Wind turbine assembly method
By pre-assembling the nacelle and blades on tower modules with a counterweight, the method addresses the challenge of high wind torque on rotor locks and crane scarcity, enabling safe and efficient wind turbine assembly.
Patent Information
- Application Number
- PCT/ES2025/070259
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2025-05-07
- Publication Date
- 2026-11-12
AI Technical Summary
The assembly of large wind turbines with pre-mounted blades is challenging due to the high torque exerted on the rotor lock by strong winds, which can break the locking pin, and large cranes are scarce, expensive, and weather-dependent.
The method involves pre-assembling the nacelle and two blades on two tower modules, installing a counterweight, and lifting the assembly with a lifting system while keeping the rotor unlocked, using auxiliary cranes to balance wind loads, then replacing the counterweight with the last blade.
This method allows safe and fast assembly at wind speeds exceeding 10-15 m/s by balancing wind loads, preventing rotor pin damage and ensuring a low center of gravity for stability.
Smart Images

Figure ES2025070259_12112026_PF_FP_ABST
Abstract
Description
[0001] METHOD OF ASSEMBLING A WIND TURBINE
[0002] DESCRIPTION
[0003] Field of invention
[0004] The invention focuses on pre-assembling part of a wind turbine using small auxiliary cranes, positioning at least one tower section onto which the nacelle, a counterweight, and two of the blades are installed. Subsequently, using a known lifting system, the assembly is hoisted and the remaining tower and blade are completed.
[0005] Background
[0006] Over the past few years, onshore wind turbine technology has developed new, more powerful, and larger turbines. The large cranes needed to assemble these turbines are scarce and expensive. Furthermore, their operation is highly dependent on the weather conditions at the installation sites. Assembly in winds exceeding 10-15 m / s is not possible due to the risk posed by the pendulum-like movement of these large cranes. Technology has advanced in automated lifting systems to mitigate these problems.
[0007] The following patents stand out from the state of the art reviewed. ES2389345A1 presents a patent where the starting point is the pre-assembly of a tower section, its nacelle, and its blades with the aid of a crane (without going into details of weight or blade size). Subsequently, vertical cylinders equipped with an actuator at their upper part raise the structure. This allows for the incorporation of successive tower sections from the lower part.
[0008] US6505785B2 describes how to hoist the nacelle and blade assembly without the need for a large crane. This involves first installing the tower, then placing the nacelle and blades onto a platform that is lifted by sliding up the side of the tower until it reaches the top. The platform is then rotated so that the blades rise horizontally to the ground.
[0009] US2009087311A1 protects an assembly method that begins with placing the nacelle on the lifting system. The tower is then assembled, with the nacelle surrounding it. Once the tower assembly is complete, the nacelle is lowered to install the blades, and the entire assembly is then lifted by sliding it up the tower. US2012131880A1 describes how to lift an AEG (Aerosolar Electric Generator) using a climbing crane that adds the tower and inserts new modules from the top. US2024309847A1 presents a climbing crane that adds tower sections. Upon completion of the assembly, the rotor is lifted from one side of the crane and the nacelle from the other. These last two patents are more focused on offshore assembly, which involves additional complexities in terms of supplying the components used.
[0010] Description
[0011] One of the most complex and costly aspects of wind turbine assembly is adding the blades after the turbine has already been lifted into place. Therefore, current assembly methods aim to include the blades at the beginning and allow the rest of the turbine to be erected with at least some of the blades already mounted. The difficulty in lifting a wind turbine with pre-mounted blades lies in locking the rotor. The usual method is the use of a sliding pin to lock the rotor (called a "rotor lock"). In large-diameter rotors (for example, over 160m), the torque that the pin must withstand is very high. This pin is typically fixed 1 meter from the axis of rotation, and if the incident wind speed exceeds 10-15 m / s, there is a risk that the pre-mounted blades will act like a sail, and the torque on the pin will be so high that it breaks.
[0012] To avoid these risks, the following assembly method has been developed, which involves the following steps:
[0013] - Two tower modules are mounted using one or more auxiliary cranes, and the entire nacelle is placed on top of them.
[0014] - The counterweight is installed, and with the rotor locked, the right blade and the left blade are installed.
[0015] - With the rotor unlocked, so that the pin is not stressed if the wind speed exceeds 10-15m / s, the pre-assembled wind turbine is lifted with the help of the pre-assembled lifting system.
[0016] The assembly of the two blades and the counterweight creates a "stand-up" effect that naturally balances the loads that the rotor pin would be subjected to due to the incident wind.
[0017] Once it has been fully lifted, the rotor is reattached and the counterweight is exchanged for the last blade of the wind turbine.
[0018] From all of the above, the following advantages emerge: The rotor pin is not damaged by subjecting it to high pressures from the loads generated by the blades. The wind turbine can be assembled at speeds exceeding 10-15 m / s. The arrangement of the two blades and the counterweight allows for a very low center of gravity, resulting in a safer and faster assembly.
[0019] Brief description of the drawings
[0020] Next, a series of drawings are briefly described that help to better understand the invention and that are expressly related to an embodiment of said invention that is presented as a non-limiting example thereof.
[0021] Figure 1 shows the assembly of a tower section onto a foundation with the help of a telescopic crane.
[0022] Figure 2 shows the assembly of the nacelle onto two tower sections with the help of a crane not shown.
[0023] Figure 3 shows how the assembly continues by adding the counterweight to the rotor. Figure 4 is a detail of the counterweight mountings.
[0024] Figure 5 represents the fixing pin on a large diameter rotor.
[0025] Figure 6 shows how the blades are added without the need for large cranes and with the rotor locked.
[0026] Figure 7 shows the lifting system mounted around the pre-assembled wind turbine and how it lifts the assembly with the rotor unlocked.
[0027] Figure 8 shows how the counterweight is lowered using the rotor's internal device.
[0028] Figure 9 shows a detail of the counterweight and its pre-installed retainers.
[0029] Figure 10 represents the final stage of assembly by raising the last blade with the internal rotor device.
[0030] Detailed description
[0031] As shown in Figure 1, a first tower section (2), specifically its lower ferrule, is bolted to a foundation (1) that protrudes above ground level, with its connecting bolts exposed. This assembly is accessible from ground level. The tower section (2) is then moved with the aid of an auxiliary crane (3), which lifts it from its vertical position to a sufficient height to rest on the protruding foundation (1). Finally, it is secured to the lower ferrule using the connecting bolts from the foundation (1). Next, a second tower section (4) is assembled on top of the first by lifting it onto the first tower section (2) using its crane (3). The upper ferrule of the first tower section (2) is then bolted to the lower ferrule of the second tower section (4).Figure 2 shows how the first (2) and second (4) tower sections and the nacelle (5) are assembled using at least one auxiliary crane; only its lifting slings (3') are shown in the figure. The nacelle (5) is thus securely bolted to the tower sections (2 and 4). The height reached by the two tower sections and the nacelle is not affected by the winds at the assembly site.
[0032] As shown in Figure 3, a counterweight (7) is fixed in one of the three openings of the rotor (6) in the nacelle (5) with the aid of an auxiliary crane (not shown) from which its corresponding lifting slings (3') are suspended. The counterweight (7) is a structure consisting of a longitudinal lattice support, preferably made of steel, topped by a heavy block (8), preferably made of concrete. The longitudinal lattice support is bolted into one of the openings of the rotor (6), remaining vertically parallel to the tower sections (2 and 4). The pre-assembled tower sections correspond to the length of the counterweight (7), which never reaches the ground and hangs vertically from the nacelle (5).
[0033] Figure 4 details the counterweight root (7), which has an internal platform. The anchor points (7') and the pulley holders for the lifting slings (3') are also shown. The anchor points (7') of the counterweight root (7) are three circular sectors protruding from the root itself, with internal hollows that allow coupling with the rotor (6) and subsequent disconnection from inside the hub. Because the anchor points (7') protrude, they provide sufficient space for handling the pulley holders for the lifting slings (3').
[0034] Figure 5 shows how the rear part of the wind turbine rotor (6) is secured using its corresponding bolt (9). In large-diameter rotors, the pressure exerted on the bolt (9) can reach extreme values due to the wind impact on the rotor, as the bolt is normally fixed 1 meter from the axis of rotation (10). Because the counterweight (7) is a lattice design, the wind impact is reduced, minimizing potential damage to the blades (11), the rotor (6), and the axis of rotation (10).
[0035] As shown in Figure 6, with the rotor (6) locked, the blades (11) are assembled. Using one or two auxiliary cranes and their corresponding slings (3'), one applied at the blade root and the other at the midpoint, one blade is installed first, followed by the other. The blades (11) are secured in a V-shape, counteracting their own weight. At this point, the locking bolt is released, and the pre-assembled wind turbine is lifted into position, and new tower modules are installed.
[0036] The lifting system, consisting of three columns on which a lifting triangle moves up and down, can be assembled before or after the counterweight (7) and blades (11) are mounted. Neither the blades (11) nor the counterweight (7) physically interfere with the lifting system (12) during its operation.
[0037] Figure 7 shows the lifting system (12), the pre-assembled wind turbine with at least two tower sections (2, 4), the nacelle (5), two blades (11), and a counterweight (7). All of this is mounted on a projecting foundation (1). When the lifting system's triangular mechanism (12) is lowered, it locks the pre-assembled wind turbine, allowing it to be detached from the foundation (1). The assembly is then raised using the lifting system (12), leaving enough space to insert a new tower section, which is bolted to the foundation. The triangular mechanism with the pre-assembled wind turbine is then lowered and attached to the new tower section. This process is repeated until the desired height is reached. The most important aspect of this assembly process is that the rotor (6) is not blocked. The wind resistance is counteracted by the two V-shaped blades (11) and the vertically positioned counterweight (7).
[0038] During wind turbine assembly, the rotor (6) is kept at a very low center of gravity. When the rotor (6) attempts to rotate due to the wind impacting the blades (11), it wobbles slightly until it returns to its original position, without subjecting the pivot shaft (10) to the strong pressures exerted by the bolt (9) when it is activated. For the assembly of the tower sections, the slight rotation of the rotor (6) in the wind is not a destabilizing factor. As shown in Figure 8, once the complete wind turbine assembly is finished, the rotor (6) is locked again, the lifting system (12) is removed, and the counterweight (7) is lowered and replaced with the last blade using the crane-free blade exchange system. The blade exchange system consists of a set of hoists located inside the nacelle (5), specifically within the hub.This blade exchange system uses hoisting cables (13) and stays (14) that lower the counterweight (7), place it on the ground, and are then hoisted again with the new blade. The hoisting cables (13) are attached to the root of the counterweight (7), and the stays (14) to the block (8) at the top of the counterweight (7). In the final stage of the operation, a crane is attached to the tip of the counterweight (7) to level it.
[0039] Figure 9 shows that the stays (14) are connected to the tip and root of the counterweight (7) from the start of the assembly operation. Once the assembly operation is complete and before lowering the counterweight (7), an operator accesses the stays (14) connected at the root from the hub using the platform integrated into the counterweight (7). From there, the stays (14) are released and lowered to the ground.
[0040] In Figure 10, with the rotor (6) locked, the lifting cables (13) are lowered and secured to the root of the blade (11). Using the stays (14), the last blade is lifted and bolted to the rotor (6) from inside the hub.
[0041] With the blade exchange system and the hoisting cables (13) and stays (14), damaged blades can also be exchanged on existing wind turbines.
Claims
CLAIMS 1- Method of assembling a wind turbine consisting of at least one tower section (2) and a complete nacelle (5) previously pre-assembled, on which a lifting system (12) is subsequently used to raise the assembly and allow the introduction of new tower modules from the bottom, where the method comprises the following steps: - to assemble with a crane (3) at least one section of tower (2) on a protruding foundation (1), - assemble the nacelle (5), - provide sufficient height to the pre-assembled wind turbine to add a counterweight (7) in one of the rotor recesses and fix it with the root anchors (7') so that it hangs vertically from the nacelle (5), - assemble the two blades (11) with the rotor (6) locked, - Using the lifting system (12), hook the base of the lower tower section (2) with the triangle and, unlocking the rotor (6), begin lifting the pre-assembled wind turbine, - raise the assembly with the lifting system (12) leaving enough space to be able to introduce a new section of tower that is bolted to the foundation (1), while the lifting system is in operation, the rotor is always unlocked and the two V-shaped blades (11) and the counterweight (7) counteract the impact of the wind, - lower the triangle and assemble the pre-assembled wind turbine with the new tower section, this process is repeated until the desired height is reached, removing the lifting system (12), - lower the counterweight (7) from inside the hub using the blade exchange system, and with its corresponding lifting cables (13) and its retainers (14), and finally, lift the third blade (11) using the exchange system. 2- Method of assembling a wind turbine according to claim one, characterized in that the counterweight (7) is a structure formed by a longitudinal lattice support preferably made of steel, topped by a heavy block (8) preferably made of concrete that keeps the rotor (6) with the center of gravity very low and when the rotor tries to rotate (6) due to the effect of the wind incident on the blades (11), it moves by wobbling slightly until it returns to its original position. 3- Method of assembling a wind turbine according to claim two, characterized in that the anchors (7') of the root of the counterweight (7) are three circular sectors protruding from the root itself and have hollows inside to facilitate assembly / disassembly. 4- Method of assembling a wind turbine according to claim two, characterized in that the stays (14) are connected to the tip and the root of the counterweight (7) from the start of the assembly operation and before lowering the counterweight (7), an operator accesses from the hub to the stays (14) connected at the root and releases them to the ground, using the platform that the counterweight (7) incorporates. 5- Method of assembling a wind turbine according to claim one, characterized in that the lifting system (12) is formed by three main columns and a triangle that moves between them, raising and lowering the pre-assembled wind turbine and is assembled before installing the blades (11) and the counterweight (7). 6- Method of assembling a wind turbine according to claim 1, characterized in that the lifting system (12) is formed by three main columns and a triangle that moves between them, raising and lowering the pre-assembled wind turbine and is assembled after installing the blades (11) and the counterweight (7). 7- Method of assembling a wind turbine according to claim one, characterized in that the fixing of the rotor (6) of the wind turbine is done by means of its corresponding bolt (9) which is located 1 meter away from the axis of rotation (10).