Method and device for random access in communication system supporting sbfd

By determining msg3 PUSCH resources based on BWP and UL subband configurations, the method addresses resource restrictions in SBFD systems, facilitating stable and efficient RACH procedures through aligned subcarrier spacing and cyclic prefix settings.

WO2026235418A1PCT designated stage Publication Date: 2026-11-12HYUNDAI MOTOR CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/KR2026/095934
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-05-07
Filing Date
2026-04-15
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

In communication systems supporting subband full duplex (SBFD), the configuration of msg3 PUSCH resources during the random access channel (RACH) procedure is hindered due to non-overlapping UL subbands and initial UL BWP, leading to restricted uplink resources and unstable RACH execution.

Method used

The method determines msg3 PUSCH resources based on the configuration status of the initial BWP, active BWP, and UL subband, ensuring proper resource allocation by considering the overlapping frequency region, subcarrier spacing, and cyclic prefix alignment, allowing flexible resource setting even in SBFD environments.

Benefits of technology

This approach enables efficient and reliable msg3 PUSCH transmission in SBFD environments, ensuring stable RACH procedure execution by securing necessary resources for terminals and enabling base stations to receive msg3 transmissions effectively.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure KR2026095934_12112026_PF_FP_ABST
    Figure KR2026095934_12112026_PF_FP_ABST
Patent Text Reader

Abstract

A method and a device for random access in a communication system supporting subband full duplex (SBFD) are disclosed. The method of a user equipment (UE) comprises the steps of: transmitting msg1 to a base station; receiving msg2 from the base station in response to the msg1; and transmitting, to the base station, msg3 in a physical uplink shared channel (PUSCH) resource indicated by an uplink (UL) grant included in the msg2, wherein the PUSCH resource is determined on the basis of an initial bandwidth part (BWP), an active BWP and the configuration state of a UL subband, the UL subband being based on an SBFD configuration.
Need to check novelty before this filing date? Find Prior Art

Description

Method and device for random access in a communication system supporting SBFD

[0001] The present disclosure relates to an improved communication technology, and more specifically, to a technology for random access in a communication system that supports SBFD (subband full duplex).

[0002] Communication networks (e.g., 5G communication networks, 6G communication networks, etc.) are being developed to provide communication services that are improved over existing communication networks (e.g., LTE (long term evolution), LTE-A (advanced), etc.). 5G communication networks (e.g., NR (new radio) communication networks) can support frequency bands above 6 GHz as well as frequency bands below 6 GHz. That is, 5G communication networks can support the FR1 band and / or FR2 band. 5G communication networks can support a wider variety of communication services and scenarios compared to LTE communication networks. For example, usage scenarios for 5G communication networks may include eMBB (enhanced Mobile BroadBand), URLLC (Ultra Reliable Low Latency Communication), mMTC (massive Machine Type Communication), etc.

[0003] 6G communication networks can support a wider variety of communication services and scenarios compared to 5G communication networks. 6G communication networks can meet the requirements for ultra-high performance, ultra-bandwidth, ultra-spatial, ultra-precision, ultra-intelligence, and / or ultra-reliability. 6G communication networks can support a wide range of frequency bands and can be applied to various usage scenarios (e.g., terrestrial communication, non-terrestrial communication, sidelink communication, etc.).

[0004] Meanwhile, the communication network may support SBFD (subband full duplex) operation. In a communication network that supports SBFD, a random access (RA) procedure can be performed. In the RACH procedure, since the resource for msg3 (hereinafter referred to as msg3 PUSCH (physical uplink shared channel)) is generally set based on the initial UL (uplink) BWP (bandwidth part), cases may occur where the msg3 PUSCH is restricted or does not exist depending on the location of the UL subband. If the UL subband and the initial UL BWP do not sufficiently overlap, a problem may arise where it is difficult for the base station to properly set the msg3 PUSCH through the RAR (random access response). Depending on the relationship between the active UL BWP and the initial UL BWP and the UL subband setting, the uplink resources that the terminal can actually use may be further restricted. Such problems can hinder the stable execution of the RACH procedure in an SBFD environment. Therefore, a technology is required to perform msg3 PUSCH configuration more efficiently in an SBFD environment.

[0005] The objective of the present disclosure to solve the above-mentioned problems is to provide a method and apparatus for random access in a communication system that supports SBFD (subband full duplex).

[0006] A method of a UE (user equipment) according to embodiments of the present disclosure for achieving the above objective comprises: transmitting msg1 to a base station; receiving msg2 from the base station in response to msg1; and transmitting msg3 to the base station in a PUSCH (physical uplink shared channel) resource indicated by an UL (uplink) grant included in msg2, wherein the PUSCH resource is determined based on the configuration status of an initial BWP (bandwidth part), an active BWP, and an UL subband, and the UL subband is based on a subband full duplex (SBFD) configuration.

[0007] Based on the fact that the overlapping frequency region between the active BWP and the UL subband is smaller than the initial BWP, the PUSCH resource can be determined based on the maximum size of the initial BWP.

[0008] The minimum number of physical resource blocks (PRBs) of the above PUSCH resource can be set, and the frequency range from the lowest PRB of the initial BWP or the active BWP up to the minimum number of PRBs can be determined as the above PUSCH resource.

[0009] Based on the fact that the active BWP includes the initial BWP, the subcarrier spacing (SCS) of the active BWP is the same as the SCS of the initial BWP, and the cyclic prefix (CP) length of the active BWP is the same as the CP length of the initial BWP, the PUSCH resource can be set within the initial BWP or UL available PRBs.

[0010] Based on the fact that the above PUSCH resource is set within the above UL available PRBs, the above PUSCH resource may be set based on the first PRB of the above UL available PRBs.

[0011] Based on the fact that the above PUSCH resource is set within the above UL available PRBs, PRB numbering for the above PUSCH resource may be performed based on the lowest PRB of the above initial BWP, the lowest PRB of the above active BWP, the lowest PRB of the overlapping frequency range between the above initial BWP and the UL subband, or the lowest PRB of the overlapping frequency range between the above active BWP and the UL subband.

[0012] Based on the existence of at least one of the following states: the SCS of the active BWP is different from the SCS of the initial BWP, the CP length of the active BWP is different from the CP length of the initial BWP, the active BWP does not include the initial BWP, or the active BWP is different from the initial BWP, the PUSCH resource can be determined based on the lowest PRB of the active BWP.

[0013] Based on the fact that the active BWP includes the initial BWP, the SCS of the active BWP is the same as the SCS of the initial BWP, the CP length of the active BWP is the same as the CP length of the initial BWP, and the UL subband includes the initial BWP, the PUSCH resource can be set within the initial BWP.

[0014] A method of a base station according to embodiments of the present disclosure for achieving the above objective comprises: receiving msg1 from a UE (user equipment); transmitting msg2 to the UE in response to the msg1, the msg2 including a UL grant indicating a PUSCH (physical uplink shared channel) resource determined based on the configuration status of an initial BWP (bandwidth part), an active BWP, and an UL (uplink) subband; and receiving msg3 from the UE from the PUSCH resource, wherein the UL subband is based on a SBFD (subband full duplex) configuration.

[0015] Based on the fact that the overlapping frequency region between the active BWP and the UL subband is smaller than the initial BWP, the PUSCH resource can be determined based on the maximum size of the initial BWP.

[0016] The minimum number of physical resource blocks (PRBs) of the above PUSCH resource can be set, and the frequency range from the lowest PRB of the initial BWP or the active BWP up to the minimum number of PRBs can be determined as the above PUSCH resource.

[0017] Based on the fact that the active BWP includes the initial BWP, the subcarrier spacing (SCS) of the active BWP is the same as the SCS of the initial BWP, and the cyclic prefix (CP) length of the active BWP is the same as the CP length of the initial BWP, the PUSCH resource can be set within the initial BWP or UL available PRBs.

[0018] Based on the fact that the above PUSCH resource is set within the above UL available PRBs, the above PUSCH resource may be set based on the first PRB of the above UL available PRBs.

[0019] Based on the fact that the above PUSCH resource is set within the above UL available PRBs, PRB numbering for the above PUSCH resource may be performed based on the lowest PRB of the above initial BWP, the lowest PRB of the above active BWP, the lowest PRB of the overlapping frequency range between the above initial BWP and the UL subband, or the lowest PRB of the overlapping frequency range between the above active BWP and the UL subband.

[0020] Based on the existence of at least one of the following states: the SCS of the active BWP is different from the SCS of the initial BWP, the CP length of the active BWP is different from the CP length of the initial BWP, the active BWP does not include the initial BWP, or the active BWP is different from the initial BWP, the PUSCH resource can be determined based on the lowest PRB of the active BWP.

[0021] Based on the fact that the active BWP includes the initial BWP, the SCS of the active BWP is the same as the SCS of the initial BWP, the CP length of the active BWP is the same as the CP length of the initial BWP, and the UL subband includes the initial BWP, the PUSCH resource can be set within the initial BWP.

[0022] User equipment (UE) according to embodiments of the present disclosure for achieving the above objective comprises at least one processor, said at least one processor causes said UE to transmit msg1 to a base station; receive msg2 from said base station in response to said msg1; and transmit msg3 to said base station in a physical uplink shared channel (PUSCH) resource indicated by an uplink (UL) grant included in said msg2, said PUSCH resource is determined based on the configuration status of an initial bandwidth part (BWP), an active BWP, and an UL subband, said UL subband is based on a subband full duplex (SBFD) configuration.

[0023] Based on the fact that the overlapping frequency region between the active BWP and the UL subband is smaller than the initial BWP, the PUSCH resource can be determined based on the maximum size of the initial BWP.

[0024] The minimum number of physical resource blocks (PRBs) of the above PUSCH resource can be set, and the frequency range from the lowest PRB of the initial BWP or the active BWP up to the minimum number of PRBs can be determined as the above PUSCH resource.

[0025] Based on the fact that the active BWP includes the initial BWP, the subcarrier spacing (SCS) of the active BWP is the same as the SCS of the initial BWP, and the cyclic prefix (CP) length of the active BWP is the same as the CP length of the initial BWP, the PUSCH resource can be set within the initial BWP or UL available PRBs.

[0026] According to the present disclosure, constraint issues that may arise when setting up a msg3 PUSCH (physical uplink shared channel) during the execution of a RACH (random access channel) procedure in a communication system supporting SBFD (subband full duplex) can be resolved. If some resource setting rules applied to non-SBFD terminals are applied to SBFD terminals as they are, msg3 PUSCH may be restricted according to specific UL subband settings; however, a resource setting method to resolve this problem can be provided. Accordingly, the base station can set msg3 PUSCH resources more flexibly even in an SBFD environment, and the terminal can reliably secure the resources necessary for msg3 PUSCH transmission. The terminal can smoothly perform msg3 PUSCH transmission even in an SBFD environment, and the base station can reliably receive msg3 PUSCH transmission from the terminal. Therefore, the setting and transmission of msg3 PUSCH during the RACH procedure in an SBFD environment can be performed more efficiently.

[0027] FIG. 1 is a conceptual diagram illustrating embodiments of a communication system.

[0028] FIG. 2 is a block diagram illustrating embodiments of communication nodes constituting a communication system.

[0029] FIG. 3 is a block diagram illustrating embodiments of communication nodes performing communication.

[0030] FIG. 4a is a block diagram illustrating embodiments of a transmission path.

[0031] FIG. 4b is a block diagram illustrating embodiments of a receiving path.

[0032] FIG. 5 is a conceptual diagram illustrating embodiments of a system frame in a communication system.

[0033] FIG. 6 is a conceptual diagram illustrating embodiments of subframes in a communication system.

[0034] FIG. 7 is a conceptual diagram illustrating embodiments of slots in a communication system.

[0035] FIG. 8 is a conceptual diagram illustrating embodiments of time-frequency resources in a communication system.

[0036] FIGS. 9A and 9B are conceptual diagrams illustrating the configuration of the UL subband during the initial connection phase.

[0037] FIG. 10 is a conceptual diagram illustrating UL available PRB(s) for msg3 transmission.

[0038] FIGS. 11a and FIGS. 11b are conceptual diagrams illustrating UL available PRB(s) for msg3 transmission.

[0039] Figure 12 is a conceptual diagram illustrating an FDRA for a PUSCH scheduled by a RAR.

[0040] The present disclosure is capable of various modifications and may have various embodiments, and specific embodiments are illustrated in the drawings and described in detail. However, this is not intended to limit the present disclosure to specific embodiments and should be understood to include all modifications, equivalents, and substitutions that fall within the spirit and scope of the present disclosure.

[0041] Terms such as "first," "second," etc., may be used to describe various components, but said components should not be limited by said terms. Such terms are used solely for the purpose of distinguishing one component from another. For example, without departing from the scope of the present disclosure, the first component may be named the second component, and similarly, the second component may be named the first component. The term "and / or" may mean a combination of a plurality of related described items or any of a plurality of related described items.

[0042] In the present disclosure, "at least one of A and B" may mean "at least one of A or B" or "at least one of one or more combinations of A and B". Additionally, in the present disclosure, "at least one of A and B" may mean "at least one of A or B" or "at least one of one or more combinations of A and B".

[0043] In the present disclosure, (re)transmission may mean "transmission," "retransmission," or "transmission and retransmission"; (re)setting may mean "setting," "resetting," or "setting and resetting"; (re)connection may mean "connection," "reconnection," or "connection and reconnection"; and (re)connection may mean "connection," "reconnection," or "connection and reconnection".

[0044] When it is stated that one component is "connected" or "connected" to another component, it should be understood that while it may be directly connected or connected to that other component, there may also be other components in between. On the other hand, when it is stated that one component is "directly connected" or "directly connected" to another component, it should be understood that there are no other components in between.

[0045] The terms used in this disclosure are used merely to describe specific embodiments and are not intended to limit this disclosure. The singular expression includes the plural expression unless the context clearly indicates otherwise. In this disclosure, terms such as “comprising” or “having” are intended to specify the existence of the features, numbers, steps, actions, components, parts, or combinations thereof described in the specification, and should be understood as not precluding the existence or addition of one or more other features, numbers, steps, actions, components, parts, or combinations thereof.

[0046] Unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as generally understood by those skilled in the art to which this disclosure pertains. Terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant technology, and should not be interpreted in an ideal or overly formal sense unless explicitly defined in this disclosure.

[0047] Hereinafter, preferred embodiments of the present disclosure will be described in more detail with reference to the attached drawings. To facilitate overall understanding in describing the present disclosure, the same reference numerals are used for identical components in the drawings, and redundant descriptions of identical components are omitted. Operations according to combinations of embodiments, extensions of embodiments, and / or modifications of embodiments may be performed, as well as the embodiments explicitly described in the present disclosure. The performance of some operations may be omitted, and the order of operations may be changed.

[0048] In the embodiments, even when a method performed at a first communication node among the communication nodes (e.g., transmission or reception of a signal) is described, the corresponding second communication node may perform a method corresponding to the method performed at the first communication node (e.g., reception or transmission of a signal). That is, when the operation of a UE (user equipment) is described, the corresponding base station may perform an operation corresponding to the operation of the UE. Conversely, when the operation of a base station is described, the corresponding UE may perform an operation corresponding to the operation of the base station.

[0049] A base station may be referred to as Node B, evolved Node B, gNode B (next generation node B), gNB, device, apparatus, node, communication node, BTS (base transceiver station), RRH (radio remote head), TRP (transmission reception point), RU (radio unit), RSU (road side unit), radio transceiver, access point, access node, etc. A UE may be referred to as terminal, device, apparatus, node, communication node, end node, access terminal, mobile terminal, station, subscriber station, mobile station, portable subscriber station, OBU (on board unit), etc.

[0050] In the present disclosure, signaling may be at least one of upper-layer signaling, MAC (medium access control) signaling, or PHY (physical) signaling. A message used for upper-layer signaling may be referred to as an "upper-layer message" or an "upper-layer signaling message." A message used for MAC signaling may be referred to as a "MAC message" or a "MAC signaling message." A message used for PHY signaling may be referred to as a "PHY message" or a "PHY signaling message." Upper-layer signaling may refer to the transmission and reception operations of system information (e.g., MIB (master information block), SIB (system information block)) and / or RRC (radio resource control) messages. MAC signaling may refer to the transmission and reception operations of MAC CE (control element). PHY signaling may refer to the transmission and reception operations of control information (e.g., DCI (downlink control information), UCI (uplink control information), SCI (sidelink control information)).

[0051] In the present disclosure, "setting an operation (e.g., a transmission operation)" may mean that "setting information for said operation (e.g., an information element, a parameter)" and / or "information directing the performance of said operation" is signaled. "Setting an information element (e.g., a parameter)" may mean that said information element is signaled. In the present disclosure, "signal and / or channel" may mean a signal, a channel, or "signal and channel," and "signal" may be used to mean "signal and / or channel." In the present disclosure, "time" and "time point" may be used interchangeably. "Time" may be interpreted as a time or a time point depending on the context, and "time point" may be interpreted as a time point or a time depending on the context.

[0052] In the present disclosure, a phrase containing "~ case (e.g., when ~)" may be expressed as a phrase containing "~ based on (e.g., based on ~)" or a phrase containing "~ in response to (e.g., in response to ~)". In other words, a phrase containing "~ case" may be interpreted as identical or similar to a phrase containing "~ based on" or a phrase containing "~ in response to".

[0053] The communication networks to which the embodiments are applied are not limited to those described below, and the embodiments may be applied to various communication networks (e.g., 4G communication networks, 5G communication networks, and / or 6G communication networks). Here, the term "communication network" may be used interchangeably with "communication system."

[0054] FIG. 1 is a conceptual diagram illustrating embodiments of a communication system.

[0055] Referring to FIG. 1, the communication system (100) may include a plurality of communication nodes (110-1, 110-2, 110-3, 120-1, 120-2, 130-1, 130-2, 130-3, 130-4, 130-5, 130-6). Additionally, the communication system (100) may further include a core network (e.g., an S-GW (serving-gateway), a P-GW (PDN (packet data network)-gateway), and an MME (mobility management entity)). If the communication system (100) is a 5G communication system (e.g., a new radio (NR) system), the core network may include an AMF (access and mobility management function), a UPF (user plane function), an SMF (session management function), etc.

[0056] Multiple communication nodes (110 to 130) can support communication protocols defined in 3GPP (3rd generation partnership project) standards (e.g., LTE communication protocol, LTE-A communication protocol, NR communication protocol, etc.). Multiple communication nodes (110 to 130) can support CDMA (code division multiple access) technology, WCDMA (wideband CDMA) technology, TDMA (time division multiple access) technology, FDMA (frequency division multiple access) technology, OFDM (orthogonal frequency division multiplexing) technology, Filtered OFDM technology, CP (cyclic prefix)-OFDM technology, DFT-s-OFDM (discrete Fourier transform-spread-OFDM) technology, OFDMA (orthogonal frequency division multiple access) technology, SC (single carrier)-FDMA technology, NOMA (non-orthogonal multiple access) technology, GFDM (generalized frequency division multiplexing) technology, FBMC (filter bank multi-carrier) technology, UFMC (universal filtered multi-carrier) technology, SDMA (space division multiple access) technology, etc. Each of the multiple communication nodes may have the following structure.

[0057] FIG. 2 is a block diagram illustrating embodiments of communication nodes constituting a communication system.

[0058] Referring to FIG. 2, the communication node (200) may include at least one processor (210), a memory (220), and a transceiver (230) that is connected to a network to perform communication. Additionally, the communication node (200) may further include an input interface device (240), an output interface device (250), a storage device (260), etc. Each component included in the communication node (200) may be connected by a bus (270) to communicate with one another.

[0059] The processor (210) can execute a program command stored in at least one of the memory (220) and the storage device (260). The processor (210) may mean a central processing unit (CPU), a graphics processing unit (GPU), or a dedicated processor on which the methods according to embodiments of the present disclosure are performed. Each of the memory (220) and the storage device (260) may be composed of at least one of a volatile storage medium and a non-volatile storage medium. For example, the memory (220) may be composed of at least one of read-only memory (ROM) and random access memory (RAM).

[0060] Referring again to FIG. 1, the communication system (100) may include a plurality of base stations (110-1, 110-2, 110-3, 120-1, 120-2) and a plurality of terminals (130-1, 130-2, 130-3, 130-4, 130-5, 130-6). Each of the first base station (110-1), the second base station (110-2), and the third base station (110-3) may form a macro cell. Each of the fourth base station (120-1) and the fifth base station (120-2) may form a small cell. The fourth base station (120-1), the third terminal (130-3), and the fourth terminal (130-4) may be located within the cell coverage of the first base station (110-1). The second terminal (130-2), the fourth terminal (130-4), and the fifth terminal (130-5) may be located within the cell coverage of the second base station (110-2). The fifth base station (120-2), the fourth terminal (130-4), the fifth terminal (130-5), and the sixth terminal (130-6) may be located within the cell coverage of the third base station (110-3). The first terminal (130-1) may be located within the cell coverage of the fourth base station (120-1). The sixth terminal (130-6) may be located within the cell coverage of the fifth base station (120-2).

[0061] Here, each of the multiple base stations (110-1, 110-2, 110-3, 120-1, 120-2) may be referred to as NB (NodeB), eNB (evolved NodeB), gNB, ABS (advanced base station), HR-BS (high reliability-base station), BTS (base transceiver station), radio base station, radio transceiver, access point, access node, RAS (radio access station), MMR-BS (mobile multihop relay-base station), RS (relay station), ARS (advanced relay station), HR-RS (high reliability-relay station), HNB (home NodeB), HeNB (home eNodeB), RSU (road side unit), RRH (radio remote head), TP (transmission point), TRP (transmission and reception point), etc.

[0062] Each of the multiple terminals (130-1, 130-2, 130-3, 130-4, 130-5, 130-6) may be referred to as UE (user equipment), TE (terminal equipment), AMS (advanced mobile station), HR-MS (high reliability-mobile station), terminal, access terminal, mobile terminal, station, subscriber station, mobile station, portable subscriber station, node, device, OBU (on board unit), etc.

[0063] Meanwhile, each of the multiple base stations (110-1, 110-2, 110-3, 120-1, 120-2) may operate in different frequency bands or in the same frequency band. Each of the multiple base stations (110-1, 110-2, 110-3, 120-1, 120-2) may be connected to each other via an ideal backhaul link or a non-ideal backhaul link, and may exchange information with each other via an ideal backhaul link or a non-ideal backhaul link. Each of the multiple base stations (110-1, 110-2, 110-3, 120-1, 120-2) may be connected to a core network via an ideal backhaul link or a non-ideal backhaul link. Each of the multiple base stations (110-1, 110-2, 110-3, 120-1, 120-2) can transmit a signal received from the core network to the corresponding terminal (130-1, 130-2, 130-3, 130-4, 130-5, 130-6), and can transmit a signal received from the corresponding terminal (130-1, 130-2, 130-3, 130-4, 130-5, 130-6) to the core network.

[0064] In addition, each of the multiple base stations (110-1, 110-2, 110-3, 120-1, 120-2) can support MIMO transmission (e.g., SU (single user)-MIMO, MU (multi user)-MIMO, massive MIMO, etc.), CoMP (coordinated multipoint) transmission, carrier aggregation (CA) transmission, transmission in an unlicensed band, sidelink communication (e.g., D2D (device to device communication), ProSe (proximity services)), IoT (Internet of Things) communication, dual connectivity (DC), etc. Here, each of the plurality of terminals (130-1, 130-2, 130-3, 130-4, 130-5, 130-6) can perform an operation corresponding to the base station (110-1, 110-2, 110-3, 120-1, 120-2) and an operation supported by the base station (110-1, 110-2, 110-3, 120-1, 120-2). For example, the second base station (110-2) can transmit a signal to the fourth terminal (130-4) based on the SU-MIMO method, and the fourth terminal (130-4) can receive a signal from the second base station (110-2) based on the SU-MIMO method. Alternatively, the second base station (110-2) can transmit a signal to the fourth terminal (130-4) and the fifth terminal (130-5) based on the MU-MIMO method, and each of the fourth terminal (130-4) and the fifth terminal (130-5) can receive a signal from the second base station (110-2) by the MU-MIMO method.

[0065] Each of the first base station (110-1), the second base station (110-2), and the third base station (110-3) can transmit a signal to the fourth terminal (130-4) based on the CoMP method, and the fourth terminal (130-4) can receive a signal from the first base station (110-1), the second base station (110-2), and the third base station (110-3) by the CoMP method. Each of the multiple base stations (110-1, 110-2, 110-3, 120-1, 120-2) can transmit and receive signals based on the CA method with terminals (130-1, 130-2, 130-3, 130-4, 130-5, 130-6) within its cell coverage area. Each of the first base station (110-1), the second base station (110-2), and the third base station (110-3) can control sidelink communication between the fourth terminal (130-4) and the fifth terminal (130-5), and each of the fourth terminal (130-4) and the fifth terminal (130-5) can perform sidelink communication by controlling each of the second base station (110-2) and the third base station (110-3).

[0066] Meanwhile, communication nodes performing communication in a communication network may be configured as follows. The communication node shown in FIG. 3 may be a specific embodiment of the communication node shown in FIG. 2.

[0067] FIG. 3 is a block diagram illustrating embodiments of communication nodes performing communication.

[0068] Referring to FIG. 3, the first communication node (300a) and the second communication node (300b) may each be a base station or a UE. The first communication node (300a) may transmit a signal to the second communication node (300b). A transmission processor (311) included in the first communication node (300a) may receive data (e.g., a data unit) from a data source (310). The transmission processor (311) may receive control information from a controller (316). The control information may include at least one of system information, RRC setting information (e.g., information set by RRC signaling), MAC control information (e.g., MAC CE), or PHY control information (e.g., DCI, SCI).

[0069] The transmitting processor (311) can generate data symbol(s) by performing processing operations on data (e.g., encoding operations, symbol mapping operations, etc.). The transmitting processor (311) can generate control symbol(s) by performing processing operations on control information (e.g., encoding operations, symbol mapping operations, etc.). Additionally, the transmitting processor (311) can generate synchronization / reference symbol(s) for synchronization signals and / or reference signals.

[0070] The Tx MIMO processor (312) can perform spatial processing operations (e.g., precoding operations) on data symbol(s), control symbol(s), and / or synchronization / reference symbol(s). The output of the Tx MIMO processor (312) (e.g., a symbol stream) can be provided to modulators (MODs) included in transceivers (313a to 313t). The modulators (MODs) can perform processing operations on the symbol stream to generate modulated symbols and perform additional processing operations on the modulated symbols (e.g., analog conversion operations, amplification operations, filtering operations, up-conversion operations) to generate signals. The signals generated by the modulators (MODs) of the transceivers (313a to 313t) can be transmitted through antennas (314a to 314t).

[0071] Signals transmitted by the first communication node (300a) can be received at the antennas (364a to 364r) of the second communication node (300b). Signals received at the antennas (364a to 364r) can be provided to demodulators (DEMODs) included in the transceivers (363a to 363r). The demodulators (DEMODs) can obtain samples by performing processing operations on the signals (e.g., filtering, amplification, down-conversion, digital conversion). The demodulators (DEMODs) can obtain symbols by performing additional processing operations on the samples. The MIMO detector (362) can perform MIMO detection operations on the symbols. The receiving processor (361) can perform processing operations on the symbols (e.g., deinterleaving, decoding). The output of the receiving processor (361) can be provided to the data sink (360) and the controller (366). For example, data can be provided to the data sink (360), and control information can be provided to the controller (366).

[0072] Meanwhile, the second communication node (300b) can transmit a signal to the first communication node (300a). The transmission processor (368) included in the second communication node (300b) can receive data (e.g., a data unit) from the data source (367) and can generate data symbol(s) by performing a processing operation on the data. The transmission processor (368) can receive control information from the controller (366) and can generate control symbol(s) by performing a processing operation on the control information. Additionally, the transmission processor (368) can generate reference symbol(s) by performing a processing operation on a reference signal.

[0073] The Tx MIMO processor (369) can perform spatial processing operations (e.g., precoding operations) on data symbol(s), control symbol(s), and / or reference symbol(s). The output of the Tx MIMO processor (369) (e.g., a symbol stream) can be provided to modulators (MODs) included in transceivers (363a to 363t). The modulators (MODs) can perform processing operations on the symbol stream to generate modulated symbols and perform additional processing operations on the modulated symbols (e.g., analog conversion operations, amplification operations, filtering operations, up-conversion operations) to generate signals. The signals generated by the modulators (MODs) of the transceivers (363a to 363t) can be transmitted through antennas (364a to 364t).

[0074] Signals transmitted by the second communication node (300b) can be received at the antennas (314a to 314r) of the first communication node (300a). Signals received at the antennas (314a to 314r) can be provided to demodulators (DEMODs) included in the transceivers (313a to 313r). The demodulators (DEMODs) can obtain samples by performing processing operations on the signals (e.g., filtering operation, amplification operation, down-conversion operation, digital conversion operation). The demodulators (DEMODs) can obtain symbols by performing additional processing operations on the samples. The MIMO detector (320) can perform MIMO detection operations on the symbols. The receiving processor (319) can perform processing operations on the symbols (e.g., deinterleaving operation, decoding operation). The output of the receiving processor (319) can be provided to the data sink (318) and the controller (316). For example, data can be provided to the data sink (318), and control information can be provided to the controller (316).

[0075] The memories (315 and 365) may store data, control information, and / or program code. The scheduler (317) may perform scheduling operations for communication. The processors (311, 312, 319, 361, 368, 369) and controllers (316, 366) shown in FIG. 3 may be the processor (210) shown in FIG. 2 and may be used to perform the methods described in this disclosure.

[0076] FIG. 4a is a block diagram illustrating embodiments of a transmission path, and FIG. 4b is a block diagram illustrating embodiments of a reception path.

[0077] Referring to FIGS. 4a and 4b, a transmission path (410) may be implemented at a communication node that transmits a signal, and a reception path (420) may be implemented at a communication node that receives a signal. The transmission path (410) may include a channel coding and modulation block (411), an S-to-P (serial-to-parallel) block (412), an N IFFT (Inverse Fast Fourier Transform) block (413), a P-to-S (parallel-to-serial) block (414), a CP (cyclic prefix) addition block (415), and an UC (up-converter) (UC) (416). The reception path (420) may include a DC (down-converter) (421), a CP removal block (422), an S-to-P block (423), an N FFT block (424), a P-to-S block (425), and a channel decoding and demodulation block (426). Here, N can be a natural number.

[0078] Information bits in the transmission path (410) can be input to the channel coding and modulation block (411). The channel coding and modulation block (411) can perform coding operations (e.g., LDPC (low-density parity check) (LDPC) coding operations, polar coding operations, etc.) and modulation operations (e.g., QPSK (Quadrature Phase Shift Keying), QAM (Quadrature Amplitude Modulation), etc.) on the information bits. The output of the channel coding and modulation block (411) may be a sequence of modulation symbols.

[0079] The S-to-P block (412) can convert modulated symbols in the frequency domain into parallel symbol streams to generate N parallel symbol streams. N can be the IFFT size or the FFT size. The N IFFT block (413) can generate signals in the time domain by performing an IFFT operation on the N parallel symbol streams. The P-to-S block (414) can convert the output of the N IFFT block (413) (e.g., parallel signals) into a serial signal to generate a serial signal.

[0080] The CP addition block (415) can insert CP into the signal. The UC (416) can up-convert the frequency of the output of the CP addition block (415) to an RF (radio frequency) frequency. Additionally, the output of the CP addition block (415) can be filtered in the baseband before up-conversion.

[0081] A signal transmitted from the transmission path (410) can be input to the reception path (420). The operation in the reception path (420) may be the inverse operation of the operation in the transmission path (410). The DC (421) may down-convert the frequency of the received signal to a baseband frequency. The CP removal block (422) may remove CP from the signal. The output of the CP removal block (422) may be a serial signal. The S-to-P block (423) may convert the serial signal into parallel signals. The N FFT block (424) may generate N parallel signals by performing an FFT algorithm. The P-to-S block (425) may convert the parallel signals into a sequence of modulation symbols. The channel decoding and demodulation block (426) may perform a demodulation operation on the modulation symbols and perform a decoding operation on the result of the demodulation operation to restore the data.

[0082] In FIGS. 4a and 4b, Discrete Fourier Transform (DFT) and Inverse DFT (IDFT) may be used instead of FFT and IFFT. In FIGS. 4a and 4b, each of the blocks (e.g., components) may be implemented by at least one of hardware, software, or firmware. For example, in FIGS. 4a and 4b, some blocks may be implemented by software, and the remaining blocks may be implemented by hardware or a "combination of hardware and software." In FIGS. 4a and 4b, one block may be subdivided into multiple blocks, multiple blocks may be integrated into one block, some blocks may be omitted, and blocks supporting other functions may be added.

[0083] FIG. 5 is a conceptual diagram illustrating embodiments of a system frame in a communication system.

[0084] Referring to FIG. 5, time resources in a communication system can be divided into frames. For example, system frames can be set consecutively in the time domain of the communication system. The length of a system frame can be 10 ms (millisecond). The system frame number (SFN) can be set from #0 to #1023. In this case, 1024 system frames can be repeated in the time domain of the communication system. For example, the SFN of a system frame after system frame #1023 can be #0.

[0085] A single system frame may contain two half frames. The length of a single half frame may be 5ms. A half frame located at the beginning of the system frame may be referred to as "Half Frame #0", and a half frame located at the end of the system frame may be referred to as "Half Frame #1". A system frame may contain 10 subframes. The length of a single subframe may be 1ms. Within a single system frame, the 10 subframes may be referred to as "Subframe #0-9".

[0086] FIG. 6 is a conceptual diagram illustrating embodiments of subframes in a communication system.

[0087] Referring to FIG. 6, one subframe may include n slots, where n is a natural number. Thus, one subframe may consist of one or more slots.

[0088] FIG. 7 is a conceptual diagram illustrating embodiments of slots in a communication system.

[0089] Referring to FIG. 7, a slot may contain one or more symbols. A slot illustrated in FIG. 7 may contain 14 symbols. The length of the slot may vary depending on the number of symbols included in the slot and the length of the symbols. Alternatively, the length of the slot may vary depending on the numerology.

[0090] Numerals applied to physical signals and channels in a communication system may be variable. Numerals may be variable to meet various technical requirements of the communication system. In a communication system where CP (cyclic prefix) based OFDM waveform technology is applied, numerals may include subcarrier spacing and CP length (or CP type). Table 1 may be a first embodiment of a method for configuring numerals for a CP-OFDM based communication system. Depending on the frequency band in which the communication system operates, at least some of the numerals in Table 1 may be supported. Additionally, numerals not listed in Table 1 may be further supported in the communication system.

[0091]

[0092] When the subcarrier spacing is 15 kHz (e.g., μ=0), the slot length may be 1 ms. In this case, one system frame may contain 10 slots. When the subcarrier spacing is 30 kHz (e.g., μ=1), the slot length may be 0.5 ms. In this case, one system frame may contain 20 slots.

[0093] When the subcarrier spacing is 60 kHz (e.g., μ=2), the slot length may be 0.25 ms. In this case, one system frame may contain 40 slots. When the subcarrier spacing is 120 kHz (e.g., μ=3), the slot length may be 0.125 ms. In this case, one system frame may contain 80 slots. When the subcarrier spacing is 240 kHz (e.g., μ=4), the slot length may be 0.0625 ms. In this case, one system frame may contain 160 slots.

[0094] A symbol can be set as a downlink (DL) symbol, a flexible (FL) symbol, or an uplink (UL) symbol. A slot consisting only of a DL symbol may be referred to as a "DL slot," a slot consisting only of an FL symbol may be referred to as a "FL slot," and a slot consisting only of a UL symbol may be referred to as a "UL slot."

[0095] The slot format can be semi-fixed by upper-layer signaling (e.g., RRC signaling). Information indicating the semi-fixed slot format may be included in system information, and the semi-fixed slot format can be set cell-specifically. Additionally, the semi-fixed slot format can be additionally set per terminal through terminal-specific upper-layer signaling (e.g., RRC signaling). The flexible symbols of the cell-specific slot format can be overridden as downlink symbols or uplink symbols by the terminal-specific upper-layer signaling. Furthermore, the slot format can be dynamically indicated by physical layer signaling (e.g., the SFI (slot format indicator) included in the DCI). The semi-fixed slot format can be overridden by the dynamically indicated slot format. For example, the semi-fixed flexible symbols can be overridden as downlink symbols or uplink symbols by the SFI.

[0096] The reference signal may be a CSI-RS (channel state information-reference signal), SRS (sounding reference signal), DM-RS (demodulation-reference signal), PT-RS (phase tracking-reference signal), etc. The channel may be a PBCH (physical broadcast channel), PDCCH (physical downlink control channel), PDSCH (physical downlink shared channel), PUCCH (physical uplink control channel), PUSCH (physical uplink shared channel), PSCCH (physical sidelink control channel), PSSCH (physical sidelink shared channel), etc. In the present disclosure, the control channel may mean PDCCH, PUCCH, or PSCCH, and the data channel may mean PDSCH, PUSCH, or PSSCH.

[0097] FIG. 8 is a conceptual diagram illustrating embodiments of time-frequency resources in a communication system.

[0098] Referring to FIG. 8, a resource consisting of one symbol (e.g., an OFDM symbol) in the time domain and one subcarrier in the frequency domain can be defined as a "RE (resource element)." A resource consisting of one OFDM symbol in the time domain and K subcarriers in the frequency domain can be defined as a "REG (resource element group)." A REG can include K REs. A REG can be used as the basic unit of resource allocation in the frequency domain. K can be a natural number. For example, K can be 12. N can be a natural number. In the slot illustrated in FIG. 7, N can be 14. N OFDM symbols can be used as the basic unit of resource allocation in the time domain.

[0099] In the present disclosure, RB may mean a common RB (CRB). Alternatively, RB may mean a physical RB (PRB) or a virtual RB (VRB). In a communication system, a CRB may mean an RB that constitutes a set of consecutive RBs (e.g., a common RB grid) with respect to a reference frequency (e.g., point A). A carrier and / or bandwidth portion may be placed on the common RB grid. That is, the carrier and / or bandwidth portion may be composed of CRB(s). An RB or CRB constituting the bandwidth portion may be referred to as a PRB, and within the bandwidth portion, a CRB index may be appropriately converted to a PRB index.

[0100] Downlink data may be transmitted via PDSCH. A base station may transmit configuration information of the PDSCH (e.g., scheduling information) to a terminal via PDCCH. A terminal may obtain the configuration information of the PDSCH by receiving the PDCCH (e.g., downlink control information (DCI)). For example, the configuration information of the PDSCH may include a modulation coding scheme (MCS) used for transmitting and receiving the PDSCH, time resource information of the PDSCH, frequency resource information of the PDSCH, feedback resource information for the PDSCH, etc. PDSCH may refer to a radio resource where downlink data is transmitted and received. Alternatively, PDSCH may refer to the downlink data itself. PDCCH may refer to a radio resource where downlink control information (e.g., DCI) is transmitted and received. Alternatively, PDCCH may refer to the downlink control information itself.

[0101] The terminal may perform a monitoring operation for the PDCCH to receive the PDSCH transmitted from the base station. The base station may notify the terminal of configuration information for the monitoring operation of the PDCCH using a higher-layer message (e.g., a radio resource control (RRC) message). The configuration information for the monitoring operation of the PDCCH may include CORESET (control resource set) information and search space information.

[0102] CORESET information may include PDCCH DMRS (demodulation reference signal) information, PDCCH precoding information, PDCCH occasion information, etc. The PDCCH DMRS may be a DMRS used to demodulate the PDCCH. A PDCCH occasion may be an area where the PDCCH can exist. That is, a PDCCH occasion may be an area where DCI can be transmitted. A PDCCH occasion may be referred to as a PDCCH candidate. PDCCH occasion information may include time resource information and frequency resource information of the PDCCH occasion. In the time domain, the length of the PDCCH occasion may be indicated in symbol units. In the frequency domain, the size of the PDCCH occasion may be indicated in RB units (e.g., PRB (physical resource block) units or CRB (common resource block) units).

[0103] The search space information may include a CORESET ID (identifier) ​​associated with the search space, the period of PDCCH monitoring, and / or an offset. The period and offset of PDCCH monitoring may each be specified in slot units. Additionally, the search space information may further include the index of the symbol where the PDCCH monitoring operation begins.

[0104] A base station may configure a Bandwidth Part (BWP) for downlink communication. BWPs may be configured differently for each terminal. The base station may notify the terminal of the BWP configuration information using upper-layer signaling. Upper-layer signaling may refer to "transmission operations of system information" and / or "transmission operations of Radio Resource Control (RRC) messages." One or more BWPs may be configured for a single terminal. The terminal may receive BWP configuration information from the base station and identify the BWP(s) configured by the base station based on the BWP configuration information. If multiple BWPs are configured for downlink communication, the base station may activate one or more of the multiple BWPs. The base station may transmit the configuration information of the activated BWP(s) to the terminal using at least one of upper-layer signaling, a Medium Access Control (MAC) Control Element (CE), or a DCI. The base station may perform downlink communication using the activated BWP(s). The terminal can identify the activated BWP(s) by receiving configuration information of the activated BWP(s) from the base station, and can perform a downlink reception operation on the activated BWP(s).

[0105] Meanwhile, communication systems (e.g., NR communication systems, 5G communication systems, 6G communication systems) can support usage scenarios such as eMBB (enhanced Mobile BroadBand), URLLC (Ultra Reliable Low Latency Communication), and mMTC (massive Machine Type Communication). Communication systems (e.g., communication networks) can support SBFD (subband full duplex) operation.

[0106] A communication system may support the time division duplexing (TDD) method. In a communication system that supports the TDD method (hereinafter referred to as the "TDD communication system"), DL (downlink) symbol(s) and UL (uplink) symbol(s) may be set in different time resources within a single carrier. DL symbols and UL symbols may be associated with coverage and / or latency. In a TDD communication system, the base station can utilize resources more efficiently than the frequency division duplexing (FDD) method by considering various use cases. Resource scheduling operations of the base station in a TDD communication system may be important. For enhanced TDD operation, SBFD operations (e.g., SBFD method) may be supported. If SBFD operations are supported in a TDD communication system, DL communication (e.g., transmission and reception of DL signals) and UL communication (e.g., transmission and reception of UL signals) may be performed simultaneously within the same time resource. For example, within the same time resource, some subbands may be DL subbands, and other subbands may be UL subbands and / or FL subbands. In this disclosure, the DL signal may be interpreted as a DL signal, a DL channel, or "DL signal and DL channel" depending on the context. In this disclosure, the UL signal may be interpreted as a UL signal, a UL channel, or "UL signal and UL channel" depending on the context.

[0107] Symbols to which SBFD operations are applied may be referred to as SBFD symbols. Symbols to which SBFD operations are not applied may be referred to as N(non)-SBFD symbols. N-SBFD symbols may be DL symbols, UL symbols, or FL symbols. In an SBFD symbol, the terminal can perform DL communication and UL communication. In other words, in an SBFD symbol, the terminal can perform full-duplex operation. The base station may assume that DL communication and UL communication are possible in an SBFD symbol. In an N-SBFD symbol, the terminal can perform one of DL communication and UL communication. In other words, in an N-SBFD symbol, the terminal can perform half-duplex operation. An SBFD symbol may be a symbol that includes a subband to which SBFD operations are performed. The subband for SBFD may be referred to or interpreted as a UL subband. The UL subband can exist (e.g., be configured) within the symbol where the SSB (synchronization signal block) is transmitted.

[0108] Resources for SBFD operation (e.g., time resources and / or frequency resources) may be configured in a semi-static manner. In other words, the configuration for SBFD resources may be a semi-static configuration. "That the SBFD resource configuration is a semi-static configuration" may mean that the SBFD resource is configured by semi-static signaling (e.g., system information, RRC messages). In this disclosure, SBFD resources may refer to time resources and / or frequency resources for SBFD operation. UL subbands for SBFD may be SBFD resources. Alternatively, SBFD resources may be configured in a dynamic manner. "That the SBFD resource configuration is a dynamic configuration" may mean that the SBFD resource is configured by dynamic signaling (e.g., MAC CE, DCI, SCI).

[0109] SBFD resources (e.g., UL subband, SBFD symbol) may be configured within DL resources and / or FL (flexible) resources configured by TDD-UL-DL configuration common information (e.g., TDD-UL-DL-ConfigCommon). In the time domain, the transition point from an N-SBFD symbol to an SBFD symbol may be limited to one. In the time domain, the transition point from an SBFD symbol to an N-SBFD symbol may be limited to one. Regarding the resource configuration of a subband for SBFD, it may be desirable for the terminal to be aware of the resource configuration information of the subband for SBFD in advance.

[0110] TDD-UL-DL configuration common information can be used to configure patterns (e.g., TDD-UL-DL-Pattern) for DL ​​resources and / or UL resources in the time domain of a TDD communication system. Patterns for DL ​​resources and / or UL resources may be referred to as UL / DL patterns. UL / DL patterns may change depending on the environment of the communication system (e.g., TDD communication system). Up to two UL / DL patterns may be configured on a terminal. TDD-UL-DL configuration common information may be cell-specific parameters (e.g., cell-specific configuration information). The base station may change the configuration for symbol(s) (e.g., transmission direction, type) on a terminal-by-terminal basis based on a specific slot within a preset UL / DL pattern. The slot where the symbol configuration (e.g., symbol direction, symbol type) can be changed may be a slot configured as an FL resource by the TDD-UL-DL configuration common information. The symbol direction (e.g., symbol transmission direction) and / or symbol type may be DL, UL, or FL. The RRC signaling used to change the configuration of an FL slot (e.g., FL resource) may be TDD-UL-DL configuration-dedicated information (e.g., TDD-UL-DL-ConfigDedicated). Table 2 may be TDD-UL-DL configuration common information, and Tables 3 and 4 may be TDD-UL-DL configuration-dedicated information.

[0111]

[0112]

[0113]

[0114] The UL / DL pattern, configured by the common information of the TDD-UL-DL configuration, may be repeated according to a specific period (e.g., dl-UL-TransmissionPeriodicity). In the time interval where the UL / DL pattern is applied, the leading portion may be configured as a DL resource. In the time interval where the UL / DL pattern is applied, the trailing portion may be configured as a UL resource. Resources that are not configured as DL or UL resources in the time interval where the UL / DL pattern is applied may be FL resources. The period of the UL / DL pattern may vary depending on the reference numerology. A guard time (e.g., guard gap) may be required for switching (e.g., transition) from a DL resource (e.g., DL symbol / slot) to a UL resource (e.g., UL symbol / slot). Since the propagation delay of the DL signal causes interference to the UL resource, a guard time may be required for switching from a DL resource to a UL resource. A separate guard time may not be required for switching from UL resources to DL resources. Since UL signals are transmitted based on TAC (timing advance command) directed by the base station, a guard time may not be required for switching from UL resources to DL resources.

[0115] TDD-UL-DL configuration common information (e.g., TDD-UL-DL-ConfigCommon) may be referred to as "TDD Common" or "TDD Common Information". TDD-UL-DL configuration dedicated information (e.g., TDD-UL-DL-ConfigDedicated) may be referred to as "TDD Dedicated" or "TDD Dedicated Information". UL subband may refer to a subband for SBFD. DL symbol(s) and / or DL ​​slot(s) may be referred to as DL area(or DL ​​resource). UL symbol(s) and / or UL slot(s) may be referred to as UL area(or UL resource). FL symbol(s) and / or FL slot(s) may be referred to as FL area(or FL resource). A terminal that supports (e.g. recognizes) SBFD operation may be referred to as an SBFD terminal or SBFD UE. A terminal that does not support (e.g., does not recognize) SBFD operation may be referred to as an N(non)-SBFD terminal or an N-SBFD UE. An N-SBFD terminal may be a legacy terminal (e.g., a legacy UE). In this disclosure, a terminal may be interpreted as an SBFD terminal and / or an N-SBFD terminal depending on the context. Legacy settings (e.g., legacy information, legacy settings information) may be information for an N-SBFD terminal.

[0116] An SBFD resource may be located adjacent to (e.g., contiguously) an N-SBFD resource. An SBFD resource may refer to an SBFD symbol and / or an SBFD slot. An N-SBFD resource may refer to an N-SBFD symbol and / or an N-SBFD slot. SBFD symbols and N-SBFD symbols may be located contiguously or discontinuously within a single slot. In slots (e.g., adjacent slots, contiguous slots), SBFD symbols and N-SBFD symbols may exist adjacently. The types of adjacent symbols (e.g., SBFD symbols or N-SBFD symbols) may be the same or different. The operation of the terminal may vary based on the types of adjacent symbols (e.g., the same symbol type or different symbol types).

[0117] A communication system supporting SBFD may support two SBFD configurations (e.g., SBFD configuration 1, SBFD configuration 2). SBFD configuration 1 may be referred to as configuration 1, SBFD transmission configuration 1, or SBFD configuration 1 transmission. SBFD configuration 2 may be referred to as configuration 2, SBFD transmission configuration 2, or SBFD configuration 2 transmission. If SBFD configuration 1 is configured on a terminal (e.g., indicated), the terminal may perform communication (e.g., downlink communication and / or uplink communication) using the same symbol type (e.g., SBFD symbol or N-SBFD symbol). If SBFD configuration 2 is configured on a terminal (e.g., indicated), the terminal may perform communication (e.g., downlink communication and / or uplink communication) using different symbol types (e.g., SBFD symbol and N-SBFD symbol). An SBFD terminal may operate based on one of SBFD settings, SBFD setting 1 and SBFD setting 2. Among SBFD setting 1 and SBFD setting 2, SBFD setting 1 may be the default setting. For example, if there is no separate instruction regarding SBFD settings, the SBFD terminal may operate based on SBFD setting 1. If the base station instructs the terminal to SBFD setting 2 (for example, if SBFD setting 2 is enabled), the SBFD terminal may operate based on SBFD setting 2. Symbol types may be classified into SBFD symbols and N-SBFD symbols. Depending on the context, a symbol type may be interpreted as a symbol having the said symbol type (e.g., a resource).

[0118] Meanwhile, in a communication system supporting SBFD, RACH (random access channel) setting 1 (e.g., Option 1) and RACH setting 2 (e.g., Option 2) may be supported. In a scenario where RACH setting 1 is applied, an RA procedure (e.g., PRACH transmission) in an SBFD resource may be performed based on a legacy RACH setting (e.g., legacy RACH setting information). A legacy RACH setting may refer to a RACH setting used for an RA procedure in an N-SBFD resource. In a scenario where RACH setting 2 is applied, additional RACH settings (e.g., additional RACH setting information) may be additionally set in addition to the legacy RACH setting, and an RA procedure in an N-SBFD resource may be performed based on the legacy RACH setting, while an RA procedure in an SBFD resource may be performed based on the additional RACH setting. Additional RACH setting information may be referred to as SBFD RACH setting information.

[0119] An additional RO (RACH occasion) may be configured differently depending on RACH settings 1 and 2. In scenarios where RACH setting 1 applies, an additional RO may refer to an RO configured only on SBFD symbols and an RO configured across SBFD symbols and N-SBFD symbols. In scenarios where RACH setting 2 applies, an additional RO may refer to an RO configured based on SBFD RACH settings. A legacy RO may refer to an RO configured based on legacy RACH settings. A legacy RO may be configured (e.g., located) on N-SBFD symbols. A legacy RO may be referred to as a first PRACH occupation and may be used for legacy terminals that do not support SBFD. An additional RO may be configured (e.g., located) on at least one of N-SBFD symbols or SBFD symbols. An additional RO may be referred to as a second PRACH occupation and may be used for SBFD terminals that support SBFD.

[0120] Based on the SBFD RACH configuration, there may be ROs configured in the N-SBFD resource. The SBFD terminal may determine (e.g., decide) that the RO configured in the N-SBFD resource is an invalid RO according to the SBFD RACH configuration, and may not perform a msg1 transmission or a msgA transmission on the invalid RO. In other words, the SBFD terminal may expect a msg1 transmission on the RO configured by the legacy RACH configuration within the N-SBFD resource, and may expect a msg1 transmission on the RO configured by the SBFD RACH configuration within the SBFD resource. In this disclosure, a msg1 transmission may be interpreted to include not only a msg1 transmission but also a msgA transmission. At least some of the transmit power parameters for the legacy RACH configuration and the SBFD RACH configuration, respectively, may be configured independently.

[0121] Considering the SBFD characteristics, the resources for msg3 may be established in SBFD symbols (e.g., a resource area consisting of SBFD symbols) and N-SBFD symbols (e.g., a resource area consisting of N-SBFD symbols). In the RACH procedure, msg3 may be transmitted in PUSCH. In this disclosure, the resources for msg3 may be referred to as msg3 PUSCH (e.g., the msg3 PUSCH resource). Due to transmission and reception constraints based on the symbol type and / or physical time constraints due to variations in the link / channel (e.g., uplink, downlink), the terminal may not be able to perform msg3 PUSCH transmission in the established resources.

[0122] In terms of frequency resources, an SBFD terminal can perform receive operations within a DL usable PRB and transmit operations within a UL usable PRB(s). The relationship between an active UL BWP and UL usable PRB(s) has been defined, but the relationship between an active UL BWP and an initial BWP has not been defined. Therefore, a clear description of the setup and transmission of msg3 PUSCH is required, and methods for the setup and transmission of msg3 PUSCH will be proposed in this disclosure. The embodiments proposed in this disclosure will be described with a focus on the setup and transmission of msg3 PUSCH, but they may be applied in the same or similarly to the setup and transmission of other messages in the RACH procedure as well as msg3 PUSCH. The embodiments proposed in this disclosure may be applied in the same or similarly to a default BWP.

[0123] An SBFD terminal can perform a receive operation within a DL available PRB and a transmit operation within UL available PRB(s). A DL available PRB may be a frequency resource that overlaps with a DL subband within an active DL BWP in the frequency domain. A UL available PRB(s) may be a frequency resource that overlaps with a UL subband within an active UL BWP in the frequency domain. A UL subband may be indicated by SBFD configuration information signaled by a base station. A terminal that has not established an RRC connection with a base station may perform a RACH procedure in an initial BWP. The operation described above in this disclosure (e.g., a RACH procedure) may be defined as Scenario #1. A terminal that has established an RRC connection with a base station may perform a RACH procedure in a separate BWP (e.g., an active BWP) other than the initial BWP. The operation described above in this disclosure (e.g., a RACH procedure) may be defined as Scenario #2. Methods for setting up and sending msg3 PUSCH in Scenarios #1 and #2, respectively, will be described.

[0124] - Scenario #1

[0125] It may not be possible to set up additional BWPs per terminal during the initial connection phase. The terminal can transmit msg1 to the base station within the initial BWP. The base station can receive msg1 from the terminal and transmit msg2 to the terminal in response to msg1. The terminal can receive msg2 from the base station. The terminal can expect to transmit msg3 (e.g., msg3 PUSCH transmission) within the initial BWP. After establishing an RRC connection with the base station, the terminal can perform a RACH procedure for beam failure recovery or handover. In this case, the terminal can expect to transmit msg3 (e.g., msg3 PUSCH transmission) within the established UL BWP (e.g., active UL BWP). The setup and transmission of msg3 PUSCH during the initial connection phase can be distinguished from the setup and transmission of msg3 PUSCH after the terminal establishes an RRC connection with the base station.

[0126] During the initial connection phase, the RACH procedure may be performed at an initial UL BWP configured by the base station's cell common parameters. Since an active UL BWP is not configured on the terminal (e.g., because the UL BWP is not activated), definition of the UL available PRB(s) for the RACH procedure may be required during the initial connection phase. The RACH procedure of an N-SBFD terminal can be considered to be performed at the initial UL BWP. The base station may transmit configuration information (e.g., additional configuration information) for a UL subband capable of UL communication (e.g., UL transmission) to the SBFD terminal via signaling. The UL subband may be indicated by cell-specific parameters. The SBFD terminal may receive configuration information for the UL subband via the base station's signaling. The SBFD terminal may perform UL communication (e.g., the RACH procedure) on the UL subband.

[0127] FIGS. 9A and 9B are conceptual diagrams illustrating the configuration of the UL subband during the initial connection phase.

[0128] Referring to FIGS. 9a and 9b, the base station may set a UL subband to a terminal (e.g., an SBFD terminal) independently of the initial UL BWP. In the embodiment of FIG. 9a, the UL subband may overlap with the initial UL BWP in the frequency domain. In the embodiment of FIG. 9b, the UL subband may not overlap with the initial UL BWP in the frequency domain. For an initial BWP that is not an active BWP, discussion of the UL available PRB(s) may be necessary. In this disclosure, an active BWP may be interpreted as an active UL BWP or an active DL BWP depending on the context, and an initial BWP may be interpreted as an initial UL BWP or an initial DL BWP depending on the context.

[0129] ■ Method #1

[0130] When replacing the initial BWP with an active BWP, the settings of the UL available PRB(s) may remain unchanged. In the embodiment of FIG. 9b (e.g., where the UL subband does not overlap with the initial UL BWP), the terminal may not expect to perform a RACH procedure in the UL subband. The terminal may expect that the initial BWP and the UL subband, as indicated by the cell-specific settings, are not configured to overlap less than a specific size in the frequency domain. The terminal may expect that the initial BWP and the UL subband, as indicated by the cell-specific settings, are configured to overlap at least by a specific size in the frequency domain. The terminal may expect that the initial BWP and the UL subband, as indicated by the cell-specific settings, are configured to overlap in the frequency domain. The specific size may be n REs or m RBs. n and m may each be natural numbers. For example, n may be 1 and m may be 1. A terminal (e.g., an SBFD terminal) can expect to receive configuration information from a base station for a UL subband that overlaps with the initial BWP in the frequency domain by at least n REs or m RBs.

[0131] ■ Method #2

[0132] Apart from the UL available PRB(s) defined based on the relationship between the active BWP and the UL subband, additional UL available PRB(s) for the initial BWP may be defined. The UL available PRB(s) for the initial BWP may be referred to as the initial UL available PRB(s). For a terminal prior to the establishment of an RRC connection with a base station and / or a terminal after the establishment of an RRC connection with a base station, the definitions / rules proposed in this disclosure may apply to the initial UL available PRB(s). A terminal after the establishment of an RRC connection with a base station may refer to a terminal with an active BWP established. In other words, for a terminal after the establishment of an RRC connection with a base station, the BWP may be activated.

[0133] A base station may instruct a terminal that has established an RRC connection with it to enable or disable the setting proposed in this disclosure through signaling (e.g., RRC message, MAC CE, DCI, etc.). If a disabled setting is received from the base station (e.g., if the base station instructs the disabled of the setting), the terminal may perform UL communication only in the UL-enabled PRB(s) defined as the overlapping area between the active BWP and the UL subband.

[0134] ■ Method #2-1

[0135] The terminal can camp in the initial UL BWP. In this case, the UL available PRB may be the entire UL subband configured specifically for the cell.

[0136] FIG. 10 is a conceptual diagram illustrating UL available PRB(s) for msg3 transmission.

[0137] Referring to FIG. 10, in Example A, the terminal before establishing an RRC connection with the base station and / or the terminal after establishing an RRC connection with the base station can interpret the entire UL subband as UL available PRB(s).

[0138] ■ Method #2-2

[0139] The base station may transmit the offset as well as the configuration information of the UL subband to the terminal (e.g., SBFD terminal) via signaling. The terminal may receive the configuration information of the UL subband and the offset via the base station's signaling. The offset may refer to a frequency offset. A communication node (e.g., base station and / or terminal) may determine the UL subband that overlaps with the frequency range indicated by the offset as the UL available PRB(s). When a single offset is set, the median value of the offset may be the center frequency of the initial BWP (e.g., initial UL BWP). Alternatively, the starting point of the offset may be the center frequency of the initial BWP. In this case, the UL subband that overlaps with the frequency range between the point offset in the positive direction from the center frequency of the initial BWP and the point offset in the negative direction from the center frequency of the initial BWP may be determined as the UL available PRB(s). The method for determining the above-described UL available PRB(s) may be Example B illustrated in FIG. 10.

[0140] Alternatively, the starting point of the offset may be set to the lowest frequency resource of the initial BWP (e.g., lowest RB, lowest SC (subcarrier)) or the highest frequency resource of the initial BWP (e.g., highest RB, highest SC). One or more offsets may be set on the terminal. The terminal may be expected to perform msg3 transmission in the UL subband within the offset from the aforementioned starting point. The offset may have a specific value on a conditional basis, and the specific value for the offset may be defined in the technical specifications. Alternatively, the base station may transmit the offset value to the terminal via signaling. The offset value may be included in the cell configuration information. The terminal may receive the offset value via the base station's signaling.

[0141] If the size of the determined UL available PRB(s) is larger than the initial BWP, the terminal can expect to perform msg3 transmission in a frequency range equal to the size of the initial BWP based on the lowest frequency resource of the initial BWP. To reuse information included in the RAR (random access response), the size of the UL available PRB(s) may be limited.

[0142] - Scenario #2

[0143] An RRC-connected terminal (e.g., a terminal operating in RRC-connected mode) may perform UL communication at an active UL BWP (e.g., a configured UL BWP). Channel conditions may deteriorate due to the movement of the terminal and / or obstacles. In this case, the terminal (e.g., an RRC-connected terminal) may perform a RACH procedure at the initial BWP. The above-described operation may be interpreted as the terminal performing UL communication at the initial BWP (e.g., an initial UL BWP). The frequency resources (e.g., UL available PRB(s)) at which the terminal can perform UL communication within the SBFD symbol(s) may be defined based on the relationship between the active BWP and the UL subband. For example, the overlapping frequency resources between the active BWP and the UL subband may be UL available PRB(s). The frequency domain (e.g., frequency resources) used for UL communication may vary based on the relationship between the initial BWP and the active BWP. Cases where the initial UL BWP and the active UL BWP overlap in the frequency domain and cases where the initial UL BWP and the active UL BWP do not overlap in the frequency domain can be considered.

[0144] In Scenario #2, a terminal (e.g., an SBFD terminal) may transmit msg1 to a base station in SBFD symbol(s) and / or N-SBFD symbol(s) within an active UL BWP (or, initial UL BWP), and the base station may receive msg1 from the terminal in SBFD symbol(s) and / or N-SBFD symbol(s) within an active UL BWP (or, initial UL BWP). The transmission of msg1 may be triggered by a PDCCH order. Alternatively, the transmission of msg1 may be initiated by the terminal without a PDCCH order. The base station may transmit msg2, which is a response to msg1, to the terminal, and the terminal may receive msg2, which is a response to msg1, from the base station. A communication node (e.g., a base station and / or a terminal) may determine a PUSCH resource for transmitting msg3 based on the initial UL BWP, the active UL BWP, and / or the configuration state (e.g., overlap state) of the UL subband. The UL subband may be indicated to the terminal by the signaling of the base station. The terminal may transmit msg3 to the base station in the determined PUSCH resource, and the base station may receive msg3 from the terminal in the determined PUSCH resource. The base station may transmit msg4 to the terminal in response to msg3, and the terminal may receive msg4 as a response to msg3 from the base station.

[0145] In the case where the initial UL BWP and the active UL BWP do not overlap in the frequency domain, the terminal may not expect to perform UL communication because the UL available PRB(s) determined based on the active BWP do not overlap with the initial BWP. The above-described embodiment may include a use case in Scenario #1. The method proposed in Scenario #1 may also be applied in Scenario #2. In Scenario #2, a method for setting up and transmitting msg3 PUSCH when the active BWP overlaps with the initial BWP in the frequency domain will be described.

[0146] A base station can set (e.g., instruct) an initial BWP (e.g., BWP #0) to a terminal based on two signaling methods (e.g., two configuration methods). According to the first signaling method, the base station can transmit cell common information containing configuration information of the initial BWP to the terminal. The terminal can receive the cell common information through the base station's signaling and verify the configuration information of the initial BWP included in the cell common information. The cell common information may further include a physical cell identifier (PCI), SSB information, subcarrier information, information required for UL communication, information required for DL ​​communication, etc. According to the second signaling method, the base station can transmit the configuration information of the initial BWP to the terminal via UE-specific signaling. The terminal can receive the configuration information of the initial BWP through the base station's UE-specific signaling. In the second signaling method, the configuration information of the initial BWP can be transmitted via both cell-specific signaling and UE-specific signaling. The initial BWP configuration information indicated by cell-specific signaling may be referred to as the first initial BWP configuration information. The initial BWP configuration information indicated by UE-specific signaling may be referred to as the second initial BWP configuration information.

[0147] A second initial BWP configuration information transmitted via UE-specific signaling may have a higher priority than a first initial BWP configuration information transmitted via cell-specific signaling. A terminal may connect by preferentially utilizing the initial BWP indicated by the UE-specific signaling. The configuration information of the initial BWP may include not only information about the BWP but also information about the physical channel (e.g., cell common information). The information about the physical channel included in the configuration information of the initial BWP may be information about uplink channels such as PUCCH, PUSCH, and PRACH. Additional BWP(s) may be configured on the terminal separately from the initial BWP. The configuration information of the additional BWP(s) may include UE-specific information (e.g., information configured per terminal).

[0148] If msg3 PUSCH transmission is performed based on a RAR UL grant or if msg3 PUSCH is not transmitted with PUCCH (e.g., if useInterlacePUCCH-PUSCH is not set (e.g., enabled), the PUSCH resource (e.g., msg3 PUSCH resource) in the frequency domain may be set as follows depending on the conditions.

[0149] ▶ Case #1: The subcarrier spacing (SCS) and cyclic prefix (CP) lengths may be the same in the active UL BWP and the initial UL BWP. If the active UL BWP in the frequency domain contains the initial UL BWP, or if the active UL BWP in the frequency domain is the initial UL BWP, the PUSCH resource may be set within the initial UL BWP. In other words, the base station may set the PUSCH resource within the initial UL BWP and transmit a msg2 containing the setting information of the PUSCH resource (e.g., UL grant) to the terminal. The terminal may identify the PUSCH resource indicated by the UL grant included in the msg2 received from the base station (e.g., msg3 PUSCH resource). The terminal may transmit msg3 PUSCH from the PUSCH resource set within the initial UL BWP. The base station may receive msg3 PUSCH from the PUSCH resource set within the initial UL BWP. The base station can transmit msg4 to the terminal in response to msg3 PUSCH. The terminal can receive msg4, which is the response to msg3 PUSCH, from the base station.

[0150] ▶ Case #2: If not in Case #1, the PUSCH resource may be configured (e.g., allocated) based on the lowest RB (e.g., the first RB) of the active BWP. In other words, the base station may transmit a msg2 to the terminal containing configuration information (e.g., UL grant) of the PUSCH resource configured based on the lowest RB (e.g., the first RB) of the active BWP. In this case, the maximum number of RBs configurable in the frequency domain may be configured to be equal to the size of the initial UL BWP. If not in Case #1, at least one of the following may be included: a state in which the SCS of the active UL BWP is different from the SCS of the initial UL BWP; a state in which the CP of the active UL BWP is different from the CP of the initial UL BWP; a state in which the active UL BWP does not include the initial UL BWP; or a state in which the active UL BWP and the initial UL BWP are different. The base station may transmit msg2 to the terminal containing configuration information (e.g., UL grant) of a PUSCH resource configured based on the lowest RB of the active BWP. The terminal may receive msg2 from the base station and identify the PUSCH resource indicated by the UL grant included in msg2 (e.g., msg3 PUSCH resource). The terminal may transmit msg3 PUSCH to the base station from the PUSCH resource configured based on the lowest RB of the active BWP. The base station may receive msg3 PUSCH from the PUSCH resource configured based on the lowest RB of the active BWP. The base station may transmit msg4 to the terminal in response to msg3 PUSCH. The terminal may receive msg4, which is a response to msg3 PUSCH, from the base station.

[0151] FIGS. 11a and FIGS. 11b are conceptual diagrams illustrating UL available PRB(s) for msg3 transmission.

[0152] The embodiment of FIG. 11a may be a configuration of frequency resources required for msg3 transmission within the SBFD symbol(s) in case #1. The active UL BWP may be larger than the initial UL BWP, and the SCS and CP lengths of the active UL BWP, respectively, may be equal to the SCS and CP lengths of the initial UL BWP. The msg3 resources (e.g., msg3 PUSCH resources) may be configured within the initial UL BWP. Considering the characteristics of the SBFD symbol(s), the frequency resources of the msg3 PUSCH (or msgB PCSCH) for the SBFD terminal may be configured to be smaller than the initial UL BWP. In this case, the terminal may not be able to transmit UL data even if UL data is present at the terminal.

[0153] In Case #1, depending on the location of the UL subband, there may be restrictions on PUSCH resource configuration by RAR in the frequency domain. The UL subband may be indicated by SBFD configuration information signaled by the base station. In the embodiment of FIG. 11a, PUSCH transmission (e.g., msg3 PUSCH transmission) may be performed within a frequency domain smaller than the initial UL BWP. In the embodiment of FIG. 11b, if the UL subband and the initial UL BWP do not overlap, the base station may not be able to configure the PUSCH resource (e.g., msg3 PUSCH resource) to the terminal. Different methods may be applied for each case, or a common method may be applied to the cases.

[0154] [When overlapping resources exist between the initial UL BWP and the UL subband in the frequency domain]

[0155] ■ Method #3

[0156] If the overlapping frequency range between the active BWP (e.g., existing active BWP) and the UL subband (e.g., UL available PRB(s)) is smaller than the initial BWP, the terminal may ignore the above-described setting (e.g., existing rule) and expect to perform msg3 PUSCH transmission based on the maximum size of the initial BWP. The base station may set the msg3 PUSCH (e.g., msg3 PUSCH resource) based on the maximum size of the initial BWP and transmit a RAR containing the setting information of the msg3 PUSCH (e.g., UL grant) to the terminal. The terminal may receive the RAR from the base station and check the setting information of the msg3 PUSCH included in the RAR.

[0157] Communication nodes (e.g., base stations and / or terminals) may not follow existing rules (e.g., rules based on the initial BWP). For the RACH procedure in SBFD symbol(s), msg3 PUSCH may be set within the UL available PRB(s), and RB numbering may be based on the first PRB of the UL available PRB(s) or the first PRB of the initial BWP. The maximum number of PRBs for msg3 PUSCH may be equal to the size of the initial BWP or the size of the UL available PRB(s). The RB numbering method may be instructed to the terminal by the base station's signaling, and the terminal may perform RB numbering based on the method instructed by the base station. RB numbering may be performed as follows. One method or a combination of two or more methods below may be used for RB numbering. When RB numbering is performed based on a combination of two or more methods, the base station may transmit information about the combination of two or more methods to the terminal through signaling (e.g., SIB, RRC message). The terminal may receive information about the combination of two or more methods for RB numbering through the base station's signaling and may perform RB numbering based on said information.

[0158] ▶ RB numbering can start from the first RB of the UL available PRB(s), and the maximum number of RBs for FDRA (frequency domain resource allocation) can be equal to the number of RBs included in the UL available PRB(s).

[0159] ▶ RB numbering may start from the first RB of the UL available PRB(s), and the maximum number of RBs for the FDRA may be equal to the number of RBs included in the initial UL BWP.

[0160] ▶ RB numbering may start from the first RB of the initial UL BWP, and the maximum number of RBs for the FDRA may be equal to the number of RBs included in the UL available PRB(s).

[0161] ■ Method #3-1

[0162] For the RACH procedure in the SBFD symbol(s), the minimum number of PRBs required for msg3 PUSCH setup by RAR may be defined (e.g., set, instructed), and the operations of the terminal and the base station may be performed differently based on the minimum number of PRBs. The minimum number of PRBs may be compared to the overlapping frequency range between the initial UL BWP and the UL subband or the overlapping frequency range between the active UL BWP and the UL subband. If the overlapping frequency range is greater than the minimum number of PRBs, the base station may expect to set msg3 PUSCH resources in a frequency range equal to the minimum number of PRBs, starting from the lowest PRB (e.g., the first PRB) of the initial UL BWP or the active UL BWP, and the terminal may expect msg3 PUSCH resources to be set in a frequency range equal to the minimum number of PRBs, starting from the lowest PRB (e.g., the first PRB) of the initial UL BWP or the active UL BWP. The terminal can transmit msg3 to the base station from the configured msg3 PUSCH resource, and the base station can receive msg3 from the terminal from the configured msg3 PUSCH resource.

[0163] If the overlapping frequency domain is smaller than the minimum number of PRBs, the terminal can expect not to perform all or part of the RACH procedure in the SBFD symbol(s). The minimum number of PRBs may be a criterion for determining whether to allow msg3 PUSCH transmission in the SBFD symbol(s). The minimum number of PRBs may be a fixed value. Alternatively, the base station may transmit information regarding the minimum number of PRBs to the terminal via signaling (e.g., SIB, RRC message). The terminal can check the minimum number of PRBs through the base station's signaling.

[0164] ■ Method #3-2

[0165] Depending on the configuration of the UL subband, the available resources for msg3 PUSCH transmission may be limited. To address the aforementioned problem, even if the active UL BWP includes the initial UL BWP and the SCS and CP lengths are the same in the active UL BWP and the initial UL BWP, the terminal can expect msg3 PUSCH transmission to be performed within the UL available PRB(s) other than the initial UL BWP. To support msg3 PUSCH transmission within the UL available PRB(s) other than the initial UL BWP, the base station may transmit a RAR to the terminal containing information on the msg3 PUSCH resources configured within the UL available PRB(s). msg3 PUSCH may be configured based on the first PRB of the UL available PRB(s). PRB numbering (e.g., RB numbering for msg3 PUSCH) may be performed based on the lowest PRB (e.g., the first PRB) of the initial UL BWP. Alternatively, PRB numbering may be performed based on the lowest PRB (e.g., the first PRB) of the overlapping frequency range between the initial UL BWP and the UL subband. Alternatively, PRB numbering may be performed based on the lowest PRB (e.g., the first PRB) of the active UL BWP. Alternatively, PRB numbering may be performed based on the lowest PRB (e.g., the first PRB) of the overlapping frequency range between the active UL BWP and the UL subband. The size of the msg3 PUSCH resource may be set to be equal to the size of the initial BWP, taking into account legacy terminals, reduction of scheduling overhead, etc.

[0166] ■ Method #4

[0167] UL available PRB(s) can be determined based on the relationship between the active UL BWP and the UL subband. In the embodiments of FIGS. 11a and 11b, since the initial UL BWP must be considered as well as the UL available PRB(s) determined in the manner described above, problems may arise where the frequency domain calculation becomes complex and the frequency domain becomes narrow. If the active UL BWP includes the initial UL BWP, the SCS and CP lengths are the same in the active UL BWP and the initial UL BWP, and the UL subband includes the initial UL BWP, it may be permitted for the terminal to perform msg3 PUSCH transmission in the initial UL BWP. In other words, in the above case, the msg3 PUSCH resource can be set within the initial UL BWP. The base station may transmit a msg2 to the terminal containing setting information (e.g., UL grant) of the msg3 PUSCH resource set within the initial UL BWP. The terminal can receive msg2 from the base station, identify the msg3 PUSCH resource indicated by the UL grant included in msg2, and transmit msg3 from the msg3 PUSCH resource to the base station.

[0168] If the UL subband does not include the entire initial UL BWP, the terminal may perform msg3 PUSCH transmission on the UL available PRB(s). In other words, the UL available PRB(s) may be configured as msg3 PUSCH resources. For an SBFD terminal, the UL available PRB(s) may include the initial UL BWP, and RB numbering may start from the initial UL BWP or the lowest PRB (e.g., the first PRB) in the overlapping frequency range between the initial UL BWP and the UL subband. An explicit method for the BWP may be specified.

[0169] The resource areas considered to determine the UL available PRB(s) (e.g., the overlapping frequency area between the UL subband and the active UL BWP, the overlapping frequency area between the UL subband and the initial UL BWP) may be defined in the technical specifications. Alternatively, the base station may transmit information about the resource areas considered to determine the UL available PRB(s) to the terminal via signaling (e.g., SIB, RRC settings). The terminal may identify the resource areas considered to determine the UL available PRB(s) through the base station's signaling.

[0170] The first PRB numbering may be the lowest PRB of the active UL BWP (e.g., the first PRB). Alternatively, the first PRB numbering may be the lowest PRB of the overlapping frequency range between the active UL BWP and the UL subband (e.g., the first PRB). Alternatively, the first PRB numbering may be the lowest PRB of the initial UL BWP (e.g., the first PRB). Or, the first PRB numbering may be the lowest PRB of the overlapping frequency range between the initial UL BWP and the UL subband (e.g., the first PRB). The size of the msg3 PUSCH resource may be set to be equal to the size of the initial BWP, taking into account legacy terminals, reduction of scheduling overhead, etc.

[0171] ■ Method #5

[0172] The initial BWP and UL subbands may be configured cell-specifically. The base station may configure (e.g., instruct) the UL subband to the terminal so that the aforementioned problem does not occur. The terminal may expect not to receive the configuration of the UL subband that may cause the aforementioned problem. In other words, the base station may configure the initial BWP and / or UL subband to the terminal so that the UL subband sufficiently overlaps with the initial BWP.

[0173] [When there are no overlapping resources between the initial UL BWP and the UL subband in the frequency domain]

[0174] ■ Method #6

[0175] Unlike N-SBFD terminals, SBFD terminals can expect to receive configuration information for msg3 PUSCH resources from the base station to perform msg3 PUSCH transmission within UL available PRB(s) rather than the initial BWP. The first PRB of msg3 PUSCH may be the first PRB of the UL available PRB(s). The size of msg3 PUSCH may be the same as the size of the initial BWP or the UL available PRB(s).

[0176] If the active UL BWP includes the initial BWP, and the SCS and CP lengths are the same in the active UL BWP and the initial BWP, it can be expected that a msg3 PUSCH transmission is performed within the initial BWP. The above-described operation may be an existing rule. Based on the existing rule and the definition of the UL available PRB(s), the terminal can be expected not to perform a RACH procedure in SBFD symbol(s) and may perform a RACH procedure within the initial BWP of N-SBFD symbol(s). Frequency resource allocation for the msg3 PUSCH within the initial BWP may follow an existing rule (e.g., a rule for N-SBFD terminals).

[0177] Meanwhile, if an RRC connected terminal (e.g., an SBFD terminal operating in RRC connected mode) performs an operation based on whether there is an overlap between the initial UL BWP and the UL subband in the frequency domain (e.g., methods #3 to #6), the complexity of the communication system may increase. Accordingly, the RRC connected terminal can perform msg3 PUSCH transmission based on the following method.

[0178] ■ Method #7

[0179] If a fallback is requested at the initial BWP, the SBFD terminal may be expected to perform a msg3 transmission (e.g., a msg3 PUSCH transmission) on N-SBFD symbol(s) rather than SBFD symbol(s). The above embodiment may include the N-SBFD terminal performing a msg3 transmission in a communication system that supports TDD. Just as the N-SBFD terminal expects a msg3 transmission at the initial BWP, the RRC connected terminal may be expected to perform part or all of the RACH procedure at the UL available PRB(s) being used for UL communication. The RACH procedure may include a msg3 transmission.

[0180] Meanwhile, the terminal may not perform uplink transmission outside of the UL available PRB(s). Frequency resources of the UL subband within the active UL BWP may be defined as UL available PRB(s), and frequency resources of the DL subband within the active DL BWP may be defined as DL available PRB(s).

[0181] Transmit and receive operations of an SBFD terminal in an SBFD symbol configured as DL and / or FL (flexible) by TDD-UL-DL-ConfigCommon can be performed as follows.

[0182] - UL transmission within UL-available PRB(s) may be allowed.

[0183] - DL reception within DL-available PRB(s) may be allowed.

[0184] - Uplink transmission outside of UL available PRB(s) may not be allowed.

[0185] - Downlink reception outside of DL-available PRB(s) may not be allowed.

[0186] ○ The aforementioned limitations may not apply to cross-link interference (CLI) measurements.

[0187] The SBFD terminal can perform CLI measurement operations. The operation of the SBFD terminal on an SBFD symbol can be performed in consideration of the interaction with legacy TDD slot configuration instructions via SFI of TDD-UL-DL-ConfigDedicated and DCI format 2_0. DCI format 2_0 may not be used to convert an SBFD symbol back to an N-SBFD symbol. Alternatively, DCI format 2_0 may be used to convert an SBFD symbol back to an N-SBFD symbol.

[0188] With respect to the FDRA for Msg3, the active UL BWP and the initial UL BWP may have the same SCS and the same CP length. If the active UL BWP contains all RBs of the initial UL BWP, the initial UL BWP may be used based on the technical specifications.

[0189] If useInterlacePUCCH-PUSCH is not provided in BWP-UplinkCommon and BWP-UplinkDedicated, the following may apply to determine the FDRA for PUSCH transmission within the active UL BWP.

[0190] - The active UL BWP and the initial UL BWP may have the same SCS and the same CP length. If the active UL BWP contains all RBs of the initial UL BWP, or if the active UL BWP is the initial UL BWP, the initial UL BWP may be used.

[0191] - Otherwise, RB numbering can start from the first RB of the active UL BWP, and the maximum number of RBs for the FDRA can be set to be equal to the number of RBs of the initial UL BWP.

[0192] Figure 12 is a conceptual diagram illustrating an FDRA for a PUSCH scheduled by a RAR.

[0193] Referring to Fig. 12, the SCS and CP lengths may differ between the active UL BWP and the initial UL BWP. The maximum number of RBs for the FDRA may be smaller than the number of RBs in the initial UL BWP.

[0194] Depending on the position of the UL subband in the frequency domain, the maximum number of RBs for the FDRA of msg3 may be smaller than the number of RBs of the initial UL BWP.

[0195] Considering the possibility that the base station may perform configuration operations without being fully aware of these potential problems, the following options may be applied.

[0196] - Option #1: The SBFD terminal may not expect to transmit msg3 in the SBFD symbol.

[0197] - Option #2: The SBFD terminal may not expect a UL subband to be configured such that the maximum number of RBs for the FDRA of msg3 is smaller than the number of RBs of the initial UL BWP.

[0198] It may occur where the maximum number of RBs for msg3 transmission becomes smaller than the number of RBs of the initial BWP. In this case, one of the following options may be supported.

[0199] - Option #1: If the maximum number of RBs for the FDRA of msg3 is smaller than the number of RBs of the initial UL BWP, the SBFD terminal may not expect to transmit msg3 in the SBFD symbol.

[0200] - Option #2: The SBFD terminal may not expect a UL subband to be configured such that the maximum number of RBs for the FDRA of msg3 is smaller than the number of RBs of the initial UL BWP.

[0201] Each of the proposals of the present disclosure may be applied independently. Or a combination of the proposals of the present disclosure may be applied. Some proposals of the present disclosure may be applied to other proposals. Each of the options of the present disclosure may be applied independently. Or a combination of the options of the present disclosure may be applied. Some options of the present disclosure may be applied to other options. The proposals and / or options of the present disclosure may be applied regardless of the RRC state of the terminal. For example, a terminal in an RRC idle state, a terminal in an RRC inactive state, and / or a terminal in an RRC connected state may perform the proposals and / or options of the present disclosure. A base station may perform the proposals and / or options of the present disclosure for a terminal in an RRC idle state, a terminal in an RRC inactive state, and / or a terminal in an RRC connected state.

[0202] The channels / signals to which the proposals of the present disclosure apply may not be limited to specific channels / signals. In other words, the proposals of the present disclosure may be applied identically or similarly to all channels / signals (e.g., all uplink channels, all uplink signals, all downlink channels, all downlink signals). The proposals of the present disclosure may be extended to various RA procedures (e.g., two-stage RA procedures, RA procedures proposed in 6G communication systems) as well as four-stage RA procedures. The names of messages in RA procedures may be described differently.

[0203] The operation of the method according to the present disclosure can be implemented as a computer-readable program or code on a computer-readable recording medium. A computer-readable recording medium includes any type of recording device in which information that can be read by a computer system is stored. Additionally, a computer-readable recording medium may be distributed across networked computer systems, allowing the computer-readable program or code to be stored and executed in a distributed manner.

[0204] In addition, computer-readable recording media may include hardware devices specifically configured to store and execute program instructions, such as ROM, RAM, and flash memory. Program instructions may include machine code, such as that generated by a compiler, as well as high-level language code that can be executed by a computer using an interpreter, etc.

[0205] Some aspects of the present disclosure have been described in the context of a device, but may also be described according to a corresponding method, wherein a block or device corresponds to a method step or a feature of a method step. Similarly, aspects described in the context of a method may also be described according to a corresponding block or item or a feature of a corresponding device. Some or all of the method steps may be performed by (or using) a hardware device, such as, for example, a microprocessor, a programmable computer, or an electronic circuit. In some embodiments, at least one of the most important method steps may be performed by such a device.

[0206] A programmable logic device (e.g., a field-programmable gate array) may be used to perform some or all of the functions of the methods described in this disclosure. A field-programmable gate array may operate with a microprocessor to perform one of the methods described in this disclosure. Generally, it is preferable that the methods be performed by some hardware device.

[0207] Although the present disclosure has been described with reference to preferred embodiments, those skilled in the art will understand that various modifications and changes can be made to the present disclosure without departing from the spirit and scope of the present disclosure as set forth in the following claims.

Claims

1. As a method of UE (user equipment), Step of transmitting msg1 to the base station; A step of receiving msg2 from the base station in response to the above msg1; and The method includes the step of transmitting msg3 to the base station in a PUSCH (physical uplink shared channel) resource indicated by a UL (uplink) grant included in the msg2, and The above PUSCH resource is determined based on the initial BWP (bandwidth part), active BWP, and UL subband configuration status, and the UL subband is based on the SBFD (subband full duplex) configuration, UE's method.

2. In Claim 1, Based on the fact that the overlapping frequency region between the active BWP and the UL subband is smaller than the initial BWP, the PUSCH resource is determined based on the maximum size of the initial BWP, UE's method.

3. In Claim 1, The minimum number of physical resource blocks (PRBs) of the above PUSCH resource is set, and the frequency range from the lowest PRB of the initial BWP or the active BWP up to the minimum number of PRBs is determined as the above PUSCH resource. UE's method.

4. In Claim 1, Based on the fact that the active BWP includes the initial BWP, the subcarrier spacing (SCS) of the active BWP is the same as the SCS of the initial BWP, and the cyclic prefix (CP) length of the active BWP is the same as the CP length of the initial BWP, the PUSCH resource is set within the initial BWP or UL available PRBs. UE's method.

5. In Claim 4, Based on the fact that the above PUSCH resource is set within the above UL available PRBs, the above PUSCH resource is set based on the first PRB of the above UL available PRBs, UE's method.

6. In Claim 4, Based on the fact that the above PUSCH resource is set within the above UL available PRBs, PRB numbering for the above PUSCH resource is performed based on the lowest PRB of the initial BWP, the lowest PRB of the active BWP, the lowest PRB of the overlapping frequency range between the initial BWP and the UL subband, or the lowest PRB of the overlapping frequency range between the active BWP and the UL subband, UE's method.

7. In Claim 1, Based on the existence of at least one of the following states: the SCS of the active BWP is different from the SCS of the initial BWP, the CP length of the active BWP is different from the CP length of the initial BWP, the active BWP does not include the initial BWP, or the active BWP is different from the initial BWP, the PUSCH resource is determined based on the lowest PRB of the active BWP. UE's method.

8. In Claim 1, Based on the fact that the active BWP includes the initial BWP, the SCS of the active BWP is the same as the SCS of the initial BWP, the CP length of the active BWP is the same as the CP length of the initial BWP, and the UL subband includes the initial BWP, the PUSCH resource is set within the initial BWP, UE's method.

9. As a method of base stations, Step of receiving msg1 from UE (user equipment); The step of transmitting to the UE, in response to the above msg1, a msg2 including a UL grant indicating a PUSCH (physical uplink shared channel) resource determined based on the configuration status of the initial BWP (bandwidth part), active BWP, and UL (uplink) subband; and The method includes the step of receiving msg3 from the UE in the above PUSCH resource, and The above UL subband is based on SBFD (subband full duplex) settings, Base station method.

10. In Claim 9, Based on the fact that the overlapping frequency region between the active BWP and the UL subband is smaller than the initial BWP, the PUSCH resource is determined based on the maximum size of the initial BWP, Base station method.

11. In Claim 9, The minimum number of physical resource blocks (PRBs) of the above PUSCH resource is set, and the frequency range from the lowest PRB of the initial BWP or the active BWP up to the minimum number of PRBs is determined as the above PUSCH resource. Base station method.

12. In Claim 9, Based on the fact that the active BWP includes the initial BWP, the subcarrier spacing (SCS) of the active BWP is the same as the SCS of the initial BWP, and the cyclic prefix (CP) length of the active BWP is the same as the CP length of the initial BWP, the PUSCH resource is set within the initial BWP or UL available PRBs. Base station method.

13. In Claim 12, Based on the fact that the above PUSCH resource is set within the above UL available PRBs, the above PUSCH resource is set based on the first PRB of the above UL available PRBs, Base station method.

14. In Claim 12, Based on the fact that the above PUSCH resource is set within the above UL available PRBs, PRB numbering for the above PUSCH resource is performed based on the lowest PRB of the initial BWP, the lowest PRB of the active BWP, the lowest PRB of the overlapping frequency range between the initial BWP and the UL subband, or the lowest PRB of the overlapping frequency range between the active BWP and the UL subband, Base station method.

15. In Claim 9, Based on the existence of at least one of the following states: the SCS of the active BWP is different from the SCS of the initial BWP, the CP length of the active BWP is different from the CP length of the initial BWP, the active BWP does not include the initial BWP, or the active BWP is different from the initial BWP, the PUSCH resource is determined based on the lowest PRB of the active BWP. Base station method.

16. In Claim 9, Based on the fact that the active BWP includes the initial BWP, the SCS of the active BWP is the same as the SCS of the initial BWP, the CP length of the active BWP is the same as the CP length of the initial BWP, and the UL subband includes the initial BWP, the PUSCH resource is set within the initial BWP, Base station method.

17. As UE (user equipment), It includes at least one processor, The above at least one processor is the UE, Transmit msg1 to the base station; Receive msg2 from the base station in response to the above msg1; and Causing msg3 to be transmitted to the base station from the PUSCH (physical uplink shared channel) resource indicated by the UL (uplink) grant included in the above msg2, and The above PUSCH resource is determined based on the initial BWP (bandwidth part), active BWP, and UL subband configuration status, and the UL subband is based on the SBFD (subband full duplex) configuration, UE.

18. In Claim 17, Based on the fact that the overlapping frequency region between the active BWP and the UL subband is smaller than the initial BWP, the PUSCH resource is determined based on the maximum size of the initial BWP, UE.

19. In Claim 17, The minimum number of physical resource blocks (PRBs) of the above PUSCH resource is set, and the frequency range from the lowest PRB of the initial BWP or the active BWP up to the minimum number of PRBs is determined as the above PUSCH resource. UE.

20. In Claim 17, Based on the fact that the active BWP includes the initial BWP, the subcarrier spacing (SCS) of the active BWP is the same as the SCS of the initial BWP, and the cyclic prefix (CP) length of the active BWP is the same as the CP length of the initial BWP, the PUSCH resource is set within the initial BWP or UL available PRBs. UE.