cell with the smallest index in the cell set. M c (r) represents the first size of the first information field corresponding to the rth cell in the cell set. When the number of scheduled PUSCHs indicated by the Time Domain Resource Assignment (TDRA) field is 1, M c The first dimension of (r) is 0, otherwise, M c The first dimension of (r) is 1. c When the first size of (r) is 1, if the value of this bit is 1, the corresponding UL-SCH is transmitted on the PUSCH; if the value of this bit is 0, the corresponding UL-SCH is not transmitted on the PUSCH.

[0410] In some embodiments, the value of the CSI Request information field in the first downlink control information is 0, and the value of the UL-SCH indicator information field is 0. The network device may not send such first downlink control information, that is, may not send the first downlink control information in which the value of the CSI Request information field is 0 and the value of the UL-SCH indicator information field is 0. The terminal may not expect to receive such first downlink control information, that is, may not expect to receive the first downlink control information in which the value of the CSI Request information field is 0 and the value of the UL-SCH indicator information field is 0.

[0411] In some embodiments, determining the second size of the first information field in the first downlink control information according to the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information includes:

[0412] A first signaling is configured for the terminal, and the second size of the first information field in the first downlink control information is determined based on the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information; wherein the first signaling is used to indicate the cell combination corresponding to the first downlink control information.

[0413] In some embodiments, the information determination method also includes: when the first signaling is not configured for the terminal, determining the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0414] In some embodiments, the network device may configure first signaling for the terminal, where the first signaling is used to indicate a cell combination corresponding to the first downlink control information.

[0415] When the first signaling is not configured in the terminal, the network device can determine the cell combination corresponding to the first downlink control information, then the network device can determine the first reference cell in the cell combination; determine the second size of the first information field in the first downlink control information based on the first reference cell, for example, it can be determined that the second size is equal to the size of the first information field corresponding to the first reference cell.

[0416] When the first signaling is not configured for the terminal, the network device has not yet determined the cell combination corresponding to the first downlink control information. In this case, the network device can determine the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, and determine the second size of the first information field in the first downlink control information based on the maximum value.

[0417] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0418] A cell combination that can be scheduled by the first downlink control information;

[0419] The cell combination actually scheduled by the first downlink control information.

[0420] For example, the first signaling includes at least one of the following:

[0421] ScheduledCellCombo-ListDCI-0-3;

[0422] ScheduledCellCombo-ListDCI-1-3.

[0423] In some embodiments, the first reference cell includes at least one of the following:

[0424] The cell with the smallest cell index in the cell combination;

[0425] The cell with the largest cell index in the cell combination;

[0426] The cell with the largest first information field corresponding to each cell in the cell combination.

[0427] In some embodiments, the terminal may determine a cell combination corresponding to the first downlink control information, and then the terminal may determine a first reference cell in the cell combination; and determine the second size of the first information field in the first downlink control information according to the first reference cell.

[0428] For example, the cell combination corresponding to the first downlink control information may include one or more cell combinations. For example, the cell combination corresponding to the first downlink control information may include cells such as those shown in Table 1 above.

[0429] As shown in Table 1, take the example where the cell combination corresponding to the first downlink control information includes two small combinations, namely cell combination #1 and cell combination #2, where cell combination #1 includes cell #1 and cell #2, and cell combination #2 includes cell #2 and cell #4.

[0430] When the first reference cell includes the cell with the smallest cell index in the cell combination, the cell with the smallest cell index in the two cell combinations can be determined to be cell #1. Furthermore, the second size of the first information field in the first downlink control information can be determined to be the size of the first information field corresponding to cell #1, for example, the second size is 2.

[0431] When the first reference cell includes the cell with the largest cell index in the cell combination, it can be determined that the cell with the largest cell index in the two cell combinations is cell #4. Furthermore, the second size of the first information field in the first downlink control information can be determined to be the size of the first information field corresponding to cell #4, for example, the second size is 5.

[0432] When the first reference cell includes the cell with the largest first information field size in the cell combination, based on the above example, the size of the first information field corresponding to cell #1 is 2, the size of the first information field corresponding to cell #2 is 3, and the size of the first information field corresponding to cell #4 is 5. Therefore, it can be determined that the size of the first information field corresponding to cell #4 is the largest, and thus the first reference cell is determined to be cell #4. Furthermore, the second size of the first information field in the first downlink control information can be determined to be the size of the first information field corresponding to cell #4, for example, the second size is 5.

[0433] In some embodiments, the information determination method further includes: when the second size of the first information field is larger than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, determining the information indicated by the first information field to the first cell based on the first number of bits in the proportion of the first information field.

[0434] In some embodiments, the first size of the first information field in the first downlink control information may be greater than the third size of the first information field corresponding to the first cell to which the first information field is actually applied. In this case, the network device may determine the information indicated by the first information field for the first cell based on the first number of bits in the proportion of the first information field, so as to ensure that the information indicated by the first information field can be successfully applied to the first cell, thereby realizing the indication function of the first information field for the first cell.

[0435] In some embodiments, the first number is equal to the third size.

[0436] For example, the first size of the first information field in the first downlink control information is 5, and the third size of the first information field corresponding to the first cell actually used by the first information field is 4. The first size is greater than the third size. Then the network device can determine 4 bits out of the 5 bits of the first information field, and then determine the information indicated by the first information field to the first cell based on these 4 bits.

[0437] In some embodiments, the first number of bits in the proportion of the first information field includes at least one of the following:

[0438] The first number of most significant bits in the ratio of the first information field, that is, the first number of bits starting from the most significant bit in the ratio of the first information field;

[0439] The first number of least significant bits in the ratio of the first information field is, that is, the first number of bits in the ratio of the first information field, starting from the least significant bit.

[0440] For example, the first size of the first information field in the first downlink control information is 5, the indication value is 10011, and the third size of the first information field corresponding to the first cell actually used by the first information field is 4. The first size is larger than the third size. Then, the 4-bit value corresponding to the most significant bit can be determined in the 5 bits of the first information field, that is, 1001. The network device can determine the information indicated by the first information field to the first cell based on 1001.

[0441] For example, the first size of the first information field in the first downlink control information is 5, the indication value is 10011, and the third size of the first information field corresponding to the first cell actually used by the first information field is 4. The first size is larger than the third size. Then, the 4-bit value corresponding to the least significant bit can be determined in the 5 bits of the first information field, that is, 0011. The network device can determine the information indicated by the first information field to the first cell based on 0011.

[0442] In some embodiments, the information determination method further includes: when the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, determining the information indicated by the first information field to the first cell by adding a second number of bits with a value of zero to the first information field.

[0443] In some embodiments, the first size of the first information field in the first downlink control information may be smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied. In this case, the network device may determine the information indicated by the first information field for the first cell by adding a second number of zero bits to the first information field, thereby ensuring that the information indicated by the first information field can be successfully applied to the first cell, thereby realizing the indication function of the first information field for the first cell.

[0444] In some embodiments, the second number is equal to the difference between the third size and the second size.

[0445] For example, the first size of the first information field in the first downlink control information is 5, the third size of the first information field corresponding to the first cell actually used by the first information field is 6, the first size is smaller than the third size, and the difference between the third size and the first size is 1. Then, the information indicated by the first information field to the first cell can be determined by adding one bit with a value of 0 to the five bits of the first information field.

[0446] In some embodiments, adding a second number of zero bits to the first information field comprises at least one of the following:

[0447] adding a second number of bits having a value of zero before the most significant bit of the first information field;

[0448] A second number of bits having a value of zero are added after the least significant bit of the first information field.

[0449] For example, the first size of the first information field in the first downlink control information is 5, specifically 10011, and the third size of the first information field corresponding to the first cell actually used by the first information field is 6. If the first size is smaller than the third size, a bit with a value of 0 may be added before the most significant bit of the 5 bits of the first information field. For example, after adding the bit with a value of 0 to the first information field, 010011 is obtained, and then the information indicated by the first information field for the first cell can be determined based on 010011.

[0450] For example, the first size of the first information field in the first downlink control information is 5, specifically 10011, and the third size of the first information field corresponding to the first cell actually used by the first information field is 6. If the first size is smaller than the third size, a bit with a value of 0 may be added after the least significant bit of the 5 bits of the first information field. For example, after adding the bit with a value of 0 to the first information field, 100110 is obtained, and then the information indicated by the first information field for the first cell can be determined based on 100110.

[0451] Fourthly, embodiments of the present disclosure provide an information determination method. Figure 7 is a schematic flow chart illustrating an information determination method according to an embodiment of the present disclosure. The information determination method illustrated in this embodiment can be executed by a terminal.

[0452] As shown in FIG7 , the information sending method may include the following steps:

[0453] In step S701, configuration signaling is sent to a terminal, where the configuration signaling is used by the terminal to determine the size of a first information field in first downlink control information used for scheduling multiple cells.

[0454] It should be noted that the embodiment shown in FIG. 7 can be implemented independently or in combination with at least one other embodiment in the present disclosure. The specific selection can be made as needed and the present disclosure does not limit it.

[0455] In some embodiments, the first downlink control information may include one or more information fields, wherein some information fields do not need to be applied to all cells among the cells actually scheduled by the first downlink control information, but only need to be applied to some cells among the cells actually scheduled by the first downlink control information. Such information fields may be referred to as first information, and the first information fields may be applied to some cells among the cells actually scheduled by the first downlink control information. That is, the first information field may be an information field included in the first downlink control information that is applied to some cells among the cells actually scheduled by the first downlink control information. For example, the type of the first information field may be referred to as type 1C.

[0456] For example, the cells actually scheduled by the first downlink control information include three cells, namely cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3. The first information domain is applied to some of these three cells, for example, it can be applied to cell #1 and cell #2, for example, it can be applied to cell #2 and cell #3, for example, it can be applied to cell #1 and cell #3, for example, it can be applied to cell #1, for example, it can be applied to cell #2, for example, it can be applied to cell #3.

[0457] In some embodiments, the portion of cells to which the first information field applies includes: the cell with the smallest index among the cells actually scheduled by the first downlink control information. That is, the first information field may be the information field within the information field included in the first downlink control information that applies to the cell with the smallest index among the cells actually scheduled by the first downlink control information. For example, taking the example where the cells actually scheduled by the first downlink control information include cell #1 with an index of 1, cell #2 with an index of 2, and cell #3 with an index of 3, the first information field may be the information field within the information field included in the first downlink control information that applies to cell #1.

[0458] In some embodiments, for each cell in the cell set to which the cell corresponding to the first downlink control information belongs, the terminal can determine the first size of the first information field corresponding to the cell. For example, the first size of the first information field corresponding to each cell can be determined based on the method of determining the size of the information field in the traditional downlink control information.

[0459] In some embodiments, the first information field includes at least one of the following: a channel state information request (eg, CSI Request) information field, and an uplink shared channel indication (eg, UL-SCH indicator) information field.

[0460] Taking the first information field including the CSI Request field as an example, the network device can indicate the first size of the CSI request field for each cell through report trigger size (e.g., reportTriggerSize) signaling. The terminal can determine the first size of the CSI request field corresponding to each cell based on the report trigger size signaling sent by the network device.

[0461] Because the first downlink control information is used to schedule multiple cells, and the network device indicates the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, and the first size of the first information field corresponding to different cells can be different, it is necessary to clearly determine how to determine the size of the first information field in the first downlink control information in order to accurately parse the first information field.

[0462] According to an embodiment of the present disclosure, a network device may send a first configuration signaling to a terminal. The first configuration signaling includes but is not limited to RRC signaling. The first configuration signaling may indicate the size of the first information field in the first downlink control information of the terminal. The terminal may receive the first configuration signaling sent by the network device, and then determine the size of the first information field in the first downlink control information based on the first configuration signaling, so that after receiving the first downlink control information, the first information field in the first downlink control information may be parsed according to the determined size. This is beneficial for avoiding problems caused by determining the size of the first information field in the first control information based on the size of the first information field corresponding to a cell in the first downlink control information when the first downlink control information schedules multiple cells. It can also ensure that the terminal and the base station have a consistent understanding of the size of the first information field.

[0463] In some embodiments, the configuration signaling is sent to the terminal in a reference cell.

[0464] For example, the first configuration signaling may be determined based on a reference cell. For example, the first size of the first information field in the first downlink control information indicated by the first configuration signaling may be determined based on the size of the first information field corresponding to the reference cell.

[0465] Take the example where the first downlink control information includes DCI 0_3 and the first information field includes the CSI Request information field.

[0466] In some embodiments, the size of the CSI Request information field may be determined based on higher layer parameters in the reference cell, such as the report trigger size (e.g., reportTriggerSizeDCI-0-3). For example, the size of the CSI Request information field may range from 0 to 6.

[0467] Take the example where the first downlink control information includes DCI 0_3 and the first information field includes the UL-SCH indicator information field.

[0468] In some embodiments, the size of the UL-SCH indicator information field may be determined based on higher-layer parameters in a reference cell. For example, the size may be determined based on uplink shared channel downlink control information (e.g., UL-SCHDCI-0-3). If UL-SCHDCI-0-3 is not enabled or disabled, or the indication value is 0 / 1, the size of the UL-SCH indicator information field is 0. If UL-SCHDCI is enabled or the indication value is 1 / 0, the size of the UL-SCH indicator information field is 1.

[0469] In some embodiments, the reference cell includes at least one of the following:

[0470] Dispatching cells;

[0471] a cell with the largest cell index in the cell combination corresponding to the first downlink control information;

[0472] the cell with the smallest cell index in the cell combination corresponding to the first downlink control information;

[0473] a cell with the largest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0474] a cell with the smallest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0475] a cell with the largest size of the first information field in the cell set to which the cell corresponding to the first downlink control information belongs;

[0476] a cell for calculating a size of the first downlink control information;

[0477] A cell used to calculate blind detection resources of the first downlink control information, for example, the blind detection resources include at least one of the following: BD, CCE, where BD represents blind detection (Blind Detection) and CCE represents control channel element (Control Channel Element)).

[0478] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0479] A cell combination that can be scheduled by the first downlink control information;

[0480] A cell combination actually scheduled by the first downlink control information;

[0481] and / or

[0482] The cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0483] The cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0484] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0485] In some embodiments, the network device may send conventional configuration signaling to the terminal in cell #1, where the conventional configuration signaling is used to indicate the size of the first information field in conventional downlink control information. However, the terminal does not parse the signaling. Alternatively, the terminal may parse the signaling but does not determine the size of the first information field corresponding to cell #1 based on the parsing result, but instead determines the size of the first information field corresponding to cell #1 based on the first configuration signaling.

[0486] For example, the network device configures the configuration signaling reportTriggerSize for legacy DCI in cell #1, but the terminal does not parse the signaling. Or, for example, the network device configures the configuration signaling reportTriggerSize for legacy DCI in cell #1, the terminal can parse the signaling, but does not determine the size of the CSI request corresponding to cell #1 based on the parsing result.

[0487] In some embodiments, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following: the cell set to which the cell that can be scheduled by the first downlink control information belongs; and the cell set to which the cell actually scheduled by the first downlink control information belongs.

[0488] In some embodiments, the network device may indicate, through a first configuration signaling, the size of the information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs. For example, the cell set to which the cell corresponding to the first downlink control information belongs includes cell #1, cell #2, cell #3, and cell #4. The network device may send a first configuration signaling reportTriggerSize-MC-DCI to the terminal, and may indicate, through reportTriggerSize-MC-DCI, the size of the CSI request information field corresponding to each cell in the above four cells. Therefore, according to this embodiment, the network device does not send, to the terminal, the configuration signaling for legacy DCI in each cell in the cell set to which the cell corresponding to the first downlink control information belongs, but may still indicate, through the first configuration signaling, the size of the information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0489] In some embodiments, the names of information, etc. are not limited to the names described in the embodiments, and terms such as "information", "message", "signal", "signaling", "report", "configuration", "indication", "instruction", "command", "channel", "parameter", "domain", "field", "symbol", "symbol", "codeword", "codebook", "codeword", "codepoint", "bit", "data", "program", and "chip" can be used interchangeably.

[0490] In some embodiments, the terms "downlink control information (DCI)", "downlink (DL) assignment", "DL DCI", "uplink (UL) grant", "UL DCI" and the like may be used interchangeably.

[0491] In some embodiments, terms such as "physical downlink shared channel (PDSCH)" and "DL data" can be used interchangeably, and terms such as "physical uplink shared channel (PUSCH)" and "UL data" can be used interchangeably.

[0492] In some embodiments, "obtain", "get", "get", "receive", "transmit", "bidirectional transmission", "send and / or receive" can be interchangeable, and can be interpreted as receiving from other entities, obtaining from protocols, obtaining from higher layers, obtaining by self-processing, autonomous implementation, etc.

[0493] In some embodiments, terms such as "send", "transmit", "report", "download", "transmit", "bidirectional transmission", "send and / or receive" can be used interchangeably.

[0494] In some embodiments, terms such as "certain", "preset", "preset", "setting", "indicated", "a certain", "any", and "first" can be interchangeable. "Specific A", "preset A", "preset A", "setting A", "indicated A", "a certain A", "any A", and "first A" can be interpreted as A pre-specified in a protocol, etc., or as A obtained through setting, configuration, or indication, etc., or as specific A, a certain A, any A, or first A, etc., but not limited to this.

[0495] Corresponding to the aforementioned embodiments of the information determination method, the present disclosure also provides embodiments of a terminal and a network device.

[0496] An embodiment of the present disclosure further proposes a terminal, comprising: one or more processors; wherein the terminal is used to execute the information determination method described in any one of the first aspect, the second aspect, the optional embodiment of the first aspect, and the optional embodiment of the second aspect.

[0497] FIG8 is a schematic block diagram of a terminal according to an embodiment of the present disclosure. As shown in FIG8 , the terminal includes a processing module 801 .

[0498] In some embodiments, the processing module is used to determine the second size of the first information field in the first downlink control information used to schedule multiple cells based on at least one of the following first sizes: the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, or the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information.

[0499] In some embodiments, the processing module is used to determine the second size of the first information field in the first downlink control information according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0500] In some embodiments, the second size of the first information field in the first downlink control information is equal to the maximum value.

[0501] In some embodiments, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0502] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0503] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0504] In some embodiments, the processing module is used to, when the terminal is configured with a first signaling, determine the second size of the first information field in the first downlink control information based on the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information; wherein the first signaling is used to indicate the cell combination corresponding to the first downlink control information.

[0505] In some embodiments, the processing module is also used to determine the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, when the terminal is not configured with the first signaling.

[0506] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0507] a cell combination that can be scheduled by the first downlink control information;

[0508] The cell combination actually scheduled by the first downlink control information.

[0509] In some embodiments, the first reference cell includes at least one of the following:

[0510] The cell with the smallest cell index in the cell combination;

[0511] the cell with the largest cell index in the cell combination;

[0512] The first information field corresponding to each cell in the cell combination has the largest size.

[0513] In some embodiments, the first information field is applied to some cells among the cells actually scheduled by the first downlink control information.

[0514] In some embodiments, the part of cells to which the first information field is applied includes: the cell with the smallest index among the cells actually scheduled by the first downlink control information.

[0515] In some embodiments, the processing module is also used to, when the second size of the first information field is larger than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, parse the first information field according to a first number of bits in the proportion of the first information field to determine the information indicated by the first information field to the first cell.

[0516] In some embodiments, the first number of bits in the proportion of the first information field includes at least one of the following:

[0517] a first number of most significant bits in the proportion of the first information field;

[0518] The first information field accounts for a first number of least significant bits in the bit.

[0519] In some embodiments, the first number is equal to the third size.

[0520] In some embodiments, the processing module is further used to, when the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, parse the first information field by adding a second number of bits with a value of zero to the first information field to determine the information indicated by the first information field to the first cell.

[0521] In some embodiments, adding a second number of zero bits to the first information field comprises at least one of the following:

[0522] adding a second number of bits having a value of zero before the most significant bit of the first information field;

[0523] A second number of bits having a value of zero are added after the least significant bit of the first information field.

[0524] In some embodiments, the second number is equal to the difference between the third size and the second size.

[0525] FIG9 is a schematic block diagram of a terminal according to an embodiment of the present disclosure. As shown in FIG9 , the terminal includes a processing module 901 .

[0526] In some embodiments, the processing module is configured to determine, according to the first configuration signaling, a size of a first information field in the first downlink control information used for scheduling multiple cells.

[0527] In some embodiments, the first configuration signaling is determined based on a reference cell.

[0528] In some embodiments, the reference cell includes at least one of the following:

[0529] Dispatching cells;

[0530] a cell with the largest cell index in the cell combination corresponding to the first downlink control information;

[0531] the cell with the smallest cell index in the cell combination corresponding to the first downlink control information;

[0532] a cell with the largest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0533] a cell with the smallest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0534] a cell having the largest size of the first information field in the cell set to which the cell corresponding to the first downlink control information belongs;

[0535] a cell used to calculate the size of the first downlink control information;

[0536] A cell used to calculate blind detection resources for the first downlink control information.

[0537] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0538] a cell combination that can be scheduled by the first downlink control information;

[0539] a cell combination actually scheduled by the first downlink control information;

[0540] And / or, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0541] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0542] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0543] In some embodiments, the processing module is further configured to ignore legacy configuration signaling, wherein the legacy configuration signaling is used to indicate a size of the first information field in legacy downlink control information.

[0544] It should be noted that the modules included in the terminal are not limited to the processing modules in the above embodiments, and may also include other modules, such as a transceiver module, a storage module, etc.

[0545] An embodiment of the present disclosure further proposes a network device, comprising: one or more processors; wherein the network device is used to execute the information determination method described in any one of the third aspect, the fourth aspect, the optional embodiment of the third aspect, and the optional embodiment of the fourth aspect.

[0546] FIG10 is a schematic block diagram of a network device according to an embodiment of the present disclosure. As shown in FIG10 , the network device includes a processing module 1001 .

[0547] In some embodiments, the processing module is used to determine the second size of the first information field in the first downlink control information used to schedule multiple cells based on at least one of the following first sizes: the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs, or the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information.

[0548] In some embodiments, the processing module is used to determine the second size of the first information field in the first downlink control information according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0549] In some embodiments, the second size of the first information field in the first downlink control information is equal to the maximum value.

[0550] In some embodiments, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0551] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0552] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0553] In some embodiments, the processing module is used to determine that a first signaling is configured for the terminal, and determine the second size of the first information field in the first downlink control information based on the first size of the first information field corresponding to the first reference cell in the cell combination corresponding to the first downlink control information; wherein the first signaling is used to indicate the cell combination corresponding to the first downlink control information.

[0554] In some embodiments, the processing module is used to determine that the first signaling is not configured for the terminal, and determine the second size of the first information field in the first downlink control information based on the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

[0555] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0556] a cell combination that can be scheduled by the first downlink control information;

[0557] The cell combination actually scheduled by the first downlink control information.

[0558] In some embodiments, the first reference cell includes at least one of the following:

[0559] The cell with the smallest cell index in the cell combination;

[0560] the cell with the largest cell index in the cell combination;

[0561] The first information field corresponding to each cell in the cell combination has the largest size.

[0562] In some embodiments, the first information field is applied to some cells among the cells actually scheduled by the first downlink control information.

[0563] In some embodiments, the part of cells to which the first information field is applied includes: the cell with the smallest index among the cells actually scheduled by the first downlink control information.

[0564] In some embodiments, the processing module is further used to determine, when the second size of the first information field is larger than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, the information indicated by the first information field to the first cell according to a first number of bits in the proportion of the first information field.

[0565] In some embodiments, the first number of bits in the proportion of the first information field includes at least one of the following:

[0566] a first number of most significant bits in the proportion of the first information field;

[0567] The first information field accounts for a first number of least significant bits in the bit.

[0568] In some embodiments, the first number is equal to the third size.

[0569] In some embodiments, the processing module is further used to, when the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, determine the information indicated by the first information field for the first cell by adding a second number of bits with a value of zero to the first information field.

[0570] In some embodiments, adding a second number of zero bits to the first information field comprises at least one of the following:

[0571] adding a second number of bits having a value of zero before the most significant bit of the first information field;

[0572] A second number of bits having a value of zero are added after the least significant bit of the first information field.

[0573] In some embodiments, the second number is equal to the difference between the third size and the second size.

[0574] FIG11 is a schematic block diagram of a network device according to an embodiment of the present disclosure. As shown in FIG11 , the network device includes a transceiver module 1101 .

[0575] In some embodiments, the transceiver module is used to send configuration signaling to the terminal, wherein the configuration signaling is used by the terminal to determine the size of the first information field in the first downlink control information used to schedule multiple cells.

[0576] In some embodiments, the configuration signaling is sent to the terminal in a reference cell.

[0577] In some embodiments, the reference cell includes at least one of the following:

[0578] Dispatching cells;

[0579] a cell with the largest cell index in the cell combination corresponding to the first downlink control information;

[0580] the cell with the smallest cell index in the cell combination corresponding to the first downlink control information;

[0581] a cell with the largest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0582] a cell with the smallest cell index in the cell set to which the cell corresponding to the first downlink control information belongs;

[0583] a cell having the largest size of the first information field in the cell set to which the cell corresponding to the first downlink control information belongs;

[0584] a cell used to calculate the size of the first downlink control information;

[0585] A cell used to calculate blind detection resources for the first downlink control information.

[0586] In some embodiments, the cell combination corresponding to the first downlink control information includes at least one of the following:

[0587] a cell combination that can be scheduled by the first downlink control information;

[0588] a cell combination actually scheduled by the first downlink control information;

[0589] And / or, the cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following:

[0590] a cell set to which the cell that can be scheduled by the first downlink control information belongs;

[0591] The cell set to which the cell actually scheduled by the first downlink control information belongs.

[0592] It should be noted that the modules included in the network device are not limited to the above-mentioned processing modules and transceiver modules, and may also include other modules, such as a storage module.

[0593] For the device embodiment, since it basically corresponds to the method embodiment, the relevant parts can be referred to the partial description of the method embodiment. The device embodiment described above is merely illustrative, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical modules, that is, they may be located in one place, or they may be distributed on multiple network modules. Some or all of the modules can be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art can understand and implement it without paying any creative work.

[0594] An embodiment of the present disclosure also proposes a communication device, comprising: one or more processors; wherein the processor is used to call instructions to enable the communication device to execute any one of the information determination methods described in the first aspect, the second aspect, the third aspect, the fourth aspect, the optional embodiment of the first aspect, the optional embodiment of the second aspect, the optional embodiment of the third aspect, and the optional embodiment of the fourth aspect.

[0595] An embodiment of the present disclosure also proposes a communication system, characterized in that it includes a terminal and a network device, wherein the terminal is configured to implement the information determination method described in any one of the first aspect, the second aspect, the optional embodiment of the first aspect, and the optional embodiment of the second aspect, and the network device is configured to implement the information determination method described in any one of the third aspect, the fourth aspect, the optional embodiment of the third aspect, and the optional embodiment of the fourth aspect.

[0596] An embodiment of the present disclosure also proposes a storage medium storing instructions, characterized in that when the instructions are executed on a communication device, the communication device executes an information determination method described in any one of the first aspect, the second aspect, the third aspect, the fourth aspect, the optional embodiment of the first aspect, the optional embodiment of the second aspect, the optional embodiment of the third aspect, and the optional embodiment of the fourth aspect.

[0597] The embodiments of the present disclosure further provide an apparatus for implementing any of the above methods. For example, an apparatus is provided, comprising units or modules for implementing each step performed by a terminal in any of the above methods. For another example, another apparatus is provided, comprising units or modules for implementing each step performed by a network device (e.g., an access network device, a core network function node, a core network device, etc.) in any of the above methods.

[0598] It should be understood that the division of the various units or modules in the above device is merely a division of logical functions. In actual implementation, they may be fully or partially integrated into a physical entity, or they may be physically separated. In addition, the units or modules in the device may be implemented in the form of a processor calling software: for example, the device includes a processor, the processor is connected to a memory, and the memory stores instructions. The processor calls the instructions stored in the memory to implement any of the above methods or implement the functions of the various units or modules of the above device, wherein the processor is, for example, a general-purpose processor, such as a central processing unit (CPU) or a microprocessor, and the memory is a memory within the device or a memory outside the device. Alternatively, the units or modules in the device can be implemented in the form of hardware circuits, and the functions of some or all of the units or modules can be realized by designing the hardware circuits. The above-mentioned hardware circuits can be understood as one or more processors; for example, in one implementation, the above-mentioned hardware circuit is an application-specific integrated circuit (ASIC), which realizes the functions of some or all of the above units or modules by designing the logical relationship of the components in the circuit; for example, in another implementation, the above-mentioned hardware circuit can be realized by a programmable logic device (PLD). Taking a field programmable gate array (FPGA) as an example, it can include a large number of logic gate circuits, and the connection relationship between the logic gate circuits is configured by configuring the configuration file, thereby realizing the functions of some or all of the above units or modules. All units or modules of the above devices can be realized in the form of software called by the processor, or in the form of hardware circuits, or in part by the form of software called by the processor, and the rest by hardware circuits.

[0599] In the embodiments of the present disclosure, the processor is a circuit with signal processing capabilities. In one implementation, the processor can be a circuit with instruction reading and execution capabilities, such as a central processing unit (CPU), a microprocessor, a graphics processing unit (GPU) (which can be understood as a microprocessor), or a digital signal processor (DSP). In another implementation, the processor can implement certain functions through the logical relationship of the hardware circuit. The logical relationship of the above-mentioned hardware circuit is fixed or reconfigurable. For example, the processor is a hardware circuit implemented by an application-specific integrated circuit (ASIC) or a programmable logic device (PLD), such as an FPGA. In a reconfigurable hardware circuit, the process of the processor loading a configuration document and implementing the hardware circuit configuration can be understood as the process of the processor loading instructions to implement the functions of some or all of the above units or modules. In addition, it can also be a hardware circuit designed for artificial intelligence, which can be understood as an ASIC, such as a neural network processing unit (NPU), a tensor processing unit (TPU), a deep learning processing unit (DPU), etc.

[0600] Figure 12 is a schematic diagram of the structure of a communication device 12100 proposed in an embodiment of the present disclosure. Communication device 12100 can be a network device (e.g., an access network device, a core network device, etc.), a terminal (e.g., a user device, etc.), a chip, a chip system, or a processor that supports a network device to implement any of the above methods, or a chip, a chip system, or a processor that supports a terminal to implement any of the above methods. Communication device 12100 can be used to implement the methods described in the above method embodiments. For details, please refer to the description of the above method embodiments.

[0601] As shown in Figure 12, the communication device 12100 includes one or more processors 12101. The processor 12101 can be a general-purpose processor or a dedicated processor, for example, a baseband processor or a central processing unit. The baseband processor can be used to process communication protocols and communication data, and the central processing unit can be used to control the communication device (such as a base station, a baseband chip, a terminal device, a terminal device chip, a DU or a CU, etc.), execute programs, and process program data. The processor 12101 is used to call instructions to enable the communication device 12100 to perform any of the above methods.

[0602] In some embodiments, the communication device 12100 further includes one or more memories 12102 for storing instructions. Optionally, all or part of the memory 12102 may be located outside the communication device 12100.

[0603] In some embodiments, the communication device 12100 further includes one or more transceivers 12103. When the communication device 12100 includes one or more transceivers 12103, the communication steps such as transmission and reception in the above method are performed by the transceiver 12103, and the other steps are performed by the processor 12101.

[0604] In some embodiments, a transceiver may include a receiver and a transmitter, which may be separate or integrated. Optionally, the terms transceiver, transceiver unit, transceiver, and transceiver circuit may be used interchangeably; the terms transmitter, transmitting unit, transmitter, and transmitting circuit may be used interchangeably; and the terms receiver, receiving unit, receiver, and receiving circuit may be used interchangeably.

[0605] Optionally, the communication device 12100 further includes one or more interface circuits 12104, which are connected to the memory 12102. The interface circuits 12104 may be configured to receive signals from the memory 12102 or other devices, and may be configured to send signals to the memory 12102 or other devices. For example, the interface circuits 12104 may read instructions stored in the memory 12102 and send the instructions to the processor 12101.

[0606] The communication device 12100 described in the above embodiments may be a network device or a terminal, but the scope of the communication device 12100 described in the present disclosure is not limited thereto, and the structure of the communication device 12100 may not be limited by FIG. 12 . The communication device may be an independent device or may be part of a larger device. For example, the communication device may be: 1) an independent integrated circuit IC, or a chip, or a chip system or subsystem; (2) a collection of one or more ICs, optionally, the above IC collection may also include a storage component for storing data or programs; (3) an ASIC, such as a modem; (4) a module that can be embedded in other devices; (5) a receiver, a terminal device, an intelligent terminal device, a cellular phone, a wireless device, a handheld device, a mobile unit, an in-vehicle device, a network device, a cloud device, an artificial intelligence device, etc.; (6) others, etc.

[0607] FIG13 is a schematic diagram of the structure of a chip 13200 according to an embodiment of the present disclosure. If the communication device 12100 can be a chip or a chip system, reference can be made to the schematic diagram of the structure of the chip 13200 shown in FIG13 , but the present disclosure is not limited thereto.

[0608] The chip 13200 includes one or more processors 13201 , and the processor 13201 is used to call instructions so that the chip 13200 executes any of the above methods.

[0609] In some embodiments, the chip 13200 further includes one or more interface circuits 13202, which are connected to the memory 13203. The interface circuit 13202 can be used to receive signals from the memory 13203 or other devices, and can be used to send signals to the memory.

[0610] 13203 or other devices to send signals. For example, the interface circuit 13202 can read the instructions stored in the memory 13203 and send the instructions to the processor 13201. Optionally, the terms interface circuit, interface, transceiver pin, transceiver, etc. can be used interchangeably.

[0611] In some embodiments, chip 13200 further includes one or more memories 13203 for storing instructions. Alternatively, all or part of memory 13203 may be located outside chip 13200.

[0612] The present disclosure also proposes a storage medium having instructions stored thereon. When the instructions are executed on the communication device 12100, the communication device 12100 is caused to execute any of the above methods. Optionally, the storage medium is an electronic storage medium. Optionally, the storage medium is a computer-readable storage medium, but is not limited thereto and may also be a storage medium readable by other devices. Optionally, the storage medium may be a non-transitory storage medium, but is not limited thereto and may also be a temporary storage medium.

[0613] The present disclosure also provides a program product, which, when executed by the communication device 12100, enables the communication device 12100 to perform any of the above methods. Optionally, the program product is a computer program product.

[0614] The present disclosure also proposes a computer program, which, when executed on a computer, causes the computer to perform any one of the above methods.

Claims

1. A method for determining information, characterized in that: Executed by a terminal, the method includes: Determine the second size of the first information field in the first downlink control information for scheduling multiple cells according to at least one of the following first sizes: a first size of a first information field corresponding to each cell in a cell set to which the cell corresponding to the first downlink control information belongs, or A first size of a first information field corresponding to a first reference cell in a cell combination corresponding to the first downlink control information.

2. The method according to claim 1, characterized in that Determining, according to a first size of a first information field corresponding to each cell in a cell set to which a cell corresponding to the first downlink control information belongs, a second size of the first information field in the first downlink control information, comprising: The second size of the first information field in the first downlink control information is determined according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

3. The method according to claim 2, characterized in that The second size of the first information field in the first downlink control information is equal to the maximum value.

4. The method according to any one of claims 1 to 3, characterized in that The cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following: A cell set to which the cell that can be scheduled by the first downlink control information belongs; The cell set to which the cell actually scheduled by the first downlink control information belongs.

5. The method according to claim 1, characterized in that Determining, according to a first size of a first information field corresponding to a first reference cell in a cell combination corresponding to the first downlink control information, a second size of the first information field in the first downlink control information includes: The terminal is configured with first signaling, and determines a second size of the first information field in the first downlink control information according to a first size of a first information field corresponding to a first reference cell in a cell combination corresponding to the first downlink control information; The first signaling is used to indicate a cell combination corresponding to the first downlink control information.

6. The method according to claim 5, characterized in that The method further comprises: The terminal is not configured with the first signaling, and determines the second size of the first information field in the first downlink control information according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

7. The method according to any one of claims 1, 5 to 6, characterized in that: The cell combination corresponding to the first downlink control information includes at least one of the following: A cell combination that can be scheduled by the first downlink control information; The cell combination actually scheduled by the first downlink control information.

8. The method according to claim 7, characterized in that The first reference cell includes at least one of the following: The cell with the smallest cell index in the cell combination; The cell with the largest cell index in the cell combination; The cell in the cell combination has the largest size of the first information field corresponding to each cell.

9. The method according to any one of claims 1 to 8, characterized in that The first information field is applied to some cells among the cells actually scheduled by the first downlink control information.

10. The method according to claim 8, characterized in that The part of cells to which the first information field applies includes: The cell with the smallest index among the cells actually scheduled by the first downlink control information.

11. The method according to any one of claims 1 to 10, characterized in that The method further comprises: When the second size of the first information field is larger than the first size of the first cell actually used by the first information field a third size of the information field, and parsing the first information field according to a first number of bits in a proportion of the first information field to determine information indicated by the first information field to the first cell.

12. The method according to claim 11, characterized in that The first number of bits in the proportion of the first information field includes at least one of the following: A first number of most significant bits in the proportion of the first information field; The first information field accounts for a first number of least significant bits in the bit.

13. The method according to claim 11 or 12, characterized in that: The first number is equal to the third size.

14. The method according to any one of claims 1 to 10, characterized in that The method further comprises: When the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell to which the first information field is actually applied, the first information field is parsed by adding a second number of bits whose value is zero to the first information field to determine the information indicated by the first information field to the first cell.

15. The method according to claim 14, characterized in that The adding a second number of bits with a value of zero to the first information field comprises at least one of the following: adding a second number of bits having a value of zero before the most significant bit of the first information field; A second number of bits having a value of zero are added after the least significant bit of the first information field.

16. The method according to claim 14 or 15, characterized in that The second number is equal to a difference between the third size and the second size.

17. A method for determining information, characterized in that: Executed by a terminal, the method includes: The size of the first information field in the first downlink control information used for scheduling multiple cells is determined according to the first configuration signaling.

18. The method according to claim 17, characterized in that The first configuration signaling is determined based on a reference cell.

19. The method according to claim 18, characterized in that The reference cell includes at least one of the following: Dispatch cell; The cell with the largest cell index in the cell combination corresponding to the first downlink control information; The cell with the smallest cell index in the cell combination corresponding to the first downlink control information; a cell with the largest cell index in a cell set to which the cell corresponding to the first downlink control information belongs; A cell with the smallest cell index in the cell set to which the cell corresponding to the first downlink control information belongs; A cell having a largest size of a first information field in a cell set to which the cell corresponding to the first downlink control information belongs; a cell used to calculate a size of the first downlink control information; A cell used to calculate blind detection resources of the first downlink control information.

20. The method according to claim 19, characterized in that The cell combination corresponding to the first downlink control information includes at least one of the following: A cell combination that can be scheduled by the first downlink control information; A cell combination actually scheduled by the first downlink control information; and / or The cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following: A cell set to which the cell that can be scheduled by the first downlink control information belongs; The cell set to which the cell actually scheduled by the first downlink control information belongs.

21. The method according to any one of claims 17 to 20, characterized in that The method further comprises: Traditional configuration signaling is ignored, wherein the traditional configuration signaling is used to indicate the size of the first information field in traditional downlink control information.

22. A method for determining information, characterized in that: Executed by a network device, the method includes: Determine the second size of the first information field in the first downlink control information for scheduling multiple cells according to at least one of the following first sizes: a first size of a first information field corresponding to each cell in a cell set to which the cell corresponding to the first downlink control information belongs, or A first size of a first information field corresponding to a first reference cell in a cell combination corresponding to the first downlink control information.

23. The method according to claim 22, characterized in that Determining, according to a first size of a first information field corresponding to each cell in a cell set to which a cell corresponding to the first downlink control information belongs, a second size of the first information field in the first downlink control information, comprising: The second size of the first information field in the first downlink control information is determined according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

24. The method according to claim 23, characterized in that The second size of the first information field in the first downlink control information is equal to the maximum value.

25. The method according to any one of claims 22 to 24, characterized in that The cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following: A cell set to which the cell that can be scheduled by the first downlink control information belongs; The cell set to which the cell actually scheduled by the first downlink control information belongs.

26. The method according to claim 22, characterized in that Determining, according to a first size of a first information field corresponding to a first reference cell in a cell combination corresponding to the first downlink control information, a second size of the first information field in the first downlink control information includes: A first signaling is configured for the terminal, and a second size of the first information field in the first downlink control information is determined according to a first size of a first information field corresponding to a first reference cell in a cell combination corresponding to the first downlink control information; The first signaling is used to indicate a cell combination corresponding to the first downlink control information.

27. The method according to claim 26, characterized in that The method further comprises: The first signaling is not configured for the terminal, and the second size of the first information field in the first downlink control information is determined according to the maximum value of the first size of the first information field corresponding to each cell in the cell set to which the cell corresponding to the first downlink control information belongs.

28. The method according to any one of claims 22, 26 to 27, characterized in that The cell combination corresponding to the first downlink control information includes at least one of the following: A cell combination that can be scheduled by the first downlink control information; The cell combination actually scheduled by the first downlink control information.

29. The method according to claim 28, characterized in that The first reference cell includes at least one of the following: The cell with the smallest cell index in the cell combination; The cell with the largest cell index in the cell combination; The cell in the cell combination has the largest size of the first information field corresponding to each cell.

30. The method according to any one of claims 22 to 29, characterized in that The first information field is applied to some cells among the cells actually scheduled by the first downlink control information.

31. The method according to claim 30, characterized in that The part of cells to which the first information field applies includes: The cell with the smallest index among the cells actually scheduled by the first downlink control information.

32. The method according to any one of claims 22 to 31, characterized in that The method further comprises: When the second size of the first information field is larger than the third size of the first information field corresponding to the first cell actually used by the first information field, the information indicated by the first information field to the first cell is determined according to a first number of bits in a proportion of the first information field.

33. The method according to claim 32, characterized in that The first number of bits in the proportion of the first information field includes at least one of the following: A first number of most significant bits in the proportion of the first information field; The first information field accounts for a first number of least significant bits in the bit.

34. The method according to claim 32 or 33, characterized in that The first number is equal to the third size.

35. The method according to any one of claims 22 to 31, characterized in that The method further comprises: When the second size of the first information field is smaller than the third size of the first information field corresponding to the first cell actually applied by the first information field, the information indicated by the first information field to the first cell is determined by adding a second number of bits with a value of zero to the first information field.

36. The method according to claim 34, characterized in that The adding a second number of bits with a value of zero to the first information field comprises at least one of the following: adding a second number of bits having a value of zero before the most significant bit of the first information field; A second number of bits having a value of zero are added after the least significant bit of the first information field.

37. The method according to claim 35 or 36, characterized in that The second number is equal to a difference between the third size and the second size.

38. A method for determining information, characterized in that: Executed by a network device, the method includes: A configuration signaling is sent to a terminal, wherein the configuration signaling is used by the terminal to determine a size of a first information field in first downlink control information used for scheduling multiple cells.

39. The method according to claim 38, characterized in that The configuration signaling is sent to the terminal in a reference cell.

40. The method according to claim 39, characterized in that The reference cell includes at least one of the following: Dispatch cell; The cell with the largest cell index in the cell combination corresponding to the first downlink control information; The cell with the smallest cell index in the cell combination corresponding to the first downlink control information; a cell with the largest cell index in a cell set to which the cell corresponding to the first downlink control information belongs; A cell with the smallest cell index in the cell set to which the cell corresponding to the first downlink control information belongs; A cell having a largest size of a first information field in a cell set to which the cell corresponding to the first downlink control information belongs; a cell used to calculate a size of the first downlink control information; A cell used to calculate blind detection resources of the first downlink control information.

41. The method according to claim 40, characterized in that The cell combination corresponding to the first downlink control information includes at least one of the following: A cell combination that can be scheduled by the first downlink control information; A cell combination actually scheduled by the first downlink control information; and / or The cell set to which the cell corresponding to the first downlink control information belongs includes at least one of the following: A cell set to which the cell that can be scheduled by the first downlink control information belongs; The cell set to which the cell actually scheduled by the first downlink control information belongs.

42. A terminal, characterized in that: include: one or more processors; The terminal is used to execute the information determination method according to any one of claims 1 to 21.

43. A network device, characterized in that: include: one or more processors; Wherein, the network device is used to execute the information determination method described in any one of claims 22 to 42.

44. A communication device, characterized in that: include: one or more processors; The processor is used to call instructions so that the communication device executes the information determination method described in any one of claims 1 to 21 and 22 to 42.

45. A communication system, characterized in that: It includes a terminal and a network device, wherein the terminal is configured to implement the information determination method according to any one of claims 1 to 21, and the network device is configured to implement the information determination method according to any one of claims 22 to 41.

46. ​​A storage medium storing instructions, characterized in that: When the instruction is executed on a communication device, the communication device is caused to execute the information determination method according to any one of claims 1 to 21 and 22 to 41.

Citation Information

Patent Citations

  • Downlink control information (DCI) receiving and sending method and device, and storage medium

    CN115462033A

  • Information domain determination method and cell determination and indication device

    CN115843460A

  • Downlink control information (DCI) receiving and sending method and device, and storage medium

    CN116097870A

  • Method and device for decoding and generating downlink control information

    CN116250346A

  • Method and device for blind detection and processing of downlink control information

    CN116458097A