Method for optimizing shut-in time of intermittent well of tight gas reservoir, and device
By analyzing the relationship between casing pressure data and shut-in time, a pressure drop rate model was established to optimize shut-in time, solving the problem of poor production reliability of intermittent wells in tight gas reservoirs in existing technologies, and achieving an improvement in gas well production efficiency and an increase in gas production.
Patent Information
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- CHINA NAT PETROLEUM CORP
- Filing Date
- 2025-10-29
- Publication Date
- 2026-06-04
AI Technical Summary
Existing technologies, when optimizing the shut-in time of intermittent wells in tight gas reservoirs, cannot effectively take into account actual conditions such as wellbore fluid accumulation and pipeline freezing, resulting in poor gas well production reliability and difficulty in meeting the actual production needs of natural gas.
By acquiring casing pressure data after well shut-in, analyzing the relationship between casing pressure and shut-in time, establishing a pressure drop rate model, determining the casing pressure recovery rate threshold, and optimizing shut-in time, gas well production data can be collected in real time to reflect the impact of wellbore fluid accumulation and pipeline freezing.
It improved the production efficiency of intermittent gas wells in tight gas reservoirs and enhanced the production capacity of gas wells. The optimized shut-in time scheme increased the average daily gas production by 14% in practical applications.
Smart Images

Figure CN2025131032_04062026_PF_FP_ABST